Downtime Minimization Capabilities of SUM

25
7/23/2019 Downtime Minimization Capabilities of SUM http://slidepdf.com/reader/full/downtime-minimization-capabilities-of-sum 1/25 Martin Herrmann, Product Management Cloud & Lifecycle Management SUM SL Toolset SP12 Downtime Minimization Capabilities of

Transcript of Downtime Minimization Capabilities of SUM

Page 1: Downtime Minimization Capabilities of SUM

7/23/2019 Downtime Minimization Capabilities of SUM

http://slidepdf.com/reader/full/downtime-minimization-capabilities-of-sum 1/25

Martin Herrmann, Product Management Cloud & Lifecycle Management

SUM SL Toolset SP12

Downtime Minimization Capabilities of

Page 2: Downtime Minimization Capabilities of SUM

7/23/2019 Downtime Minimization Capabilities of SUM

http://slidepdf.com/reader/full/downtime-minimization-capabilities-of-sum 2/25

© 2014 SAP AG. All rights reserved. This presentation and SAP‘s strategy and possible future developments are subject to change and may be changed by SAP at any time for any reason without notice. Thiswarranty of any kind, either express or implied, including but not limited to, the implied warranties of merchantability, fitness for a particular purpose, or non-infringement

The information in this presentation is confidential and proprietary to SAP and may not be disclose

permission of SAP. This presentation is not subject to your license agreement or any other serviceagreement with SAP. SAP has no obligation to pursue any course of business outlined in this doc

presentation, or to develop or release any functionality mentioned therein. This document, or any

and SAP's strategy and possible future developments, products and or platforms directions and fu

subject to change and may be changed by SAP at any time for any reason without notice. The inf

document is not a commitment, promise or legal obligation to deliver any material, code or functio

document is provided without a warranty of any kind, either express or implied, including but not li

warranties of merchantability, fitness for a particular purpose, or non-infringement. This documen

purposes and may not be incorporated into a contract. SAP assumes no responsibility for errors o

document, except if such damages were caused by SAP´s willful misconduct or gross negligence

 All forward-looking statements are subject to various risks and uncertainties that could cause actu

materially from expectations. Readers are cautioned not to place undue reliance on these forward

which speak only as of their dates, and they should not be relied upon in making purchasing decis

Legal disclaimer

Page 3: Downtime Minimization Capabilities of SUM

7/23/2019 Downtime Minimization Capabilities of SUM

http://slidepdf.com/reader/full/downtime-minimization-capabilities-of-sum 3/25

© 2014 SAP AG. All rights reserved. This presentation and SAP‘s strategy and possible future developments are subject to change and may be changed by SAP at any time for any reason without notice. Thiswarranty of any kind, either express or implied, including but not limited to, the implied warranties of merchantability, fitness for a particular purpose, or non-infringement

Minimization of downtime is business critical

Page 4: Downtime Minimization Capabilities of SUM

7/23/2019 Downtime Minimization Capabilities of SUM

http://slidepdf.com/reader/full/downtime-minimization-capabilities-of-sum 4/25

© 2014 SAP AG. All rights reserved. This presentation and SAP‘s strategy and possible future developments are subject to change and may be changed by SAP at any time for any reason without notice. Thiswarranty of any kind, either express or implied, including but not limited to, the implied warranties of merchantability, fitness for a particular purpose, or non-infringement

SUM is the  tool: target system releases

Upgrade, EHPs, SPs for target releases

SAP Business Suite 7 Innovations 2011

SAP NetWeaver 7.3 and higher

EHPs and SPs for target releases

SAP Business Suite 7 Innovations 2010

SAP NetWeaver Process Integration (PI)

SAP NetWeaver CE, MI 7.1 and above

Example: SAP ERP 6

7.0 7.01 7.02SAP BASIS

04 7.0SAP NetWeaver

4.6C…6.40 

7.0 EHP27.0 EHP1

SAP ERP 6.0SAP ERP 6.0 EHP 1

SAP ERP 6.0 EHP 2

Bottom line versio

relevant for ABA

R/3 4.6C & 4.7

BASIS 4.6D

SAP ERP 5.0

SAP BusinessSuite (BS) 7

SAP BS 7Innovations 2010

SAInnova

No path to

EHP 6H

EHP5

EHP4

EHP3

 Ap

Up

Using SUM f

Page 5: Downtime Minimization Capabilities of SUM

7/23/2019 Downtime Minimization Capabilities of SUM

http://slidepdf.com/reader/full/downtime-minimization-capabilities-of-sum 5/25© 2014 SAP AG. All rights reserved. This presentation and SAP‘s strategy and possible future developments are subject to change and may be changed by SAP at any time for any reason without notice. Thiswarranty of any kind, either express or implied, including but not limited to, the implied warranties of merchantability, fitness for a particular purpose, or non-infringement

Basic concept regarding downtime minimization capabi

SUM

SUM replaces tools

for upgrade, update, and implementing SPs.

Consolidated to SP StacksSAP EHPs

UP

Software

Update Manager

SAPehpi

SAPup

Upgrade

ABAP

ABAP

SAP EHPsSPS

UP

For maintenance activities that are supported

the usage of the substituted tool is no longer

starting Q1/2013 (except for SPAM

see SAP Note 1589311.

Page 6: Downtime Minimization Capabilities of SUM

7/23/2019 Downtime Minimization Capabilities of SUM

http://slidepdf.com/reader/full/downtime-minimization-capabilities-of-sum 6/25© 2014 SAP AG. All rights reserved. This presentation and SAP‘s strategy and possible future developments are subject to change and may be changed by SAP at any time for any reason without notice. Thiswarranty of any kind, either express or implied, including but not limited to, the implied warranties of merchantability, fitness for a particular purpose, or non-infringement

Business criticality of downtime for SAP systems

Version 1as-isprocedure

business downtimeproductive use

cool downsystem maintenance by

Software Update Manager

(SUM)

tests /

verification

r

Minimizing the planned business do

is in focus

of downtime minimization capabilitie

cust.

trsp.

technical downtime

Page 7: Downtime Minimization Capabilities of SUM

7/23/2019 Downtime Minimization Capabilities of SUM

http://slidepdf.com/reader/full/downtime-minimization-capabilities-of-sum 7/25© 2014 SAP AG. All rights reserved. This presentation and SAP‘s strategy and possible future developments are subject to change and may be changed by SAP at any time for any reason without notice. Thiswarranty of any kind, either express or implied, including but not limited to, the implied warranties of merchantability, fitness for a particular purpose, or non-infringement

Downtime minimization capabilities of SUM for ABAP ba

systems

• Parallel operation of production system and shadow system

• Import of the substitution set into the shadow tables during

operation (extended shadow) enables the following in uptim

 –Activation ABAP loads (SGEN)

near-Zero Downtime Maintenance (nZDM)

Customer transports import (available on request, s

TODAY

Page 8: Downtime Minimization Capabilities of SUM

7/23/2019 Downtime Minimization Capabilities of SUM

http://slidepdf.com/reader/full/downtime-minimization-capabilities-of-sum 8/25© 2014 SAP AG. All rights reserved. This presentation and SAP‘s strategy and possible future developments are subject to change and may be changed by SAP at any time for any reason without notice. Thiswarranty of any kind, either express or implied, including but not limited to, the implied warranties of merchantability, fitness for a particular purpose, or non-infringement

Configuration to minimize downtime

Page 9: Downtime Minimization Capabilities of SUM

7/23/2019 Downtime Minimization Capabilities of SUM

http://slidepdf.com/reader/full/downtime-minimization-capabilities-of-sum 9/25© 2014 SAP AG. All rights reserved.

This presentation and SAP‘s strategy and possible future developments are subject to change and may be changed by SAP at any time for any reason without notice. Thiswarranty of any kind, either express or implied, including but not limited to, the implied warranties of merchantability, fitness for a particular purpose, or non-infringement

Focus on downtime minimization in SUMBig picture

Uptime

Installation

preparation

SUM

standardmode 

Uptime

Shadow

operation

Business Downtime

SUM

advanced

mode

Extendedshadow

operation

Business Downtime

Installation

preparationShadow

operation

Savings of

40-60% Savings

app. 50%

obsolete

SGENTechnicaldowntime

(system update)

 

    

Customer

transports.,add-ons,...

 S  y s t   em

 c o ol  

 d  own

 

Technical

downtime

(system update +

custom transports)

T  e s t   & 

v er i  f  i   c

 a t  i   on

 S  y s t   em

r  am

 p u p

 S  y s t   em

 c o ol  

 d  own

Page 10: Downtime Minimization Capabilities of SUM

7/23/2019 Downtime Minimization Capabilities of SUM

http://slidepdf.com/reader/full/downtime-minimization-capabilities-of-sum 10/25© 2014 SAP AG. All rights reserved.

This presentation and SAP‘s strategy and possible future developments are subject to change and may be changed by SAP at any time for any reason without notice. Thiswarranty of any kind, either express or implied, including but not limited to, the implied warranties of merchantability, fitness for a particular purpose, or non-infringement

Downtime minimization for AIMs and SGEN

Uptime

 C  onv er  si   on ,

m ai  ni  m p or  t   ,X P RA’   s

V  al  i   d  a t  i   on

R am p u p

 C  o ol   d  own

Shadow operation

Business Downtime

R e p o si   t   or  y

 o b  j   e c t   s

 

AI  M

 s

 S wi   t   ch 

P  o s t  - pr  o c e s si  n g

N onr  e p o si   t   or  y

 o b  j   e c t   s

 C  u s t  ..X P RA’   s ,AI  M s

Customer trsp.

 S  GE N

Minimumdowntime

Move the most intensive time consumingAIMs to shadow

Optional parameter to run SGEN in Sha

Page 11: Downtime Minimization Capabilities of SUM

7/23/2019 Downtime Minimization Capabilities of SUM

http://slidepdf.com/reader/full/downtime-minimization-capabilities-of-sum 11/25

© 2014 SAP AG. All rights reserved. This presentation and SAP‘s strategy and possible future developments are subject to change and may be changed by SAP at any time for any reason without notice. Thiswarranty of any kind, either express or implied, including but not limited to, the implied warranties of merchantability, fitness for a particular purpose, or non-infringement

Downtime minimization capabilities of SUMQuick facts: near-Zero Downtime Maintenance (nZDM) feature of SUM 

This feature enables the main import running in the shadow during

business downtime significantly by using the shadow instance for

Technical details:

Record & Replay technique for business transactions based

technology to ensure synchronization between shadow and pro

Minimizes manual effort:

all steps run automatically in background

needed tables are selected automatically

Minimal additional hardware requirement due to shadow-tec

DB space is independent from system size

only some additional DB space needed (80 – 350 GB)

Is available for all ABAP-based Business Suite products and

Integration (dual-stack)

SCN: DOC-32544 

Page 12: Downtime Minimization Capabilities of SUM

7/23/2019 Downtime Minimization Capabilities of SUM

http://slidepdf.com/reader/full/downtime-minimization-capabilities-of-sum 12/25

© 2014 SAP AG. All rights reserved. This presentation and SAP‘s strategy and possible future developments are subject to change and may be changed by SAP at any time for any reason without notice. Thiswarranty of any kind, either express or implied, including but not limited to, the implied warranties of merchantability, fitness for a particular purpose, or non-infringement

Maintenance downtime improvements realized with nZDReference customer example (SAP ERP system, EHP update)

EHPInstaller

(Feb. 2012)

Cool downValidation &

ramp up

2:00 h

SUM withnZDM

(July 2012)

SUM withnZDM

(July 2013)

Cool down Technical downtime Transports &

manual steps

Validation &

ramp up

2:45 h 9:00 h 4:30 h 2:00 h

Technical

downtime

Transports

&

manual steps

Cool down Technical 

downtime

2:45 h

Transports

&

manual steps

2:15 h

Validation &

ramp up

2:00 h

2:45 h

2:45 h

11:15 h

9:45 h

4:00 h 2:30 h

Business Downtime

Business Downtime

Business Downtime

Page 13: Downtime Minimization Capabilities of SUM

7/23/2019 Downtime Minimization Capabilities of SUM

http://slidepdf.com/reader/full/downtime-minimization-capabilities-of-sum 13/25

© 2014 SAP AG. All rights reserved. This presentation and SAP‘s strategy and possible future developments are subject to change and may be changed by SAP at any time for any reason without notice. Thiswarranty of any kind, either express or implied, including but not limited to, the implied warranties of merchantability, fitness for a particular purpose, or non-infringement

TCO Lab Preview: nZDM for SAP ERP 6.0 EHP6

System Details:

• OS/DB: AIX/Oracle

• DB size: 1,7 TB

• System clone from a customer

Source:

ERP 6.0 SR3

Target:

ERP 6.0 with EHP6

Technical Usages:

• Central Applications

• Human Capital Management

• IS-Utilities

• Strategic Enterprise Management

Generation of ABAP loads during uptime Source: TIP Core LM TCO Lab measurements

hours

Minimum

Downtime

Overall

Uptime

5:41

2:31

Update with nZDM

Update w/o nZDM

Significant downtime reduction when using the nZDM capabilit

Software Update Manager for the Business Suite 7i2011

Page 14: Downtime Minimization Capabilities of SUM

7/23/2019 Downtime Minimization Capabilities of SUM

http://slidepdf.com/reader/full/downtime-minimization-capabilities-of-sum 14/25

© 2014 SAP AG. All rights reserved. This presentation and SAP‘s strategy and possible future developments are subject to change and may be changed by SAP at any time for any reason without notice. Thiswarranty of any kind, either express or implied, including but not limited to, the implied warranties of merchantability, fitness for a particular purpose, or non-infringement

Downtime minimization with nZDM of SUMhow it works

Uptime

Shadow

operation

Technical Downtime

• Move application tables that are touched by the upgrade/update to the shadow system (ca

• Equip them with a change recording replication (Record & Replay technique)

• DB changes in productive system during maintenance create triggers, changes are re

• Replication of DB changes: shadow instance tables are updated after the update pha

Extended shadow

operation

 S wi   t   ch 

 t   a b l   e

 s an

 d 

K er n

 el  

I  m p or  t  

 c on

 t   en

 t  

 a p pl  .T 

 a b l   e

 s

 (  T  a b i  m  UP  G )  

A d  j   u s t   c en

 t  r  al  

 S AP NW  t   a

 b l   e

 s

 (  x n c v - ph  a s  e s  )  

A d  j   u s t   a p pl  i   c

 a t  i   on

 t   a b l   e

 s

 (   p ar  c  onv  u p g )  

Conversion, main import, X

DDL 

 s

Page 15: Downtime Minimization Capabilities of SUM

7/23/2019 Downtime Minimization Capabilities of SUM

http://slidepdf.com/reader/full/downtime-minimization-capabilities-of-sum 15/25

© 2014 SAP AG. All rights reserved. This presentation and SAP‘s strategy and possible future developments are subject to change and may be changed by SAP at any time for any reason without notice. Thiswarranty of any kind, either express or implied, including but not limited to, the implied warranties of merchantability, fitness for a particular purpose, or non-infringement

Newest info + Troubleshooting nZDM

Information about:

Database/SUM SP specific restrictions

Solution (reference to guide)

Troubleshooting

note 1678564 “Restrictions, Database-specific Settings, and Troubleshooting of nZDM for SU

Page 16: Downtime Minimization Capabilities of SUM

7/23/2019 Downtime Minimization Capabilities of SUM

http://slidepdf.com/reader/full/downtime-minimization-capabilities-of-sum 16/25

© 2014 SAP AG. All rights reserved. This presentation and SAP‘s strategy and possible future developments are subject to change and may be changed by SAP at any time for any reason without notice. Thiswarranty of any kind, either express or implied, including but not limited to, the implied warranties of merchantability, fitness for a particular purpose, or non-infringement

Quick facts: import customer transports in SUM 

Technical details:

All customer transports are considered, incl. SPAU & A

Depending on the transport object types, objects are auto

managed in uptime or downtime of the standard SUM m

procedure

Flexible regarding size and quantity of customer trans

No additional hardware requirement

Integration into Transport Management System (STMS), S

Change Request Management (ChaRM)

Available on request, see SAP note 1759080 

This feature integrates the customer transports in the installation procedure. The busin

reduced significantly by using the shadow instance for certain customer transport obje

SCN blog:

customer transports import 

Page 17: Downtime Minimization Capabilities of SUM

7/23/2019 Downtime Minimization Capabilities of SUM

http://slidepdf.com/reader/full/downtime-minimization-capabilities-of-sum 17/25

© 2014 SAP AG. All rights reserved. This presentation and SAP‘s strategy and possible future developments are subject to change and may be changed by SAP at any time for any reason without notice. Thiswarranty of any kind, either express or implied, including but not limited to, the implied warranties of merchantability, fitness for a particular purpose, or non-infringement

Import Customer transports to SUMHow it works 

Customer tra

not enabled to

are integrate

SUM downtim

Customer transport objects

enabled to run in uptime

are integrated into the

shadow operations

Uptime Business Downtime

T  e s t   & v

 er i  f  i   c

 a t  i   on

 S  y s t   emr  am

 p u p

… 

Shadow

operation

 C  u s t   om

 er 

 r  e p o si   t   or  y

 o b  j   e c t   s

 

P  o s t  - pr  o

 c e s si  n

 g

 C  u s t   om

 er 

n onr  e

 p o si   t   or  y

 o b  j   e c t   s

 C  u s t   om er X P RA’   s ,AI  M s

Mi  ni  m

 um

 d  own

 t  i  m e

Cust. transportsTechnical

downtime

Page 18: Downtime Minimization Capabilities of SUM

7/23/2019 Downtime Minimization Capabilities of SUM

http://slidepdf.com/reader/full/downtime-minimization-capabilities-of-sum 18/25

© 2014 SAP AG. All rights reserved. This presentation and SAP‘s strategy and possible future developments are subject to change and may be changed by SAP at any time for any reason without notice. Thiswarranty of any kind, either express or implied, including but not limited to, the implied warranties of merchantability, fitness for a particular purpose, or non-infringement

How to identify shadow enabled customer transport ord

Based on a white list approach the transport orders are checked :

Objects with object type listed in the white list are moved to shadow instance White list currently contains about 100 entries of objects types

Examples for shadow enabled objects

 – Dictionary objects (e.g. tables, view types, search help),

 – ABAP objects (e.g. classes, programs, screens)

Examples for objects transported in downtime

 – Roles,

 – Authority objects,

 – Forms,

 – Customizing Uptime

b

Page 19: Downtime Minimization Capabilities of SUM

7/23/2019 Downtime Minimization Capabilities of SUM

http://slidepdf.com/reader/full/downtime-minimization-capabilities-of-sum 19/25

© 2014 SAP AG. All rights reserved. This presentation and SAP‘s strategy and possible future developments are subject to change and may be changed by SAP at any time for any reason without notice. Thiswarranty of any kind, either express or implied, including but not limited to, the implied warranties of merchantability, fitness for a particular purpose, or non-infringement

How to get customer transports import in SUM

Request functionality by CSS ticket

Registration is managed by SAP development team

Support by SAP Active Global Support or SAP Consulting

Close cooperation with SAP development team ensured

1-2 pre-tests recommended (planned runtime ca. 5 days forImplementation)

Combined forces from SAP Active Global Support / SAP Consu

development and the customer specialists leads to successful

Import of customer transports is available on request: see SAP note 1759080

Page 20: Downtime Minimization Capabilities of SUM

7/23/2019 Downtime Minimization Capabilities of SUM

http://slidepdf.com/reader/full/downtime-minimization-capabilities-of-sum 20/25

© 2014 SAP AG. All rights reserved. This presentation and SAP‘s strategy and possible future developments are subject to change and may be changed by SAP at any time for any reason without notice. Thiswarranty of any kind, either express or implied, including but not limited to, the implied warranties of merchantability, fitness for a particular purpose, or non-infringement

Downtime minimization capabilities of SUM for SAP Busrelease and platform coverage

Downtime minimization capabilities of SUM are available for the following standard so

activities:

Apply a Support Package on … 

... any ABAP-System with a target release based on SAP NetWeaver 7.0 Enhancement Package 2, SP8 or hig

 –  Apply Support Package 8 or higher (NW 7.02 SP8) on a SAP NetWeaver 7.0 Enhancement Package 2 syste

 –  Apply Support Package 5 or higher on a SAP ERP 6.0 Enhancement Package 5 System

 – … 

Install an Enhancement Package on top of … 

… any ABAP-System with a target release based on SAP NetWeaver 7.0 Enhancement Package 2, SP8 or hi

 – Install SAP Enhancement Package 5 on a SAP ERP 6.0 system with SAP Enhancement Package 4

 – Install SAP Enhancement Package 2 on SAP NetWeaver 7.0 (ABAP)

 – … 

Upgrade your system to … 

… any ABAP-System with a target release based on SAP NetWeaver 7.0 Enhancement Package 3 or higher, e

 – Upgrade SAP R/3 4.6C to SAP ERP 6.0 Enhancement Package 6 (SAP Business Suite 7 Innovations 2011

 –   … 

D b l f f d i i i i i

Page 21: Downtime Minimization Capabilities of SUM

7/23/2019 Downtime Minimization Capabilities of SUM

http://slidepdf.com/reader/full/downtime-minimization-capabilities-of-sum 21/25

© 2014 SAP AG. All rights reserved. This presentation and SAP‘s strategy and possible future developments are subject to change and may be changed by SAP at any time for any reason without notice. Thiswarranty of any kind, either express or implied, including but not limited to, the implied warranties of merchantability, fitness for a particular purpose, or non-infringement

Database platforms for downtime minimization

capabilities of SUM

Available for

Oracle, 10g or higher

IBM DB2 LUW, 9.7 FP4 or higher

Microsoft SQL, 2005 or higher

SAP MaxDB 7.9 or higher

IBM DB2 z/OS 10.1 or higher

SAP HANA 1.00.52 or higher

SAP Adaptive Server Enterprise (ASE) 15.7.0.103 (details see S

DB2 for IBM i 7.1 (details see SAP note 1809339)

Most current status

• for nZDM see SAP note 1678565 – “Prerequisites, Terms and Conditions for nZDM/SUM”

• For customer transports import see SAP note 1759080 – “Conditions for SUM including c

requests” 

Page 22: Downtime Minimization Capabilities of SUM

7/23/2019 Downtime Minimization Capabilities of SUM

http://slidepdf.com/reader/full/downtime-minimization-capabilities-of-sum 22/25

© 2014 SAP AG. All rights reserved. This presentation and SAP‘s strategy and possible future developments are subject to change and may be changed by SAP at any time for any reason without notice. Thiswarranty of any kind, either express or implied, including but not limited to, the implied warranties of merchantability, fitness for a particular purpose, or non-infringement

Requirements using nZDM/SUMCalculation example

 40 GB for SUM installation directory on central instance

  12 GB for Download Directory with EHP data, kernel, stack XML

~ 10 GB free space in /trans (DIR_TRANS) directory (recommended)

~ 80 GB for temporary shadow system installation

Total estimated files space requirements using SUM nZDM:

for development or test system : ~ 170 – 290 GB

for production system : ~ 220 – 490 GB

Temporary space requirements using SUM:

~ 30 – 150 GB for selected application tables which are transferred to shadow systemNote: Depends on individual customer system (selected large tables). Pre-installation anal

~ 50 – 200 GB for logging tables

Note: Depends on user workload (update, insert, delete) and active recording time of relev

Additional temporary space requirements using SUM with nZDM:

Database

and

File System

Page 23: Downtime Minimization Capabilities of SUM

7/23/2019 Downtime Minimization Capabilities of SUM

http://slidepdf.com/reader/full/downtime-minimization-capabilities-of-sum 23/25

© 2014 SAP AG. All rights reserved. This presentation and SAP‘s strategy and possible future developments are subject to change and may be changed by SAP at any time for any reason without notice. Thiswarranty of any kind, either express or implied, including but not limited to, the implied warranties of merchantability, fitness for a particular purpose, or non-infringement

Key links for more information For customers and partners 

Key links SCN

Business Continuity Community http://scn.sap.com/community/business-continuity 

Software Logistics http://scn.sap.com/community/it-management/alm/software-log

SCN Blogs

Near-Zero Downtime Maintenance for SAP

Business Suite Systems

Considering of customer transports to minimize

the downtime of SAP Business Suite updates

Settings to activate downtime minimization

capabilities in SUM Software Update Manager (SUM): introducing the

tool for software maintenance

near-Zero Downtime Maintenance 

Import customer transports 

Settings of downtime minimization capabilities 

Software Update Manager  

Key Links SAP Service Marketplace

Software Update Manager, Update Guide http://websmp201.sap-ag.de/sltoolset 

Road maps on SAP Service Marketplace http://service.sap.com/roadmap 

Page 24: Downtime Minimization Capabilities of SUM

7/23/2019 Downtime Minimization Capabilities of SUM

http://slidepdf.com/reader/full/downtime-minimization-capabilities-of-sum 24/25

Thank You!

Contact information:

Martin Herrmann

email: [email protected] 

Page 25: Downtime Minimization Capabilities of SUM

7/23/2019 Downtime Minimization Capabilities of SUM

http://slidepdf.com/reader/full/downtime-minimization-capabilities-of-sum 25/25

© 2014 SAP AG. All rights reserved. This presentation and SAP‘s strategy and possible future developments are subject to change and may be changed by SAP at any time for any reason without notice. Thiswarranty of any kind, either express or implied, including but not limited to, the implied warranties of merchantability, fitness for a particular purpose, or non-infringement

No part of this publication may be reproduced or transmitted in any form or for any purpose

without the express permission of SAP AG. The information contained herein may be

changed without prior notice.

Some software products marketed by SAP AG and its distributors contain proprietary

software components of other software vendors.

Microsoft, Windows, Excel, Outlook, and PowerPoint are registered trademarks of Microsoft

Corporation.

IBM, DB2, DB2 Universal Database, System i, System i5, System p, System p5, System x,

System z, System z10, System z9, z10, z9, iSeries, pSeries, xSeries, zSeries, eServer,

z/VM, z/OS, i5/OS, S/390, OS/390, OS/400, AS/400, S/390 Parallel Enterprise Server,

PowerVM, Power Architecture, POWER6+, POWER6, POWER5+, POWER5, POWER,

OpenPower, PowerPC, BatchPipes, BladeCenter, System Storage, GPFS, HACMP,

RETAIN, DB2 Connect, RACF, Redbooks, OS/2, Parallel Sysplex, MVS/ESA, AIX,

Intelligent Miner, WebSphere, Netfinity, Tivoli and Informix are trademarks or registered

trademarks of IBM Corporation.

Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.

 Adobe, the Adobe logo, Acrobat, PostScript, and Reader are either trademarks or

registered trademarks of Adobe Systems Incorporated in the United States and/or other

countries.

Oracle and Java are registered trademarks of Oracle and/or its affiliates.

UNIX, X/Open, OSF/1, and Motif are registered trademarks of the Open Group.

Citrix, ICA, Program Neighborhood, MetaFrame, WinFrame, VideoFrame, and MultiWin are

trademarks or registered trademarks of Citrix Systems, Inc.

 © 2014 SAP AG. All rights reserved.

HTML, XML, XHTML and W3C are trademarks or registe

Wide Web Consortium, Massachusetts Institute of Techn

SAP, R/3, SAP NetWeaver, Duet, PartnerEdge, ByDesignStreamWork, and other SAP products and services ment

respective logos are trademarks or registered trademarks

countries.

Business Objects and the Business Objects logo, Busines

Crystal Decisions, Web Intelligence, Xcelsius, and other B

services mentioned herein as well as their respective logo

trademarks of Business Objects Software Ltd. Business O

SAP company.

Sybase and Adaptive Server, iAnywhere, Sybase 365, SQ

products and services mentioned herein as well as their r

registered trademarks of Sybase, Inc. Sybase is an SAP

 All other product and service names mentioned are the tr

companies. Data contained in this document serves infor

product specifications may vary.

The information in this document is proprietary to SAP. N

reproduced, copied, or transmitted in any form or for any

written permission of SAP AG.