ATV PROJECTS INDIA LTD. MATHURA DYE PENETRENT TEST REPORT Ref. No.-ATV/QA/F/05 Rev-0 Customer name M/S-FLSmidth pvt. Ltd. Report No. ATV/QC/13/458B Project name N.A. Testing Date 06.08.2013 Order No. N.A. Drawing No. N.A. Component name N.A. Material & Grade SA 516 GR. 70 (H. NO. 156016) Component part TEST PIECE (30X300X350) W-04+ W-24 Area Examined DP carried out on weld joint after back chip Stage After Welding(WELDER QUALIFICATION) APPLICABLE CODE/SPECIFICATION REFERENCE STANDARD: ASME SEC-V ARTICLE-6 ACCEPTANCE STANDARD: ASME SEC-VIII DIV.I APPENDIX-8 QAP NO.- N.A. TEST DETAIL Material used MAKE MODAL BATCH NO. Test method Solvent removal method Cleaner type CHEKMAT E CL -96 Cl-C-01- 234 DWELL time 12 Minutes Penetrate type CHEKMAT E PT-97 Cl-P-01- 229 Developing time 15 Minutes Developer Type CHEKMAT E DV-98 Cl-D-01- 230 Surface condition Free from dust & Greece Final inspection After 20 Minutes Observation No defective indications were observed. Result Accepted.

description

dp

Transcript of Dp Report Mk

ATV PROJECTS INDIA LTD. MATHURA

DYE PENETRENT TEST REPORT Ref. No.-ATV/QA/F/05 Rev-0

Customer name

M/S-FLSmidth pvt. Ltd.

Report No.

ATV/QC/13/458B

Project name

N.A.

Testing Date

06.08.2013

Order No.

N.A.

Drawing No.

N.A.

Component name

N.A.

Material & Grade

SA 516 GR. 70 (H. NO. 156016)

Component part

TEST PIECE (30X300X350) W-04+ W-24

Area Examined

DP carried out on weld joint after back chip

Stage

After Welding(WELDER QUALIFICATION)

APPLICABLE CODE/SPECIFICATION

REFERENCE STANDARD: ASME SEC-V ARTICLE-6

ACCEPTANCE STANDARD: ASME SEC-VIII DIV.I APPENDIX-8

QAP NO.- N.A.

TEST DETAIL

Material used

MAKE

MODAL

BATCH NO.

Test method

Solvent removal method

Cleaner type

CHEKMATE

CL -96

Cl-C-01-234

DWELL time

12 Minutes

Penetrate type

CHEKMATE

PT-97

Cl-P-01-229

Developing time

15 Minutes

Developer Type

CHEKMATE

DV-98

Cl-D-01-230

Surface condition

Free from dust & Greece

Final inspection

After 20 Minutes

Observation

No defective indications were observed.

Result

Accepted.

APPROVED BY

INSPECTED BY

(Signature of Inspection Authority)