LAND ACQUISITION AND RESETTLEMENT PLAN Document Status: Draft May 2015 INO: Flood Management in Selected River Basins Sector Project Ciujung Dyke Construction Subproject Prepared by the Ministry of Public Works and Housing through the Directorate General of Water Resources for the Asian Development Bank.

Transcript of Download 2.56 MB

Page 1: Download 2.56 MB

LAND ACQUISITION AND RESETTLEMENT PLAN

Document Status: Draft

May 2015

INO: Flood Management in Selected River Basins Sector Project

Ciujung Dyke Construction Subproject

Prepared by the Ministry of Public Works and Housing through the Directorate General of Water Resources for the Asian Development Bank.

Page 2: Download 2.56 MB

ii

Currency Equivalents (as of 15 May 2015)

Currency unit – rupiah (Rp)

Rp1.00 = $0.00076

$1.00 = 13,159

Abbreviations

AA Appraisal Agency

ADB Asian Development Bank

AH Affected Household

AP Affected Person

BAL Basic Agrarian Law

BAPPEDA Badan Perencanaan Pembangunan Daerah (Provincial / District Development Planning Agency)

BAPPENAS Badan Perencanaan Pembangunan Nasional (National Development Planning Agency)

BPL Below The Poverty Line

BPN Badan Pertanahan Nasional (National Land Agency)

BWS Balai Wilayah Sungai (Center for River Basin)

CBFRM Community-Based Flood Risk Management

COI Corridor Of Impact

CWZ Construction Works Zone

DED Detailed Engineering Design

DGWR Directorate General of Water Resources

DMS Detailed Measurement Survey

EA Executing Agency

EIA Environmental Impact Assessment

EMA External Monitoring Agency

FMSRBP Flood Management in Selected River Basins Project

GOI Government of Indonesia

HH Household

HUP Harga Umum Pasar – general market price

IA Implementing Agency

ICWRMP Integrated Citarum Water Resources Management Investment Program

IEC Information, Education, and Communication

IFM Integrated Flood Management

IOL Inventory Of Losses

Page 3: Download 2.56 MB

iii

IP Indigenous People

IR Involuntary Resettlement

km Kilometer

LA Land Acquisition

LAIT Land Acquisition Implementation Team

LARF Land Acquisition Resettlement Framework

LARP Land Acquisition Resettlement Plan

LRP Livelihood Restoration Program

MAPPI Masyarakat Profesi Penilai Indonesia - Indonesian Professional Appraiser Association

MFF Multitranche Financing Facility

MOA Ministry of Agriculture

MOHA Ministry of Home Affairs

NJOP Nilai Jual Object Pajak (Tax object selling price)

NTP Notice To Proceed

PBHTP Biaya Perolehan Hak Atas Tanah dan Bangunan (Cost for the Acquisition of the right Land and / or Buildings)

PCMC Provincial Project Coordination Monitoring Committees

PIB Project Information Booklet

PIC Project Implementing Consultant

PIU Project Implementation Unit

PNBP Non-Taxes of State Revenue

PPAT Pejabat Pembuat Akta Tanah (Land Deed Official)

RCS Replacement Cost Study

ROW Right-Of-Way

RWG Resettlement Working Group

SES Socioeconomic Survey

SLIC Subproject LARP Implementation Team/Committee

SOE State-Owned Enterprise

SPS Safeguards Policy Statement

SPPT Surat Pemberitahuan Pajak Terhutang (Government notification of outstanding tax)

TOR Terms Of Reference

WS Wilayah Sungai (district)

Page 4: Download 2.56 MB

iv

Definition of Terms

Affected Residents / Population / Entitled Persons

Refers to any person or persons, customary community, private or public institution who are physically displaced (relocation, loss of residential land, or loss of shelter) and/or economically displaced (loss of land, assets, access to assets, income sources, or means of livelihood) as result of i) acquisition of land; ii) restriction on land use or on access to legally designated parks and protected areas. The affected populations are parties who control or possess an object land acquisition.

Entitled party Party that controls or possesses land acquisition object

Land Acquisition object

Land, space above ground and below ground, buildings, plants, objects related to land, or any other objects that can be assessed

Census of affected persons

The census is a count of all displaced persons irrespective of their titled or non-titled land ownership status. Its purpose is to accurately document the number of displaced persons and to create an inventory of their losses finalized on the basis of a DMS.

A census describes the persons who are displaced, their livelihoods and income sources, and what they are likely to lose because of the project.

Compensation Proper and equitable replacement provided in the form of cash or other agreed in kind at replacement cost to the affected person / entitled party in the process of land acquisition / resettlement for the assets and livelihoods lost or affected by the project.

Construction Works Zone

A CWZ shall be a designated zone defined during detailed design and clearly identified in the LARP update that will divide the canal/river into convenient stretches for construction implementation

Corridor of Impact Area, which is impacted by civil works in the implementation of any subproject of the FMSRBP. It is important in two particular respects: (a) Legally as the area within which AHs will be entitled to compensation and other measures for any loss of land, structures or land use and occupation and of livelihoods and (b) Operationally as the agreed and demarcated area within which construction activities will take place.

Impact Extent of social and economic impacts resulting from the implementation of an activity. In land acquisition / resettlement, the degree of impact will be determined by (a) scope of economic loss and physical displacement / relocation; and (b) vulnerability of the affected population / entitled party. Impact can be positive or negative.

Cut-off date The cut-off-date for eligibility to project entitlements refers to the date when the Land Acquisition Implementation Team (LAIT) led by Land Agency posts the result of the detailed measurement

Page 5: Download 2.56 MB

v

survey (DMS) that include the list of the entitled parties and the losses in public places (e.g village office, district office, and the location of the land acquisition).

The cut-off date sets the time limits to determine eligibility of persons living and/or with assets or interests inside the project areas. Should they be adversely affected, they will be entitled to compensation for their affected assets, including rehabilitation measures as needed, sufficient to assist them to improve or at least maintain their pre-project living standards, income-earning capacity and production levels. Those who encroach into the project area, or any of its subprojects, after the cut-off date will not be entitled to compensation or any other assistance. The cut-off date will be made known to entitled parties and other stakeholders.

Impact Indicator Effect of benefits derived from project activity. Impact indicators can only be known in medium and long term. Impact indicators show the rationale why a project is implemented, describe the macro aspects of project implementation, and the purpose of sectoral, regional and national projects.

Detailed Measurement Survey

With the use of approved detailed engineering drawings, this activity involves the finalization and/or validation of the results of the IOL, severity of impacts, and list of APs done during the preparation of this land acquisition and resettlement plan (LARP). The updating will be carried out during land acquisition implementation phase undertaken by the land acquisition team led by land office.

Eminent domain/ Compulsory Land Acquisition

The right of the state using its sovereign power to acquire land for public purposes. National law establishes which public agencies have the prerogative to exercise eminent domain.

Entitlement Refers to a range of measures of compensation and other forms of assistance provided to displaced/ entitled persons in the respective eligibility category.

Income restoration This involves rehabilitating the sources of income and productive livelihoods of severely affected and vulnerable APs to enable income generation equal to or, if possible, better than earned by displaced persons before resettlement.

Inventory of Losses This is the listing of assets as a preliminary record of affected or lost assets during the preparation of this LARP where all fixed assets (i.e., land used for residence, commerce, agriculture; dwelling units; stalls and shops; secondary structures, such as fences, tombs, wells; standing crops and trees with commercial value; etc.) and sources of income and livelihood inside the COI are identified, measured, their owners identified, their exact location pinpointed, and their replacement costs calculated. The severity of impact on the affected assets and the severity of impact on the livelihood and productive capacity of the Affected Persons or entitled parties are likewise determined.

Page 6: Download 2.56 MB

vi

Resettlement It is the displacement of people, not of their own volition but involuntarily, from their homes, assets, sources of income and livelihood in the Corridor Of Impact (COI) in connection with the Project.

Land acquisition Land Acquisition activity by way of giving compensation and other measures adequately and at replacement costs for damages / loss to the entitled parties / affected populations in order to reduce adverse social impacts due to the project. Land acquisition and resettlement are conducted involuntary for the benefit of the project.

Relocation The physical displacement of an AP from his/her pre-project place of residence and/or business.

Relocation Assistance Support provided to persons who are physically displaced by a project. It may include transportation, transitional assistance (food, shelter, and social service) that is provided to the displaced persons in connection with their relocation.

Replacement cost

Amount in cash or in kind needed to replace an asset in its existing condition, without deduction for transaction costs or depreciation, at prevailing market value, or its nearest equivalent, at the time of compensation payment

Land Acquisition and Resettlement Plan (LARP)

A time-bound action plan with budget, setting out the resettlement objectives and strategies, entitlements, activities and responsibilities, resettlement monitoring, and resettlement evaluation.

Severely affected persons

This refers to Affected/ displaced Persons who will i) lose 10% or more of their total productive assets, ii) have to relocate, and/or iii) lose 10% or more of their total income sources due to the project.

Vulnerable groups These are distinct groups of people who might suffer more or face the risk of being further marginalized due to the project and specifically include: i) households that are headed by women, ii) household heads with disabilities, iii) households falling under the regional poverty line, and iv) elderly household heads.1

This Land Acquisition and Resettlement Plan is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff and may be preliminary in nature. Your attention is directed to the “terms of use” section of this website.

In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

1 This definition is in line with Law No. 39/1999 (Article 5 elucidation) on Human Rights. Vulnerable populations

include the elderly, children, the poor, pregnant women and people with disabilities.

Page 7: Download 2.56 MB

vii

Page 8: Download 2.56 MB

viii

Table of Contents

Currency Equivalents ....................................................................................................................... ii

Abbreviations .................................................................................................................................. ii

Definition of Terms ......................................................................................................................... iv

List of Tables ................................................................................................................................... x

List of Figures ................................................................................................................................. xi

Executive Summary ....................................................................................................................... xii

I. Project Description ....................................................................................................................... 1

A. Overall Project Description ................................................................................................................................................. 1

B. The Ciujung Dyke Construction Subproject ................................................................................................................. 1

C. Civil Works to Be Undertaken ............................................................................................................................................ 2

D. Measures Adopted to Mitigate Negative Impacts ...................................................................................................... 2

II. Scope of Land Acquisition and Resettlement ................................................................................ 3

A. Project Coverage ...................................................................................................................................................................... 3

B. Project Impacts and Affected Households .................................................................................................................... 4

III. Socioeconomic Information and Profile..................................................................................... 12

A. The Project Area ................................................................................................................................................................... 12

B. Results of the Socioeconomic Survey of AHs ............................................................................................................ 13

C. Impacts on AHs: Livelihood ............................................................................................................................................. 16

D. Impacts on Vulnerable Sector ......................................................................................................................................... 17

E. Gender Analysis ..................................................................................................................................................................... 18

IV. Consultation and Participation, and Information Disclosure ...................................................... 20

A. Stakeholders ........................................................................................................................................................................... 20

B. Consultation and Participation Mechanisms across Project Cycle .................................................................. 21

C. Consultation Conducted at Project Design Stage .................................................................................................... 22

D. Disclosure of Information ................................................................................................................................................. 24

V. Grievance Redress Mechanisms ................................................................................................. 26

A. General Flow of Grievance Redress .............................................................................................................................. 26

B. Specific Grievances .............................................................................................................................................................. 26

VI. Legal Framework ...................................................................................................................... 28

A. National and Local Policy Framework ........................................................................................................................ 28

B. ADB Safeguards Policy ....................................................................................................................................................... 31

C. Comparison of Government Law and Regulations with ADB Policies ........................................................... 32

D. Principles of Land Acquisition and Resettlement Policy for the Project....................................................... 35

E. Commitments in Minimizing Involuntary Resettlement ...................................................................................... 36

F. Unanticipated Impacts........................................................................................................................................................ 37

VII. Entitlements, Assistance and Benefits ...................................................................................... 38

A. Project Eligibility and Entitlements ............................................................................................................................. 38

B. Special Assistance to Vulnerable Sector ..................................................................................................................... 49

VIII. Relocation of Housing and Settlements ................................................................................... 51

IX. Livelihood Restoration and Rehabilitation Program .................................................................. 52

Page 9: Download 2.56 MB

ix

A. Objectives of the Program ................................................................................................................................................ 52

B. Employment Services/Opportunity for Project Related Jobs ............................................................................ 52

C. Livelihoods Training ........................................................................................................................................................... 53

X. Resettlement Budget and Financing Plan ................................................................................... 57

A. Budgetary Considerations for Resettlement Activities ........................................................................................ 57

B. Funds sources and Flow .................................................................................................................................................... 57

C. Assumptions Made for Budget Line Items ................................................................................................................. 57

XI. Institutional Arrangements ....................................................................................................... 60

A. Implementation Arrangements ...................................................................................................................................... 60

B. Institutions and Capacity Strengthening .................................................................................................................... 63

C. Key Procedures and Institutional Arrangements ................................................................................................... 65

D. Project Supervision Consultants .................................................................................................................................... 67

E. Implementation Schedule of the LARP ....................................................................................................................... 67

XII. Monitoring and Reporting ....................................................................................................... 68

A. Internal Monitoring ............................................................................................................................................................. 68

B. External Monitoring ............................................................................................................................................................ 68

Appendices

Appendix 1. SES-LOL Survey Instrument ......................................................................................... 70

Appendix 2. List of Affected Households ........................................................................................ 81

Appendix 3. Consultation Meetings at Planning Stage .................................................................. 165

Appendix 4. Social Action Plan ..................................................................................................... 190

Appendix 5. Public Information Booklet ....................................................................................... 220

Appendix 6. Terms of Reference for External Monitoring ............................................................. 225

Appendix 7. Internal Monitoring and Reporting Template ............................................................ 230

Page 10: Download 2.56 MB

x

List of Tables

Table 1. Relative Location of Villages in the Ciujung Land Acquisition Corridor ................................... 4

Table 2. Impacts on Land by Village, Location and Affected Households ............................................. 5

Table 3. Ownership, Occupation and Land Use of AHs by Village ....................................................... 5

Table 4. Impacts on Primary Structures by Village ............................................................................... 6

Table 5. Characteristics of AHs and Use of Primary Structures by Village ........................................... 6

Table 6. Impacts on Secondary Structures by Village .......................................................................... 7

Table 7. Affected Croplands by AH and Village .................................................................................... 7

Table 8. Affected Crop Types by AH and Village .................................................................................. 7

Table 9. Impacts on Fruit Trees by Village and Impact Area ................................................................ 8

Table 10. Affected Fruit Tree Type by Village ...................................................................................... 8

Table 11. Impacts on Forest Trees by Village and Impact Area ........................................................... 9

Table 12. Affected Fruit Tree Type by Village ...................................................................................... 9

Table 13. Impacts on Business .......................................................................................................... 10

Table 14. Impacts on Common Properties ......................................................................................... 10

Table 15. Impacts on Common Properties ......................................................................................... 11

Table 16. Banten Province Population for 2010 and 2014 .................................................................. 12

Table 17. Serang Regency 2010 Population and Project-Affected Villages ........................................ 12

Table 18. The Education Indicator of Serang Regency Year 2012-2013 ............................................ 13

Table 19. Livelihood Risks ................................................................................................................. 16

Table 20. Impacts on Vulnerable Households .................................................................................... 18

Table 21. Some gaps between Land Acquisition Law and Regulation with ADB SPS and Proposed Project Principles ............................................................................................... 33

Table 22. Entitlement Matrix ............................................................................................................... 39

Table 23. Estimated Manpower Requirement in the Construction Phase in Ciujung River Embankment Development Project .................................................................................... 53

Table 25. Building Price ..................................................................................................................... 58

Table 26. Price of Agricultural Crops .................................................................................................. 58

Table 27. Price of Fruit Trees ............................................................................................................. 58

Page 11: Download 2.56 MB

xi

Table 28. Price of Forest Trees .......................................................................................................... 59

Table 29. Key LARP Institutions and Roles Under Law 2/2012 .......................................................... 60

Table 30. Preliminary Schedule of Resettlement Activities ................................................................. 67

List of Figures

Figure 1. Detailed Description of River Dike Construction (Typical Design) .......................................... 2

Figure 2. Project Location within the Ciujung River Basin and Surrounding Administrative Units ......... 3

Figure 3. Planning and Preparation for Determination of Location (+ 207 Days) ................................ 66

Figure 4. Implementation and Land Transfer, IOL, Compensation Valuation, Consultation on Compensation, Delivery of Compensation and Land Transfer ............................................. 66

Page 12: Download 2.56 MB

xii

Executive Summary

1. Project Description. The project will support the government and communities to better manage and mitigate flood risks. Project interventions will include (i) enhance data, information, knowledge base and institutional coordination for management of floods; (ii) upgrade or develop water management infrastructure; (iii) reduce erosion and improve watershed condition; and (iv) prepare communities to manage floods. The main beneficiaries will be floodplain communities in flood prone areas along the Cidanau-Ciujung-Cidurian (3 Cis) and Ambon – Seram river basin territories (RBTs), respectively located in Banten and Maluku Provinces. The construction of new dykes along the Ciujung River was selected as representative of candidate structural subprojects as the core subproject.

2. Dike construction will be sub-parallel to and set back from the Ciujung River commencing approximately 30 km upstream from the river mouth and extending approximately 11 km further upstream to the existing Pamarayan Weir. The area of the dikes is mostly flat mixed crop agriculture at elevations of about 10 to 20 m above sea level. Borrow pit areas are expected to be in mostly mixed land use areas at slightly higher elevations. The dykes will be complemented by spillways and a retention basin.

3. Sub Project Coverage and Impacts. The land acquisition corridor covers 5 sub districts and 10 villages within the district of Serang in the province of Banten. An inventory of losses (IOL) and a census of all affected persons/affected households (APs/AHs) and private and public organizations and institutions affected by the loss of assets were conducted from June to July 2013. This was followed by detailed surveys from June to August 2104.

4. Loss of Land. The total parcels of affected land amount is 1,811 with total of 2,957,246.87 m2 and occupied by 1,887 AHs Of the 1,811 parcels, 21% of land are situated along the footprint area, 12% are located along the river-dike sections, 13% are permanent borrow pit areas, and 4% are in temporary borrow pit area.

5. Loss of Structures and Common Properties. There are 83 total structural units occupied by 93 AHs with about 86% (75 AHs) located along the left bank. These structures are classified as permanent (76%/66AHs), semi-permanent (14%/12AHs), and non-permanent (6%/5AHs). The total area of primary structures is 9,460.21 m2, while the total area to be affected is 8,456.43 m2. Most of the AHs whose structures to be affected are found in Katulisan Village, followed by Panosogan Village and Gandayasa Village. Other structures owned by 5 AHs are located along the left bank footprint area and the temporary borrow pit. In addition, there are 15 affected common properties such as mosques/mosque lands/waqfs and grave.

6. Loss of Crops/Trees. The total affected croplands is 316,166.91 m2 belonging to 655 AHs mostly in Nagara and Gandayasa. The greatest number of AHs engaged in farming is found in Blokang with 150 AHs. Croplands are almost evenly distributed between the footprint and the river-dike areas with significant impacts on borrow pit areas as well. Paddy rice is predominant along with cassava, chili, corn, cucumber, eggplant, long beans, peanut, and squash. Affected fruit trees are found within footprint areas and mostly found in Panyabrangan followed by Katulisan and Nagara villages. Affected areas are largely planted for banana (pisang), cocoa (cokelat), coffee (kopi), and coconut (kelapa). Affected forest trees/timbers such as albasia and bamboo mostly are found in Kamuning with 8,297 followed by Malabar with 5,607 trees, and Panyabrangan with 3,882 trees. Affected forest trees are mostly clustered within footprint areas.

7. Loss of Business. There are 176 affected stable businesses in the project sites mostly situated in Nagara along the right bank followed by Katulisan and Blokang 23 (13%). Of the 176

Page 13: Download 2.56 MB

xiii

businesses, 95% or 168 are small stores. The rest are motorbike services, pharmacy and grocery. Only 1 reported having 20 paid workers, while all others only indicated 1 or zero.

8. Characteristics of Affected Households. The socio economic survey to the AHs indicates that majority of the AHs are in the 16-25 year old group (57%), followed by the 26-40 year group (16%) and with the 0-15 year age group (14%). Around 88% of HH heads are males and 12% females but more female HH members than males. Average HH size is computed at 3.5 or 4 persons per HH. Majority (90%) of AHs are married, while from ethnicity, most of AH are Javanesse (59%) and followed by Sundanesse (41%). Almost all AHs are Muslims. An estimated 73% of AHs have resided in their current places of residence for 10 years or more.

9. Most household heads and their respective family members have low levels of education. The low level of education encourages people in the area to work as a farmers. About 71% of AH heads in the area are farmers. Average household income is IDR 3 million per month. Minimum wage for Serang district (UMK) is IDR 2,080,000 per month thus shows that AHs are relatively better off.

10. Toilets with septic tanks located within housing structures are predominant, followed by outdoor but enclosed toilet facilities located above rivers and toilet facilities within households that drain to rivers or ponds. The most common means and location for disposing domestic waster is by burning followed by disposal in the nearby river and use of garbage cans or household disposal containers.

11. Religious activities are carried out regularly within the villages. Community activities also abound revolving around road construction and O&M, environmental hygiene programs, and assistance to building a home for a family or couple. Several extension programs are ongoing such as the PNPM Program for rural road construction. Formal credit is commonly with the Bank Syariah Mandiri and the informal system is likewise present in the form of “Bank Keliling” with higher interest rates. Relief operations during disasters or calamities are also found within the project sites in the form of “Bansos” assistance where distribution of food, blankets, rice, used clothing, and clean water.

12. The vulnerable sector within the project sites are distinct groups of people who might suffer more or face the risk of being further marginalized due to the project and specifically include: (i) households that are headed by women, (ii) household heads with disabilities, (iii) households falling under the regional poverty line, and (iv) elderly household heads. Of the total AHs (1,887), about 57% are vulnerable, mostly those with income below minimum wage, followed by elderly household heads, households headed by women and disabled household heads. The desired means of compensation on land acquisition are cash, followed by land and house substitutions, and swaps (tukar guling).

13. Gender. A gender strategy and actions to ensure the participation of women in resettlement has been prepared. Gender strategy and action plan has been prepared to ensure women’s participation and benefit from the project.

14. Consultation and Participation. A total of 24 public consultation meetings (PCM) were conducted at the planning stage from 2013 to 2014 to which 1,286 participants which are mostly with implementing and executing agencies, local governments, communities, AHs and a few interest groups. Key issues raised by affected communities and AHs revolved around the amount for compensation and the land acquisition process. Institutions were more focused on the operationalization of the 2012 Land Law viz the ADB Safeguards Policy of 2009 and cost sharing. There was strong support for the project with assurances that the 2012 Land Law would be implemented to the fullest. Consultation will relevance stakeholders including interest groups will be continued throughout the implementation.

Page 14: Download 2.56 MB

xiv

15. Disclosure of Information. Disclosure at the site level will be undertaken by the provincial or district governments at the preparatory land acquisition stage and by land office (land acquisition committee) at the implementation land acquisition stage. A pre-IOL/SES Project Information Booklet (PIB) was produced by the Executing Agency produced in Bahasa Indonesia. Notices to meetings and other subproject activities/updates were issued and made accessible in public locations, such as the village or sub-districts offices. Village leaders and AHs were provided with PIBs. Project disclosure of the following documents will include: (i) The final LARP endorsed by DGWR; (ii) New or updated LARP, and a corrective action plan prepared during subproject implementation, if any; and (iii) LARP monitoring reports and LARP final completion report.

16. Grievance Redress Mechanisms. A grievance redress mechanism was developed for the project catered to the general structure of the local government with specific mechanisms for different grievances as upheld by Law 2/2012: (i) grievance on project location confirmation and results of inventory of assets, and (ii) grievance on compensation rate. It is anticipated that all grievances related to benefits and other assistance will be resolved at the subproject level. Project staff will assist APs in registering their complaints with subproject management. The Project Manager will settle the complaint and within 15 working days and convey a decision to the APs.

17. Legal Framework. A gap-equivalence analysis was made of GOI laws particularly with Law No. 2/2012 viz the ADB Safeguards Policy Framework of 2009. A few gaps between the new Land Acquisition Law of Indonesia and ADB’s SPS were noted and these have been bridged by the provisions of other relevant GOI laws. Based on the legal framework and equivalence gap analysis, the involuntary resettlement objective and policy principles are set as follows:

(i) Screen subproject components during early stages to identify involuntary resettlement impacts and risks indicators. These impacts and risks will be minimal, so that appropriate resettlement planning will be developed as a result of a social assessment.

(ii) Carry out meaningful consultations with entitled parties and affected persons particularly living in the project areas, and concerned civil organizations. Inform all entitles parties on project plan and its potential impacts to their sources of income, and ensure their participation in the project cycle.

(iii) Improve or at least restore the livelihood of the entitled parties/APs. APs without title or any recognizable legal rights to land are eligible for resettlement assistance and compensation for non-land assets at replacement cost.

(iv) Entitled parties shall be involved in resettlement planning and LARP shall cover all appropriate mitigation measures to improve, or at least restore, the livelihoods of all entitled parties, so that the living standard of entitled parties do not become worse compared to pre-project levels.

(v) Particular attention will be paid to women, women-headed households, the elderly and other vulnerable persons including indigenous communities.

(vi) Disclose a draft LARP and its updates to the entitled parties and other stakeholders in a timely manner, in an accessible place and a form and understandable language.

(vii) Grievance redress mechanism will be established in order to ensure that all entitled parties grievances and complaints on any aspect of land acquisition and compensation are addressed in a timely and satisfactory manner, and that all possible avenues are available to entitled parties to air their grievances.

Page 15: Download 2.56 MB

xv

(viii) Civil works and/or restrictions to use of land/coastal resources will not commence unless entitled parties are fully compensated and all other entitlements provided. EA or PIU will not issue notice to proceed for civil works in any given construction works zone (CWZ) unless the land acquisition team has satisfactorily completed payment of compensation and relocation of entitled parties to new site, if any physically relocation, in accordance with the approved LARP in the particular given CWZ.

(ix) Any voluntary “donation” and negotiated settlement will follow international best practices and be confirmed through written record.

(x) Monitor and assess loss of assets outcomes, their impacts on the standards of living of entitled parties, and also disclose the monitoring reports.

(xi) Should unanticipated involuntary resettlement impacts be determined during project implementation, the PIU will ensure the conduct of a social impact assessment and update the LARP or formulate a new LARP covering all applicable requirements specified in this LARF.

18. Entitlements, Assistance and Benefits. Entitled parties or APs/AHs identified within the project areas are eligible for compensation at full replacement cost, either in cash, replacement land, replacement house, or resettlement and other assistance under this project can be described as (i) persons with formal legal rights to land they may lose in its entirety or in part; (ii) persons who may lose the land they occupy or utilize in its entirety or in part who have no formal legal rights to such land or resources but have claims to such lands or resources such as customary claims, that are recognized or recognizable under national laws, i.e., nadzie for waqf land, former customary rights secured landowners, indigenous people/customary communities, parties occupy the state land in good faith. Compensation at replacement cost for lost land and non-land assets, and relocation assistance, if applicable will be provided to the parties fall in category i and ii; and (iii) persons who may lose the land they occupy or utilize in its entirety or in part who have neither formal legal rights nor recognized or recognizable claims to such land or resources. Compensation for lost assets other than land will be provided at replacement cost. Vulnerable and severely AHs are entitled to participate in the income restoration that will be designed with their active participation and priority for employment in project-related jobs during the civil works.

19. Relocation of Housing and Settlements. In the Ciujung LA corridor, 83 total structural units occupied by 93 AHs may potentially have to relocate their housing structures. As most of the physically AHs prefer receiving cash compensation for the lost assets, the government will not provide relocation/resettlement.

20. Income Restoration and Rehabilitation. The Income/livelihood Restoration Program (IRP/LRP) called as Social action Plan (SAP) of this LARP was prepared in collaboration with the Serang District Government. The LRP is intended to reduce social risk in the implementation of Flood Management Selective River Basin (FMSRB) Project. The main target group of the project is vulnerable households and severely AHs to ensure that their living conditions are improved or at least similar to the initial condition.

21. This LRP will be implemented in the form of various programs i.e economic empowerment, institutional capacity building of farmers groups, education and entrepreneurship training, business assistance during the transition period, community institutional capacity building, improvement of education quality, improvement of sanitation facility and environment, hygienic and healthy life behavior improvement program, and many others which will be implemented by Serang Regency before the construction activities is carried out during the 5 years period of 2015-2019.

Page 16: Download 2.56 MB

xvi

22. Resettlement Budget and Financing Plan. The estimated cost of resettlement for the Ciujung Subproject is estimated at IDR 179,135,384.181 including cost for LRP. Funding for Land Acquisition and compensation for lost assets (land, structures, crops/trees, relocation assistance) will come from national budget (APBN). Funding of the costs associated with the LRP is from the local government.

23. Institutional Arrangements. The DGWR is the Executing Agency responsible for overall project including resettlement, while the project implementing Agency (IA) is the BBWS C3 who will establish a PIU headed by a manager (PIU head). The Serang Land Office with its land acquisition committee is responsible for implementation of land acquisition activities. The Banten Provincial Government and the Serang District Government will be responsible for land acquisition preparation including issuance of project location determination by the Governor.

24. Monitoring and Reporting. Quarterly resettlement progress reports will be submitted to ADB for web posting. The CPMU will hire an external organization to carry out external monitoring and post-implementation evaluation. The external monitor will provide DGWR and ADB a copy of its semi-annual monitoring reports. The EMO will likewise conduct a post-RP implementation evaluation study six months following the completion of resettlement. The monitoring reports will be disclosed to the APs and posted on the ADB website.

Page 17: Download 2.56 MB

I. Project Description

A. Overall Project Description

1. The project will support the Government of Indonesia (the Government) and communities to better manage and mitigate flood risks. The project aims to shift from project-oriented flood control centered on structural measures, to process-oriented flood risk management (FRM) that provides a well-balanced mix of non-structural interventions, institutional and capacity building, and structural works to mitigate the negative impacts of floods. Project interventions will (i) enhance data, information, knowledge base and institutional coordination for management of floods; (ii) upgrade or develop water management infrastructure; (iii) reduce erosion and improve watershed condition; and (iv) prepare communities to manage floods. The main beneficiaries will be floodplain communities in flood prone areas along the Cidanau-Ciujung-Cidurian (3 Cis) and Ambon – Seram river basin territories (RBTs), respectively located in Banten and Maluku Provinces. Those river basins are characterized by different flood typologies that represent a range of flood issues within and outside Java Island. As representative of candidate structural subprojects, the construction of new dykes along the Ciujung River, in the 3 Cis RBT has been selected as the core subproject.1

B. The Ciujung Dyke Construction Subproject

2. The Ciujung River Basin lies in close proximity to several other river basins, and extends over 3 districts with a river basin area of 1,860 km2. It commences in mountainous uplands in the district of Lebak and extends down to the seas over an extensive, lowland stretch in the district of Serang where much of the river’s flooding takes place. The 3 linked river basins are administered and managed by a Balai Besar Wilayah Sungai 3 Cis, the River Basin Organization with oversight from Public Works Ministry of Public Works and Housing, Directorate General of Water Resources, and Directorate of Rivers.

3. This structural subproject (i.e., Dike Construction of Ciujung River) is intended to improve the current situation of flood management in Ciujung River specifically where the river flows through an area with a history of damaging floods. River Dike construction involves structural civil interventions to retain 25 year return period floods (Q25) within the existing main river channel for an 11 km stretch downstream of the existing Pamarayan weir in an area where there are no existing river dikes.

4. Through the project, communities in the upper river basins will improve selected degraded land areas by implementing agroforestry. The project will empower farmers groups in the 3 Cis RBT to adopt sustainable agriculture practices including terracing and development of retention ponds to reduce erosion. Over time this will result in lower discharges during floods, more water in the dry season, less loss of soil in the upper watershed and less sedimentation in the flood plain. Physical measures (soil and forest restoration and conservation activities) are proposed and will have (positive) impact on the environment. To complement structural measures, community flood risk management (CBFRM) community groups will be established, strengthened and engaged in implementation of community driven development activities including solid waste management and construction and repair of small water infrastructure. Where structural interventions are not feasible or have limited effects, communities will be engaged in preparation of emergency response planning, procedures, and evacuation provisions.

5. The River Dike is needed because the present flood management in the lower Ciujung is inadequate and become worse. Flooding along Ciujung is mainly caused by the poor condition of embankments and structures facilitating drainage from adjacent areas into the river. Some local drainage problems near Serang also cause flooding, including the Jakarta-Merak toll road. The river dike construction designed for Q25 includes flood dike, rehabilitation of the existing dike with the heightening of embankment, river dike construction and structures.

6. The location of borrow areas are chosen from those located near or in the project area. Based on initial investigation the potential borrow areas found in 13 (thirteen) locations within District Serang. 1 Located upstream of the toll road and downstream of the Pamayaran weir.

Page 18: Download 2.56 MB

2

C. Civil Works to Be Undertaken

7. Dike construction will be sub-parallel to and set back from the Ciujung River commencing approximately 30 km upstream from the river mouth and extending approximately 11 km further upstream to the existing Pamarayan Weir. The area of the dikes is mostly flat mixed crop agriculture at elevations of about 10 to 20 m above sea level. Borrow pit areas are expected to be in mostly mixed land use areas at slightly higher elevations. The dikes will be complemented by side spill ways and retention areas.

8. The detailed description of the River Dike Construction project is presented in the following figure.

Figure 1. Detailed Description of River Dike Construction (Typical Design)

D. Measures Adopted to Mitigate Negative Impacts

9. Some measures adopted to minimize resettlement include:

(i) design initiatives include endeavoring to minimize the width of the land acquisition (LA) corridors – 45 meters on each side of the Ciujung River - and their impact on privately owned agricultural and residential land assets. Land located within the planned elevated and enlarged embankments adjacent to the Ciujung River will be acquired.

(ii) efforts to minimize the resettlement transition period (from approval of the LARP to LARP updating and LARP implementation) will be done in a timely manner, to be completed prior to any construction activities within a designated construction works zone.

(iii) the selection of borrow pits with minimum impacts is envisaged to mitigate resettlement impacts and the provision of lead time by way of advance notice for the relocating APs will be made to allow them enough time for moving and start construction of new buildings much earlier.

(iv) Measures such as provision of fence, information boards and regular inspections will be taken to ensure that the spill way and retention areas to be built under the Project will be functional and free from encroachment.

3.00

< 3.00

1.00

6.00

1.51

1.51

1.51

1.51

Drainase

0.50

Pasangan Batu

Page 19: Download 2.56 MB

3

II. Scope of Land Acquisition and Resettlement

A. Project Coverage

10. The land acquisition corridor spans an 11-kilometer stretch of the Ciujung River that covers 5 districts and 10 villages within the district of Serang in the province of Banten (Figure 2). Table 1 provides the list of project-covered villages located along the Ciujung River.

Figure 2. Project Location within the Ciujung River Basin and Surrounding Administrative Units

Page 20: Download 2.56 MB

4

Table 1. Relative Location of Villages in the Ciujung Land Acquisition Corridor

Village

Location Along Ciujung Impact Area Total Parcels Total AHs

Right Bank

Left Bank

Other FootprintRiver - Dike

Both Footprint/ River-Dike

Permanent Borrow pit

Temporary Borrow Pit

# % # %

Blokang 273 0 0 32 41 79 121 0 273 15% 281 15% Dukuh 63 33 5 25 0 63 3% 67 4% Gandayasa - 158 - 74 9 75 - 158 9% 174 9% Katulisan - 217 - 36 46 135 - 217 12% 239 13% Kp Baru 163 0 0 20 6 137 0 163 9% 171 9% Malabar 171 0 0 25 8 102 36 0 171 9% 177 9% Nagara 326 0 0 78 61 92 95 0 326 18% 330 17% Panasogan 0 174 0 49 15 110 0 174 10% 178 9% Panyabrangan 64 134 - 50 35 113 - 198 11% 202 11% Kamuning

68 68 68 4% 68 4%

Totals 1,060 683 68 397 226 868 252 68 1,811 100% 1,887 100% Source: Survey by Geo and Equator, 2014. Note; Other refers to the temporary borrow pit area within the village of Kamuning, not situated along the 11-km project stretch of the Ciujung River.

B. Project Impacts and Affected Households

11. An inventory of losses (IOL) and a census of all APs/AHs and private and public organizations and institutions affected by the loss of assets were conducted from June to July 2013 by a team of local survey assistants and with the participation of government personnel from subproject covered villages. This was followed by detailed surveys from June to August 2104 as spearheaded by the local government of Serang as well as the BBWS, with the participation of the original surveyors in 2013 (Equator). The 2014 survey was strengthened by the participation of Geo-Prana designated by the local governments as their official surveyor to provide professional/engineering land surveys as well as MAPPI for eventual guidance in valuation.

12. The 11-kilometer stretch of LA corridor extends alongside both embankments on the downstream end from the toll road heading upstream to the Pamarayan weir. From the left side of the river, the desired easement used was 29 m from the bottom of the embankment and 31 m on the right side to allow for raising and widening dyke embankments as well as to allow for a small inspection road.

13. Table 1 further shows that the total parcels of affected land amount to 1,811 indicating that with some parcels and even structures, more than 1 household reside or utilize. In terms of impact area, 21% of the 1,811 parcels of land are situated along the footprint area as against those along the river-dike sections at 12%, permanent borrow pit area (13%), and temporary borrow pit area (4%). However, some affected households (AH) utilize parcels of land in both the footprint and river-dike areas (46%). Of the 1,811 parcels, most are found in Nagara (18%), Blokang (15%), Katulisan (12%), Panyabrangan (11%) and Panasogan (10%). The least is in Dukuh (3%).

14. A total of 1,887 AHs with residential or agricultural lands have been identified along both sides of the Ciujung River embankment. Clustering of AHs are more evident in Nagara (18%), Blokang (15%) Katulisan (13%) and Panyabrangan (11%). Least number of AHs are in Dukuh with 4%.

15. Permanent and Temporary Losses. Impacts will be relatively confined to access roads, noise disturbance, and location of construction equipment. Impacts brought about by temporary borrow pit areas have been identified (Table 2) - belonging to 68 households from Kamuning Village, Tunjung Teja District, which is off the direct impact areas along the left and right banks of the river.

16. Data on losses of land and main structures were largely generated by the Geo-Prana Team. The initiatives of Geo-Prana were complemented by Equator who provided actual number of AHs. All other data were derived by Equator.

17. Loss of Land. Table 2 further indicates that a total of 1,904,395.31 m2 of land will be affected by the project: all lands (96%) along the footprint, river-dike and borrow pit areas within the 11-km

Page 21: Download 2.56 MB

5

stretch of the Ciujung River will permanently be affected. Only those in Kamuning Village (4%) are subject to temporary land losses. Of the 68 AHs in Kamuning, 66 will experience temporary land loss. Severity of land loss is computed at 64.4% with Nagara highsest at 78.97% severity and Gandayasa lowest at 47.59%.

Table 2. Impacts on Land by Village, Location and Affected Households

Village Total Area owned by AHs (m2)

Impact area (m2)

Land Loss (m2)

Severity

No of Parcels Total No of AHs

Permanent Temporar

y No % No %

Footprint

River-Dike

Both Footprint/ River-Dike

Borrow pit

Borrow pit

Blokang 603,655.19 32 41 79 121 0 382,616.74 63.38% 273 15.07% 281 14.89

% Dukuh 91,247.47 33 5 25 0 60,210.17 65.99% 63 3.48% 67 3.55%

Gandayasa 262,588.83 74 9 75 - 124,971.75 47.59% 158 8.72% 174 9.22%

Katulisan 267,226.68 36 46 135 - 166,223.76 62.20% 217 11.98% 239 12.67

% Kp. Baru 270,923.55 20 6 137 0 132,670.41 48.97% 163 9.00% 171 9.06% Malabar 278,938.82 25 8 102 36 0 204,319.59 73.25% 171 9.44% 177 9.38%

Nagara 473,334.16 78 61 92 95 0 373,814.87 78.97% 326 18.00% 330 17.49

% Panosogan 253,136.27 49 15 110 0 154,976.74 61.22% 174 9.61% 178 9.43%

Panyabrangan

296,515.53 50 35 113 - 190,665.46 64.30% 198 10.93% 202 10.70

% Kamuning 159,680.37 68 113,925.82 71.35% 68 3.75% 66 3.60%

Totals 2,957,246.87 397 226 868 252 68

1,904,395.31

64.40% 1,811 100.00

% 1,887

100.00%

Source: Survey by Geo and Equator, 2014.

18. Table 3 shows the land ownership status of AHs, along with status of asset occupation and land use. Of the total 1,885 AHs, about 3% admit to others owning the land they utilize and about 1% is public/common property. All others have some form of legal instrument legitimizing use of land: 88% with certificates, 3% with tax letters, and 0.1% by deed of sale. Around 5% have no proof to show and respondents did not own up to any rental scheme.

Table 3. Ownership, Occupation and Land Use of AHs by Village

Village

Total No of AHs

Ownership (No of AHs)

Status of asset occupation (No of AHs) Land Use (No of AHs)

No % Owned

by Others

Public/ Common Property

Certificate No

certificate

Tax payment

letter

Deed of sale

Rental Agricultural land (dry)

Field Paddy field

Yard Vacant land

Blokang 304 16% 23 5 250 15 28 0 0 180 0 80 0 33

Dukuh 112 6% 0 1 108 0 0 0 0 72 10 25 0 1

Gandayasa 244 13% 8 5 213 10 1 0 0 140 9 55 20 0

Kamuning 66 4% 4 0 62 4 0 0 0 65 0 0 0 1

Katulisan 239 13% 1 0 197 13 7 0 0 182 6 0 29 0

Kp. Baru 171 9% 0 0 157 4 2 0 0 163 0 0 0 0

Malabar 138 7% 2 0 121 9 5 0 0 130 3 0 2 0

Nagara 231 12% 4 1 208 16 7 0 0 222 2 0 7 0

Panosogan 178 9% 7 1 166 3 4 1 0 148 1 0 25 0 Panyabrangan 202 11% 10 2 178 13 7 0 0 191 3 0 4 0

Totals

1,887 100% 59 15 1,660 87 61 1 - 1,493 34 160 87 35

Page 22: Download 2.56 MB

6

19. With respect to land use, Table 3 shows that 79% are subject to dry agriculture, 8% paddy field, 5% as yards, 2% each as vacant lands and fields. Paddy fields are concentrated in the villages of Blokang, Dukuh, and Gandayasa.

20. Loss of Structures. There are 83 total structural units occupied by 93 AHs. Table 4 reveals that the large majority or 86% (75 AHs) are located along the left bank, 6% (5 AHs) on the right bank, and 3% (3 AHs) in temporary borrow pits (Kamuning Village). These structures are classified as permanent, semi-permanent, and non-permanent using the Standar Satuan Harga (SSH) Belanja Daerah Kabupaten Serang, TA 2013. Around 76% or 66 AHs have been classified as having permanent structures, 14% or 12 AHs with semi-permanent structures, and 6% (5 AHs) with non-permanent structures.

Table 4. Impacts on Primary Structures by Village

Village

Primary Structure No of Units Total No of

Ahs

Permanent

Semi-permane

nt

Non-permanent

Total Area Total

Affected Area

Severity No % No %

Gandayasa 14 4 2 1,442.83 1,383.05 96% 18 22% 25 27%

Kamuning 0 0 0 240.00 240.00 100% 3 4% 3 3% Katulisan 31 5 1 4,002.60 3,522.60 88% 28 34% 30 32% Nagara 4 0 1 249.73 249.73 100% 5 6% 5 5% Panosogan 28 6 0 2,914.60 2,529.80 87% 25 30% 26 28% Panyabrangan 5 0 1 610.45 531.25 87% 4 5% 4 4%

Totals 82 15 5 9,460.21 8,456.43 89% 83 100% 93 100% Source: Survey by Geo and Equator, 2014. Note: Missing 1 unit for descriptors under specifications.

21. Still with reference to Table 4, the total area of primary structures is 9,460.21 m2 as against 8,456.43 m2 of affected area for the 93 AHs. Severity is computed at 89%. Most of the AHs are found in Katulisan (32%/30 AHs) followed by Panosogan (28%/26 AHs) and Gandayasa at 27% or 25 AHs. The least affected structures are in Kamuning with 3% or 3 AHs. It will be noted that only 6 (Gandayasa, Kamuning, Katulisan, Nagara, Panosogan, and Panyabrangan) of 10 affected villages have main structural losses.

22. Of the 83 affected units, 43% have been used by AHs for 10 years or more. About 51% are within the 2-5 year range and 6% within the 5-10 year range (Table 5). The table also shows that respondents were not too keen on responding to use. Suffice it to say that these generally are residential in nature with lack of clarity on ownership.

Table 5. Characteristics of AHs and Use of Primary Structures by Village

Village Years of residence HH Head

No of Units

Total No of AHs

Different owner

Rented Use

<2 2-5 5-10 >10 Male Female Residential Home Shop

Home Office

Gandayasa 0 5 0 13 14 4 18 25 5 0 7 1 1

Kamuning 0 1 0 2 3 0 3 3 1 0 0 0 0

Katulisan 0 18 3 7 22 6 28 30 1 0 4 0 4

Nagara 0 3 1 1 5 0 5 5 0 0 0 0 0

Panosogan 0 15 1 9 19 5 25 26 0 0 3 2 3 Panyabrangan 0 0 0 4 4 0 4 4 0 0 1 0 0

Totals 0 42 5 36 67 15 83 93 7 0 15 3 8 Source: Survey by Equator, 2014. Note: Totals do not tally since some AHs did not provide responses under some categories.

Page 23: Download 2.56 MB

7

23. Loss of Other structures. As regards to other structures, Table 6 shows these are only situated along the left bank footprint area and the temporary borrow pit area for a total of 29 m2 belonging to 5 AHs in Katulisan (2 AHs), Panosogan (2 AHs), and Kamuning 1 AH).

Table 6. Impacts on Secondary Structures by Village

Village Affected area

No of Ahs Footprint (m2)

Between dike-river (m2)

Borrow pit Temporary (m2)

Panosogan 8 12 - 2 Katulisan 8 - - 2 Kamuning - - 1 1 Total 16.0 12.0 1.0 5

Source: Survey by Equator, 2014.

24. Loss of Agricultural Crops. A total of 316,166.91 m2 croplands belonging to 655 AHs were recorded (Table 7) with Nagara having the most in terms of area 145,225.45 m2 (98 AHs) and Gandayasa the least with 8,521.38 m2 having 72 AHs. The greatest number of AHs engaged in farming is found in Blokang with 150 AHs, followed by Nagara (98 AHs) and Gandayasa (72 AHs). Croplands are almost evenly distributed between the footprint and the river-dike areas with significant impacts on borrow pit areas as well.

25. Table 8 reveals that of the 684 parcels of croplands directly measured by Equator, paddy rice was greatest in number (36%) followed by cassava (19%). Other common crops are chili, corn, cucumber, eggplant, long beans, peanut, and squash. Not commonly planted are waluh, lengkuas, turmeric, and lemongrass at 0.4% each.

Table 7. Affected Croplands by AH and Village

Village Footprint River-Dyke Borrow pit Total

Total AHs

# of parcels

m2 # of

parcels m2 # of parcels m2

# of parcels

m2

Blokang 60 14,796.44 57 8,959.67 85 49,575.00 202 73,331.11 150 Dukuh 2 272.00 11 15,742.48 0 - 13 16,014.48 16 Gandayasa 62 6,614.00 41 1,907.38 0 - 103 8,521.38 72 Kamuning 0 - 0 - 68 8,769.00 68 8,769.00 68 Katulisan 37 5,710.00 41 6,195.07 0 - 78 11,905.07 51 Kp. Baru 55 8,502.21 55 2,666.79 0 - 110 11,168.99 59 Malabar 43 8,351.00 45 4,901.78 8 7,338.00 96 20,590.78 54 Nagara 21 6,132.86 19 3,704.59 74 35,388.00 114 145,225.45 98 Panosogan 21 5,507.75 24 3,766.64 0 - 45 9,274.39 27 Panyabrangan 55 7,100.69 50 4,265.57 0 - 105 11,366.27 60 Totals 356 62,986.95 343 52,109.96 235 01,070.00 934 316,166.91 655

Source: Survey by Equator, 2014.

Table 8. Affected Crop Types by AH and Village

Village

Seasonal Crops (number of parcels) Total

Parcels

Total

AHS

Cassava Chili Corn

Cucumber

Eggplant

Long beans Paddy

Peanut

Squash Waluh

Lengkuas

Turmeric

Lemongrass

Blokang 9 44 9 6 19 11 77 4 3 0 0 0 0 182 150 Dukuh 1 0 0 0 0 0 10 0 0 0 0 0 0 11 16 Gandayasa 7 0 8 2 2 2 10 5 0 1 0 0 0 37 72 Kamuning 48 0 10 0 10 0 0 0 0 0 0 0 0 68 68 Katulisan 3 3 3 5 5 2 11 0 1 1 0 0 0 34 51 Kp. Baru 24 0 11 11 10 0 16 1 1 1 1 2 0 78 59 Malabar 14 3 12 3 15 3 15 0 5 0 0 1 0 71 54 Nagara 4 5 1 0 6 2 102 0 0 0 1 0 0 121 98 Panosogan 5 0 1 4 5 3 1 0 3 0 0 0 1 23 27 Panyabrangan 13 0 12 15 2 3 1 4 6 0 1 0 2 59 60 Totals 128 55 67 46 74 26 243 14 19 3 3 3 3 684 655 Source: Survey by Equator, 2014.

Page 24: Download 2.56 MB

8

26. Loss of Fruit Trees. Table 9 shows that affected fruit trees are mostly found in Panyabrangan (27%/4,886 trees) belonging to 117 AHs, followed by Katulisan at 13% (2,398 trees/100 AHs), and Nagara with 12% (2,102 trees/92 AHs). The least number of affected fruit trees are in Panosogan at almost 4% (622 trees) belonging to 48 AHs. Disaggregated, more affected fruit trees (53%) are found within footprint areas, followed by 36% along the river-dike areas and 11% in the temporary borrow pit area in Kamuning.

Table 9. Impacts on Fruit Trees by Village and Impact Area

Village Footprint River-Dyke

Borrow pit Total Total Ahs

N % N % Blokang 814 45 - 859 4.76% 41 6.48% Dukuh 357 481 - 838 4.65% 23 3.63% Gandayasa 702 259 - 961 5.33% 59 9.32% Kamuning - - 1,933 1,933 10.72% 55 8.69% Katulisan 1,253 1,145 - 2,398 13.30% 100 15.80% Kp. Baru 868 617 - 1,485 8.24% 63 9.95% Malabar 1,289 622 - 1,911 10.60% 35 5.53% Nagara 1,065 1,037 - 2,102 11.66% 92 14.53% Panosogan 364 258 - 622 3.45% 48 7.58% Panyabrangan 2,879 2,044 - 4,923 27.30% 117 18.48%

Totals 9,591 6,508 1,933 18,032 100.00% 633 100.00% Source: Survey by Equator, 2014.

27. Table 10 provides the list of affected fruit trees that are mostly found in Panyabrangan (27%/4,920 trees), followed by Katulisan at 13% (2,401 trees), and Nagara with 12% (2,102 trees). The least number of affected fruit trees are in Panosogan at 3% (614 trees). The affected areas are largely planted to pisang (33%), cokelat (21%), kopi (14%) and kelapa (10%).

Table 10. Affected Fruit Tree Type by Village

Fruit tree Village Grand Total

Blokang Dukuh Gandayasa Kamuning Katulisan

Kp. Baru Malabar

Nagara

Panosogan

Panyabrangan

N %

Asem 1 - - - - - - - - - 1 0.01% Buah Naga - 2 1 - - - - - - - 3 0.02% Cengkeh - - - - - - - - - 172 172 0.95% Ceri - - 4 - - - - - - 27 31 0.17% Cokelat 317 435 59 - 975 264 21 60 95 1,606 3,832 21.26% Dukuh 2 - - 28 6 - - - - - 36 0.20% Durian - 1 20 - 3 1 - - - - 25 0.14% Jambu - - 4 - - 1 - 1 1 - 7 0.04% Jengkol - - - 23 - - 5 - - - 28 0.16% Jeruk 1 - 151 - 57 3 - - - 23 235 1.30% Kakao 23 - - - - - - - - - 23 0.13% Kecapi - - - 779 - - - 5 - 26 810 4.49% Kelapa 142 5 269 360 303 112 91 224 102 249 1,857 10.30% Kelengkeng - - - - 5 - - - - - 5 0.03% Kopi - - - - 123 643 1,582 4 - 120 2,472 13.72% Mangga 3 5 9 73 9 21 29 7 - 26 182 1.01% Melinjo 29 9 59 516 41 169 80 94 41 361 1,399 7.76% Menteng - - - 13 - - - - - - 13 0.07% Nangka 24 5 86 8 10 32 10 50 15 23 263 1.46% Pepaya - - 13 - - 45 - 7 7 46 118 0.65% Pete Cina 10 20 17 - - - - 5 - 2 54 0.30% Pisang 301 355 256 133 714 178 93 1,640 342 2,018 6,030 33.46% Rambutan 3 - 1 - 155 5 - 5 11 112 292 1.62% Randu - - 3 - - - - - - - 3 0.02% Sirsak - - - - - - - - - 77 77 0.43% Sukun 3 - - - - 11 - - - 32 46 0.26% Not - 1 6 - - - - - - - 7 0.04%

Page 25: Download 2.56 MB

9

Fruit tree Village Grand Total

Blokang Dukuh Gandayasa Kamuning Katulisan

Kp. Baru Malabar

Nagara

Panosogan

Panyabrangan

N %

identified TOTAL 859 838 958 1,933 2,401 1,485 1,911 2,102 614 4,920 18,021 100.00% % by

Village 4.77% 4.65% 5.32%

10.73%

13.32% 8.24% 10.60% 11.66

% 3.41% 27.30%

100.00%

Source: Survey by Equator, 2014. Note: Some not identified.

28. Loss of Forest Trees. By village, affected forest trees mostly are found in Kamuning - site of the temporary borrow pit areas - with 8,297 affected forest trees claimed by 64 AHs (Table 11). Next to Kamuning is Malabar with 5,607 trees from 83 AHs, followed by Panyabrangan (3,882 trees/115 AHs). Least affected forest trees are in Blokang (663 trees/52 AHs) and Dukuh (596 trees/23 AHs). Affected forest trees are mostly clustered within footprint areas (41%) followed by river-dike (31%) and temporary borrow pit area (28%).

Table 11. Impacts on Forest Trees by Village and Impact Area

Village Footprint River-Dyke Temp

BP Total AHs Total Forest Trees

N % N % Blokang 545 118 - 52 6.52% 663 2.25% Dukuh 238 358 - 23 2.88% 596 2.02% Gandayasa 1,332 360 - 91 11.40% 1,692 5.73% Kamuning - - 8,297 64 8.02% 8,297 28.11% Katulisan 1,622 1,567 - 111 13.91% 3,189 10.80% Kp. Baru 1,496 1,014 - 99 12.41% 2,510 8.50% Malabar 2,400 3,207 - 83 10.40% 5,607 19.00% Nagara 1,578 653 - 109 13.66% 2,231 7.56% Panosogan 547 302 - 51 6.39% 849 2.88% Panyabrangan 2,234 1,648 - 115 14.41% 3,882 13.15% Totals 11,992 9,227 8,297 798 100.00% 29,516 100.00%

% 40.63% 31.26% 28.11% 100.00% Source: Survey by Equator, 2014.

29. Table 12 shows that the most common affected forest trees is albasia (24%) followed by bambu (23%) and bayur (16%). Least is dadap with 1 tree.

Table 12. Affected Fruit Tree Type by Village

Forest tree Village Total

Blokang Dukuh Gandayasa Kamuning Katulisan Kp. Baru Malabar Nagara Panosoga

n Panyabranga

n No %

Albasia 367 371 867 1,729 1,156 1,613 838 478 836 8,255 24.27% Angsana 12 12 0.04% Bambu 68 100 55 3,385 67 53 3,315 444 15 198 7,700 22.64% Bayur 36 6 57 4,756 24 63 541 75 17 5,575 16.39% Dadap 1 1 0.00% Gempol 119 73 680 8 522 1,009 255 133 84 1,359 4,242 12.47% Jabon 3 607 42 15 122 81 51 849 1,770 5.20% Jatake 2 25 27 0.08% Jati 4 8 15 2 3 7 20 21 24 104 0.31% Karet 1 3 40 1 3 3 169 220 0.65% Kembang 1 4 1 33 1 12 52 0.15% Laban 1 2 5 2 32 16 3 47 108 0.32% Lame 1,380 1,380 4.06% Mahoni 11 3 1,950 157 17 216 27 73 76 2,530 7.44% Randu 1 95 3 1 8 39 147 0.43% Salam 12 3 2 17 0.05% Sengon 42 898 460 72 40 95 20 226 1,853 5.45% Waru 1 7 5 4 17 0.05%

Total 664 560 1,684 8,297 7,742 2,510 5,637 2,201 859 3,856 34,010 100.00% % 1.95% 1.65% 4.95% 24.40% 22.76% 7.38% 16.57% 6.47% 2.53% 11.34% 100.00% 0.00%

Page 26: Download 2.56 MB

10

Source: Survey by Equator, 2014.

30. Loss of Business. Table 13 provides information on fixed enterprises in the Ciujung land acquisition corridor owned and operated by AHs. There are 176 affected stable businesses in the project sites. Of these 176, 30% are situated in Nagara along the right bank affecting 52 businesses/HHs (30%). Nagara is followed by Katulisan with 37 (21%) and Blokang 23 (13%). There are no affected businesses in Dukuh and Kamuning. Of the 176 businesses, 95% or 168 are small stores. The rest are motorbike services, pharmacy and grocery. Only 1 reported having 20 paid workers, while all others only indicated 1 or zero.

Table 13. Impacts on Business

Desa/ Village

Left Right TOTAL AFFECTED

BUSINESS Footprint Between Dyke and

River Footprint

Between Dyke and River

Affected Business

No of AHs

Affected Business

No of AHs Affected Business

No of AHs

Affected Business

No of AHs

Affected Business

No of AHs

Blokang - - - - 19 19 4 4 23 23 Dukuh - - - - - - - - 0 0 Gandayasa 2 2 - - - - - - 2 2 Katulisan 34 34 3 3 - - - - 37 37 Kampung Baru - - - - 15 15 1 1 16 16 Malabar - - - - 15 15 - - 15 15 Nagara - - - - 42 42 10 10 52 52 Panosogan 13 13 - - - - - - 13 13 Panyabrangan 8 8 2 2 7 7 1 1 18 18 Kamuning - - - - - - - - 0 0 Total 57 57 5 5 98 98 16 16 176 176

31. Loss of Common Properties. There are 13 common properties as documented during the surveys-mosques/mosque lands/waqfs as shown in Table 14. One grave is located in Panyabrangan.

Table 14. Impacts on Common Properties Basic Land Structure

Village Description AHs Total Area

(m2) Footprint Dike-River Borrow pit Land Loss Total Area Affected Area

Blokang Wakap Mesjid 1 100.00

1 160.00 - - Wakap Mesjid 1 1,325.00

1 2,125.00 - -

Wakap Mesjid 0 750.00

1 500.00 - - Wakap Mesjid 0 4,464.00

1 3,520.00 - -

Dukuh TN.Wakaf/Saprani 0 791.35 429.11 -

429.11 - - Gandayasa Wakap Mesjid 1 900.00

1 900.00 - -

Tanah Wakap 0 1,500.00

1 1,500.00 - - Warga Kampung Bagoang

1 10,815.33 2,609.52 -

2,609.52 - -

Wakap Mesjid 0 600.00

1 600.00 - - Nagara Wakaf/Mushola 0 505.80 450.89 5.21

456.09 - -

Panosogan Musola 0 100.99 0.19 -

0.19 58.90 58.90 Panyabrangan Nurjaya 1 814.94 296.07 515.65

811.71 - -

Wakaf Kubiuran 0 2,648.71 793.02 757.33

1,550.35 - - Total 5 25,316.12 4,578.80 1,278.19 7.00 15,161.97 58.90

Page 27: Download 2.56 MB

11

32. The summary of resettlement impacts is outlined in the Table below:

Table 15. Summary of Resettlement Impacts

Loss Category Unit Quantity Remarks

Component: Land Acquisition for Dyke, Between Dyke and River and Borrow Pit

No. of Affected Households HH 1.887 No. of Affected People AP’s 5.760 Loss of Land (Permanent) m

2 1,904,395.31

No. of Affected Structures (Building etc.) m2 8,456.43

No. of affected crops land m2 316,166.91

No. of affected crops land parcels 684 No. Affected Household of crops land HH 655 No. of Severely Affected Households HH 1.208 No. of Vulnerable Households/APs HH’s/AP’s 1.060 No. of Houses to be Resettled Unit 93 No. of physically relocated Affected Household/APs

HH/AP’s 93

No. of Affected Business Income HH 176

No. of Commmunities Infrastructure Impacted Unit 13 + 1

Graveyard

Page 28: Download 2.56 MB

12

III. Socioeconomic Information and Profile

A. The Project Area

33. Banten is a province of Indonesia bordering Jakarta on the island of Java. Capital city is Serang. The 2014 population of Banten is officially estimated at 11,834,087. Sixty-five percent or 574,090 hectares of Banten is classified as flat, 186,320 hectares (21%) with slopes of between 2% and 15% and the remaining 118,471 hectares (13%) is steep with slopes over 15%. The economic structure of Banten in 2010 was primarily led by the manufacturing industry (44.27%), trading (21.33%), transport and communication (10.12%). The biggest contribution from agriculture comes from the farming of cassava, followed by sweet potato and corn.

34. Banten Province is subdivided into four regencies (kabupaten) and four autonomous cities (kota), listed below with populations from the 2010 Censuses, together with the latest (2014) official estimates.2

Table 16. Banten Province Population for 2010 and 2014

Name Area (km2)

Population Census 2010

Population 2014 Estimate

Cilegon (city) 175.51 374,559 416,901 Serang (city) 266.71 577,785 643,101 Serang Regency 1,734.28 1,402,818 1,561,401 Lebak Regency 3,426.56 1,204,095 1,340,213 Pandeglang Regency 2,746.89 1,149,610 1,279,569 Western part (outside Jabodetabek)

8,349.95 4,708,867 5,241,185

Tangerang (city) 153.93 1,798,601 2,001,925 South Tangerang (city) 147.19 1,290,322 1,436,187 Tangerang Regency 1,011.86 2,834,376 3,154,790 Eastern part (within Jabodetabek)

1,312.98 5,923,299 6,592,902

35. Serang (Kabupaten Serang) is a regency of Banten province with administrative center at Baros while the capital of the province is the independent municipality of Serang (Kota Serang) which was split off the regency in 2007. It covers an area of 1,734.28.km2 with a population of 1,402,818 at the 2010 Census with latest official estimate for 2014 at 1,561,401. With Cilegon and Serang cities surrounded by the regency, the 2014 population amounted to 2,621,403 inhabiting 2,176.49 km2, for an overall density of over 1,200 per sq.km. The Regency is divided into 28 districts (kecamatan), listed below with their populations at the 2010 Census: 3

Table 17. Serang Regency 2010 Population and Project-Affected Villages

District 2010 District Population

Affected Village

Anyar 51,124 Baros 51,293 Bandung 30,540 Blokang, Malabar Bojonegara 41,526 Cikande 91,834 Cikeusal 64,872 Gandayasan,

Katulisan, Nagara, Panosogan, and Panyabrangan

Cinangka 53,323 Ciomas 37,112

2 Biro Pusat Statistik, Jakarta, 2010. 3 Ibid.

Page 29: Download 2.56 MB

13

District 2010 District Population

Affected Village

Gunung Sari 19,359 Jawilan 52,448 Kibin 67,194 Nagara Kopo 48,183 Kragilan 79,627 Dukuh Mancak 43,275 Pabuaran 38,005 Padarincang 61,357 Pamarayan 48,820 Petir 50,134 Pulo Ampel 34,098 Tunjung Teja 38,933 Kamuning Waringinkurung 41,290

36. In terms of education/literacy statistics, Table 18 shows that overall, an increase in the quality of education and enrollment rates were recorded from 2012 to 2013 specifically in regard to literacy that stands at 96.04%. Enrollment rates likewise generally increased, although dropped by 0.17% for the 13-15 year old bracket.

Table 18. The Education Indicator of Serang Regency Year 2012-2013

Description Year

2012 2013 The Quality of Education of Population

The Literacy Rate (percentage) 95.28 96.04 The average length of school (year) 7.36 7.48 The enrollment rates

Ages 7 - 12 years 98.93 99.96 Ages 13 - 15 years 91.01 90.84 Ages 16 – 18 years 51.14 58.25

Source: Central Bureau of Statistics 2014.

B. Results of the Socioeconomic Survey of AHs

37. Complete enumeration of AHs was made parallel to the detailed measurements surveys conducted from March – May 2014. Equator was joined by Prana-Geo, the local firm contracted by the government to ensure accuracy of measurements with use of engineering equipment.

38. The draft inventory of losses (IOL) and census of all APs/AHs and private and public organizations and institutions affected by the loss of assets conducted in 2013 was finalized and updated with the strong participation of local government, BBWS, and MAPPI.

1. Socio-demographic Characteristics of Affected Households

39. Age. In the 1st iteration of the SES, it was determined that of the total 2,154 interviewed for the project, the age mode is in the 16-25 year old bracket (57%), followed by the 26-40 year bracket (16%) and with the 0-15 year age group or the children, at 14%. All other age groups is in the single digit percent. The population can be established as belonging more to the young age group with the 8% of the productive population carrying the burden for the estimated 70% young and elderly population

40. Sex and HH size. The people generally are patriarchal within project sites. Around 88% of HH heads are males and 12% females. However, there are more female HH members than males. Along the left bank, 60% are female, 59% females along the right bank, 59% of the total household members are female and 68% females in temporary borrow pit areas. Average HH sixe is computed at 3.5 or 4 persons per HH.

Page 30: Download 2.56 MB

14

41. Marital status. Overall, majority (90%) of AHs are married, with 8% widowed, and 1% each single and another 1% into forced relationships.

42. Ethnicity and Religion. Around 59% of AHs are Javanese as against 41% Sundanese. The only area that has more Sundanese is in the temporary borrow pit areas of Kamuning where almost all AHs are Sundanese. Sundanese culture has a number of similarities with Javanese, however it differs by being more overtly Islamic, with less Hindu-Buddhist elements, and has a less rigid system of social hierarchy.4 Almost all AHs are Muslims, with just 7 Christians: 3 in Gandayasa and 2 each in Nagara Panyabrangan.

43. Residency. An estimated 73% of AHs have resided in their current places of residence for 10 years or more, followed by the 2-5 years bracket at 25%, 2% for the 5-10 years, and 0.1% being 2 years and less. This has great bearing on the cost for emotional trauma.

44. Educational status. Most household heads and their respective family members have low level of education. About 50% of the household heads graduated from primary education (elementary), 14% continued to secondary education (high school) but did not finish, 12% did not finish elementary, 8% have not experienced any formal education, 6% are still in elementary, and 5% for those who have completed high school and college.

45. As for the family members, 27% have graduated from elementary only and did not continue to secondary education, 21% reached high school but did not finish and only 18% have completed their secondary education.

46. Occupation. Educational level of the household head is believed to influence occupation. The low level of education encourages people in the area to work as farmers. About 71% of AH heads in the area are farmers. Their work is dependent on available agricultural lands. Other occupations are as drivers/labourers (13%), 9% are employees of private and government offices, 4% retired, 2% business owners and are self-employed, and the remaining 2.2% are either unemployed, still studying, or are engaged in other types of work.

47. Income. The average household income is IDR 3 million per month with AHs from the left bank getting slightly lower at 2,979,704 per month and those from right bank higher with IDR 3,198,224 per month. Minimum wage for Serang district (UMK) is IDR 2,080,000 per month thus shows that AHs are relatively better off.

2. Health and Sanitation

48. Toilet facilities. Data on the location of toilet facilities for households in the Ciujung land acquisition corridor reveal that the most common location and facility (54.1%) was use of toilets with septic tanks located within housing structures, followed by outdoor but enclosed toilet facilities located above rivers (27.0%) and toilet facilities within households (10.0%) where waste was channeled to rivers or ponds.

49. Waste disposal. The final table in this sub-section concerns the location and sources for household waste (non-toilet) disposal within the Ciujung land acquisition corridor. The most common means (84.6%) and location for disposing domestic waster was to burn it nearby, followed by disposal in the nearby river (8.9%) and finally usage of garbage cans or household disposal containers (3.3%).

3. Participation to Community or Religious Activities

50. Religious activities are carried out regularly usually every Friday in every village where both men and women participate. There are also religious activities in every village attended only by women (mother and girls). In Panosogan Village, this is held usually on Tuesdays and Sundays. In this village the implementation of religious activities are usually carried out by the “majlis al-Ikhlas”.

51. In each village, community activities revolve around road construction and O&M, environmental hygiene programs, and assistance to building a home for a family or couple. Women 4 Hefner, Robert (1997), Java's Five Regional Cultures. taken from Oey, Eric (editor) (1997). Java. Singapore: Periplus Editions. pp. 58–61.

Page 31: Download 2.56 MB

15

and men usually participate in these activities where men generally providing the labor and the women helping in food preparation.

4. Perceptions about the Project and Willingness to Relocate

52. Perceptions about the project were largely derived through initial surveys (75% of current census), frequent consultations with stakeholders and local officials.

53. Resettlement preferences. The desired means of compensation on land acquisition are cash, land and house substitutions, and swaps (tukar guling) (see consultation appendix). Most of the households (64.31%) prefer compensation in the form of cash. As for the asset in the form of house structure, 54% expect the compensation in other forms. There were only few households (less than 5%) that expect the compensation in the form of new land/house or swap.

54. Impacts of land acquisition. The impact of the land acquisition project was also asked and 36.40% stated that the land acquisition activities in these locations will have some impacts on their lives. However, 3.03% stated the opposite, while the remaining 60.57% remain uncertain. Cited impacts were related to livelihoods, shelter, and social life in the new environment. The people who answered "no" said that they are working away from the area of land acquisition, having no area of cultivation in the area of land acquisition, and if the compensation provided is considered sufficient.

55. Flood safety. Regarding the safety from flood, almost all of the households (97.77%) stated that their current residence is relatively safe from flood. There are only 22 (2.22%) households that stated the opposite. Of the 22 households, 15 households said that they are willing to be relocated, while the remaining 7 households are not sure yet.

5. Social Services Available in Project Sites

56. Extension Programs. An ongoing extension/advanced program is implemented by government in Panosogan Village, commonly known as the PNPM Mandiri Program for rural road construction. It promotes local materials to upgrade the village road axis using hotmik material. People generally are pleased with the program because it improved accessibility between villages or between hamlets. Community business activities have increased.

57. Credit Facilities. Credit within the communities is commonly availed of for working capital to open kiosks and some carts or stalls to sell goods and ware for improves household income. There are several sources within the communities, both formal and informal.

58. Credit programs implemented formally generally help AHs if affordable to the public. Generally, AHs can avail of credit if repayment is computed with reasonable interest rates. However, if the interest rate is very high APs have difficulty to pay, thus many APs, and the community at large result to selling their properties pay off debts.

59. The formal credit facility is commonly the Bank Syariah Mandiri with an interest rate of 10% per year. Repayment is every two weeks. The informal credit facility is locally known as “Bank Keliling.” Payment is made every day with an interest rate of 20% per month. The informal system has less requirements and is processed faster hence out of necessity, APs borrow money from “Bank Keliling” despite higher interest rates.

60. In the recent past, the Unit Pelayanan Kemasyarakatan (UPK), the social service unit of the Office of SMEs for savings and loans operated in the area. At the village level, one credit group consists of 10 persons who avail of loans. The credit group makes monthly payments: within the group, members pay to the group-designated chairman. The program stopped because repayment was not regularly made specifically in Pasir Muncang, Panosogan Village. The credit service stopped operating for one year now. It had been a regular source since 2006.

61. Relief Operations During Disasters/Calamities. Relief operations during disasters or calamities is in the form of “Bansos” assistance where distribution of food, blankets, rice, used clothing, clean water, mineral water is the norm. These are mostly facilitated by local officials like

Page 32: Download 2.56 MB

16

board members (for groceries), vice-regent / mayor (for groceries and food items). Aid is distributed directly to the public. All geopolitical units are involved.

62. Serang Regency Empowerment Initiatives. The ongoing empowerment programs of Serang Regency in 2014 by the local government working units are as follows:

(i) Agriculture Office - In 2014, the Agriculture Office of Serang Regency is implementing a processing enhancement program for agricultural products which is intended for all sub-districts, including 5 sub-districts along Ciujung River Basin. The program covers land area as wide as 25,819 ha.

(ii) Cooperative, Industry and Trade Office - In 2014, Cooperative, Industry and Trade Office of Serang Regency implemented their business development program in all sub-districts (29 sub-districts) for business activities categorized as home industry, small and medium enterprises. Unfortunately, the provision of venture capital still cannot be accommodated for all sub-districts, as it’s only focused for Kragilan Sub-District in the northern coast region and Blokang Sub-Districts of Malabar Village.

(iii) Environment Office - The programs which is carried out in 2014 are among other centralized in the eastern region (Ciruas, Pamarayan) such as green open space (RTH), reducing the critical land area. More to the point, flood management and seeding programs were undertaken in April and May 2014.

(iv) Spatial Planning Office - The Pansimas and Sandimas programs are specifically made available in 2014 for Housing and Human Settlements sector. Whilst the flood mitigation program is carried out in Kibin Sub- District.

(v) Public Works Office - In 2014, a dam development program is carried out in Ciujung River Basin such as in Cikeusal and Katulisan as well as in another region, i.e. Cicangkok.

(vi) Fisheries Office - The catfish breeding and fish feed manufacturing programs is also carried out in 2014 in Cikeusal for 2 groups.

(vii) Disaster and Flood Mitigation Agency - In 2013, a flood mitigation program was implemented in 17 flood affected sub-districts. By 2014 the program focused on five sub-districts along Ciujung River Basin, such as flood mitigation counseling program and disaster evacuation simulation for flood affected areas. This program is conducted for 50 people in each batch.

(viii) Education Office - In 2014, the program is focused on renovation or rehabilitation of schools affected by the flood in Ciujung River Basin area such as SD Gandayasa and SD Katulisan. School buildings that have been built are damaged because of flood.

(ix) BKPMD - The following are empowerment programs implemented in Ciujung River Basin area in 2014: a. Institutional capacity building through education and training, technical training, PKK,

and local youth organization. b. PNPM Facilities: Access to capital, improvement of rural facilities and infrastructures. c. The services or assistance to affected people.

C. Impacts on AHs: Livelihood

63. Identified impacts during consultation are summarized in Table 19.

Table 19. Livelihood Risks

No. Type of Impact Magnitude of Impact of Relocation Nature of Impact of Relocation 1 The obstruction

of the loss of livelihood /other activities

The landowner farmers or sharecroppers will experience the change or loss of livelihood, as they will have to relocate to another area. Landowner non-farmers will also experience the change or loss of livelihood, as they will have to relocate to

This impact is temporary for the landowner farmers as they can buy lands in another area. This impact is temporary for the landowner as they can buy lands and open business/working in another area.

Page 33: Download 2.56 MB

17

No. Type of Impact Magnitude of Impact of Relocation Nature of Impact of Relocation another area. Vulnerable group: Sharecroppers will experience the change/loss their livelihoods, as they have to move to new area. Poor family who do not have land will experience the change/lose their livelihoods, as they have to move to new area. The female head of households will experience the change/lose their livelihoods, as they have to move to new area. Children will experience distraction of access to their schools.

The impact is permanent, as they have to find and till new land in the embankment area or another area. The impact is permanent, as they have to find new jobs in another area. The impact is permanent, as they have to find new jobs in another area.

The impact is permanent, as they have to move to new schools near their new houses.

2 The change or decrease of income

There will be a decrease in agricultural products’ value, particularly with landowner farmers. Landowner non-farmers will experience the decrease of income during the transition period.

This impact is temporary for the landowner farmers, as they will buy lands in other areas. This impact is temporary for the landowner as they can buy lands and open business/working in other areas.

Vulnerable group: Sharecroppers will lose their livelihoods - no land to be tilled. Poor families who do not have land will experience the change; they will lose their livelihoods, as they have to move to new areas. The female head of households will experience change/decrease in income during the transition period.

The impact is permanent and they have to find new land to be tilled. The impact is permanent. The impact is permanent.

D. Impacts on Vulnerable Sector

64. The vulnerable sector as elaborated under Law No. 39/1999 (Article 5 elucidation) on Human Rights include the elderly, children, the poor, pregnant women and people with disabilities. For purposes of this document, these are distinct groups of people who might suffer more or face the risk of being further marginalized due to the project and specifically include: (i) households that are headed by women, (ii) household heads with disabilities, (iii) households falling under the regional poverty line, and (iv) elderly household heads.

65. The distribution of identified vulnerable households within the project sites are summarized in Table 20.

Page 34: Download 2.56 MB

18

Table 20. Impacts on Vulnerable Households

Village Total AHs HH with Income Below Minimum

Wage

Elderly HH head (65 or more)

Disabled HH head

HH headed by female

Vulnerable AHs

% Vulnerable AHs

Blokang 156 55 23 11 21 81 7.64% Dukuh 67 20 5 0 7 29 2.74% Gandayasa 174 80 28 0 21 93 8.77% Katulisan 239 90 52 17 36 127 11.98% Kp Baru 171 60 53 10 24 100 9.43% Malabar 138 55 37 4 13 85 8.02% Nagara 231 98 25 9 22 124 11.70% Panasogan 178 65 30 8 25 90 8.49% Panyabrangan

202 100 31 4 14 130 12.26%

Blokang 125 61 25 0 13 73 6.89% Kamuning 68 50 9 0 11 55 5.19% Malabar 39 12 16 0 1 22 2.08% Nagara 99 41 23 0 10 51 4.81% Total 1,887 787 357 63 218 1,060 100.00%

% of Tot Vulnerable AHs 74.25% 33.68% 5.94% 20.57% 100.00% % of Tot AHs 41.71% 18.92% 3.34% 11.55% 56.17%

66. Table 19 further shows that of the total AHs (1,887), about 57% are vulnerable. Of those that are vulnerable (1,060), almost 75% belong to those with income below minimum wage, followed by elderly household heads (34%), households headed by women (21%) and disabled household heads. Of the villages, vulnerable (12.26 %) are generally found in Panyabrangan, followed by Katulisan (11.98%) and Nagara (11.7%).

E. Gender Analysis

67. Gender issues at the project sites were generated through a sample survey piggy-backed with the socioeconomic survey for affected households from June to July 2013. Interview and focus groups discussion were also conducted in early 2014 and during the loan fact-finding mission. Based on survey results, the summary of gender issues are:

(i) Access to and involvement of citizens, of women and of men, varies according to the form in the handling of post-disaster activities. Nevertheless, the role of women in the rescue and evacuation of disaster victims is still very limited, because this activity is still perceived as a 'domain' work of men;

(ii) Women lack access to satisfy special needs, especially in the critical period of three flood disasters until a week after the flood. Women also lack management roles in managing of refugee camps, such as the layout of refugee camps and separation between men and women such as barriers in the hospital room, or separate toilet for men and women. In addition, the handling of post-flood found in the project location is still not gender sensitive;

(iii) Gender discrimination frequently excludes women from decision-making about community disaster response. However their dominance in the domestic sphere means they have more knowledge than men about the production, preparation and distribution of food. Additionally, their long-standing role as family careers means that they are often very knowledgeable about medical care. This kind of knowledge saves lives in emergency situations;

(iv) Landholding is still commonly under the man’s name; (v) Women and in general communities are not involved in hazard analysis, preparing

hazard map and assessment of vulnerability; (vi) Women do not have access to information and assistance following flooding events.

There is need for meaningful socialization in all phases of flood management to encourage behavior change and increase awareness;

Page 35: Download 2.56 MB

19

(vii) Flood forecast is not available and farmers especially women have little knowledge on crop diversification, food storage, etc.;

(viii) Women and children suffer most and carry the burden during flooding but women have more initiative to seek help. They are not however involved in planning on emergency housing facilities and evacuation shelters;

(ix) Women are not involved in flood risk management discussion, and do not understand the procedures of flood warning and activities for contingency plans and post flood recovery;

(x) Decision making in the public and domestic sphere is still dominated by men. For local governments, there is strong need for gender-disaggregated data in documenting disasters such as flooding hence they could not provide for specific needs for women;

(xi) Information and communication alert is not yet established and should be made assessable for both women, men and youth;

(xii) Women are over-burdened before disasters, and even more so during and after. Because of their roles in domestic household work and chores, child care and housekeeping, women tend to bear more of the flooding burden than men during flooding events. Female-headed households in particular have to respond on their own initially when floods arrive;

(xiii) Women especially young women should be involved in flood warning activities; (xiv) Many female head of households have not completed primary school and they would like

to have better skills in productive economic activities; (xv) Many women would like to be involved in conservation, watershed management, flood

management committees and other activities in reducing flood occurrence in their areas; (xvi) Many women and men also asking for the possibility of activities to keep children

occupied after the flood; and (xvii) Women spend 6 hours or more on household chores and time allocation for farm work

have to balance with household work.

Page 36: Download 2.56 MB

20

IV. Consultation and Participation, and Information Disclosure

A. Stakeholders

69. There are two general types of stakeholders: Community-based households and institutions.

1. Community-based Stakeholders

70. APs. The key stakeholders in Ciujung comprise persons directly affected by land acquisition activities that result in loss of land and non – land assets, including primarily agricultural and residential land, crops, house structures and assets, and businesses. Agricultural lands and land owners (primarily farmers) are adjacent to the embankment. Business owners, either operate out of their own residences in micro-enterprises, or in distinct small businesses such as food stalls.

71. Religious/Social Groups. Prominent local figures in Ciujung, whether they represent social, religious, cultural and even political interests, also comprise important local stakeholders near the Ciujung land acquisition corridors because of the influence they wield in molding perceptions and opinions of the local societies at large and the affected persons.

2. Institutional Stakeholders

72. National Government Agencies. The three major implementing agencies for the Project also represent major stakeholders. These agencies comprise, first, the Directorate General of Water Resources of the Ministry of Public Works and Housing, where the Project is linked directly to the Directorate of Rivers, and where the CPMU (Central Project Management Unit) will be located in the planning wing of the DGWR. In addition, the Ministry of Home Affairs (MOHA) Directorate General of Regional Development (DGRD), and the Ministry of Agriculture’s (MOA) Directorate General of Agriculture Infrastructure Facilities represent other key national level technical agencies with technical, supervisory, coordination and monitoring roles towards their regional agency counterparts.

73. Regional Institutions. There abound several key regional stakeholder institutions:

(i) BBWS C3. The most prominent regional agency stakeholders are the Ciujung river basin authority, termed the Balai Besar Wilayah Sungai, or BBWS C3. The BBWS river basin organization is structured to manage 3 river basins in close proximity in an integrated, cross administrative boundary fashion, based on the demarcations of river catchments and watershed areas.

(ii) Local Governments. Regional governments with direct interest and responsibility for assisting in preparation and implementation of land acquisition and resettlement arrangements likewise represent strategic regional entities and institutions with direct influence and involvement in multiple components of the Project related interventions. These include provincial government and most importantly district (kabupaten) level government, in addition to lower level sub-district (kecamatan) and village (desa) governments. The regional (provincial, kabupaten) branches of the National Land Agency, or BPN (Badan Pertahanan Nasional), play strategic roles in implementing land acquisition activities for the development of public interest including land measuring, negotiation of compensation form, compensation payment, and transfer of acquired land to agency needing the land/project proponent. Under the 2012 updated Land Acquisition in the Public Interest law and follow-up guidelines, the head of the province based regional BPN chairs the land acquisition committees set up to facilitate land acquisition on projects within the public domain and interest.

(iii) Line Agencies. The Banten provincial and Serang kabupaten government that maintain direct responsibility for overseeing land acquisition and resettlement activities within their jurisdictional regions are complemented by their key technical and line agencies that parallel the national agencies. These agencies comprise Bappeda planning agencies, water resources or/and irrigation agencies, agricultural agencies and potentially also forestry agencies in the watersheds. Special regional project implementation units (PIU) will be set up in these agencies.

Page 37: Download 2.56 MB

21

(iv) Civil Society. Additional civil society groups such as environmentally oriented NGOs may have roles to play as a complement to the local civil society groups. In the Ciujung river basin, a special watershed ‘communication’ and conservation institution, with inter-agency coordination functions, has been established by the provincial governor. The Ciujung Watershed (DAS) Communication Forum is chaired by the Bappeda of Serang, with its deputy from the kabupaten environmental agency, along with inter-agency membership including local government, Water Resources/Irrigation, Agriculture, and Forestry agencies.

(v) Media. Regional and sub-regional media (newspapers, magazines, television and radio), as well as official local government (province, kabupaten) information and media units, through their roles to disburse information and influence and mold public opinion, have been involved during the PPTA phase/planning phase and represent regional and local level stakeholders that need to be provided access and information during the FMSRB implementation phases.

B. Consultation and Participation Mechanisms across Project Cycle

74. Meaningful consultations have been carried out with the entitled parties/APs, groups, host communities and concerned groups if any relocation, land or other assets acquisition and ensure participation of relevance stakeholders from planning up to implementation. Meaningful consultation is a process that (i) begins early in the project preparation stage and is carried out on an ongoing basis throughout the project cycle; (ii) provides timely disclosure of relevant and adequate information that is understandable and readily accessible to affected people; (iii) is undertaken in an atmosphere free of intimidation or coercion; (iv) is gender inclusive and responsive, and tailored to the needs of disadvantaged and vulnerable groups; and (v) enables the incorporation of all relevant views of affected people and other stakeholders into decision making, such as project design, mitigation measures, the sharing of development benefits and opportunities, and implementation issues. Particular attention will be provided to the needs of vulnerable group and ensure their participation.

75. The Ministry of Public Works and Housing through the DGWR is the EA. The key entities with responsibilities to promote and facilitate consultation with local stakeholders including civil society groups are, (i) the BBWS C3 as the implementing agencies, and (ii) the provincial and district governments, in particular the Bappeda of Serang District Governments and land acquisition preparatory team supported by the local kecamatan and village governments. These agencies have significant role in the consultation at planning and preparatory stage of land acquisition; (iii) provincial BPN and land office in Serang District with land acquisition implementation committee;

76. A variety of mechanisms will be applied to consult with entitled parties and communities during preparation and implementation of LARP: (i) community consultations and dissemination of information about the Project and its subproject components; (ii) meetings with landowners and entitled parties; (iii) separate meetings with female entitled parties; (iv) a socioeconomic survey of male and female entitled parties to produce a village profile; and (v) awareness improvement training about possible risks associated with the project.

77. The BBWS C3 and the provincial/district government as well as the land office/BPN will be responsible for the consultation and participation processes at the planning stage of land acquisition process. Village based consultative meetings involving APs and stakeholders both women and men will be conducted at the LARP preparation and implementation. The subproject plan will be explained to the APs and stakeholders, as well as the potential positive and negative impacts that include land acquisition/ resettlement issues. Participants at the meeting have the opportunity to discuss the issues that concern them.. In the preparation of the LARP, the APs, representatives of communities and government agencies have been consulted both at the national, provincial, district levels to ensure that eligibilities and entitlements are agreed upon and will be applied accordingly.

78. Topics discussed in the public consultation meetings include:

Page 38: Download 2.56 MB

22

(i) An orientation on the project: Subproject designs, schedules of implementation, and Identification / introduction of PIU focal / contact persons;

(ii) Project benefits, potential adverse impacts, and mitigating measures to be taken; (iii) Valuation methods and entitlements/compensation packages; (iv) Grievance process and monitoring; and (v) Subsequent schedule of meetings.

79. DGWR together with the other IAs will ensure that women and other vulnerable shall attend the consultation meetings, and separate meetings will be organized with women so that their specific concerns can be discussed. Consultations will be conducted at venues and times that are suitable for women and will not disadvantage them.

C. Consultation Conducted at Project Design Stage

1. Consultation at Planning Stage

80. A total of 24 public consultation meetings (PCM) were conducted at the planning stage from 2013 to 2014 to which 1,286 participants - double entries mostly with implementing and executing agencies, local governments as well as PPTA members - attended from both institutional stakeholders to communities and AHs. Details are provided in Appendix 4. Of the 24 PCMs at planning stage, 12 PCMs were catered to communities and AHs, and the other 12 for institutions. Community consultations were brought down to the village level for a total of 896 persons in attendance with strong participation for village officials.

81. Key issues from affected communities and AHs revolved around the amount for compensation and the how the land acquisition process would be conducted. The Project is planned to be implemented over a period of 6 years and the construction of the dykes in the core subproject will take 3 years. By and large, there was strong support for the project with assurances that the 2012 Land Law would be implemented to the fullest. Further, that land acquisition budget is 100% funded by BBWS C3.

82. Two other key consultations were conducted in November 2014 (See Appendix 4 for details): a series on the Expose of BBWS C3 to Preparatory Committee Team Banten Province, BPN, Kecamatan, Villages Related to the Project Plan. First session attended by (ASDA Banten Province; Head of Government Bureau Banten Province and staff; Head of BPN Banten Province and staff; Heads of Kecamatan; Heads of Villages; Dinas SDA Banten Provinces; and BBWS C3.The main objective of the consultation was to assess the readiness of BBWS C3 for the land acquisition activities in the Ciujung River. Key outcome is the agreement of land to be acquired (including the area between river and dyke). Agreements made during the 1st Session are

83. The BBWS C3 shall prepare the data of affected HH’s with the complete map (including the numbering of the name of HH’s)

(i) The area between river and dykes should be acquired because the area will be unproductive land after the dykes built.

(ii) The land owners status and the ownership land must be included in the planning land acquisition document.

(iii) The recommendation spatial suitability of the district should be included in the document.

84. The second session of consultation was also attended by the PPTA-ADB representatives and the first session participants. Aside from project preparedness, cost sharing was also discussed as it was a major concern. Outcomes of the 2nd Session as follows:

(i) Land acquisition budget will be fully financed by BBWS C3. (ii) The remaining land will be acquired with due consideration to community benefits. (iii) BBWS C3 with the head of villages will carry out the data checking related to land

ownership status.Develop agreement on the location of the land arose and additional

Page 39: Download 2.56 MB

23

status information affected land. In the area of the location to be acquired, there are several locations arise land requested by the AH's to be acquired. BBWS has declared the arise land would not be acquired because the arise not have clarity status.

(iv) Coordinate with village leaders regarding land status and after data collection, for the preparatory team to conduct public consultation in every village.

(v) Consider remaining land to be acquired with respect to community benefits. For the remaining land to be acquired but are not giving more benefits to AH's lives, it was decided to be acquired by BBWS C3.

(vi) Check with village treasury to avoid mistakes in land acquisition. (vii) BPN requested the outer limits of the land and the boundary between the land to set up

the boundaries plot, so that the BPN stay perform the measurements. In the planning stage, BPN asked BBWS that limit land to be acquired has been determined by using clear stakes, so that BPN can easily perform the measurement. This is done because of the difficulties in the implementation phase to determine the boundary due to limited human resources. BPN requested the outer limits of the land and the boundary between the land to set up the boundaries plot, so that the BPN stay perform the measurements.

(viii) BPN requested adjustments and finalized the estimated time of implementation planning documents to be actually used. These statement arised related to the readiness BBWS in delivering the Land Acquisition Planning Document (not LARP) to facilitate the BPN in setting time for implementation stage.

(ix) Land acquisition budget to be fully financed by APBN and local government to fully finance the Social Action Plan (SAP), otherwise known as the Income/Livelihood Restoration Program. Bappeda Serang District committed to conducting SAP.

(x) Determine land prices according to market prices and other values as comparison with the appraisal team, NJOP price and market price in anticipation of mark up / mismatch of land prices.

(xi) Refer to economic value and accessibility of land to be acquired. If the remaining land cannot demonstrate economic value and community access is affected by project construction, the remaining land need to be acquired.

(xii) Heads of villages to secure HH data and map for finalization.

2. Consultation at Preparatory and Implementation Stages

85. The principle of meaningful consultation as per ADB SPS will be followed at the preparatory stage of land acquisition. Scopes and procedures of consultations with the entitled parties and concerned groups to be conducted by land preparatory team are the following;

(i) Public consultation on the development/project plan is to reach agreement on the location for the planned development from the entitled parties and persons likely to be affected by the development/project.

(ii) Explanation on the development/project plan shall cover: a. The objectives and purposes of the planned development for public interests; b. Stages and process of land acquisition; c. Roles of valuator in setting the compensation rate; d. Compensation to be given to the entitled parties; e. Objects eligible for compensation; f. The form of compensation; and g. Rights and obligations of the entitled parties.

(iii) The public consultation shall be held in village office or sub district office where the planned development is located or other places mutually agreed by the preparatory team and the entitled parties.

(iv) Public Consultation shall be carried in respect to local conditions (v) Invitations on the public consultation by the preparatory team shall be directly submitted

to the entitled parties and the affected persons no later than 3 working days prior to public consultation.

Page 40: Download 2.56 MB

24

(vi) For the unknown entitled parties, the invitation shall be made with: a) announcement in village office or sub district office at the location of the planned development; and; b) printed or electronic media.

(vii) The entitled parties/affected persons or their attorneys shall be given with opportunity to express their opinion/comments with regard to the location of the planned development.

(viii) The attendance of the entitled parties/APs or their attorneys shall be proved with List of attendance.

(ix) Agreement on the location of the planned development achieved during public consultation shall be spelled out in an agreement report.

(x) If during public consultation some entitled parties and APs or their attorneys express their objection or disagreement on the location of the planned development, Public Consultation shall be repeated. The second public consultation as referred shall be organized no later than 30 (thirty) working days.

86. At the implementation stages, meaningful consultation/deliberation shall be conducted by land acquisition implementation team with the following activities:

(i) Consultation/deliberation shall be facilitated by the land acquisition implementation team with the participation entitled parties and institution needing the land/project proponent. In case of the entitled parties can not attend the consultations, they can provide attorney to the husband/wife or a sibling who have blood relationship.

(ii) The deliberation shall be held to establish the form of compensation based on the compensation assessment.

(iii) During the consultation/deliberation, the chairman of land acquisition implementation team shall propose the amount of compensation as recommended in compensation assessment

(iv) Invitation of consultations shall be submitted no later than 5 (five) working days ahead of deliberation forum date.

(v) Consultation/deliberation implementation shall be record completed with the list of attendees.

87. Consultation/deliberation forum can be carried out in several groups in view of the number of the entitled parties, time and venue.If no agreement is reached, the consultation/deliberation forum can be conducted for one more time. Deliberation forum must be conducted not later than 30 working days since the submission of valuation results by the appraiser to the chairman of land acquisition implementation committee.

88. In addition, the consultations will be conducted for the livelihood restoration program implementation that will involve the entitled parties, village offices, sub district offices, and relevant agencies at Kabupaten level.

D. Disclosure of Information

89. A pre-IOL/SES Project Information Booklet (PIB) was produced covering such topics as: project description, potential project impacts, broad statements on compensation, project timeline, and identification of focal agency and contact details. The PIB was produced in Bahasa Indonesia which is understandable by the entitled parties. Notices to meetings and other subproject activities/updates were issued and made accessible in public locations, such as the village or sub-districts offices. Village leaders and AHs were provided with PIBs.

90. At the preparation stage of land acquisition, when the entitled parties/APs agreed with the project plan and location and the project location determination has been issued, the governor/Serang Bupati (District Regent) together with the BBWS C3 shall announce the project location determination through printed and/or electronic media and shall be made at village/sub district/district office.

91. Overall project disclosure of the following documents will be met:

Page 41: Download 2.56 MB

25

(i) The final LARP endorsed by DGWR; (ii) New or updated LARP, and a corrective action plan prepared during subproject

implementation, if any; and (iii) The LARP monitoring reports and LARP final completion report.5

92. The ADB Public Communication Policy will serve as guide. The documents listed above will be uploaded in the Project management information system for interconnectivity as well as the ADB website.

5 Includes relevant information from the monitoring reports as disclosed to entitled parties, such as the implementation status of a

resettlement plan (i.e., information on financial progress/ disbursement and physical progress related to land and other assets acquisition and relocation; livelihood/income restoration; benefits sharing; and corrective action plan, if any.

Page 42: Download 2.56 MB

26

V. Grievance Redress Mechanisms 93. The project implementing units will ensure a culturally and gender sensitive grievance redress mechanism to receive and address, in coordination with provincial authorities, project related concerns and to resolve AP related disputes that may arise during project implementation. It is anticipated that all grievances related to benefits and other assistance will be resolved at the subproject level.

A. General Flow of Grievance Redress

94. Generally and at the village level APs through their facilitator or representative may bring the complaints to the village leaders and customary leaders, then they may bring it to the project officers at the field office or subproject site office. Specifically, (i) the AP narrates discontent to the community leader, (ii) the leader prepares an official report for documentation purposes and attempts to address and resolve the grievance at the community level; and (iii) if the AP is satisfied, there is no need to elevate the issue. If the grievance cannot be addressed at the village level, village leader submits the complaint to project management on-site.

95. Project staff from the safeguards units will assist APs in registering their complaints with subproject management, and preparing their specific grievances. The Project Manager will consider the complaint and within 15 working days convey a decision to the APs. These staff, along with local government district officials, will assist management in reviewing and addressing the complaint. The Project district officers will record/keep a file of the complaint. The safeguards staff will facilitate communication between the affected APs and the project management.

B. Specific Grievances

96. There are specific mechanisms for different grievances as upheld by Law 2/2012: (i) grievance on project location confirmation and results of inventory of assets, and (ii) grievance on compensation rate. The LAIT keeps records of complaints and disputes handled.

1. Grievance on project location determination and results of inventory/IOL

97. The announcement of the results of the inventory and identification shall include the subjects of title, size, location, and map/s of the project area. Grounds for grievance are; (i) should the AP not receive the results of the inventory, and (ii) should the AP object to the results of the inventory. As such, the grievance procedures to be observed are:

(i) An aggrieved AP/AH may appeal the result of the inventory on affected land and other assets found on the affected land (buildings, plants, other objects) with the LAIT.

(ii) LAIT within 14 days will verify the results of the inventory of the affected assets of the AH and will make necessary revisions/corrections, as needed. If the AH is still not satisfied with the findings of the LAIT, the AH can bring the matter to the district court for resolution.

(iii) If the grievance/complaint concerns ownership/control of land and/or other assets found on the affected land, the LAIT will seek a settlement with the contending parties through consultation.

(iv) If the consultation does not produce a settlement, the LAIT will advise the APs to resolve the case through the court.

2. Grievance on Compensation rate

98. Based on the 2012 Law, an aggrieved AP may bring the grievance/complaint as regards identification of land acquisition objects and compensation rates directly to the LAIT or land agency through the informal leader who will submit it to the LAIT either in writing or relay it verbally. The LAIT together with the land agency and the informal leader will attempt to seek consensus to achieve an acceptable settlement with the aggrieved AP. Specifically:

(i) An AP/AH that is not satisfied with the amount of compensation initially offered by the LAIT has within 30 days to come into agreement with the LAIT on the level of

Page 43: Download 2.56 MB

27

compensation for affected assets, including income loss for adversely affected business or employment.

(ii) If negotiation on compensation with the LAIT fails, the AP/AH may file within 14 days with the district court a complaint on the compensation proffered by LAIT. The court will judge on the case within 30 days.

(iii) If the AP/AH is not satisfied with the decision of the district court, the AP/AH within 14 days following judgment by the district court may bring the case to the Supreme Court and seek a reversal of the ruling of the district court. The Supreme Court will judge on the case within 30 days.

3. Other Disputes

99. In case of complaints related to project construction and other resettlement matters like restriction to access, the aggrieved party may bring the complaint through the informal leader, either to the contractor or to the LAIT.

100. If the aggrieved AP is not satisfied with the decision or handling of the complaint, he/she may bring the grievance, either in writing or verbally to the regent of the district accompanied by an explanation on the causes and reasons for the objection within a period of 14 days from the issuance of the decision of the LAIT or contractor/concerned entity.

101. The Bupati will decide on the complaint within a period of 30 days by requesting for opinions/wishes from (i) the aggrieved AP; (ii) LAIT; and (iii) other concerned entities (i.e., contractor, Land Agency). The Bupati’s decision will be delivered to the aggrieved AP, the LAIT, and other entity.

102. If after 30 days, no decision to the complaint is made or if the aggrieved AH is not satisfied with the decision taken by the Bupati, the AH may bring the complaint/case to the governor. The governor will decide on the complaint within a period of 30 days. The opinions/wishes of (i) the aggrieved AP; (ii) the LAIT; and (iii) other concerned entity may be required for the decision. The governor’s decision on the complaint will be delivered to the aggrieved AP, the LAIT, and other concerned entity.

103. If after another 30 days, no decision to the complaint is made or if the aggrieved AP is not satisfied with the decision taken by Walikota and/or the governor, it may bring the complaint/case to the court for adjudication.

Page 44: Download 2.56 MB

28

VI. Legal Framework

A. National and Local Policy Framework

104. Indonesia recently enacted a new land acquisition law for development in the public interest,6 Law No. 2/2012 and its implementing regulations i.e. (i) President of the Republic of Indonesia Regulation No. 71/2012 and President of the Republic of Indonesia Regulation No. 40/20147 on the Amendment to the President of the Republic of Indonesia Regulation No. 71 of 2012;8 (ii) Head of National Land Agency No. 5/2012;9 (iii) Ministry of Finance Regulation No. 13/PKM.02/2013;10 and (iv) Ministry of Home Affairs Regulation No. 72/2012). The law and regulations were issued to ensure land acquisition for the implementation of development for the public interest, emphasizing on the principles of humanity, democratic, and equitable. These legal provisions replaced previous land acquisition laws and its implementation regulations (President of the Republic of Indonesia Regulation No. 65 of 2006; President of the Republic of Indonesia Regulation No. 36/ 2005; BPN Head Regulation No. 3/2007).

105. Law No. 2/2012 provides a clear procedure and timeframe for land acquisition involving all stakeholders with clear procedures and time frame. The implementation of land acquisition considers balance between development interest and the interests of the community and by way of giving appropriate and equitable compensation. The objective of land acquisition is to make land available to improve the welfare and the prosperity of the people, state, and society by ensuring the legal interest of the entitled parties. The provision of the transitional law stipulates that land acquisition started before the enactment of the new law will be completed in accordance with the rules or regulations applicable previously, while land acquisition implemented after the enactment of the new law will be conducted under the provisions of the law No 2/2012.

106. The President of the Republic of Indonesia Regulation No. 71 of/2012 stipulates that the previous regulations will still apply if (i) the planning document on land acquisition has been prepared prior to the law promulgation; or (ii) land acquisition will be completed prior to 31 December 2014.11 The FSMRB is considered as a development for public interest, the land acquisition for the project is undertaken after the promulgation of the land acquisition law. Thus the land acquisition is implemented in reference to the Law No. 2/2012 and its implementing regulations. The Land Acquisition Law stipulates that government should undertake development for the public interest and the land belongs to the government or regional government or State Owned Entrerprises while the development in the public interest is the responsibility of the government, it can cooperate with State-Owned Enterprises, Regional-Owned Enterprises, and Private – Owned Enterprises.

6 Public Interest means the interest of the people, state, and society that must be realized by the government for best prosperity of the

people. Please see Law No. 2/2012, General Elucidation. 7 President of the Republic of Indonesia Regulation No. 40/2014, changes the content of Article 121 of President of the Republic of

Indonesia Regulation No. 71/2012, stipulates that, in the context of efficiency and effectiveness, land acquisition for public purposes of no more than 5 hectares can be implemented directly by the agency requiring land with the land rights holders, by way of sale or exchange or other means agreed upon by both parties.

8 It further regulates provisions under the land acquisition law that include i) land acquisition planning that include required information to be included in the land acquisition document; ii) land acquisition preparation that covers preparatory team and its tasks, stages and detailed activities for the project location determination; iii) land acquisition implementation by National Land Agency that include detailed provisions on land acquisition implementation team, preparation of land acquisition implementation, inventory of identification of losses, determination of independent appraiser, deliberations on the forms of compensation, delivery of compensation payment, delivery of compensation in the special circumstances, deposit compensation payment, release of the land acquisition objects, termination of rights between the entitled parties and land acquisition objects, recording and administrative data; iv) transfer of acquired land,; v) other provisions that include monitoring and evaluation, source of fund for land acquisition, negotiated land acquisition for small plot of land (less than 1 hectare; vii), tax incentive for entitled parties except those who make claims on the decision of the location determination and decision on the amount of compensation.

9 It provides technical guidelines on land acquisition implementation by Land National Agency. 10 It stipulates operational and support costs for land acquisition implementation (planning, preparation, implementation, and land transfer

phases) that come from the government budget. The regulation provides a detailed guidance on maximum cost for land acquisition preparation and implementation.

11 For the land acquisition being done and there is remaining land that will not be able to be completed by 31 December 2013, hence the remaining land should be acquired using provisions under the new land acquisition law and its implementation regulations. Please see Presidential Decree No. 71/2012 article 123.

Page 45: Download 2.56 MB

29

107. Based on Law No. 2/2012, the government should undertake land acquisition by involving all entitled holders (pihak yang berhak) and stakeholders. The entitled parties shall be those who control or own the object of the land acquisition, inter alia: a. the holders of land rights; b. the holders of land rights to manage; c. nadzir for the waqf land;12 d. the owners of former customary rights secured land; e. indigenous people/customary communities; f. the parties occupying the state land in good faith; g. land tenure holders; and/or h. the owners of buildings, plants or other objects related to the land. The object of land acquisition includes; (i) land; (ii) over ground and underground space; (iii) plants; (iii) buildings; (iv) objects related to land; and (v) other appraisable loss that include non-physical loss such as loss of business, loss of job, cost of change of location, cost of change of profession, and loss of the remaining property (residual property that is no longer viable).13 Land acquisition is implemented by the National Land Agency, conducted by providing fair and adequate compensation. The Law 2012 requires that a location determination must be done prior to land acquisition.14 Acquisition of land for public interest less than 1 hectare can be conducted by the institution needing the land through sale transaction, exchange, or other means acceptable to both parties.15

108. Compensation for losses in terms of land acquisition and resettlement activities as stipulated in the provisions of Law Number. 2/2012 now covers “Other appraisable loss”16. Losses in terms of restriction/limitation or restriction to access to natural resources such as marine-fishery resources that can impact on the economic activities of people are now categorized as losses by the new Law and may be valuated for compensation purposes and may be in any of the following forms (Article 36): (i) money; (ii) substitute land; (iii) resettlements; (iv) shareholding; or (v) other forms as agreed upon by both parties.

109. Law No. 2/2012 and its implementation regulations are applicable to the activities of land acquisition for development for the public interest17 carried out by the government by way of giving fair and adequate compensation. Various discussions with institutions that have the authority to provide an explanation on provisions of the law, such as the AGO and Land Agency (BPN) asserted that Law No. 2 /2012 is only applicable to land acquisition, where the object to be acquired are the property of other party and not owned by the institutions requiring land. Acquisition of land belonging to the institution requiring land is regarded as a land clearing. In this context, the Government Regulation in lieu of Law Number. 51 of 1960 regarding the prohibition of land use without the consent of the entitled party or his proxy is still applicable. Nevertheless, the Government Regulation in Lieu of Law Number. 51/1960 is deemed not provide protection to the entitled party and therefore is not widely implemented.

110. In many areas, asset clearing from acquired land or occupation of other parties (non-land rights holders) are conducted by giving kadeudeuh money (allowance) or a replacement of the assets acquired and resettlement assistance. in the West Tarum Canal Rehabilitation Project in return for the land clearing, compensation was granted on the affected assets, loss of business income, as well as relocation assistance. This compensation scheme is set forth in the Decree of the Governor as its legal basis. In some other projects (Road Rehabilitation Project 2) of the Ministry of Public Works, compensation, either in cash or resettlement provision is also given to people occupying state land for their loss of assets, and income. While in various projects in Jakarta, the Government of Jakarta provides resettlement facilities and means needed to restore economic income of the displaced residents.

111. Other relevant laws, regulations and provisions are:

12 Waqf - an inalienable religious endowment in Islamic law, typically donating a building or plot of land or even cash for Muslim religious or

charitable purposes. The donated assets are held by a charitable trust or waqf organizer. 13 Elucidation of Article 33, Law No. 2/ 2012 14 Article 19 (5) specifies that "After the agreement referred to in paragraph (4), Agency requiring land must apply to the government for

confirmation of the location". 15 See Regulation of the Number 40/2014 an amendment to Article 121 of the President of the Republic of Indonesia Regulation No. 71/2012 16 Per Article 33 of the Land Law 2012 means nonphysical loss equivalent to money value, for example, loss due to loss of business or job,

cost of change of location, cost of change of profession, and loss of value of the remaining property. 17 Public interest is the interest of the nation, state, and society that must be realized by the government and used as much as possible for

the prosperity of the people. Law No. 2/2012, General Elucidation.

Page 46: Download 2.56 MB

30

(i) Related to IP/Customary/Adat

a. Law No. 5/1960 concerning Basic Agrarian Affairs – acknowledges customary rights of Indigenous Peoples (IPs).

b. Law No. 32/2004 concerning Local Government – establishes state respect of customary and traditional rights and laws, devolves authority to village or customary governance systems and empowers them to promulgate customary village rules that may affect projects e.g. levying land transaction tax.

c. Law No 38/2004 Concerning Streets/Roads. Article 58 of Law 38/2004 says that land acquisition for road development for public use is carried out based on City/ district spatial management plan and the project must be informed to the affected people. Further, land right holder or state land user or customary law community whose land is needed for development are entitled for compensation that will be carried out through consensus.

d. Constitutional Court Decree (MK) canceled the provisions of the Forestry Law No. 41/1999 on indigenous forests, which establishes that indigenous forest is state forest in the area of indigenous peoples. This Decree excluded indigenous forest within the state forest.

(ii) Related to compensation and Improvement of living standards

a. Law no. 41/1999 on Forestry – regulates land acquisition in forests, requiring compensation land to be acquired for afforestation in a ratio of 2:1

b. Law No.11/2005 on the Ratification of the International Covenant on Economic, Social and Cultural Rights. This Act protects people rights of economy, social, and culture including right to live descent and protection of culture. As stated in Article 11 of the Convention that the state recognizes the right of everyone to an adequate standard of living for himself and his family, including adequate food, clothing and housing, and to the continuous improvement of living conditions. The State will take appropriate steps to ensure the realization of this right, recognizing the essential importance of international cooperation based on free and prior informed consent.

c. Law No.41/2009 on Protection of Agricultural Land for Sustainable Food – stipulates special compensation if a project impacts sawah (wet rice) land, which is important to food security

d. Head of BPN Regulation No. 1/2010 – on Standard of Land Service and Regulation regulates the time frame for certification of the remaining land after compensation payment.

e. Presidential Decree No. 34/2003 on National Policy on Land- regulates authorities of national and local governments on land. It stipulates that the authorities of local government on land include; i) undertake land acquisition for development; ii) provide compensation and allowance (santunan) for land acquisition.

f. The Indonesian Government Regulation No. 38/2007 about distribution of state activities between the Central Government, Provincial Government, and district/ municipality government. Government regulations set the state activities that must be conducted by the provincial government and district / municipality government related to basic services18 including among others land issues.19

g. Indonesia Valuation Standards 306 (SPI 306) on the Assessment of Land Acquisition for Development for the Public Interest. The Indonesia Professional Appraisers Society (MAPPI) formulated the standards by adopting the development of international standards (IVS 2011). The Standards 306 provides guidelines on land acquisition object assessment for compensation in land acquisition for the public interest. Assessment includes the adequate replacement value of property and land. Assessment standards are also

18 Article 7 Paragraph 1. 19 Compulsory activities with reference to Article 7, Section 2 includes a. education; b. health; c. the environment; d. public works; e. spatial

planning; f. development planning; g. housing; h. youth and sport; i. capital investment; j. cooperatives and small and medium enterprises. demographic and civil registry; l. employment; m. food security; n. empowerment of women and protection of children; o. family planning and family welfare; p. transportation; q. communication and informatics; r. land; s. national unity and internal political; t. regional autonomy, public administration, regional financial administration , the regional equipment, personnel, and coding; u. empowering communities and villages; v. social; w. culture; x. statistics; y. archives; and z. library.

Page 47: Download 2.56 MB

31

associated with other standards, such as scope of assignment, land property and structures valuation, farmland property valuation, valuation of property with particular business, business valuation, and inspection of cases under consideration.

(iii) Related to Water Resources Management

a. Law No 7/2004 Concerning Water Resources. Article 6 of Law No. 7/2004 describes that water resources is controlled by tate and is utilized for the greater interest of prosperity for the people in general. Water resources is managed by central government and/or regional government by recognizing customary rights of local customary law community and similar rights as long as it does not conflict with national interest and laws and regulations. Customary law prevails over water resources if it exists and legalized through regional regulation (peraturan daerah). Due to state control over water resources, water use right is established.

b. Regulation of the President of the Republic of Indonesia No. 12/2012 on Determination of the river basins between regional and national authority.

c. Government regulation (PP) No. 38/2011 with regard to river management; Ministry of Public Work no. 63/ 1993 with regard to river bank. Regulate riverbank (Bantaran) use, river and Sempadan right of way and benefits derived from the rivers/streams. The integrity of the riparian function is a key consideration in any review for status quo.

(iv) Related to Vulnerability and Severity Assistance

a. The Law No. 11/2009 on Social Welfare and its implementing regulation Ministry of Social Welfare Decree No. 39/2012 on Delivery of Welfare.

b. Law No. 39/1999 On Human Rights (Article 5, elucidation), describes the vulnerable groups include the elderly, children, the poor, pregnant women and people with disabilities.

c. Vulnerable / severely affected people are identified as early as possible through the Social Impact Assessment of AMDAL as referred to in the Environmental Law no. 32/2009 on Environmental Protection and Management; Indonesia Government Regulation on the Environmental Permit, Ministry of Environment Regulation No. 17/2012 with regard to participation guidance of local community in order to obtain AMDAL and Environmental Permit Issuance. Decree of the Head of Environmental Impact Management Agency No. 299/1996 on Guidelines for the Technical Assessment on Social Aspects in preparation of the Environmental Impact Analysis.

(v) Related to Tax Incentive

a. Income Tax Rate of Land and / or Building ownership transfer. b. Basic Law: Government Regulation (PP). 48/1994 jo; PP. 27/1996 jo; PP. 79/1999 jo; PP.

71/2008. On the Third Amendment of Government Regulation No. 48/1994.

B. ADB Safeguards Policy

112. The objectives of the ADB social safeguards policy are to avoid involuntary resettlement whenever possible; to minimize involuntary resettlement by exploring project and design alternatives; and to enhance, or at least restore, the livelihoods of all displaced and vulnerable persons in real terms relative to pre-project levels; and to improve the standards of living of the displaced poor and other vulnerable groups. The policy indicates four important elements in involuntary resettlement:

(i) Avoid the need for involuntary resettlement by exploring project and design alternatives; (ii) If avoidance is not possible, compensate for lost assets and loss of livelihood and income

of displaced / affected population so that their livelihood will be enhanced or at least equal or restored to the pre-project level;

(iii) Assist in relocation including provision of relocation sites with appropriate facilities and services; and

(iv) Enhance the living standards of the poor and other vulnerable affected / displaced groups.

Page 48: Download 2.56 MB

32

113. The absence of legal title to land cannot be considered an obstacle to compensation and rehabilitation privileges per ADB Policy. All persons affected by the Project, especially the poor, landless, and semi-landless persons shall be included in the compensation, resettlement, and rehabilitation package. APs and/or AHs, whichever is deemed applicable, who are unable to demonstrate a legalizable or recognizable claim to the land being acquired will be eligible for compensation with respect to non-land assets only, and not the land itself. They will however be provided with other benefits and allowances as provided to other APs.

114. The following ADB-SPS principles on involuntary resettlement are put forward and will also apply to the Project:20

(i) Develop procedures in a transparent, consistent, and equitable manner, if land acquisition is through negotiated settlement in order to ensure that those people who enter into negotiated settlements will maintain the same or better income and livelihood status.

(ii) Prepare a LARP elaborating on displaced persons' entitlements, the income and livelihood restoration strategy, institutional arrangements, monitoring and reporting framework, budget, and time-bound implementation schedule.

(iii) Disclose a draft LARP, including documentation of the consultation process in a timely manner, before subproject appraisal, in an accessible place and a form and language(s) understandable to affected persons and other stakeholders.

(iv) Disclose the final LARP and its updates to affected persons and other stakeholders. (v) Monitor and assess resettlement outcomes, their impacts on the standards of living of

displaced persons, and whether the objectives of the LARP have been achieved by taking into account the baseline conditions and the results of resettlement monitoring. Disclose monitoring reports.

115. ADB’s SPS includes Indigenous Peoples safeguards, which is triggered if a project directly or indirectly affects the dignity, human rights, livelihood systems, or culture of IPs or affects the territories or natural or cultural resources that IPs own, use, occupy, or claim as their ancestral domain. If impacts on IPs involve involuntary resettlement, SPS Safeguard Requirements 3 will likewise govern this LARF. There are no IP will be impacted positively or negatively by the three identified core sub-projects and future projects, therefore IPPF (Indigenous People Framework) is not prepared, and the project is categorized as C for IP.

116. The ADB Policy on Gender and Development (1998) adopts gender mainstreaming as a key strategy for promoting gender equity, and for ensuring participation of women and that their needs are explicitly addressed in the decision-making process for development activities. The new safeguard policy also reiterates the importance of including gender issues in the preparation of safeguards documents at all stages to ensure that gender concerns are incorporated, including gender-specific consultation and information disclosure. This includes special attention to guarantee women’s assets, property, and land-use rights and restoration/improvement of their living standards; and to ensure that women will receive project benefits.

117. Another policy that has bearing on resettlement planning and implementation is the Public Communications Policy (2011) that seeks to encourage the participation and understanding of people and other stakeholders affected by ADB-assisted activities. Information on ADB-funded projects should start early in the resettlement preparation phase and continue throughout all stages in order to facilitate dialogue with affected people and other stakeholders.

C. Comparison of Government Law and Regulations with ADB Policies

118. The GOI enhanced its country system in order to address land acquisition issues for public interest development project purposes. The new Land Acquisition Law No. 2/2012 and its

20 ADB-SPS 2009. Appendix 2.

Page 49: Download 2.56 MB

33

implementing rules and regulations approximate harmonization with the ADB SPS of 2009. The new law grants that persons with no legal title over the land they occupy or utilize are entitled to compensation21 for improvements found thereon, including compensation for job and business losses, moving cost,22 etc. A land acquisition plan also needs to be prepared by the agency requiring land. People affected by land acquisition are consulted and their complaints heard and resolved in the most expeditious way during the planning and implementation of land acquisition.

119. Most of principles in Law No. 2/2012 have been in line with ADB SPS. There are some differences identified and the gaps have been addressed by the provisions of other relevant laws, regulations, and guidance. The gaps include compensation principle for affected buildings / structures without depreciation, provision of livelihood recovery programs for severely affected people and vulnerable groups to ensure that their lives will not be worse due to the project, and relocation assistance for physically displaced residents as well as transition allowance. Some gaps identified between land acquisition law and its implementing regulation and ADB SPS 2009 Policy Principle is presented in the table below.

Table 21. Some gaps between Land Acquisition Law and Regulation with ADB SPS and Proposed Project Principles

Principles

Indonesian Regulations; Law No 2/2012 and

Presidential Decree No. 71/2012

ADB Policy Gaps Project Policy

Level of compensation and bases of calculation: Depreciation of affected structure value

Compensation will be provided based on valuation of independent appraiser for a parcel by parcel of land that include i) land; ii) over ground and underground spaces; iii) building; iv) plants; v) objects related to land and/or; vi) other appraisable loss such loss of business, jobs, change of profession, and moving costs. Yet, for affected buildings, MAPPI applies solatium (emotional compensation) of 10% - 30% of the total compensation for physical loss.

The rate of compensation will be calculated at full replacement cost that will be based on; i) fair market value; ii) transaction cost; interest accrued, iv) transitional and restoration cost; and v) other applicable payment. No deduction on taxes and administrative costs for affected lands, as well as depreciation in the value of the affected structure will be applied.

The law is silent on the issue of whether or not depreciation will be applied when calculating compensation for affected structures. While valuation standard set by Independent appraisers association (MAPPI) indicates that depreciation for physical condition of the affected building is applied in order to meet sense of justice23. Yet, for affected buildings, MAPPI applies solatium (emotional compensation) of 10% - 30% of the total compensation for physical loss. Tax incentive is provided to: a) person

The principle of full replacement cost will be applied. Capital gains tax and the costs of transferring ownership, including the cost of new land certificates, will not be deducted from the compensation of those who will lose lands. Compensation at full replacement cost for affected structures will be determined based on the replacement cost of a new building with adjustment with physical condition24. Depreciation deduction of the structures physical condition will be covered through the provision of emotional compensation (solatium). Dismantled materials become the property of the state.

21

See Act No.2/2012 Elucidation of Article 40. 22

Elucidation of Article 40 of Law No. 2/2012 with the following provisions: For building rights or land use right, Compensation granted to the holder of building right or use rights on buildings, plants, or other objects related to land owned by him/her, while Compensation on land granted to the holder of the ownership or management rights.

23 Indonesia Valuation Standards 306 (SPI 306). Land Acquisition Assessment For Development for the Public Interest. Code of Ethics Indonesia Appraisers and Indonesia Standard, 2013, Jakarta, Gelora Karya Bharata, 2013.

24 Compensation will be based on i) the market value; ii) transaction costs; iii) accrued interest; iv) transition costs and repairs; v) other applicable payments.

Page 50: Download 2.56 MB

34

Principles

Indonesian Regulations; Law No 2/2012 and

Presidential Decree No. 71/2012

ADB Policy Gaps Project Policy

who supports the project; b) does not file a complaint related to project location determination and/or compensation.

Relocation assistance: Transitional allowance.

Resettlement is one of the compensation options that shall be given by the agency needing the lands via Land Acquisition Implementation Committee. The implementation of resettlement shall continue for maximum 1 (one) year since the establishment of compensation form by Land Acquisition Implementation Committee. Location of resettlement area shall be based on the deliberation with entitled parties. Moving cost is covered under the compensation elements.

If there is relocation, provide assistance for physically or economically displaced persons including i) secure tenure to land and housing with comparable access to employment and production opportunities; ii) assist to integrate and share benefits with hosts, iii) restore social amenity; iv) provide moving and transitional support e.g. land preparation, training, access to credit, civic infrastructure and community services if required.

Law No. 2/2012 and PD No, 71/2012 is silent about transition assistance for the physically relocating APs. However, Act No. 9/2009 on Transmigration and Ministry of Transmigration Decree No. 17/1997 stipulates on transmigration services including food aid during transition period. The Indonesia appraiser standard provide solatium for the building/structure owners including physically relocated AHs.

Transition and moving allowance will be provided for relocating AHs and will be covered in solatium.

High Risk of Impoverishment

Entitled Party means any party by whom objects of the acquired land are possessed or owned. Entitled party with high risk of impoverishment is not covered in the new Land Acquisition Law. However, the Law No. 11/2009 on Social Welfare and its implementing regulation Ministry of Social Welfare Decree No. 39/2012 To cover or identify vulnerable / severity impacted people by the project as early as possible it can be covered in Social Impact Assessment of AMDAL as referred in Environmental Law no. 32/2009; Government of Republic of Indonesia Regulation No. 27/2012 on Environmental Permit, Ministry of Environment Regulation No. 17/2012 on guidelines for Community Involvement In

Particular attention must be given to the needs of poor APs and vulnerable AHs that face the risk of further marginalization and impoverishment.

Law No. 2/2012 and PD No.71/2012 is silent about paying special attention to poor APs and vulnerable AHs and severely AHs.

Livelihood / income rehabilitation program will be provided to severely affected and vulnerable populations. Programs for vulnerable groups refer to Law No. 11/2009 and its implementing regulations. In this Law the regional government is responsible for addressing these issues. The programs that will be implemented are included in the social Action Plan for affected persons / households. Severely affected Residents / households and other vulnerable groups will be identified at land acquisition / resettlement planning. Livelihood improvement assistance will be provided to them through: i) social

Page 51: Download 2.56 MB

35

Principles

Indonesian Regulations; Law No 2/2012 and

Presidential Decree No. 71/2012

ADB Policy Gaps Project Policy

Analysis Process of Environmental Impact and Environmental Permits, Head of BAPEDAL Decree No. 299/1996 on Technical Guidelines for the Social Aspects Study in preparation of the Environmental Impact Assessment.

programs implemented by local government; ii) development program for community under the project components. Dirjen Bina Pembangunan Daerah Will facilitate the coordination of program implementation at the regional level.

Monitoring of Project Implementation

Monitoring and evaluation of the performance of Acquisition of Land in the Public Interest shall be made by the Government. National Land Agency shall monitor and evaluate the occupation, ownership, use and utilization of land acquisition results for the development in public interests.

ADB requires monitoring of LARP implementation by the executing agency for resettlement Category B projects, and by an independent external organization for resettlement Category A projects

The Law No. 2/2012 and PD No, 71/2012 is silent about monitoring on resettlement impact to the entitled parties and external monitoring by independent external party

FMSRBP is rated as Category A for resettlement because more than 200 persons are severely affected. Therefore, external monitoring of resettlement implementation is required. Therefore, the procurement of consulting services will include provision of external monitoring consulting services

D. Principles of Land Acquisition and Resettlement Policy for the Project

120. The Policy on land acquisition and resettlement harmonizes relevant Indonesian laws and procedures with those of the ADB-Safeguards Policy Statement (SPS) 2009. The subprojects will avoid or minimize involuntary resettlement wherever possible by exploring project and design alternatives. If unavoidable, efforts to enhance or at least restore the livelihoods of all entitled parties to pre-project levels, and to improve the standards of living of the displaced poor and other vulnerable groups will be made.

121. Based on the above legal framework and equivalence gap analysis, the involuntary resettlement objective and policy principles are set as follows:

(i) Screen subproject components during early stages to identify involuntary resettlement impacts and risks indicators. These impacts and risks must be minimal, so that appropriate resettlement planning should be developed precisely and accurately as a result of a social assessment.

(ii) Carry out meaningful consultations with entitled parties particularly living in the project areas, and concerned civil organizations. Inform all entitles parties on restriction to access to natural resources as their sources of income, and ensure their participation in the project cycle.

(iii) Improve or at least restore the livelihood of the entitled parties/APs through 1) land-based resettlement strategies or cash compensation at replacement cost for land; ii) prompt replacement of assets with access to assets of equal or higher value; iii) prompt compensation at full replacement cost for lost assets that cannot be restored; and iv) additional revenues and services through benefit sharing schemes where possible

Page 52: Download 2.56 MB

36

(iv) APs without title or any recognizable legal rights to land are eligible for resettlement assistance and compensation for non-land assets at replacement cost.

(v) Entitled parties shall be involved in resettlement planning and LARP should cover all appropriate mitigation measures to improve, or at least restore, the livelihoods of all entitled parties, so that the living standard of entitled parties do not become worse compared to pre-project levels. LARP should elaborate on their entitlements, strategy for income and livelihood restoration, including institutional arrangements, monitoring and evaluation, budgeting, and time-bound implementation schedule. Provide entitled parties with appropriate assistance considering options provided by the entitlement matrix.

(vi) Particular attention will be paid to women, women-headed households, the elderly and other vulnerable persons including indigenous communities.

(vii) Disclose a draft LARP and its updates to the entitled parties and other stakeholders in a timely manner, in an accessible place and a form and understandable language.

(viii) A well-defined, culturally acceptable and gender sensitive grievance redress mechanism will be established in order to ensure that all entitled parties grievances and complaints on any aspect of land acquisition and compensation are addressed in a timely and satisfactory manner, and that all possible avenues are available to entitled parties to air their grievances. Civil works and/or restrictions to use of land/coastal resources will not commence unless entitled parties are fully compensated and all other entitlements provided.

(ix) Civil works can proceed in any given construction works zone (CWZ) when the project implementing agency through land acquisition team has satisfactorily completed payment of compensation for affected assets and non-assets and relocation of entitled parties to new site, if any physical relocation, in accordance with the approved LARP.

(x) Any voluntary “donation” and negotiated settlement will follow procedure in a transparent, consistence, and equitable manner principles as set forth in the LARF and be confirmed through written record.

(xi) Monitor and assess land acquisition/resettlement activities and outputs, outcomes, their impacts on the standards of living of entitled parties, and whether the objectives of the resettlement plan have been achieved. Disclose the monitoring reports.

(xii) Should unanticipated involuntary resettlement impacts be determined during project implementation, the PIU will ensure the conduct of a social impact assessment and update the LARP or formulate a new LARP covering all applicable requirements specified in this LARF.

E. Commitments in Minimizing Involuntary Resettlement

122. For subproject assessment and evaluation, a set of screening criteria were established:

(i) Sub-projects are in line and included in the priorities of the National Strategic and Work Plan of the Directorate General of Water Resources;

(ii) Sub-project and land acquisition are in line with the Spatial Planning and National / Regional Development Plan;

(iii) Sub-project has a detailed funding plan that includes the operation and maintenance of infrastructure components;

(iv) Sub-project does not impact positively or negatively, either directly or indirectly on indigenous peoples;

(v) Land to be used for the sub-project is the land that belongs to the project-implementing agency or the Directorate General of Water Resources, but controlled or used by the residents. If the compensation principles to the entitled parties on land owned by the project implementing agency are not in line with the entitlement framework of LARF document, then this area will not be included in the sub-project.

123. The Directorate General of Water Resources (DGWR) will conduct initial screening on each subproject regarding the potential impact of land acquisition and resettlement, and will adopt measures to minimize these impacts. The screening form (Appendix 2) will be applied. The screening

Page 53: Download 2.56 MB

37

process will: (i) provide a brief description of the site and proposed works; (ii) whether the subproject will require land acquisition; (iii) land status and ownership arrangements; (iv) landuse; and (v) characteristics of entitled persons. If any resettlement impacts are identified, DGWR will undertake an assessment of social impacts (census of entitled parties, inventory of losses, and socioeconomic survey) and prepare the LARP document.

124. The river basin organizations as IAs will make all possible efforts to minimize land acquisition and resettlement and potential adverse impacts through exploring project design alternatives and implementation stages in consultation with the communities and other stakeholders. When the land acquisition and ressettlement cannot be avoided, mitigation measures will be prepared in close consultation with the entitled parties and other stakeholders.

F. Unanticipated Impacts

125. If unanticipated involuntary resettlement impacts are determined during project implementation, the NPIU will ensure the conduct of a social impact assessment and update this LARP or formulate a new LARP covering all applicable requirements depending on the extent of the impact changes. The social impact assessment will be done in accordance with the procedures stipulated in the LARF.

126. Unanticipated impacts will be documented and mitigated based on the principles provided in the LARF. DGWR shall submit the updated LARP and SIA to ADB for disclosure on ADB’s website and convey relevant information in them to the affected persons/community.

Page 54: Download 2.56 MB

38

VII. Entitlements, Assistance and Benefits

A. Project Eligibility and Entitlements

1. Eligibility

127. Entitled parties/ displaced persons are those who stand to lose, as a consequence of the project, all or part of their physical and non-physical assets, including homes, productive lands, resource such as forests, range lands, fishing areas, or important cultural sites, commercial properties, tenancy, income-earning opportunities, social and cultural networks and activities. Such impacts may be permanent or temporary.25

128. Entitled parties identified within the project areas that are eligible for compensation, either in cash, replacement land, replacement house, or resettlement and other assistance under this project can be described as (i) persons with formal legal rights to land they may lose in its entirety or in part, such as land rights holders, holders of land rights to manage, and land tenure holders.; (ii) persons who may lose the land they occupy or utilize in its entirety or in part who have no formal legal rights to such land or resources but have claims to such lands or resources such as customary claims, that are recognized or recognizable under national laws, i.e., nadzie for waqf land, former customary rights secured landowners, indigenous people/customary communities, parties occupy the state land in good faith; and (iii) persons who may lose the land they occupy or utilize in its entirety or in part who have neither formal legal rights nor recognized or recognizable claims to such land or resources such as owners of buildings, plants or other objects related to land.

2. Cut-Off Date

129. The cut-off-date for eligibility to project entitlements refers to the date when the Land Acquisition Implementation Team (LAIT) led by Land Agency posts the result of the detailed measurement survey (DMS) that include the list of the entitled parties and the losses in public places (e.g village office, district office, and the location of the land acquisition).26

130. The cut-off date sets the time limits to determine eligibility of persons living and/or with assets or interests inside the project areas. Should they be adversely affected, they will be entitled to compensation for their affected assets, including rehabilitation measures as needed, sufficient to assist them to improve or at least maintain their pre-project living standards, income-earning capacity and production levels. Those who encroach into the project area, or any of its subprojects, after the cut-off date will not be entitled to compensation or any other assistance. The cut-off date will be made known to entitled parties and other stakeholders.

131. The LARF recognizes that certain social groups may be less able to restore their living conditions, livelihoods and income levels and therefore, at greater risk of impoverishment when their land and other assets are lost due to the project. These disadvantaged groups, such as landless, poor, households headed by women, elderly, and disabled, will receive special rehabilitation assistance and will be determined during screening and social assessment. Restoring living conditions of vulnerable people and severely affected people will be organized through local government social programs and other programs catered for poor communities.

3. Entitlements

132. Based on the harmonization of Indonesian laws and the ADB SPS 2009, entitlements have been agreed upon. Entitled parties will be provided compensation at full replacement cost as well as other assistance extended as stipulated in the Entitlement Matrix (Table 22).

25 ADB. Involuntary Resettlement Safeguards: A Planning and Implementation Good Practice Sourcebook – Draft Working Document.

November 2012. 26 Article 29 of Law No. 2 of 2012.

Page 55: Download 2.56 MB

39

Table 22. Entitlement Matrix

No Impact/Loss

Category Entitled Person

Project entitlement Basis / Legal

Implementation Executing

Agency/ Fund Resources

Remark

A. LAND LOSS27

1 Loss of land, including agricultural and residential land

Those who have formal legal rights (certificate) or those whose claim over the land is recognized as a full title including persons occupying the state land in good faith

28.

• Cash compensation at replacement cost and reflective of fair market value at the time of payment of compensation

29; or

land replacement with at least similar attributes to the acquired land in term of value, productivity, location, and titling

30.

• Financial assistance

for the renewal of the land ownership documents (certificate and land documents recognized as full title) for the residual area of the entitled persons' land

31.

• If the remaining

affected land can’t be functioned for the specific use and utilization, the entitled party can ask for compensation for their entire land at replacement cost (Law No. 2 tahun 2012 article 35).

32

a) Law No 2/2012, Article 36

b) Presidential Regulation No 71/2012, Article : 65, 77

c) Indonesia Valuation Standards 306 (SPI 306)

Land requiring agencies allocate land compensation Land Acquisition Implementing Team delivers compensation Independent Appraisal: conducts a valuation of the assets.

Valuation of compensation is determined based on an assessment by an independent appraisal and negotiations have been carried out by the Land Acquisition Implementing Team 6 months advance notice is given to the entitled party before they have to destroy the overall house or store.

• Tax incentives given to all entitled parties if they do not file a lawsuit against the decision of the location and the form and / or amount of compensation.

Law No. 2 /2012 Art. 44 Presidential Regulation No. 71/ 2012 Article122

Government: provide tax incentives (BPHTB) to institutions requiring land

Entitled parties bear the cost of the tax payable in the current year if they file a lawsuit. However, if there was an agreement / relinquishment of the land, then they are entitled to tax incentives

33

2 Loss of Ulayat land/

Customary communities (masyarakat

• Land replacement will be provided with similar value or

Elucidation of Law No.2 / 2012 Article. 40

Land requiring agencies allocate land

The presence of indigenous peoples, if any will

27 Law No. 2 of 2012, Article 36 states that compensation can be given in the form of; (i) cash / money; ii) replacement land; iii) resettlement;

iv) shares ownership , and v) other forms agreed by both parties. Assessment of compensation by appraisers in accordance with Article 32 of Law should be done per plot.

28 It is in line with the Law No. 2/2012, Article 40, and its elucidation and the PP No. 71/2012, Article 17 – 25. 29 See Law No. 2/2012, Article 36, PP No. 71/2012, Article 65. MAPPI’s standard on Valuation for land acquisition for the development in the

public interest. 30 Ibid. 31 See MAPPI’s valuation standard. 32 Article 35 of Law No. 2 of 2012 and Article 67 of the PP 71/2012. 33 Income taxes will be the responsibility of the entitled party and there is no tax deduction

Page 56: Download 2.56 MB

40

No Impact/Loss

Category Entitled Person

Project entitlement Basis / Legal

Implementation Executing

Agency/ Fund Resources

Remark

customary land

hukum adat

34)

higher (in terms of value, productivity, location, and titling)

35

compensation Land Acquisition Implementing Team delivers compensation Independent Appraisal: conducts a valuation of the assets.

be based on the results of the study, local government regulations, or the map on indigenous peoples.

3 Government/ state enterprise land

Land owned / controlled by the government, state enterprises, village treasury

• Cash Compensation at replacement cost; or

• Land replacement with similar value or higher (in terms of value, productivity, location, and titling).

Presidential Regulation 71/2012 Article 82, 112 Regulation of the Head of BPN No. 5/2012 Article 29, 49

Land requiring agencies allocate land compensation Land Acquisition Implementing Team delivers compensation Independent Appraisal: conducts a valuation of the assets.

Compensation will be provided for i) Land owned/controlled by government with building used actively for governance; ii) land is owned/controlled by national and local state owned enterprises; iii) village land

36

BPN transfers the acquired land owned by government / provincial government / SOE / regional government / village owned enterprise, to the agency requiring land within 60 working days after the governor / district/ mayor issued location confirmation

4 Loss of Forest

Ministry of Forestry /

• Forestry land: compensation

37 will

Presidential Regulation No

Land requiring agencies

Land acquisition procedure will

34 Customary or indigenous community is a distinct community that is characterized by; i) the existence of group of people who has a

collective attachment to a certain customary legal order as a whole community of an alliance with a particular customary law, who recognizes and implements the tradition in their daily life; ii) the existence of certain customary lands, which are the environment of the customary community and the area where they take their daily needs; and iii) the existence of common law regarding the maintenance of order, dominance, and applicable customary land use adhered by the members of the community. PP No. 71/2012, Article 22.

35 Elucidation of Article 40 of Law No. 2/2012 36 Article 82 of PP 71/2012 37 Compensation for forestland include: i) Payment for forestry boundaries; ii) payment for affected timbers; iii) Commitment for reclamation

Page 57: Download 2.56 MB

41

No Impact/Loss

Category Entitled Person

Project entitlement Basis / Legal

Implementation Executing

Agency/ Fund Resources

Remark

Land Forestry Agency

be guided under the law and regulations related to land use permit issued by Ministry of Forestry.

71/2012 Article 82 BPN Regulation No. 5/2012 Article 29, 49 Law No. 49 /1999 on Forestry

allocate land compensation Land Acquisition Implementing Team delivers compensation Independent Appraisal: conducts a valuation of the assets.

follow the Law No. / 12/2012

38and

consider relevant regulations on forestry. Land Acquisition procedure will follow the Law No. / 12/2012 and reflects relevant forestry regulations.

5 Loss of Agricultural Land For Food Security

Ministry of Agriculture

Replacement of agricultural land will refer to Law No. 41/2009,

At least three times the land area in terms of converted irrigated land;

At least twice the land area in case of a converted tidal and non-tidal (lowland) reclaimed swampland;

At least one time the land area in not irrigated converted land.

Presidential Regulation No. 71/2012 Article 82 BPN head Regulation No. 5/2012 Article 29, 49 Law No. 41 / 2009 Article 46

Land requiring agencies allocate land compensation Land Acquisition Implementing Team delivers compensation Independent Appraisal: conducts a valuation of the assets.

Land acquisition procedure will follow Law No. 12/2012 and the provisions of agricultural land replacement will follow Law No. 41/2009

39

B. Loss of Crops and Trees:

1. Loss of Crops and Trees:

Owners, regardless of land tenure status (with certificate or recognizable rights, informal dwellers, occupants).

• Annual crops: cash

compensation will be paid based on prevailing market rates.

• Perennial crops: compensation at replacement cost taking into account their productivity and age

40.

• Timbers/trees: compensation at current market rate based on age, type of

Law No. 2 /2012 Pasal 33 Presidential Regulation No. 71/2012 Article 65 BPN Head Regulation No. 5/2012 Article 23, 24 Presidential Regulation No.

Land requiring agencies allocate budget for compensation Land Acquisition Implementing Team delivers compensation Independent Appraisal: conducts a valuation of the

Commercial crops: referring to income approach using Discarded Cash Flow (DCF) for 1 cycle Noncommercial crops: referring to market approach with a standard price reference issued by the local government. Nonproductive

and forestation; iv) Investment cost; v) land replacement or PNBP. Provisions on land acquisition in the agricultural land for sustainable food protection: i) at least three times the land area in terms of converted irrigated land (productive land); ii) at least two times the land area in terms of reclamation of land converted to tidal marsh and also which is not depending on tide; iii) at least once in terms of land area if converted land is not irrigated.

38 Article 82 President of the Republic of Indonesia Law No. 71/2012. 39 Provisions of the land acquisition in agricultural land for sustainable food security : i) at least three times the land area for converted irrigated

land one time for not irrigated converted land . ii) At least twice the land area in case of a converted tidal and non-tidal reclaimed swampland iii) at least one times the land area in a not irrigated converted land. See Law No. 41/ 2009.

40 For commercial plants, aside of considering market rate, appraiser will also consider DCF method for 1 cycle. While for non-commercial plants, the valuation is carried out in reference to the pricing standard issued by the concerned authorities. For plants, which are not productive yet, the valuation method uses cost approach.

Page 58: Download 2.56 MB

42

No Impact/Loss

Category Entitled Person

Project entitlement Basis / Legal

Implementation Executing

Agency/ Fund Resources

Remark

trees and diameter of trunk at breast height

41.

38/2007 Indonesia Valuation Standards 306 (SPI 306) / 2013

assets. Plants: referring to cost approach; 30 to 60 days advance notice before harvesting / land clearing.

C. LOSS OF STRUCTURE

1

Loss of main structures (houses, offices, independent shops) and secondary structures (fences, driveways, extended eaves, sheds, etc.)

Owners of the affected structure, regardless of tenure

42

• Compensation at full replacement cost that reflect prevailing market prices of materials and cost of labor for dismantling, transferring and rebuilding

43 at the

time payment. No depreciation should be applied or;

• Option of Resettlement with comparable access to employment and production.

• For partially affected structures, the cost of repairing the residual unaffected structure in addition to the compensation at replacement cost for the affected portion of the same

44.

• Compensation for affected electric, telephone, and other services based on prevailing cost of disconnection and re-installation

45.

Law No. 2 / 2012 Article 33 Elucidation of Law No. 2/2012 Article 35, 40 Presidential Regulation No. 71/2012 Article 65 BPN Head Regulation No. 5/2012 Article 23, 24 Government Regulation No. 38/2007 Indonesia Valuation Standards 306 (SPI 306) / 2013

Land requiring agencies allocate budget for compensation Land Acquisition Implementing Team delivers compensation Independent Appraisal: conducts a valuation of the assets.

Valuation is determined by an independent appraiser Depreciation applies for the physical condition of structures / buildings only. There is no depreciation for age of the building. Depreciation deduction for affected structures, will be given back to the entitled parties through the emotional compensation (solatium). See D. 3 below. 6 months advance notice is given to the entitled party prior to the date on which they must demolish their entirely affected houses or shops. If more than 50% of the main structure is affected, the entire structure will be replaced at full replacement cost. If less than 50% of the main structure is affected, but

41 Ibid. 42 Law No. 12/2012 Article 40 and the explanation, Indonesia Assessment Standards 2013 For commercial crops, in addition to considering

market prices, assessors will also consider the DCF method for 1 cycle. Whereas for non-commercial crops, assessment is based on standards price issued by the competent authorities. For plants that are no longer productive, assessment uses the cost approach. See Indonesia Valuation Standards 306. MAPPI (Indonesian Society of Appraisers), 2013.

43 Elucidation Article 33 UU No 2/2012. 44 Article 33 Law No. 2 Tahun 2012 and Indonesia Valuation Standards (SPI 306) 2013. 45 Article 33 of the Law No. 2/2012 and MAPPI’s valuation standard 2013.

Page 59: Download 2.56 MB

43

No Impact/Loss

Category Entitled Person

Project entitlement Basis / Legal

Implementation Executing

Agency/ Fund Resources

Remark

would endanger the stability of the residual area of the main structure, that is, structurally unstable, then the project will compensate at full replacement cost of equivalent structures. If the resettlement / relocation is chosen, the relocation / resettlement sites should be discussed with the entitled parties, including the provision of public services and facilities as well as access to employment and production In case of delay in the construction of relocation sites, cash assistance equivalent to temporary house rental rates until the completion of resettlement in a new place. 3 months advance notice, before the date on which the affected tenants must move

Relocated entitled persons regardless of land tenure

Cash allowance for moving if the project is not able to provide the use of a truck or a means of transportation to carry goods to a new place.

Elucidation of Law No. 2/2012 Article 33 f BPN Head Regulation No. 5 /2012 Article 30, 31 Indonesia Valuation Standards 306 (SPI 306) of 2013 Law No. 11/ 2009 on Social

Land requiring agencies allocate budget for compensation Land Acquisition Implementing Team delivers compensation Independent Appraisal: conducts a valuation of the assets.

3 months - 1 year advance notice, before the date on which the affected tenants must move These requirements will be incorporated into the TOR for valuation of object loss / acquired land in determining the value of compensation

Page 60: Download 2.56 MB

44

No Impact/Loss

Category Entitled Person

Project entitlement Basis / Legal

Implementation Executing

Agency/ Fund Resources

Remark

Welfare

Regional Government : Social Program (land clearing)

Tenant house / shop regardless of tenure

• cash assistance equivalent of 12 months rental cost

Elucidation of Law No. 2 / 2012 Article 33 f BPN Head Regulation No. 5/2012 Article 30, 31 Indonesia Standard Valuation 306 (SPI 306) of 2013 Law No. 11 Tahun 2009 on Social Welfare

Land requiring agencies allocate budget for compensation Land Acquisition Implementing Team delivers compensation Independent Appraisal: conducts a valuation of the assets. Regional Government : Social program (Land Clearing)

3 months prior notice before the date on which the affected tenants must move

2 Infrastructure and public facilities / objects attached to land

Government or State Enterprises / communal property and assets (e.g. schools, mosques, village office power poles, etc.)

• Rebuilding the facility or provide cash compensation based on the agreement with the affected

parties46

.

Law No. 2 Tahun 2012 Article 33 Presidential Regulation No. 71/2012 Article 82

Land requiring agencies allocate budget for compensation Land Acquisition Implementing Team delivers compensation Independent Appraisal: conducts a valuation of the assets. Local Government: allocates budgets or rebuild facility

Valuation of affected assets will be performed by an independent appraiser

3 Tomb / grave

Owner A replacement for public cemetery through prior consultation with village officials and residents. Financial assistance to move the graves,

Law No. 2/2012 Article 33 Presidential Regulation No. 71 / 2012 Article 82

Land requiring agencies allocate budget for land compensation Land Acquisition

Valuation of loss performed by an independent appraiser

46 Article 33 of Law No. 2 of 2012 and Article 82 of the Presidential Regulation Number 71 of 2012.

Page 61: Download 2.56 MB

45

No Impact/Loss

Category Entitled Person

Project entitlement Basis / Legal

Implementation Executing

Agency/ Fund Resources

Remark

including costs for the ceremony

Implementing Team delivers compensation Independent Appraisal: conducts a valuation of the assets. Regional Government: allocates budget for land replacement, removal costs, including the cost of the ceremony

4 Temporary impact during construction

For those who have formal legal rights (certificate) or those whose claim on land is recognized as a full right

For lease payments of the affected land by the contractor based on the applicable rental fees and agreements with landowners. For productive land, the cost of the rental will not be less than the net income that will be generated from productive affected land compensation for non-land assets acquired (trees / plants, buildings) will be provided at replacement cost Land will be restored to pre-project conditions or even better.

Contract documents / agreements with civil works contractors

contractors 30-60 days prior notice given to the owner of the land before it is used temporarily by contractors. This provision is stated in the contract / agreement with the civil works contractors Temporary impacts during construction include activities at the borrow pit area.

Those who do not have legal rights and entitlements that can be recognized as full ownership

• There is no land rental costs during the period of impact

• Land will be restored as it was before the project, or even better.

Contract documents / agreements with civil works contractors

Contractors

D. Other Appraisable Loss

1. Loss of income, venture and job

Business owner and employees regardless the tenure

The loss of a permanent business (restaurant, barber) or a termination due to closure of business premises: Replace the loss in cash based on

Elucidation of Law No. 2 of 2012 Article 33 f Presidential Regulation No. 71/2012 Article

Land requiring agencies allocate budget for compensation Land

For permanent loss, SPI 306 assess entire business losses include business interruption.

Page 62: Download 2.56 MB

46

No Impact/Loss

Category Entitled Person

Project entitlement Basis / Legal

Implementation Executing

Agency/ Fund Resources

Remark

the loss of business investment (capital, other production mode) is added to the total loss of revenue of at least 6 months and support the transition allowance in accordance with the time needed to stabilize the business.

33 f Government Regulation No. 38 of 2007 Indonesia Valuation Standards (SPI 306), 2013,

Acquisition Implementing Team delivers compensation Independent Appraisal: conducts a valuation of the assets. Regional Government: Social program

Waiting cost is needed so that affected operations business activities can resume

Temporary Loss: Compensations in cash based on the loss of expected revenue is to be obtained from use of the affected assets

47.

Elucidation of Law No. 2 of 2012 Article 33 f Government Regulation No. 38 of 2007 Indonesia Valuation Standards (SPI 306), 2013,

Land requiring agencies allocate budget for compensation Land Acquisition Implementing Team delivers compensation Independent Appraisal: conducts a valuation of the assets. Regional government: Social program

For land clearing compensation can be covered from social programs

Permanent job loss: Damages in cash equivalent to the amount of lost job income multiplied at least by 6 months, or Profession shift: Cash compensation based on the costs required to change the profession on par with previous professions based on an assessment by a licensed appraiser

Elucidation of Law No. 2 of 2012 Article 33 f Government Regulation No. 38 of 2007 Indonesia Valuation Standards (SPI 306), 2013

Land requiring agencies allocate budget for compensation Land Acquisition Implementing Team delivers compensation Independent Appraisal: conducts a valuation of the assets. Regional Government : Social Program

Payment slip, or if no payment slip, minimum wage will be used for the calculation of restitution. For land clearance, compensation can be covered from social programs

Loss of temporary employees: Compensation

Elucidation of Law No. 2 of 2012 Article 33 f

Land requiring agencies allocate budget

Payment slip, or if no payment slip, minimum wage will

47 See Standardized assessment of Indonesia (SPI 306), 2013, "Concepts and General Principles of Assessment", page 17.

Page 63: Download 2.56 MB

47

No Impact/Loss

Category Entitled Person

Project entitlement Basis / Legal

Implementation Executing

Agency/ Fund Resources

Remark

equivalent to the income loss during the disruption.

Government Regulation No. 38 of 2007 Indonesia Valuation Standards (SPI 306), 2013

for compensation Land Acquisition Implementing Team delivers compensation Independent Appraisal: conducts a valuation of the assets. Regional Government : Social Program

be used for the calculation of restitution. For land clearance, compensation can be covered from social programs

2 Limited access to the river waterway.

Venture owner who use river waterway for livelihood (ferry boat operator)

Compensations in cash based on the temporary loss; or Participate in livelihood recovery programs.

Elucidation of Law No. 2 of 2012 Article 33 Law No. 11 of 2009 Government Regulation No. 38 of 2007

Land requiring agencies allocate budget for compensation Land Acquisition Implementing Team delivers compensation Independent Appraisal: conducts a valuation of the assets. Regional Government : Social Program

Modification of Technical Design that allows the AP to be able to sustain their livelihoods from the river. Livelihood recovery program will be integrated with local government social programs in where the project is located.

3 Loss of emotional attachment to assets (solatium)

Entitled party who lost the emotional bond with the affected assets (land, structures, and plants)

Additional compensation of 10% - 30% of total compensation for physical assets affected. Compensation will include funding for:

• Transitional living allowance equivalent to 3 months of basic living expenses (at the provincial poverty line per household member which will be included in the solatium.

• Reduction of building depreciation.

Elucidation of Law No. 2 of 2012 Article 2 f Indonesia Valuation Standards (SPI 306), 2013,

Land requiring agencies allocate budget for compensation Land Acquisition Implementing Team delivers compensation Independent Appraisal: conducts a valuation of the assets. Regional Government : Social Program

Percentage of emotional loss compensation will be based on an independent appraisal assessment

Details calculation and coverage of solatium is set forth in the LARP document

4 Transaction Cost

The entitled party who

Allowance to cover administration cost,

Presidential Regulation No.

Land requiring agencies

Calculations are based on IOL and

Page 64: Download 2.56 MB

48

No Impact/Loss

Category Entitled Person

Project entitlement Basis / Legal

Implementation Executing

Agency/ Fund Resources

Remark

lost land and non-land assets

renewal of land ownership (ownership name transfer) for residual land, land clearing

48

71/2012 Article 112

Indonesia Standard of Valuation (SPI) 306, 2013

allocate budget for compensation Land Acquisition Implementing Team delivers compensation Independent Appraisal: conducts a valuation of the assets.

SES

5 Compensation for the waiting period (interest)

The party entitled to receive compensation for late payment

Cash compensation based on the risk free interest, government bank interest

SPI 306, 2013

Land requiring agencies allocate budget for compensation Land Acquisition Implementing Team delivers compensation Independent Appraisal: conducts a valuation of the assets.

6 Loss of residual Land

Those who have formal legal rights (certificate) or those who make claim on land and recognized as legitimate owners including those who occupy state land in good faith.

If there are no residual land that can be used for a particular purpose, the entitled party is entitled to receive compensation for the entire land at replacement cost.

49

Law No. 2/2012, Article 35

Presidential Regulation No. 71/2012, Article 67.

SPI 306, 2013

Land requiring agencies allocate land compensation Land Acquisition Implementing Team delivers compensation Independent Appraisal: conducts an valuation of the residual land

7 Other physical loss

Owner, regardless of tenure

Compensation for repair costs

Elucidation of Law No. 2/2012 Article 33 f Indonesia Valuation Standards (SPI 306), 2013,

Land requiring agencies allocate budget for compensation Land Acquisition Implementing Team delivers compensation

48 Lihat Standar Penilaian MAPPI, SPI 306, 2013. 49 Article 35 of Law No. 2 of 2012 and Section 67 Presidential Regulation 71/2012.

Page 65: Download 2.56 MB

49

No Impact/Loss

Category Entitled Person

Project entitlement Basis / Legal

Implementation Executing

Agency/ Fund Resources

Remark

Independent Appraisal: conducts a valuation of the assets.

8 Loss of the resource base (high risk of impoverishment)

Entitled Party who lost of 10% or more of total assets or earning revenue sources; Entitled Party , poor and vulnerable, regardless of the severity of the impact

Participate in livelihood restoration program (LRP) Given the opportunity to get a job related with the project

Law No. 2 of 2012, article 33

Elucidation of Law No. 2 of 2012, Article 2b

Law No. 11 Year 2009 on Social Welfare

Government Regulation No. 38 of 2007

Regional Government: Social Program IA / PIU: integrated in non-structural components of the program. Contractor: work related project

LRP includes agricultural support, provision of training, job placement, additional financial grants and micro loans for equipment and buildings, as well as organizational support / logistics to establish alternative income generating activities for affected populations LRP will be integrated with local government social programs where the project is located

B. Special Assistance to Vulnerable Sector

133. The vulnerable sector is a distinct group of people who might suffer more or face the risk of being further marginalized due to the project. Per Law No. 39/1999 on Human Rights (Art 5 elucidation), it specifically includes (i) households headed by women; (ii) household heads with disabilities; (iii) households falling under the regional poverty line; and (iv) elderly household heads.

1. Strategy to address gender issues

134. The FMSRBP Gender Action Plan envisages entry points during differing phases of FMSRB Project implementation. In the Project Design and Monitoring Framework (DMF), gender mainstreaming entry points, performance targets and indicators also extend to different Subproject components of the Project that are provided in greater detail in the GAP.

135. Specific to this LARP, the following specific actions are imperative to ensure women’s participation:

(i) Female representative of the AHs will be elected as member of resettlement-related committees.

(ii) In conducting the DMS, consultations on resettlement activities and relocation options, both women and men will participate in the discussions.

(iii) Gender issues, including HIV/AIDS and human trafficking prevention measures, will be included in the training to be provided during LARP implementation.

(iv) Both husband and wife will be invited to receive the compensation and other allowances due to the household for affected assets.

(v) Women will be given equal chance in getting hired for unskilled labor and to receive equal remuneration for the same work as the men.

Page 66: Download 2.56 MB

50

(vi) Ensure that women will be prioritized for livelihood restoration program/income restoration.

(vii) Special measures will be taken in helping elderly, disabled and women-headed households relocate or reconstruct their affected shops and houses.

(viii) Women will be prioritized in livelihood restoration program/income restoration. (ix) Disaggregated monitoring indicators by gender will be developed for monitoring social

benefits, economic opportunities, livelihood, and resettlement activities.

2. Strategy to assist other vulnerable and severely households

136. As discussed in preceding sections, on top of compensation and allowances that vulnerable AHs will receive for their losses as provided in the entitlement matrix, vulnerable AHs are entitled to participate in the income restoration that will be designed with their active participation and priority for employment in project-related jobs during the civil works.

Page 67: Download 2.56 MB

51

VIII. Relocation of Housing and Settlements 137. Resettlement Options. In the Ciujung land acquisition corridor, 93 affected households (AH) may potentially have to relocate their housing structures, but only 60 AHs are eligible for outright compensation by the project thus several options may be considered. Households losing land with residential structures can choose to receive compensation supplemented by relocation assistance from the government and then choose to make the relocation and housing arrangements on their own initiative. This appears to be the local preference based on preliminary feedback from the Focused Group Discussions (FGD) conducted in the 10 villages. The AHs have options for cash compensation for their lost assets or relocation. Most likely of the physically AHs prefer receiving cash compensation for the lost assets, then government will not provide relocation/resettlement, but if they preferred relocation, land for relocation with basic infrastructure will be provided.

138. Total cost for self-relocation assistance of the 60 AHs in terms of compensation for main structure and solatium is Rp 27,410,911,657. In most cases, computation for solatium amongst the potential 60 AHs for relocation include.

Page 68: Download 2.56 MB

52

IX. Livelihood Restoration and Rehabilitation Program 139. The Livelihood Restoration Program (LRP) of this LARP was conducted at the local government level, locally referred to as the Social Action Plan or Livelihood Restoration Program (LRP).

140. The LRP is a program to reduce social risk in the implementation of the Project in order to ensure that the implementation of the program can be undertaken appropriately. The main target group of the project is vulnerable categorized households and those of entirely affected as part of the Land Acquisition Resettlement Plan (LARP) document of the embankments development activity in Ciujung River Basin of Serang Regency in Banten Province. The vulnerable categorized households are chosen as the primary target in this program in order to ensure that their lives condition is improved or at least similar to the initial condition.

141. The LRP contains livelihood recovery program which is based on the detailed measurement survey (DMS) and socio-economic survey (SES). The livelihood recovery program plan has been included in the Serang Regency Government program for the period of 2015-2019.

142. This LRP will be implemented in the form of various programs, i.e. economic empowerment, institutional capacity building of farmers groups, education and entrepreneurship training, business assistance during the transition period, community institutional capacity building, improvement of education quality, improvement of sanitation facility and environment, Hygienic and Healthy Life Behavior (PHBS) improvement program, and many others which will be implemented by Serang Regency before the construction activities is carried out. Confirmation of budget and other support for SAP has been signed by Bappeda (Appendix 4-Annex).

A. Objectives of the Program

143. The following are objectives of the livelihood restoration program (LRP):

(i) Restore the livelihood and income of affected households (RTD) who live along the 11.8 km of Ciujung River Basin in which the embankment activity will be carried out (corridor of impact).

(ii) Improve the quality of human resources for the affected households (RTD) through the development of a creative, innovative and entrepreneurial mindset.

(iii) Improve the institutional capacity of farmers and community. (iv) Increase the awareness of healthy lifestyles for affected people who live in the corridor of

impact. (v) Improve the environmental quality in the corridor of impact area.

B. Employment Services/Opportunity for Project Related Jobs

144. The embankment development plan along 11.8 km in Ciujung will provide many job opportunities, especially in the construction phase for communities along the corridor of impact of Ciujung River Basin. Based on the identification of livelihood and income of potentially affected households, they are generally working in agriculture and becoming drivers/laborer with income below the Regency Minimum Wages, so they need alternate side jobs to increase income. Similarly for job seekers, job and business opportunities and in the construction phase are needed to meet their daily needs.

145. It is estimated that there will be about 15 types of jobs, which do not require special skills, available in the construction phase. As the Environmental Impact Analysis, recommendation, BBWS C3 will require the contractor to provide employment opportunities for local people, especially for the potentially affected people who do not have relevant background, skills and experience to the project work. The types of work that identified can involve potentially affected people are as follows:

(i) The work of cleaning and preparation of the land (the cutting of trees/plants, soil excavation, stockpiling).

Page 69: Download 2.56 MB

53

(ii) The embankment structure work (construction of foundations, casting, installation of stones/bricks, stucco).

(iii) The construction of facilities and utilities (the construction of bridge, borrow pit, spillway, and sluice).

(iv) The finishing and greening work.

1. Facilitation and Organization

146. Manpower Office of Serang Regency together with BBWS C3 will establish a special committee in the recruitment process of workers during the construction stage, by issuing a policy that each contractor should involve APs in a proportional manner and in accordance with the program’s objectives. This will be contained as a clause in the contract between the contractor and BBWS C3. The contractor may deliver the need of the local workforce to every village by displaying "Announcement of Manpower Requirement" which is acknowledged by Manpower Office of Serang Regency and BBWS C3. Then all of program implementation should be reported to the Environmental Agency of Serang Regency as the implementation of recommendations of Environmental Impact Analysis of the construction of Ciujung River’s embankment.

2. Estimated Manpower Requirement at the Construction Stage

147. Some 183 people will be required for the construction of Ciujung embankment and 150 people of them (82%) will be supplied from around the project site, such as the security personnel, builders, picket crew, and daily laborers. Based on a review on the potentially affected people’s livelihoods, the manpower requirement in the construction phase can be supplied by them.

Table 23. Estimated Manpower Requirement in the Construction Phase in Ciujung River Embankment Development Project

No. Specification Manpower Requirement

1 Project Manager 1 2 Site Manager 1 3 Site Engineer 2 4 Supervisor 4 5 Surveyor 3 6 Drafter 2 7 qa & qc 2 8 Quality Surveyor 2 9 Operator 20

10 Helper 150 TOTAL 300

Source: EIA of Ciujung BBWS C3, 2014.

C. Livelihoods Training

148. The skill training program is prepared based on a review on the socio-economic conditions of the potentially affected people and community inputs during the public consultation activities. The training modules will be developed based on the livelihood group of the potentially affected people who work in the agricultural and non-agricultural sectors and the modules will also be adapted to their educational level. The training activity will be carried out separately for women.

149. The skills training program will be undertaken in 2 stages: (i) the first stage before the relocation; and (ii) the second stage during the project implementation period as a follow-up of activities carried out in the first stage and provide feedback on the progress of the affected people after training. Components of skill training activities are: (i) facilitation and organization; (ii) logistics; and (iii) training delivery.

D. Agriculture inputs and support

150. Based on the social econonomic condition, most of the AHs involved in agriculture activities, and during consultation they have asked support for intensification of development of rice field,

Page 70: Download 2.56 MB

54

seedling activities, post harvest technology, small business development for agriculture products and animal husbandry. All those demands will be supported as part of Social Action Plan (Appendix 4).

1. Facilitation and Organization

151. The following are main steps in the facilitation and organization processes:

(i) The initial meeting to establish the SAP Program Implementation Team under the coordination of BAPPEDA of Serang Regency;

(ii) The SAP Program Implementation Team prepares a more detailed program plan; (iii) The development of program plan; (iv) The establishment of facilitators at the regency level (5 facilitators are required); (v) The establishment of a training group for the affected households (related to the distance

and area); (vi) The SAP Program Implementation Team submits the implementation plan in all

regencies. (vii) The facilitator arrange community organizations meeting in all affected villages to

improve the training needs based on further input from the affected households and prepare Training Group for the implementation of the program.

2. Funding Mechanism

152. Funding source for the implementation of Skill Training program comes from the Serang Regency’s local budget, which is allocated in 2015 until 2016. The budget allocation mechanism proposed to BAPPEDA of Serang Regency by each relevant office based on the type and implementation period of the program. The BAPPEDA then proposes the budget allocations, in the draft of local budget (RAPBD), for Skills Training Program for People Affected by Embankment Construction Project at Ciujung River Basin. The RAPBD is then consulted to local parliament for approval. In the implementation phase, the funding mechanism is proposed by the Program Implementation Team based on the identification and problems of potentially affected people and inputs from all facilitators and trainers.

3. Logistics

153. Each facilitator will work with the environment/village in which the training is undertaken to organize venue, transportation and other necessities. Some 10% space of the total capacity will be provided for the poor in every village. To participate in the training, candidates will have to through selection or screening process after the invitation, which contains the necessary requirements, is placed on the announcement board in each village.

4. Type Skill Training Program

154. After having consultation with BAPPEDA of Serang Regency and related offices, Resettlement Specialist prepared seven packages of initial training which include as follows:

(i) Entrepreneurship training for potentially affected people who change their livelihoods; (ii) Technical training on agriculture, livestock and fisheries sectors; (iii) The institutional capacity building for farmer groups for improving agricultural production,

business management and market access; (iv) Training on improving micro and small enterprises; (v) Training on cultivation of agriculture, livestock and fisheries; (vi) Training Skills: mechanics, sewing, and crafts; and (vii) Joint Training: Entrepreneurship, technical, cultivation, improving micro and small

enterprises.

155. The training packets to be conducted will require modification and updating by a trainer team who have been selected before the training implementation and is adjusted to the socio-economic condition

Page 71: Download 2.56 MB

55

and the severity of the project’s impact. Only households categorized vulnerable and the most affected with a total of 1,273 or 34.3% of the total affected households can participate in the training program.

5. Program Implementation Schedule

156. All training activities for the first stage will be implemented in 6 months period. In the meantime, the second stage, as a follow-up program, will also be implemented in 6 months period. The program will be implemented after the payment of compensation has been completed. It is estimated that the preparation phase can be started in June 2015 and completed in June 2016. The program implementation schedule the can be seen in Table 30.

157. The initial time period for the construction is not affected by the resettlement plan so that there’s a room for the time flexibility in conducting trainings. For this reason, the activities in the first stage will be completed before the construction activity is started.

6. Budget Plan

158. The budget plan for the implementation of SAP program can be seen in Table 24. The estimated cost for the program is Rp 25,400,000.000.

7. Internal Monitoring

159. The livelihood recovery program is designed and modified in accordance with the condition of potentially affected people. It is planned that there are six training packages to be implemented and the implementation process needs to be monitored and evaluated internally by using measurable indicators.

8. External Monitoring

160. External Monitoring Agency (EMA) will analyze the following indicators:

(i) The effectiveness, impact and sustainability of the livelihood recovery program and the need for improvement and further mitigation steps, if necessary;

(ii) The capacity of the affected households to recover or re-establish their livelihoods and living standards. Special attention will be given to households categorized as severely affected and vulnerable households in order to make it in line with the objective of livelihood recovery program, i.e. to improve the socio-economic status of vulnerable categorized households;

(iii) The satisfaction condition with current economic activity and the type of problems encountered; and

(iv) Recommendations to address the problems.

161. The monitoring method consists of the following activities:

(i) Periodical site visits to ensure that those affected people receive comprehensive information related to the project objectives, impacts, compensation policy and their rights through an effective public information campaign. This activity will cover at least 30% of all potentially affected people.

(ii) Periodical site visits to assess whether the grievance procedure has been adequately explained to the affected people and can be implemented. This activity will cover at least 30% of all potentially affected people.

(iii) As for the evaluation study, the methodology will be based primarily on a comparison of the socio-economic conditions of the potentially affected people, both before and after relocation. For this purpose, a follow-up socio-economic survey will be conducted by the EMA to find out the standard of living of potentially affected people for nine months to one year after the completion of the implementation of the relocation program.

(iv) Data and monitoring result will be separated by gender.

Page 72: Download 2.56 MB

56

162. The following are key indicators that need to be monitored for the livelihood recovery program:

(i) Number of potentially affected households/people who are eligible for the livelihood recovery program.

(ii) Number of potentially affected households/people who receive training on livelihood recovery program and those who participate in the project work (women, men, and vulnerable categorized potentially affected households/people).

(iii) Type of training to be conducted and the number of participants in each training session. (iv) The percentage of poor households living in villages along Ciujung River Basin and

participate in the training of livelihood recovery program. (v) The satisfaction level of participants towards the training and opportunities for employment in

the project. (vi) The percentage of potentially affected households/people who experience the increase in

their income (women, men, vulnerable categorized potentially affected households/people). (vii) The percentage affected households whose standard of living increases (women, men, and

vulnerable categorized potentially affected households/people). (viii) The number or percentage of affected people who replace the use of agricultural land with

production.

163. Data collection will be carried out through triangulation techniques as follows: (i) questionnaire, which will be given personally to the potentially affected people; (ii) interview, which will be determined purposively to potentially affected households; (iii) focus group discussion and village meetings; and (iv) meeting with the project staff.

164. Strategic Lessons for policy formulation and planning in the future will be assessed based on the monitoring and evaluation results towards the resettlement or relocation activity. This will be supported by Evaluation Study on Post-Relocation Implementation, which will be carried out 6 to 12 months after the completion of all relocation activities.

Page 73: Download 2.56 MB

57

X. Resettlement Budget and Financing Plan

A. Budgetary Considerations for Resettlement Activities

165. The estimated cost of resettlement for the Ciujung Subproject is estimated at IDR 150,222,827,457.50. Table 24 below provides a breakdown of the resettlement costs.

Table 24. Summary of Resettlement Costs

Budget Items Budget (in Rp)

I. COMPENSATION 98,949,826.028

A. Land 58,329,047.920

B. House/Main Structures 35,744,388.992

C. Secondary Structures 276,689.000

D. Forest Trees 2,886,723.200

E. Fruit Trees 1,104,569.550

F. Crops 608,407.366

II. SOLATIUM / EMOTIONAL LOSS 21,229,519.101

III. LIVELIHOOD RESTORATION PROGRAM *) 25,400,000.000

SubTotal 145,579,345.129

LARP Administrative costs (5% of direct costs) 7,278,967.256 External Monitoring (2%) 2,911,586.903

OVERALL TOTAL 155,769,899.288

Cost contingencies (15% of direct costs) 23,365,484.893

GRAND TOTAL 179,135,384.181

Note: The funding source from The Government of Serang Regency.

B. Funds sources and Flow

166. In preparing the Ciujung LARP and accompanying budgets, the key implementing agencies (IAs) - local government and the Land agency (BPN) along with the river basin authority (BBWS), will arrange funding sources for the differing budgetary components. Details on sources for funding the Ciiujung LARP budget will be developed later in the context of preparing the individual Ciujung Sub-Project final.

167. In the case of actual implementation of resettlement plans, the categories will be divided into several different components with differing funding source options. Funding for Land Acquisition and compensation for lost assets (land, housing structures, crops) will come from national (APBN) budgets and channeled through the Local Government.

168. Budgeting and funding of the costs associated with the Livelihood Restoration Program, locally known as Social Action Plan, setting up of any resettlement location housing arrangements, including the option of construction of apartment complexes, will primarily be the responsibility of the local government (district government of Serang, Banten). However, funding assistance for selected aspects of the Resettlement Plan relocation and housing budgets will also be solicited from provincial and central governments, and in particular from the Ministry of Public Works and Housing.

C. Assumptions Made for Budget Line Items

169. Assumptions were largely based on prevailing rates as consulted with MAPPI during the survey.

(i) For land, the market price of Rp 50,000/m2 per Surat Keterangan Pemerintah Kabupaten Serang 2014.

(ii) For structures, Table 25 provides the guide as taken from Standar Satuan Harga (SSH) Belanja Daerah Kabupaten Serang, TA 2013.

Page 74: Download 2.56 MB

58

Table 25. Building Price

Multiple Type Single Type

Simple Class Non-simple Class Simple Class (NP-SP) Non-simple Class (P)

(Rp/m2)

4,378,000 6,129,000 3,137,000 4,392,000 Source: Standar Satuan Harga (SSH) Belanja Daerah Kabupaten Serang, TA 2013.

(iii) As regards agricultural crops, fruit trees, and forest trees, these are found in Tables 27, 28, and 29 - using Standar Satuan Harga (SSH) Belanja Daerah Kabupaten Lebak, TA 2014.

Table 26. Price of Agricultural Crops

Type of Crops Price/m2

Cabe 7,000 Jagung 1,500 Kacang Hijau 1,200 Kacang Panjang 3,500 Kacang Tanah 1,750 Kunyit 3,500 Labu 3,500 Lengkuas 6,250 Padi 1,600 Sereh 4,500 Singkong 3,600 Talas 43,000 Terong 2,500 Timun 5,000 Timun Suri 5,000 Tomat 3,500 Waluh 3,500 Ubi (per kg) 7,000 Kacang 7,000

Table 27. Price of Fruit Trees

Type of Trees Harga

A B C D Cokelat 13,500 35,000 35,000 11,500 Jambu 29,150 87,400 87,400 174,800 Jengkol 34,150 99,750 99,750 275,000 Jeruk 33,750 99,500 99,500 296,550 Kelapa 48,300 291,500 291,500 144,900 Kopi 11,200 21,400 21,400 8,500 Mangga 31,650 94,850 94,850 284,650 Melinjo 36,750 105,500 105,500 350,000 Nangka 36,750 102,350 102,350 302,300 Pepaya 15,000 27,750 27,750 42,000 Pete Cina 32,250 96,850 96,850 350,000 Pisang 12,500 36,200 36,200 84,500 Rambutan 33,200 95,500 95,500 286,500 Kecapi 24,150 72,450 72,450 217,350 Durian 48,500 287,500 287,500 862,500 Pete 32,250 96,850 96,850 350,000 Buah Naga 32,250 96,850 96,850 350,000 Lengkeng 32,250 96,850 96,850 350,000 Jambu Mete 14,000 54,000 54,000 12,200 Dukuh 38,450 115,350 115,350 346,050

Page 75: Download 2.56 MB

59

Type of Trees Harga

A B C D Sukun 33,600 99,800 99,800 25,200 Sirsak 33,600 99,750 99,750 152,250 Ceri 33,200 95,500 95,500 148,600 Cengkeh 17,300 148,400 148,400 13,400 Cokelat 13,500 35,000 35,000 11,500 Kelapa Sawit 220,200 339,400 339,400 5,600 Asem 16,500 77,000 77,000 11,000 Menteng 30,450 91,350 91,350 234,300

Notes: A: 1-3 years, B: 4-5 years, C: 6-10 years, D: over 10 years

Table 28. Price of Forest Trees

Type of Trees Price

A B C D Akasia 33,000 66,000 88,000 110,000 Albasia 33,000 66,000 88,000 110,000 Angsana 16,500 77,000 110,000 110,000 Bambu 22,000 27,500 38,500 50,000 Bayur 33,000 66,000 88,000 110,000 Dadap 33,000 77,000 165,000 275,000 Gempol 33,000 66,000 88,000 110,000 Jabon 33,000 66,000 88,000 137,500 Jatake 27,500 55,000 55,000 88,000 Jati 275,000 275,000 935,000 935,000 Karet 19,000 95,000 95,000 66,000 Kembang 11,000 55,000 55,000 137,500 Laban 16,500 33,000 33,000 99,000 Lame 16,500 33,000 33,000 99,000 Mahoni 275,000 275,000 935,000 935,000 Randu 16,500 33,000 99,000 99,000 Salam 16,500 27,500 27,500 44,000 Sengon 33,000 66,000 66,000 88,000 Waru 8,800 33,000 33,000 77,000

Notes: A: 1-3 years, B: 4-5 years with a stem diameter of 4-6 cm, C: 6-10 years with a diameter of 7-20 cm stem, and D: more than 10 years with a stem diameter of more than 20 cm.

(iv) For solatium or emotional trauma, the considerations are as follows: a. Case A: less than 2 years of Residency does not merit consideration for solatium; b. Case B: recorded 2-5 years of Residency granted 10% of the cost of land and main

structure; c. Case C: with 5-10 years of Residency allocated 20% of the cost of land and main

structure; and d. Case D: those with over 10 years of Residency granted 30% of the cost of land and

main structure.

Page 76: Download 2.56 MB

60

XI. Institutional Arrangements

A. Implementation Arrangements

170. The DGWR is the Executing Agency responsible for overall project including resettlement, while the project implementation unit (PIU) is the BBWS who will establish a PIU headed by a manager (PIU head) with experience in externally financed projects. PIU will be responsible for the day-to-day implementation of the Project and will be accountable for technical, safeguards, and financial reporting. The BBWS will collaborate with the CPMU to address the resettlement issues as necessary.

1. National Level

171. At the national level, the DGWR is complemented by the Ministry of Home Affairs (MOHA) Directorate General of Regional Development (DGRD) described earlier, that will provides technical advice and coordination to the provincial and district Bappeda planning agencies. In particular, MOHA will implement (i) Enhanced knowledge base for flood management, specifically a) Enhanced basin data and information, and b) Institutional strengthening, planning and coordination for implementation of flood risks management plans; (ii) Adapted basin management, increased discharge capacity and reduced peak flow particularly that of Watershed rehabilitation and management in village-land; and (iii) Enhanced capacity for community-based flood risk management (CBFRM). All other project components/subcomponents will be though the DGWR.

172. Special project related Central Implementation Units (CPIU) will be established to support implementation and to coordinate with the CPMU in the DGWR.

173. The following matrix (Table 29) summarizes the key institutions in the Ciujung subproject involved with roles and responsibilities regarding LARP implementation.

Table 29. Key LARP Institutions and Roles Under Law 2/2012 No Phase of Land Acquisition Responsible Agencies Time Frame

I. PLANNING PHASE

1 Make Land Acquisition Plan in the public interest

2 Prepare Land Acquisition Planning Document that include; objectives of the development plan, in line with regional spatial planning and national /regional development plan , land location , land size needed, land status, period of land acquisition implementation, implementation construction, land value, and budget. The planning document should be based on the feasibility study:

Agency needing land and relevant technical agency (ies), assisted by professional institution if needed

a. Social Economic survey Agency needing land and relevant technical agency (ies), assisted by professional institution if needed

b. Location feasibility study

c. Analysis of cost and development benefit

d. Estimated land value

e. Environmental and social impacts

f. Other study as necessary

3 Certify the Land Acquisition Planning Document Agency needing the land

4 Submission of the planning document to the provincial government

Agency needing the land

Page 77: Download 2.56 MB

61

No Phase of Land Acquisition Responsible Agencies Time Frame

II PREPARATION PHASE 130 – 207 days

1 Establishment of preparatory team Governor/Bupati/Mayor 10

2 Notice on development plan Provincial Preparatory Team (PPT)/District Preparatory Team (DDR)

20

3 Preliminary identification PPT/DPT 30

4 Republic consultation, if any rejection PPT/DPT 30

5 Public Consultation PPT/DPT 60

6 Issuance on project location determination ‘Decree’ Governor/Bupati/Mayor

7 Announcement of project location determination Governor/Bupati/Mayor and agency needing the land

Grievance/Complaint raised by entitled parties

8 Complaint lodging/rejection on project area Compliant 14

9 Establishment of assessment team Governor/Bupati/Mayor

10 Assessment on complaints Complaint/grievance assessment team

11 Acceptance/rejection on the complain Governor

12 Complaint lodging to the Administrative Court (PTUN) Compliant 30

13 Administrative Court decision Court 30

14 Complaint lodging to Supreme Court (MA) Compliant 14

15 Location determination, if complaint is rejected (Location determination is valid for 2 years and 1 year for extension)

Supreme Court 30

- Project located in more than 1 districts/cities - Project located in a district/city

- Provincial Preparatory Team (PPT) established by the Governor - District/City preparatory team (DPT) established by the Bupati/Mayor

III IMPLEMENTATION PHASE 382 days max

1 Preparation of land acquisition implementation led by head of provincial BPN/ led of land Office

Head of Provincial BPN/Head of Land Office at district

2 Inventory of losses (IOL) and legal assessment of affected assets

Provincial LAIT/District LAIT- Task team for IOL

30

3 Announcement of the IOL Provincial LAIT/District LAIT

4 Data verification, if any complaint on IOL Provincial LAIT/District LAIT 14

5 Mobilization of appraiser /public appraiser Provincial LAIT/District LAIT 30

6 Appraisal/valuation of losses Independent appraiser

7 Deliberation of forms of compensation Provincial LAIT/District LAIT 30

Grievance/Complaint raised by entitled parties

Page 78: Download 2.56 MB

62

No Phase of Land Acquisition Responsible Agencies Time Frame

8 Complaint lodging on compensation to the court Compliant 14

9 Court decision on the complaint Court 30

10 Complaint lodging to Supreme Court Compliant 14

11 Supreme court final decision Supreme Court 30

12 Deposit compensation money in the court

13 Delivery of compensation Provincial LAIT/District LAIT and agency needing the land

14 Delivery of compensation in the specific condition Provincial LAIT/District LAIT and agency needing the land

15 Release of land acquisition objects (land and non-land assets)

District Land Office 7

16 Breaking of legal relation between entitled parties and land acquisition objects

Provincial LAIT/District LAIT 7

17 Documentation of land plot map, list of nominative (entitled parties), and land acquisition administrative data

Provincial LAIT/District LAIT and District Land Office.

- Land acquisition located in more 1 districts/cities - Land Acquisition located in 1 district/city

Provincial LAIT/District LAIT Land Office at district level.

IV HANDOVER OF ACQUIRED LAND

1 Handover land acquisition documents from land acquisition implementer to agency needing the land

Provincial LAIT/District LAIT

7

2 Commencement of infrastructure development1 (For urgent need;

Agency needing the land

3 Certification of the acquired land Agency needing the land 30

MONITORING and BUDGET

1 Controlling of use and utilization of the acquired land BPN RI

2 Sources of fund - National project - Regional project - National State owned enterprise project - Regional state owned enterprise project

National budget (APBN) Regional budget (APBD) National SOE (BUMN) Regional SOE (BUMD)

2. Regional Level

174. The most prominent regional agency stakeholders are the provincial, district and village local governments with technical guidance from the BBWS. These river basin authorities have been established for some time to consider river basin management in a holistic, cross administrative boundary fashion, based on the demarcations of river catchments and watershed areas. The potential roles of the river basin authorities and organizations have been upgraded and given special attention as a part of the water resource policy reforms, emphasizing broad based stakeholder participation, enunciated under the 2004 Water Resources Law and accompanying follow-up legislation and guidelines. In addition to coordinating with the DGWR and the Directorate of Rivers, the river basin authorities also should work closely with local governments, the regional land agencies (BPN) in land acquisition matters, and the key regional technical agencies (Water Resources/Irrigation, or SDA, Bappedas, Agriculture, Forestry).

175. The regional branches of the national Land Agency, or BPN (Badan Pertahanan Nasional)/Ministry of Agrarian and Forestry located in Banten Province and District Serang (where the

Page 79: Download 2.56 MB

63

Ciujung Sub-Project land acquisition corridors are located), represent strategic entities for implementation of Land Acquisition activities. This strategic role in particular extends to asset valuation activities that involve selection of independent valuators, measuring and estimating the value of assets, negotiating with APs and certifying land and asset (property) compensation levels and transfers. Under the 2012 updated Land Acquisition in the Public Domain law and follow-up regulatory guidelines, the head of the province based regional BPN chairs the land acquisition committee that will be set up to facilitate the Project land acquisition in the Ciujung sub-project. Other key BPN entities to which land acquisition functions may be delegated comprise the Serang district BPN office, as well as the relevant subdistrict and village heads who also serve as members of the LA committees.

176. The regional governments are complemented by their key technical that parallel the national agencies. In each of the agencies project implementation units (PIUs) will be set up to help implement the Project activities and to deal specifically land acquisition and resettlement aspects. The Bappeda planning agencies have coordinated and will continue to coordinate and host inter-agency meetings dealing with planning and implementation of the Project land acquisition and resettlement. The water resources agencies will promote improved water resources management by water user organizations (WUAs), and will potentially deal with APs in the mid -downstream land acquisition areas of the Ciujung river basin. The Agricultural agencies will extend technical guidance both to WUAs and farmer groups in the vicinity of the LA corridors. These extension functions will include promotion of improved agricultural technologies and livelihood restoration activities to subsets of APs impacted by land acquisition and any resettlement required.

3. Site Level

177. The Banten provincial government, and in particular the Serang district government, have a direct interest, responsibility for and role in assisting implementation of land acquisition and resettlement arrangements in the Ciujung sub-project. The Serang district government, via the deputy Bupati, has directly participated and paid attention to initial Project and land acquisition public consultation and socialization activities. Should any resettlement be required, the Serang district government would be directly involved, given its preliminary plans to relocate households near to the Ciujung river mouth into apartment blocks. In addition, lower level sub-district (subdistrict) and village (village) governments and their leaders with residents and land in the land acquisition corridors are and will be directly involved in planning, preparing and implementing the land acquisition activities, in part through their roles on land acquisition implementation committees, and to the extent needed, for any resettlement required.

B. Institutions and Capacity Strengthening

178. In as much as the Land Law is relatively new (2012), much capacitation is required to implement the LARPs. Institutionally, a Land Acquisition Preparatory Team as well as Special Ad Hoc Committees will be set up. Special ad hoc committees will be set up in the locations to deal with land acquisition activities. Based on the 2012 LA law and regulations, these include, first, land acquisition preparatory teams to be established at the request of the provincial governors, and involving the district and city governments, to deal with public consultations and negotiations with local stakeholders, to address issues and objections, and to secure initial stakeholder agreements. These LA preparatory teams are linked to efforts to secure project location permits to be issued by the provincial governor. Since these LA preparatory and LA implementation teams will be following new procedures and regulations, specialized technical assistance and/or workshops will be conducted to ensure that they are familiar with the new laws/regulations and social safeguards related issues. Training plan will be prepared and budget has been allocated adequately. Some key staff from Balai has received training related to the new law and social safeguards principles as part of TA 7566 capacity development activities. Training manual to guide the staff has been included.

179. Establishment and Composition of the Ciujung land acquisition Preparatory Team. Special ad hoc committees will be set up in Banten, Serang and the Ciujung Bank sub-project area to deal with Land Acquisition activities. Based on the 2012 LA law and regulations, these include, first,

Page 80: Download 2.56 MB

64

land acquisition preparatory teams to be established at the request of the Banten governor, and involving the district Serang government, to deal with public consultations and negotiations with local stakeholders, to address issues and objections, and to secure initial stakeholder agreements. These land acquisition preparatory team is linked to efforts to secure project location permits to be issued by the provincial governors.

180. The Ciujung Sub-Project Land Acquisition Preparatory team will consist of (a) the regents (bupatis) or mayors, (b) the working units of the similar apparatus at the district level, (c) and other local officials of the local government of Serang requiring the land in the Ciujung River land acquisition corridor. In addition, the Banten governor will also establish a Land Acquisition Preparation Secretariat in the Provincial Government’s Secretariat to oversee and facilitate the activities of the Land Acquisition Preparatory Teams.

181. The tasks of the Ciujung LARP site preparation team are:

(i) Conduct the announcement of the planned development (river embankment improvements with land acquisition required);

(ii) Collect preliminary data from the planned development location; (iii) Conduct Public Consultation of the planned river embankment improvement

development; (iv) Determine the boundaries of the river embankment improvement development location; (v) Announce the precise location of the river embankment improvements being done in the

public interest; and (vi) Perform other tasks that relate to preparatory steps for undertaking Land Acquisition in

the public interest, as assigned by the provincial governor.

182. Objection Review Team. In the event that after two rounds of Public Consultations agreements to proceed still cannot be achieved, then a special ‘Objection Review Team’ may be set up to review the objections to the planned location for the planned development activity, and in the case of the Project, the river bank improvement areas where land acquisition will occur. The Objection Review Teams comprise the province secretary, the head of the BPN kantor wilayah, regional development governance institutions, the head of the regional office of the Ministry of Laws and Human Rights, local regents (Bupatis) or mayor, and academicians. Their duties are to prepare an inventory of problems linked to the objections, organize meetings and clarifications with the parties concerned, and then to prepare recommendations of either accepting or rejecting the recommendations that take into account (i) regional spatial planning and the regional development priorities; (ii) RPJMD, or regional medium term development plans; (iii) strategic plans or RENSTRA; and (iv) government work plans of the concerned institution.

183. Establishment and Composition of Land Acquisition Implementation Committee, Unit and Task Force. In addition to the land acquisition preparatory committee, a full Land Acquisition (LA) implementation committee will be established in the Ciujung Sub-Project location, chaired by the head of the Banten province regional BPN land agency office (kantor wilayah). In addition to the chair, the Land Acquisition implementation committee to be set up in Banten should establish implementing units that comprise, at a minimum, (i) the official within the regional BPN office in charge of land acquisition affairs; (ii) the head of the local district land office in the project location; (iii) an official from the district government working unit dealing with land affairs; (iv) the subdistrict head (camat, or camats) at the site location; and (v) the village headperson (lurah) at the project site. In the case of multiple subdistricts or villages, several camat and several headpersons may also be put on the Land Acquisition committees. Special task forces, in addition, may be set up to undertake the implementation of the land acquisition required.

Page 81: Download 2.56 MB

65

C. Key Procedures and Institutional Arrangements

184. Table 29 localizes LARP implementation as stipulated in Law 2/2012 and Figure 3 summarizes the procedures to be followed for planning and preparation with corresponding institutional responsibilities and time frame.

185. Securing Location Permits and Establishment of Preparatory Committees. As mandated by land acquisition law, the local government of Serang will use the compulsory land acquisition mechanism to acquire the needed land from the Ciujung land acquisition corridor. As per provisions in the new Law for determining the project location and obtaining the project principle permit, the provincial government will conduct ( i) a notification of the development plan; (ii) an initial identification of the development location; and (iii) public consultation on the development plan. Linked to these activities and needs above, as noted above, a special Preparatory Committee will be established to handle the initial information collection, public consultation and preliminary agreement with development and land acquisition plans that are needed to secure the location permit from the Banten Governor. Since many of these linked activity site identification and consultation activities have already been performed, it is hoped that the process can be streamlined during future implementation.

186. Land Acquisition Implementation. Following the issuance of a project location permit (see Figure 4) by the Governor, the local government will request the regional BPN Land Agency office based in Banten to commence handling the land acquisition process. The BPN Land Agency will then carry out (i) an inventory of land and assets to be acquired, either through voluntary or compensation means, shall include information on land area, land status, land use, and ownership; (ii) valuation of compensation based on a valuation by an independent appraisal agency to be appointed; ( iii) negotiation of compensation rates and compensation forms; (iv) arrangement of compensation payments; and (v) transfer of the land acquisition results to the Serang provincial government.

187. Procedures for Delivering Entitlements. Procedures for delivery of entitlements will be notified to the Affected Persons (APs) through individual entitlement summaries, or by the land agency. In the case of involuntary acquisition under the 2012 land acquisition law, delivery of entitlements is the responsibility of the regional BPN land agency. The transaction is signed and witnessed to ensure transparency and integrity. In case there are still gaps regarding the resettlement entitlements between the Indonesian government policy and ADB requirements, and should these resettlement gaps cannot be addressed by the BPN land agency office, the provincial government will be responsible to fill the gaps. In the case of involuntary acquisition, delivery of entitlements is the responsibility of the regional BPN land agency, while the local government, as implementing agency, program and arrange the budgets and funds for compensation. The transaction is signed and witnessed to ensure transparency and integrity.

Page 82: Download 2.56 MB

66

Figure 3. Planning and Preparation for Determination of Location (+ 207 Days)

Source. Land Acquisition Process and Activities Law No. 2/2012.

Figure 4. Implementation and Land Transfer, IOL, Compensation Valuation, Consultation on Compensation, Delivery of Compensation and Land Transfer

Source. Land Acquisition Process and Activities Law No. 2/2012.

188. Timing of Commencement of Civil Works. Construction contracts will reference the safeguards principles and processes, and contractors to the IAs will be contractually bound by any representations or warranties that the IAs makes under the safeguards plans. The safeguards teams will coordinate in meetings with the technical managers and contractors through the Project Management Units until implementation of the LARP is complete. This close coordination is essential to ensure that settlements and any supplementary assistance to APs is delivered in advance of civil or other works that occasion any adverse impact, and that resettlement actions are timely accomplished to avoid project delays.

Page 83: Download 2.56 MB

67

D. Project Supervision Consultants

189. The BBWS as implementing agency is required to retain adequate staff, or alternatively a Project Implementation Consultant with relevant qualifications and experience, to be able to adequately design and deliver the LARP for the Ciujung sub-project. It remains responsible for reviewing and if necessary updating the LARP at the time of each scheduled bi- annual report, particularly with regards to potential changes in project scope, location, timing, entitlements or valuations that might require additional resources. In order to assist the local Serang district government and selected technical agencies to implement their roles and tasks, special capacity building programs will be devised to upgrade technical and institutional capacity.

E. Implementation Schedule of the LARP

190. The table below summarizes the various inter-related activities connected with the updating and implementation of the LARP.

Table 30. Preliminary Schedule of Resettlement Activities

Activities Schedule Preparation of feasibility study LARP March 2014 – March 2015 Distribution of Project information leaflet March 2015 DGWR concurrence of draft LARP April 2015 ADB approval of draft LARP April 2015 LARP updating June – September 2015 Submission to and ADB concurrence of updated LARP September 2015 Implementation of land acquisition and relocation From October 2015 Implementation of income restoration program From September 2015 - 2019 Internal monitoring (submission of quarterly reports) From January 2016 Post-resettlement implementation evaluation From October 2016

Page 84: Download 2.56 MB

68

XII. Monitoring and Reporting

A. Internal Monitoring

191. The BBWS will be responsible for internal and compliance monitoring of the LARP. Quarterly reports will be submitted to DGWR starting from the commencement of LARP updating, which coincides with the conduct of the DMS. The CPMU will include updates on resettlement in its regular progress reports to ADB. These progress reports will be submitted to ADB for web posting. The internal monitoring and reporting template (Appendix 7) will be used to prepare the progress reports.

192. Internal monitoring and supervision will look into the following aspects and indicators:

(i) Delivery of entitlement (Payment of compensation including entitlements disbursed, compared with number and category of losses set out in the entitlement matrix; Timely disbursements of the agreed transport costs, relocation costs, income substitution support, and any resettlement allowances, according to schedule; Provision of replacement land plots; Quality of new plots and issue of land titles; Restoration of social infrastructure and services.

(ii) Coordination of completion of land acquisition activities: Progress on income and livelihood restoration activities being implemented as set out in the income restoration plan (SAP), for example, utilizing replacement land, commencement of production, the number of AP trained in employment with jobs, number of income-generating activities assisted.

(iii) Public consultation and awareness of compensation policy. Consultations organized as scheduled including general meetings, focus group discussion, etc; Knowledge of entitlements of APs; Translation of information disclosure in the local languages Use of the grievance redress mechanism by AP including Information on the resolution of the grievances and number of complaints received.

(iv) Throughout the implementation process, the trends of living standards will be observed and surveyed. Any potential problems in the restoration of living standards will be reported. Other potential monitoring indicators can be used as described in LARF.

B. External Monitoring

193. The CPMU will hire an independent organization to carry out external monitoring and post-implementation evaluation and as such will prepare the terms of reference (TOR) for this purpose. Both the TOR of the external monitoring organization (EMO) and the selection of the monitor will require ADB’s prior consent. The EMO will provide DGWR and ADB a copy of its semi-annual monitoring reports. The EMO will likewise conduct a post-RP implementation evaluation study six months following the completion of resettlement. The monitoring reports will be disclosed to the APs and posted on the ADB website.

194. Major activities of the EMO during each monitoring period include:

(i) Verifying the results of internal monitoring reports prepared by the PMU; (ii) Looking into whether provision of compensation and other agreed forms of assistance

complies with the approved RPs; How much do the displaced persons know about resettlement procedures and entitlements; Do the displaced persons know their entitlements; Do they know whether these have been met;

(iii) Assessing whether supplemental assistance measures have been provided to severely affected and vulnerable AHs, and the extent to which they have been effective in restoring incomes and living standards for severely affected households;

(iv) Evaluating the effectiveness, impact and sustainable level of resettlement management agencies and procedures; and

(v) Proposing, as needed, adjustments in the implementation of the RPs and income restoration measures to improve implementation effectiveness and meet safeguards

Page 85: Download 2.56 MB

69

compliance.Basic information on AP (Gender disaggregated data essential for all aspects): Location of the project; Composition and structure, ages, educational, and skill levels and gender of household head; Land and other resource-owning and resource-using patterns; Occupations and employment patterns;Income sources and levelsLivelihood restoration: Were compensation payments sufficient to replace lost assets; Was sufficient replacement land available of suitable standard; Did income substitution allow for reestablishment of enterprises and production; Have vulnerable groups been provided income-earning opportunities; Are these opportunities effective and sustainable

(vi) Levels of AP satisfaction: How do the displaced persons assess the extent to which their own living standards and livelihoods have been restored.

Page 86: Download 2.56 MB

Appendix 1 70

APPENDIX 1. SES-IOL SURVEY INSTRUMENT Draft 13 June 2013 Attachment 1

QUESTIONAIRE OF HOUSEHOLD

Date of survey : …….. / …….. / 2013 Start : ……….. Finish : ………..

Code Questionnaire

Province : .................................................. City : .................................................. Subdistrict : : ..................................................

Name of Enumerator : ................................................... Code Enumerator : ....................................................... No HP : ............................................. Name Of Supervisor : ……………………………… No HP : ............................................. Signature : …………………………………

Village : ..................................................

Number of Respondent : ................................. Location of house : ...................................... 1. Right of River 2. Left of Rive

3. Disposal Area

A. PROFILE OF RESPONDENCE – IOL (100%)

A.1. Name .................................................................................................................. A.1

A.2. Address (ID CARD) or other ID documents

Street..................................................................................................... Village............................................RT ……. / RW ……. Kec/Kab/Prov.................................................................................. Cellphone :.......................................................................................

A. 2

A.3. Age

� < 20 year A.3

� 20 – 30 year

� 31 – 40 year

� 41 – 50 year

� 51 – 55 year

� 55 – 65 year 7. > 65 years

A.4. Education (last)

� Never Not Graduate SD (Primary School)

A.4

� Graduate SD / MI / Equal

� Graduate SLTP / MTs / Equal

� Graduate SLTA / MA / Equal

� Graduate Academy (D1, D2, D3)

� Strata (S1)

� Post Graduate (S2, S3)

A.5. Status in the household

� Head of household A.5

� Wife � Member of household (child)

� Other ....................................(Specify)

A.6. Live at this house

…………………………..years A.6

� < 2 year

� 2 – 5 years � 5,1 – 10 years � > 10 years

Page 87: Download 2.56 MB

Appendix 1 71

B. DATA FOR SOCIAL HOUSEHOLD OF RESPONDENCE – IOL (100%)

B.1. Number of people living in this house � 1 - 2 persons � 3 – 5 persons � 6 – 8 persons � > 8 persons

B.1.

Please give detail information:

No. Name of

HH Members

Relation with HH head 1*

Sex 2*

Ethnic Age Religion Marital Status

3*

Education Attainmen

t 4*

Primary Occupation

5*

Monthly Income

(Rp)

Work / School

Distance 6*

Physical Condition

7*

1

2

3

4

5

1* Relation with the HH head: [1] head [2] spouse [3] child [4] parents [5] other relatives [6] house helper 2* Sex: [M] male [F] female 3* Marital status: [1] single [2] married [3] widowed [4] divorced 4* Education attainment: [1] No education [2] Not completed Elementary [3] Being in Elementary [4] Completed

Elementary [5] Not Completed High School [6] Being in High School [7] Completed High School [8] Not completed College [9] Being in College [7] Finished College

5* Occupation: [1] Farming/ livestock [2] Business/Trader/Shop Owner [3] Driver / Labourer [4] Employee (private/government [5] Retired [6] Unemployed looking for work [7] Scholar [8] Other: (specify) …………

6* Work/School distance: [1] at home [2] less than 1km [3] between 1 to 2km [4] between 2 to 4km [5] more than 4km 7* Physical condition: [1] normal [2] disabled [3] very old/chronically B.2. Number of

household living in this house? All of households will census

� 1 household B.2.

� 2 household

� 3 household

� 4 household

� > 4 household

B.3. Relationship to household head

1. Child 2. Sibling 3. Relative 4. Friend 5. Othe............................... (Specify)

B.3.

B.4. Is this family is a native (born in Ambon/ Banten) or migrants?

� Native people (husband and wife) � Immigrant (come from)………………….. � Husband is indigenous people � Wife is indigenous people C.14. Other...................... (Specify)

B.4.

B.5. Identity Cards (ID CARD) of yours? And number of ID CARD

� Not have ID CARD

� Has ID CARD and corresponding address same with ID CARD

� Has ID CARD and corresponding address not same with ID CARD but same City � Has ID CARD and corresponding address not same with ID CARD but different

City

� Has seasonal ID CARD C.15. Other (Specify).....................................

B.6. Family card status?

� Not has Family Card B.5.

� Has Family Card, address same with ID CARD

� Has Family Card but different address with ID CARD 4. Other (Specify).....................................

Page 88: Download 2.56 MB

72 Appendix 1

C. STATUS LAND AND CONDITION OF STRUCTURE (HOUSE) – IOL (100%)

Picture of Affected Asset 1 Picture of Affected Asset 2

Picture of Affected Asset 3 Picture of Affected Asset 4

Affected

Asset GPS

Coordinate Type of Usage

Ownership Status*

Proof of ownership*

Asset Specification*

Total Area (p x l) m2

Affected area(p x l) m2

C.1. C.2. C.3. C.4. C.5. C.6. C.7. C.8.

Land

Structure 1:

Structure 2:

*C4 � Own property / famili � Official home � Monthly rental � Yearly rental contract � “Stay but not pay” � Other: ………………………(specify)

*C5 � Certificate of Ownership � un certificate � Building Rights � Public land � Others : ……………………………

*C6 � Single permanent � Permanent coupling � Single semi-permanent � Semi-permanent coupling� Single non-permanent � Non-permanent coupling� Terraced permanent � Terraced Semi permanent. Non permanent rise

C.9. Part of other structure which is affected No Structure Length (meter) Width (meter) Height (meter) 1 Cage

2 Storage

3 Fence

4 Toilet/WC

C.10. Material was used to build the structure

No Structure Material 1. Roof 1. Ceramic 2. Zink

2. Wall 1. Wood 2. Red brick 3. White brick

3. Floor 1. Ceramic 2. Concrete 3. Wood

4.

C.11. Tree Wood Affected by project

Type of Wood Number (Tree) Age Price/m3

� �

Page 89: Download 2.56 MB

Appendix 1 73

� �

Total

C.12. Trees fruits Affected by project

Type of Trees Fruits Number (Tree) Harvest (ton/season) Price (Rp/Kg) � � � �

Total

C.13. Affected crops project

Type of Crops Total area

(m2) Affected (m2) Harvest per year Price (Rp/Kg)

� � � �

Total

C.14. Distance of the house/land to river/dam

......................................... meter

C.15. If this house does not belong to you, who the owner is and where he lived?

Name …….…….. Address at RT/RW Village …….…….. Subdistrict…………………… City / District Province

C.16. If the lease / contract, how is the average rental price per month?

Rp. …….……../month

C.17. Beside within project area, do you have land in other place?

Yes, square: …….…….. m2

No

C.18. If yes, where is the location

1. In the same village 2. In other village, but within the same subdistrict 3. In other subdistrict, but within the same city 4. In other city, but within the same province 5. In other province

C.19. Beside within project area, do you have house in other place?

Yes, square: …….…….. m2

No

C.20. If yes, where is the location

1. In the same village 2. In other village, but within the same subdistrict 3. In other subdistrict, but within the same city 4. In other city, but within the same province 5. In other province

C.21. Whether the structure/land is for lease or rent?

1. Yes 2. No

C.22. If yes, How much you earn per month

Rp. …….……../month

C.23. How many person leases your house/land each year?

…….…….. person/year

C.24. If you have business, type of

1. Kiosk 2. Restaurant

Page 90: Download 2.56 MB

74 Appendix 1

business will be affected

3. Catering 4. Retreading 5. Non 6. Other …….…….. (specify)

C.25. Is the small business able to be relocated?

7. Yes, reason …….…….. 8. No, reason …….……..

C.26. Turnover/profit earned per month from the affected asset a. Turnover per

month b. Profit per

month

1. Rp. …….……../month 2. Rp. …….……../month

C.27. How many man power involved in the affected business

1. Female …….…….. person 2. Male …….…….. person

C.28. Do you have mobile business

1. Yes 2. No

C.29. If yes, type of mobile business

1. Cadger, specify …….…….. 2. Service, specify…….…….. 3. Other, specify …….……..

C.30. If you have to be relocated into other location, what will you do with the business?

1. Keep trading 2. Close the business 3. Others, specify

C.31. If you have to be relocated, which type compensation fits you

1. Cash 2. Have the business place rebuild 3. Provided the business location 4. Other, specify …….……..

C.32. Alternative of location of new business which fits you

1. Not far from current location 2. Move to other location 3. Have own decision where to move 4. Other, specify …….……..

D. ECONOMIC CONDITION – MIXED IOL (100%) & SES (20%)

D.1. Main job: (a) Head of household (a)……… (b)……… (c) member of HH …………..

D.1

� civil servants / Army � Merchant

(b) housewife ; (c) member of household � private employees � Driver � Farmers / ranchers housewife � Fisherman Head of HH � entrepreneur others. ............. (mentioned) � Labour

D.2. Others Job : (a) head of HH; (b) housewife; (c) member of HH

(a)…… (b)…… (c) member of HH …………..

D.2

� civil servants / Army � Merchant

� private employees � Driver � Farmers / ranchers housewife � Fisherman Head of HH � Entrepreneur others. ............. (mentioned) � Labour

D.3. How is the average income per month (from main job and second job) all household members?

a. Income from main job Rp. .................... / month

b. Income from secondary job Rp. .................... / month

D.3

11

11

Page 91: Download 2.56 MB

Appendix 1 75

E. WATER CONSUMPTION – MIXED IOL (100%) & SES (20%)

E.1. Water source for drinking for your family?

�. PDAM itself �. shallow wells �. Public hydrants �. River / times / reservoir �. Terminal water �. Spring �. Gallons of water . PAH (Rainwater Reservoirs)

F.1.

�. Buy water pole . Others ................ (specify)

And price per liter:m3/ Rp

E.2. Water source for cooking for the family of Mr. / Mrs.?

�. PDAM itself �. shallow wells �. Public hydrants�. River / times / reservoir �. Terminal water �. Spring �. Gallons of water. PAH (Rainwater Reservoirs)

F.2.

�. Buy water pole . Others ................ (specify)

And price per liter: m3/Rp

E.3. Sources of water used to bathe/wash the family members?

�. PDAM itself �. River / time / reservoir F.3.

�. Public fire hydrant �. fountain

Total income (a+b) Rp. .................... / month

D.4. How is the entire Household Expenditure per month?

1. Food Rp. .............../month D.4

2. Transportation Rp. .............../month

3. Settlement (installment/lease) Rp. .............../month

4. Electricity Rp. .............../month 5. Water Rp. .............../month

6. Education Rp. .............../month 7. Health Rp. .............../month 8. Savings Rp. .............../month 9. Entertainment Rp. .............../month 10. Other expense, specify.......Rp...../month Amounting Rp. .............../month

D.5. How is the distance between residence to office / school…. a) Father b) Mother….. c) Children

(a) Father..…; (b) Mother…….. (c) Children………. � Less than 1 km

D.5

� 1 Km – 5 Km � More than 5 Km

� Mother Rp …………………. � Children Rp ………………….

D.6. Transportation to and from work / school a) Father b) Mother c) Children

(a) Father... (b) mother (c) Children

D.6.

� There is no / walk � Public vehicle

� Bicycle � Office motorcycle

� Private motorcycle � Office car

� Private car � Others……. (specify

D.7. Sources of electricity?

� Direct from PLN � Electricity connection from neighbors � Non electrical connections PLN � kerosene lamp / Lamp / Candle

D.8. Electric equipment is frequently to use (more answer allowed)

1. AC. 2. Computer 3. TV 4. Radio 5. Refrigerator 6. Telephone 7. Cellphone 8. Other, specify.................

D.9. Energy source is used to cook

1. Electricity 2. Gass 3. Firewood 4. Other, specify.................

Page 92: Download 2.56 MB

76 Appendix 1

�. Water terminal �. PAH (Rain Water Container) �. Buy water load .More.................... (please specify)

�. More than Rp 150.000

E.4. Where family members of you defecate?

� WC with septic tank in house � Pit latrine toilets in the house WC in the house flowed directly into the river / reservoir � Public toilet with septic tank � Public toilets without septic tank � WC helicopter (above the river / reservoir) � Other ...................................... (specify)

F.7

E.5. Where family members of Mr / Mrs bathing / washing clothes?

� Inside the house � public toilets � In river / reservoir � Other ...................................... (specify)

F.8

F. PERCEPTIONS ABOUT WASTE – SES (20%) included as possible solid waste management intervention through program. F.1. Where do you dispose the trash?

�. Vat/garbage can/ bucket �. Trash carts passing �. TPS (Disposal While) �. Into the ground �. Burnt �. To the river �. Other.................................... (specify)

G.1

F.2. Do you sort of wet and dry waste before disposal?

�.Yes �. No, (reason………………………..)

G.3

F.3. Are there workers who regularly collect garbage from residents?

�.An ( ….. times per week) �There is no

G.4

F.4 Do you pay any levy/retribution for dispose the trash?

�.Yes: (a) less than Rp 10,000; (b) Rp 10,000 – Rp 15,000; (c) Rp 15,000-Rp 20,000; (d) More than Rp 20,000; (e) Other.............(specify) �No

G.5

F.5. How drawdown mechanism waste levy?

� Officer who picked G.7

� At each meeting, social gathering PKK

� Directly into the RT / sexy women

� Other ........................... (specify)

F.6. According to you how to address the problem of litter in the father.?

…………………………………………………………… G.8

……………………………………………………………

……………………………………………………………

G. HEALTH - SES 20%

H.1. Is there any of your family were sick this month?

� Yes (directly to H2) �. No

H.1

G.2. Any disease that often affects to your family?

� skin disease H.2.

� respiratory disease � stomach illness

�diarrhea �Other .................................... (specify)

G.3. Where do you and family for treatment when sick?

� Puskesmas H.3

� Hospital � Doctor

� Nurse

� Traditional healer � Other ....................................(specify)

H. INFORMATION ABOUT FLOOD – MIXED IOL (100%) & SES (20%)

H.1. Are you never flooded, the last 5 years?

� Yes � No

I.1

Page 93: Download 2.56 MB

Appendix 1 77

� Do not know (because of moving to this area)

H.2 Is there any early warning system for flood in your area?

� Yes: (a) Serine, (b) gong, (c) other.....................................................(specify) � No

I.2

H.3 How many often flood ?

� Once a month � Six once a month � Once a year � Other .......................... (specify)

I.3

H.4 Is your home flooded?

� Yes � No

I.4

H.5 What is the deep of the water entering to the your home ?

� Less than 20 cm � 20 cm - 50 cm � 50 cm - 100 cm � More than 100 cm

I.5

H.6 How long is the flood waters recede?

� Less than 1 hour � 1 – 3 hours � 3 – 6 hours � 6 - 12 hours � 12 – 24 hours � More than 24 hours

I.6

H.7 When flooding occurs whether did you leave the house?

� Yes � No

I.7

H.8 Where do you go during floods?

� To a neighbor's house � To the nearest mosque � To the nearest school To the 2nd floor � Other................................. (please specify)

I.8

H.9 Types and estimates of property losses, while flood?

� Furniture RP........................ � Structure of house Rp......................... � Electronic RP........................... � Livestock Rp.......................... � Other......(Please specify) RP.................

I.9

H.10 Expenses during and after the flood?

� Revised house RP........... � Cleaning house Rp............ � Health RP........... � Other........ (Please specify) RP..........

I.10

H.11 What is the role of women at the time of the flood? Please explain.....

� Cooking food � Organize consumption � Care of children � Care of her husband and son � Others (Please specify)

I.11

H.12 How long it takes to clean up and fix up the house/structure

1. Less than 6 hours 2. More than 6 hours 3. 24 hours 4. More than 24 hours

H.13 What do you think of the most effective mean to deliver the news about the flood

1. Passed by mouth to mouth 2. Radio 3. TV 4. Cellphone 5. Other, specify ...................

H.14 What is the role of women at the time after flood? Please explain.....

� Cleaning of household appliances � Cleaning the house � Look for fire wood � Others (Please specify)

I.12

H.15 What is the role of male at the time of the flood? Please explain.....

� Transport of goods � Roving home-made boats � Help or security guard � Others (Please specify)

I.13

H.16 What is the role of male at the time after flood? Please explain.....

� Clean the mud � Cleaning of household appliances � Cleaning the house � Others (Please specify)

I.14

Page 94: Download 2.56 MB

78 Appendix 1

H.17 Women discomfort when flooding happen?

� Difficult to use toilet � Difficult to buy baby formula � Difficult bath � Difficult to cook meals � Other (please specify)

I.15

H.18 Utilities held for flood information home?

� Radio � News paper � TV � Mobile Phone � Other (Please specify)

I.16

E. PUBLIC PERCEPTION AND ASPIRATIONS - MIXED IOL (100%) & SES (20%)

E1. Do you know Ambon/Ciujung flood management project plan?

� Yes E.1.

� No

E2 If you know, where do you obtain such information

� Official of Desa/Village/Subdistrict E.2.

� Balai

� Neighbour

� Newspaper�Others………………………(specify

E3 Whether the Government has done dissemination to the community?

� Already, when (………….) E.3.

� Not yet

� not know

E.4. Has the government done negotiation for land, structure and plant (tree, crop)

� Already, (when………..) E.4.

� Not yet

� Not know

E5. If your land affected, what form the compensation you need?

� Money E.5.

� land

� House

� Others, …………………………..(mentioned)

E5. If your structure affected, what form the compensation you need?

� Money � land � House � Others, …………………………..(mentioned)

E.6. As far as you concern, how much avarage price for land per m2 in this area?

E.7. As far as you concern, how much avarage NJOP price for land per m2 in this area?

E.7. What is your Proposal to be resettled?

� Specify................................... E.8.

� Other, ................................ (specify)

E.8. Is land acquisition for the planned flood Management will affect your business Ambon?

............................................................ E.9.

� Yes (please explain briefly the effect) ………………….………………………… …………………………………………………………

� No (please explain briefly the effect) …………………………………………….. ………………………………………………………..

(Mentioned) � Not know ……………………………………………….. ………………………………………………………..

E.9. According your opinion, what kind of land acquisition procedure to be undertaken

a. Under the agreement the prevailing price in the location of activities

b. Under an agreement between the land owner and initiator without brokers

c. Under an agreement between the land owner and initiator, involving Neighborhood Head, Hamlet Head, Village Head, Subdistrict Government and Local Government.

Page 95: Download 2.56 MB

Appendix 1 79

d. Do not know e. Other,......................................

OTHER QUESTIONS RELATING TO THE POSSIBILITY RESETLEMEN (SPECIAL LARAP) Open ended, and include within main questions.

1. According to you, if the people feel safe and comfortable staying here?

a. Yes

b. No

2. If you do not feel comfortable if people are you ready if there is a government program to move to the place

that is more secure and comfortable (Yes / No)

a. Yes

b. No.

3. If you are ready to move, to which area is more secure and comfortable, and what is reasons?

a) Not out of this village

b) Still in this Subdistrict

c) Still in this kabupaten

d) Where's all that matters safe and comfortable

e) Others.................... (please specify)

4. If not willing to move, what is specifying the reasons?

a) Here with family b) The close of business of the house c) School children near from this house d) In the new place will adapt again to a new neighborhood e) Others .......... (please specify)

5. What you hope is if have to relocation?

a) ................................... b) ................................... c) ...................................

6. If you are granted redress for the land, what will you do?

a) Buy similar land in other location

b) Save it

c) Develop new business

d) Build/renovate a house

e) Go pilgrim

f) Other plan

7. If you experience a declining in income / loss of livelihood at the time of land acquisition / relocation, what kind of program do you need to avoid a decline in income?

Page 96: Download 2.56 MB

80 Appendix 1

a) Business fortering

b) Capital assistance

c) Life skill training

d) Other

8. If you find problems during land acquisition / relocation, what will you do:

a) Keep still

b) Make a complaint to the local government

c) Make a complaint with the NGOs

d) Make a complaint with local community

e) Raise the mass to abort the development

f) Other, specify......................................

9. If you are not satisfied with the process of land acquisition / relocation, will you sue it?

a) Yes, reason..............................

b) No, reason...............................

10. Please give your comment/suggestion with regard to the plan of the activity to be carried out in the your region .

................................................................................................................................................................... ...................................................................................................................................................................

Page 97: Download 2.56 MB

Appendix 2 81

APPENDIX 2. LIST OF AFFECTED HOUSEHOLDS

AH No

Urut AREA DESA

No bidang ukur

NAMA PEMILIK

Luas Bidang

luas terkena

SISA LAHAN PADA KAKI TANGGUL

% JENIS PEMANFATAN

Bangunan

terkena kaki tanggul

terkena bibir sungai

P SP NP Luas Luas

Terkena

1 KIRI panyabrangan kiri 1 Confidential 578.6543 218.5687 274.2958 360.0856 62% ladang/kebuncampuran

2 KIRI panyabrangan kiri 2 Confidential 862.3578 360.1414 310.1273 502.2164 58% ladang/kebuncampuran

3 KIRI panyabrangan kiri 3 Confidential 1092.9851 505.525 587.460 587.4601 54% ladang/kebuncampuran

4 KIRI panyabrangan kiri 4 Confidential 909.7902 130.7211 779.0691 86% ladang/kebuncampuran

5 KIRI panyabrangan kiri 5 Confidential 1674.3774 524.9905 445.6816 1.149.3869 69% ladang/kebuncampuran

6 KIRI panyabrangan kiri 6 Confidential 905.3938 293.6313 488.2447 611.7625 68% ladang/kebuncampuran

7 KIRI panyabrangan kiri 7 Confidential 866.1269 866.1269 866.1269 100% ladang/kebuncampuran

8 KIRI panyabrangan kiri 8 Confidential 814.9372 296.0656 515.6464 518.8716 64% ladang/kebuncampuran

9 KIRI panyabrangan kiri 9 Confidential 2235.9110 646.3333 1.589.5777 1.589.5777 71% ladang/kebuncampuran

10 KIRI panyabrangan kiri 10 Confidential 1809.4850 1.809.4850 1.809.4850 100% ladang/kebuncampuran

11 KIRI panyabrangan kiri 11 Confidential 2202.0368 950.9272 499.9630 1.251.1096 57% ladang/kebuncampuran

12 KIRI panyabrangan kiri 12 Confidential 2138.4547 747.5534 1.390.9013 65% ladang/kebuncampuran

13 KIRI panyabrangan kiri 13 Confidential 1250.5523 204.8884 1.045.6639 1.045.6639 84% ladang/kebuncampuran

14 KIRI panyabrangan kiri 14 Confidential 1297.6296 494.8125 802.8171 62% ladang/kebuncampuran

15 KIRI panyabrangan kiri 15 Confidential 1409.3115 279.4673 1.129.8442 1.129.8442 80% ladang/kebuncampuran

16 KIRI panyabrangan kiri 16 Confidential 1881.8026 761.2335 531.4328 1.120.5691 60% ladang/kebuncampuran

17 KIRI panyabrangan kiri 17 Confidential 128.0712 128.0712 128.0712 100% ladang/kebuncampuran

18 KIRI panyabrangan kiri 18 Confidential 1966.9171 1.163.0136 740.8929 803.9035 41% ladang/kebuncampuran

19 KIRI panyabrangan kiri 19 Confidential 804.2966 804.2966 804.2966 100% ladang/kebuncampuran

20 KIRI panyabrangan kiri 20 Confidential 320.9514 25.2198 295.7316 295.7316 92% ladang/kebuncampuran

21 KIRI panyabrangan kiri 21 Confidential 447.4182 376.5270 17.4215 70.8912 16% ladang/kebuncampuran

22 KIRI panyabrangan kiri 22 Confidential 6932.2027 2.484.0107 1.523.4955 4.448.1920 64% ladang/kebuncampuran

23 KIRI panyabrangan kiri 23 Confidential 688.7229 530.0060 104.5427 158.7169 23% ladang/kebuncampuran

24 KIRI panyabrangan kiri 24 Confidential 1152.6441 10.0155 1.142.6286 1.142.6286 99% ladang/kebuncampuran

Page 98: Download 2.56 MB

82 Appendix 2

AH No

Urut AREA DESA

No bidang ukur

NAMA PEMILIK

Luas Bidang

luas terkena

SISA LAHAN PADA KAKI TANGGUL

% JENIS PEMANFATAN

Bangunan

terkena kaki tanggul

terkena bibir sungai

P SP NP Luas Luas

Terkena

25 KIRI panyabrangan kiri 25 Confidential 278.8651 278.8651 278.8651 100% ladang/kebuncampuran

26 KIRI panyabrangan kiri 26 Confidential 533.8775 533.8775 533.8775 100% ladang/kebuncampuran

27 KIRI panyabrangan kiri 27 Confidential 815.9495 815.9495 815.9495 100% ladang/kebuncampuran

28 KIRI panyabrangan kiri 28 Confidential 463.8984 463.8984 463.8984 100% ladang/kebuncampuran

29 KIRI panyabrangan kiri 29 Confidential 4595.1563 996.2287 1.793.3936 3.598.9276 78% ladang/kebuncampuran

30 KIRI panyabrangan kiri 30 Confidential 468.7759 468.7759 468.7759 100% ladang/kebuncampuran

31 KIRI panyabrangan kiri 31 Confidential 985.5633 201.3635 626.7436 784.1998 80% ladang/kebuncampuran

32 KIRI panyabrangan kiri 32 Confidential 936.7709 936.7709 936.7709 100% ladang/kebuncampuran

33 KIRI panyabrangan kiri 33 Confidential 950.5051 287.6824 662.8227 662.8227 70% ladang/kebuncampuran

34 KIRI panyabrangan kiri 34 Confidential 1163.6970 127.2609 1.036.4361 89% ladang/kebuncampuran

35 KIRI panyabrangan kiri 35 Confidential 1814.7195 12.4613 1.802.2582 99% ladang/kebuncampuran

36 KIRI panyabrangan kiri 36 Confidential 2467.9121 1.006.2536 1.283.5761 1.461.6585 59% ladang/kebuncampuran

37 KIRI panyabrangan kiri 37 Confidential 1353.3016 289.4740 1.063.8276 79% ladang/kebuncampuran

38 KIRI panyabrangan kiri 38 Confidential 1710.7737 469.0729 1.241.7008 1.241.7008 73% ladang/kebuncampuran

39 KIRI panyabrangan kiri 39 Confidential 1696.8498 275.4644 1.421.3854 1.421.3854 84% ladang/kebuncampuran

40 KIRI panyabrangan kiri 40 Confidential 1439.9418 424.0185 1.015.9233 71% ladang/kebuncampuran

41 KIRI panyabrangan kiri 41 Confidential 7060.0745 1.882.8220 3.589.2355 5.177.2525 73% ladang/kebuncampuran

42 KIRI panyabrangan kiri 42 Confidential 5053.2302 5.053.2302 5.053.2302 100% ladang/kebuncampuran

43 KIRI panyabrangan kiri 43 Confidential 955.3803 955.3803 100%

44 KIRI panyabrangan kiri 44 Confidential 1845.2856 605.0940 684.8513 1.240.1916 67% ladang/kebuncampuran

45 KIRI panyabrangan kiri 45 Confidential 760.0728 760.0728 760.0728 100% ladang/kebuncampuran

46 KIRI panyabrangan kiri 46 Confidential 5505.4307 1.991.1912 3.479.2355 3.514.2395 64% ladang/kebuncampuran

47 KIRI panyabrangan kiri 47 Confidential 1908.2132 1.908.2132 1.908.2132 100% ladang/kebuncampuran

48 KIRI panyabrangan kiri 48 Confidential 2514.7369 207.5035 2.307.2334 2.307.2334 92% ladang/kebuncampuran

49 KIRI panyabrangan kiri 49 Confidential 2650.7953 2.650.7953 2.650.7953 100% ladang/kebuncampuran

Page 99: Download 2.56 MB

Appendix 2 83

AH No

Urut AREA DESA

No bidang ukur

NAMA PEMILIK

Luas Bidang

luas terkena

SISA LAHAN PADA KAKI TANGGUL

% JENIS PEMANFATAN

Bangunan

terkena kaki tanggul

terkena bibir sungai

P SP NP Luas Luas

Terkena

50 KIRI panyabrangan kiri 50 Confidential 1331.6957 1.331.6957 100%

51 KIRI panyabrangan kiri 51 Confidential 5222.5963 223.8560 4.998.7403 96% ladang/kebuncampuran

52 KIRI panyabrangan kiri 52 Confidential 3794.9830 1.881.3709 115.8665 1.913.6121 50% ladang/kebuncampuran

53 KIRI panyabrangan kiri 53 Confidential 1471.8326 284.0745 1.187.7581 81% ladang/kebuncampuran

54 KIRI panyabrangan kiri 54 Confidential 3079.5092 5.5046 3.074.0046 100% ladang/kebuncampuran

55 KIRI panyabrangan kiri 55 Confidential 1775.0533 412.0159 16.8768 1.363.0374 77% ladang/kebuncampuran

56 KIRI panyabrangan kiri 56 Confidential 1179.3822 185.9583 990.4239 993.4239 84% ladang/kebuncampuran

57 KIRI panyabrangan kiri 57 Confidential 1114.3539 1.114.3539 1.114.3539 100% ladang/kebuncampuran

58 KIRI panyabrangan kiri 58 Confidential 1084.5324 1.084.5324 1.084.5324 100% ladang/kebuncampuran

59 KIRI panyabrangan kiri 59 Confidential 2648.7110 793.0195 757.3306 1.855.6915 70% ladang/kebuncampuran

60 KIRI panyabrangan kiri 60 Confidential

5671.4176 953.9939 2.666.9271 4.717.4237 83%

PEKARANGAN 1 70.800

m2

61 KIRI panyabrangan kiri 61

Confidential 659.1479 135.3688 452.2812

523.7791 79% PEKARANGAN 1

99.000 m2

62 KIRI panyabrangan kiri 62 Confidential

641.9684 136.6015 442.2219 505.3669 79%

PEKARANGAN 1 74.750

m2

63 KIRI panyabrangan kiri 63 Confidential 756.3625 183.1497 509.2735 573.2128 76% PEKARANGAN

64 KIRI panyabrangan kiri 64 Confidential

3631.3288 643.8597 1.627.7461 2.987.4691 82%

pekarangan dan ladang 3

286.700 m2

65 KIRI panyabrangan kiri 65 Confidential 2650.8242 524.5183 367.8003 2.126.3059 80% ladang/kebuncampuran

66 KIRI panyabrangan kiri 66 Confidential 1299.7517 1.299.7517 1.299.7517 100% ladang/kebuncampuran

67 KIRI panyabrangan kiri 67 Confidential 471.4170 471.4170 471.4170 100% ladang/kebuncampuran

68 KIRI panyabrangan kiri 68 Confidential 1686.4104 345.6274 1.299.8955 1.340.7830 80% ladang/kebuncampuran

69 KIRI panyabrangan kiri 69 Confidential 3840.6365 398.9152 45.1472 3.441.7213 90% ladang/kebuncampuran

70 KIRI panyabrangan kiri 70 Confidential 3547.7568 783.0682 1.765.1539 2.764.6886 78% ladang/kebuncampuran

71 KIRI panyabrangan kiri 71 Confidential 2368.8374 575.8270 701.7527 1.793.0104 76% ladang/kebuncampuran

72 KIRI panyabrangan kiri 72 Confidential 737.8774 226.5574 16.4502 511.3200 69% ladang/kebuncampuran

73 KIRI panyabrangan kiri 73 Confidential 4473.7831 1.087.7920 1.195.6122 3.385.9911 76% ladang/kebuncampuran

Page 100: Download 2.56 MB

84 Appendix 2

AH No

Urut AREA DESA

No bidang ukur

NAMA PEMILIK

Luas Bidang

luas terkena

SISA LAHAN PADA KAKI TANGGUL

% JENIS PEMANFATAN

Bangunan

terkena kaki tanggul

terkena bibir sungai

P SP NP Luas Luas

Terkena

74 KIRI panyabrangan kiri 74 Confidential 2140.5927 44.8757 2.095.7170 98% ladang/kebuncampuran

75 KIRI panyabrangan kiri 75 Confidential 828.1919 122.0696 706.1223 85% ladang/kebuncampuran

76 KIRI panyabrangan kiri 76 Confidential 1114.9474 47.4044 1.067.5430 96% ladang/kebuncampuran

77 KIRI panyabrangan kiri 77 Confidential 1494.0680 706.8452 767.5337 787.2228 53% ladang/kebuncampuran

78 KIRI panyabrangan kiri 78 Confidential 2135.8140 2.135.8140 2.135.8140 100% ladang/kebuncampuran

79 KIRI panyabrangan kiri 79 Confidential 2819.1125 1.304.4628 814.6846 1.514.6497 54% ladang/kebuncampuran

80 KIRI panyabrangan kiri 80 Confidential 536.1164 536.1164 100%

81 KIRI panyabrangan kiri 81 Confidential 387.6792 387.6792 100%

82 KIRI panyabrangan kiri 82 Confidential 1599.3714 1.599.3714 100%

83 KIRI panyabrangan kiri 83 Confidential 1085.7479 1.085.7479 100%

84 KIRI panyabrangan kiri 84 Confidential 760.0583 213.6283 546.4300 72% ladang/kebuncampuran

85 KIRI panyabrangan kiri 85 Confidential 1520.2351 1.074.3091 410.1157 445.9260 29% ladang/kebuncampuran

86 KIRI panyabrangan kiri 86 Confidential 665.3013 665.3013 665.3013 100% ladang/kebuncampuran

87 KIRI panyabrangan kiri 87 Confidential 3153.9576 3.153.9576 3.153.9576 100% ladang/kebuncampuran

88 KIRI panyabrangan kiri 88 Confidential 1949.1658 1.949.1658 100%

89 KIRI panyabrangan kiri 89 Confidential 1607.4232 1.607.4232 100%

90 KIRI panyabrangan kiri 90 Confidential 2078.9018 37.3204 2.041.5814 98% ladang/kebuncampuran

91 KIRI panyabrangan kiri 91 Confidential 1545.5393 1.394.2069 69.9503 151.3324 10% ladang/kebuncampuran

92 KIRI panyabrangan kiri 92 Confidential 1471.6889 71.3195 1.400.3694 1.400.3694 95% ladang/kebuncampuran

93 KIRI panyabrangan kiri 93 Confidential 1645.7816 1.645.7816 100%

94 KIRI panyabrangan kiri 94 Confidential 1088.7982 1.088.7982 100%

95 KIRI panyabrangan kiri 95 Confidential 2594.5759 2.594.5759 100%

96 KIRI panyabrangan kiri 96 Confidential 1757.3140 1.757.3140 100%

97 KIRI panyabrangan kiri 97 Confidential 1287.5294 1.287.5294 100%

98 KIRI panyabrangan kiri 98 Confidential 1368.2140 1.368.2140 100%

Page 101: Download 2.56 MB

Appendix 2 85

AH No

Urut AREA DESA

No bidang ukur

NAMA PEMILIK

Luas Bidang

luas terkena

SISA LAHAN PADA KAKI TANGGUL

% JENIS PEMANFATAN

Bangunan

terkena kaki tanggul

terkena bibir sungai

P SP NP Luas Luas

Terkena

99 KIRI panyabrangan kiri 99 Confidential 1207.1769 968.5335 238.6434 20% ladang/kebuncampuran

100 KIRI panyabrangan kiri 100 Confidential 4109.9342 768.1707 3.341.7635 3.341.7635 81% ladang/kebuncampuran

101 KIRI panyabrangan kiri 101 Confidential 287.4408 287.4408 287.4408 100% ladang/kebuncampuran

102 KIRI panyabrangan kiri 102 Confidential 469.3406 469.3406 469.3406 100% ladang/kebuncampuran

103 KIRI panyabrangan kiri 103 Confidential 1987.5754 1.987.5754 100%

104 KIRI panyabrangan kiri 104 Confidential 4501.5403 4.501.5403 100%

105 KIRI panyabrangan kiri 105 Confidential 1633.1201 119.8827 1.513.2374 93% ladang/kebuncampuran

106 KIRI panyabrangan kiri 106 Confidential 931.3410 810.2225 121.1185 13% ladang/kebuncampuran

107 KIRI panyabrangan kiri 107 Confidential 1731.5003 566.0789 1.067.7726 1.165.4214 67% ladang/kebuncampuran

108 KIRI panyabrangan kiri 108 Confidential 1046.3250 1.046.3250 100%

109 KIRI panyabrangan kiri 109 Confidential 1879.5537 1.879.5537 100%

110 KIRI panyabrangan kiri 110 Confidential 1049.5633 1.049.5633 100%

111 KIRI panyabrangan kiri 111 Confidential 482.0511 482.0511 100%

112 KIRI panyabrangan kiri 112 Confidential 987.8568 240.2930 556.3030 747.5638 76% ladang/kebuncampuran

113 KIRI panyabrangan kiri 113 Confidential 640.4181 423.7020 216.7161 34% ladang/kebuncampuran

114 KIRI panyabrangan kiri 114 Confidential 1119.8494 110.7605 1.009.0889 1.009.0889 90% ladang/kebuncampuran

115 KIRI panyabrangan kiri 115 Confidential 2800.9772 2.800.9772 2.800.9772 100% ladang/kebuncampuran

116 KIRI panyabrangan kiri 116 Confidential 1747.3622 1.747.3622 1.747.3622 100% ladang/kebuncampuran

117 KIRI panyabrangan kiri 117 Confidential 1543.3435 363.0482 598.8866 1.180.2953 76% ladang/kebuncampuran

118 KIRI panyabrangan kiri 118 Confidential 1100.9977 277.7943 555.8378 823.2034 75% ladang/kebuncampuran

119 KIRI panyabrangan kiri 119 Confidential 975.5681 242.4091 601.7127 733.1590 75% ladang/kebuncampuran

120 KIRI panyabrangan kiri 120 Confidential 1368.9397 345.9374 530.9633 1.023.0023 75% ladang/kebuncampuran

121 KIRI panyabrangan kiri 121 Confidential 1806.0172 427.3029 654.4408 1.378.7143 76% ladang/kebuncampuran

122 KIRI panyabrangan kiri 122 Confidential 3458.9897 776.9879 1.097.5426 2.682.0018 78% ladang/kebuncampuran

123 KIRI panyabrangan kiri 123 Confidential 1106.5245 41.5038 1.065.0207 1.065.0207 96% ladang/kebuncampuran

Page 102: Download 2.56 MB

86 Appendix 2

AH No

Urut AREA DESA

No bidang ukur

NAMA PEMILIK

Luas Bidang

luas terkena

SISA LAHAN PADA KAKI TANGGUL

% JENIS PEMANFATAN

Bangunan

terkena kaki tanggul

terkena bibir sungai

P SP NP Luas Luas

Terkena

124 KIRI panyabrangan kiri 124 Confidential 2845.4518 888.8522 53.8631 1.956.5996 69% ladang/kebuncampuran

125 KIRI panyabrangan kiri 125 Confidential 1575.5178 1.575.5178 100%

126 KIRI panyabrangan kiri 126 Confidential 2326.5247 810.0846 1.516.4401 1.516.4401 65% ladang/kebuncampuran

127 KIRI panyabrangan kiri 127 Confidential 1712.4379 468.3595 1.244.0784 73% ladang/kebuncampuran

128 KIRI panyabrangan kiri 128 Confidential 1311.8777 1.311.8777 100%

129 KIRI panyabrangan kiri 129 Confidential 1315.6311 1.315.6311 100%

130 KIRI panyabrangan kiri 130 Confidential 1338.8356 1.338.8356 100%

131 KIRI panyabrangan kiri 131 Confidential 2794.6556 815.0180 665.3893 1.979.6376 71% ladang/kebuncampuran

132 KIRI panyabrangan kiri 132 Confidential 1976.6687 318.2843 220.1395 1.658.3844 84% ladang/kebuncampuran

133 KIRI panyabrangan kiri 133 Confidential 2400.3506 349.3466 189.9946 2.051.0040 85% ladang/kebuncampuran

134 KIRI panyabrangan kiri 134 Confidential 2370.1691 2.370.1691 100%

135 KIRI panyabrangan kiri 135 Confidential 961.9367 961.9367 100%

136 KIRI panyabrangan kiri 136 Confidential 3967.7059 455.5156 193.8148 3.512.1903 89% ladang/kebuncampuran

137 KIRI panyabrangan kiri 137 Confidential 3077.9208 1.273.9511 402.7278 1.803.9697 59% ladang/kebuncampuran

138 KIRI panyabrangan kiri 138 Confidential 1709.7066 1.709.7066 100%

139 KIRI panyabrangan kiri 139 Confidential 5377.7513 1.058.0400 225.6305 4.319.7113 80% ladang/kebuncampuran

140 KIRI panyabrangan kiri 140 Confidential 1129.4752 1.129.4752 1.129.4752 100% ladang/kebuncampuran

141 KIRI panyabrangan kiri 141 Confidential 762.8776 762.8776 762.8776 100% ladang/kebuncampuran

142 KIRI panyabrangan kiri 142 Confidential 894.6927 894.6927 894.6927 100% ladang/kebuncampuran

143 KIRI panyabrangan kiri 143 Confidential 1499.7634 1.499.7634 1.499.7634 100% ladang/kebuncampuran

144 KIRI panyabrangan kiri 144 Confidential 1146.6422 1.146.6422 100% ladang/kebuncampuran

145 KIRI panyabrangan kiri 145 Confidential 869.4297 380.9007 46.5020 488.5290 56% ladang/kebuncampuran

146 KIRI panyabrangan kiri 146 Confidential 2225.3189 2.225.3189 100% ladang/kebuncampuran

147 KIRI panyabrangan kiri 147 Confidential 493.6488 5.1170 488.5318 99% ladang/kebuncampuran

148 KIRI panyabrangan kiri 148 Confidential 1318.1339 187.7075 1.130.4264 86% ladang/kebuncampuran

Page 103: Download 2.56 MB

Appendix 2 87

AH No

Urut AREA DESA

No bidang ukur

NAMA PEMILIK

Luas Bidang

luas terkena

SISA LAHAN PADA KAKI TANGGUL

% JENIS PEMANFATAN

Bangunan

terkena kaki tanggul

terkena bibir sungai

P SP NP Luas Luas

Terkena

149 KIRI katulisan 1 Confidential 481.5095 481.5095 100%

150 KIRI katulisan 2 Confidential 554.5423 554.5423 100%

151 KIRI katulisan 3 Confidential 519.6318 519.6318 100%

152 KIRI katulisan 4 Confidential 598.5716 598.5716 100%

153 KIRI katulisan 5 Confidential 423.0966 423.0966 100%

154 KIRI katulisan 6 Confidential 366.0204 366.0204 100%

155 KIRI katulisan 7 Confidential 1074.8887 1.074.8887 100%

156 KIRI katulisan 8 Confidential 841.2243 841.2243 100%

157 KIRI katulisan 9 Confidential 867.3969 867.3969 100%

158 KIRI katulisan 10 Confidential 686.7442 686.7442 100%

159 KIRI katulisan

11 Confidential 254.3114

254.3114 100% 2

180.00 m2

160 KIRI

katulisan 12 Confidential

301.3596 301.3596 100%

1 94.50

m2

161 KIRI katulisan 13 Confidential 541.4257 541.4257 100%

162 KIRI

katulisan 14 Confidential 349.2902 349.2902 100%

1

124.00 m2

163 KIRI katulisan 15 Confidential 272.0759 272.0759 100%

164 KIRI katulisan 16 Confidential 258.0749 258.0749 100%

165 KIRI katulisan 17 Confidential 228.4387 228.4387 100%

166 KIRI

katulisan 18 Confidential

1376.0793

123.9692 1.252.1101 91%

pekarangan 1 105.00

m2

167 KIRI katulisan 19

Confidential 1299.3193

704.6747

594.6446 46% ladang/kebuncampuran

168 KIRI katulisan 20 Confidential 653.7939 653.7939 100%

169 KIRI katulisan 21

Confidential 892.4874

892.4874 100% 1

160.00 m2

170 KIRI

katulisan 22 Confidential

1614.5485

489.2128 1.125.3357 70%

pekarangan 1 132.00

m2

171 KIRI katulisan

23 Confidential 306.5856

306.5856 100% 2

105.80 m2

Page 104: Download 2.56 MB

88 Appendix 2

AH No

Urut AREA DESA

No bidang ukur

NAMA PEMILIK

Luas Bidang

luas terkena

SISA LAHAN PADA KAKI TANGGUL

% JENIS PEMANFATAN

Bangunan

terkena kaki tanggul

terkena bibir sungai

P SP NP Luas Luas

Terkena

172 KIRI

katulisan 24 Confidential

1841.7621

659.6788 1.182.0833 64%

ladang/kebuncampuran

173 KIRI katulisan 25

Confidential 230.5886

230.5886 100% 1 1

113.00 m2

174 KIRI

katulisan 26 Confidential

1240.0850

418.6685 821.4165 66%

ladang/kebuncampuran

175 KIRI katulisan 27

Confidential 117.8790

117.8790 100% 1

182.00 m2

176 KIRI

katulisan 28 Confidential

1137.1427

412.1060 725.0367 64%

pekarangan 1 80.50

m2

177 KIRI katulisan 29

Confidential 2474.2479

1.144.5724

1.329.6755 54% pekarangan 4

329.30 m2

178 KIRI katulisan 29a Confidential 168.4435 168.4435 100% 1

179 KIRI katulisan 29b Confidential 92.5562 92.5562 100% 1

180 KIRI katulisan 29c Confidential 134.3790 134.3790 100% 1

181 KIRI katulisan 29d Confidential 69.4374 69.4374 100% 1

182 KIRI

katulisan 30 Confidential

1963.6570

935.1395 1.028.5175 52%

pekarangan 1 1 151.80

m2

183 KIRI katulisan

31 Confidential 231.3856

110.7041

120.6815 52% pekarangan 1

50.00 m2

184 KIRI

katulisan 32 Confidential

538.1623

361.3047 176.8576 33%

pekarangan 1 85.00

m2

185 KIRI katulisan

33 Confidential 1232.9268

980.9429

251.9839 20% ladang/kebuncampuran

186 KIRI

katulisan 34 Confidential

229.1548

86.2766 142.8782 62%

ladang/kebuncampuran

187 KIRI katulisan

35 Confidential 731.3010

566.1750

165.1260

165.1260 23% ladang/kebuncampuran

188 KIRI

katulisan 36 Confidential 557.4772

298.8181

258.6591 46% pekarangan 1

263.50 m2

189 KIRI katulisan

36a Confidential 363.8412

206.7493 157.0919 43%

pekarangan 1

36.00 m2

190 KIRI

katulisan 37 Confidential

633.8006

370.1094

263.6912 263.6912 42%

ladang/kebuncampuran

191 KIRI katulisan

38 Confidential 755.4595

370.6566

15.9987

384.8029 51% ladang/kebuncampuran

192 KIRI

katulisan 39 Confidential 244.9296

116.8434

128.0862 52% pekarangan

1 150.00

m2

193 KIRI katulisan

40 Confidential 225.4239

82.0315

143.3924 64% pekarangan 1

120.00 m2

Page 105: Download 2.56 MB

Appendix 2 89

AH No

Urut AREA DESA

No bidang ukur

NAMA PEMILIK

Luas Bidang

luas terkena

SISA LAHAN PADA KAKI TANGGUL

% JENIS PEMANFATAN

Bangunan

terkena kaki tanggul

terkena bibir sungai

P SP NP Luas Luas

Terkena

194 KIRI

katulisan 41 Confidential

592.0260

434.5812

157.4448 157.4448 27%

pekarangan 1 187.00

m2

195 KIRI katulisan

42 Confidential 306.9349

306.9349

306.9349 100% ladang/kebuncampuran

196 KIRI

katulisan 43 Confidential

556.9398

394.1891 162.7507 29%

pekarangan 1 155.25

m2

197 KIRI katulisan

44 Confidential 283.5945

283.5945

283.5945 100% ladang/kebuncampuran

198 KIRI

katulisan 45 Confidential

163.7748

50.0547 113.7201 69%

pekarangan 1 81.00

m2

199 KIRI katulisan

46 Confidential 469.1832

19.5410

449.6422 96% pekarangan 1

42.00 m2

200 KIRI

katulisan 47 Confidential

707.7243

609.0971 98.6272 14%

pekarangan 3 264.00

m2

201 KIRI katulisan

48 Confidential 96.4991

41.8088

54.6903

54.6903 57% ladang/kebuncampuran

202 KIRI

katulisan 49 Confidential 94.9338

94.9338

94.9338 100% ladang/kebuncampuran

203 KIRI katulisan 50

Confidential 250.1129

250.1129

250.1129 100% ladang/kebuncampuran

204 KIRI

katulisan 51 Confidential

1392.8372

805.1846

587.2104 587.6526 42%

pekarangan 1 45.00

m2

205 KIRI katulisan 52

Confidential 394.4041

394.4041

394.4041 100% ladang/kebuncampuran

206 KIRI

katulisan 53 Confidential

174.3939

174.3939 174.3939 100%

ladang/kebuncampuran

207 KIRI katulisan 54

Confidential 1326.8123

27.3082

1.299.5041

1.299.5041 98% pekarangan 1

48.00 m2

208 KIRI

katulisan 55 Confidential

251.3713

251.3713 251.3713 100%

ladang/kebuncampuran

209 KIRI katulisan 56

Confidential 257.3368

257.3368

257.3368 100% ladang/kebuncampuran

210 KIRI

katulisan 57 Confidential

594.6329

158.8644 435.7685 73%

pekarangan 3 1 348.00

m2

211 KIRI katulisan

58 Confidential 521.7842

521.7842 100% 2

242.00 m2

212 KIRI

katulisan 59 Confidential

267.8840

30.3704 237.5136 89%

pekarangan

213 KIRI katulisan 60

Confidential 238.0926

130.8756

107.2170 45% pekarangan 1

153.00 m2

214 KIRI

katulisan 61 Confidential

189.7105

155.6037 34.1068 18%

pekarangan 1 119.00

m2

Page 106: Download 2.56 MB

90 Appendix 2

AH No

Urut AREA DESA

No bidang ukur

NAMA PEMILIK

Luas Bidang

luas terkena

SISA LAHAN PADA KAKI TANGGUL

% JENIS PEMANFATAN

Bangunan

terkena kaki tanggul

terkena bibir sungai

P SP NP Luas Luas

Terkena

215 KIRI katulisan 62

Confidential 642.3770

195.9797

446.3973

446.3973 69% pekarangan 1

80.00 m2

216 KIRI

katulisan 63 Confidential

357.4073

339.8339 17.5734 5%

pekarangan 1 66.00

m2

217 KIRI katulisan 64

Confidential 423.0082

423.0082

423.0082 100% ladang/kebuncampuran

218 KIRI

katulisan 65 Confidential

2095.0239

207.6830

1.887.3409 1.887.3409 90%

ladang/kebuncampuran

219 KIRI katulisan

66 Confidential 3443.1305

390.0603

3.053.0702

3.053.0702 89% ladang/kebuncampuran

220 KIRI

katulisan 67 Confidential

709.3201

709.3201

709.3201 100% ladang/kebuncampuran

221 KIRI katulisan

68 Confidential 474.2094

474.2094 474.2094 100%

ladang/kebuncampuran

222 KIRI

katulisan 69 Confidential

705.8402

632.8575 72.9827 10%

ladang/kebuncampuran

223 KIRI katulisan

69a Confidential 1093.4793

49.6086

1.043.8707

1.043.8707 95% ladang/kebuncampuran

224 KIRI

katulisan 70 Confidential

2340.2378

470.4935

1.869.7443 1.869.7443 80%

ladang/kebuncampuran

225 KIRI katulisan

71 Confidential 2410.6149

1.168.6804

55.7361

1.241.9345 52% ladang/kebuncampuran

226 KIRI katulisan 72 Confidential 604.9442 604.9442 100%

227 KIRI katulisan

73 Confidential 3837.4748

953.9544

589.9543 2.883.5204 75%

ladang/kebuncampuran

228 KIRI

katulisan 74

Confidential 2754.7675

987.4430

955.1564

1.767.3245 64% ladang/kebuncampuran

229 KIRI katulisan

75 Confidential

1139.8461

418.5819

721.2642 721.2642 63%

ladang/kebuncampuran

230 KIRI

katulisan 76 Confidential

193.3543

193.3543 193.3543 100%

ladang/kebuncampuran

231 KIRI katulisan

77 Confidential

1529.8387

560.7602

792.4195 969.0785 63%

ladang/kebuncampuran

232 KIRI

katulisan 78 Confidential

4428.6158

1.401.9370

1.500.3728 3.026.6788 68%

ladang/kebuncampuran

233 KIRI katulisan

79 Confidential

818.3914

818.3914 818.3914 100%

ladang/kebuncampuran

234 KIRI

katulisan 80 Confidential

5889.3824

1.596.9622

1.784.8454 4.292.4202 73%

ladang/kebuncampuran

235 KIRI katulisan

81 Confidential

908.0397

908.0397 908.0397 100%

ladang/kebuncampuran

Page 107: Download 2.56 MB

Appendix 2 91

AH No

Urut AREA DESA

No bidang ukur

NAMA PEMILIK

Luas Bidang

luas terkena

SISA LAHAN PADA KAKI TANGGUL

% JENIS PEMANFATAN

Bangunan

terkena kaki tanggul

terkena bibir sungai

P SP NP Luas Luas

Terkena

236 KIRI

katulisan 82 Confidential

1508.3017

421.6996

539.5069 1.086.6021 72%

ladang/kebuncampuran

237 KIRI katulisan

83 Confidential

2386.2709

781.0328

609.3972 1.605.2381 67%

ladang/kebuncampuran

238 KIRI

katulisan 84 Confidential

988.4326

988.4326 988.4326 100%

ladang/kebuncampuran

239 KIRI katulisan

85 Confidential

1376.1230

382.0124

471.9312 994.1106 72%

ladang/kebuncampuran

240 KIRI

katulisan 86 Confidential

1025.4991

331.1873

264.8098 694.3118 68%

ladang/kebuncampuran

241 KIRI katulisan

87 Confidential

1569.4593

478.9509

650.1429 1.090.5084 69%

ladang/kebuncampuran

242 KIRI

katulisan 88

Confidential 2872.3163

475.7143

1.095.2406

2.396.6020 83% ladang/kebuncampuran

243 KIRI katulisan 89

Confidential 2247.7593

763.7742

135.8419

1.483.9851 66% ladang/kebuncampuran

244 KIRI katulisan 90 Confidential 736.3387 736.3387 100%

245 KIRI katulisan 91 Confidential

315.4092 315.4092 100%

246 KIRI

katulisan 92

Confidential 913.9497

148.7830

65.9282

765.1667 84% ladang/kebuncampuran

247 KIRI katulisan 93

Confidential 1958.8269

302.2633

140.5304

1.656.5636 85% ladang/kebuncampuran

248 KIRI

katulisan 94

Confidential 461.0817

363.9163

97.0499

97.1654 21% ladang/kebuncampuran

249 KIRI katulisan 95

Confidential 845.5965

12.0451

833.5514 99% ladang/kebuncampuran

250 KIRI

katulisan 96

Confidential 1317.4766

496.7751

135.8057

820.7015 62% ladang/kebuncampuran

251 KIRI katulisan

97 Confidential

2244.2211

569.7270

163.1792 1.674.4941 75%

ladang/kebuncampuran

252 KIRI

katulisan 98

Confidential 416.2531

416.2531

416.2531 100% ladang/kebuncampuran

253 KIRI katulisan 99

Confidential 344.6411

344.6411

344.6411 100% ladang/kebuncampuran

254 KIRI

katulisan 100

Confidential 346.8398

346.8398

346.8398 100% ladang/kebuncampuran

255 KIRI katulisan 101

Confidential 2546.4452

628.9229

798.0596

1.917.5223 75% ladang/kebuncampuran

256 KIRI

katulisan 102

Confidential 808.6834

289.9280

463.2461

518.7554 64% ladang/kebuncampuran

257 KIRI katulisan 103 Confidential

1697.1233 1.383.4193 82% ladang/kebuncampuran

Page 108: Download 2.56 MB

92 Appendix 2

AH No

Urut AREA DESA

No bidang ukur

NAMA PEMILIK

Luas Bidang

luas terkena

SISA LAHAN PADA KAKI TANGGUL

% JENIS PEMANFATAN

Bangunan

terkena kaki tanggul

terkena bibir sungai

P SP NP Luas Luas

Terkena

313.7040 1.383.4193

258 KIRI

katulisan 104

Confidential 346.0283

12.9151

333.1132

333.1132 96% ladang/kebuncampuran

259 KIRI katulisan

105 Confidential

373.3260

15.0978

358.2282 358.2282 96%

ladang/kebuncampuran

260 KIRI

katulisan 106 Confidential

3392.8014

392.2461 3.000.5553 88%

ladang/kebuncampuran

261 KIRI katulisan

107 Confidential

703.9709

703.9709 703.9709 100%

ladang/kebuncampuran

262 KIRI

katulisan 108 Confidential

685.4287

303.3719

382.0568 382.0568 56%

ladang/kebuncampuran

263 KIRI katulisan

109 Confidential

294.9536

294.9536 294.9536 100%

ladang/kebuncampuran

264 KIRI

katulisan 110 Confidential

169.5768

169.5768 169.5768 100%

ladang/kebuncampuran

265 KIRI katulisan

110a Confidential

163.2406

163.2406 163.2406 100%

ladang/kebuncampuran

266 KIRI

katulisan 110b Confidential

175.1688

175.1688 175.1688 100%

ladang/kebuncampuran

267 KIRI katulisan

110c Confidential

176.7529

176.7529 176.7529 100%

ladang/kebuncampuran

268 KIRI

katulisan 111

Confidential 738.6571

320.8238

417.8333

417.8333 57% ladang/kebuncampuran

269 KIRI katulisan

112 Confidential

1371.3690

430.9620

913.5418 940.4070 69%

ladang/kebuncampuran

270 KIRI

katulisan 113 Confidential

254.7672

254.7672 254.7672 100%

ladang/kebuncampuran

271 KIRI katulisan

114 Confidential

466.4030

119.8669

325.6120 346.5361 74%

ladang/kebuncampuran

272 KIRI

katulisan 115 Confidential

468.1195

117.9883

334.1551 350.1312 75%

ladang/kebuncampuran

273 KIRI katulisan

116 Confidential

469.8359

116.0859

343.0915 353.7500 75%

ladang/kebuncampuran

274 KIRI

katulisan 117 Confidential

474.8607

114.4093

355.4524 360.4514 76%

ladang/kebuncampuran

275 KIRI katulisan

118 Confidential

708.5484

202.6110

499.1233 505.9374 71%

ladang/kebuncampuran

276 KIRI

katulisan 119 Confidential

1954.7833

499.4315

1.377.6940 1.455.3518 74%

ladang/kebuncampuran

277 KIRI katulisan

120 Confidential

348.0073

348.0073 348.0073 100%

ladang/kebuncampuran

Page 109: Download 2.56 MB

Appendix 2 93

AH No

Urut AREA DESA

No bidang ukur

NAMA PEMILIK

Luas Bidang

luas terkena

SISA LAHAN PADA KAKI TANGGUL

% JENIS PEMANFATAN

Bangunan

terkena kaki tanggul

terkena bibir sungai

P SP NP Luas Luas

Terkena

278 KIRI

katulisan 121 Confidential

332.7093

332.7093 332.7093 100%

ladang/kebuncampuran

279 KIRI katulisan

122 Confidential

1535.2840

336.2547

1.131.9138 1.199.0293 78%

ladang/kebuncampuran

280 KIRI

katulisan 123 Confidential

949.5916

156.9537

555.1228 792.6379 83%

ladang/kebuncampuran

281 KIRI katulisan

124 Confidential

821.6397

128.8870

565.6522 692.7527 84%

ladang/kebuncampuran

282 KIRI

katulisan 125

Confidential 1545.2755

241.0451

1.304.2304

1.304.2304 84% ladang/kebuncampuran

283 KIRI katulisan 126

Confidential 380.1470

380.1470

380.1470 100% ladang/kebuncampuran

284 KIRI

katulisan 127

Confidential 1509.2844

245.6755

1.263.6089

1.263.6089 84% ladang/kebuncampuran

285 KIRI katulisan 128

Confidential 1510.1467

321.1199

1.184.5268

1.189.0268 79% ladang/kebuncampuran

286 KIRI

katulisan 129

Confidential 299.6007

299.6007

299.6007 100% ladang/kebuncampuran

287 KIRI katulisan 130

Confidential 1465.5532

266.5424

1.177.1835

1.199.0108 82% ladang/kebuncampuran

288 KIRI

katulisan 131

Confidential 1454.7248

242.9361

1.187.2467

1.211.7887 83% ladang/kebuncampuran

289 KIRI katulisan 132

Confidential 1439.8923

277.9564

1.127.4146

1.161.9359 81% ladang/kebuncampuran

290 KIRI

katulisan 133

Confidential 4029.5843

383.9827

1.193.1681

3.645.6016 90% ladang/kebuncampuran

291 KIRI katulisan

134 Confidential

4033.1501

372.7944

1.087.7687 3.660.3557 91%

ladang/kebuncampuran

292 KIRI

katulisan 135

Confidential 6376.3709

441.9490

1.309.3853

5.934.4219 93% ladang/kebuncampuran

293 KIRI katulisan 136

Confidential 3142.9123

369.0254

975.4223

2.773.8869 88% ladang/kebuncampuran

294 KIRI

katulisan 137

Confidential 1390.7977

258.8768

726.7527

1.131.9209 81% ladang/kebuncampuran

295 KIRI katulisan 138

Confidential 1707.4513

261.0195

1.309.7410

1.446.4318 85% ladang/kebuncampuran

296 KIRI

katulisan 139

Confidential 281.4241

281.4241

281.4241 100% ladang/kebuncampuran

297 KIRI katulisan 140

Confidential 1111.9819

201.4805

520.9483

910.5014 82% ladang/kebuncampuran

298 KIRI

katulisan 141

Confidential 1075.4981

197.1038

513.9880

878.3943 82% ladang/kebuncampuran

Page 110: Download 2.56 MB

94 Appendix 2

AH No

Urut AREA DESA

No bidang ukur

NAMA PEMILIK

Luas Bidang

luas terkena

SISA LAHAN PADA KAKI TANGGUL

% JENIS PEMANFATAN

Bangunan

terkena kaki tanggul

terkena bibir sungai

P SP NP Luas Luas

Terkena

299 KIRI katulisan

142 Confidential

1847.7722

326.6399

825.4589 1.521.1323 82%

ladang/kebuncampuran

300 KIRI

katulisan 143 Confidential

2573.4543

459.6714

1.023.7584 2.113.7829 82%

ladang/kebuncampuran

301 KIRI katulisan

144 Confidential

1243.4138

302.4066

654.4917 941.0072 76%

ladang/kebuncampuran

302 KIRI katulisan 145 Confidential

476.2127 476.2127 100%

303 KIRI katulisan

146 Confidential

1253.8442

202.3491

398.2502 1.051.4951 84%

ladang/kebuncampuran

304 KIRI

katulisan 147 Confidential

920.5917

162.7306

291.1910 757.8611 82%

ladang/kebuncampuran

305 KIRI katulisan

148 Confidential

1645.8469

129.3346

438.0312 1.516.5123 92%

ladang/kebuncampuran

306 KIRI

katulisan 149 Confidential

326.3762

167.9370

85.2472 158.4392 49%

ladang/kebuncampuran

307 KIRI katulisan

150 Confidential

2074.9894

391.1830

736.3288 1.683.8064 81%

ladang/kebuncampuran

308 KIRI

katulisan 151

Confidential 2570.3013

487.7660

796.9777

2.082.5353 81% ladang/kebuncampuran

309 KIRI katulisan

152 Confidential

800.8133

800.8133 800.8133 100%

ladang/kebuncampuran

310 KIRI

katulisan 153 Confidential

545.3818

545.3818 545.3818 100%

ladang/kebuncampuran

311 KIRI katulisan

154 Confidential

416.1213

416.1213 416.1213 100%

ladang/kebuncampuran

312 KIRI

katulisan 155 Confidential

940.9642

193.4772

318.1063 747.4870 79%

ladang/kebuncampuran

313 KIRI katulisan

156 Confidential

2930.7718

636.3919

913.1478 2.294.3799 78%

ladang/kebuncampuran

314 KIRI

katulisan 157 Confidential

930.7740

213.2273

298.9751 717.5467 77%

ladang/kebuncampuran

315 KIRI katulisan

158 Confidential

968.0557

968.0557 968.0557 100%

ladang/kebuncampuran

316 KIRI

katulisan 159 Confidential

2130.7763

428.1083

635.4097 1.702.6680 80%

ladang/kebuncampuran

317 KIRI katulisan

160 Confidential

1325.7128

303.4452

329.1902 1.022.2676 77%

ladang/kebuncampuran

318 KIRI

katulisan 161 Confidential

520.1051

124.8084

155.5150 395.2967 76%

ladang/kebuncampuran

319 KIRI katulisan

162 Confidential

518.7034

123.8464

153.7306 394.8570 76%

ladang/kebuncampuran

Page 111: Download 2.56 MB

Appendix 2 95

AH No

Urut AREA DESA

No bidang ukur

NAMA PEMILIK

Luas Bidang

luas terkena

SISA LAHAN PADA KAKI TANGGUL

% JENIS PEMANFATAN

Bangunan

terkena kaki tanggul

terkena bibir sungai

P SP NP Luas Luas

Terkena

320 KIRI

katulisan 163 Confidential

1410.1903

244.4541

298.0720 1.165.7362 83%

ladang/kebuncampuran

321 KIRI katulisan

164 Confidential

1567.6731

282.3523

408.6987 1.285.3208 82%

ladang/kebuncampuran

322 KIRI

katulisan 165

Confidential 842.9790

842.9790

842.9790 100% ladang/kebuncampuran

323 KIRI katulisan 166

Confidential 2055.7536

290.9081

447.5352

1.764.8455 86% ladang/kebuncampuran

324 KIRI

katulisan 167

Confidential 1154.1668

168.2708

270.6707

985.8960 85% ladang/kebuncampuran

325 KIRI katulisan 168

Confidential 339.6655

56.5714

283.0941

283.0941 83% ladang/kebuncampuran

326 KIRI

katulisan 169

Confidential 460.5346

122.2792

338.2554 73% ladang/kebuncampuran

327 KIRI katulisan 170

Confidential 732.5277

172.2167

280.1424

560.3110 76% ladang/kebuncampuran

328 KIRI

katulisan 171

Confidential 475.8090

113.1215

205.0977

362.6875 76% ladang/kebuncampuran

329 KIRI katulisan 172

Confidential 486.3400

113.2852

209.8727

373.0548 77% ladang/kebuncampuran

330 KIRI

katulisan 173

Confidential 970.7439

218.7784

434.5516

751.9655 77% ladang/kebuncampuran

331 KIRI katulisan

174 Confidential

1449.4960

1.449.4960 1.449.4960 100%

ladang/kebuncampuran

332 KIRI

katulisan 175

Confidential 288.6058

251.2657

37.3401

37.3401 13% ladang/kebuncampuran

333 KIRI katulisan 176

Confidential 900.3778

900.3778

900.3778 100% ladang/kebuncampuran

334 KIRI

katulisan 177

Confidential 1122.9986

228.6320

894.3666 80% ladang/kebuncampuran

335 KIRI katulisan 178

Confidential 2320.5701

301.7293

588.0904

2.018.8408 87% ladang/kebuncampuran

336 KIRI

katulisan 179

Confidential 1157.0219

376.6130

664.1112

780.4089 67% ladang/kebuncampuran

337 KIRI katulisan 180

Confidential 2292.9493

487.1089

758.0004

1.805.8404 79% ladang/kebuncampuran

338 KIRI

katulisan 181

Confidential 2851.7851

604.3851

1.105.6116

2.247.4000 79% ladang/kebuncampuran

339 KIRI katulisan

182 Confidential

886.9811

187.9194

274.3043 699.0617 79%

ladang/kebuncampuran

340 KIRI

katulisan 183 Confidential

852.0720

188.4772

256.5081 663.5948 78%

ladang/kebuncampuran

Page 112: Download 2.56 MB

96 Appendix 2

AH No

Urut AREA DESA

No bidang ukur

NAMA PEMILIK

Luas Bidang

luas terkena

SISA LAHAN PADA KAKI TANGGUL

% JENIS PEMANFATAN

Bangunan

terkena kaki tanggul

terkena bibir sungai

P SP NP Luas Luas

Terkena

341 KIRI katulisan

184 Confidential

2308.8259

557.8368

652.1373 1.750.9891 76%

ladang/kebuncampuran

342 KIRI

katulisan 185 Confidential

1551.8315

410.4498

441.5926 1.141.3817 74%

ladang/kebuncampuran

343 KIRI katulisan

186 Confidential

1065.6946

287.2578

318.6955 778.4368 73%

ladang/kebuncampuran

344 KIRI

katulisan 187 Confidential

1160.6073

318.8107

341.1368 841.7966 73%

ladang/kebuncampuran

345 KIRI katulisan

188 Confidential

1106.9843

316.8083

340.4066 790.1760 71%

ladang/kebuncampuran

346 KIRI

katulisan 189 Confidential

2315.3809

2.315.3809 2.315.3809 100%

ladang/kebuncampuran

347 KIRI katulisan

190 Confidential

1437.4617

447.6851

455.1812 989.7766 69%

ladang/kebuncampuran

348 KIRI

katulisan 191

Confidential 691.3697

228.3495

223.5317

463.0202 67% ladang/kebuncampuran

349 KIRI katulisan

192 Confidential

692.3800

229.4430

240.8078 462.9370 67%

ladang/kebuncampuran

350 KIRI

katulisan 193 Confidential

1242.2747

411.5183

382.3080 830.7564 67%

ladang/kebuncampuran

351 KIRI katulisan

194 Confidential

1676.8866

547.0442

435.1175 1.129.8424 67%

ladang/kebuncampuran

352 KIRI

katulisan 195 Confidential

1971.6952

465.3235

348.4504 1.506.3717 76%

sawah

353 KIRI katulisan

196 Confidential

1952.3361

484.8634

342.6087 1.467.4727 75%

sawah

354 KIRI

katulisan 197 Confidential

1383.3206

1.383.3206 1.383.3206 100%

ladang/kebuncampuran

355 KIRI katulisan

198 Confidential

3345.9831

871.9214

543.3864 2.474.0617 74%

sawah

356 KIRI

katulisan 199 Confidential

1130.3896

311.1593

175.5483 819.2303 72%

ladang/kebuncampuran

357 KIRI katulisan

200 Confidential

504.9217

504.9217 504.9217 100%

ladang/kebuncampuran

358 KIRI

katulisan 201 Confidential

1109.4802

304.3393

174.8757 805.1409 73%

ladang/kebuncampuran

359 KIRI katulisan

202 Confidential

1547.2067

411.9792

257.3203 1.135.2275 73%

ladang/kebuncampuran

360 KIRI

katulisan 203 Confidential

623.1278

623.1278 623.1278 100%

ladang/kebuncampuran

361 KIRI katulisan

204 Confidential

1677.9993

460.3627

296.0435 1.217.6366 73%

ladang/kebuncampuran

Page 113: Download 2.56 MB

Appendix 2 97

AH No

Urut AREA DESA

No bidang ukur

NAMA PEMILIK

Luas Bidang

luas terkena

SISA LAHAN PADA KAKI TANGGUL

% JENIS PEMANFATAN

Bangunan

terkena kaki tanggul

terkena bibir sungai

P SP NP Luas Luas

Terkena

362 KIRI

katulisan 205

Confidential 797.9256

232.9744

246.7848

564.9512 71% ladang/kebuncampuran

363 KIRI katulisan 206

Confidential 748.3509

232.9744

260.4703

515.3765 69% ladang/kebuncampuran

364 KIRI

katulisan 207

Confidential 2338.9010

390.2352

409.4285

1.948.6658 83% ladang/kebuncampuran

365 KIRI katulisan 208

Confidential 610.3993

610.3993

610.3993 100% ladang/kebuncampuran

366 KIRI

katulisan 209

Confidential 2034.0339

491.5762

509.8523

1.542.4577 76% ladang/kebuncampuran

367 KIRI katulisan 210

Confidential 1611.5958

545.4915

460.4439

1.066.1043 66% sawah

368 KIRI

katulisan 211

Confidential 1516.2882

593.0551

327.2697

923.2331 61% sawah

369 KIRI katulisan 212

Confidential 467.4807

200.6777

82.8723

266.8030 57% sawah

370 KIRI

katulisan 213

Confidential 465.3519

200.7777

79.2612

264.5742 57% ladang/kebuncampuran

371 KIRI katulisan

214 Confidential

306.4424

134.1489

50.7836 172.2935 56%

ladang/kebuncampuran

372 KIRI

katulisan 215

Confidential 314.5258

138.3025

45.0561

176.2233 56% ladang/kebuncampuran

373 KIRI katulisan 216

Confidential 656.3186

289.8485

64.5309

366.4701 56% ladang/kebuncampuran

374 KIRI

katulisan 217

Confidential 619.9295

287.3586

25.2073

332.5709 54% ladang/kebuncampuran

375 KIRI katulisan 218 Confidential

5836.6942 5.836.6942 100%

376 KIRI

katulisan 219

Confidential 1724.0816

1.724.0816

1.724.0816 100% ladang/kebuncampuran

377 KIRI katulisan 220

Confidential 893.3024

490.5419

34.9636

402.7605 45% ladang/kebuncampuran

378 KIRI katulisan 221 Confidential 2209.8453 2.209.8453 100%

379 KIRI katulisan

222 Confidential

3918.2720

641.1205

111.4694 3.277.1515 84%

ladang/kebuncampuran

380 KIRI

katulisan 223 Confidential

953.3301

953.3301 953.3301 100%

ladang/kebuncampuran

381 KIRI katulisan

224 Confidential

1932.7336

420.2191

110.3891 1.512.5145 78%

ladang/kebuncampuran

382 KIRI

katulisan 225 Confidential

2116.7430

505.1843

136.7743 1.611.5587 76%

ladang/kebuncampuran

383 KIRI katulisan 226 Confidential 2169.3211 1.353.5559 62% ladang/kebuncampuran

Page 114: Download 2.56 MB

98 Appendix 2

AH No

Urut AREA DESA

No bidang ukur

NAMA PEMILIK

Luas Bidang

luas terkena

SISA LAHAN PADA KAKI TANGGUL

% JENIS PEMANFATAN

Bangunan

terkena kaki tanggul

terkena bibir sungai

P SP NP Luas Luas

Terkena

815.7652 322.2407

384 KIRI

katulisan 227 Confidential

1403.4768

242.3890 1.161.0878 83%

ladang/kebuncampuran

385 KIRI katulisan

228 Confidential

1716.4442

1.716.4442 1.716.4442 100%

ladang/kebuncampuran

386 KIRI katulisan 229 Confidential

1704.5231 1.704.5231 100%

387 KIRI panosogan

1 Confidential

3131.9831 497.0177 772.3255 2.634.9654 84% ladang/kebuncampuran

388 KIRI

panosogan 2 Confidential

3213.7603 574.5617 900.9361 2.639.1986 82%

ladang/kebuncampuran

389 KIRI panosogan

3 Confidential

579.2410 579.2410 579.2410 100%

ladang/kebuncampuran

390 KIRI

panosogan 4 Confidential

521.7320 521.7320

521.7320 100% ladang/kebuncampuran

391 KIRI panosogan

5 Confidential

4306.8536 938.4998 467.0793 3.368.3538 78%

ladang/kebuncampuran

392 KIRI

panosogan 6 Confidential

967.6968 967.6968 967.6968 100%

ladang/kebuncampuran

393 KIRI panosogan

7 Confidential

929.8067 929.8067 929.8067 100%

ladang/kebuncampuran

394 KIRI

panosogan 8 Confidential

924.1742 373.3212 137.3652 550.8530 60% ladang/kebuncampuran

395 KIRI panosogan

9 Confidential

473.4950 201.5256 79.6107 271.9694 57%

ladang/kebuncampuran

396 KIRI

panosogan 10 Confidential

413.0064 169.9741 243.0323 243.0323 59%

ladang/kebuncampuran

397 KIRI panosogan

11 Confidential

799.1015 407.9790 391.1225 49%

ladang/kebuncampuran

398 KIRI

panosogan 12 Confidential

1577.4080 1.577.4080 1.577.4080 100%

ladang/kebuncampuran

399 KIRI panosogan

13 Confidential

1607.4764 517.0482 322.5837 1.090.4282 68%

ladang/kebuncampuran

400 KIRI

panosogan 14

Confidential 1165.6776 503.5687 167.4104 662.1089 57%

ladang/kebuncampuran

401 KIRI panosogan 15

Confidential 357.1531

357.1531 100%

402 KIRI

panosogan 16

Confidential 767.0501

767.0501 100%

403 KIRI panosogan 17

Confidential 1198.2457 588.1935 70.8537

610.0522 51% ladang/kebuncampuran

Page 115: Download 2.56 MB

Appendix 2 99

AH No

Urut AREA DESA

No bidang ukur

NAMA PEMILIK

Luas Bidang

luas terkena

SISA LAHAN PADA KAKI TANGGUL

% JENIS PEMANFATAN

Bangunan

terkena kaki tanggul

terkena bibir sungai

P SP NP Luas Luas

Terkena

404 KIRI

panosogan 18

Confidential 1021.2712 1.021.2712

1.021.2712 100% ladang/kebuncampuran

405 KIRI panosogan 19

Confidential 2266.5850 363.0371 1.903.5479

1.903.5479 84% ladang/kebuncampuran

406 KIRI

panosogan 20

Confidential 893.1429 729.2340

163.9089 18% ladang/kebuncampuran

407 KIRI panosogan 21

Confidential 705.5996 3.3365

702.2631 100% ladang/kebuncampuran

408 KIRI

panosogan 22

Confidential 397.1222

397.1222 100%

409 KIRI panosogan

23 Confidential

683.8897 683.8897 100%

410 KIRI

panosogan 24

Confidential 320.3862 153.9814

166.4048 52% ladang/kebuncampuran

411 KIRI panosogan 25

Confidential 450.9157 141.5712

309.3445 69% ladang/kebuncampuran

412 KIRI

panosogan 26

Confidential 1175.7205 404.5284 771.1921

771.1921 66% ladang/kebuncampuran

413 KIRI panosogan 27

Confidential 582.3502 582.3502

582.3502 100% ladang/kebuncampuran

414 KIRI

panosogan 28

Confidential 1552.8490 649.6032

903.2458 58% ladang/kebuncampuran

415 KIRI panosogan 29

Confidential 472.9521 5.1126 467.8395

467.8395 99% ladang/kebuncampuran

416 KIRI

panosogan 30

Confidential 719.1098 107.0582 612.0516

612.0516 85% ladang/kebuncampuran

417 KIRI panosogan

31 Confidential

1126.3997 649.6032 476.7965 42%

ladang/kebuncampuran

418 KIRI

panosogan 32 Confidential

812.7584 1.2564 811.5020 100% ladang/kebuncampuran

419 KIRI panosogan

33 Confidential

1524.3178 976.2792 548.0386 36% ladang/kebuncampuran

420 KIRI

panosogan 34 Confidential

1112.3852 169.8910 942.4942 942.4942 85%

ladang/kebuncampuran

421 KIRI panosogan

35 Confidential

820.1562 379.7129 440.4433 440.4433 54%

ladang/kebuncampuran

422 KIRI

panosogan 36 Confidential

580.8769 138.6691 442.2078 76%

ladang/kebuncampuran

423 KIRI panosogan

37 Confidential

577.9206 10.5143 567.4063 98%

ladang/kebuncampuran

Page 116: Download 2.56 MB

100 Appendix 2

AH No

Urut AREA DESA

No bidang ukur

NAMA PEMILIK

Luas Bidang

luas terkena

SISA LAHAN PADA KAKI TANGGUL

% JENIS PEMANFATAN

Bangunan

terkena kaki tanggul

terkena bibir sungai

P SP NP Luas Luas

Terkena

424 KIRI

panosogan 38 Confidential

560.7875 560.7875 100%

425 KIRI panosogan

39 Confidential

495.2386 234.2954 260.9432 53%

ladang/kebuncampuran

426 KIRI

panosogan 40

Confidential 540.4001

481.2366 59.1635 59.1635 11%

ladang/kebuncampuran

427 KIRI panosogan

41 Confidential

572.1038 13.8007 558.3031 558.3031 98% ladang/kebuncampuran

428 KIRI

panosogan 42 Confidential

1501.6385 497.1116 1.004.5269 1.004.5269 67%

ladang/kebuncampuran

429 KIRI panosogan

43 Confidential

3277.6928 807.8091 2.469.8837 75%

ladang/kebuncampuran

430 KIRI

panosogan 44 Confidential

1147.9965 113.4463 1.034.5502 90% ladang/kebuncampuran

431 KIRI panosogan

45 Confidential

503.3430 503.3430 100%

432 KIRI

panosogan 46 Confidential

451.6029 451.6029 100%

433 KIRI panosogan

47 Confidential

458.1987 458.1987 100%

434 KIRI

panosogan 48 Confidential

1334.5988 1.334.5988 100%

435 KIRI panosogan

49 Confidential

283.8917 68.6674 215.2243 215.2243 76%

ladang/kebuncampuran

436 KIRI

panosogan 50 Confidential

482.2625 211.3944 270.8681 56%

ladang/kebuncampuran

437 KIRI panosogan

51 Confidential

682.4734 190.0635 492.4099 492.4099 72%

ladang/kebuncampuran

438 KIRI

panosogan 52 Confidential

568.1123 511.4004 56.7119 10%

ladang/kebuncampuran

439 KIRI panosogan

53 Confidential

1155.6892 633.3588 522.3304 45%

ladang/kebuncampuran

440 KIRI

panosogan 54

Confidential 857.4570 213.9519 643.5051 643.5051 75%

ladang/kebuncampuran

441 KIRI panosogan 55

Confidential 521.8159 186.2257 335.5902

335.5902 64% ladang/kebuncampuran

442 KIRI

panosogan 56

Confidential 904.0278 127.6029

776.4249 86% ladang/kebuncampuran

443 KIRI panosogan 57

Confidential 966.1591

966.1591 100%

Page 117: Download 2.56 MB

Appendix 2 101

AH No

Urut AREA DESA

No bidang ukur

NAMA PEMILIK

Luas Bidang

luas terkena

SISA LAHAN PADA KAKI TANGGUL

% JENIS PEMANFATAN

Bangunan

terkena kaki tanggul

terkena bibir sungai

P SP NP Luas Luas

Terkena

444 KIRI

panosogan 58

Confidential 592.3988 20.6880

571.7108 97% ladang/kebuncampuran

445 KIRI panosogan 59

Confidential 687.7853 28.8477

658.9376 96% ladang/kebuncampuran

446 KIRI

panosogan 60

Confidential 1437.5836 6.3004

1.431.2832 100% ladang/kebuncampuran

447 KIRI panosogan 61

Confidential 2485.9616 1.238.8601 1.247.1015

1.247.1015 50% ladang/kebuncampuran

448 KIRI

panosogan 62

Confidential 2214.7152 866.5383 1.348.1769

1.348.1769 61% ladang/kebuncampuran

449 KIRI panosogan

63 Confidential

1439.2094 1.439.2094 100%

450 KIRI

panosogan 64

Confidential 567.8165

567.8165 100%

451 KIRI panosogan 65

Confidential 640.1365

640.1365 100%

452 KIRI

panosogan 66

Confidential 1030.1039 404.9108 625.1931

625.1931 61% ladang/kebuncampuran

453 KIRI panosogan 67

Confidential 3274.7118 1.267.2719 2.007.4399

2.007.4399 61% ladang/kebuncampuran

454 KIRI

panosogan 68

Confidential 2707.1294

2.707.1294 100%

455 KIRI panosogan 69

Confidential 1783.6592 3.1290

1.780.5302 100% ladang/kebuncampuran

456 KIRI

panosogan 70

Confidential 613.3814 378.5447

234.8367 38% ladang/kebuncampuran

457 KIRI panosogan

71 Confidential

2113.0858 700.1122 1.412.9736 67%

pekarangan 1 123.20

m,2

458 KIRI

panosogan 72 Confidential

970.7063 337.8477 632.8586 632.8586 65%

ladang/kebuncampuran

459 KIRI panosogan

73 Confidential

2447.5405 775.0697 1.672.4708 1.672.4708 68% ladang/kebuncampuran

460 KIRI

panosogan 74 Confidential

2547.4586 459.8720 2.087.5866 2.087.5866 82%

ladang/kebuncampuran

461 KIRI panosogan

75 Confidential

1434.3412 438.4371 53.7030 995.9041 69%

ladang/kebuncampuran

462 KIRI

panosogan 76 Confidential

334.7678 132.6532 49.6226 202.1146 60%

ladang/kebuncampuran

463 KIRI panosogan

77 Confidential

305.1477 122.2763 52.0347 182.8714 60%

ladang/kebuncampuran

Page 118: Download 2.56 MB

102 Appendix 2

AH No

Urut AREA DESA

No bidang ukur

NAMA PEMILIK

Luas Bidang

luas terkena

SISA LAHAN PADA KAKI TANGGUL

% JENIS PEMANFATAN

Bangunan

terkena kaki tanggul

terkena bibir sungai

P SP NP Luas Luas

Terkena

464 KIRI

panosogan 78 Confidential

1236.4550 175.6875 891.0598 1.060.7675 86%

ladang/kebuncampuran

465 KIRI panosogan

79 Confidential

2024.5989 529.1886 1.129.4907 1.495.4103 74%

ladang/kebuncampuran

466 KIRI

panosogan 80

Confidential 1125.2852 450.3343 244.4716 674.9509 60%

ladang/kebuncampuran

467 KIRI panosogan

81 Confidential

710.3471 710.3471 710.3471 100% ladang/kebuncampuran

468 KIRI

panosogan 82 Confidential

1526.9056 422.8907 838.0553 1.104.0149 72%

pekarangan 1 1 138.40

m2

469 KIRI panosogan

83 Confidential

1188.4901 364.0612 679.3473 824.4289 69%

pekarangan 2 1 162.00

m2

470 KIRI

panosogan 84 Confidential

649.7940 179.2112 337.9710 470.5828 72% pekarangan

1 82.50

m2

471 KIRI panosogan

85 Confidential

100.9919 0.1861 100.8058 100%

pekarangan 1 58.90

m2

472 KIRI

panosogan 86 Confidential

525.7148 173.6147 352.1001 352.1001 67%

pekarangan 1 36.40

m2

473 KIRI panosogan

87 Confidential

205.8674 62.3925 143.4749 70%

pekarangan 1 82.50

m2

474 KIRI

panosogan 88 Confidential

146.7190 39.7523 106.9667 73%

pekarangan 1 63.30 m

475 KIRI panosogan

89 Confidential

740.4609 279.3015 461.1594 461.1594 62%

pekarangan 1 70.00

m2

476 KIRI

panosogan 90 Confidential

391.8214 391.8214 391.8214 100%

ladang/kebuncampuran

477 KIRI panosogan

91 Confidential

486.9310 87.4692 399.4618 399.4618 82%

ladang/kebuncampuran

478 KIRI

panosogan 92 Confidential

251.8536 246.9384 4.9152 4.9152 2%

pekarangan 1 44.00

m2

479 KIRI panosogan

93 Confidential

203.9873 50.9830 153.0043 75%

pekarangan 3 138.00

m2

480 KIRI

panosogan 94

Confidential 148.8477 29.0831 119.7646 80%

pekarangan 1

48.00 m2

481 KIRI panosogan 95

Confidential 169.0811 43.6200

125.4611 74% pekarangan 1

67.90 m2

482 KIRI

panosogan 96

Confidential 182.4055 59.3332

123.0723 67% pekarangan 2

138.40 m2

483 KIRI panosogan 97

Confidential 166.7310 166.7310

0.0000 0% pekarangan 2

104.5 m2

Page 119: Download 2.56 MB

Appendix 2 103

AH No

Urut AREA DESA

No bidang ukur

NAMA PEMILIK

Luas Bidang

luas terkena

SISA LAHAN PADA KAKI TANGGUL

% JENIS PEMANFATAN

Bangunan

terkena kaki tanggul

terkena bibir sungai

P SP NP Luas Luas

Terkena

484 KIRI

panosogan 98

Confidential 296.5803

296.5803 100% 1

122.50 m2

485 KIRI panosogan 99

Confidential 291.1510 99.1323

192.0187 66% pekarangan 1

129.60 m2

486 KIRI

panosogan 100

Confidential 141.0773 139.3253

1.7520 1% pekarangan 1

169.00 m2

487 KIRI panosogan 101

Confidential 141.5921 141.5921

0.0000 0% pekarangan 1

97.20 m2

488 KIRI

panosogan 102

Confidential 274.1878 273.3825 0.8053

0.8053 0% ladang/kebuncampuran

489 KIRI panosogan

103 Confidential

914.8312 68.3626 846.4686 846.4686 93%

ladang/kebuncampuran

490 KIRI

panosogan 104

Confidential 208.1470

208.1470 100% 1

148.50 M2

491 KIRI panosogan 105

Confidential 153.0354 1.4639

151.5715 99% pekarangan 1

118.30 M2

492 KIRI

panosogan 106

Confidential 131.8233 123.8016

8.0217 6% pekarangan 1

82.50 M2

493 KIRI panosogan 107

Confidential 524.0313 307.8559 216.1754

216.1754 41% pekarangan 1

125.00 M2

494 KIRI

panosogan 108

Confidential 335.0389 335.0389

335.0389 100% ladang/kebuncampuran

495 KIRI panosogan 109

Confidential 942.0537 942.0537

942.0537 100% ladang/kebuncampuran

496 KIRI

panosogan 110

Confidential 44.6733 37.1815

7.4918 17% ladang/kebuncampuran

497 KIRI panosogan

111 Confidential

111.8764 111.8764 100%

1 104.00

M2

498 KIRI

panosogan 112 Confidential

346.4502 42.2004 304.2498 88% pekarangan

1 90.20

M2

499 KIRI panosogan

113 Confidential

263.4974 37.6427 225.8547 86% ladang/kebuncampuran

500 KIRI

panosogan 114 Confidential

256.9255 256.9255 0.0000 0%

ladang/kebuncampuran

501 KIRI panosogan

115 Confidential

383.0937 218.9250 164.1687 164.1687 43%

pekarangan 1 93.80

M2

502 KIRI

panosogan 116 Confidential

404.9146 404.9146 100%

2 141.00

M2

503 KIRI panosogan

117 Confidential

618.9611 422.4329 100.1276 196.5282 32%

pekarangan 3 195.80

M2

Page 120: Download 2.56 MB

104 Appendix 2

AH No

Urut AREA DESA

No bidang ukur

NAMA PEMILIK

Luas Bidang

luas terkena

SISA LAHAN PADA KAKI TANGGUL

% JENIS PEMANFATAN

Bangunan

terkena kaki tanggul

terkena bibir sungai

P SP NP Luas Luas

Terkena

504 KIRI

panosogan 118 Confidential

421.6153 234.5365 187.0788 44%

ladang/kebuncampuran

505 KIRI panosogan

119 Confidential

3237.0391 669.6257 2.567.4134 2.567.4134 79%

pekarangan 1 70.40

M2

506 KIRI

panosogan 120

Confidential 1208.8191 12.9212 1.195.8979 99%

ladang/kebuncampuran

507 KIRI panosogan

121 Confidential

2216.4350 1.156.9336 1.059.5014 48% ladang/kebuncampuran

508 KIRI

panosogan 122 Confidential

1456.7022 41.5902 1.415.1120 1.415.1120 97%

ladang/kebuncampuran

509 KIRI panosogan

123 Confidential

810.6595 810.6595 810.6595 100%

ladang/kebuncampuran

510 KIRI

panosogan 124 Confidential

902.8496 724.7568 173.3132 178.0928 20% ladang/kebuncampuran

511 KIRI panosogan

125 Confidential

614.2947 81.3161 532.9786 87%

ladang/kebuncampuran

512 KIRI

panosogan 126 Confidential

1029.4667 649.1042 5.4671 380.3625 37%

ladang/kebuncampuran

513 KIRI panosogan

127 Confidential

1137.1811 62.4464 1.074.7347 1.074.7347 95%

ladang/kebuncampuran

514 KIRI

panosogan 128 Confidential

441.8611 441.8611 441.8611 100%

ladang/kebuncampuran

515 KIRI panosogan

129 Confidential

1817.7599 245.4742 1.343.3874 1.572.2857 86%

ladang/kebuncampuran

516 KIRI

panosogan 130 Confidential

3906.8946 426.4231 1.335.5114 3.480.4715 89%

ladang/kebuncampuran

517 KIRI panosogan

131 Confidential

442.1185 63.3698 378.7487 378.7487 86%

ladang/kebuncampuran

518 KIRI

panosogan 132 Confidential

221.9667 221.9667 221.9667 100%

ladang/kebuncampuran

519 KIRI panosogan

133 Confidential

471.8496 471.8496 471.8496 100%

ladang/kebuncampuran

520 KIRI

panosogan 134

Confidential 1372.8841 471.7234 685.2426 901.1607 66%

ladang/kebuncampuran

521 KIRI panosogan 135

Confidential 440.0478 87.2043 352.8435

352.8435 80% ladang/kebuncampuran

522 KIRI

panosogan 136

Confidential 214.0586 214.0586

214.0586 100% ladang/kebuncampuran

523 KIRI panosogan 137

Confidential 382.0988 201.2670 15.9300

180.8318 47% ladang/kebuncampuran

Page 121: Download 2.56 MB

Appendix 2 105

AH No

Urut AREA DESA

No bidang ukur

NAMA PEMILIK

Luas Bidang

luas terkena

SISA LAHAN PADA KAKI TANGGUL

% JENIS PEMANFATAN

Bangunan

terkena kaki tanggul

terkena bibir sungai

P SP NP Luas Luas

Terkena

524 KIRI

panosogan 138

Confidential 1614.0722 207.7618 1.406.3104

1.406.3104 87% ladang/kebuncampuran

525 KIRI panosogan 139

Confidential 2163.7683 682.2870 1.369.8734

1.481.4813 68% ladang/kebuncampuran

526 KIRI

panosogan 140

Confidential 2454.1482 689.8586 1.157.4556

1.764.2896 72% ladang/kebuncampuran

527 KIRI panosogan 141

Confidential 2602.1683 631.7269 894.3195

1.970.4414 76% ladang/kebuncampuran

528 KIRI

panosogan 142

Confidential 1975.3901 440.3087 610.0701

1.535.0814 78% ladang/kebuncampuran

529 KIRI panosogan

143 Confidential

1163.8471 238.4804 277.3329 925.3667 80%

ladang/kebuncampuran

530 KIRI

panosogan 144

Confidential 1184.9483 234.0829 240.3469

950.8654 80% ladang/kebuncampuran

531 KIRI panosogan 145

Confidential 2607.4396 551.0743 494.6904

2.056.3653 79% ladang/kebuncampuran

532 KIRI

panosogan 146

Confidential 7475.1014 1.199.3638 804.9227

6.275.7376 84% ladang/kebuncampuran

533 KIRI panosogan 147

Confidential 4307.3188 752.2681 593.9651

3.555.0507 83% ladang/kebuncampuran

534 KIRI

panosogan 148

Confidential 4511.8772 627.8688 537.2783

3.884.0084 86% ladang/kebuncampuran

535 KIRI panosogan 149

Confidential 1558.2764 544.8116 392.7052

1.013.4648 65% ladang/kebuncampuran

536 KIRI

panosogan 150

Confidential 587.2059

587.2059 100%

537 KIRI panosogan

151 Confidential

1694.2572 1.694.2572 100%

538 KIRI

panosogan 152 Confidential

1550.0262 1.550.0262 100%

539 KIRI panosogan

153 Confidential

2481.6002 583.9689 338.8031 1.897.6313 76% ladang/kebuncampuran

540 KIRI

panosogan 154 Confidential

4552.7708 1.141.6660 762.0588 3.411.1048 75%

ladang/kebuncampuran

541 KIRI panosogan

155 Confidential

2003.9009 2.003.9009 100%

542 KIRI

panosogan 156 Confidential

840.7028 840.7028 100%

543 KIRI panosogan

157 Confidential

4019.6577 637.9187 606.7739 3.381.7390 84%

ladang/kebuncampuran

Page 122: Download 2.56 MB

106 Appendix 2

AH No

Urut AREA DESA

No bidang ukur

NAMA PEMILIK

Luas Bidang

luas terkena

SISA LAHAN PADA KAKI TANGGUL

% JENIS PEMANFATAN

Bangunan

terkena kaki tanggul

terkena bibir sungai

P SP NP Luas Luas

Terkena

544 KIRI

panosogan 158 Confidential

4041.9746 614.0143 818.0899 3.427.9603 85%

ladang/kebuncampuran

545 KIRI panosogan

159 Confidential

772.7756 772.7756 100%

546 KIRI

panosogan 160

Confidential 1400.5811 1.400.5811 100%

547 KIRI panosogan

161 Confidential

4234.4688 1.092.7200 2.057.8842 3.141.7488 74% ladang/kebuncampuran

548 KIRI

panosogan 162 Confidential

2207.1750 368.5294 730.4324 1.838.6456 83%

ladang/kebuncampuran

549 KIRI panosogan

163 Confidential

1909.5116 316.9898 712.7528 1.592.5218 83%

ladang/kebuncampuran

550 KIRI

panosogan 164 Confidential

1892.4636 314.9297 746.8242 1.577.5339 83% ladang/kebuncampuran

551 KIRI panosogan

165 Confidential

1601.0607 303.7149 786.5303 1.297.3458 81%

ladang/kebuncampuran

552 KIRI

panosogan 166 Confidential

1481.3673 291.8149 832.7985 1.189.5524 80%

ladang/kebuncampuran

553 KIRI panosogan

167 Confidential

1455.3072 286.7423 889.5919 1.168.5649 80%

ladang/kebuncampuran

554 KIRI

panosogan 168 Confidential

1679.1765 338.7260 1.078.2007 1.340.4505 80%

ladang/kebuncampuran

555 KIRI panosogan

169 Confidential

1655.0426 338.7382 1.107.2040 1.316.3044 80%

ladang/kebuncampuran

556 KIRI

panosogan 170 Confidential

2689.0719 427.1808 1.435.9255 2.261.8911 84%

ladang/kebuncampuran

557 KIRI panosogan

171 Confidential

2802.2254 479.2416 1.481.1042 2.322.9838 83%

ladang/kebuncampuran

558 KIRI

panosogan 172 Confidential

3008.9790 528.4241 1.671.7122 2.480.5549 82%

ladang/kebuncampuran

559 KIRI panosogan

173 Confidential

742.1807 139.8471 386.6247 602.3336 81%

ladang/kebuncampuran

560 KIRI

panosogan 174

Confidential 734.8914 140.5698 384.5770 594.3216 81%

ladang/kebuncampuran

561 KIRI panosogan 175

Confidential 727.6020 141.2945 382.5298

586.3075 81% ladang/kebuncampuran

562 KIRI

panosogan 176

Confidential 720.3126 142.0213 380.4831

578.2913 80% ladang/kebuncampuran

563 KIRI panosogan 177

Confidential 2291.8162 477.3271 1.180.8111

1.814.4891 79% ladang/kebuncampuran

Page 123: Download 2.56 MB

Appendix 2 107

AH No

Urut AREA DESA

No bidang ukur

NAMA PEMILIK

Luas Bidang

luas terkena

SISA LAHAN PADA KAKI TANGGUL

% JENIS PEMANFATAN

Bangunan

terkena kaki tanggul

terkena bibir sungai

P SP NP Luas Luas

Terkena

564 KIRI

panosogan 178

Confidential 679.8974 84.0408

595.8566 88% ladang/kebuncampuran

565 KIRI panosogan 179

Confidential 1006.7466 247.4316 759.1941

759.3150 75% ladang/kebuncampuran

566 KIRI

panosogan 180

Confidential 927.1238 199.9484 727.1754

727.1754 78% ladang/kebuncampuran

567 KIRI panosogan 181

Confidential 1907.2755 287.7585 814.5693

1.619.5170 85% ladang/kebuncampuran

568 KIRI

panosogan 182

Confidential 1641.2159 255.8539 461.3111

1.385.3620 84% ladang/kebuncampuran

569 KIRI panosogan

183 Confidential

1317.8109 217.6748 432.9717 1.100.1361 83%

ladang/kebuncampuran

570 KIRI

panosogan 184

Confidential 2251.9323 403.2456 803.2540

1.848.6867 82% ladang/kebuncampuran

571 KIRI panosogan 185

Confidential 1357.9788 260.2879 535.6591

1.097.6909 81% ladang/kebuncampuran

572 KIRI

panosogan 186

Confidential 1351.9655 274.6606 530.3253

1.077.3049 80% ladang/kebuncampuran

573 KIRI panosogan 187

Confidential 2449.9563 520.1302 825.8781

1.929.8261 79% ladang/kebuncampuran

574 KIRI

panosogan 188

Confidential 1225.5348 463.6667 761.8681

761.8681 62% ladang/kebuncampuran

575 KIRI panosogan 189

Confidential 1219.5288 121.8642

1.097.6646 90% ladang/kebuncampuran

576 KIRI

panosogan 190

Confidential 3709.9439 994.7893 1.121.0765

2.715.1546 73% ladang/kebuncampuran

577 KIRI panosogan

191 Confidential

3147.0238 1.173.6067 596.9265 1.973.4171 63%

ladang/kebuncampuran

578 KIRI

panosogan 192 Confidential

4474.4725 1.061.0147 437.6715 3.413.4578 76% ladang/kebuncampuran

579 KIRI panosogan

193 Confidential

7503.6046 3.499.9842 2.832.9435 4.003.6204 53% ladang/kebuncampuran

580 KIRI

panosogan 194 Confidential

2597.7778 141.1331 2.456.6447 95%

ladang/kebuncampuran

581 KIRI panosogan

195 Confidential

2059.6476 683.5832 1.002.4688 1.376.0644 67%

ladang/kebuncampuran

582 KIRI

panosogan 196 Confidential

2483.1837 818.7494 1.226.8289 1.664.4343 67%

ladang/kebuncampuran

583 KIRI panosogan

197 Confidential

4318.8949 1.400.2101 1.764.8147 2.918.6848 68%

ladang/kebuncampuran

Page 124: Download 2.56 MB

108 Appendix 2

AH No

Urut AREA DESA

No bidang ukur

NAMA PEMILIK

Luas Bidang

luas terkena

SISA LAHAN PADA KAKI TANGGUL

% JENIS PEMANFATAN

Bangunan

terkena kaki tanggul

terkena bibir sungai

P SP NP Luas Luas

Terkena

584 KIRI

panosogan 198 Confidential

4869.2375 1.020.2347 949.6029 3.849.0028 79%

sawah

585 KIRI panosogan

199 Confidential

972.1673 6.0065 966.1608 99%

ladang/kebuncampuran

586 KIRI

gandayasa 1

Confidential 450.9385 0.0369 450.9016 100%

sawah

587 KIRI gandayasa 2

Confidential 585.6013 5.6646

579.9367 99% sawah

588 KIRI

gandayasa 3

Confidential 636.1591 59.4528

576.7063 91% sawah

589 KIRI gandayasa 4

Confidential 829.2871 757.7527 71.5344 71.5344 9%

sawah

590 KIRI

gandayasa 5

Confidential 1334.0322 357.9278

976.1044 73% sawah

591 KIRI gandayasa 6

Confidential 1196.8110 517.2673

679.5437 57% sawah

592 KIRI

gandayasa 7

Confidential 804.9406 615.6307

189.3099 189.3099 24% sawah

593 KIRI gandayasa 8

Confidential 494.6524 200.8325 293.8199 59%

ladang/kebuncampuran

594 KIRI

gandayasa 9

Confidential 280.8638 102.9847

177.8791 63% ladang/kebuncampuran

595 KIRI gandayasa 10

Confidential 449.6524 269.3145

180.3379 180.3379 40% ladang/kebuncampuran

596 KIRI

gandayasa 11

Confidential 108.0933 66.7148

41.3785 41.3785 38% ladang/kebuncampuran

597 KIRI gandayasa 12

Confidential 228.6267 195.5644

33.0623 14% ladang/kebuncampuran

598 KIRI

gandayasa 13

Confidential 115.4115

115.4115 100%

599 KIRI gandayasa

14 Confidential

155.6796 155.6796 100%

600 KIRI

gandayasa 15 Confidential

266.8094 132.8679 133.9415 50%

ladang/kebuncampuran

601 KIRI gandayasa

16 Confidential

64.2662 64.2662 100%

602 KIRI

gandayasa 17 Confidential

419.8788 342.2198 77.6590 18%

ladang/kebuncampuran

603 KIRI gandayasa

18 Confidential

608.0242 290.9764 317.0478 317.0478 52%

ladang/kebuncampuran

Page 125: Download 2.56 MB

Appendix 2 109

AH No

Urut AREA DESA

No bidang ukur

NAMA PEMILIK

Luas Bidang

luas terkena

SISA LAHAN PADA KAKI TANGGUL

% JENIS PEMANFATAN

Bangunan

terkena kaki tanggul

terkena bibir sungai

P SP NP Luas Luas

Terkena

604 KIRI

gandayasa 19 Confidential

1615.4570 819.2836 796.1734 796.1734 49%

ladang/kebuncampuran

605 KIRI gandayasa

20 Confidential

308.6217 308.6217 308.6217 100%

ladang/kebuncampuran

606 KIRI

gandayasa 21 Confidential

108.9646 108.9646 108.9646 100%

ladang/kebuncampuran

607 KIRI gandayasa

22 Confidential

354.5930 354.5930 354.5930 100%

ladang/kebuncampuran

608 KIRI

gandayasa 23

Confidential 420.3202 293.9145

126.4057 126.4057 30% ladang/kebuncampuran

609 KIRI gandayasa

24 Confidential

1174.6010 262.9802 911.6208 78%

ladang/kebuncampuran

610 KIRI

gandayasa 25 Confidential

176.5055 176.5055 176.5055 100%

ladang/kebuncampuran

611 KIRI gandayasa

26 Confidential

147.6262 147.6262 0.0000 0%

ladang/kebuncampuran

612 KIRI

gandayasa 27 Confidential

198.2428 159.7170 38.5258 19%

ladang/kebuncampuran

613 KIRI gandayasa

28 Confidential

1904.2800 382.1476 1522.1324 1.522.1324 80%

ladang/kebuncampuran

614 KIRI

gandayasa 29 Confidential

325.1564 123.5907 201.5657 62%

ladang/kebuncampuran

615 KIRI gandayasa

30 Confidential

1833.8324 800.1778 1033.6546 1.033.6546 56%

ladang/kebuncampuran

616 KIRI

gandayasa 31

Confidential 528.0049 528.0049

528.0049 100% ladang/kebuncampuran

617 KIRI gandayasa 32

Confidential 236.5269 5.8561 230.6708 98%

ladang/kebuncampuran

618 KIRI

gandayasa 33

Confidential 518.7718 0.4219 518.3499 100%

ladang/kebuncampuran

619 KIRI gandayasa 34

Confidential 558.6161

558.6161 100%

620 KIRI

gandayasa 35

Confidential 4592.6727 2189.4561 2137.7694

2.403.2166 52% ladang/kebuncampuran

621 KIRI gandayasa 36

Confidential 1171.5546 1171.5546

1.171.5546 100% ladang/kebuncampuran

622 KIRI

gandayasa 37

Confidential 2283.1888 1198.9018 29.8549

1.084.2870 47% ladang/kebuncampuran

623 KIRI gandayasa 38

Confidential 1685.5951

1.685.5951 100%

Page 126: Download 2.56 MB

110 Appendix 2

AH No

Urut AREA DESA

No bidang ukur

NAMA PEMILIK

Luas Bidang

luas terkena

SISA LAHAN PADA KAKI TANGGUL

% JENIS PEMANFATAN

Bangunan

terkena kaki tanggul

terkena bibir sungai

P SP NP Luas Luas

Terkena

624 KIRI

gandayasa 39

Confidential 865.6721

865.6721 100%

625 KIRI gandayasa

40 Confidential

1513.0903

1.513.0903 100%

626 KIRI

gandayasa 41 Confidential

763.0167 368.2094 394.8073 52%

ladang/kebuncampuran

627 KIRI gandayasa

42 Confidential

805.8696 22.2544 783.6152 97%

ladang/kebuncampuran

628 KIRI

gandayasa 43 Confidential

826.0682

826.0682 100%

629 KIRI gandayasa

44 Confidential

1873.3963 464.2834

1409.1129 1.409.1129 75%

ladang/kebuncampuran

630 KIRI

gandayasa 45 Confidential

3173.6055 1163.7557 1922.4991 2.009.8498 63%

ladang/kebuncampuran

631 KIRI gandayasa

46 Confidential

2302.6688 2.302.6688 100%

632 KIRI

gandayasa 47 Confidential

909.3207 909.3207 100%

633 KIRI gandayasa

48 Confidential

1278.2102 1.278.2102 100%

634 KIRI

gandayasa 49 Confidential

2179.9856 2.179.9856 100%

635 KIRI gandayasa

50 Confidential

1214.2238 466.2517 747.9721 62%

ladang/kebuncampuran

636 KIRI

gandayasa 51 Confidential

1177.0449 58.2295 1.118.8154 95%

ladang/kebuncampuran

637 KIRI gandayasa

52 Confidential

2116.4481 785.8898 1922.4991 1.330.5583 63%

ladang/kebuncampuran

638 KIRI

gandayasa 53

Confidential 898.0706

338.4941 482.7570 559.5765 62%

ladang/kebuncampuran

639 KIRI gandayasa

54 Confidential

512.9060 512.9060 100%

640 KIRI

gandayasa 55 Confidential

727.0732 727.0732 100%

641 KIRI gandayasa

56 Confidential

1589.1749 1.589.1749 100%

642 KIRI

gandayasa 57 Confidential

755.7318 176.4491 251.7489 579.2827 77%

ladang/kebuncampuran

643 KIRI gandayasa

58 Confidential

833.8259 211.3724 250.2892 622.4535 75%

ladang/kebuncampuran

Page 127: Download 2.56 MB

Appendix 2 111

AH No

Urut AREA DESA

No bidang ukur

NAMA PEMILIK

Luas Bidang

luas terkena

SISA LAHAN PADA KAKI TANGGUL

% JENIS PEMANFATAN

Bangunan

terkena kaki tanggul

terkena bibir sungai

P SP NP Luas Luas

Terkena

644 KIRI

gandayasa 59 Confidential

946.3367 263.7779 247.1106 682.5588 72%

ladang/kebuncampuran

645 KIRI gandayasa

60 Confidential

960.3004 273.1613 223.0029 687.1391 72%

ladang/kebuncampuran

646 KIRI

gandayasa 61

Confidential 1134.0433 311.5343 204.9539

822.5090 73% ladang/kebuncampuran

647 KIRI gandayasa

62 Confidential

502.9913 502.9913 100%

648 KIRI

gandayasa 63 Confidential

1448.1966 1.448.1966 100%

649 KIRI gandayasa

64 Confidential

376.5081 376.5081 100%

650 KIRI

gandayasa 65 Confidential

4557.8553 1340.2021 608.1199 3.217.6532 71%

ladang/kebuncampuran

651 KIRI gandayasa

66 Confidential

3327.0392 3.327.0392 100%

652 KIRI

gandayasa 67 Confidential

211.2578 211.2578 100%

653 KIRI gandayasa

68 Confidential

151.2148 151.2148 100%

654 KIRI

gandayasa 69

Confidential 436.7946

436.7946 100%

655 KIRI gandayasa 70

Confidential 399.2585

399.2585 100%

656 KIRI

gandayasa 71

Confidential 1088.5888

1.088.5888 100%

657 KIRI gandayasa 72

Confidential 3327.0392

1011.5083 290.1458 2.315.5309 70% ladang/kebuncampuran

658 KIRI

gandayasa 73 Confidential

676.2864 312.8047 96.6592 363.4817 54%

ladang/kebuncampuran

659 KIRI gandayasa

74 Confidential

746.5409 333.2581 88.0290 413.2828 55%

ladang/kebuncampuran

660 KIRI

gandayasa 75 Confidential

1540.3597 655.8041 123.2101 884.5556 57%

ladang/kebuncampuran

661 KIRI gandayasa

76 Confidential

242.5937 242.5937 100%

662 KIRI

gandayasa 77

Confidential 450.1530

450.1530 100%

663 KIRI gandayasa

78 Confidential

747.9328

747.9328 100%

Page 128: Download 2.56 MB

112 Appendix 2

AH No

Urut AREA DESA

No bidang ukur

NAMA PEMILIK

Luas Bidang

luas terkena

SISA LAHAN PADA KAKI TANGGUL

% JENIS PEMANFATAN

Bangunan

terkena kaki tanggul

terkena bibir sungai

P SP NP Luas Luas

Terkena

664 KIRI

gandayasa 79 Confidential

631.2731 631.2731 100%

665 KIRI gandayasa

80 Confidential

216.3439 216.3439 100%

666 KIRI

gandayasa 81 Confidential

661.3416 661.3416 100%

667 KIRI gandayasa

82 Confidential

1256.1996 531.9245 56.5202 724.2751 58%

ladang/kebuncampuran

668 KIRI

gandayasa 83 Confidential

1269.0700 518.8342 22.7270 750.2358 59%

ladang/kebuncampuran

669 KIRI gandayasa

84 Confidential

1259.6394 1.259.6394 100%

670 KIRI

gandayasa 85 Confidential

755.0496 755.0496 100%

671 KIRI gandayasa

86 Confidential

618.8546 618.8546 100%

672 KIRI

gandayasa 87 Confidential

600.4683 600.4683 100%

673 KIRI gandayasa

88 Confidential

823.5273 823.5273 100%

674 KIRI

gandayasa 89 Confidential

3485.8610 847.4660 2.638.3950 76%

ladang/kebuncampuran

675 KIRI gandayasa

90 Confidential

3585.7321 646.2323

2.939.4998 82% ladang/kebuncampuran

676 KIRI

gandayasa 91 Confidential

2149.4820 425.5061 1.723.9759 80%

ladang/kebuncampuran

677 KIRI gandayasa

92 Confidential

273.5049 273.5049 100%

678 KIRI

gandayasa 93 Confidential

390.3804 390.3804 100%

679 KIRI gandayasa

94 Confidential

402.2314 402.2314 100%

680 KIRI

gandayasa 95 Confidential

435.8797 435.8797 100%

681 KIRI gandayasa

96 Confidential

353.4387 353.4387 100%

682 KIRI

gandayasa 97 Confidential

1000.7661 1.000.7661 100%

683 KIRI gandayasa

98 Confidential

1523.6564 472.3750 1.051.2814 69%

ladang/kebuncampuran

Page 129: Download 2.56 MB

Appendix 2 113

AH No

Urut AREA DESA

No bidang ukur

NAMA PEMILIK

Luas Bidang

luas terkena

SISA LAHAN PADA KAKI TANGGUL

% JENIS PEMANFATAN

Bangunan

terkena kaki tanggul

terkena bibir sungai

P SP NP Luas Luas

Terkena

684 KIRI

gandayasa 99

Confidential 1722.2148 339.0270

1.383.1878 80% ladang/kebuncampuran

685 KIRI gandayasa

100 Confidential

2907.6603 718.5628 2.189.0975 75%

ladang/kebuncampuran

686 KIRI

gandayasa 101 Confidential

1967.8249 708.8937 1.258.9312 64%

ladang/kebuncampuran

687 KIRI gandayasa

102 Confidential

2694.3463 846.3886 1.847.9577 69%

ladang/kebuncampuran

688 KIRI

gandayasa 103 Confidential

3327.4259 1393.0124 1.934.4135 58%

ladang/kebuncampuran

689 KIRI gandayasa

104 Confidential

1942.6938 1.942.6938 100%

690 KIRI

gandayasa 105 Confidential

847.6239 237.5745 610.0494 610.0494 72%

ladang/kebuncampuran

691 KIRI gandayasa

106 Confidential

1337.5095 458.9535 84.1452 878.5560 66%

ladang/kebuncampuran

692 KIRI

gandayasa 107

Confidential 1524.7797 432.4831 77.2309

1.092.2966 72% ladang/kebuncampuran

693 KIRI gandayasa 108

Confidential 6210.4402

1754.3036 7.7593 4.456.1366 72%

ladang/kebuncampuran

694 KIRI

gandayasa 109

Confidential 1002.2740

358.5492 643.7248 64%

ladang/kebuncampuran

695 KIRI gandayasa 110

Confidential 707.9268 476.5189 231.4079

231.4079 33% ladang/kebuncampuran

696 KIRI

gandayasa 111

Confidential 585.4704 174.7231

410.7473 70% ladang/kebuncampuran

697 KIRI gandayasa 112

Confidential 612.4082

181.5014 430.9068 70% ladang/kebuncampuran

698 KIRI

gandayasa 113

Confidential 1603.5263

476.1107 1.127.4156 70% ladang/kebuncampuran

699 KIRI gandayasa 114

Confidential 1792.7991 514.8589

1.277.9402 71% ladang/kebuncampuran

700 KIRI

gandayasa 115

Confidential 1000.6970 489.2544

511.4426 51% ladang/kebuncampuran

701 KIRI gandayasa

116 Confidential

986.5027

986.5027 100%

702 KIRI

gandayasa 117

Confidential 1463.7076

1122.5278 7.1797 341.1798 23%

ladang/kebuncampuran

703 KIRI gandayasa 118

Confidential 1257.3140 530.0741 13.7927

727.2399 58% ladang/kebuncampuran

Page 130: Download 2.56 MB

114 Appendix 2

AH No

Urut AREA DESA

No bidang ukur

NAMA PEMILIK

Luas Bidang

luas terkena

SISA LAHAN PADA KAKI TANGGUL

% JENIS PEMANFATAN

Bangunan

terkena kaki tanggul

terkena bibir sungai

P SP NP Luas Luas

Terkena

704 KIRI

gandayasa 119

Confidential 1027.3732 374.6688

652.7044 64% ladang/kebuncampuran

705 KIRI gandayasa 120

Confidential 1367.4552 224.7608 1.142.6944 84%

ladang/kebuncampuran

706 KIRI

gandayasa 121

Confidential 1030.9518

1.030.9518 100%

707 KIRI gandayasa 122

Confidential 602.4886 41.2778

561.2108 93% ladang/kebuncampuran

708 KIRI

gandayasa 123

Confidential 1869.3014 1607.0747 199.5085

262.2267 14% ladang/kebuncampuran

709 KIRI gandayasa 124

Confidential 744.4379

677.2385 67.1994 9% ladang/kebuncampuran

710 KIRI

gandayasa 125

Confidential 231.5645 110.2847 121.2798

121.2798 52% ladang/kebuncampuran

711 KIRI gandayasa 126

Confidential 143.5156 48.1811 95.3345

95.3345 66% ladang/kebuncampuran

712 KIRI

gandayasa 127

Confidential 957.4978 180.3630 777.1348

777.1348 81% ladang/kebuncampuran

713 KIRI gandayasa 128

Confidential 371.4365

307.9632 63.4733 17% ladang/kebuncampuran

714 KIRI

gandayasa 129

Confidential 693.7622 479.2907 191.1034

214.4715 31% ladang/kebuncampuran

715 KIRI gandayasa

130 Confidential

702.2568 507.4122 194.8446

194.8446 28% ladang/kebuncampuran

716 KIRI

gandayasa 131 Confidential

733.6849 516.9863 216.6986 216.6986 30%

ladang/kebuncampuran

717 KIRI gandayasa

132 Confidential

343.8518 203.1708 140.6810 140.6810 41%

ladang/kebuncampuran

718 KIRI

gandayasa 133 Confidential

1626.6742 897.7449 470.2892 728.9293 45%

ladang/kebuncampuran

719 KIRI gandayasa

134 Confidential

185.3277 44.1466

141.1811 141.1811 76%

ladang/kebuncampuran

720 KIRI

gandayasa 135 Confidential

406.0196 406.0196 0.0000 0%

ladang/kebuncampuran

721 KIRI gandayasa

136 Confidential

357.8347 238.9632 102.7483 118.8715 33%

ladang/kebuncampuran

722 KIRI

gandayasa 137 Confidential

1153.2110 28.5777 1124.6333 1.124.6333 98%

ladang/kebuncampuran

723 KIRI gandayasa

138 Confidential

312.0291 304.3547 7.6744 2%

ladang/kebuncampuran

Page 131: Download 2.56 MB

Appendix 2 115

AH No

Urut AREA DESA

No bidang ukur

NAMA PEMILIK

Luas Bidang

luas terkena

SISA LAHAN PADA KAKI TANGGUL

% JENIS PEMANFATAN

Bangunan

terkena kaki tanggul

terkena bibir sungai

P SP NP Luas Luas

Terkena

724 KIRI

gandayasa 139

Confidential 367.7499 268.0285 99.7214

99.7214 27% ladang/kebuncampuran

725 KIRI gandayasa

140 Confidential

706.3217 556.2491 150.0726 150.0726 21%

ladang/kebuncampuran

726 KIRI

gandayasa 141 Confidential

241.0182 150.0725 90.9457 38%

ladang/kebuncampuran

727 KIRI gandayasa

142 Confidential

261.9926 145.4283 116.5643 44%

pekarangan 2 24.00

728 KIRI

gandayasa 143 Confidential

65.9693 65.9693 100%

729 KIRI gandayasa

144 Confidential

1210.8982 934.8878 156.1142 276.0104 23%

pekarangan 1 1 195.30

730 KIRI

gandayasa 145 Confidential

424.9925 378.1072 46.8853 46.8853 11%

pekarangan 1 128.00

731 KIRI gandayasa

146 Confidential

532.4426 451.6568 80.7858 80.7858 15%

pekarangan 1 79.00

732 KIRI

gandayasa 147

Confidential 68.8421 27.0811

41.7610 61% pekarangan 1 48.00

733 KIRI gandayasa 148

Confidential 36.6635

12.9957 23.6678 65%

pekarangan 1 36.50

734 KIRI

gandayasa 149

Confidential 69.9881

32.3728 37.6153 54%

pekarangan 1 67.90

735 KIRI gandayasa 150

Confidential 105.7088 105.7088

0.0000 0% ladang/kebuncampuran

736 KIRI

gandayasa 151

Confidential 187.0363 154.1034 32.9329

32.9329 18% pekarangan 1 46.10

737 KIRI gandayasa 152

Confidential 125.3078

109.2635 16.0443

16.0443 13% ladang/kebuncampuran

738 KIRI

gandayasa 153

Confidential 79.4555

79.4555 0.0000 0% pekarangan 1 64.80

739 KIRI gandayasa 154

Confidential 144.2011

144.2011

0.0000 0% pekarangan 1 62.00

740 KIRI

gandayasa 155

Confidential 89.9710 39.7286

50.2424 56% pekarangan 1 61.50

741 KIRI gandayasa

156 Confidential

145.8115 119.3436

26.4679 18% ladang/kebuncampuran

742 KIRI

gandayasa 157

Confidential 182.4966

178.5882 3.9084 3.9084 2%

pekarangan 1 24.75

743 KIRI gandayasa 158

Confidential 368.0538 367.4015 0.6523

0.6523 0% pekarangan 1 157.50

Page 132: Download 2.56 MB

116 Appendix 2

AH No

Urut AREA DESA

No bidang ukur

NAMA PEMILIK

Luas Bidang

luas terkena

SISA LAHAN PADA KAKI TANGGUL

% JENIS PEMANFATAN

Bangunan

terkena kaki tanggul

terkena bibir sungai

P SP NP Luas Luas

Terkena

744 KIRI

gandayasa 159

Confidential 107.9352 107.9352

0.0000 0% pekarangan 1 84.00

745 KIRI gandayasa 160

Confidential 70.8090 41.0221 29.7869 42%

pekarangan 1 51.50

746 KIRI

gandayasa 161

Confidential 571.8261

551.8852 19.9409 19.9409 3% pekarangan 1 109.60

747 KIRI gandayasa 162

Confidential 206.8843 55.5943

151.2900 73% pekarangan 1 73.50

748 KIRI

gandayasa 163

Confidential 387.3008

387.3008 100%

749 KIRI gandayasa 164

Confidential 758.5782 424.2766

334.3016 44% ladang/kebuncampuran

750 KIRI

gandayasa 165

Confidential 622.7829 614.7783 8.0046

8.0046 1% ladang/kebuncampuran

751 KIRI gandayasa 166

Confidential 139.6795 139.6795

0.0000 0% ladang/kebuncampuran

752 KIRI

gandayasa 167

Confidential 158.3119 158.3119

0.0000 0% ladang/kebuncampuran

753 KIRI gandayasa 168

Confidential 173.2161 173.2161

0.0000 0% ladang/kebuncampuran

754 KIRI

gandayasa 169

Confidential 370.3463 366.2722 4.0741

4.0741 1% ladang/kebuncampuran

755 KIRI gandayasa

170 Confidential

271.0090 234.7446 36.2644

36.2644 13% ladang/kebuncampuran

756 KIRI

gandayasa 171 Confidential

296.5050 220.9328 75.5722 75.5722 25%

ladang/kebuncampuran

757 KIRI gandayasa

172 Confidential

521.3747 309.5297 211.8450 211.8450 41%

ladang/kebuncampuran

758 KIRI

gandayasa 173 Confidential

948.3443 418.9395 529.4048 529.4048 56%

ladang/kebuncampuran

759 KIRI gandayasa

174 Confidential

1285.5513 596.0090

689.5423 689.5423 54%

ladang/kebuncampuran

760 KIRI

gandayasa 175 Confidential

1411.8587 790.8510 600.1054 621.0077 44%

ladang/kebuncampuran

761 KIRI gandayasa

176 Confidential

10815.3280 2609.5241 8.205.8039 76%

ladang/kebuncampuran

762 KIRI

gandayasa 177 Confidential

642.1436 137.0630 505.0806 505.0806 79%

ladang/kebuncampuran

763 KIRI gandayasa

178 Confidential

580.2468 540.6997 39.5471 7%

ladang/kebuncampuran

Page 133: Download 2.56 MB

Appendix 2 117

AH No

Urut AREA DESA

No bidang ukur

NAMA PEMILIK

Luas Bidang

luas terkena

SISA LAHAN PADA KAKI TANGGUL

% JENIS PEMANFATAN

Bangunan

terkena kaki tanggul

terkena bibir sungai

P SP NP Luas Luas

Terkena

764 KIRI

gandayasa 179

Confidential 866.6019 47.7501

818.8518 94% ladang/kebuncampuran

765 KIRI gandayasa

180 Confidential

863.6244 49.4214 814.2030 814.2030 94%

ladang/kebuncampuran

766 KIRI

gandayasa 181 Confidential

749.9403 736.8472 13.0931 2%

ladang/kebuncampuran

767 KIRI gandayasa

182 Confidential

638.1203 226.1275 411.9928 65%

ladang/kebuncampuran

768 KIRI

gandayasa 183 Confidential

513.7968 513.7968 100%

769 KIRI gandayasa

184 Confidential

605.1004 605.1004 100%

770 KIRI

gandayasa 185 Confidential

1117.6707 1.117.6707 100%

771 KIRI gandayasa

186 Confidential

639.6558 639.6558 100%

772 KIRI

gandayasa 187

Confidential 767.1757 338.5326 215.3523

428.6431 56% ladang/kebuncampuran

773 KIRI gandayasa 188

Confidential 278.8075

186.2355 72.8782 92.5720 33%

ladang/kebuncampuran

774 KIRI

gandayasa 189

Confidential 239.3620

178.1025 61.2595 61.2595 26%

ladang/kebuncampuran

775 KIRI gandayasa 190

Confidential 210.9229 162.0339 48.8890

48.8890 23% ladang/kebuncampuran

776 KIRI

gandayasa 191

Confidential 188.6376 151.9151 36.7225

36.7225 19% ladang/kebuncampuran

777 KIRI gandayasa 192

Confidential 163.0182

139.1208 23.8974

23.8974 15% ladang/kebuncampuran

778 KIRI

gandayasa 193

Confidential 140.5720

140.5720 140.5720 100% ladang/kebuncampuran

779 KIRI gandayasa 194

Confidential 27638.4100

27.638.4100 100%

780 KIRI

gandayasa 195

Confidential 4660.4735

4.660.4735 100%

781 KIRI gandayasa

196 Confidential

7707.3778 315.8329

7.391.5449 96% ladang/kebuncampuran

782 KIRI

gandayasa 197

Confidential 92.957.9141 29163.7380

63.794.1761 69% ladang/kebuncampuran

783 KIRI gandayasa 198

Confidential 9.227.1613 3066.8543 6160.3070

6.160.3070 67% ladang/kebuncampuran

Page 134: Download 2.56 MB

118 Appendix 2

AH No

Urut AREA DESA

No bidang ukur

NAMA PEMILIK

Luas Bidang

luas terkena

SISA LAHAN PADA KAKI TANGGUL

% JENIS PEMANFATAN

Bangunan

terkena kaki tanggul

terkena bibir sungai

P SP NP Luas Luas

Terkena

784 KIRI

gandayasa 40 A

Confidential 1518.8714

1.518.8714 100%

785 KIRI gandayasa 53 A

Confidential 381.8785

381.8785 381.8785 100% ladang/kebuncampuran

786 KIRI

gandayasa 72 A

Confidential 656.1319

656.1319 656.1319 100% ladang/kebuncampuran

787 KIRI gandayasa

89 A Confidential

328.3742 34.2038 294.1704 294.1704 90%

ladang/kebuncampuran

788 KIRI

gandayasa 199 Confidential

2418.1805 579.7864 1.838.3941 76%

sawah

789 KIRI gandayasa 200

Confidential 699.8464 87.1941

612.6523 88% sawah

790 KIRI

gandayasa 201

Confidential 976.2500

976.2500 100%

791 KIRI gandayasa

202 Confidential

1230.1866 363.8634 866.3232 70%

ladang/kebuncampuran

792 KIRI

gandayasa 203

Confidential 383.3381 244.7846

138.5535 36% ladang/kebuncampuran

793 KIRI gandayasa

204 Confidential

1227.4126 633.6575 593.7551 48%

ladang/kebuncampuran

794 KIRI

gandayasa 205

Confidential 599.6748 146.3454

453.3294 76% ladang/kebuncampuran

795 KIRI gandayasa

206 Confidential

99.0338 73.0919 25.9419 26%

pekarangan

796 KIRI

gandayasa 207

Confidential 309.1975 252.2438

56.9537 18% pekarangan

797 KIRI gandayasa 208

Confidential 195.6939 50.9352

144.7587 74% pekarangan 1 69.096

798 KIRI

gandayasa 208A Confidential

0.0000

#DIV/0! 1 34.845

799 KIRI dukuh

1 Confidential

6097.3369 1.182.9468 4.914.3901 81% ladang/kebuncampuran

800 KIRI

dukuh 2 Confidential

658.3489 658.3489 100%

801 KIRI dukuh

3 Confidential

687.1794 687.1794 100%

802 KIRI

dukuh 4 Confidential

128.1184 128.1184 100%

803 KIRI dukuh

5 Confidential

2528.5355 477.6842 2.050.8513 81%

ladang/kebuncampuran

Page 135: Download 2.56 MB

Appendix 2 119

AH No

Urut AREA DESA

No bidang ukur

NAMA PEMILIK

Luas Bidang

luas terkena

SISA LAHAN PADA KAKI TANGGUL

% JENIS PEMANFATAN

Bangunan

terkena kaki tanggul

terkena bibir sungai

P SP NP Luas Luas

Terkena

804 KIRI

dukuh 6 Confidential

2061.7193 558.8626 1.502.8567 1.502.8567 73%

sawah

805 KIRI dukuh

7 Confidential

3899.3799 1.112.7548 2.765.4988 2.786.6251 71%

sawah

806 KIRI

dukuh 8 Confidential

1482.9851 887.9464 595.0387

595.0387 40% sawah

807 KIRI dukuh

9 Confidential

1113.1635 1.113.1635 1.113.1635 100%

sawah

808 KIRI

dukuh 10 Confidential

631.6192 23.1530 608.4662 608.4662 96%

sawah

809 KIRI dukuh

11 Confidential

1341.4409 857.3926 484.0483 36%

sawah

810 KIRI

dukuh 12 Confidential

980.3598 980.3598 980.3598 100%

ladang/kebuncampuran

811 KIRI dukuh

13 Confidential

91.4426 49.0675 42.3751 42.3751 46%

ladang/kebuncampuran

812 KIRI

dukuh 14

Confidential 665.5125 432.5451 89.2298 232.9674 35%

ladang/kebuncampuran

813 KIRI dukuh 15

Confidential 91.4426

91.4426 100%

814 KIRI

dukuh 16

Confidential 5117.6096 1.607.4778 542.8834

3.510.1318 69% ladang/kebuncampuran

815 KIRI dukuh 17

Confidential 755.9395 4.7404 751.1991

751.1991 99% sawah

816 KIRI

dukuh 18

Confidential 308.9276 173.0313 135.8963

135.8963 44% ladang/kebuncampuran

817 KIRI dukuh 19

Confidential 1109.8528 151.7577

958.0951 86% ladang/kebuncampuran

818 KIRI

dukuh 20

Confidential 3255.3123 1.013.9597 862.8419

2.241.3526 69% ladang/kebuncampuran

819 KIRI dukuh 21

Confidential 647.3655

647.3655 100% sawah

820 KIRI

dukuh 22

Confidential 750.5198

750.5198 100% sawah

821 KIRI dukuh

23 Confidential

2419.1211 2.419.1211 100%

sawah

822 KIRI

dukuh 24

Confidential 3228.5331 481.1711

2.747.3620 85% ladang/kebuncampuran

823 KIRI dukuh 25

Confidential 662.0228 101.4654 560.5574

560.5574 85% ladang/kebuncampuran

Page 136: Download 2.56 MB

120 Appendix 2

AH No

Urut AREA DESA

No bidang ukur

NAMA PEMILIK

Luas Bidang

luas terkena

SISA LAHAN PADA KAKI TANGGUL

% JENIS PEMANFATAN

Bangunan

terkena kaki tanggul

terkena bibir sungai

P SP NP Luas Luas

Terkena

824 KIRI

dukuh 26

Confidential 687.9836 687.9836

687.9836 100% ladang/kebuncampuran

825 KIRI dukuh 27

Confidential 716.2054 10.6686 705.5368

705.5368 99% ladang/kebuncampuran

826 KIRI

dukuh 28

Confidential 861.1347 591.4293 196.8540

269.7054 31% ladang/kebuncampuran

827 KIRI dukuh 29

Confidential 312.4925 312.4925

312.4925 100% ladang/kebuncampuran

828 KIRI

dukuh 30

Confidential 2032.0457 818.5658 448.7914

1.213.4799 60% ladang/kebuncampuran

829 KIRI dukuh

31 Confidential

1986.2363 550.0855 1.314.1476 1.436.1508 72%

ladang/kebuncampuran

830 KIRI

dukuh 32 Confidential

2339.0953

2.339.0953 100% sawah

831 KIRI dukuh

33 Confidential

2358.0627 2.358.0627 100% sawah

832 KIRI

dukuh 34 Confidential

1840.0238 1.840.0238 100%

sawah

833 KIRI dukuh

35 Confidential

932.2485 932.2485 100%

sawah

834 KIRI

dukuh 36 Confidential

1275.7944 1.275.7944 100%

sawah

835 KIRI dukuh

37 Confidential

3392.4636 3.392.4636 100%

sawah

836 KIRI

dukuh 38 Confidential

1054.2777 1.054.2777 100%

sawah

837 KIRI dukuh

39 Confidential

3650.5852 911.9589 2.132.1015 2.738.6263 75%

ladang/kebuncampuran

838 KIRI

dukuh 40

Confidential 7089.4276

1.861.5968 4.042.1173 5.227.8308 74%

ladang/kebuncampuran

839 KIRI dukuh

41 Confidential

5997.6876 1.507.2874 3.548.1048 4.490.4002 75% sawah

840 KIRI

dukuh 42 Confidential

3340.9599 932.9344 1.773.9026 2.408.0255 72%

sawah

841 KIRI dukuh

43 Confidential

5584.5006 1.481.3654 2.853.8597 4.103.1352 73%

sawah

842 KIRI

dukuh 44 Confidential

553.2174 161.6813 391.5361

391.5361 71% ladang/kebuncampuran

843 KIRI dukuh

45 Confidential

807.6786 245.4267 562.2519 562.2519 70%

ladang/kebuncampuran

Page 137: Download 2.56 MB

Appendix 2 121

AH No

Urut AREA DESA

No bidang ukur

NAMA PEMILIK

Luas Bidang

luas terkena

SISA LAHAN PADA KAKI TANGGUL

% JENIS PEMANFATAN

Bangunan

terkena kaki tanggul

terkena bibir sungai

P SP NP Luas Luas

Terkena

844 KIRI

dukuh 46 Confidential

815.6701 296.0205 519.6496 64%

ladang/kebuncampuran

845 KIRI dukuh

47 Confidential

194.8100 88.7244 106.0856 54%

ladang/kebuncampuran

846 KIRI

dukuh 48 Confidential

614.2224 437.4183 176.8041 29%

ladang/kebuncampuran

847 KIRI dukuh

49 Confidential

171.9574 171.9574 0.0000 0%

ladang/kebuncampuran

848 KIRI

dukuh 50 Confidential

1196.5542 167.4814 1.029.0728 1.029.0728 86%

ladang/kebuncampuran

849 KIRI dukuh

51 Confidential

1274.1268 539.5724 734.5544 734.5544 58%

ladang/kebuncampuran

850 KIRI

dukuh 52 Confidential

890.1472 133.1902 756.9570 756.9570 85%

ladang/kebuncampuran

851 KIRI dukuh

53 Confidential

970.0243 147.4452 822.5791 822.5791 85%

ladang/kebuncampuran

852 KIRI

dukuh 54

Confidential 830.9016 120.80350

710.0981 85%

ladang/kebuncampuran

853 KIRI dukuh 55

Confidential 959.1640 132.1681

826.9959 86% ladang/kebuncampuran

854 KIRI

dukuh 56

Confidential 896.3639 228.6340

667.7299 74% ladang/kebuncampuran

855 KIRI dukuh 57

Confidential 1045.4852 499.1452

546.3400 52% ladang/kebuncampuran

856 KIRI

dukuh 58

Confidential 1193.8555 462.7384

731.1171 61% ladang/kebuncampuran

857 KIRI dukuh 59

Confidential 1068.3174 413.6820

654.6354 61% ladang/kebuncampuran

858 KIRI

dukuh 60

Confidential 460.8049 196.9075

263.8974 57% ladang/kebuncampuran

859 KIRI dukuh 61

Confidential 219.5565 114.5182

105.0383 48% ladang/kebuncampuran

860 KIRI

dukuh 62

Confidential 1471.7192 604.4500

867.2692 59% ladang/kebuncampuran

861 KIRI dukuh

63 Confidential

844.9061 330.7642 514.1419 61%

ladang/kebuncampuran

862 KIRI

dukuh 64

Confidential 614.9740 332.8108

282.1632 46% ladang/kebuncampuran

863 KIRI dukuh 65

Confidential 451.5097 259.6380

191.8717 42% ladang/kebuncampuran

Page 138: Download 2.56 MB

122 Appendix 2

AH No

Urut AREA DESA

No bidang ukur

NAMA PEMILIK

Luas Bidang

luas terkena

SISA LAHAN PADA KAKI TANGGUL

% JENIS PEMANFATAN

Bangunan

terkena kaki tanggul

terkena bibir sungai

P SP NP Luas Luas

Terkena

864 KIRI

dukuh 66

Confidential 260.9956

122.5699

138.4257 53% ladang/kebuncampuran

865 KIRI dukuh 67

Confidential 272.3940

272.3940 100%

866 KIRI

dukuh 68

Confidential 791.3451

429

362.2357 46% ladang/kebuncampuran

867 KIRI dukuh 69

Confidential 402.9242 98.6832

304.2410 76% ladang/kebuncampuran

868 KIRI

dukuh 70

Confidential 685.0025 163.0306

521.9719 76% ladang/kebuncampuran

869 KIRI dukuh 71

Confidential 944.4800 944.4800

0.0000 0% ladang/kebuncampuran

870 KIRI

dukuh 72

Confidential 450.7562 450.7562

0.0000 0% ladang/kebuncampuran

871 KIRI dukuh

73 Confidential

190.4449 4.5775

185.8674 98% ladang/kebuncampuran

872 KIRI

dukuh 74 Confidential

178.1912 18.4859 159.7053 90%

ladang/kebuncampuran

873 KIRI dukuh

75 Confidential

417.9982 362.5647 55.4335 13%

ladang/kebuncampuran

874 KIRI

dukuh 76

Confidential 364.7717 123.0560

241.7157 66% ladang/kebuncampuran

875 KIRI dukuh 77

Confidential 208.7272

208.7272 100%

876 KIRI

dukuh 78

Confidential 580.9650

580.9650 100%

877 KIRI dukuh

79 Confidential

619.2864 392.3214 226.9650 37%

ladang/kebuncampuran

878 KIRI

dukuh 80 Confidential

804.3580 370.3040

434.0540 54% ladang/kebuncampuran

879 KANAN panyabrangan kanan 1

Confidential 957.1534

241.2651 556.3374 715.8883 75% ladang/kebuncampuran

880 KANAN panyabrangan kanan 2 Confidential

347.7004 96.8817 178.6337 250.8187 72%

ladang/kebuncampuran

881 KANAN panyabrangan kanan 3

Confidential 1.150.2012 100.4553 1.049.7459

1.049.7459 91% ladang/kebuncampuran

882 KANAN panyabrangan kanan 4 Confidential

850.8699 312.4597 538.4102 63%

ladang/kebuncampuran

883 KANAN panyabrangan kanan 5

Confidential 453.4520 173.6204

279.8316 62% ladang/kebuncampuran

Page 139: Download 2.56 MB

Appendix 2 123

AH No

Urut AREA DESA

No bidang ukur

NAMA PEMILIK

Luas Bidang

luas terkena

SISA LAHAN PADA KAKI TANGGUL

% JENIS PEMANFATAN

Bangunan

terkena kaki tanggul

terkena bibir sungai

P SP NP Luas Luas

Terkena

884 KANAN panyabrangan kanan 6 Confidential

341.2942 38.6782 302.6160 302.6160 89%

ladang/kebuncampuran

885 KANAN panyabrangan kanan 7

Confidential 750.2691 240.5355

509.7336 68% ladang/kebuncampuran

886 KANAN panyabrangan kanan 8 Confidential

1.126.4310 546.6655

579.7655 51%

ladang/kebuncampuran

887 KANAN panyabrangan kanan 9

Confidential 733.0600 62.7393 670.3207

670.3207 91% ladang/kebuncampuran

888 KANAN panyabrangan kanan 10 Confidential

1.154.9162 33.2522 1.121.6640 1.121.6640 97%

sawah

889 KANAN panyabrangan kanan 11

Confidential 1.101.2748 678.8696

422.4052 38% sawah

890 KANAN panyabrangan kanan 12 Confidential

2.659.7028 899.9523 942.4605 1.759.7505 66%

sawah

891 KANAN panyabrangan kanan 13

Confidential 736.7953 160.6615 576.1338

576.1338 78% ladang/kebuncampuran

892 KANAN panyabrangan kanan 14 Confidential

248.1243 248.1243 0.0000 0%

ladang/kebuncampuran

893 KANAN panyabrangan kanan 15

Confidential 720.8006 158.7636 158.7636

562.0370 78% ladang/kebuncampuran

894 KANAN panyabrangan kanan 16 Confidential

1.295.1516 622.9379 649.9693 672.2137 52%

ladang/kebuncampuran

895 KANAN panyabrangan kanan 17

Confidential 536.1211 319.3734

216.7477 40% ladang/kebuncampuran

896 KANAN panyabrangan kanan 18 Confidential

1.529.5979 585.9503 943.6476 943.6476 62%

ladang/kebuncampuran

897 KANAN panyabrangan kanan 19

Confidential 464.5631 301.4484 163.1147

163.1147 35% ladang/kebuncampuran

898 KANAN panyabrangan kanan 20 Confidential

155.0326 155.0326 0.0000 0%

ladang/kebuncampuran

899 KANAN panyabrangan kanan 21

Confidential 90.6056 90.6056

0.0000 0% ladang/kebuncampuran

900 KANAN panyabrangan kanan 22 Confidential

131.6988 34.0302 97.6686 74%

ladang/kebuncampuran

901 KANAN panyabrangan kanan 23

Confidential 685.2130 226.9152

458.2978 67% ladang/kebuncampuran

902 KANAN panyabrangan kanan 24 Confidential

1.294.5172 79.5277 1.214.9895 94%

ladang/kebuncampuran

903 KANAN panyabrangan kanan 25

Confidential 1.139.6324 642.6751 469.7892

496.9573 44% ladang/kebuncampuran

Page 140: Download 2.56 MB

124 Appendix 2

AH No

Urut AREA DESA

No bidang ukur

NAMA PEMILIK

Luas Bidang

luas terkena

SISA LAHAN PADA KAKI TANGGUL

% JENIS PEMANFATAN

Bangunan

terkena kaki tanggul

terkena bibir sungai

P SP NP Luas Luas

Terkena

904 KANAN panyabrangan kanan 26 Confidential

482.6530 293.5168 154.1508 189.1362 39%

ladang/kebuncampuran

905 KANAN panyabrangan kanan 27

Confidential 1.177.2604 423.7431 154.1508

753.5173 64% ladang/kebuncampuran

906 KANAN panyabrangan kanan 28 Confidential

668.0196 423.7431 55.9991 244.2765 37%

ladang/kebuncampuran

907 KANAN panyabrangan kanan 29

Confidential 1.580.4782 700.0194 446.4271

880.4588 56% ladang/kebuncampuran

908 KANAN panyabrangan kanan 30 Confidential

251.4957 7.4971 243.9986 97%

ladang/kebuncampuran

909 KANAN panyabrangan kanan 31

Confidential 518.0229

518.0229 100%

910 KANAN panyabrangan kanan 32

Confidential 791.2542

567.6033 195.8263

223.6509 28% ladang/kebuncampuran

911 KANAN panyabrangan kanan

33 Confidential

1.550.7428 601.8847 184.3523 948.8581 61%

ladang/kebuncampuran

912 KANAN panyabrangan kanan 34 Confidential

950.6563 425.6240 109.2727 525.0323 55%

ladang/kebuncampuran

913 KANAN panyabrangan kanan 35

Confidential 516.0056 516.0056

516.0056 100% ladang/kebuncampuran

914 KANAN panyabrangan kanan 36 Confidential

563.5433 111.4852 452.0581 452.0581 80%

ladang/kebuncampuran

915 KANAN panyabrangan kanan 37

Confidential 335.0952 169.1470

165.9482 50% ladang/kebuncampuran

916 KANAN panyabrangan kanan 38 Confidential

367.4884 195.7917 171.6967 47%

ladang/kebuncampuran

917 KANAN panyabrangan kanan 39

Confidential 593.8080

593.8080 100%

918 KANAN panyabrangan kanan 40

Confidential 477.0251 234.7846 124.1305

242.2405 51% ladang/kebuncampuran

919 KANAN panyabrangan kanan

41 Confidential

475.5182 244.7724 111.8640 230.7458 49%

ladang/kebuncampuran

920 KANAN panyabrangan kanan 42 Confidential

455.3037 455.3037 100%

921 KANAN panyabrangan kanan 43

Confidential 239.0638

239.0638 100%

922 KANAN panyabrangan kanan 44

Confidential 904.7885

347.5730 194.8450

557.2155 62% ladang/kebuncampuran

923 KANAN panyabrangan kanan 45

Confidential 436.3881 270.8775 144.6911

165.5106 38% ladang/kebuncampuran

Page 141: Download 2.56 MB

Appendix 2 125

AH No

Urut AREA DESA

No bidang ukur

NAMA PEMILIK

Luas Bidang

luas terkena

SISA LAHAN PADA KAKI TANGGUL

% JENIS PEMANFATAN

Bangunan

terkena kaki tanggul

terkena bibir sungai

P SP NP Luas Luas

Terkena

924 KANAN panyabrangan kanan 46 Confidential

755.7433 289.0129 173.2155 466.7304 62%

ladang/kebuncampuran

925 KANAN panyabrangan kanan 47

Confidential 700.8281 297.5715 71.9385

403.2566 58% ladang/kebuncampuran

926 KANAN panyabrangan kanan 48 Confidential

174.0709 174.0709 174.0709 100%

ladang/kebuncampuran

927 KANAN panyabrangan kanan 49

Confidential 521.4605 226.0935 77.1768

295.3670 57% ladang/kebuncampuran

928 KANAN panyabrangan kanan 50 Confidential

932.0350 309.0394 222.7720 622.9956 67%

ladang/kebuncampuran

929 KANAN panyabrangan kanan 51

Confidential 845.0788

845.0788 845.0788 100% ladang/kebuncampuran

930 KANAN panyabrangan kanan 52 Confidential

626.4352 157.9261 468.5091 75%

ladang/kebuncampuran

931 KANAN panyabrangan kanan 53

Confidential 195.1295 63.7267 131.4028

131.4028 67% ladang/kebuncampuran

932 KANAN panyabrangan kanan 54 Confidential

1.220.4840 406.1853

188.3201 814.2987 67%

ladang/kebuncampuran

933 KANAN panyabrangan kanan 55

Confidential 1.103.1066 383.8709 130.1169

719.2357 65% ladang/kebuncampuran

934 KANAN panyabrangan kanan 56 Confidential

993.9681 356.1940 119.7510 637.7741 64%

ladang/kebuncampuran

935 KANAN panyabrangan kanan 57

Confidential 986.2524 365.6283 145.9998

620.6241 63% ladang/kebuncampuran

936 KANAN panyabrangan kanan 58 Confidential

1.014.0395 390.2447 186.1383 623.7948 62%

ladang/kebuncampuran

937 KANAN panyabrangan kanan 59

Confidential 905.9351 341.7061 150.3941

564.2290 62% ladang/kebuncampuran

938 KANAN panyabrangan kanan 60 Confidential

1.118.6357 422.1656 375.1146 696.4701 62%

ladang/kebuncampuran

939 KANAN panyabrangan kanan 61

Confidential 925.7572 375.1146 235.6296

550.6426 59% ladang/kebuncampuran

940 KANAN panyabrangan kanan 62 Confidential

720.2140 720.2140 100%

941 KANAN panyabrangan kanan 63

Confidential 2.163.6050 730.1284 391.9552

1.433.4766 66% ladang/kebuncampuran

942 KANAN panyabrangan kanan 64 Confidential

2.134.1224 865.3213 796.3769 1.268.8011 59%

ladang/kebuncampuran

943 KANAN panyabrangan kanan 65

Confidential 469.0894 469.0894

469.0894 100% ladang/kebuncampuran

Page 142: Download 2.56 MB

126 Appendix 2

AH No

Urut AREA DESA

No bidang ukur

NAMA PEMILIK

Luas Bidang

luas terkena

SISA LAHAN PADA KAKI TANGGUL

% JENIS PEMANFATAN

Bangunan

terkena kaki tanggul

terkena bibir sungai

P SP NP Luas Luas

Terkena

944 KANAN panyabrangan kanan 66 Confidential

421.4644 421.4644 421.4644 100%

ladang/kebuncampuran

945 KANAN panyabrangan kanan 67

Confidential 517.2956 517.2956

517.2956 100% ladang/kebuncampuran

946 KANAN panyabrangan kanan 68 Confidential

397.7402 108.5698 289.1704 289.1704 73%

ladang/kebuncampuran

947 KANAN panyabrangan kanan 69

Confidential 186

56.3175

129.8226 70% ladang/kebuncampuran

948 KANAN kampung baru 1 Confidential

562.2009 179.0199 2.4530 383.1810 68%

ladang/kebuncampuran

949 KANAN kampung baru 2

Confidential 849.1308

849.1308 100%

950 KANAN kampung baru 3 Confidential

489.1737 489.1737 100%

951 KANAN kampung baru 4

Confidential 1614.2003

86.9614 1.527.2389 95% ladang/kebuncampuran

952 KANAN kampung baru 5 Confidential

789.8859 392.6211 397.2648 397.2648 50%

ladang/kebuncampuran

953 KANAN kampung baru 6

Confidential 562.4546

130.9472 431.5074 77% ladang/kebuncampuran

954 KANAN kampung baru 7 Confidential

1962.2909 617.1486 33.8404 1.345.1423 69%

ladang/kebuncampuran

955 KANAN kampung baru 8

Confidential 1323.2164

217.7359 1.105.4805 1.105.4805 84% ladang/kebuncampuran

956 KANAN kampung baru 9 Confidential

2304.6282 843.6459 914.1992 1.460.9823 63%

ladang/kebuncampuran

957 KANAN kampung baru 10

Confidential 807.6675

807.6675 100%

958 KANAN kampung baru 11 Confidential

2793.5106 881.1186 1.087.4777 1.912.3920 68%

ladang/kebuncampuran

959 KANAN kampung baru 12

Confidential 626.0225

13.0175 613.0050 98% ladang/kebuncampuran

960 KANAN kampung baru 13 Confidential

873.9645 1.4435 872.5210 100%

ladang/kebuncampuran

961 KANAN kampung baru 14

Confidential 589.4655

589.4655 100%

962 KANAN kampung baru 15 Confidential

1619.3615 699.1782 768.2378 920.1833 57%

ladang/kebuncampuran

963 KANAN kampung baru 16

Confidential 476.7907

476.7907 476.7907 100% ladang/kebuncampuran

Page 143: Download 2.56 MB

Appendix 2 127

AH No

Urut AREA DESA

No bidang ukur

NAMA PEMILIK

Luas Bidang

luas terkena

SISA LAHAN PADA KAKI TANGGUL

% JENIS PEMANFATAN

Bangunan

terkena kaki tanggul

terkena bibir sungai

P SP NP Luas Luas

Terkena

964 KANAN kampung baru 17 Confidential

592.5359 592.5359 100%

965 KANAN kampung baru 18

Confidential 769.3944

769.3944 100%

966 KANAN kampung baru 19 Confidential

1335.6401 555.3934 780.2467 58%

ladang/kebuncampuran

967 KANAN kampung baru 20

Confidential 718.2666

68.1729 650.0937 650.0937 91% ladang/kebuncampuran

968 KANAN kampung baru 21 Confidential

539.3054 149.4675 389.8379 389.8379 72%

ladang/kebuncampuran

969 KANAN kampung baru 22

Confidential 1444.1505

1.444.1505 100%

970 KANAN kampung baru 23 Confidential

2878.9655 642.4349 471.7040 2.236.5306 78%

ladang/kebuncampuran

971 KANAN kampung baru 24

Confidential 748.139

297.8608 317.3853 450.2782 60% ladang/kebuncampuran

972 KANAN kampung baru 25 Confidential

1315.8063 1.315.8063 100%

973 KANAN kampung baru 26

Confidential 460.3055

460.3055 100%

974 KANAN kampung baru 27 Confidential

897.2753 285.7608 191.5838 611.5145 68%

ladang/kebuncampuran

975 KANAN kampung baru 28

Confidential 1661.858

471.5350 449.9064 1.190.3230 72% ladang/kebuncampuran

976 KANAN kampung baru 29 Confidential

1439.039 358.5639 196.6451 1.080.4751 75%

ladang/kebuncampuran

977 KANAN kampung baru 30

Confidential 216.1539

216.1539 216.1539 100% ladang/kebuncampuran

978 KANAN kampung baru 31 Confidential

963.4767 127.3000 836.1767 836.1767 87%

ladang/kebuncampuran

979 KANAN kampung baru 32

Confidential 1018.6566

645.2761 54.7630 373.3805 37% ladang/kebuncampuran

980 KANAN kampung baru 33 Confidential

2794.1716 2.794.1716 100%

981 KANAN kampung baru 34

Confidential 3081.113

3.081.1130 100%

982 KANAN kampung baru 35 Confidential

2399.1213 794.0867 613.8717 1.605.0346 67%

ladang/kebuncampuran

983 KANAN kampung baru 36

Confidential 6261.9676

1.462.0755 2.464.2320 4.799.8921 77% ladang/kebuncampuran

Page 144: Download 2.56 MB

128 Appendix 2

AH No

Urut AREA DESA

No bidang ukur

NAMA PEMILIK

Luas Bidang

luas terkena

SISA LAHAN PADA KAKI TANGGUL

% JENIS PEMANFATAN

Bangunan

terkena kaki tanggul

terkena bibir sungai

P SP NP Luas Luas

Terkena

984 KANAN kampung baru 37 Confidential

2325.8078 2.325.8078 100%

985 KANAN kampung baru 38

Confidential 921.1695

921.1695 100%

986 KANAN kampung baru 39

Confidential 2550.5771 377.5214 1.088.9250 2.173.0557 85%

ladang/kebuncampuran

987 KANAN kampung baru 40

Confidential 1846.3155

228.1866 817.2498 1.618.1289 88% ladang/kebuncampuran

988 KANAN kampung baru 41

Confidential 276.7596 276.7596 100%

989 KANAN kampung baru 42

Confidential 2297.0321

318.1266 916.2889 1.978.9055 86% ladang/kebuncampuran

990 KANAN kampung baru 43 Confidential

3066.3174 359.9601 1.009.0298 2.706.3573 88%

ladang/kebuncampuran

991 KANAN kampung baru 44

Confidential 8714.8775

941.9298 2.230.3586 7.772.9477 89% ladang/kebuncampuran

992 KANAN kampung baru 45 Confidential

743.6423 92.6988 650.9435 88%

ladang/kebuncampuran

993 KANAN kampung baru 46

Confidential 687.4971

9.3432 678.1539 99% ladang/kebuncampuran

994 KANAN kampung baru 47 Confidential

365.6633 83.7715 281.8918 281.8918 77%

ladang/kebuncampuran

995 KANAN kampung baru 48

Confidential 380.9803

107.5667 273.4136 273.4136 72% ladang/kebuncampuran

996 KANAN kampung baru 49 Confidential

396.2973 130.8558 265.2098 265.4415 67%

ladang/kebuncampuran

997 KANAN kampung baru 50

Confidential 411.6144

139.1139 257.2370 272.5005 66% ladang/kebuncampuran

998 KANAN kampung baru 51

Confidential 999.6313 156.4629 415.7327 843.1684 84%

ladang/kebuncampuran

999 KANAN kampung baru 52

Confidential 1212.2644

216.3260 403.7987 995.9384 82% ladang/kebuncampuran

1000 KANAN kampung baru 53 Confidential

1725.6441 294.2059 491.5598 1.431.4382 83%

ladang/kebuncampuran

1001 KANAN kampung baru 54

Confidential 4057.5294

613.7772 840.1423 3.443.7522 85% ladang/kebuncampuran

1002 KANAN kampung baru 55 Confidential

1993.0345 449.3077 463.6546 1.543.7268 77%

ladang/kebuncampuran

1003 KANAN kampung baru 56

Confidential 3718.4023

422.4579 487.8483 3.295.9444 89% ladang/kebuncampuran

Page 145: Download 2.56 MB

Appendix 2 129

AH No

Urut AREA DESA

No bidang ukur

NAMA PEMILIK

Luas Bidang

luas terkena

SISA LAHAN PADA KAKI TANGGUL

% JENIS PEMANFATAN

Bangunan

terkena kaki tanggul

terkena bibir sungai

P SP NP Luas Luas

Terkena

1004 KANAN kampung baru 57 Confidential

3690.8553 302.1680 420.1485 3.388.6873 92%

ladang/kebuncampuran

1005 KANAN kampung baru 58

Confidential 2443.8302

201.9036 273.9452 2.241.9266 92% ladang/kebuncampuran

1006 KANAN kampung baru 59 Confidential

876.243 121.4386 158.3009 754.8044 86%

ladang/kebuncampuran

1007 KANAN kampung baru 60

Confidential 1388.3684

146.3927 203.3009 1.241.9757 89% ladang/kebuncampuran

1008 KANAN kampung baru 61

Confidential 608.2163 89.5980 118.2312 518.6183 85%

ladang/kebuncampuran

1009 KANAN kampung baru 62

Confidential 629.3476

91.9195 117.8269 537.4281 85% ladang/kebuncampuran

1010 KANAN kampung baru 63 Confidential

567.8573 81.3021 111.9510 486.5552 86%

ladang/kebuncampuran

1011 KANAN kampung baru 64

Confidential 618.2561

87.2239 106.6560 531.0322 86% ladang/kebuncampuran

1012 KANAN kampung baru 65

Confidential 2696.7871 193.2567 236.7415 2.503.5304 93%

ladang/kebuncampuran

1013 KANAN kampung baru 66

Confidential 2648.3611

182.2897 211.8385 2.466.0714 93% ladang/kebuncampuran

1014 KANAN kampung baru 67 Confidential

1542.4355 199.5179 261.3089 1.342.9176 87%

ladang/kebuncampuran

1015 KANAN kampung baru 68

Confidential 1974.8826

225.4333 313.3809 1.749.4493 89% ladang/kebuncampuran

1016 KANAN kampung baru 69 Confidential

1507.7776 169.2186 241.5992 1.338.5590 89%

ladang/kebuncampuran

1017 KANAN kampung baru 70

Confidential 1714.7373

173.4730 245.1001 1.541.2643 90% ladang/kebuncampuran

1018 KANAN kampung baru 71 Confidential

1808.1749 176.6792 248.3975 1.631.4957 90%

ladang/kebuncampuran

1019 KANAN kampung baru 72

Confidential 1847.3244

181.1370 261.1074 1.666.1874 90% ladang/kebuncampuran

1020 KANAN kampung baru 73 Confidential

1453.1622 159.7361 256.1420 1.293.4261 89%

ladang/kebuncampuran

1021 KANAN kampung baru

74 Confidential

1539.9047 158.9662 260.9026 1.380.9385 90% ladang/kebuncampuran

1022 KANAN kampung baru 75 Confidential

2996.1607 361.0050 529.4728 2.635.1557 88%

ladang/kebuncampuran

1023 KANAN kampung baru 76

Confidential 2864.2482

363.9593 551.2004 2.500.2889 87% ladang/kebuncampuran

Page 146: Download 2.56 MB

130 Appendix 2

AH No

Urut AREA DESA

No bidang ukur

NAMA PEMILIK

Luas Bidang

luas terkena

SISA LAHAN PADA KAKI TANGGUL

% JENIS PEMANFATAN

Bangunan

terkena kaki tanggul

terkena bibir sungai

P SP NP Luas Luas

Terkena

1024 KANAN kampung baru 77 Confidential

2208.8051 275.3348 374.0543 1.933.4703 88%

ladang/kebuncampuran

1025 KANAN kampung baru 78

Confidential 1743.0195

237.2900 354.9124 1.505.7295 86% ladang/kebuncampuran

1026 KANAN kampung baru 79 Confidential

1546.677 250.1337 426.8769 1.296.5433 84%

ladang/kebuncampuran

1027 KANAN kampung baru 80

Confidential 1505.15

219.5772 378.8471 1.285.5728 85% ladang/kebuncampuran

1028 KANAN kampung baru 81 Confidential

2396.1466 353.6594 483.3100 2.042.4872 85%

ladang/kebuncampuran

1029 KANAN kampung baru 82

Confidential 2119.992

346.5749 464.3259 1.773.4171 84% ladang/kebuncampuran

1030 KANAN kampung baru 83 Confidential

3361.6249 542.6663 708.5403 2.818.9586 84%

ladang/kebuncampuran

1031 KANAN kampung baru 84

Confidential 2841.2203

271.5516 385.4420 2.569.6687 90% ladang/kebuncampuran

1032 KANAN kampung baru 85 Confidential

3751.7437 458.9405 590.4202 3.292.8032 88%

ladang/kebuncampuran

1033 KANAN kampung baru 86

Confidential 2527.6523

375.6535 448.1738 2.151.9988 85% ladang/kebuncampuran

1034 KANAN kampung baru 87 Confidential

1762.3741 231.9249 280.9945 1.530.4492 87%

ladang/kebuncampuran

1035 KANAN kampung baru 88

Confidential 1853.3418

267.1141 276.4165 1.586.2277 86% ladang/kebuncampuran

1036 KANAN kampung baru 89 Confidential

1720.6587 210.2683 222.9765 1.510.3904 88%

ladang/kebuncampuran

1037 KANAN kampung baru 90

Confidential 1508.8963

196.1391 185.5741 1.312.7572 87% ladang/kebuncampuran

1038 KANAN kampung baru 91 Confidential

1405.1242 214.3409 177.2320 1.190.7833 85%

ladang/kebuncampuran

1039 KANAN kampung baru 92

Confidential 4568.3231

648.9480 428.7161 3.919.3751 86% ladang/kebuncampuran

1040 KANAN kampung baru 93 Confidential

3416.4673 1.003.8905 522.7619 2.412.5768 71%

ladang/kebuncampuran

1041 KANAN kampung baru 94

Confidential 2670.9844

1.083.4904 321.9339 1.587.4940 59% ladang/kebuncampuran

1042 KANAN kampung baru 95 Confidential

971.7832 586.3875 138.8688 385.3957 40%

ladang/kebuncampuran

1043 KANAN kampung baru 96

Confidential 2458.1288

1.496.0013 474.1193 962.1275 39% ladang/kebuncampuran

Page 147: Download 2.56 MB

Appendix 2 131

AH No

Urut AREA DESA

No bidang ukur

NAMA PEMILIK

Luas Bidang

luas terkena

SISA LAHAN PADA KAKI TANGGUL

% JENIS PEMANFATAN

Bangunan

terkena kaki tanggul

terkena bibir sungai

P SP NP Luas Luas

Terkena

1044 KANAN kampung baru 97 Confidential

6563.795 1.957.3814 967.3298 4.606.4136 70%

ladang/kebuncampuran

1045 KANAN kampung baru 98

Confidential 1539.8944

565.2156 974.6788 974.6788 63% ladang/kebuncampuran

1046 KANAN kampung baru 99 Confidential

1283.9671 355.8204 928.1467 72%

ladang/kebuncampuran

1047 KANAN kampung baru 100

Confidential 1354.4188

516.0483 838.3705 838.3705 62% ladang/kebuncampuran

1048 KANAN kampung baru 101 Confidential

1216.5357 408.8979 578.8663 807.6378 66%

ladang/kebuncampuran

1049 KANAN kampung baru 102

Confidential 336.3032

336.3032 336.3032 100% ladang/kebuncampuran

1050 KANAN kampung baru 103 Confidential

2952.6134 711.5456 400.5258 2.241.0678 76%

ladang/kebuncampuran

1051 KANAN kampung baru 104

Confidential 174.1854

80.6256 93.5598 93.5598 54% ladang/kebuncampuran

1052 KANAN kampung baru 105 Confidential

939.9696 87.3575 852.6121 852.6121 91%

ladang/kebuncampuran

1053 KANAN kampung baru 106

Confidential 1634.0624

262.9960 1.371.0664 1.371.0664 84% ladang/kebuncampuran

1054 KANAN kampung baru 107 Confidential

1200.5456 641.1248 28.8033 559.4208 47%

ladang/kebuncampuran

1055 KANAN kampung baru 108

Confidential 1485.9226

673.2960 567.1640 812.6266 55% ladang/kebuncampuran

1056 KANAN kampung baru 109 Confidential

1635.248 676.9312 958.3168 958.3168 59%

ladang/kebuncampuran

1057 KANAN kampung baru 110

Confidential 1270.8882

383.8087 887.0795 887.0795 70% ladang/kebuncampuran

1058 KANAN kampung baru 111 Confidential

1294.7924 314.0740 980.7184 76%

ladang/kebuncampuran

1059 KANAN kampung baru 112

Confidential 833.3622

595.8194 237.5428 29% ladang/kebuncampuran

1060 KANAN kampung baru 113 Confidential

841.03 105.5648 735.4652 735.4652 87%

ladang/kebuncampuran

1061 KANAN kampung baru 114

Confidential 1272.9727

693.3047 77.6537 579.6680 46% ladang/kebuncampuran

1062 KANAN kampung baru 115

Confidential 394.7116 227.1406 103.8224 167.5710 42%

ladang/kebuncampuran

1063 KANAN kampung baru 116

Confidential 2661.7632

1.2360 2.660.5272 2.660.5272 100% ladang/kebuncampuran

Page 148: Download 2.56 MB

132 Appendix 2

AH No

Urut AREA DESA

No bidang ukur

NAMA PEMILIK

Luas Bidang

luas terkena

SISA LAHAN PADA KAKI TANGGUL

% JENIS PEMANFATAN

Bangunan

terkena kaki tanggul

terkena bibir sungai

P SP NP Luas Luas

Terkena

1064 KANAN kampung baru 117 Confidential

2274.8676 126.2712 2.148.5964 2.148.5964 94%

ladang/kebuncampuran

1065 KANAN kampung baru 118

Confidential 3371.4345

1.208.2820 2.084.9841 2.163.1525 64% ladang/kebuncampuran

1066 KANAN kampung baru 119 Confidential

2749.1615 898.3136 1.262.5162 1.850.8479 67%

ladang/kebuncampuran

1067 KANAN kampung baru 120

Confidential 2752.7851

545.8396 959.7516 2.206.9455 80% ladang/kebuncampuran

1068 KANAN kampung baru 121 Confidential

969.8418 149.1273 300.9656 820.7145 85%

ladang/kebuncampuran

1069 KANAN kampung baru 122

Confidential 984.5768

137.6249 286.8279 846.9519 86% ladang/kebuncampuran

1070 KANAN kampung baru 123 Confidential

761.6708 224.0817 528.0436 537.5891 71%

ladang/kebuncampuran

1071 KANAN kampung baru 124

Confidential 1407.363

313.5693 462.3200 1.093.7937 78% ladang/kebuncampuran

1072 KANAN kampung baru 125 Confidential

1330.5059 180.0799 335.0480 1.150.4260 86%

ladang/kebuncampuran

1073 KANAN kampung baru 126

Confidential 1339.8625

184.1653 328.1620 1.155.6972 86% ladang/kebuncampuran

1074 KANAN kampung baru 127 Confidential

1349.2191 190.3779 327.2705 1.158.8412 86%

ladang/kebuncampuran

1075 KANAN kampung baru

128 Confidential

2725.3106 389.0608 622.8254 2.336.2498 86% ladang/kebuncampuran

1076 KANAN kampung baru 129 Confidential

2069.12 313.0455 551.6261 1.756.0745 85%

ladang/kebuncampuran

1077 KANAN kampung baru 130

Confidential 896.5334

241.0735 398.5144 655.4599 73% ladang/kebuncampuran

1078 KANAN kampung baru 131 Confidential

1147.1814 294.5917 587.9001 852.5897 74%

ladang/kebuncampuran

1079 KANAN kampung baru 132

Confidential 610.3881

163.6061 293.1885 446.7820 73% ladang/kebuncampuran

1080 KANAN kampung baru 133 Confidential

596.0625 163.3116 280.7720 432.7509 73%

ladang/kebuncampuran

1081 KANAN kampung baru

134 Confidential

1462.3880 485.8911 685.1645 976.4969 67% ladang/kebuncampuran

1082 KANAN kampung baru 135 Confidential

3307.4058 1.178.4195 624.3127 2.128.9863 64%

ladang/kebuncampuran

1083 KANAN kampung baru 136

Confidential 729.1728

323.1863 178.8010 405.9865 56% ladang/kebuncampuran

Page 149: Download 2.56 MB

Appendix 2 133

AH No

Urut AREA DESA

No bidang ukur

NAMA PEMILIK

Luas Bidang

luas terkena

SISA LAHAN PADA KAKI TANGGUL

% JENIS PEMANFATAN

Bangunan

terkena kaki tanggul

terkena bibir sungai

P SP NP Luas Luas

Terkena

1084 KANAN kampung baru 137 Confidential

1238.7944 310.3885 127.9481 928.4059 75%

ladang/kebuncampuran

1085 KANAN kampung baru 138

Confidential 863.5665

863.5665 100%

1086 KANAN kampung baru 139 Confidential

875.1017 186.5946 104.4871 688.5071 79%

ladang/kebuncampuran

1087 KANAN kampung baru 140

Confidential 2290.2362

369.1336 215.6175 1.921.1026 84% ladang/kebuncampuran

1088 KANAN kampung baru 141 Confidential

2346.9754 377.5578 202.7407 1.969.4176 84%

ladang/kebuncampuran

1089 KANAN kampung baru 142

Confidential 485.8122

308.1563 149.8756 177.6559 37% ladang/kebuncampuran

1090 KANAN kampung baru 143 Confidential

3597.2067 741.2074 473.5477 2.855.9993 79%

ladang/kebuncampuran

1091 KANAN kampung baru 144

Confidential 1777.1076

488.1403 371.1512 1.288.9673 73% ladang/kebuncampuran

1092 KANAN kampung baru 145 Confidential

1276.3534 566.7636 556.9115 709.5898 56%

ladang/kebuncampuran

1093 KANAN kampung baru 146

Confidential 977.4989

501.8363 475.6626 49% ladang/kebuncampuran

1094 KANAN kampung baru 147 Confidential

644.848 7.0941 637.7539 637.7539 99%

ladang/kebuncampuran

1095 KANAN kampung baru 148

Confidential 1388.0319

59.9946 1.328.0373 1.328.0373 96% ladang/kebuncampuran

1096 KANAN kampung baru 149 Confidential

748.5464 499.2559 249.2905 249.2905 33%

ladang/kebuncampuran

1097 KANAN kampung baru 150

Confidential 945.4286

507.8239 437.6047 46% ladang/kebuncampuran

1098 KANAN kampung baru 151 Confidential

1387.1289 7.5317 1.379.5972 1.379.5972 99%

ladang/kebuncampuran

1099 KANAN kampung baru 152

Confidential 728.2442

728.2442 728.2442 100% ladang/kebuncampuran

1100 KANAN kampung baru 153 Confidential

2096.9306 826.8135 1.270.1171 61%

ladang/kebuncampuran

1101 KANAN kampung baru 154

Confidential 1452.2944

381.2806 280.3330 1.071.0138 74% ladang/kebuncampuran

1102 KANAN kampung baru 155 Confidential

729.5777 174.2762 191.0270 555.3015 76%

ladang/kebuncampuran

1103 KANAN kampung baru 156

Confidential 1008.2334

233.3364 294.3063 774.8970 77% ladang/kebuncampuran

Page 150: Download 2.56 MB

134 Appendix 2

AH No

Urut AREA DESA

No bidang ukur

NAMA PEMILIK

Luas Bidang

luas terkena

SISA LAHAN PADA KAKI TANGGUL

% JENIS PEMANFATAN

Bangunan

terkena kaki tanggul

terkena bibir sungai

P SP NP Luas Luas

Terkena

1104 KANAN kampung baru 157 Confidential

893.1253 201.3438 294.8917 691.7815 77%

ladang/kebuncampuran

1105 KANAN kampung baru 158

Confidential 997.7955

215.3944 364.1101 782.4011 78% ladang/kebuncampuran

1106 KANAN kampung baru 159 Confidential

1470.6722 308.7536 629.4272 1.161.9186 79%

ladang/kebuncampuran

1107 KANAN kampung baru 160

Confidential 2127.8976

428.3180 1.041.2990 1.699.5796 80% ladang/kebuncampuran

1108 KANAN kampung baru 161 Confidential

740.6723 144.7770 380.8365 595.8953 80%

ladang/kebuncampuran

1109 KANAN kampung baru 162

Confidential 129.695

129.6950 129.6950 100% ladang/kebuncampuran

1110 KANAN kampung baru 163 Confidential

291.6736 291.6736 291.6736 100%

ladang/kebuncampuran

1111 KANAN kampung baru 164

Confidential 212.0593

18.6436 193.4157 193.4157 91% ladang/kebuncampuran

1112 KANAN kampung baru 165 Confidential

1154.2689 232.1061 623.4986 922.1628 80%

ladang/kebuncampuran

1113 KANAN kampung baru 166

Confidential 995.4764

168.8588 591.3759 826.6176 83% ladang/kebuncampuran

1114 KANAN kampung baru 167 Confidential

1142.1306 188.8695 702.5200 953.2611 83%

ladang/kebuncampuran

1115 KANAN kampung baru 168

Confidential 1248.0848 195.2378 821.9843 1.052.8470 84%

ladang/kebuncampuran

1116 KANAN kampung baru 169 Confidential

923.8607 102.8427 821.0180 821.0180 89%

ladang/kebuncampuran

1117 KANAN kampung baru 170

Confidential 1335.9222

144.5079 1.191.4143 1.191.4143 89% ladang/kebuncampuran

1118 KANAN kampung baru 171 Confidential

865.0052 103.4580 761.5472 761.5472 88%

ladang/kebuncampuran

1119 KANAN kampung baru 172

Confidential 1609.055

462.5882 1.146.4668 71% ladang/kebuncampuran

1120 KANAN kampung baru 173 Confidential

5862.1184 852.3119 5.009.8065 85%

ladang/kebuncampuran

1121 KANAN kampung baru 174

Confidential 718.1195

53.5023 664.6172 93% ladang/kebuncampuran

1122 KANAN kampung baru 175 Confidential

662.1794 662.1794 100%

1123 KANAN kampung baru 176

Confidential 572.2408

572.2408 100%

Page 151: Download 2.56 MB

Appendix 2 135

AH No

Urut AREA DESA

No bidang ukur

NAMA PEMILIK

Luas Bidang

luas terkena

SISA LAHAN PADA KAKI TANGGUL

% JENIS PEMANFATAN

Bangunan

terkena kaki tanggul

terkena bibir sungai

P SP NP Luas Luas

Terkena

1124 KANAN kampung baru 177 Confidential

661.8436 361.5455 300.2981 45% ladang/kebuncampuran

1125 KANAN kampung baru 178

Confidential 1033.2285

468.0176 565.2109 55% ladang/kebuncampuran

1126 KANAN kampung baru 179 Confidential

1313.4575 125.4196 1.188.0379 90%

ladang/kebuncampuran

1127 KANAN kampung baru 180

Confidential 1972.4465

117.9436 1.854.5029 94% ladang/kebuncampuran

1128 KANAN malabar 1

Confidential 1182.0798 113.9499 1.068.1299 90%

ladang/kebuncampuran

1129 KANAN

malabar 2

Confidential 2622.2617 39.4991

2.582.7626 98% ladang/kebuncampuran

1130 KANAN malabar 3

Confidential 2087.0211 2.087.0211

2.087.0211 100% ladang/kebuncampuran

1131 KANAN

malabar 4

Confidential 1056.6652 224.7396 831.9256 79%

ladang/kebuncampuran

1132 KANAN malabar 5

Confidential 2673.9980 2.673.9980

2.673.9980 100% ladang/kebuncampuran

1133 KANAN

malabar 6

Confidential 2035.4765 663.6623 1.075.5699

1.371.8142 67% ladang/kebuncampuran

1134 KANAN malabar 7

Confidential 1357.5443 1.357.5443

1.357.5443 100% ladang/kebuncampuran

1135 KANAN

malabar 8

Confidential 784.6961

702.3858 75.6195 82.3103 10%

ladang/kebuncampuran

1136 KANAN malabar 9

Confidential 2174.3239 920.3915 1.203.7215

1.253.9324 58% ladang/kebuncampuran

1137 KANAN

malabar 10

Confidential 1774.8748 925.7099 617.5309

849.1649 48% ladang/kebuncampuran

1138 KANAN malabar 11

Confidential 1343.4825 43.5080

1.299.9745 97% ladang/kebuncampuran

1139 KANAN

malabar 12

Confidential 1776.6948 784.6839 304.3781

992.0109 56% ladang/kebuncampuran

1140 KANAN malabar 13

Confidential 873.5345

873.5345 100%

1141 KANAN

malabar 14 Confidential

939.3356 625.7565 310.0885 313.5791 33% ladang/kebuncampuran

1142 KANAN malabar

15 Confidential

864.4905 62.6003 801.8902 93%

ladang/kebuncampuran

1143 KANAN

malabar 16 Confidential

996.7141 996.7141 100%

Page 152: Download 2.56 MB

136 Appendix 2

AH No

Urut AREA DESA

No bidang ukur

NAMA PEMILIK

Luas Bidang

luas terkena

SISA LAHAN PADA KAKI TANGGUL

% JENIS PEMANFATAN

Bangunan

terkena kaki tanggul

terkena bibir sungai

P SP NP Luas Luas

Terkena

1144 KANAN malabar

17 Confidential

1277.9200 642.1501 635.7699 635.7699 50%

sawah

1145 KANAN

malabar 18 Confidential

1173.6473 623.4961 550.1512 47%

sawah

1146 KANAN malabar

19 Confidential

1238.6170 1.238.6170 100%

1147 KANAN

malabar 20 Confidential

1061.0989 1.061.0989 100%

1148 KANAN malabar

21 Confidential

667.5663 83.8418 583.7245 583.7245 87%

ladang/kebuncampuran

1149 KANAN

malabar 22 Confidential

2542.5508 571.5310 1.971.0198 78%

sawah

1150 KANAN malabar 23

Confidential 1509.0585 294.5497 1.214.5088

1.214.5088 80% ladang/kebuncampuran

1151 KANAN

malabar 24 Confidential

1559.6985 514.5802 1.045.1183 67%

ladang/kebuncampuran

1152 KANAN malabar

25 Confidential

2904.1757 408.4467 672.0390 2.495.7290 86%

ladang/kebuncampuran

1153 KANAN

malabar 26 Confidential

525.5520 179.3568 328.6927 346.1952 66%

ladang/kebuncampuran

1154 KANAN malabar

27 Confidential

651.8603 651.8603 651.8603 100%

ladang/kebuncampuran

1155 KANAN

malabar 28 Confidential

278.4433 187.7958 61.8410 90.6475 33%

ladang/kebuncampuran

1156 KANAN malabar

29 Confidential

954.6886 160.1202 794.5684 794.5684 83%

ladang/kebuncampuran

1157 KANAN

malabar 30 Confidential

1140.5741 604.9926 87.9929 535.5815 47%

ladang/kebuncampuran

1158 KANAN malabar 31

Confidential 1022.0054 386.9900 635.0154

635.0154 62% pekarangan 1 83 83

1159 KANAN

malabar 32

Confidential 1166.2863 359.7581 651.4055 806.5282 69%

ladang/kebuncampuran

1160 KANAN malabar 33

Confidential 356.0025 83.4229

272.5796 272.5796 77%

ladang/kebuncampuran

1161 KANAN

malabar 34

Confidential 122.6894 99.7145

22.9749 19% ladang/kebuncampuran

1162 KANAN malabar 35

Confidential 194.4847 4.5053

189.9794 98% pekarangan 1 68 0

1163 KANAN

malabar 36

Confidential 611.8551 204.0029 314.6407

407.8522 67% ladang/kebuncampuran

Page 153: Download 2.56 MB

Appendix 2 137

AH No

Urut AREA DESA

No bidang ukur

NAMA PEMILIK

Luas Bidang

luas terkena

SISA LAHAN PADA KAKI TANGGUL

% JENIS PEMANFATAN

Bangunan

terkena kaki tanggul

terkena bibir sungai

P SP NP Luas Luas

Terkena

1164 KANAN malabar 37

Confidential 213.0771

213.0771 100%

1165 KANAN

malabar 38

Confidential 708.6183 274.2993 389.9247

434.3190 61% ladang/kebuncampuran

1166 KANAN malabar 39

Confidential 1052.7417 6.2050

1.046.5367 99% pekarangan 1 68 0

1167 KANAN

malabar 40 Confidential

880.6500 353.1877 508.7614

527.4623 60% ladang/kebuncampuran

1168 KANAN malabar 41

Confidential 955.1015 955.1015 100%

1169 KANAN

malabar 42

Confidential 4100.5395 861.0498 1.709.5395

3.239.4897 79% ladang/kebuncampuran

1170 KANAN malabar 43

Confidential 328.5032

328.5032 100%

1171 KANAN

malabar 44

Confidential 1502.7089 430.4683

1.072.2406 1.072.2406 71%

ladang/kebuncampuran

1172 KANAN malabar 45

Confidential 1479.2626 478.6921 968.3740

1.000.5705 68% ladang/kebuncampuran

1173 KANAN

malabar 46

Confidential 6050.7554 169.9208

5.880.8346 97% ladang/kebuncampuran

1174 KANAN malabar 47

Confidential 1133.6786 355.7568 665.2110

777.9218 69% ladang/kebuncampuran

1175 KANAN

malabar 48

Confidential 161.9326 161.9326

161.9326 100% ladang/kebuncampuran

1176 KANAN malabar 49

Confidential 562.2970 216.7462 211.6902

345.5508 61% ladang/kebuncampuran

1177 KANAN

malabar 50

Confidential 215.0779 215.0779

215.0779 100% ladang/kebuncampuran

1178 KANAN malabar 51

Confidential 141.9850 57.5512 84.4338

84.4338 59% ladang/kebuncampuran

1179 KANAN

malabar 52

Confidential 299.9075 165.1339

134.7736 45% ladang/kebuncampuran

1180 KANAN malabar 53

Confidential 188.3953

188.3953 100%

1181 KANAN

malabar 54 Confidential

327.7461 115.8631 211.8830

211.8830 65% ladang/kebuncampuran

1182 KANAN malabar

55 Confidential

308.9606 53.9568 255.0038 83%

ladang/kebuncampuran

1183 KANAN

malabar 56 Confidential

434.7008 122.3158 312.3850 312.3850 72%

ladang/kebuncampuran

Page 154: Download 2.56 MB

138 Appendix 2

AH No

Urut AREA DESA

No bidang ukur

NAMA PEMILIK

Luas Bidang

luas terkena

SISA LAHAN PADA KAKI TANGGUL

% JENIS PEMANFATAN

Bangunan

terkena kaki tanggul

terkena bibir sungai

P SP NP Luas Luas

Terkena

1184 KANAN malabar

57 Confidential

253.8488 99.3962 154.4526 61%

ladang/kebuncampuran

1185 KANAN

malabar 58 Confidential

971.1085 303.6499 468.5526 667.4586 69%

ladang/kebuncampuran

1186 KANAN malabar

59 Confidential

1026.9746 304.0806 359.0482 722.8940 70%

ladang/kebuncampuran

1187 KANAN

malabar 60 Confidential

716.6556 188.5781 306.2673 528.0775 74%

ladang/kebuncampuran

1188 KANAN malabar

61 Confidential

988.0834 235.7485 482.7348 752.3349 76%

ladang/kebuncampuran

1189 KANAN

malabar 62 Confidential

1569.8637 532.0832 715.7063 1.037.7805 66%

ladang/kebuncampuran

1190 KANAN malabar 63

Confidential 736.8684

736.8684 100%

1191 KANAN

malabar 64 Confidential

965.0926 71.2484 893.8442 893.8442 93%

ladang/kebuncampuran

1192 KANAN malabar

65 Confidential

814.7176 157.4214 657.2962 657.2962 81%

ladang/kebuncampuran

1193 KANAN

malabar 66 Confidential

1833.2412 483.0242 1.350.2170 74%

ladang/kebuncampuran

1194 KANAN malabar

67 Confidential

949.0170 216.8105 732.2065 732.2065 77%

ladang/kebuncampuran

1195 KANAN

malabar 68 Confidential

569.5680 36.5515 533.0165 94%

ladang/kebuncampuran

1196 KANAN malabar

69 Confidential

1123.1912 330.3782 731.1531 792.8130 71%

ladang/kebuncampuran

1197 KANAN

malabar 70 Confidential

529.5862 0.0793 529.5069 100%

ladang/kebuncampuran

1198 KANAN malabar 71

Confidential 635.7973

635.7973 100%

1199 KANAN

malabar 72

Confidential 1280.3177

274.6193 1.005.6984

1.005.6984 79% ladang/kebuncampuran

1200 KANAN malabar 73

Confidential 476.7259 120.0390

356.6869 356.6869 75%

ladang/kebuncampuran

1201 KANAN

malabar 74

Confidential 464.9444 111.1530 353.7914

353.7914 76% ladang/kebuncampuran

1202 KANAN malabar 75

Confidential 1375.9415 134.5311 1.241.4104

1.241.4104 90% ladang/kebuncampuran

1203 KANAN

malabar 76

Confidential 964.9613 273.5028 568.4793

691.4585 72% ladang/kebuncampuran

Page 155: Download 2.56 MB

Appendix 2 139

AH No

Urut AREA DESA

No bidang ukur

NAMA PEMILIK

Luas Bidang

luas terkena

SISA LAHAN PADA KAKI TANGGUL

% JENIS PEMANFATAN

Bangunan

terkena kaki tanggul

terkena bibir sungai

P SP NP Luas Luas

Terkena

1204 KANAN malabar 77

Confidential 1117.5048 270.0286 661.4173

847.4762 76% ladang/kebuncampuran

1205 KANAN

malabar 78

Confidential 3285.2190 765.4892 1.697.3978

2.519.7298 77% ladang/kebuncampuran

1206 KANAN malabar 79

Confidential 2278.0374 507.8243 1.324.1534

1.770.2131 78% ladang/kebuncampuran

1207 KANAN

malabar 80 Confidential

3754.6504 842.2129 2.140.5635 2.912.4375 78% ladang/kebuncampuran

1208 KANAN malabar 81

Confidential 1685.8946 374.3727

1.311.5219 1.311.5219 78%

ladang/kebuncampuran

1209 KANAN

malabar 82

Confidential 2595.6388 486.9562 1.213.9553

2.108.6826 81% ladang/kebuncampuran

1210 KANAN malabar 83

Confidential 7574.3415 1.390.3057 3.930.8197

6.184.0358 82% ladang/kebuncampuran

1211 KANAN

malabar 84

Confidential 3580.4325 583.2296

2.997.2029 2.997.2029 84%

ladang/kebuncampuran

1212 KANAN malabar 85

Confidential 2373.4564 217.2684 2.156.1880

2.156.1880 91% ladang/kebuncampuran

1213 KANAN

malabar 86

Confidential 2842.3621 485.7119 1.107.8814

2.356.6502 83% ladang/kebuncampuran

1214 KANAN malabar 87

Confidential 742.1209 82.9613 659.1596

659.1596 89% ladang/kebuncampuran

1215 KANAN

malabar 88

Confidential 1453.9820 324.5905 1.129.3915

1.129.3915 78% ladang/kebuncampuran

1216 KANAN malabar 89

Confidential 1150.9122 266.6462 554.6290

884.2660 77% ladang/kebuncampuran

1217 KANAN

malabar 90

Confidential 934.5409 212.3965 418.1207

722.1444 77% ladang/kebuncampuran

1218 KANAN malabar 91

Confidential 1737.9420 382.8687 817.0297

1.355.0733 78% ladang/kebuncampuran

1219 KANAN

malabar 92

Confidential 1511.3730 341.5285 682.3365

1.169.8445 77% ladang/kebuncampuran

1220 KANAN malabar 93

Confidential 1530.1574 263.5236 570.3364

1.266.6338 83% ladang/kebuncampuran

1221 KANAN

malabar 94 Confidential

1570.1368 267.1195 633.9871 1.303.0173 83% ladang/kebuncampuran

1222 KANAN malabar

95 Confidential

2443.2680 393.7161 846.2796 2.049.5519 84%

ladang/kebuncampuran

1223 KANAN

malabar 96 Confidential

2185.6325 349.1587 954.9090 1.836.4738 84%

ladang/kebuncampuran

Page 156: Download 2.56 MB

140 Appendix 2

AH No

Urut AREA DESA

No bidang ukur

NAMA PEMILIK

Luas Bidang

luas terkena

SISA LAHAN PADA KAKI TANGGUL

% JENIS PEMANFATAN

Bangunan

terkena kaki tanggul

terkena bibir sungai

P SP NP Luas Luas

Terkena

1224 KANAN malabar

97 Confidential

1384.0454 210.2208 517.8729 1.173.8246 85%

ladang/kebuncampuran

1225 KANAN

malabar 98 Confidential

2462.6674 360.1157 891.4519 2.102.5517 85%

ladang/kebuncampuran

1226 KANAN malabar

99 Confidential

1475.5308 217.9096 651.0688 1.257.6212 85%

ladang/kebuncampuran

1227 KANAN

malabar 100 Confidential

3844.9521 547.1293 1.469.0373 3.297.8228 86%

ladang/kebuncampuran

1228 KANAN malabar

101 Confidential

6096.9882 833.8452 1.819.7208 5.263.1430 86%

ladang/kebuncampuran

1229 KANAN

malabar 102 Confidential

480.3500 8.8733 471.4767 471.4767 98%

ladang/kebuncampuran

1230 KANAN malabar 103

Confidential 1283.5136 270.1483 10.6058

1.013.3653 79% ladang/kebuncampuran

1231 KANAN

malabar 104 Confidential

1289.1651 203.5513 312.0297 1.085.6138 84%

ladang/kebuncampuran

1232 KANAN malabar

105 Confidential

1144.4822 188.3690 293.9787 956.1132 84%

ladang/kebuncampuran

1233 KANAN

malabar 106 Confidential

1010.9333 173.8053 262.5975 837.1280 83%

ladang/kebuncampuran

1234 KANAN malabar

107 Confidential

1500.8528 238.8499 296.2540 1.262.0029 84%

ladang/kebuncampuran

1235 KANAN

malabar 108 Confidential

1100.7892 279.2857 385.9231 821.5035 75%

ladang/kebuncampuran

1236 KANAN malabar

109 Confidential

1425.0491 384.9368 490.1397 1.040.1123 73%

ladang/kebuncampuran

1237 KANAN

malabar 110 Confidential

1082.2186 303.9553 274.5113 778.2633 72%

ladang/kebuncampuran

1238 KANAN malabar 111

Confidential 747.1577 224.3935 188.4449

522.7642 70% ladang/kebuncampuran

1239 KANAN

malabar 112

Confidential 1183.9224 345.7205 285.4673 838.2019 71%

ladang/kebuncampuran

1240 KANAN malabar 113

Confidential 860.3967 227.7610 180.8994 632.6357 74%

ladang/kebuncampuran

1241 KANAN

malabar 114

Confidential 960.0552 248.9142 241.2433

711.1410 74% ladang/kebuncampuran

1242 KANAN malabar 115

Confidential 863.0347 219.2026 227.8047

643.8321 75% ladang/kebuncampuran

1243 KANAN

malabar 116

Confidential 1299.4848 304.1667 252.0522

995.3181 77% ladang/kebuncampuran

Page 157: Download 2.56 MB

Appendix 2 141

AH No

Urut AREA DESA

No bidang ukur

NAMA PEMILIK

Luas Bidang

luas terkena

SISA LAHAN PADA KAKI TANGGUL

% JENIS PEMANFATAN

Bangunan

terkena kaki tanggul

terkena bibir sungai

P SP NP Luas Luas

Terkena

1244 KANAN malabar 117

Confidential 1234.6803 290.9405 310.0770

943.7398 76% ladang/kebuncampuran

1245 KANAN

malabar 118

Confidential 1371.2393 316.7105 419.9855

1.054.5288 77% ladang/kebuncampuran

1246 KANAN malabar 119

Confidential 1401.2684 313.1152 419.2427

1.088.1532 78% ladang/kebuncampuran

1247 KANAN

malabar 120 Confidential

1408.5225 475.9967 496.0500 932.5258 66% ladang/kebuncampuran

1248 KANAN malabar 121

Confidential 1613.7119 527.3584 653.5566 1.086.3535 67%

ladang/kebuncampuran

1249 KANAN

malabar 122

Confidential 900.8747 289.6950 503.5299

611.1797 68% ladang/kebuncampuran

1250 KANAN malabar 123

Confidential 1969.2969 685.2343 967.9406

1.284.0626 65% ladang/kebuncampuran

1251 KANAN

malabar 124

Confidential 1829.9231 539.6379 989.1848 1.290.2852 71%

ladang/kebuncampuran

1252 KANAN malabar 125

Confidential 1712.9495 526.1269 903.2211

1.186.8226 69% ladang/kebuncampuran

1253 KANAN

malabar 126

Confidential 1244.7643 431.4822 805.2350

813.2821 65% ladang/kebuncampuran

1254 KANAN malabar 127

Confidential 995.5466 317.1681 678.3785

678.3785 68% ladang/kebuncampuran

1255 KANAN

malabar 128

Confidential 961.0914 268.2387 692.8527

692.8527 72% ladang/kebuncampuran

1256 KANAN malabar 129

Confidential 1513.1879 331.1741 1.182.0138

1.182.0138 78% ladang/kebuncampuran

1257 KANAN

malabar 130

Confidential 2369.4719 581.2910 1.413.7576

1.788.1809 75% ladang/kebuncampuran

1258 KANAN malabar 131

Confidential 1299.8098 1.299.8098

1.299.8098 100% ladang/kebuncampuran

1259 KANAN

malabar 132

Confidential 1322.5340 1.322.5340

1.322.5340 100% ladang/kebuncampuran

1260 KANAN malabar 133

Confidential 2994.1697 502.9540 1.266.7302

2.491.2157 83% ladang/kebuncampuran

1261 KANAN

malabar 134 Confidential

3678.2631 703.2018 1.921.3327 2.975.0613 81% ladang/kebuncampuran

1262 KANAN malabar

135 Confidential

5137.2059 999.2673 2.424.2596 4.137.9386 81%

ladang/kebuncampuran

1263 KANAN

malabar 136 Confidential

2169.5067 496.3245 1.023.1655 1.673.1822 77%

ladang/kebuncampuran

Page 158: Download 2.56 MB

142 Appendix 2

AH No

Urut AREA DESA

No bidang ukur

NAMA PEMILIK

Luas Bidang

luas terkena

SISA LAHAN PADA KAKI TANGGUL

% JENIS PEMANFATAN

Bangunan

terkena kaki tanggul

terkena bibir sungai

P SP NP Luas Luas

Terkena

1264 KANAN malabar

137 Confidential

3715.6478 819.2267 1.531.5451 2.896.4211 78%

ladang/kebuncampuran

1265 KANAN

malabar 138 Confidential

2554.1644 626.6362 779.4686 1.927.5282 75%

ladang/kebuncampuran

1266 KANAN malabar 139

Confidential 1311.9711 222.5106

1.089.4605 83% ladang/kebuncampuran

1267 KANAN

malabar 140 Confidential

724.4996 280.6515 443.8481 61%

ladang/kebuncampuran

1268 KANAN malabar 141

Confidential 751.4324 177.3008

574.1316 76% ladang/kebuncampuran

1269 KANAN

malabar 142 Confidential

516.7288 190.6626 326.0662 63%

ladang/kebuncampuran

1270 KANAN malabar 143

Confidential 546.5398 181.5653

364.9745 67% ladang/kebuncampuran

1271 KANAN

malabar 144 Confidential

1192.6078 219.4370 973.1708 82%

ladang/kebuncampuran

1272 KANAN malabar

145 Confidential

1582.6083 62.2649 1.520.3434 96%

ladang/kebuncampuran

1273 KANAN

blokang 1 Confidential

3066.3537 507.6251 987.3205 2.558.7286 83% ladang/kebuncampuran

1274 KANAN blokang

2 Confidential

1723.6351 273.2053 510.0716 1.450.4298 84%

ladang/kebuncampuran

1275 KANAN

blokang 3 Confidential

1476.0435 394.5706 394.5706 1.081.4729 73%

ladang/kebuncampuran

1276 KANAN blokang 4

Confidential 1448.8815 227.6199 384.3452

1.221.2616 84% ladang/kebuncampuran

1277 KANAN

blokang 5 Confidential

1886.4627 300.7243 545.3913 1.585.7384 84%

ladang/kebuncampuran

1278 KANAN blokang

6 Confidential

1774.2734 284.8101 578.9074 1.489.4633 84%

ladang/kebuncampuran

1279 KANAN

blokang 7 Confidential

4651.5709 671.5077 1.728.8609 3.980.0632 86%

ladang/kebuncampuran

1280 KANAN blokang

8 Confidential

1678.2276

1.678.2276 100%

1281 KANAN

blokang 9 Confidential

1941.9181 1.941.9181 100%

1282 KANAN blokang

10 Confidential

779.1310 779.1310 100%

1283 KANAN

blokang 11 Confidential

1343.5538 1.343.5538 100%

Page 159: Download 2.56 MB

Appendix 2 143

AH No

Urut AREA DESA

No bidang ukur

NAMA PEMILIK

Luas Bidang

luas terkena

SISA LAHAN PADA KAKI TANGGUL

% JENIS PEMANFATAN

Bangunan

terkena kaki tanggul

terkena bibir sungai

P SP NP Luas Luas

Terkena

1284 KANAN blokang

12 Confidential

4463.1004 1.112.1004 2.068.6822 3.351.0000 75%

ladang/kebuncampuran

1285 KANAN

blokang 13 Confidential

2214.8837 570.6344 1.323.9303 1.644.2493 74%

ladang/kebuncampuran

1286 KANAN blokang 14

Confidential 446.3647 13.5155 432.8492 97%

ladang/kebuncampuran

1287 KANAN

blokang 15

Confidential 1410.2595

1.410.2595 100%

1288 KANAN blokang 16

Confidential 729.3880

729.3880 100%

1289 KANAN

blokang 17

Confidential 608.1410

608.1410 100%

1290 KANAN blokang 18

Confidential 890.2663

890.2663 100%

1291 KANAN

blokang 19

Confidential 1144.9351

1.144.9351 100%

1292 KANAN blokang 20

Confidential 1124.7003 313.9972 420.3235

810.7031 72% ladang/kebuncampuran

1293 KANAN

blokang 21

Confidential 2059.2796 540.2648 898.4741

1.519.0148 74% ladang/kebuncampuran

1294 KANAN blokang 22

Confidential 1465.1804 403.5655 590.4695

1.061.6149 72% ladang/kebuncampuran

1295 KANAN

blokang 23 Confidential

2051.3283 2.051.3283 100%

1296 KANAN blokang 24

Confidential 3218.3471 812.2764 920.6475

2.406.0707 75% ladang/kebuncampuran

1297 KANAN

blokang 25

Confidential 1626.8041 446.2832 404.4428

1.180.5209 73% ladang/kebuncampuran

1298 KANAN blokang 26

Confidential 3063.3868 998.3370 776.0905

2.065.0498 67% ladang/kebuncampuran

1299 KANAN

blokang 27

Confidential 4862.0791 2.608.9113 947.5653

2.253.1678 46% ladang/kebuncampuran

1300 KANAN blokang 28

Confidential 2715.0447

2.715.0447 100%

1301 KANAN

blokang 29

Confidential 11348.2757

11.348.2757 100%

1302 KANAN blokang 30

Confidential 1477.1322

1.477.1322 100%

1303 KANAN

blokang 31 Confidential

1023.3502 1.023.3502 100%

Page 160: Download 2.56 MB

144 Appendix 2

AH No

Urut AREA DESA

No bidang ukur

NAMA PEMILIK

Luas Bidang

luas terkena

SISA LAHAN PADA KAKI TANGGUL

% JENIS PEMANFATAN

Bangunan

terkena kaki tanggul

terkena bibir sungai

P SP NP Luas Luas

Terkena

1304 KANAN blokang

32 Confidential

1044.6665 1.044.6665 100%

1305 KANAN

blokang 33 Confidential

935.5888 8.1214 927.4674 99% ladang/kebuncampuran

1306 KANAN blokang

34 Confidential

1146.8977 131.1294 1.015.7683 89%

ladang/kebuncampuran

1307 KANAN

blokang 35 Confidential

1215.9005 990.0435 225.4463 225.8570 19%

ladang/kebuncampuran

1308 KANAN blokang

36 Confidential

1182.1269 910.7397 27.0884 271.3872 23%

ladang/kebuncampuran

1309 KANAN

blokang 37 Confidential

2213.6459 0.5450 2.213.1009 100%

ladang/kebuncampuran

1310 KANAN blokang

38 Confidential

721.1795 65.0123 656.1672 656.1672 91%

ladang/kebuncampuran

1311 KANAN

blokang 39 Confidential

1712.2924 1.367.9538 148.7960 344.3386 20%

ladang/kebuncampuran

1312 KANAN blokang 40

Confidential 1816.5285

1.816.5285 1.816.5285 100%

ladang/kebuncampuran

1313 KANAN

blokang 41 Confidential

1504.3533 580.5521 923.8012

923.8012 61% ladang/kebuncampuran

1314 KANAN blokang

42 Confidential

639.9906 639.9906 0.0000 0%

ladang/kebuncampuran

1315 KANAN

blokang 43 Confidential

815.7424 718.6886 97.0538 97.0538 12%

ladang/kebuncampuran

1316 KANAN blokang

44 Confidential

1147.5648 48.8495 1.098.7153 1.098.7153 96% ladang/kebuncampuran

1317 KANAN

blokang 45 Confidential

379.5622 379.5622 379.5622 100%

ladang/kebuncampuran

1318 KANAN blokang

46 Confidential

452.5416 452.5416 452.5416 100%

ladang/kebuncampuran

1319 KANAN

blokang 47 Confidential

1256.7665 686.7374 9.6226 570.0291 45%

ladang/kebuncampuran

1320 KANAN blokang

48 Confidential

159.0141 159.0141 159.0141 100%

ladang/kebuncampuran

1321 KANAN

blokang 49 Confidential

1068.7140 1.068.7140 1.068.7140 100%

ladang/kebuncampuran

1322 KANAN blokang

50 Confidential

650.8856 192.5288 276.4866 458.3568 70%

ladang/kebuncampuran

1323 KANAN

blokang 51 Confidential

1086.9407 446.9012 202.2835 640.0395 59%

ladang/kebuncampuran

Page 161: Download 2.56 MB

Appendix 2 145

AH No

Urut AREA DESA

No bidang ukur

NAMA PEMILIK

Luas Bidang

luas terkena

SISA LAHAN PADA KAKI TANGGUL

% JENIS PEMANFATAN

Bangunan

terkena kaki tanggul

terkena bibir sungai

P SP NP Luas Luas

Terkena

1324 KANAN blokang

52 Confidential

199.1888 199.1888 199.1888 100%

ladang/kebuncampuran

1325 KANAN

blokang 53 Confidential

397.5540 397.5540 397.5540 100%

ladang/kebuncampuran

1326 KANAN blokang 54

Confidential 711.6185

711.6185 711.6185 100%

ladang/kebuncampuran

1327 KANAN

blokang 55

Confidential 962.0756 527.8689 202.2835

434.2067 45% ladang/kebuncampuran

1328 KANAN blokang 56

Confidential 895.4397 546.3978 30.5499

349.0419 39% ladang/kebuncampuran

1329 KANAN

blokang 57

Confidential 601.3673 2.5722 598.7951

598.7951 100% ladang/kebuncampuran

1330 KANAN blokang 58

Confidential 1554.9776 362.1630 1.192.8146

1.192.8146 77% ladang/kebuncampuran

1331 KANAN

blokang 59

Confidential 1157.8054 473.5187

684.2867 59% ladang/kebuncampuran

1332 KANAN blokang 60

Confidential 954.7239 954.7239

954.7239 100% ladang/kebuncampuran

1333 KANAN

blokang 61

Confidential 240.4992 240.4992

240.4992 100% ladang/kebuncampuran

1334 KANAN blokang 62

Confidential 920.7131 529.0710 385.4130

391.6421 43% ladang/kebuncampuran

1335 KANAN

blokang 63 Confidential

649.8004 77.4607 572.3397 88%

ladang/kebuncampuran

1336 KANAN blokang 64

Confidential 265.8112

265.8112 100%

1337 KANAN

blokang 65

Confidential 2508.7668 429.8798 2.078.8870

2.078.8870 83% ladang/kebuncampuran

1338 KANAN blokang 66

Confidential 716.1186 716.1186

716.1186 100% ladang/kebuncampuran

1339 KANAN

blokang 67

Confidential 462.2518 377.3399 84.9119

84.9119 18% ladang/kebuncampuran

1340 KANAN blokang 68

Confidential 4186.1513 841.0457

3.345.1056 80% ladang/kebuncampuran

1341 KANAN

blokang 69

Confidential 1571.2758 1.173.8106 251.6983

397.4652 25% ladang/kebuncampuran

1342 KANAN blokang 70

Confidential 831.8868 2.3631 829.5237

829.5237 100% ladang/kebuncampuran

1343 KANAN

blokang 71 Confidential

550.1470 20.8421 529.3049 529.3049 96%

ladang/kebuncampuran

Page 162: Download 2.56 MB

146 Appendix 2

AH No

Urut AREA DESA

No bidang ukur

NAMA PEMILIK

Luas Bidang

luas terkena

SISA LAHAN PADA KAKI TANGGUL

% JENIS PEMANFATAN

Bangunan

terkena kaki tanggul

terkena bibir sungai

P SP NP Luas Luas

Terkena

1344 KANAN blokang

72 Confidential

453.8225 453.8225 453.8225 100%

ladang/kebuncampuran

1345 KANAN

blokang 73 Confidential

1105.8868 474.8095 74.4288 631.0773 57% ladang/kebuncampuran

1346 KANAN blokang

74 Confidential

1433.7968 543.6489 6.4012 890.1479 62%

ladang/kebuncampuran

1347 KANAN

blokang 75 Confidential

1672.8959 363.1165 1.309.7794 78%

ladang/kebuncampuran

1348 KANAN blokang

76 Confidential

1213.5853 1.213.5853 100%

1349 KANAN

blokang 77 Confidential

802.2531 802.2531 100%

1350 KANAN blokang

78 Confidential

1681.1606 1.681.1606 100%

1351 KANAN

blokang 79 Confidential

1252.1270 1.252.1270 100%

1352 KANAN blokang 80

Confidential 461.9775 461.9775 461.9775 100%

ladang/kebuncampuran

1353 KANAN

blokang 81 Confidential

606.7352 606.7352 606.7352 100% ladang/kebuncampuran

1354 KANAN blokang

82 Confidential

789.7090 437.8914 351.8176 351.8176 45%

ladang/kebuncampuran

1355 KANAN

blokang 83 Confidential

1614.2744 59.6956 1.554.5788 1.554.5788 96%

ladang/kebuncampuran

1356 KANAN blokang

84 Confidential

1161.7953 913.9441 36.9907 247.8512 21% ladang/kebuncampuran

1357 KANAN

blokang 85 Confidential

1550.0353 159.2695 1.390.7658 90%

ladang/kebuncampuran

1358 KANAN blokang

86 Confidential

1264.9121 1.264.9121 100%

1359 KANAN

blokang 87 Confidential

2296.8702 241.9676 2.054.9026 89%

ladang/kebuncampuran

1360 KANAN blokang

88 Confidential

1329.3475 863.9564 448.8162 465.3911 35%

ladang/kebuncampuran

1361 KANAN

blokang 89 Confidential

1072.8832 8.8498 1.064.0334 1.064.0334 99%

ladang/kebuncampuran

1362 KANAN blokang

90 Confidential

794.2455 794.2455 794.2455 100%

ladang/kebuncampuran

1363 KANAN

blokang 91 Confidential

1976.8926 1.976.8926 1.976.8926 100%

ladang/kebuncampuran

Page 163: Download 2.56 MB

Appendix 2 147

AH No

Urut AREA DESA

No bidang ukur

NAMA PEMILIK

Luas Bidang

luas terkena

SISA LAHAN PADA KAKI TANGGUL

% JENIS PEMANFATAN

Bangunan

terkena kaki tanggul

terkena bibir sungai

P SP NP Luas Luas

Terkena

1364 KANAN blokang

92 Confidential

948.9215 948.9215 100%

1365 KANAN

blokang 93 Confidential

3486.9349 1.338.1917 255.2542 2.148.7432 62%

ladang/kebuncampuran

1366 KANAN blokang 94

Confidential 552.7428 274.1947 215.0087 278.5481 50%

ladang/kebuncampuran

1367 KANAN

blokang 95

Confidential 1501.0759 707.0244 703.7015

794.0515 53% ladang/kebuncampuran

1368 KANAN blokang 96

Confidential 978.4633 401.8352 512.7781

576.6281 59% ladang/kebuncampuran

1369 KANAN

blokang 97

Confidential 210.0581 2.7488

207.3093 99% ladang/kebuncampuran

1370 KANAN blokang 98

Confidential 264.3513 198.7624

65.5889 25% ladang/kebuncampuran

1371 KANAN

blokang 99

Confidential 435.8546 233.5544

202.3002 46% ladang/kebuncampuran

1372 KANAN blokang 100

Confidential 957.5288 565.5131 392.0157

392.0157 41% ladang/kebuncampuran

1373 KANAN

blokang 101

Confidential 1896.1267 1.896.1267

1.896.1267 100% ladang/kebuncampuran

1374 KANAN blokang 102

Confidential 512.7330 512.7330

512.7330 100% ladang/kebuncampuran

1375 KANAN

blokang 103 Confidential

450.2583 450.2583 450.2583 100%

ladang/kebuncampuran

1376 KANAN blokang 104

Confidential 821.7674 821.7674

821.7674 100% ladang/kebuncampuran

1377 KANAN

blokang 105

Confidential 895.2948 895.2948

895.2948 100% ladang/kebuncampuran

1378 KANAN blokang 106

Confidential 826.8921 826.8921

826.8921 100% ladang/kebuncampuran

1379 KANAN

blokang 107

Confidential 3878.5571 1.555.2861 2.118.0044

2.323.2710 60% ladang/kebuncampuran

1380 KANAN blokang 108

Confidential 398.5737 100.1610

298.4127 75% ladang/kebuncampuran

1381 KANAN

blokang 109

Confidential 760.3545 289.5152

470.8393 62% ladang/kebuncampuran

1382 KANAN blokang 110

Confidential 645.5319 643.7595

1.7724 0% ladang/kebuncampuran

1383 KANAN

blokang 111 Confidential

653.5618 153.2729 500.2889 77%

ladang/kebuncampuran

Page 164: Download 2.56 MB

148 Appendix 2

AH No

Urut AREA DESA

No bidang ukur

NAMA PEMILIK

Luas Bidang

luas terkena

SISA LAHAN PADA KAKI TANGGUL

% JENIS PEMANFATAN

Bangunan

terkena kaki tanggul

terkena bibir sungai

P SP NP Luas Luas

Terkena

1384 KANAN blokang

112 Confidential

1561.1691 154.1597 1.407.0094

1.407.0094 90% ladang/kebuncampuran

1385 KANAN

blokang 113 Confidential

558.6010 558.6010 558.6010 100% ladang/kebuncampuran

1386 KANAN blokang

114 Confidential

330.5222 330.5222 330.5222 100%

ladang/kebuncampuran

1387 KANAN

blokang 115 Confidential

637.3444 637.3444 637.3444 100%

ladang/kebuncampuran

1388 KANAN blokang

116 Confidential

709.8924 709.8924 709.8924 100%

ladang/kebuncampuran

1389 KANAN

blokang 117 Confidential

1170.9142 1.170.9142 1.170.9142 100%

ladang/kebuncampuran

1390 KANAN blokang

118 Confidential

588.7000 434.7162 54.5365 153.9838 26%

ladang/kebuncampuran

1391 KANAN

blokang 119 Confidential

1014.7519 694.0491 310.0828 320.7028 32%

ladang/kebuncampuran

1392 KANAN blokang 120

Confidential 480.8906 480.8906 480.8906 100%

ladang/kebuncampuran

1393 KANAN

blokang 121 Confidential

1521.6467 1.521.6467 1.521.6467 100% ladang/kebuncampuran

1394 KANAN blokang

122 Confidential

1369.4140 1.369.4140 1.369.4140 100%

ladang/kebuncampuran

1395 KANAN

blokang 123 Confidential

1410.6479 1.410.6479 1.410.6479 100%

ladang/kebuncampuran

1396 KANAN blokang

124 Confidential

675.2263 122.7175 552.5088

552.5088 82% ladang/kebuncampuran

1397 KANAN

blokang 125 Confidential

634.8319 102.8337 531.9982 531.9982 84%

ladang/kebuncampuran

1398 KANAN blokang

126 Confidential

1133.2679 1.133.2679 0.0000 0%

ladang/kebuncampuran

1399 KANAN

blokang 127 Confidential

797.2397 797.2397 797.2397 100%

ladang/kebuncampuran

1400 KANAN blokang

128 Confidential

1438.3384 845.5984 592.7400 592.7400 41%

ladang/kebuncampuran

1401 KANAN

blokang 129 Confidential

1102.9742 1.102.9742 1.102.9742 100%

ladang/kebuncampuran

1402 KANAN blokang

130 Confidential

1271.5674 1.271.5674 1.271.5674 100%

ladang/kebuncampuran

1403 KANAN

blokang 131 Confidential

2585.5882 2.585.5882 2.585.5882 100%

ladang/kebuncampuran

Page 165: Download 2.56 MB

Appendix 2 149

AH No

Urut AREA DESA

No bidang ukur

NAMA PEMILIK

Luas Bidang

luas terkena

SISA LAHAN PADA KAKI TANGGUL

% JENIS PEMANFATAN

Bangunan

terkena kaki tanggul

terkena bibir sungai

P SP NP Luas Luas

Terkena

1404 KANAN blokang

132 Confidential

2133.9376 2.133.9376 2.133.9376 100%

ladang/kebuncampuran

1405 KANAN

blokang 133 Confidential

664.3250 87.3517 576.9733 576.9733 87%

ladang/kebuncampuran

1406 KANAN blokang 134

Confidential 586.2511 586.2511 0.0000 0%

ladang/kebuncampuran

1407 KANAN

blokang 135

Confidential 431.3728 162.5610 268.8118

268.8118 62% ladang/kebuncampuran

1408 KANAN blokang 136

Confidential 465.9403 7.5954 458.3449

458.3449 98% ladang/kebuncampuran

1409 KANAN

blokang 137

Confidential 628.3010 628.3010

628.3010 100% ladang/kebuncampuran

1410 KANAN blokang 138

Confidential 828.3857 828.3857

828.3857 100% ladang/kebuncampuran

1411 KANAN

blokang 139

Confidential 3201.6450 803.3008 2.398.3442

2.398.3442 75% ladang/kebuncampuran

1412 KANAN blokang 140

Confidential 188.8376 188.8376

188.8376 100% ladang/kebuncampuran

1413 KANAN

blokang 141

Confidential 162.0765 162.0765

162.0765 100% ladang/kebuncampuran

1414 KANAN blokang 142

Confidential 158.1602 158.1602

158.1602 100% ladang/kebuncampuran

1415 KANAN

blokang 143 Confidential

171.3840 171.3840 171.3840 100%

ladang/kebuncampuran

1416 KANAN blokang 144

Confidential 160.7760 160.7760

160.7760 100% ladang/kebuncampuran

1417 KANAN

blokang 145

Confidential 271.7990 271.7990

271.7990 100% ladang/kebuncampuran

1418 KANAN blokang 146

Confidential 272.2370 272.2370

272.2370 100% ladang/kebuncampuran

1419 KANAN

blokang 147

Confidential 283.1280 6.0207 277.1073

277.1073 98% ladang/kebuncampuran

1420 KANAN blokang 148

Confidential 305.1733 237.7531 67.4202

67.4202 22% ladang/kebuncampuran

1421 KANAN

blokang 149

Confidential 860.3564 860.3564

860.3564 100% ladang/kebuncampuran

1422 KANAN blokang 150

Confidential 1339.3953 581.8852 599.5007

757.5101 57% ladang/kebuncampuran

1423 KANAN

blokang 151 Confidential

858.5105 173.7718 534.9433 684.7387 80%

ladang/kebuncampuran

Page 166: Download 2.56 MB

150 Appendix 2

AH No

Urut AREA DESA

No bidang ukur

NAMA PEMILIK

Luas Bidang

luas terkena

SISA LAHAN PADA KAKI TANGGUL

% JENIS PEMANFATAN

Bangunan

terkena kaki tanggul

terkena bibir sungai

P SP NP Luas Luas

Terkena

1424 KANAN blokang

152 Confidential

623.2731 623.2731 623.2731 100% ladang/kebuncampuran

1425 KANAN

blokang 153 Confidential

1253.7030 385.9650 867.7380

867.7380 69% ladang/kebuncampuran

1426 KANAN blokang

154 Confidential

520.6895 520.6895 520.6895 100%

ladang/kebuncampuran

1427 KANAN

blokang 155 Confidential

751.4375 751.4375 751.4375 100%

ladang/kebuncampuran

1428 KANAN blokang

156 Confidential

810.1098 339.5370 368.4950 470.5728 58%

ladang/kebuncampuran

1429 KANAN

blokang 157 Confidential

933.1070 372.3323 460.0589 560.7747 60%

ladang/kebuncampuran

1430 KANAN blokang

158 Confidential

1032.3969 1.032.3969 1.032.3969 100%

ladang/kebuncampuran

1431 KANAN

blokang 159 Confidential

1052.9777 1.052.9777 1.052.9777 100%

ladang/kebuncampuran

1432 KANAN blokang 160

Confidential 1252.6370

1.252.6370 1.252.6370 100%

ladang/kebuncampuran

1433 KANAN

blokang 161 Confidential

1459.0614 1.000.7123 341.8253 458.3491 31% ladang/kebuncampuran

1434 KANAN blokang

162 Confidential

3649.8492 617.3872 3.032.4620 3.032.4620 83%

ladang/kebuncampuran

1435 KANAN

blokang 163 Confidential

731.1889 527.8179 203.3710 28%

ladang/kebuncampuran

1436 KANAN blokang

164 Confidential

5575.7885 1.272.9490 3.468.4528 4.302.8395 77% ladang/kebuncampuran

1437 KANAN

blokang 165 Confidential

3321.3776 805.5778 2.054.9215 2.515.7998 76%

ladang/kebuncampuran

1438 KANAN blokang

166 Confidential

3091.0119 734.2033 1.916.0887 2.356.8086 76%

ladang/kebuncampuran

1439 KANAN

blokang 167 Confidential

2739.3362 671.4714 1.622.4065 2.067.8648 75%

ladang/kebuncampuran

1440 KANAN blokang

168 Confidential

1595.4737 399.2264 917.1631 1.196.2473 75%

ladang/kebuncampuran

1441 KANAN

blokang 169 Confidential

687.6559 687.6559 687.6559 100%

ladang/kebuncampuran

1442 KANAN blokang

170 Confidential

338.2652 94.8817 243.3835 243.3835 72%

ladang/kebuncampuran

1443 KANAN

blokang 171 Confidential

1366.2778 345.6405 1.020.6373 75%

ladang/kebuncampuran

Page 167: Download 2.56 MB

Appendix 2 151

AH No

Urut AREA DESA

No bidang ukur

NAMA PEMILIK

Luas Bidang

luas terkena

SISA LAHAN PADA KAKI TANGGUL

% JENIS PEMANFATAN

Bangunan

terkena kaki tanggul

terkena bibir sungai

P SP NP Luas Luas

Terkena

1444 KANAN blokang

172 Confidential

1753.1236 456.1870 1.296.9366 1.296.9366 74%

ladang/kebuncampuran

1445 KANAN

blokang 173 Confidential

794.1695 246.3608 547.8087 547.8087 69%

ladang/kebuncampuran

1446 KANAN blokang 174

Confidential 755.8648 169.4306 586.4342 78%

ladang/kebuncampuran

1447 KANAN

blokang 175

Confidential 702.8584 147.9384

554.9200 79% ladang/kebuncampuran

1448 KANAN blokang 176

Confidential 887.4633 248.0062 374.9939

639.4571 72% ladang/kebuncampuran

1449 KANAN

blokang 177

Confidential 233.3346 233.3346

233.3346 100% ladang/kebuncampuran

1450 KANAN blokang 178

Confidential 471.0463 219.4753 98.1226

251.5710 53% ladang/kebuncampuran

1451 KANAN

blokang 179

Confidential 741.6970 238.1607 356.8065

503.5363 68% ladang/kebuncampuran

1452 KANAN blokang 180

Confidential 710.1329 139.6207 180.9835

570.5122 80% ladang/kebuncampuran

1453 KANAN

blokang 181

Confidential 673.8755 140.9233 187.0371

532.9522 79% ladang/kebuncampuran

1454 KANAN blokang 182

Confidential 628.0375 282.3086 345.7289

345.7289 55% ladang/kebuncampuran

1455 KANAN

blokang 183 Confidential

851.1666 55.7625 795.4041 93%

ladang/kebuncampuran

1456 KANAN blokang 184

Confidential 987.9873 264.9785 232.1157

723.0088 73% ladang/kebuncampuran

1457 KANAN

blokang 185

Confidential 971.2524 316.6748 654.5776

654.5776 67% ladang/kebuncampuran

1458 KANAN blokang 186

Confidential 1060.7355 351.1565

709.5790 67% ladang/kebuncampuran

1459 KANAN

blokang 187

Confidential 1032.9868 463.3963 569.5905

569.5905 55% ladang/kebuncampuran

1460 KANAN blokang 188

Confidential 1013.4969 365.3954

648.1015 64% ladang/kebuncampuran

1461 KANAN

blokang 189

Confidential 727.3586 408.0508 319.3078

319.3078 44% ladang/kebuncampuran

1462 KANAN blokang 190

Confidential 942.3334 262.2407

680.0927 72% ladang/kebuncampuran

1463 KANAN

blokang 191 Confidential

1753.4957 1.017.1829 490.7231 736.3128 42%

ladang/kebuncampuran

Page 168: Download 2.56 MB

152 Appendix 2

AH No

Urut AREA DESA

No bidang ukur

NAMA PEMILIK

Luas Bidang

luas terkena

SISA LAHAN PADA KAKI TANGGUL

% JENIS PEMANFATAN

Bangunan

terkena kaki tanggul

terkena bibir sungai

P SP NP Luas Luas

Terkena

1464 KANAN blokang

192 Confidential

1759.6131 110.6900 1.648.9231 94% ladang/kebuncampuran

1465 KANAN

blokang 193 Confidential

928.5702 928.5702 100%

1466 KANAN blokang

194 Confidential

3257.5303 1.479.4659 1.287.8045 1.778.0644 55%

ladang/kebuncampuran

1467 KANAN

blokang 195 Confidential

383.4960 383.4960 100%

1468 KANAN blokang

196 Confidential

832.7643 21.0808 811.6835 97%

ladang/kebuncampuran

1469 KANAN

blokang 197 Confidential

1056.5209 479.5376 576.9833 55%

ladang/kebuncampuran

1470 KANAN blokang 198

Confidential 997.4544 602.0105

395.4439 40% ladang/kebuncampuran

1471 KANAN

nagara 1 Confidential

741.5560 4.8277 736.7283 736.7283 99% ladang/kebuncampuran

1472 KANAN nagara

2 Confidential

3068.9060 1.566.2334 1.427.6672 1.502.6726 49%

ladang/kebuncampuran

1473 KANAN

nagara 3 Confidential

1584.2060 16.3631 1.567.8429 99%

ladang/kebuncampuran

1474 KANAN nagara

4 Confidential

671.4110 259.2336

412.1774 61% ladang/kebuncampuran

1475 KANAN

nagara 5 Confidential

1800.2470 1.278.0948 21.7220 522.1522 29%

pekarangan 1

1476 KANAN nagara

6 Confidential

741.1150 88.6000 652.5150 652.5150 88%

ladang/kebuncampuran

1477 KANAN

nagara 7 Confidential

557.4620 3.9694 553.4926 553.4926 99%

ladang/kebuncampuran

1478 KANAN nagara

8 Confidential

365.2210 365.2210

365.2210 100% ladang/kebuncampuran

1479 KANAN

nagara 9 Confidential

454.3750 373.4552 74.7613 80.9198 18%

pekarangan 1 58

1480 KANAN nagara

10 Confidential

310.0190 218.9027 91.1163 91.1163 29%

pekarangan 1 86

1481 KANAN

nagara 11 Confidential

295.9770 168.5225 127.4545 127.4545 43%

pekarangan 1 84

1482 KANAN nagara

12 Confidential

185.6311 45.1234

140.5077 76% pekarangan 1 109 22

1483 KANAN

nagara 13 Confidential

219.9451 142.9837

76.9614 35% pekarangan 1 45 37

Page 169: Download 2.56 MB

Appendix 2 153

AH No

Urut AREA DESA

No bidang ukur

NAMA PEMILIK

Luas Bidang

luas terkena

SISA LAHAN PADA KAKI TANGGUL

% JENIS PEMANFATAN

Bangunan

terkena kaki tanggul

terkena bibir sungai

P SP NP Luas Luas

Terkena

1484 KANAN nagara 14

Confidential 0.0000

pekarangan 1 50

1485 KANAN

nagara 15

Confidential 106.5944

106.5944 0.0000 0%

pekarangan 1 91

1486 KANAN nagara 16

Confidential 105.0207

105.0207 0.0000 0%

pekarangan 1 41

1487 KANAN

nagara 17

Confidential 333.3980

136.4213 196.9767 59%

pekarangan 1

1488 KANAN nagara 18

Confidential 723.0972

723.0972 723.0972 100%

ladang/kebuncampuran

1489 KANAN

nagara 19

Confidential 161.9880 161.9880

161.9880 100% ladang/kebuncampuran

1490 KANAN nagara 20

Confidential 671.9310 671.9310

671.9310 100% ladang/kebuncampuran

1491 KANAN

nagara 21

Confidential 307.2100 74.1332

233.0768 76% pekarangan 2 40

1492 KANAN nagara 22

Confidential 294.5670 38.1579

256.4091 87% pekarangan 1 19.9984

1493 KANAN

nagara 23 Confidential

1128.9170 5.0108 1.123.9062 100%

pekarangan 1

1494 KANAN nagara 24

Confidential 268.7380 268.7380

268.7380 100% ladang/kebuncampuran

1495 KANAN

nagara 25

Confidential 827.5056

433.2932 394.2124 48%

pekarangan 1

118 22.5

1496 KANAN nagara 26

Confidential 1369.1144

807.1080 562.0064 41%

ladang/kebuncampuran

1497 KANAN

nagara 27

Confidential 443.3029

385.3953 57.9076 13%

sawah

1498 KANAN nagara 28

Confidential 417.6805

410.2634 7.4171 2%

sawah

1499 KANAN

nagara 29

Confidential 846.6050 846.6050

846.6050 100% ladang/kebuncampuran

1500 KANAN nagara 30

Confidential 503.8650 503.8650

503.8650 100% ladang/kebuncampuran

1501 KANAN

nagara 31 Confidential

690.1530 690.1530 690.1530 100%

pekarangan 2 64

1502 KANAN nagara

32 Confidential

395.6884 326.7591 68.9293 17% sawah

1503 KANAN

nagara 33 Confidential

831.0897 589.4308 241.6589 29% sawah

Page 170: Download 2.56 MB

154 Appendix 2

AH No

Urut AREA DESA

No bidang ukur

NAMA PEMILIK

Luas Bidang

luas terkena

SISA LAHAN PADA KAKI TANGGUL

% JENIS PEMANFATAN

Bangunan

terkena kaki tanggul

terkena bibir sungai

P SP NP Luas Luas

Terkena

1504 KANAN nagara

34 Confidential

403.9665 369.8772

34.0893 8% sawah

1505 KANAN

nagara 35 Confidential

498.6940 498.6940 498.6940 100%

ladang/kebuncampuran

1506 KANAN nagara

36 Confidential

304.1330 304.1330 304.1330 100%

ladang/kebuncampuran

1507 KANAN

nagara 37 Confidential

343.8250 343.8250 343.8250 100%

ladang/kebuncampuran

1508 KANAN nagara

38 Confidential

289.8620 289.8620 289.8620 100%

ladang/kebuncampuran

1509 KANAN

nagara 39 Confidential

225.4850 225.4850 225.4850 100%

pekarangan 1 112

1510 KANAN nagara 40

Confidential 621.2039

491.2713 129.9326 21%

sawah

1511 KANAN

nagara 41 Confidential

499.6018 391.0040 108.5978 22% sawah

1512 KANAN nagara

42 Confidential

495.3550 11.3926 483.9624 483.9624 98%

ladang/kebuncampuran

1513 KANAN

nagara 43 Confidential

734.2920 28.4803 705.8117 705.8117 96%

pekarangan 2 146 21

1514 KANAN nagara

44 Confidential

172.2500 34.3319

137.9181 137.9181 80%

pekarangan 1 151 28

1515 KANAN

nagara 45 Confidential

416.2208 304.7347

111.4861 27% pekarangan 1 56

1516 KANAN nagara

46 Confidential

316.5978 208.1909

108.4069 34% pekarangan 1 52

1517 KANAN

nagara 47 Confidential

371.9910 215.9070 156.0840 42%

pekarangan 1 143

1518 KANAN nagara

48 Confidential

720.2600 97.4510 622.8090 622.8090 86%

pekarangan 1 1 198.901

6 81

1519 KANAN

nagara 49 Confidential

543.5310 163.0989 380.4321

380.4321 70% pekarangan 1 1 120 69

1520 KANAN nagara

50 Confidential

407.8600 161.3115 246.5485

246.5485 60% pekarangan 1 1 116

1521 KANAN

nagara 51 Confidential

423.7230 192.0859 231.6371 231.6371 55%

pekarangan 2 42

1522 KANAN nagara

52 Confidential

429.9280 212.3851 217.5429 217.5429 51%

pekarangan 1 162

1523 KANAN

nagara 53 Confidential

461.7880 241.6942 220.0938 220.0938 48%

pekarangan 2 169.5

Page 171: Download 2.56 MB

Appendix 2 155

AH No

Urut AREA DESA

No bidang ukur

NAMA PEMILIK

Luas Bidang

luas terkena

SISA LAHAN PADA KAKI TANGGUL

% JENIS PEMANFATAN

Bangunan

terkena kaki tanggul

terkena bibir sungai

P SP NP Luas Luas

Terkena

1524 KANAN nagara 54

Confidential 854.5160

854.5160 854.5160 100% ladang/kebuncampuran

1525 KANAN

nagara 55

Confidential 163.2790

163.2790 163.2790 100% ladang/kebuncampuran

1526 KANAN nagara 56

Confidential 396.0480

396.0480 396.0480 100% ladang/kebuncampuran

1527 KANAN

nagara 57

Confidential 765.2750 171.1287 594.1463

594.1463 78% pekarangan 1 1 86

1528 KANAN nagara 58

Confidential 299.6440

269.0310 24.2999 30.6130 10%

pekarangan 1 174

1529 KANAN

nagara 59

Confidential 505.8028

450.8869 5.2072 54.9159 11%

pekarangan 1 294.029

6

1530 KANAN nagara 60

Confidential 519.1010 454.5505

64.5505 12% pekarangan 1 153

1531 KANAN

nagara 61

Confidential 423.3810

146.8076 276.5734 276.5734 65%

ladang/kebuncampuran

1532 KANAN nagara 62

Confidential 808.3140 808.3140

808.3140 100% ladang/kebuncampuran

1533 KANAN

nagara 63 Confidential

354.7280 354.7280 354.7280 100%

ladang/kebuncampuran

1534 KANAN nagara 64

Confidential 295.2200 295.2200

295.2200 100% ladang/kebuncampuran

1535 KANAN

nagara 65

Confidential 3140.7060 192.0218 2.948.6842

2.948.6842 94% ladang/kebuncampuran

1536 KANAN nagara 66

Confidential 1222.1000 898.1042 209.3012

323.9958 27% pekarangan 2 261

1537 KANAN

nagara 67

Confidential 481.4252 395.3916

86.0336 18% ladang/kebuncampuran

1538 KANAN nagara 68

Confidential 616.2198 452.4159

163.8039 27% pekarangan 3

275.5384 151

1539 KANAN

nagara 69

Confidential 1824.0855 841.1423 804.0582

982.9432 54% pekarangan 1 171

851.569

1540 KANAN nagara 70

Confidential 1725.0170 1.725.0170

1.725.0170 100% ladang/kebuncampuran

1541 KANAN

nagara 71 Confidential

230.9836 230.9836 230.9836 100%

ladang/kebuncampuran

1542 KANAN nagara

72 Confidential

334.8036

334.8036 334.8036 100%

ladang/kebuncampuran

1543 KANAN

nagara 73 Confidential

625.6151 350.4445

275.1706 275.1706 44%

ladang/kebuncampuran

Page 172: Download 2.56 MB

156 Appendix 2

AH No

Urut AREA DESA

No bidang ukur

NAMA PEMILIK

Luas Bidang

luas terkena

SISA LAHAN PADA KAKI TANGGUL

% JENIS PEMANFATAN

Bangunan

terkena kaki tanggul

terkena bibir sungai

P SP NP Luas Luas

Terkena

1544 KANAN nagara

74 Confidential

176.4804 46.5466

129.9338 74% pekarangan 1 136 33

1545 KANAN

nagara 75 Confidential

115.5126 11.8844 103.6282 90%

ladang/kebuncampuran

1546 KANAN nagara

76 Confidential

55.7225 55.7225 100%

1 100

1547 KANAN

nagara 77 Confidential

633.3205 483.5754 149.7451 24%

pekarangan 3 189.798

2

1548 KANAN nagara

78 Confidential

799.8425 298.6007 501.2418 501.2418 63%

ladang/kebuncampuran

1549 KANAN

nagara 79 Confidential

1094.6133 61.6822 1.032.9311 1.032.9311 94%

ladang/kebuncampuran

1550 KANAN nagara 80

Confidential 1914.4724

1.914.4724 1.914.4724 100% ladang/kebuncampuran

1551 KANAN

nagara 81 Confidential

460.9124 460.9124 460.9124 100% ladang/kebuncampuran

1552 KANAN nagara

82 Confidential

368.5011 368.5011 368.5011 100%

ladang/kebuncampuran

1553 KANAN

nagara 83 Confidential

429.4884 5.8901 423.5983 423.5983 99%

ladang/kebuncampuran

1554 KANAN nagara

84 Confidential

958.8127 619.5686 48.2122 339.2441 35% ladang/kebuncampuran

1555 KANAN

nagara 85 Confidential

1502.4317 862.9315 639.5002 639.5002 43%

ladang/kebuncampuran

1556 KANAN nagara

86 Confidential

1066.2996 1.066.2996 1.066.2996 100%

ladang/kebuncampuran

1557 KANAN

nagara 87 Confidential

2569.3017 2.569.3017 2.569.3017 100%

ladang/kebuncampuran

1558 KANAN nagara

88 Confidential

1113.8956 1.113.8956 1.113.8956 100%

ladang/kebuncampuran

1559 KANAN

nagara 89 Confidential

2585.0232 2.585.0232 2.585.0232 100%

ladang/kebuncampuran

1560 KANAN nagara

90 Confidential

580.4772 580.4772 580.4772 100%

ladang/kebuncampuran

1561 KANAN

nagara 91 Confidential

1072.6430 769.5937 303.0493 303.0493 28%

ladang/kebuncampuran

1562 KANAN nagara

92 Confidential

1559.5490 1.211.4178 348.1312 348.1312 22%

ladang/kebuncampuran

1563 KANAN

nagara 93 Confidential

2433.6940 2.433.6940 2.433.6940 100%

ladang/kebuncampuran

Page 173: Download 2.56 MB

Appendix 2 157

AH No

Urut AREA DESA

No bidang ukur

NAMA PEMILIK

Luas Bidang

luas terkena

SISA LAHAN PADA KAKI TANGGUL

% JENIS PEMANFATAN

Bangunan

terkena kaki tanggul

terkena bibir sungai

P SP NP Luas Luas

Terkena

1564 KANAN nagara 94

Confidential 657.4030

657.4030 657.4030 100%

ladang/kebuncampuran

1565 KANAN

nagara 95

Confidential 402.1050 402.1050

402.1050 100% ladang/kebuncampuran

1566 KANAN nagara 96

Confidential 193.8428 193.8428

193.8428 100% ladang/kebuncampuran

1567 KANAN

nagara 97

Confidential 1091.3730 1.091.3730

1.091.3730 100% ladang/kebuncampuran

1568 KANAN nagara 98

Confidential 1329.7740 1.329.7740

1.329.7740 100% ladang/kebuncampuran

1569 KANAN

nagara 99

Confidential 1563.4350 1.563.4350

1.563.4350 100% ladang/kebuncampuran

1570 KANAN nagara 100

Confidential 854.3930 590.8462 263.5468

263.5468 31% ladang/kebuncampuran

1571 KANAN

nagara 101

Confidential 748.3850 720.6189

27.7661 4% ladang/kebuncampuran

1572 KANAN nagara 102

Confidential 296.6690 296.6690

0.0000 0% ladang/kebuncampuran

1573 KANAN

nagara 103 Confidential

552.9010 493.9682 58.9328 58.9328 11%

ladang/kebuncampuran

1574 KANAN nagara 104

Confidential 1080.4500 616.2759 288.8847

464.1741 43% ladang/kebuncampuran

1575 KANAN

nagara 105

Confidential 1212.6440 1.212.6440

1.212.6440 100% ladang/kebuncampuran

1576 KANAN nagara 106

Confidential 2590.2650 2.590.2650

2.590.2650 100% ladang/kebuncampuran

1577 KANAN

nagara 107

Confidential 802.5970 802.5970

802.5970 100% ladang/kebuncampuran

1578 KANAN nagara 108

Confidential 2519.4100 129.8267 2.389.5833

2.389.5833 95% ladang/kebuncampuran

1579 KANAN

nagara 109

Confidential 9561.9270 2.623.3093 5.962.7702

6.938.6177 73% ladang/kebuncampuran

1580 KANAN nagara 110

Confidential 2434.6650 639.9539 1.794.7111

1.794.7111 74% ladang/kebuncampuran

1581 KANAN

nagara 111 Confidential

2529.5370 457.7491 2.071.7879 2.071.7879 82%

ladang/kebuncampuran

1582 KANAN nagara

112 Confidential

3350.4740 112.3048 3.238.1692

3.238.1692 97% ladang/kebuncampuran

1583 KANAN

nagara 113 Confidential

3358.1860 1.966.1503 1.392.0357

1.392.0357 41% ladang/kebuncampuran

Page 174: Download 2.56 MB

158 Appendix 2

AH No

Urut AREA DESA

No bidang ukur

NAMA PEMILIK

Luas Bidang

luas terkena

SISA LAHAN PADA KAKI TANGGUL

% JENIS PEMANFATAN

Bangunan

terkena kaki tanggul

terkena bibir sungai

P SP NP Luas Luas

Terkena

1584 KANAN nagara

114 Confidential

49753.3862 9.971.3963 4.816.7668 39.781.9899 80%

ladang/kebuncampuran

1585 KANAN

nagara 115 Confidential

3335.3805 2.698.7652 362.2201 636.6153 19%

ladang/kebuncampuran

1586 KANAN nagara

116 Confidential

1725.7365 1.440.9051 182.6068 284.8314 17%

ladang/kebuncampuran

1587 KANAN

nagara 117 Confidential

2573.8007 1.792.4303 362.6240 781.3704 30%

ladang/kebuncampuran

1588 KANAN nagara

118 Confidential

1356.0855 955.7977 299.7763 400.2878 30%

ladang/kebuncampuran

1589 KANAN

nagara 119 Confidential

1138.9831 864.4309 262.5445 274.5522 24%

ladang/kebuncampuran

1590 KANAN nagara 120

Confidential 1070.7421 694.0107 316.9229 376.7314 35%

ladang/kebuncampuran

1591 KANAN

nagara 121 Confidential

1796.0095 965.3617

830.6478 830.6478 46%

ladang/kebuncampuran

1592 KANAN nagara

122 Confidential

2636.8207 851.4969 1.785.3238 1.785.3238 68%

ladang/kebuncampuran

1593 KANAN

nagara 123 Confidential

2677.2690 1.016.0529 1.661.2161 1.661.2161 62%

ladang/kebuncampuran

1594 KANAN nagara

124 Confidential

916.8902 916.8902 916.8902 100%

ladang/kebuncampuran

1595 KANAN

nagara 125 Confidential

768.5057 431.8341 336.6716 336.6716 44%

sawah

1596 KANAN nagara

126 Confidential

792.8606 478.2390 314.6216 40%

sawah

1597 KANAN

nagara 127 Confidential

855.0070 587.4336 267.5734 31%

sawah

1598 KANAN nagara

128 Confidential

467.3236 184.2585 283.0651 283.0651 61%

sawah

1599 KANAN

nagara 129 Confidential

693.9979 693.9979

693.9979 100% ladang/kebuncampuran

1600 KANAN nagara

130 Confidential

1478.6318 390.3256 1.088.3062

1.088.3062 74% ladang/kebuncampuran

1601 KANAN

nagara 131 Confidential

615.1359 350.6406 264.4953 264.4953 43%

sawah

1602 KANAN nagara

132 Confidential

773.4740 292.8935 480.5805 62%

sawah

1603 KANAN

nagara 133 Confidential

1286.5340 215.6156 1.070.9184 83%

sawah

Page 175: Download 2.56 MB

Appendix 2 159

AH No

Urut AREA DESA

No bidang ukur

NAMA PEMILIK

Luas Bidang

luas terkena

SISA LAHAN PADA KAKI TANGGUL

% JENIS PEMANFATAN

Bangunan

terkena kaki tanggul

terkena bibir sungai

P SP NP Luas Luas

Terkena

1604 KANAN nagara 134

Confidential 432.0470

418.1010 13.9460 3% sawah

1605 KANAN

nagara 135

Confidential 912.1370 4.0949

908.0421 100% ladang/kebuncampuran

1606 KANAN nagara 136

Confidential 1031.9200 635.2995 377.8767

396.6205 38% ladang/kebuncampuran

1607 KANAN

nagara 137

Confidential 866.6598

433.5864 193.1282 433.0734 50%

ladang/kebuncampuran

1608 KANAN nagara 138

Confidential 1848.2816

930.9256 152.2685 917.3560 50%

ladang/kebuncampuran

1609 KANAN

nagara 139

Confidential 1229.8155

1.229.8155 100%

1610 KANAN nagara 140

Confidential 960.5907

960.5907 100%

1611 KANAN

nagara 141

Confidential 387.5316

74.6045 312.9271 81%

ladang/kebuncampuran

1612 KANAN nagara 142

Confidential 1847.8139 951.7270

896.0869 48% ladang/kebuncampuran

1613 KANAN

nagara 143 Confidential

797.7636 797.7636 100%

1614 KANAN nagara 144

Confidential 701.3055

701.3055 100%

1615 KANAN

nagara 145

Confidential 781.5745 53.5461

728.0284 93% ladang/kebuncampuran

1616 KANAN nagara 146

Confidential 340.7010

340.7010 100%

1617 KANAN

nagara 147

Confidential 2576.6327 2.133.2724 266.5211

443.3603 17% ladang/kebuncampuran

1618 KANAN nagara 148

Confidential 1432.0633 203.8920

1.228.1713 86% ladang/kebuncampuran

1619 KANAN

nagara 149

Confidential 1292.7895 656.9119 635.8776

635.8776 49% ladang/kebuncampuran

1620 KANAN nagara 150

Confidential 929.0070 116.4925

812.5145 87% ladang/kebuncampuran

1621 KANAN

nagara 151 Confidential

692.6400 112.0687 580.5713 84%

ladang/kebuncampuran

1622 KANAN nagara

152 Confidential

544.1950 66.8864 477.3086 88%

ladang/kebuncampuran

1623 KANAN

nagara 153 Confidential

1552.2846 858.0689 694.2157

694.2157 45% ladang/kebuncampuran

Page 176: Download 2.56 MB

160 Appendix 2

AH No

Urut AREA DESA

No bidang ukur

NAMA PEMILIK

Luas Bidang

luas terkena

SISA LAHAN PADA KAKI TANGGUL

% JENIS PEMANFATAN

Bangunan

terkena kaki tanggul

terkena bibir sungai

P SP NP Luas Luas

Terkena

1624 KANAN nagara

154 Confidential

1320.1250 57.1645 1.262.9605 96%

ladang/kebuncampuran

1625 KANAN

nagara 155 Confidential

725.8158 725.8158 100%

1626 KANAN nagara

156 Confidential

884.5731 59.9331 824.6400 93%

ladang/kebuncampuran

1627 KANAN

nagara 157 Confidential

915.5762 466.4652 449.1110 49%

ladang/kebuncampuran

1628 KANAN nagara

158 Confidential

1466.9654 743.1191 723.8463 723.8463 49%

ladang/kebuncampuran

1629 KANAN

nagara 159 Confidential

245.7500 245.7500 245.7500 100%

ladang/kebuncampuran

1630 KANAN nagara 160

Confidential 722.4522

684.7441 37.7081

37.7081 5% ladang/kebuncampuran

1631 KANAN

nagara 161 Confidential

812.5252 142.7490

669.7762 669.7762 82%

ladang/kebuncampuran

1632 KANAN nagara

162 Confidential

766.6361 766.6361 766.6361 100%

ladang/kebuncampuran

1633 KANAN

nagara 163 Confidential

610.7786 610.7786 610.7786 100%

ladang/kebuncampuran

1634 KANAN nagara

164 Confidential

249.3646

249.3646 249.3646 100%

ladang/kebuncampuran

1635 KANAN

nagara 165 Confidential

3345.1547 377.6286 2.967.5261 2.967.5261 89%

ladang/kebuncampuran

1636 KANAN nagara

166 Confidential

763.4167 659.8597 103.5570 103.5570 14%

ladang/kebuncampuran

1637 KANAN

nagara 167 Confidential

1440.2131 106.3711 1.333.8420 1.333.8420 93%

ladang/kebuncampuran

1638 KANAN nagara

168 Confidential

489.7735 489.7735 489.7735 100%

ladang/kebuncampuran

1639 KANAN

nagara 169 Confidential

497.1974 399.1047 98.0927 20%

ladang/kebuncampuran

1640 KANAN nagara

170 Confidential

421.4216 250.7540 170.6676

170.6676 40% ladang/kebuncampuran

1641 KANAN

nagara 171 Confidential

313.9031 313.9031

313.9031 100% ladang/kebuncampuran

1642 KANAN nagara

172 Confidential

369.3036 369.3036 369.3036 100%

ladang/kebuncampuran

1643 KANAN

nagara 173 Confidential

282.2817 282.2817 282.2817 100%

ladang/kebuncampuran

Page 177: Download 2.56 MB

Appendix 2 161

AH No

Urut AREA DESA

No bidang ukur

NAMA PEMILIK

Luas Bidang

luas terkena

SISA LAHAN PADA KAKI TANGGUL

% JENIS PEMANFATAN

Bangunan

terkena kaki tanggul

terkena bibir sungai

P SP NP Luas Luas

Terkena

1644 KANAN nagara 174

Confidential 4566.9248

4.4893 4.562.4355

4.562.4355 100% ladang/kebuncampuran

1645 KANAN

nagara 175

Confidential 653.9183 593.2777 60.6406

60.6406 9% ladang/kebuncampuran

1646 KANAN nagara 176

Confidential 576.1449 138.5565

437.5884 76% ladang/kebuncampuran

1647 KANAN

nagara 177

Confidential 418.0808

418.0808 100%

1648 KANAN nagara 178

Confidential 839.2752

92.3050 746.9702 89%

ladang/kebuncampuran

1649 KANAN

nagara 179

Confidential 5031.2635

1.283.8935 3.747.3700 3.747.3700 74%

ladang/kebuncampuran

1650 KANAN nagara 180

Confidential 2418.0204 475.4823 1.942.5381

1.942.5381 80% ladang/kebuncampuran

1651 KANAN

nagara 181

Confidential 845.5474

140.1880 705.3594 83%

ladang/kebuncampuran

1652 KANAN nagara 182

Confidential 1623.9461 401.6507

1.222.2954 75% ladang/kebuncampuran

1653 KANAN

nagara 183 Confidential

4346.4881 765.4100 2.705.6246 3.581.0781 82%

ladang/kebuncampuran

1654 KANAN nagara 184

Confidential 3741.4185 455.2393 2.286.8830

3.286.1792 88% ladang/kebuncampuran

1655 KANAN

nagara 185

Confidential 3918.0293 473.3328 3.013.6367

3.444.6965 88% ladang/kebuncampuran

1656 KANAN nagara 186

Confidential 3181.1633 356.2250 2.621.2855

2.824.9383 89% ladang/kebuncampuran

1657 KANAN

nagara 187

Confidential 3015.8520 361.2008 2.509.2113

2.654.6512 88% ladang/kebuncampuran

1658 KANAN nagara 188

Confidential 280.4105 247.6287

32.7818 12% ladang/kebuncampuran

1659 KANAN

nagara 189

Confidential 1294.1496 90.4693 1.203.6803

1.203.6803 93% ladang/kebuncampuran

1660 KANAN nagara 190

Confidential 793.8805 793.8805

793.8805 100% ladang/kebuncampuran

1661 KANAN

nagara 191 Confidential

729.3110 729.3110

729.3110 100% ladang/kebuncampuran

1662 KANAN nagara

192 Confidential

285.5012

285.5012 285.5012 100%

ladang/kebuncampuran

1663 KANAN

nagara 193 Confidential

480.5641

480.5641 480.5641 100%

ladang/kebuncampuran

Page 178: Download 2.56 MB

162 Appendix 2

AH No

Urut AREA DESA

No bidang ukur

NAMA PEMILIK

Luas Bidang

luas terkena

SISA LAHAN PADA KAKI TANGGUL

% JENIS PEMANFATAN

Bangunan

terkena kaki tanggul

terkena bibir sungai

P SP NP Luas Luas

Terkena

1664 KANAN nagara

194 Confidential

709.2184 709.2184 709.2184 100%

ladang/kebuncampuran

1665 KANAN

nagara 195 Confidential

646.2322 646.2322 646.2322 100%

ladang/kebuncampuran

1666 KANAN nagara

196 Confidential

617.6682 92.9504 524.7178 524.7178 85%

ladang/kebuncampuran

1667 KANAN

nagara 197 Confidential

1149.1402 2.6204 1.146.5198 100%

ladang/kebuncampuran

1668 KANAN nagara

198 Confidential

1227.8176 526.8877 700.9299 57%

ladang/kebuncampuran

1669 KANAN

nagara 199 Confidential

1318.3250 856.5557 431.7282 461.7693 35%

ladang/kebuncampuran

1670 KANAN nagara 200

Confidential 1044.8206

49.9332 994.8874

994.8874 95% ladang/kebuncampuran

1671 KANAN

nagara 201 Confidential

619.5802 619.5802 619.5802 100%

ladang/kebuncampuran

1672 KANAN nagara

202 Confidential

833.2798 833.2798 833.2798 100%

ladang/kebuncampuran

1673 KANAN

nagara 203 Confidential

544.4681 498.4307 46.0374 8%

ladang/kebuncampuran

1674 KANAN nagara

204 Confidential

586.9885 586.9885 100%

1675 KANAN

nagara 205 Confidential

503.9288 329.4130 174.5158 35%

ladang/kebuncampuran

1676 KANAN nagara

206 Confidential

949.8212 218.5730 731.2482 731.2482 77%

ladang/kebuncampuran

1677 KANAN

nagara 207 Confidential

642.2718 642.2718 642.2718 100%

ladang/kebuncampuran

1678 KANAN nagara

208 Confidential

614.6891 495.6945 118.9946 118.9946 19%

ladang/kebuncampuran

1679 KANAN

nagara 209 Confidential

683.3890 227.3502

456.0388 67% ladang/kebuncampuran

1680 KANAN nagara

210 Confidential

1838.5347 1.391.0640

447.4707 24% ladang/kebuncampuran

1681 KANAN

nagara 211 Confidential

907.3372 613.3644 293.9728 293.9728 32%

ladang/kebuncampuran

1682 KANAN nagara

212 Confidential

654.0379 654.0379 654.0379 100%

ladang/kebuncampuran

1683 KANAN

nagara 213 Confidential

523.2239 523.2239 523.2239 100%

ladang/kebuncampuran

Page 179: Download 2.56 MB

Appendix 2 163

AH No

Urut AREA DESA

No bidang ukur

NAMA PEMILIK

Luas Bidang

luas terkena

SISA LAHAN PADA KAKI TANGGUL

% JENIS PEMANFATAN

Bangunan

terkena kaki tanggul

terkena bibir sungai

P SP NP Luas Luas

Terkena

1684 KANAN nagara 214

Confidential 1335.0803

38.8994 1.296.1809 97% ladang/kebuncampuran

1685 KANAN

nagara 215

Confidential 501.3483 199.2306

302.1177 60% ladang/kebuncampuran

1686 KANAN nagara 216

Confidential 624.4278 417.4758

206.9520 33% ladang/kebuncampuran

1687 KANAN

nagara 217

Confidential 788.2397

723.2507 15.9994 64.9890 8%

ladang/kebuncampuran

1688 KANAN nagara 218

Confidential 582.9284

368.1854 214.7430 214.7430 37%

ladang/kebuncampuran

1689 KANAN

nagara 219

Confidential 360.7052 140.8599 219.8453

219.8453 61% ladang/kebuncampuran

1690 KANAN nagara 220

Confidential 470.9701 295.0505 175.9196

175.9196 37% ladang/kebuncampuran

1691 KANAN

nagara 221

Confidential 332.0722

278.3840 53.6882 16%

ladang/kebuncampuran

1692 KANAN nagara 222

Confidential 169.6001 109.5332

60.0669 35% pekarangan

1693 KANAN

nagara 223 Confidential

476.4840 317.0290 159.4550 159.4550 33%

ladang/kebuncampuran

1694 KANAN nagara 224

Confidential 321.6498 108.5217

213.1281 66% pekarangan

1695 KANAN

nagara 225

Confidential 289.2137 190.2177 98.9960

98.9960 34% ladang/kebuncampuran

1696 KANAN nagara 226

Confidential 204.7510 120.4554 84.2956

84.2956 41% ladang/kebuncampuran

1697 KANAN

nagara 226

Confidential 204.7510

204.7510 100%

1698 KANAN nagara

227 Confidential

185.6311 11.5451 174.0860 94%

pekarangan

1699 KANAN

nagara 228

Confidential 64.0070 44.9530

19.0540 30% pekarangan 1 20.000

1700 KANAN nagara

229 Confidential

63.6271 60.5421 3.0850 5%

pekarangan 1 20.000

1701 KANAN

nagara 230

Confidential 1078.0826 418.6320

659.4506 61% pekarangan 1 63.543

1702 KANAN nagara

230A Confidential

1 51.000

1703 KANAN

nagara 231

Confidential 187.9190 16.2242

171.6948 91% pekarangan 1 83.791

Page 180: Download 2.56 MB

164 Appendix 2

AH No

Urut AREA DESA

No bidang ukur

NAMA PEMILIK

Luas Bidang

luas terkena

SISA LAHAN PADA KAKI TANGGUL

% JENIS PEMANFATAN

Bangunan

terkena kaki tanggul

terkena bibir sungai

P SP NP Luas Luas

Terkena

1704 KANAN nagara

232 Confidential

331.5088 3.7766 327.7322 99%

pekarangan 1

62.400

1705 KANAN

nagara 232A

Confidential

pekarangan 1 26.000

1706 KANAN nagara

233 Confidential

319.6056 319.6056 100%

1 148.083

1707 KANAN

nagara 234

Confidential 747.2963 484.0970

263.1993 35% ladang/kebuncampuran

1708 KANAN nagara

235 Confidential

644.0840 347.1687 296.9153 46%

ladang/kebuncampuran

1709 KANAN

nagara 236

Confidential 616.6643 333.0921

283.5722 46% ladang/kebuncampuran

1710 KANAN nagara

237 Confidential

3713.5896 100.5340 3.613.0556 97%

ladang/kebuncampuran

1711 KANAN

nagara 238

Confidential 935.4744 142.9766

792.4978 85% ladang/kebuncampuran

1712 KANAN nagara

239 Confidential

1037.9157 1.037.9157 100%

ladang/kebuncampuran

1713 KANAN

nagara 240

Confidential 1776.7451 264.9138

1.511.8313 85% sawah

1714 KANAN nagara

241 Confidential

2647.8134 516.5364 2.131.2770 80%

sawah

1715 KANAN

nagara 242

Confidential 1511.9990 1.123.4852 388.5138

388.5138 26% ladang/kebuncampuran

1716 KANAN nagara

243 Confidential

1640.0152 621.0363 1.018.9789 62%

ladang/kebuncampuran

Ket : RUMAH/BANGUNAN

P

SP : Semi Permanent NP

: Non Permanent

Page 181: Download 2.56 MB

Appendix 3 165

APPENDIX 3. CONSULTATION MEETINGS AT PLANNING STAGE

No. Activiti

es Objective/s

Issues/Topics Outcomes Participants Type of PCM Issues Discussed/Agreement Time/Place

1 PPTA Team Meeting with Serang Regency

Submitting flood management plan of Ciujung River to Serang Regency

Discussing the follow up actions

Project Planning Serang Regency warmly welcomes the plan of flood management program in Ciujung river basin

11 persons: (i) The Regency and staffs (3 persons); (ii) Head of Bappeda (Ismanto) and staff of Bappeda (4 persons); (iii) ADB 1 persons, (iv) PPTA 3 persons:

General meeting

Serang Regency warmly welcomed the plan of flood management program in Ciujung river basin and it needed real follow-up action which then followed up through a meeting held on May 1, 2013.

22-04-2013/ Serang Regency Office

2 PPTA Team meeting with Vice Seranng Regency

Submitting flood management plan of Ciujung River to Serang Regency

Discussing the follow up actions

Project Planning Serang Regency warmly welcomes the plan of flood management program in Ciujung river basin

12 persons: (i) Vice Regency (Ratu Tatu Chasanah), staff of Regency 3 persons; (ii) Head of Bappeda and staffs (4 persons); (iii) PPTA 5 persons.

General meeting

Vice Regent of Serang Regency also warmly welcomed the plan of flood management program in Ciujung river basin, who then followed it up with a stakeholder meetings on May 8, 2013

May 1, 2013/Vice Vice Serang Regency Office

3 Meeting coordination between BBWS C3, the Government of Serang Regency, and PPTA Team

Discussion on flood control plan activity of Ciujung River in the FMSRB.

Discussion on the documents to be prepared, particularly related to Participatory and Gender Responsive Flood Management Planning of Ciujung River.

Discussion on socialization of Ciujung River flood control plan at the sub-Regency level by Serang Regency and BBWS C3.

Project Planning Planning document of Participatory and Gender Responsive Flood Management Planning for Ciujung River Basin

Public Consultation Meeting Planning at the sub-district and village level which will be affected by the project’s construction along 7 km.

86 persons: (i) Vice Regent (Ratu Tatu Chasanah), Local Secretary of Serang Regency and staff 7 persons; (ii) Head of Bappeda (Ismanto Ismail) and staff (4 persons); (iii) Public Works Office of Serang Regency 2 persons; (iv) Forestry Office of Serang Regency 2 persons; (v) Agricultural Office of Serang Regency; (vi) Environment Agency of Serang Regency 2 persons; (vi) BBWS C3, 4 persons: Head of BBWS C3 (A. Hanan Ahmad). Head Division of Planning and staff; (vi) ADB 1 person Robindra Osti; (vii) Bappenas, 1 person; (vii) BPN of Banten Province 1 person; (ix) Toll Road Management, 2 persons; (x) PPTA 8 persons; (xi) Reporters 6 persons ( TV Banten, Newspapers)

General Meeting

BBWS C3 has commitment to implement flood control activity of Ciujung River under flood management in selected river basin (FMSRB) program and will follow it up by providing any necessary documents, such as the document of Ciujung Watershed’s Flood Control Planning.

Serang Regency supports the Plan of Ciujung River flood control activities.

Local Government hopes that the flood control can be immediately implemented.

Local Government together with BBWS C3 will carry out socialization on the activities plan in all sub-regencys.

May 8, 2013/ Vice Serang Regency meeting room

Page 182: Download 2.56 MB

166 Appendix 3

No. Activiti

es Objective/s

Issues/Topics Outcomes Participants Type of PCM Issues Discussed/Agreement Time/Place

4 Public Consultation with Kibin residents at Kibin Sub-District office

Delivering a flood control plan to be implemented by BBWS C3 along with Serang Regency through the ADB funding along with the impact generated by the project (positive and negative impacts).

Obtaining feedbacks/inputs from the public related to flood control plan and attaining aspiration/expectation from the public.

Project Planning, Potential project impact (positive, negative), PIB

The inclusion of flood management plans for Ciujung River Basin with the length of 7 km in the Business Information Center (PIB) and the presence of community voice related to the amount of compensation if they are included in the directly or indirectly affected people of the construction of embankments along the Ciujung River Basin and their hope in the effort to overcome the flood problem in their area.

90 persons: (i) Staff of BBWS C3 (1 person); (ii) PPTA: John Duewel, Ratna Laelasari, Adam Yazid, Supriadi Dt Tumpatih; (iii) Vice Regent (Ratu Tatu Chasanah) and staff, Head of Bappeda and staff; (iv) community of more than 30 persons; (v) Reporters 6 persons ( TV Banten, Newspapers)

Public consultation/ Socialization

Serang Regency (Deputy of Serang Regent) conveyed flood control plan to be implemented in Ciujung River and support from Serang Regency towards the FMSRB program.

BBWS C3 conveyed stages of flood control activities along 7 km in Ciujung RIver, potential impacts of the project (positive and negative), and various preparations being implemented.

The community demonstrated their support to Ciujung River’s flood control plan, asked the amount of compensation to be given, and expressed their expectations in the effort of overcoming flood.

May 13, 2013, Kibin Sub-District office

5. FGD in Nagara Village of Kibin Sub-District

Delivering a flood control plan to be implemented by BBWS C3 along with Serang Regency through the ADB funding along with the impact generated by the project (positive and negative impacts).

Obtaining feedbacks/inputs from the public related to flood control plan and attaining aspiration/expectation from the public.

Project Planning, Potential project impact (positive, negative), PIB

The inclusion of flood management plans for Ciujung River Basin with the length of 7 km in the Business Information Center (PIB) and the presence of community voice related to the amount of compensation if they are included in the directly or indirectly affected people of the construction of embankments along the Ciujung River Basin and their hope in the effort to overcome the flood problem in their area.

37 persons: (i) Head of Nagara Village and staff 4 persons; (ii) community 30 persons; (iii) Bappeda of Serang Regency 1 person; (iv) 2 persons from PPTA (Ratna Laelasari, and Supriadi Dt Tumpatih).

FGD BBWS C3 conveyed stages of flood control activities along 7 km in Ciujung RIver, potential impacts of the project (positive and negative), and various preparations being implemented and will cooperate with Serang Regency.

Bappeda of Serang Regency informed that Ciujung River’s flood control plan is a priority program of Serang Regency. Bappeda of Serang Regency and BBWS C3 will work together to implement Ciujung River’s flood control program.

May 14, 2013, Nagara Village of Kibin Sub-District

6. FGD at Bandung Sub-District office

Delivering a flood control plan to be implemented by BBWS C3 along with Serang

Project Planning, Potential project impact (positive, negative), PIB

The inclusion of flood management plans for Ciujung River Basin with the length of 7 km in the

41 persons: (i) Head of Bandung Sub-District and staff, (ii) Bappeda of Serang Regency 1 person, Head of

FGD BBWS C3 conveyed stages of flood control activities along 7 km in Ciujung RIver, potential impacts of the project (positive

May 15, 2013, Bandung Sub-District office

Page 183: Download 2.56 MB

Appendix 3 167

No. Activiti

es Objective/s

Issues/Topics Outcomes Participants Type of PCM Issues Discussed/Agreement Time/Place

Regency through the ADB funding along with the impact generated by the project (positive and negative impacts).

Obtaining feedbacks/inputs from the public related to flood control plan and attaining aspiration/expectation from the public.

Business Information Center (PIB) and the presence of community voice related to the amount of compensation if they are included in the directly or indirectly affected people of the construction of embankments along the Ciujung River Basin and their hope in the effort to overcome the flood problem in their area.

Bolakang Village and staff, Head of Malabar Village and staff, community member, 2 persons from PPTA (Ratna Laelasari, and Supriadi Dt Tumpatih)

and negative), and various preparations being implemented and will cooperate with Serang Regency.

Bappeda of Serang Regency informed that Ciujung River’s flood control plan is a priority program of Serang Regency. Bappeda of Serang Regency and BBWS C3 will work together to implement Ciujung River’s flood control program.

Bandung Sub-district and the community welcome and support government program in flood control plan of Ciujung River.

7 FGD in Panasogan Village of Ceukesal Sub-District

Delivering a flood control plan to be implemented by BBWS C3 along with Serang Regency through the ADB funding along with the impact generated by the project (positive and negative impacts).

Obtaining feedbacks/inputs from the public related to flood control plan and attaining aspiration/expectation from the public.

Project Planning,

Potential project

impact (positive,

negative), PIB

The inclusion of flood management plans for Ciujung River Basin with the length of 7 km in the Business Information Center (PIB) and the presence of community voice related to the amount of compensation if they are included in the directly or indirectly affected people of the construction of embankments along the Ciujung River Basin and their hope in the effort to overcome the flood problem in their area.

40 persons: (i) Head of

Panasogan Village and staff 4

persons; (ii) community 30

persons; (iii) Bappeda of

Serang Regency 1 person;

(iv) 2 persons from PPTA

FGD BBWS C3 conveyed stages of flood control activities along 7 km in Ciujung RIver, potential impacts of the project (positive and negative), and various preparations being implemented and will cooperate with Serang Regency.

Bappeda of Serang Regency informed that Ciujung River’s flood control plan is a priority program of Serang Regency. Bappeda of Serang Regency and BBWS C3 will work together to implement Ciujung River’s flood control program.

The community expressed their support and hope for flood control plan and asked questions related to the amount of compensation and land acquisition process.

May 16, 2013, Panasogan Village of Ceukesal Sub-District

Page 184: Download 2.56 MB

168 Appendix 3

No. Activiti

es Objective/s

Issues/Topics Outcomes Participants Type of PCM Issues Discussed/Agreement Time/Place

8 Coordinating Meeting with BBWS Ciujung, Serang Regency and Kibin Sub-District

Submitted Ciujung River’s flood control plan in Kibin Sub-District and stages of activities to be implemented. Delivering initial data collection plan (IOL/SE survey).

Project Planning IOL/SE Survey

The inclusion of flood management plans for Ciujung River Basin with the length of 7 km in the Business Information Center (PIB) in Kibin Sub-District Schedule for initial data collection of IOL/SE Survey in all villages in Kibin sub-District

20 persons: (i) BBWS C3, 1 person: Medya Ramadhan; (ii) Bappeda of Serang Regency, Abdullah.; (iii) Head of Kibin Sub-District, Head of Nagara Village, Head of Blokang Village, Head of Malabar Village, Head of Gandayasa Village, Head of Panosogan Village, Head of Katulisan Village; (iii) PPTA, 2 persons Ratna Laelasari, Supriadi Dt Tumpatih; (iv) LPK Equator, 5 persons

General Meeting

BBWS C3 conveyed stages of flood control activities along 7 km in Ciujung River, the wide area of land required, the stages of activities to be carried out, and initial data collection plan on the assets and socio-economic survey to be implemented by Equator Team.

Kibin Sub-District and villages that will be affected by the flood control activities support the Ciujung River’s flood control plan and ready for initial data collection on assets and socio-economic survey to be carried out.

The Equator Team submitted IOL/SE Survey plan, implementation schedule, and stages of activities to be implemented.

June 26, 2013. Kibin Sub-District Office

9 Coordinating Meeting between ADB Team, BBWS Ciujung, Serang Regency, and PPTA Team

Project Planning, requirement of land acquisition

36 persons: (i) Vice of Regent, Assistant I, Assistant II, Head of Public Works Office, staff of Vice Regent 6 persons; (ii) ADB: Syarifah, Eric, Naning; (iii) Vice of Regent, Assistant 1 and 2, Secretary of Bappeda, Head of Public Works Office; (iv) BBWS C3: Head of Agency (A. Hanan Ahmad), Head of Planning Division; (v) PPTA 5 persons; (v) Reporters 6 persons ( TV Banten, Newspapers)

General Meeting

All stakeholders, among others Serang Regency, BBWS C3, and National Land Agency (BPN) of Serang Regency, will focus on the land acquisition issue and shall act in accordance with their respective roles and responsibilities

July 15, 2013 at Vice Regent Office of Serang Regency

10. Discussion Meeting on IOL/ SES Ciujung and Batu Merah Rivers

Delivering results of IOL/SE Survey of Ciujung River and Batu Merah by Equator

Dissemination of IOL/SE Survey to Director General of Water

Results of initial data collection of awal IOL/SE Survey are wel disseminated

25 persons: Director General of Water Resources (Mr. Biren, Mr. Indera Bangun) and staff (10 persons), Head of BBWS C3

General Meeting

There is a difference in term of wide of land to be acquired between DED Ciujung and IOL Survey, whereby according to the DED is 60 Ha but the IOL

September 27, 2013, Meeting Room on 7th Floor, Director General of Water

Page 185: Download 2.56 MB

Appendix 3 169

No. Activiti

es Objective/s

Issues/Topics Outcomes Participants Type of PCM Issues Discussed/Agreement Time/Place

Team.

Attaining feedbacks/ inputs for the improvement of IOL/SE Survey results

Resources Revision of IOL/SE Survey results

Follow up the creation of cadastral map

(Mr. Hanan) and staff (5 persons), BWSM staff (2 persons), PPTA Team (5 persons), Tetira Consultant (3 persons), DED Consultant (2 persons).

Survey noted 48 Ha.

Map embankment, including vacant land needs to be made as well as with the results of IOL Survey in order to find out clearly the location and wide of land to be acquired.

To help people who are living in the embankment area, the houses in the embankment area should be recorded and given compensation.

The categorization of buildings to be acquired need to be revised of not based on percentage, but the type of building.

Data generated by the IOL

survey is just preliminary data

and can not be used as a basis

for assessing the actual wide

area of land and building, so it

needs to be measured in detail

by BPN.

Resources.

11 Disscussion on dissemination plan of IOL/SE survey with BBWS C3 and local governments (Serang Regency/ Banten Province)

Disscussion on dissemination plan of IOL/SE survey.

Disscussion on procedure for determining the location and budgeting for land acquisition and implementation process.

Planning on socialization of IOL/SES, determination location procedure, planning document, budget, and implementation of land acquisition

Revision of TOR for the implementation of IOL/SE Survey socialization was done on January 15, 2014.

Rediscussion on the activity plan with BBWS of Ciujung on January 27, 2014.

The submission of letter to BBWS Ciujung through the Ministry of Public Works for land acquisition budget

63 persons : (i) Local Secretary I of Banten Province, (ii) Deputy Regent of Serang Regency, (iv) Head of Bappeda of Banten Province, (v) Secretary of Water Resurces Office of Banten Province (vi) National Land Agency, (vii) Regional Office of Banten Province, (viii) Head of Government Bureau of Banten Province (ix) Local Secretary II of Serang

General Meeting

Revised TOR for the time and place for socialization of IOL/SE Survey, methodology, and resource persons.

Procedure for determining the location of land acquisition is submitted to the Governor of Banten by BBWS Ciujung and all activities of land acquisition preparation will be coordinated by ASDA I of Banten Province. While the implementation of land acquisition activities will be

Januariy 8-10, 2014, Meeting Room of of Serang Deputy Regent’s Office

Page 186: Download 2.56 MB

170 Appendix 3

No. Activiti

es Objective/s

Issues/Topics Outcomes Participants Type of PCM Issues Discussed/Agreement Time/Place

allocation from the preparation until the implementation.

Land Acquisition Document can be submitted to ASDA I of Banten Province promptly after the dissemination of IOL/SES Survey.

Regency (x) Head of Bappeda of Serang Regency (xi) Staff of Government Bureau of Banten Province: (xii) Staff of Bappeda of Serang Regency (xii persons) Related Offices of Banten Province: (xiii ) Related Offices of Serang Regency: 10 persons, (xiv) Sub-district: 4 persons (xv) Villages: 9 persons (xvi), ADB: 1 person PPTA ADB: 6 persons

carried out by BPN Regional Office of Banten Province.

Land Acquisition Document is well prepared and contains a clear plan along with the results of initial data collection and socio-economic surveys and other supporting documents required to accelerate the determination procedure of land acquisition’s location.

Budget for land acquisition process from preparation until implementation phase should be prepared thoroughly so that the process is not interrupted in the middle of the road and not audited by BPK.

12 Coordination meeting for FMSRB PPTA between ADB Team with Serang Regency and Banten Province, BBWS C3

Submit information on PPTA activity status and a detailed plan for the Ciujung River Basin project to Banten Province and Serang Regency and at the same time to obtain confirmation on concrete support from Banten Province and Serang Regency on the project implementation plan of FMSRB Ciujung River Basin.

Banten Province and Serang Regency can take an active role in the FMSRB project implementation.

FMSRB Project status, BBWS C3 and local government commitment

The commitment of local government to support the embankment project in Ciujung River and FMSRB program.

Commitment of fund share for land acquisition with the composition of: central government is 50%, Banten Province is 30%, Serang Regency is 20%.

The preparation of action plan before the implementation of fact finding mission.

1. Deputy Regent of Serang Regency;

2. Head of DPRD of Serang Regency;

3. Head of commission IV of DPRD of Banten Province;

4. Local Secretary of Serang Regency;

5. Director of River and Coast of Director General of Water Resources, Ministry of Public Works;

6. Director of Program Development, Director General of Water Resources, Ministry of Public Works;

7. Director of Operation and Maintenance of Director General of Water Resources, Ministry of Public Works;

8. Director of Water

General Meeting

Serang Regency will continue to coordinate with Banten Province related to the readiness of the local government in accepting this program.

Serang Regency will allocate fund for Land Acquisition after the determination of wide area and location of land that will be presented at the next meeting by PPTA Consultant on February 25, 2014.

Results of this Coordination Meeting will be submitted to Banten Province and related ministry to the subject of follow-up actions.

Prior to the implementation of the meeting on February 25, 2014, it is necessary to hold a

February 6, 2014 at Regent Office of Serang Regency

Page 187: Download 2.56 MB

Appendix 3 171

No. Activiti

es Objective/s

Issues/Topics Outcomes Participants Type of PCM Issues Discussed/Agreement Time/Place

Resourcs Development, of Director General of Water Resources, Ministry of Public Works;

9. Director of Spatial and Environment Facilitation, Directorate General of Regional Development of Ministry of Home Affairs;

10. Director of Land Extension and Management, Directorate General of Land and Water Management, Ministry of Agriculture;

11. Director of Water and Irrigation of Bappenas;

12. Head of BBWS of Cidanau-Ciujung-Cidurian, Director General of Water Resources, Ministry of Public Works;

13. Head of Watershed Management Agency of Citarum-Ciliwung, Ministry of Forestry;

14. Head of Bappeda of Banten Province;

15. Head of Water Reources snd Settlements of Banten Province;

16. Head of Agriculture Office of Banten Province;

17. Head of National Land Agency of Banten Province;

18. Specialist Staff of Regenct for Public Governance;

19. Local Assistant I of

further meeting between Serang Regency, Banten Province, BBWS C3, Provincial and Regency National Land Agency and PPTA Consultant Team.

One Small Team will be formed to prepare an action plan that is expected to be available before the visit of ADB Fact Finding Mission.

This small team will also be in charge for preparing the draft of Memorandum of Understanding (MoU) on Social and Environmental Aspects handling in Ciujung River’s Flood Management in Serang Regency and Lebak Regency, and then followed by the preparation of an Mutual Agreement Document containing more detailed provisions and is also completed with an attachment on the Action Plan.

195.

Page 188: Download 2.56 MB

172 Appendix 3

No. Activiti

es Objective/s

Issues/Topics Outcomes Participants Type of PCM Issues Discussed/Agreement Time/Place

Serang Regency; 20. Local Assistant II of

Serang Regency; 21. Specialist Staff of

Regent for Development;

22. Specialist Staff of Regent for Community and Human Resources;

23. Head of Bappeda of Serang Regency;

24. Head of Environmental Agency of Serang Regency;

25. Head of Local Disaster Mitigation Agency of Serang Regency;

26. Head of Family Planning, Community and Women Empowerment Agency (BKBPMP) of Serang Regency;

27. Head of National Land Agency of Serang Regency;

28. Head of Public Works Office of Serang Regency;

29. Head of Spatial, Building and Housing Office of Serang Regency;

30. Head of Nautical, Fishery, Energy and Mineral Resources of Serang Regency;

31. Head of Health Office of Serang Regency;

32. Head of Social Office of Serang Regency;

33. Head of Agriculture, Forestry, Plantation, and Animal Husbandry

Page 189: Download 2.56 MB

Appendix 3 173

No. Activiti

es Objective/s

Issues/Topics Outcomes Participants Type of PCM Issues Discussed/Agreement Time/Place

Office of Serang Regency;

34. Head of Water Resources Management of Ciujung-Cidanau River of Water Resources and Settlements Office of Banten Province;

35. Head of Sub-District of Kibin of Serang Regency;

36. Head of Sub-District of Bandung of Serang Regency;

37. Head of Sub-District of Cikeusal of Serang Regency;

38. Head of Sub-District of Pamarayan of Serang Regency;

39. Head of Sub-District of Kragilan of Serang Regency;

40. Head of Asset Management of Local Secretary of Serang Regency;

41. Head of Development Administration of Serang Regency;

42. Head of Legal Unit of Local Secretary of Serang Regency;

43. Head of General Government of Local Secretary of Serang Regency;

44. Head of Village Government of Local Secretary of Serang Regency;

45. Head of Local Development Planning

Page 190: Download 2.56 MB

174 Appendix 3

No. Activiti

es Objective/s

Issues/Topics Outcomes Participants Type of PCM Issues Discussed/Agreement Time/Place

Board of Serang Regency;

46. Head of Bappeda’s Strategic Planning of Serang Regency;

47. Head of Bappeda’s Economy Planning and Development of Serang Regency;

48. Head of Bappeda’s Social and Culture Planning and Development of Serang Regency;

49. Head of Bappeda’s Regional Infrastructure and Development Planning and Development of Serang Regency;

50. Head of Bappeda’s Statistic, Research, and Development of Serang Regency;

51. Head of Environment Care Forum of Serang Regency;

52. Senior Staff of Miistry of Public Works (DR. Djaya Murni Dalam);

53. Executive Director of Ciujung Watershed of Banten Province;

54. Director of NGO of Rekonvasi Bhumi;

55. PPTA Consultant Team of 7364-INO ADB

13 Coordination Meeting on Preparation of Data/Material for MoU Signing of Flood Management In Selected River Basins Program in Serang

Coordination between

BBWS, Banten

Province and Serang

Regency for

preparation of IOL/SES

dissemination on

Project planning: Fund for land acquisition

Cost sharing for land acquisition has been approved by central and local government.

Agreement on the preparation of draft of MoU

1. Deputy Regent of Serang Regency;

2. Head of BBWS of Cidanau-Ciujung-Cidurian, Director General of Water Resources, Ministry of Public Works;

General Meeting

Finalization of Cost Sharing for Land Acquisition, i.e. Central Government is 50%, Banten Province is 30% and Serang Regency is 20%.

Serang Regency will continue to

February 17, 2014 at K.H. Syam’un Room of Local Secretary of Serang Regency

Page 191: Download 2.56 MB

Appendix 3 175

No. Activiti

es Objective/s

Issues/Topics Outcomes Participants Type of PCM Issues Discussed/Agreement Time/Place

Regency

Februari 27, 2014 and

discussion on cost

sharing for land

acquisition.

and the MoU signing plan between central and local government.

3. Local Development Planning Board of Banten Province;

4. Local Assistant I of Banten Province;

5. Head of National Land Agency of Banten Province;

6. Equipment Bureau of Banten Province;

7. Specialist Staff of Regent for Public Governance;

8. Local Assistant II of Serang Regency;

9. Head of Local Development Planning Board of Serang Regency;

10. Head of Environment Office of Serang Regency;

11. Head of Local Disaster Mitigation Agency of Serang Regency;

12. Head of Family Planning, Community and Women Empowerment Agency (BKBPMP) of Serang Regency;

13. Head of National Land Agency of Serang Regency;

14. Head of Public Works Office of Serang Regency;

15. Head of Spatial, Building and Housing Office of Serang Regency;

16. Head of Sub-District of Kibin of Serang Regency;

17. Head of Sub-District of Bandung of Serang Regency;

18. Head of Sub-District of Cikeusal of Serang Regency;

19. Head of Sub-District of

coordinate with BBWS C3 and Banten Province in relation to the preparation of Draft of Cooperation Agreement and it will be completed by February 27, 2014.

Serang Regency proposed that fund for land acquisition should be allocated in state budget through BBWS, so that the allocation of fund from Serang Regency and Banten Province is granted to the central government.

BPN will continue to coordinate with the central government in relation to the land acquisition plan so that there is no obstacle faced in the future.

The point 2 above is proposed in consideration that Planning Document, initial land identification document and DED have been prepared by the Central Government through BBWS C3.

A small team is needed to complete the Draft of Cooperation Agreement so that the document can be signed by related three parties.

Page 192: Download 2.56 MB

176 Appendix 3

No. Activiti

es Objective/s

Issues/Topics Outcomes Participants Type of PCM Issues Discussed/Agreement Time/Place

Pamarayan of Serang Regency;

20. Head of Sub-District of Kragilan of Serang Regency;

21. Head of Asset Management of Local Secretary of Serang Regency;

22. Head of Legal Unit of Local Secretary of Serang Regency;

23. PPTA Consultant Team of 7364-INO ADB.

14 Workshop: Discussion on the Implementation of Flood Management Project in Ciujung River and Cooperation Agreement for Land Acquisition Activity

Agreement on the measures and the division of tasks and responsibilities in the implementation of the control of water damage in Ciujung and land acquisition activities.

IOL-SES Socialization, Project Planning, MOU LA budget sharing.

Results of initial data (IOL/SE Survey) and the activity plan of controlling water destructive power in Ciujung River can be understood and accepted by Banten Province, Serang Regency, Lebak Regency and other relevant institutions.

The land acquisition process for public purposes in accordance with Law No. 2 of 2012 and the location determination procedure is well comprehended.

The approval of activities related to activity plan of controlling water destructive power in Ciujung River and land acquisition to be implemented in 2014/2015.

Agreement on the tasks and responsibilities between the Directorate

72 persons: Director General of Water Resources, Ministry of Public Works; Ministry of Agriculture; Ministry of Home Affairs, BAPPENAS, Banten Province, Serang Regency, Lebak Regency, National Land Agency of Banten Province, National Land Agency of Serang Regency, related local offices, ADB, PPTA, Equator Team, Environment Observing Institution, and Head of Sub-District.

General Meeting

By paying attention to the results of initial data collection, the location determination process should be immediately submitted by BBWS C3 to Guvernor of Banten Province. In conformity with Law No. 2 of 2012, budget for land acquisition should be ready promptly after the local determination. It is approved the fund share for land acquisition between central and local government with the composition of central government is 50%, Banten Province is 30%, and Serang Regency is 20%. It is necessary to prepare draft of Memorandum of Understanding (MoU) for land acquisition activity between Directorate General of Water Resources of the Ministry of Public works, Banten Province, and SErang Regency.

February 27, 2014, Ledian Hotel in Serang

Page 193: Download 2.56 MB

Appendix 3 177

No. Activiti

es Objective/s

Issues/Topics Outcomes Participants Type of PCM Issues Discussed/Agreement Time/Place

General of Water Resources (BBWS Ciujung, Cidurian, Cidanau) of the Ministry of Public Works, Ministry of Agriculture, Ministry of Home Affairs, Banten Province, Serang Regency, and Lebak Regency in the implementation of controlling water destructive power in Ciujung River and land acquisition.

The approval of activities and the work plan in flood management program in Ciujung River during 2014/2015, including budget allocation in the activity of controlling water destructive power in Ciujung River and other related programs between BBWS Ciujung, Cidurian, Cidanau, Ministry of Agriculture, and Ministry of Home Affairs.

The approval of share of funds and Memorandum of Understanding (MOU) on land acquisition activities between between the Directorate General of Water Resources of the Ministry of Public Works, Banten Province, Serang Regency, and Lebak Regency.

15 PCM IOL/SES in embankment and river

1. Introduction to the development,

Project Planning, Potential project

People’s understanding on the embankment

Ketulisan Village: 155 persons, male 76 persons,

Consultation/ FGD

People who are living in the embankment and river banks

March 18-May, 25 2014 in

Page 194: Download 2.56 MB

178 Appendix 3

No. Activiti

es Objective/s

Issues/Topics Outcomes Participants Type of PCM Issues Discussed/Agreement Time/Place

bank of Ciujung Riber and borrow pit area.

including magnitude of the impact, status and role among stakeholders and the public policies of party that acquire the land;

2. Introduction to the development implementation framework, especially regarding the development objectives, benefits and implementation;

3. Inform the data obtained from the plan/result of the initial data collection which includes:

List of affected households-(general)

Magnitude of the development impact-(general)

Magnitude of the impact that may be experienced by affected households-(general)

Inform the policy of local government in respect to land acquisition, including the executing agency;

4. Inform the community’s rights and obligations and supporting rules and regulations.

impact (positive, negative)

development plan;

People understand the land acquisition process for public interest’s development.

People understand the plan for initial data collection and social economy survey.

People understand their rights and obligations in the land acquisition process for public interest’s development.

female: 68 persons. Invited persons and village staff: 11 persons. Dukuh Village: 32 persons, male: 13 persons, female: 7 persons. Invited persons and village staff: 12 persons. Gandayasa Village: 121 persons, male: 82 persons, female: 26 persons, Invited persons and village staff: 13 persons. Kp. Baru Village: 119 persons, male: 36 persons, female: 75 persons, Invited persons and village staff: 8 persons. Nagara Village: 95 persons, male: 74 persons, female: 13 persons, Invited persons and village staff: 8 persons. Panosogan Village: 83 persons, male: 44 persons, female: 29 persons, Invited persons and village staff: 10 persons.

area are supporting the planned construction plan of Ciujung River’s embankment.

Owners of land, buildings, and plants expect compensation in accordance with the rules and do not harm the public.

People proposed that the emerging land that attributed with proof of entitlement should obtain appropriate compensation in accordance with applicable regulations.

People are ready for further meeting in respect to the embankment construction plan.

Gandayasa Village, Panosogan Village, Dukuh Village, Malabar Village, Nagara Village, Blokang Village, Kemuning Village, Katulisan Village

Page 195: Download 2.56 MB

Appendix 3 179

No. Activiti

es Objective/s

Issues/Topics Outcomes Participants Type of PCM Issues Discussed/Agreement Time/Place

5. Inform the procedures related to land acquisition, including procedures for complain filing and handling.

16 Coordination Meeting to Discuss the Preparation of Program Plan for Social, Environment Handling for People Affected by the Construction of Embankment in Ciujung River of Serang Regency in Flood Management on Selected River Basin (FMSRB) Program

Discussion of programs that have been implemented by each of Local Government’s Working Unit or SKPD in Ciujung River Basin area. Discussion on Social Action Plan for affected households along Ciujung River basin. Discussion on Time schedule and budget allocation for 5 years.

Project/Program Planning for Social Action Plan

Negative/Positive impacts of Project plan

The preparation of Social Action Plan in 2015-2019 for affected households along Ciujung River Basin by all SKPD and related agencies in Serang Regency

Time Schedulle and fund allocation and person in charge for the program in every SKPD and agency.

1. Head of BBWS of Cidanau-Ciujung-Cidurian, Director General of Water Resources, Ministry of Public Works;

2. PPTA Consultant Team of 7364-INO ADB;

3. Local Assistant II of Serang Regency;

4. Specialist Staff of Regent for Development;

5. Specialist Staff of Regent for Community and Human Resources;

6. Head of Local Development Planning Board of Serang Regency;

7. Head of Environment Office of Serang Regency;

8. Head of Local Disaster Mitigation Agency of Serang Regency;

9. Head of Family Planning, Community and Women Empowerment Agency (BKBPMP) of Serang Regency;

10. Head of Public Works Office of Serang Regency;

11. Head of Spatial, Building and Housing Office of Serang Regency;

12. Head of Nautical, Fishery, Energy and Mineral Resources of Serang Regency;

General Meeting/

Consultation

In 2014, in general SKPD/Agencies in Serang Regency have directed their programs in Ciujung River Basin area, although it’s yet to cover all areas of 9 villages affected by embankment development project plan.

In 2015-2019, SKPD/Agencies will implement their programs in the sector of economic recovery, social, health and environment in 9 villages affected by the project starting from land acquisition, construction, until the operation.

Serang Regency will support the economic recovery of affected people in Ciujung River Basin area especially for poor and vulnerable groups by focusing the program to activities as follows:

Economic empowerment for affected people, especially the poor and vulnerable categorized group, for example: empowerment in agriculture (development of agricultural land in other places), trade (the provision of venture capital).

Institutional capacity building for farmer groups in increasing production capacity of

April 15, 2014, T.B. Saparudin Room of Local Secretary Office of Serang Regency

Page 196: Download 2.56 MB

180 Appendix 3

No. Activiti

es Objective/s

Issues/Topics Outcomes Participants Type of PCM Issues Discussed/Agreement Time/Place

13. Head of Health Office of Serang Regency;

14. Head of Social Office of Serang Regency;

15. Head of Agriculture, Forestry, Plantation, and Animal Husbandry Office of Serang Regency;

16. Head of Sub-District of Kibin of Serang Regency;

17. Head of Sub-District of Bandung of Serang Regency;

18. Head of Sub-District of Cikeusal of Serang Regency;

19. Head of Sub-District of Kragilan of Serang Regency;

20. Head of Sub-District of Pamarayan of Serang Regency;

21. Secretary of Local Development Planning Board of Serang Regency;

22. Head of Bappeda’s Strategic Planning of Serang Regency;

23. Head of Bappeda’s Economy Planning and Development of Serang Regency;

24. Head of Bappeda’s Social and Culture Planning and Development of Serang Regency;

25. Head of Bappeda’s Regional Infrastructure and Development Planning and Development of Serang

agricultural products, business management and market access.

Entrepreneurship education and training for affected people who switch their livelihoods.

Facilitation of business for the affected people during the transition period.

Strengthening community institutions such as the Community Empowerment Agency (LPM), the PKK, local youth organization, and others related to the flood mitigation and economic empowerment of affected people.

Improvement of the educational quality for female affected people.

Improvement of sanitation facilities and environment for villages in embankments area of Ciujung River Basin.

Hygienic and Healthy Life Behavior Program (PHBS).

The target group is not only for people who are categorized as vulnerable, but also for the people who lost 10% of their productive assets.

To implement the economic recovery program for the affected people in particular, Serang Regency needs the support of funding from both the

Page 197: Download 2.56 MB

Appendix 3 181

No. Activiti

es Objective/s

Issues/Topics Outcomes Participants Type of PCM Issues Discussed/Agreement Time/Place

Regency; 26. Head of Bappeda’s

Statistic, Research, and Development of Serang Regency;

27. Head of Bappeda’s Regional Development Plan and Environment of Serang Regency;

28. Head of Bappeda’s Settlements and Regional Infrastructure Development Plan of Serang Regency.

central and provincial government.

Empowerment program that will be implemented will be described in the form of Social Action Plan, in which will be included who does what, source of funds, and program indicators to be implemented.

Prior to the implementation of development program, there needs to be clarity on the status of the people who live along the river banks as well as form of compensation to be given.

Embankment development activity should pay attention to the impact on access for the people to and from education, economic, and social facilities as well as the impact on kinship and family relationship in the community.

17 Discussion with Key Respective Agencies on the Land Acquisition and Resettlement Framework (LARF)

To discuss the suitability of LARF document both from ADB’s Policy Statement (SPS) 2009 and the new Land Acquisition Law No. 2/2012 and its implementing regulations.

Assessing the stages of land acquisition activities contained in the land acquisition

LARF consultation meeting

The output expected of the discussions is that the LARF in substance can be used as guidelines for the implementation of the LARP that can be accepted by Asian Development Bank (ADB) and Goverrnment of Indonesia (GOI) in FMSRB Project.

BAPPENAS The Directorate General of Water Resources (DGWR), Asian Development Bank (ADB), Central of National Land Agency, MAPPI, BBWS 3 Cis, BWS Maluku, PPTA 7364

Discussion The LARF Document is one readiness prerequisite of activities to be financed through loan scheme. It is recommended that the LARF document is not too rigid, so it does not interfere with the development process.

Documents to be used as guidelines should be implemented easily in the field and do not add to the confusion.

Law No. 2 of 2012 on Land Procurement for the Development in Public Interest can be deemed of

September 2, 2014, Ambara Hotel

Page 198: Download 2.56 MB

182 Appendix 3

No. Activiti

es Objective/s

Issues/Topics Outcomes Participants Type of PCM Issues Discussed/Agreement Time/Place

Law No. 2/2012 and its implementing regulations as a basis for the implementation of the LARP.

comprehensive. This law provides answers to the problems relating to land acquisition for the development in public interest/government and can be solution for the future.

The Preparation of Document of Development Planning/Land Acquisition for Public Interest should be transparent to those directly or indirectly affected people. Therefore, public consultation in the preparation process is needed.

Agencies which want to acquire land for the Development in Public interest/Government (either using funding from the State Budget, Local Budget, or special allocation such as APLN) should refer to the Law No. 2 of 2012.

Law No. 2 does not call it compensation but indemnification only for those Eligible People. Other than that provision, it should not be the domain of Law No. 2 of 2012. The emptying action imposed on the land owned by government should be referred to Government Regulation in Lieu of Law No. 51/1960. If the compensation should be given in the land emptying action, it is necessary to make clear about the legal basis which becomes the reference of the action. Pursuant to Law no. 2, those who are not included into the

Page 199: Download 2.56 MB

Appendix 3 183

No. Activiti

es Objective/s

Issues/Topics Outcomes Participants Type of PCM Issues Discussed/Agreement Time/Place

category of Eligible People are not entitled to compensation either for their lands, assets, or other losses that can be calculated.

Principally, LARF is appropriate, but the size and impact formulation need to be revised.

In Law No. 2, the people who receive compensation only those of Entitled Party. What about the squatters (illegal settlers)? It is required special arrangements with reference to other applicable laws and regulations and social justice and not violate human rights.

In LARF, it needs to differentiate the formulation of those of directly or indirectly affected by the impact as well as the impact to the legal and illegal community (special impact).

The Law No. 2 has made clear compensation to the Eligible People in the form of resettlement. However, compensation in the form of resettlement can also be given to the squatters or those of not eligible people. For example, the one conducted by Mr. Jokowi. It is probably the source of fund is taken from Social Assistance program.

There are 18 provinces that carry out this law and there is no problem so far.

Page 200: Download 2.56 MB

184 Appendix 3

No. Activiti

es Objective/s

Issues/Topics Outcomes Participants Type of PCM Issues Discussed/Agreement Time/Place

In relation to Grievance Handling, in addition to deliberation process, the court process should also be clearly outlined in the description on the grievance in the planning document.

The land acquisition process should not be lasted for more than 2 years.

Law No. 2 is 90% for the people. People should not be sacrificed and BPN is ready to help.

They can be categorized as Eligible People if: 1). Occupied land is not government assets 2). It is not forest and 3). It is not in dispute.

The principle of social justice should be prioritized but it should not hamper the development process.

Related to the potential impact of land acquisition in the Ciujung River bank area, by considering the safety aspect, those who are "besieged" and/or at risk due to the rising water level in the river bank, it is advisable to relocate them or to take measures to anticipate (the construction of wall or hazard warning) integrated with the EIA.

In general and in principle, there is no difference between the Law 2/2012 with ADB's SPS, and these two can complement each

Page 201: Download 2.56 MB

Appendix 3 185

No. Activiti

es Objective/s

Issues/Topics Outcomes Participants Type of PCM Issues Discussed/Agreement Time/Place

other.

SPI 306 specifically facilitates the Law 2/2012. Currently, MAPPI is preparing the Implementation Technical Guidelines of the SPI 306 which internally will be used as guidelines for MAPPI assessors.

For examples, land acquisition for high-voltage tower of PLN, the land in which the high-voltage tower is built is given full compensation but land crossed by high voltage cables only be compensated at 15% of the price of land. This is not set in Law No. 2 of 2012. Legal basis for compensation amounting to 15% of the land price is Regulation of Ministry of Energy and Mineral Resources No. 39/2013.

MAPPI work refers only to the Law, other aspects outside the law that needs to be studied/taken into account should be included in the TOR/scope of the tasks.

The amount of solatium is set in the SPI 306. For example, the land that has been inhabited for generations is entitled to full compensation. The solatium is not explicitly stated in the Law, but it can be used to accommodate other indemnifications.

The term “indemnification" is used in accordance with the Law 2/2012. While the term

Page 202: Download 2.56 MB

186 Appendix 3

No. Activiti

es Objective/s

Issues/Topics Outcomes Participants Type of PCM Issues Discussed/Agreement Time/Place

"compensation" is for things that are not regulated by Law 2/2012 or refer to other rules/policies.

TOR of MAPPI is consisten with Law No. 2 of 2012. MAPPI does not count those of severely affected (those of seriously affected by project). MAPPI only calculates the wide area of land affected and the remainings. If it is (severly affected) required to be calculated, then it needs to be formulated as an additional scope in the TOR for MAPPI.

In connection with the provision of compensation in the form of resettlement, MAPPI calculation has included items other than the cost of waiting, the cost of moving, and so forth. The compensation should not be given in double.

Currently, KPK, BPKP, and District Attorney are also taking part in education/training in order to understand the assessment methods. So we need to be very careful and do not let anyone bubbling budget on items that are difficult to be financed.

The workshop came out with decision that there is no need for a special meeting to discuss about LARF. PPTA is urged to finalize the LARF document so that it can be submitted to ADB in not later than 1 month.

18 Discussion on Work Plan related to the

The Preparation of

Work Plan 2015-2019

Social Action Plan (SAP) and

The preparation of work plan and budgeting for

Head of Environment Office of Serang Regency;

Discussion All SKPD and related Agencies will propose program and budget

November 12, 2014, Meeting

Page 203: Download 2.56 MB

Appendix 3 187

No. Activiti

es Objective/s

Issues/Topics Outcomes Participants Type of PCM Issues Discussed/Agreement Time/Place

handling of Social Economy Impact for Affected People

and Budgeting for

Social and Economic

Impact Management

Program for the

Community Affected

by the Development of

Ciujung River’s

Embankment.

Budgeting 2015-2019 Period

livelihood recovery program for affected people by SKPD and related agencies in Serang Regency

Head of Local Disaster Mitigation Agency of Serang Regency;

Head of Family Planning, Community and Women Empowerment Agency (BKBPMP) of Serang Regency;

Head of Public Works Office of Serang Regency;

Head of Spatial, Building and Housing Office of Serang Regency;

Head of Nautical, Fishery, Energy and Mineral Resources of Serang Regency;

Head of Cooperatives, Industry and Trade Office of Serang Regency;

Head of Education Office of Serang Regency;

Head of Agriculture, Forestry, Plantation, and Animal Husbandry Office of Serang Regency;

Head of Sub-District of Kibin of Serang Regency;

Head of Sub-District of Bandung of Serang Regency;

Head of Sub-District of Cikeusal of Serang Regency;

Head of Sub-District of Kragilan of Serang Regency;

Head of Sub-District of Pamarayan of Serang Regency;

Head of Development Administration of Serang Regency;

on 17 November 2014 at the latest

BAPPEDA of Serang Regency is committed to implement social programs for people affected by the construction of embankments along Ciujung River.

The program will be implemented in phases starting in 2015. The budget meeting is planned to be carried out in 2015 with Local Parliament on October 23-25, 2014.

It is expected that exact amount for land acquisition activities is attained before the meeting with Local Parliament in order to be clear about the share of local government, especially for the 20% share of Serang Regency.

The embankment construction program is not only about physical development, but it should also consider the impact to those affected people through the utilization of agricultural land and livelihood recovery program.

Room of Bappeda of Serang Regency

Page 204: Download 2.56 MB

188 Appendix 3

No. Activiti

es Objective/s

Issues/Topics Outcomes Participants Type of PCM Issues Discussed/Agreement Time/Place

Secretary of Local Development Planning Board of Serang Regency;

Head of Bappeda’s Strategic Planning of Serang Regency;

Head of Bappeda’s Economy Development Planning of Serang Regency;

Head of Bappeda’s Social, Culture and Government Development Planning of Serang Regency;

Head of Bappeda’s Regional Infrastructure and Development Planning and Development of Serang Regency;

Head of Bappeda’s Statistic, Research, and Development of Serang Regency;

Head of Bappeda’s Regional Development Plan and Environment of Serang Regency;

Head of Bappeda’s Settlements and Regional Infrastructure Development Plan of Serang Regency.

SEER, Asian Development Bank

Social Safeguard Team, Asian Development Bank

PPTA Consultant Team of 7364-INO ADB.

19 Workshop of Proposed Joint Agreement Land Acquisition Action Plan Discussion for

The status of the project to all stakeholders: including: the

Land Acquisition Joint agreement between BBWS C3 and local

FMSRB Status known by all institutions/agencies involved;

BAPPENAS; Directorate General of Water

Resources Ministry of Public Works;

General Meeting

The provision of grant from local governments (province/regency) to central government is allowed with reference to Government

November 19, 2014, Ratu Bidakara Hotel

Page 205: Download 2.56 MB

Appendix 3 189

No. Activiti

es Objective/s

Issues/Topics Outcomes Participants Type of PCM Issues Discussed/Agreement Time/Place

Infrastructure Development in Ciujung Flood Control Serang - Banten Province

details of the components and the location of the activities, the implementing organization, implementation period, cost, etc;

The follow-up step is expected of each agency/department;

Land acquisition plan; Social Action Plan /

Livelihoods Recovery Program For Residents Along Ciujung;

Proposed share funding through grants from the Government of Banten Province and the Government of Serang to BBWS C3 in accordance with the provisions of existing law;

Institututional Arrangement for shared funding of the Land Acquisition Activity for Ciujung Flood Control Infrastructure Development in Serang Banten;

government The mechanism of shared funding of the Land Acquisition Activity Plan for Ciujung Flood Control Infrastructure Development in accordance with applicable laws;

Institutional Arrangement in the implementation of funding share mechanism of the Land Acquisition Activity Plan for Ciujung Flood Control Infrastructure Development;

Final draft document Joint Agreement (MOU) between C3 BBWS with the Government of Banten Province and the Government of Serang in terms of the Land Acquisition Activity Plan for Ciujung Flood Control Infrastructure Development.

Directorate General of Bangda The Minsitry of Home Affairs;

Directorate General of Infrastructure Agriculture, The Ministry of Agriculture;

Balai Besar Sungai Cidanau-Ciujung-Cidurian (BBWS C3);

Asian Development Bank (ADB);

BAPPEDA Banten; The relevant agencies of

Banten

Regulation No. 2/2012 on Regional Grant.

There is no standard mechanism for the grant process from local to central government, but this can be analogized to the process of grant awarding from Central to local government with a reverse process and in the perspective of Local Budget.

Local government and BBWS C3 agreed to finalize the MoU by considering and further discussing whether it is in the form of a percentage (50%, 30%, 20%) or in the definite amount in rupiah denomination and will follow up the workshop results in the next one week to produce a final draft of the agreement (MoU).

Serang Regency is ready to finalize the social recovery program and allocate budget in 2015.

Page 206: Download 2.56 MB

190 Appendix 4

APPENDIX 4. SOCIAL ACTION PLAN LIVELIHOOD RESTORATION PROGRAM MARCH 2015 INO: FLOOD MANAGEMENT PROJECT IN SELECTED RIVER BASIN OF CIUJUNG RIVER IN SERANG REGENCY OF BANTEN PROVINCE BAPPEDA SERANG REGENCY

Page 207: Download 2.56 MB

Appendix 4 191

TABLE OF CONTENTS 1. Introduction

2. Objectives of the Program

3. The Land Acquisition Activity Principles in the Livelihoods Recovery Program

4. Target Group

5. Socio-Economic Profile of Affected Households

6. Consultation

7. The Ongoing Social Programs of Serang Regency in 2014 along Ciujung River Basin

8. Impact Identification Analysis of Land Acquisition Activity for Affected Households in Ciujung River Basin Area

9. Alternative Option for the Type of Economic Recovery Program for Affected People in Ciujung River Basin

10. Proposed Programs

11. Monitoring and Evaluation

Page 208: Download 2.56 MB

192 Appendix 4

LIST OF TABLES

Table A4.1: Relative Location of Villages in the Ciujung Land Acquisition Corridor

Table A4.2: Impacts on Land by Village, Location and Affected Households

Table A4.3: Impacts on Vulnerable Households

Table A4.4: Number and Percentage of Poor People and Poverty Line in Banten Province as of March 2014

Table A4.5: The Occupation of Affected Households in Each Village

Table A4.6 Range of Monthly Income of Affected Households in Each Village

Table A4.7: Impact Analysis of Land Acquisition Activity in Ciujung Basin

Table A4.8: Estimated Manpower Requirement in the Construction Phase in Ciujung River Embankment Development Project

Table A4.9: Proposed Schedule for the Program

Table A4.10: Budget Estimation for the Program

LIST OF FIGURES Figure A4.1: Organizational Structure of Skill Training Program

Figure A4.2: Funding Mechanism for Skill Training Program

Page 209: Download 2.56 MB

Appendix 4 193

1. Introduction 1. The Livelihood Restoration Program (LRP) is a program to reduce social risk in the implementation of Flood Management Selective River Basin Project in order to ensure that the implementation of the program can be undertaken appropriately. The main target group of the project is vulnerable categorized households and those of entirely affected as part of the Land Acquisition Resettlement Plan (LARP) document of the embankments development activity in Ciujung River Basin of Serang Regency in Banten Province. The vulnerable categorized households are chosen as the primary target in this program in order to ensure that their lives condition is improved or at least similar to the initial condition.

2. The LRP, which contains livelihood recovery program, is based on the detailed measurement survey (DMS) and socio-economic survey (SES) that have been implemented in five regencies and nine villages along the 11.8 km of Ciujung River Basin and the livelihood recovery program plan for affected households which is compiled by Serang Regency Government for the period of 2015-2019.

3. This LRP will be implemented in the form of various programs, i.e. economic empowerment, institutional capacity building of farmers groups, education and entrepreneurship training, business assistance during the transition period, community institutional capacity building, improvement of education quality, improvement of sanitation facility and environment, Hygienic and Healthy Life Behavior (PHBS) improvement program, and many others which will be implemented by Serang Regency before the construction activities is carried out during the 5 years period of 2015-2019.

2. Objectives of the Program 4. The following are objectives of the livelihood restoration program (LRP):

(i) Restore the livelihood and income of affected households (RTD) who live along the 11.8 km of Ciujung River Basin in which the embankment activity will be carried out (corridor of impact);

(ii) Improve the quality of human resources for the affected households (RTD) through the development of a creative, innovative and entrepreneurial mindset;

(iii) Improve the institutional capacity of farmers and community; (iv) Increase the awareness of healthy lifestyles for affected people who live in the

corridor of impact; and (v) Improve the environmental quality in the corridor of impact area.

5. There are some things which need to be considered in deciding the appropriate livelihood restoration program: among others (i) the nature of loss and/or asset situation of affected people; (ii) the needs, issues, and preferences the affected people, (iii) the readiness level of affected people to participate in the livelihood recovery activities, and (iv) socio-economic conditions of the affected people.

3. The Land Acquisition Activity Principles in the Livelihoods Recovery Program

6. The principles of land acquisition activities set out in the Land Acquisition Activity Framework (Draft of LARF) and Land Acquisition Activity Plan (Draft of LARP) specify that the livelihood loss suffered by the affected households shall be indemnify through income

Page 210: Download 2.56 MB

194 Appendix 4

restoration program that will be given to vulnerable categorized and entirely affected households. This activity is carried out to maintain the pre-project’s standard living of affected households, while increasing their revenue and productions. Special measures have been incorporated in the draft of LARP, including mitigation activities to protect the socio-economic conditions of the poor and vulnerable categorized of affected households. The poor and vulnerable categorized of affected households are entitled to participate in the Livelihoods Recovery Program. In addition, vulnerable and poor affected people will also be given the opportunity to be involved in the construction activities. The LRP education and training activities will be undertaken separately for women, including female heads of households and poor categorized women.

4. Target Group 7. The embankment construction activity along 11.8 km in Ciujung River Basin is estimated to require ± 190,44 Ha of land and will pass through five districts and nine villages. The total parcels of affected land amount is 1,811 and occupied by 1,887 AHs of the 1,811 parcels, 21% of land are situated along the footprint area, 12% are located along the river-dike sections, 13% are permanent borrow pit areas, and 4% are in temporary borrow pit area.

8. In respect to land acquisition plan for the embankments construction activity in Ciujung River Basin, the project management will do their best to minimize the land acquisition activity in order to avoid negative impacts on the potentially affected people who live along Ciujung River Basin. The target group of the livelihood recovery program is vulnerable categorized affected people and those of exposed to high severity impact, both on land and building structural aspects.

Table A4.1: Relative Location of Villages in the Ciujung Land Acquisition Corridor

Village Location Along Ciujung Impact Area Total Parcels Total AHs Right Bank

Left Bank

Other Footprint River - Dike

Both Footprint/ River-Dike

Permanent Borrow pit

Temporary Borrow Pit

# % # %

Blokang 273 0 0 32 41 79 121 0 273 15% 281 15% Dukuh 63 33 5 25 0 63 3% 67 4% Gandayasa - 158 - 74 9 75 - 158 9% 174 9% Katulisan - 217 - 36 46 135 - 217 12% 239 13% Kp Baru 163 0 0 20 6 137 0 163 9% 171 9% Malabar 171 0 0 25 8 102 36 0 171 9% 177 9% Nagara 326 0 0 78 61 92 95 0 326 18% 330 17% Panasogan 0 174 0 49 15 110 0 174 10% 178 9% Panyabrangan 64 134 - 50 35 113 - 198 11% 202 11% Kamuning

68 68 68 4% 68 4%

Totals 1,060 683 68 397 226 868 252 68 1,811 100% 1,887 100% Source: Survey by Geo and Equator, 2014. Note: “Other” refers to the temporary borrow pit area within the village of Kamuning, not situated along the 11-km project stretch of the Ciujung River.

9. Table A4.2 further indicates that a total of 1,904,395.31 m2 of land will be affected by the project: all lands (96%) along the footprint, river-dike and borrow pit areas within the 11-km stretch of the Ciujung River will permanently be affected. Only those in Kamuning Village (4%) are subject to temporary land losses. Of the 68 AHs in Kamuning, 66 will experience temporary land loss. Severity of land loss is computed at 64.4% with Nagara highsest at 78.97% severity and Gandayasa lowest at 47.59%.

Page 211: Download 2.56 MB

Appendix 4 195

Table A4.2: Impacts on Land by Village, Location and Affected Households

Village Total Area

owned by AHs (m2)

Impact area (m2) Land Loss

(m2) Severity

No of Parcels Total No of AHs Permanent Temporary

No % No % Footprint River-Dike

Both Footprint/ River-Dike

Borrow pit

Borrow pit

Blokang 603,655.19 32 41 79 121 0 382,616.74 63.38% 273 15.07% 281 14.89% Dukuh 91,247.47 33 5 25 0 60,210.17 65.99% 63 3.48% 67 3.55%

Gandayasa 262,588.83 74 9 75 - 124,971.75 47.59% 158 8.72% 174 9.22% Katulisan 267,226.68 36 46 135 - 166,223.76 62.20% 217 11.98% 239 12.67% Kp. Baru 270,923.55 20 6 137 0 132,670.41 48.97% 163 9.00% 171 9.06% Malabar 278,938.82 25 8 102 36 0 204,319.59 73.25% 171 9.44% 177 9.38% Nagara 473,334.16 78 61 92 95 0 373,814.87 78.97% 326 18.00% 330 17.49%

Panosogan 253,136.27 49 15 110 0 154,976.74 61.22% 174 9.61% 178 9.43% Panyabrangan 296,515.53 50 35 113 - 190,665.46 64.30% 198 10.93% 202 10.70%

Kamuning 159,680.37 68 113,925.82 71.35% 68 3.75% 66 3.60% Totals 2,957,246.87 397 226 868 252 68 1,904,395.31 64.40% 1,811 100.00% 1,887 100.00%

Source: Survey by Geo and Equator, 2014.

10. The target group of this LRP program shall be vulnerable categorized household. According to SPS ADB of 2009, the vulnerable group is defined as a certain group of people who might suffer the impact disproportionately or those of facing the risk of becoming more marginalized due to the project and they specifically include: (i) households headed by female; (ii) household headed by disabled people; (iii) household whose economic condition is below the line of generally prevailing poverty indicators; and (iv) household headed by elderly people. This definition is in line with Law No. 39 of 1999 (Article 5 of Explanation) on Human Rights (HAM), whereby the vulnerable group of people is defined as those of elderly, children, the poor, pregnant women and people with disabilities.

11. Based on the above definition, of a total of 1.887 households that have been surveyed, 56.17% or 1.060 HH’s is categorized as vulnerable which is scattered in a number of villages, i.e. Panyabrangan (12.26%), Katulisan (11.98%), Nagara (11.7%), Malabar (8.02%), Blokang (7.64%) (see Table A4.3). Table 3 further shows that of the total AHs (1,887), about 57% are vulnerable. Of those that are vulnerable (1,060), almost 75% belong to those with income below minimum wage, followed by elderly household heads (34%), households headed by women (21%) and disabled household heads.

Table A4.3: Impacts on Vulnerable Households

Village Total AHs HH with Income Below Minimum

Wage

Elderly HH head (65 or more)

Disabled HH head

HH headed by female

Vulnerable Ahs

% Vulnerable

AHs Blokang 156 55 23 11 21 81 7.64% Dukuh 67 20 5 0 7 29 2.74% Gandayasa 174 80 28 0 21 93 8.77% Katulisan 239 90 52 17 36 127 11.98% Kp Baru 171 60 53 10 24 100 9.43% Malabar 138 55 37 4 13 85 8.02% Nagara 231 98 25 9 22 124 11.70% Panasogan 178 65 30 8 25 90 8.49% Panyabrangan 202 100 31 4 14 130 12.26% Blokang 125 61 25 0 13 73 6.89% Kamuning 68 50 9 0 11 55 5.19% Malabar 39 12 16 0 1 22 2.08% Nagara 99 41 23 0 10 51 4.81% Total 1,887 787 357 63 218 1,060 100.00%

% of Tot Vulnerable Ahs 74.25% 33.68% 5.94% 20.57% 100.00% % of Tot AHs 41.71% 18.92% 3.34% 11.55% 56.17%

12. One of the vulnerable groups that will be deployed as the target group is poor people. For this, it should be acknowledged the size or standard of poverty from a variety of sources. The concept of poverty measuring according to the Central Bureau of Statistics (BPS) is the

Page 212: Download 2.56 MB

196 Appendix 4

ability to meet basic needs or basic needs approach. Hence, the poverty is seen as an economic inability to meet the basic needs of food and non-food as measured from the expenditure side. Therefore, the Poor is a group of people whose average monthly per capita expenditure is below the poverty line. The per capita expenditure (purchasing power) is the ability of people to spend their money for goods or services.

13. Based on the criteria of the BPS, the poverty line (GK) is the sum of Food Poverty Line (FPL) and Non-Food Poverty Line (NFPL). The person whose average monthly per capita expenditure is below the poverty line is categorized as poor. In Banten Province, the number of poor people in rural area is 2.4714.000 with the percentage of 5.35% whose average monthly per capita expenditure of less than Rp 304,636/capita/month for the town and village or particularly in the village is under Rp 281,925/capita/month (please refer to Table A4.4).

Table A4.4: Number and Percentage of Poor People and Poverty Line in Banten Province as of March 2014

Province

Number of Poor People (000) Percentage of Poor People (%) Poverty Line (Rp/capita/mont)

City Village Citu+Village City Village Citu+Villa

ge City Village Citu+Village

Banten 375.69 247.14 622.84 4.73 6.67 5.35 315.239 281.925 304.636

Source: http://www.bps.go.id/ 2014.

14. Based on the survey data, the monthly average consumption expenditures of affected households, including expenses for food and non-food items is Rp 2,492,225. Nonetheless, based on the standard poverty line criteria of BPS, there is no potentially affected household under the poverty line. In terms of income, household income, average income of household in corridor area of land acquisition of Ciujung river Basin is Rp 3,250,000 per month. This is higher than the regency minimum wage (UMK) of Serang Regency of Rp 2,080,000 per month. However, there are still potentially affected household with the income of less than Rp 500,000 per month, i.e. 787 households or 41.71% of the total number of households interviewed in the corridor of land acquisition in Ciujung River Basin. Income of less than Rp 500,000 will mean that spending per capita is also low. Therefore, based on temporary data, the percentage of poor people is 74.25% of the vulnerable categorized affected people. As for the types of vulnerability there is households headed by women and the elderly, i.e. 20.57% and 33.68% respectively of the total households.

5. Socio-Economic Profile of Affected Households

a. Profile of the age of household head, wife and number of household members in the Corridor of Land Acquisition in Ciujung River Basin

15. Head of household in the area of land acquisition corridor of Ciujung River Basin is dominated by those of with the age of 16-25 years (57%), followed by the 26-40 year bracket (16%) and with the 0-15 year age group or the children, at 14%. All other age groups is in the single digit percent. The population can be established as belonging more to the young age group with the 8% of the productive population carrying the burden for the estimated 70% young and elderly population.

b. The status of the household head and members by sex

16. The people generally are patriarchal within project sites. Around 88% of HH heads are males and 12% females. However, there are more female HH members than males. Along the left bank, 60% are female, 59% females along the right bank, 59% of the total household members are female and 68% females in temporary borrow pit areas. Average HH sixe is computed at 3.5 or 4 persons per HH.

Page 213: Download 2.56 MB

Appendix 4 197

c. The average size of household per village

17. The size of household in nine villages is ranged from 1-5. The average size is 3.55 – the number of household members is about 3-4 people. Villages which number of household members is more than 4 people are Blokang, Kampung Baru, Malabar, Nagara, and Panyabrangan. In the meantime, other villages have number of household members of average 1-4 people, and Dukuh Village is reported to have the smallest average number of household members.

d. Religious identity of household head and member

18. Around 59% of AHs are Javanese as against 41% Sundanese. The only area that has more Sundanese is in the temporary borrow pit areas of Kamuning where almost all AHs are Sundanese. Sundanese culture has a number of similarities with Javanese, however it differs by being more overtly Islamic, with less Hindu-Buddhist elements, and has a less rigid system of social hierarchy.51

19. Almost all AHs are Muslims, with just 7 Christians: 3 in Gandayasa and 2 each in Nagara Panyabrangan.

e. Educational Status

20. Most household heads and their respective family members have low level of education. About 50% of the household heads graduated from primary education (elementary), 14% continued to secondary education (high school) but did not finish, 12% did not finish elementary, 8% have not experienced any formal education, 6% are still in elementary, and 5% for those who have completed high school and college.

21. As for the family members, 27% have graduated from elementary only and did not continue to secondary education, 21% reached high school but did not finish and only 18% have completed their secondary education.

f. Occupation

22. Level of education of household heads is believed to affect their jobs. The low educational level has encouraged many people in this area to work as farmers. There are 1,941 or 74.62% of household heads in the land acquisition area who work as farmers and 307 or 11.80% are working as drivers or labor as can be seen in Table 6. This indicates that majority of affected people are working in farming and informal sectors and they need alternative side job to cover their daily necessities.

Table A4.5. The Occupation of Affected Households in Each Village Total

Village 1 2 3 4 5 6 7 8 None Number

Blokang 263 10 42 27 5 0 1 0 2 350

Dukuh 82 2 1 2 0 0 0 0 0 87

Gandayasa 162 6 28 26 6 0 5 0 0 233

Katulisan 222 7 52 39 18 5 0 9 0 352

Kampung Baru 228 4 23 31 4 6 0 4 0 300

Malabar 211 2 34 12 8 3 0 0 3 273

Nagara 332 4 55 15 2 0 0 0 6 414

51 Hefner, Robert (1997), Java's Five Regional Cultures. taken from Oey, Eric (editor) (1997). Java. Singapore: Periplus Editions.

pp. 58–61.

Page 214: Download 2.56 MB

198 Appendix 4

Total

Village 1 2 3 4 5 6 7 8 None Number

Panosogan 193 0 42 27 15 1 0 5 0 283

Panyabrangan 248 6 30 11 11 0 0 3 0 309

Kemuning 0 0 0 0 0 0 0 0 0 0

TOTAL 1,941 41 307 190 69 15 6 21 11 2,601

Percentage (%) 74.63 1.58 11.80 7.30 2.65 0.58 0.23 0.81 0.42 100

Source: Social-Economic Survey, PPTA of August 2014 Note: 1) Agriculture; 2) Entrepreneur/trader; 3) Drive/Labor; 4) Employee (private/government); 5) Retirement; 6) Unemployed/searching for a job; 7) College Student/Student; 8) Others

g. Frequency distribution of monthly average household income: Number of households by income category

23. Based on the questionnaire recapitulation, most of the affected households in embankment, river bank and borrow pit area have the range of monthly income of Rp 1,000,000-Rp 2,000,000 and then followed by the income of less than RP 1,000,000. This is lower than the regency minimum wage (UMK) of Serang Regency of Rp 2.080000 per month. This indicates that households in this area cannot cover their daily needs and they need side jobs to do so.

Table A4.6: Range of Monthly Income of Affected Households in Each Village

Village

Area

Number Embankment River Bank Borrow Pit (Spilway)

1 2 3 4 5 1 2 3 4 5 1 2 3 4 5

Blokang 31 43 18 18 1 34 54 11 20 1 13 84 19 2 1 350

Dukuh 4 22 10 21 0 6 15 3 6 0 0 0 0 0 0 87

Gandayasa 31 82 26 10 0 16 52 14 2 0 0 0 0 0 0 233

Katulisan 54 56 30 31 0 57 65 27 32 0 0 0 0 0 0 352

Kampung Baru 28 87 27 15 0 29 75 25 13 1 0 0 0 0 0 300

Malabar 34 65 13 15 0 32 58 9 11 0 9 23 3 1 0 273

Nagara 0 0 0 0 2 33 71 15 30 3 32 53 6 0 2 247

Panosogan 76 146 45 58 0 25 69 14 17 0 0 0 0 0 0 450

Panyabrangan 35 76 25 26 0 30 78 19 20 0 0 0 0 0 0 309

Kemuning 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

TOTAL 293 577 194 194 3 262 537 137 151 5 54 160 28 3 3 2601

Percentage (%) 11.3 22.2 7.5 7.5 0.1 10.1 20.7 5.3 5.8 0.2 2.1 6.2 1.1 0.1 0.1 100

Source: Social-Economic Survey, PPTA of August 2014 Note: 1) < Rp 1.000.000; 2) Rp 1.000.000 - Rp 2.000.000; 3) Rp 2.100.000 - Rp 3.000.000; 4) Rp 3.100.000 - Rp 5.000.000; 5) > Rp 5.000.000

h. Status of monthly consumption pattern of the affected households

24. There are about ten different types of monthly consumption expenditures of affected households, i.e. food, transport, housing payment, the cost of electricity, water, education, health, savings, entertainment, and others. The average cost of overall consumption spent by affected households is Rp 2.492.225.00. The cost for food is the biggest expense of all, which is

Page 215: Download 2.56 MB

Appendix 4 199

about Rp 1,283,439 or 51.5% of the total cost. Meanwhile, the smallest cost is for housing payment/rent.

6. Consultation 25. The consultation activity with affected people about alternative economic recovery program which needs to be implemented has been carried out through a series of consultation activities during the implementation of IOL/SE Survey for affected households in the embankment as well as in the river banks area.

26. A discussion on the economic recovery program for the affected people along Ciujung River was held with Serang Regency Administration on April 15, 2014 at Local Secretary Office of Serang Regency. The discussion came up with the conclusion that each office will submit livelihood recovery program for affected people along Ciujung River. Local government’s offices that have submitted proposals, budget allocation and schedule of activities of the program are: Agriculture Office, Social Welfare Office, Environment Agency of Serang, and Local Disaster and Flood Mitigation Agency of Serang. The proposed programs have been analyzed and concluded that those programs are too broad and less specific for Ciujung River Basin. A more specific discussion on the program will be carried out by inviting relevant agencies as follows: a) Cooperative, Industry and Trade Office, b) Social Office, c) Health Office, d) Local Environmental Office d) Spatial Planning, Building and Settlements Office, e) Family Planning, Community Empowerment and Women Office, f) Fishery Office, and g) Manpower and Transmigration Office.

7. The Ongoing Social Programs of Serang Regency in 2014 along Ciujung River Basin 27. The ongoing empowerment programs of Serang Regency in 2014 by the local government working units are as follows:

(i) Agriculture Office. In 2014, the Agriculture Office of Serang Regency is implementing a processing enhancement program for agricultural products which is intended for all sub-districts, including 5 sub-districts along Ciujung River Basin. The program covers land area as wide as 25,819 ha.

(ii) Cooperative, Industry and Trade Office. In 2014, Cooperative, Industry and Trade Office of Serang Regency is implementing business development program in all sub-districts (29 sub-districts) for business activities categorized as home industry, small and medium enterprises. Unfortunately, the provision of venture capital still cannot be accommodated for all sub-districts, as it’s only focused for Kragilan Sub-District in the northern coast region and Blokang Sub-Districts of Malabar Village.

(iii) Environment Office. The programs which is carried out in 2014 are among other centralized in the eastern region (Ciruas, Pamarayan) such as green open space (RTH), reducing the critical land area. More to the point, flood management and seeding programs were undertaken in April and May 2014.

(iv) Spatial Planning Office. The Pansimas and Sandimas programs are specifically made available in 2014 for Housing and Human Settlements sector. Whilst the flood mitigation program is carried out in Kibin Sub- District.

(v) Public Works Office. In 2014, a dam development program is carried out in Ciujung River Basin such as in Cikeusal and Katulisan as well as in another region, i.e. Cicangkok.

Page 216: Download 2.56 MB

200 Appendix 4

(vi) Fisheries Office. The catfish breeding and fish feed manufacturing programs is also carried out in 2014 in Cikeusal for 2 groups.

(vii) Disaster and Flood Mitigation Agency. In 2013, a flood mitigation program was implemented in 17 flood affected sub-districts. In 2014, the program is focused on five sub-districts along Ciujung River Basin, such as flood mitigation counseling program and disaster evacuation simulation for flood affected areas. This program is conducted for 50 people in each batch.

(viii) Education Office. In 2014, the program is focused on renovation or rehabilitation of schools affected by the flood in Ciujung River Basin area such as SD Gandayasa and SD Katulisan. In 2011-2012, SD Kragilan building was constructed, but for only one classroom, let alone the 2nd floor. The construction of 2nd floor is carried out in 2014. Problem: School buildings that have been built are damaged because of flood.

(ix) BKPMD. The following are empowerment programs implemented in Ciujung River Basin area in 2014: a. Institutional capacity building through education and training, technical training,

PKK, and local youth organization. b. PNPM Facilities: Access to capital, improvement of rural facilities and

infrastructures. c. The services or assistance to affected people.

8. Impact Identification Analysis of Land Acquisition Activity for Affected Households in Ciujung River Basin Area

28. The land acquisition activity for the construction of embankments along the 11.8 km in Ciujung River Basin will bring various negative impacts to the lives of affected households. The negative impacts that potentially occur and for that the livelihood recovery program for affected households needs to be carried out to overcome them can be seen in the following Table A4.7.

Table A4.7: Impact Analysis of Land Acquisition Activity in Ciujung Basin No. Type of Impact Size of Impact Nature of Impact

1 The obstruction of the loss of livelihood /other activities

The land owner farmers or share-croppers will experience the change or loss of livelihood as they will have to relocate to another area.

Land owners non-farmers will also experience the change or loss of livelihood as they will have to relocate to another area.

This impact is temporary for the land owner farmers as they can buy lands in another area. This impact is temporary for the land owner as they can buy lands and open business/working in another area.

Vulnerable group: Share-croppers will experience the change/loss their livelihoods as they have to move to new area. Poor family who do not have land will experience the change/lose their livelihoods as they have to move to new area. The female head of households will experience the change/lose their livelihoods as they have to move to new area. Children will experience distraction of access to their schools.

The impact is permanent as they have to find new till land in the embankment are or another area. The impact is permanent as they have to find new jobs in another area. The impact is permanent as they have to find new jobs in another area. The impact is permanent as they have to move to new schools near their new houses.

Page 217: Download 2.56 MB

Appendix 4 201

No. Type of Impact Size of Impact Nature of Impact 2 The change or

decrease of income There will be a decrease in agricultural products’ value. This particularly will be experienced by land owner farmers. Land owners non-farmers will experience the decrease of income during the transition period.

This impact is temporary for the land owner farmers as they will buy lands in another area. This impact is temporary for the land owner as they can buy lands and open business/working in another area.

Vulnerable group: Share-croppers will lose their livelihoods as there’s no land to be tilled. Poor family who do not have land will experience the change/lose their livelihoods as they have to move to new area. The female head of households will experience the change/decrease of income during the transition period.

The impact is permanent and they have to find new land to be tilled. The impact is permanent. The impact is permanent.

29. Based on the above-mentioned identification result, the socio-economic condition of affected households can be concluded that Land owners’ non-farmers and vulnerable group require livelihood recovery program that is adjusted to their real condition and problems so that the program can meet the objectives appropriately.

9. Alternative Option for the Type of Economic Recovery Program for Affected People in Ciujung River Basin

30. The following are some alternative livelihood recovery programs that can be implemented for affected people in the project site:

(i) Cash-for-work. This program is focused on the activities of cleaning, repair, and reconstruction after a disaster hit an area. The program will employ day workers in the short term with daily wages.

(ii) Cash grants. This is a grant program which is intended to specific target and criteria. This program requires the client to pay to the public by recruiting a number of workers or providing some goods at no cost to individuals categorized vulnerable in society.

(iii) In-kind Grants. This is a grant program in the form of equipment, animals, goods, programs, and others. An organization or community group handles the procurement and distribution processes. Some programs require the client to pay to the public by recruiting a number of workers or providing some goods at no cost to individuals categorized vulnerable in society.

(iv) Skills Training. This program trains clients on specific vocational skills which will improve their ability to find work and/or improves an existing business or to start a new one. The program covers training in general skills such as carpentry, tailoring, hair cutting, mechanical, making cakes, cooking, as well as training in agriculture, entrepreneurship and business management.

(v) Environmental Awareness Training. This program is deployed as part of a broader approach to improve special environment and social conditions of a physical infrastructure with the aim of enhancing the environmental and public

Page 218: Download 2.56 MB

202 Appendix 4

health. The program is aimed at promoting behavioral change which will affect the livelihood such as waste management and public health aspects.

(vi) Employment Services. This program is intended to make people who are not working can attain employment in various positions. The program also includes building a relationship with a company in the project activities and identifies the right candidates from the potentially affected people with good skills to fill the required position. The program can also provide counseling to job seekers to help them prepare Curriculum Vitae and learn the interview techniques. The program is only intended for unskilled labor of potentially affected people in the Corridor of Impact (COI).

(vii) Available Social Safety Nets. The program is mainly intended to target of the vulnerable categorized group, which consists of poor households headed by women, the elderly, households with disabled head/member and people who do not own land. The objective of this program is to identify the current social safety programs at national, provincial or regency/city level whether it includes programs for the neediest of vulnerable groups. This project will then provide support and information regarding the request for assistance from various programs.

(viii) Marketing Services. This program supports the marketing of products produced by the client. The program includes the identification of domestic and international markets, assisting in advertising, product placement, packaging or other related marketing functions, or a direct marketing and sales of products developed by the client through the existing retail outlets. This program is simple and in the business scale along the Corridor of Impact, which means that the program is implemented on a limited basis.

(ix) Business Development Services (BDS). This program is undertaken to support various business consulting needs of clients, including providing direct technical assistance in market research, product development, production/process improvement, pricing, packaging, financial management, accounting and/or other business functions. Once again, the simple nature and scale of the businesses affected in the corridor of impact will limit its usefulness in this case.

(x) Evaluation of Options. A wide range of program choices should be adjusted to the program’s objectives and the combination program between employment services and skill training can be used as the foundation of the program. The combination program is selected to take into account circumstances in which the affected households will receive cash compensation for their losses; thus further cash option is considered of not appropriate. It is also needs to be considered that the poor households with low skills, lack of business activity or people who just gain income from agricultural activities should be the main target of the program by providing employment opportunities for the unskilled potential affected people. The employment services and skills training will be better implemented before the construction begins in order to make it relevant to ADB's policies.

10. Proposed Programs

1. Employment Services

31. The embankment development plan along 11.8 km in Ciujung will provide many job opportunities, especially in the construction phase for communities along the corridor of impact of Ciujung River Basin. Based on the identification of livelihood and income of potentially affected households, they are generally working in agriculture and becoming drivers/laborer with income below the Regency Minimum Wages, so they need alternate side jobs to increase

Page 219: Download 2.56 MB

Appendix 4 203

income. Similarly for job seekers, job and business opportunities and in the construction phase are needed to meet their daily needs.

32. It is estimated that there will be about 15 types of jobs, which do not require special skills, available in the construction phase. As the Environmental Impact Analysis, recommendation, BBWS C3 will require the contractor to provide employment opportunities for local people, especially for the potentially affected people who do not have relevant background, skills and experience to the project work. The types of work that identified can involve potentially affected people are as follows:

(i) The work of cleaning and preparation of the land (the cutting of trees/plants, soil excavation, stockpiling).

(ii) The embankment structure work (construction of foundations, casting, installation of stones/bricks, stucco).

(iii) The construction of facilities and utilities (the construction of bridge, borrow pit, spillway, and sluice).

(iv) The finishing and greening work.

33. Facilitation and Organization. Manpower Office of Serang Regency together with BBWS C3 will establish a special committee in the recruitment process of workers in the construct stage, by issuing a policy that each contractor should involve potentially affected people in a proportional manner and in accordance with the program’s objectives. This will be contained as a clause in the contract between the contractor and BBWS C3. The contractor may deliver the need of the local workforce to every village by displaying "Announcement of Manpower Requirement" which is acknowledged by Manpower Office of Serang Regency and BBWS C3. Then all of program implementation should be reported to the Environmental Agency of Serang Regency as the implementation of recommendations of Environmental Impact Analysis of the construction of Ciujung River’s embankment.

34. Estimated Manpower Requirement in the Construction Stage. Some 183 people will be required for the construction of Ciujung embankment and 150 people of them (82%) will be supplied from around the project site, such as the security personnel, builders, picket crew, and daily laborers. Based on a review on the potentially affected people’s livelihoods, the manpower requirement in the construction phase can be supplied by them.

Table A4.8: Estimated Manpower Requirement in the Construction Phase in Ciujung River

Embankment Development Project

NO. SPECIFICATION THE MANPOWER REQUIREMENT

1 Project Manager 1 2 Site Manager 1 3 Site Engineer 2 4 Supervisor 4 5 Surveyor 3 6 Drafter 2 7 qa & qc 2 8 Quality Surveyor 2 9 Operator 20

10 Helper 150 TOTAL 300

Source: EIA of Ciujung BBWS C3, 2014.

Page 220: Download 2.56 MB

204 Appendix 4

2. Skill Training

35. The skill traning program is prepared based on a review on the socio-economic conditions of the potentially affected people and community inputs during the public consultation activities. The training modules will be developed based on the livelihood group of the potentially affected people who work in the agricultural and non-agricultural sectors and the modules will also be adapted to their educational level. The training activity will be carried out separately for women.

36. The skills training program will be undertaken in 2 stages: (i) the first stage before the relocation; and (ii) the second stage during the project implementation period as a follow-up of activities carried out in the first stage and provide feedback on the progress of the affected people after training. Components of skill training activities are: (i) facilitation and organization, (ii) logistics, and (iii) training delivery.

37. Facilitation and Organization. The following are main steps in the facilitation and organization processes:

(i) The initial meeting to establish the SAP Program Implementation Team under the coordination of BAPPEDA of Serang Regency;

(ii) The SAP Program Implementation Team prepares a more detailed program plan; (iii) The development of program plan; (iv) The establishment of facilitators at the regency level (5 facilitators are required); (v) The establishment of a training group for the affected households (related to the

distance and area); (vi) The SAP Program Implementation Team submits the implementation plan in all

regencies; and (vii) The facilitator arrange community organizations meeting in all affected villages to

improve the training needs based on further input from the affected households and prepare Training Group for the implementation of the program.

Figure A4.1: Organizational Structure of Skill Training Program

BAPPEDA OF SERANG REGENCY

SAP Program Implementation Team

Established from the elements of related local agencies or offices and BBWS

• Prepare Program Plan

• Develop the Program

• Establish Facilitator

• Establish group in each region

• Program Implementation

Page 221: Download 2.56 MB

Appendix 4 205

38. Funding Mechanism. Funding source for the implementation of Skill Training program comes from the Serang Regency’s local budget, which is allocated in 2015 until 2016. The budget allocation mechanism proposed to BAPPEDA of Serang Regency by each relevant office based on the type and implementation period of the program. The BAPPEDA then proposes the budget allocations, in the draft of local budget (RAPBD), for Skills Training Program for People Affected by Embankment Construction Project at Ciujung River Basin. The RAPBD is then consulted to local parliament for approval. In the implementation phase, the funding mechanism is proposed by the Program Implementation Team based on the identification and problems of potentially affected people and inputs from all facilitators and trainers.

Figure A4.2: Funding Mechanism for Skill Training Program

39. Logistics. Each facilitator will work with the environment/village in which the training is undertaken to organize venue, transportation and other necessities. Some 10% space of the total capacity will be provided for the poor in every village. To participate in the training, candidates will have to through selection or screening process after the invitation, which contains the necessary requirements, is placed on the announcement board in each village.

40. Type Skill Training Program. After having consultation with BAPPEDA of Serang Regency and related offices, local government prepared seven packages of initial training which include as follows:

(i) Entrepreneurship training for potentially affected people who change their livelihoods;

(ii) Technical training on agriculture, livestock and fisheries sectors;

BAPPEDA OF SERANG REGENCY

SAP Program Implementation

Team

TRAINING PROPOSAL

FACILITATOR TRAINING GROUP (PARTICIPANTS)

TRAINER TEAM

Page 222: Download 2.56 MB

206 Appendix 4

(iii) The institutional capacity building for farmer groups for improving agricultural production, business management and market access;

(iv) Training on improving micro and small enterprises; (v) Training on cultivation of agriculture, livestock and fisheries; (vi) Training Skills: mechanics, sewing, and crafts; and (vii) Joint Training: Entrepreneurship, technical, cultivation, improving micro and small

enterprises.

41. The training packets to be conducted will require modification and updating by a trainer team who have been selected before the training implementation and is adjusted to the socio-economic condition and the severity of the project’s impact. Only households categorized vulnerable and the most affected with a total of 1,273 or 34.3% of the total affected households can participate in the training program.

42. Program Implementation Schedule. All training activities for the first stage will be implemented in 6 months period. In the meantime, the second stage, as a follow-up program, will also be implemented in 6 months period. The program will be implemented after the payment of fair compensation has been completed. It is estimated that the preparation phase can be started in June 2015 and completed in June 2016. The program implementation schedule the can be seen in Table 11.

43. The initial time period for the construction is not affected by the resettlement plan so that there’s a room for the time flexibility in conducting trainings. For this reason, the activities in the first stage will be completed before the construction activity is started.

44. Budget Plan. The budget plan for the implementation of SAP program can be seen in Table 12. The estimated cost for the program is Rp 2,954,120,000.

Page 223: Download 2.56 MB

Appendix 4 207

Table A4.9: Proposed Schedule for the Program Component/

Activity STAGE 1 STAGE 2

Month 1 Month 2 Month 3 Month 4 Month 5 Month 6 Month 1 Month 2 Month 3 Month 4 Month 5 Month 6

1 2 3 3 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4

Facilitation and Organization

Initial brainstorming and meetings with BBWS, Bappeda, and related offices for the approval of SK on SAP program, including the discussion on the budget and organizational structure for the implementation of both employment service and skills training.

Ratification of SK on SAP Program and the establishment of SAP Program’s Implementation Team

Page 224: Download 2.56 MB

208 Appendix 4

Component/ Activity

STAGE 1 STAGE 2 Month 1 Month 2 Month 3 Month 4 Month 5 Month 6 Month 1 Month 2 Month 3 Month 4 Month 5 Month 6

1 2 3 3 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4

The training implementation plan will be reviewed by SAP Program’s Implementation Team of Serang Regency under the coordination BAPPEDA of Serang Regency.

The SAP Program’s Implementation Team proposes program plan and budget

The establishment and assignment of facilitators in all villages

The establishment Training Expert Team by SAP Program’s Implementation Team

The establishment of Affected Households Group based on the Distance and Area by SAP Program’s

Page 225: Download 2.56 MB

Appendix 4 209

Component/ Activity

STAGE 1 STAGE 2 Month 1 Month 2 Month 3 Month 4 Month 5 Month 6 Month 1 Month 2 Month 3 Month 4 Month 5 Month 6

1 2 3 3 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4

Implementation Team

Facilitator establishes community organization based affected people group that has been formed

Focused Meeting/Discussion in all affected villages to find out the training needed based on feedback from affected people and to select potential workforce who will be involved in the construction activities.

The determination of Final Training Group

Approval on Final Training Expert Team

Logistics

Page 226: Download 2.56 MB

210 Appendix 4

Component/ Activity

STAGE 1 STAGE 2 Month 1 Month 2 Month 3 Month 4 Month 5 Month 6 Month 1 Month 2 Month 3 Month 4 Month 5 Month 6

1 2 3 3 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4

The SAP Program’s Implementation Team holds a meeting with potentially affected people and select the Training Group

Preparing Training Schedule and Transportation

Development and Preparation of Modules

The SAP Program’s Implementation Team and Expert Team identify training needs based on the early identification Detailed Measurement Survey and SES 2014

Page 227: Download 2.56 MB

Appendix 4 211

Component/ Activity

STAGE 1 STAGE 2 Month 1 Month 2 Month 3 Month 4 Month 5 Month 6 Month 1 Month 2 Month 3 Month 4 Month 5 Month 6

1 2 3 3 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4

The development of training modules from 7 training modules proposed by an Expert Team for the need of affected households in order to increase their knowledge and skills in the business and agricultural activity sectors.

Training Implementation

Monitoring and Evaluation

Internal Monitoring

External Monitoring

Page 228: Download 2.56 MB

212 Appendix 4

Table A4.10: Budget Estimation for the Program

Component/Activity Quantity Unit Day Unit Price

(Rp) Total (Rp)

Total Per Affected

Household

Facilitation and Organization

Initial brainstorming and meetings with BBWS, Bappeda, and related offices for the approval of SK on SAP program, including the discussion on the budget and organizational structure for the implementation of both employment service and skills training.

10 Team

Member 3 500,000 15,000,000 5,767

Ratification of SK on SAP Program and the establishment of SAP Program’s Implementation Team

The training implementation plan will be reviewed by SAP Program’s Implementation Team of Serang Regency under the coordination BAPPEDA of Serang Regency.

10 Team

Member 3 500,000 15.000,000 5,767

The SAP Program’s Implementation Team proposes program plan and budget

10 Team

Member 3

500,000

15,000,000

5,767

The establishment and assignment of facilitators in all regencies 10 Team

Member 3

500,000

15,000,000

5,767

The establishment Training Expert Team by SAP Program’s Implementation Team

10 Team

Member 3

500,000

15,000,000

5,767

The establishment of Affected Households Group based on the Distance and Area by SAP Program’s Implementation Team

10 Team

Member 2 500,000 10,000,000 3,845

Facilitator establishes community organization based affected people group that has been formed

5 Facilitator 2 750,000 7,500,000 2,884

Focused Meeting/Discussion in all affected villages to find out the training needed based on feedback from affected people and to select potential workforce who will be involved in the construction activities.

5 Facilitator 2 750.000 7,500,000 2,884

The determination of Final Training Group 10 Team

Member 1 500,000 5,000,000 1,922

Approval on Final Training Expert Team 10 Team

Member 1 500,000 5,000,000 1,922

Logistics

Page 229: Download 2.56 MB

Appendix 4 213

Component/Activity Quantity Unit Day Unit Price

(Rp) Total (Rp)

Total Per Affected

Household

The SAP Program’s Implementation Team holds a meeting with potentially affected people and select the Training Group

95 Village/Group 2 500,000 95,000,000 36,524

Preparing Training Schedule and Transportation 10 Team

Member 1 500,000 5,000,000 1,922

RWG Organises Travel Arrangements 10 Team

Member 1 500,000 5,000,000 1,922

Development and Preparation of Modules

The SAP Program’s Implementation Team and Expert Team identify training needs based on the early identification Detailed Measurement Survey and SES 2014

20 Team

Member /Expert

3

500,000

30,000,000

11,534

The development of training modules from 7 training modules proposed by an Expert Team for the need of affected households in order to increase their knowledge and skills in the business and agricultural activity sectors.

20 Team

Member /Expert

3

500,000

30,000,000

11,534

Training Implementation

Instructor/Trainer 210 Package 2 500,000 210,000,000 80,738

Supporting Instructor 210 Package 2 250,000 105,000,000 40,369

Building 50 Package 2 2,000,000 200,000,000 76,894

Moderator 210 Package 2 150,000 63,000,000 24,221

Lunch 2650 Package 2 50,000 265,000,000 101,884

Snacks 2650 Package 2 25,000 132,500,000 50,942

Script, Handout, etc. 2650 Package 2 50,000 265,000,000 101,884

Participants’ transportation 2650 Package 2 50.,000 265,000,000 101,884

Training materials and tools 2650 Package 2 200,000 1,060,000,000 407,536

2,840,500,000 1,092,080

Administration Fee (4%)

113,620,000 43,683

Total

2,954,120.000 1,135,763

Page 230: Download 2.56 MB

214 Appendix 4

11. Monitoring and Evaluation

45. Internal Monitoring. The livelihood recovery program is designed and modified in accordance with the condition of potentially affected people. It is planned that there are six training packages to be implemented and the implementation process needs to be monitored and evaluated internally by using measurable indicators. The indicators that will be monitored and evaluated can be seen in Appendix 1.

46. External Monitoring. External Monitoring Agency (EMA) will analyze the following indicators:

(i) The effectiveness, impact and sustainability of the livelihood recovery program and the need for improvement and further mitigation steps, if necessary;

(ii) The capacity of the affected households to recover or re-establish their livelihoods and living standards. Special attention will be given to households categorized as severely affected and vulnerable households in order to make it in line with the objective of livelihood recovery program, i.e. to improve the socio-economic status of vulnerable categorized households;

(iii) The satisfaction condition with current economic activity and the type of problems encountered; and

(iv) Recommendations to address the problems.

47. The monitoring method consists of the following activities:

(i) Periodical site visits to ensure that those affected people receive comprehensive information related to the project objectives, impacts, compensation policy and their rights through an effective public information campaign. This activity will cover at least 30% of all potentially affected people.

(ii) Periodical site visits to assess whether the grievance procedure has been adequately explained to the affected people and can be implemented. This activity will cover at least 30% of all potentially affected people.

(iii) As for the evaluation study, the methodology will be based primarily on a comparison of the socio-economic conditions of the potentially affected people, both before and after relocation. For this purpose, a follow-up socio-economic survey will be conducted by the EMA to find out the standard of living of potentially affected people for nine months to one year after the completion of the implementation of the relocation program.

(iv) Data and monitoring result will be separated by gender.

48. The following are key indicators that need to be monitored for the livelihood recovery program:

(i) Number of potentially affected households/people who are eligible for the livelihood recovery program.

(ii) Number of potentially affected households/people who receive training on livelihood recovery program and those who participate in the project work (women, men, and vulnerable categorized potentially affected households/people).

(iii) Type of training to be conducted and the number of participants in each training session. (iv) The percentage of poor households living in villages along Ciujung River Basin and

participate in the training of livelihood recovery program. (v) The satisfaction level of participants towards the training and opportunities for

employment in the project. (vi) The percentage of potentially affected households/people who experience the increase in

their income (women, men, vulnerable categorized potentially affected households/people).

(vii) The percentage affected households whose standard of living increases (women, men, and vulnerable categorized potentially affected households/people).

Page 231: Download 2.56 MB

Appendix 4 215

(viii) The number or percentage of affected people who replace the use of agricultural land with production.

49. Data collection will be carried out through triangulation techniques as follows: (i) questionnaire, which will be given personally to the potentially affected people; (ii) interview, which will be determined purposively to potentially affected households; (iii) focus group discussion and village meetings; and (iv) meeting with the project staff.

50. Strategic Lessons for policy formulation and planning in the future will be assessed based on the monitoring and evaluation results towards the resettlement or relocation activity. This will be supported by Evaluation Study on Post-Relocation Implementation which will be carried out 6 to 12 months after the completion of all relocation activities.

Page 232: Download 2.56 MB

216 Appendix 4

APPENDIX 4-ANNEX. BAPPEDA BUDGET APPROVAL

Page 233: Download 2.56 MB

Appendix 4-Annex 217

Page 234: Download 2.56 MB

218 Appendix 4-Annex

Page 235: Download 2.56 MB

Appendix 4-Annex 219

Page 236: Download 2.56 MB

220

APPENDIX 5. PUBLIC INFORMATION BOOKLET

BUKLET INFORMASI PROYEK (PIB)

Kegiatan Pengelolaan Banjir Daerah Aliran Sungai (DAS) Ciujung

Kabupaten Serang – Provinsi Banten

Apa yang dimaksud dengan Rencana Proyek Pengelolaan Banjir Daerah Aliran Sungai (DAS) Ciujung?

Proyek Pengelolaan Banjir di DAS Ciujung merupakan proyek terpadu multi sektor yang mencakup kegiatan yang bersifat struktural maupun non struktural. Upaya Non-Struktural meliputi: (i) Pengelolaan Daerah Aliran Sungai (DAS) Ciujung secara partisipatif; (ii) Pengelolaan Tanggap Darurat bagi Warga di Sepanjang DAS Ciujung; (iii) Konservasi di daerah Hulu Sungai Ciujung; (iv) Pemberdayaan Masyarakat Warga Terkena Dampak (WTP) kegiatan pengadaan tanah.

Kegiatan struktural berupa pembangunan tanggul sungai Ciujung, sepanjang 11,8 km yang akan dimulai dari hilir Bendung Pamarayan hingga jembatan jalan tol Tangerang-Merak Pembangunan ini akan melintasi empat kecamatan dan delapan desa di Kabupaten Serang, yakni: (i) Kecamatan Kibin (Desa Nagara); (ii) Kecamatan Bandung (Desa Malabar dan Blokang); (iii) Kecamatan Cikeusal (Desa Panosogan dan Panyabrangan); (iv) Kecamatan Kragilan (Desa Dukuh dan Gandayasa); dan Kecamatan Pamarayan (Desa Pamarayan).

Pembangunan tanggul dimaksudkan untuk mencegah terjadinya banjir Sungai Ciujung, hingga 25 tahun periode banjir mendatang terutama di delapan desa yang berada di sekitar sungai. Dengan demikian, kerugian harta benda, gangguan psikologis dan hilangnya nyawa akibat banjir dapat diminimalisir dan dalam jangka panjang dapat dihilangkan.

Apa dampak proyek bagi warga yang tinggal dan berusaha di sepanjang Sungai Ciujung?

Berdasarkan pendataan awal area terkena dampak yang dilakukan pada Juni – Juli 2013 dan Juni - Agustus 2014, total lahan yang terkena proyek seluas 190 hektar. Lahan tersebut diperlukan untuk pembangunan tanggul, bangunan pelimpah, bantaran sungai (lahan di antara tanggul dan sungai), dan saluran drainase. Secara umum tanah yang akan dibebaskan adalah tanah hak milik (SPPT) di wilayah pemukiman dan pertanian. Sementara, . ??..bangunan dan ??……tanaman harus dibebaskan. Jumlah keseluruhan warga terkena dampak/pihak yang berhak adalah 1,887 keluarga (5,760 orang) dan 1,208 keluarga .di antaranya terkena dampak serius (kehilangan lebih dari 10% dari total asset yang dimiliki atau lebih dari 10% dari pendapatan produktifnya).

Apa prinsip utama yang diterapkan dalam pengadaan tanah untuk Proyek Pengelolaan Banjir DAS Ciujung ?

Prinsip utama dalam kegiatan pengadaan tanah adalah memastikan bahwa kehidupan warga terkena dampak tidak lebih buruk karena proyek dan memberikan kesempatan bagi warga setempat untuk mendapatkan manfaat dari proyek ini. Beberapa prinsip-prinsip dalam pengadaan tanah Proyek sebagai berikut:

a. Menghindari dan/atau meminimalisasi dampak proyek terhadap aset dan mata pencaharian warga.

b. Berkonsultasi dengan warga terkena dampak/pihak yang berhak dan organisasi masyarakat terkait sejak awal perencanaan proyek dan pengadaan tanah.

Page 237: Download 2.56 MB

Appendix 5 221

c. Memberikan informasi mengenai proyek, potensi dampaknya, dan hak-hak warga terkena dampak/pihak yang berhak. Memastikan partisipasi pihak yang berhak dalam rencana dan pelaksanaan proyek.

d. Meningkatkan atau setidaknya memperbaiki matapencaharian pihak yang berhak melaui; i) pemberian ganti kerugian atas tanah dan asset yang terkena pengadaan tanah sesuai nilai penggantian; ii) mendapatkan keuntungan dari proyek. Perhatian khusus diberikan pada pihak yang berhak yang miskin dan rentan

e. Pekerjaan konstruksi akan dimulai bila pembayaran ganti kerugian dan fasilitasi relokasi sudah diberikan pada pihak yang berhak.

f. Mekanisme penyelesaian keberatan yang efektif dikembangkan untuk mendengar dan menyelesaikan keluhan dan keberatan yang disampaikan warga selama pelaksanaan proyek.

Bagaimana pengadaan tanah untuk proyek dilaksanakan?

Kegiatan pengadaan tanah bagi rencana pengelolaan banjir DAS Ciujung mengacu pada ketentuan dalam Undang-Undang Nomor 2 Tahun 2012, dimana pengadaan yanah dilaksanakan melalui beberapa tahapan sebagaimana terlihat dalam bagan berikut:

Siapa yang berhak mendapat ganti kerugian dalam rencana proyek?

Pihak yang mendapatkan ganti kerugian adalah pihak yang menguasai atau memiliki objek pengadaan tanah (tanah, bangunan, tanaman, benda yang berkaitan dengan tanah, atau lainnya

yang dapat dinilai, seperti kehilangan usaha, perubahan profesi). Daftar pihak yang berhak diidentifikasi pada tahap persiapan pengadaan tanah dan ditetapkan oleh panitia pengadaan tanah pada saat pelaksanaan pengadaan tanah.

Apa saja keberhakan (entitlement) pihak yang berhak/warga terkena rencana proyek?

Keberhakan pihak yang berhak (WTP) dalam kegiatan pengadaan tanah dalam proyek ini adalah sebagai berikut:

a) Ganti kerugian untuk kehilangan tanah sesuai nilai penggantian penuh didasarkan pada hasil penilaian tim penilai independen dan profesional. Sisa tanah yang tidak dapat

Penetapan lokasi

Instansi yang memerlukan tanah mengajukan

pelaksanaan pengadaan tanah

kepada Ketua Pelaksana Pengadaan Tanah (BPN)

TIM (Inventarisasi dan identifikasi

penguasaan, pemilikan,

penggunaan dan pemanfaatan tanah)

(30 Hari)

Pengumuman inventariasasi

dan identifikasi aset terkena

dampak (14 Hari)

Musyawarah (nilai

kompensasi atas asset)

Perhitungan atau penaksiran harga

oleh lembaga Appraisal/MAPPI

(30 hari)

TIM

Melakukan verifikasi dan

perbaikan data

Hasil verifikasi

dan perbaikan atas Aset yang

terkena

dampak

Pengadilan

Negeri 30 hari

Pemberian Ganti Kerugian

Penyerahan Aset

Kasasi MA 30 hari

Penitipan di MA

PELAKSANAAN KONSTRUKSI

YA

YA

YA

NO

NO 14 hari

14

14 hari

14 hari

Page 238: Download 2.56 MB

222 Appendix 5

dimanfaatkan, dapat diberikan ganti kerugian terhadap keseluruhan tanah. Bantuan akan diberikan untuk memperbaharui dokumen kepemilikan tanah dan insentif pajak penerimaan ganti kerugian.

b) Ganti kerugian untuk tanaman ditetapkan sesuai hasil penilaian tim penilai independen dan profesional.

c) Ganti kerugian untuk bangunan ditetapkan sesuai hasil penilaian tim penilai independen dan profesional. Untuk bangunan yang terkena sebagian, selain ganti rugi bangunan yang terkena, juga akan diperhitungkan biaya perbaikan kembali bangunan yang tidak terkena. Ganti rugi biaya pemasangan listrik dan telepon akan diberikan bila ada.

d) Ganti kerugian kehilangan keterikatan dengan aset akan diberikan sesuai perhitungan penilai pertanahan.

e) Bantuan biaya pindah dan masa transisi pada warga yang harus pindah (relokasi).

f) Tanah pengganti akan diberikan untuk makam yang terkena proyek termasuk biaya pemindahannya.

g) Ganti kerugian akan diberikan untuk kehilangan usaha, pekerjaan, dan perubahan profesi.

h) Program pemulihan mata pencaharian akan diberikan kepada pihak yang berhak (WTP) yang terkena dampak serius dan pihak yang berhak (WTP) rentan termasuk warga miskin, rumah tangga yang dikepalai perempuan, kelompok lanjut usia, dan tidak memiliki tanah.

i) Disain proyek mempertimbangkan keamanan dan akses warga ke sungai

Warga yang sudah menerima ganti kerugian tidak diperkenankan untuk kembali tinggal di area yang sudah dibebaskan sepanjang Sungai Ciujung, baik di area pembangunan tanggul maupun area bantaran. Jika warga kembali ke area yang sudah dibebaskan tersebut dan sewaktu-waktu kegiatan konstruksi akan dimulai, warga yang bersangkutan tidak akan mendapatkan ganti kerugian tambahan.

Bagaimana keluhan/keberatan warga terkena dampak didengar dan diselesaikan ?

Penyelesaian keluhan/keberatan terkait dengan proses pengadaan tanah dan penanganannya, akan dilakukan melalui beberapa tahapan sebagai berikut:

1. Tahap pertama-Tingkat Camat dan Tingkat Desa/Lurah

Warga yang terkena dampak dapat mengajukan pengaduan secara lisan atau tertulis kepada Kepala Desa/Lurah atau Camat, atau melalui Komite Penanganan Keluhan (KPK) maupun fasilitator lapangan. KPK bersama Camat dan/atau Kepala Desa/Lurah memiliki waktu paling lama 14 hari sejak diterimanya keluhan untuk menyelesaikannya.

Bagaimana memantau pelaksanaan Kegiatan Pengadaan Tanah Bagi Pengelolaan Banjir di DAS Ciujung ?

Pemantauan Internal

BBWS C3 akan memastikan dilakukannya pemantauan dan supervisi internal untuk memastikan pengadaan tanah dilakukan sesuai dengan prosedur dan prinsip pengadaan tanah sebagaimana dijelaskan di atas.

Pemantauan Eksternal

Pemantau eksternal akan dilibatkan untuk memberikan penilaian independen secara berkala terhadap (i) proses pengadaan tanah yang akurat, transparan dan sesuai dengan prinsip dan keberhakan dalam pengadaan tanah; (ii) tercapai tidaknya tujuan pengadaan tanah; (iii) kondisi kehidupan pihak

Page 239: Download 2.56 MB

Appendix 5 223

yang berhak setelah menerima ganti kerugian; (iv) kebutuhan terhadap tindakan perbaikan yang diperlukan.

Siapa yang bertanggung jawab terhadap pelaksanaan proyek dan proses kegiatan pengadaan tanah?

Balai Besar Wilayah Sungai Ciujung Cidanau, Ciujung, Cidurian (BBWS C3), Kementerian Pekerjaan Umum dan Perumahan bertanggungjawab pada pelaksanaan dan kegiatan pengadaan tanah. Dalam proses pengadaan tanah, sebagaimana ketentuan dalam Undang-Undang Nomor 2 Tahun 2012, BBWS C3 akan bekerjasama dengan pemerintah propinsi Banten untuk persiapan pengadaan tanah (penetapan lokasi proyek) dan bekerjasama dengan Kantor Pertanahan (Badan Pertanahan Nasional) propinsi Banten untuk pelaksanaan pengadaan tanah. BBWS C3 juga bekerjasama dengan Pemerintah Kabupaten Serang untuk penyiapan dan pelaksanaan Rencana Aksi Sosial (program perbaikan matapencaharian) untuk warga yang terkena dampak serius dan kelompok rentan.

Bagaimana Jadwal Kegiatan Pelaksanaan Rencana Proyek dan Kegiatan Pengadaan Tanah?

Perkiraan jadwal kegiatan pengadaan tanah adalah sebagai berikut.

No. Tahapan Kegiatan Waktu Pelaksanaan

1 Perencanaan Maret 2014 s.d. Maret 2015 Penyelesian Rancangan Rinci Konstruksi Juni 2014 Konsultasi publik Mei – Juni 2014 Identifikasi Aset Terkena Dampak dan

Survei Sosial Ekonomi Pihak yang Berhak/WTP

Juni 2014

Penyiapan Program Pemulihan Mata Pencahariaan

Maret 2014 – Maret 2015

Penyusunan Dokumen Perencanaan Pengadaan Tanah

Review Perencanaan dan pengumpulan alas bukti

Oktober 2014 – Maret 2015

Penyingkapan ringkasan dokumen pengadaan tanah ke publik

Maret 2015

3 Persiapan Pemberitahuan rencana pembangunan oleh

Tim Persiapan Maret 2015

Identifikasi dan pendataan awal pihak yang berhak dan objek pengadaan tanah

Maret – April 2015

Konsultasi publik rencana pembangunan Mei - Juni 2015 Penetapan Lokasi Juni 2015 3 Pelaksanaan Pengadaan Tanah Juli s.d. November 2015 Inventarisasi dan identifikasi Juli – Agustus 2015 Penetapan Penilai Independen dan

Penilaian Obyek Pengadaan Tanah September 2015

Musyawarah Penetapan Ganti Kerugian Oktober 2015 Pemberian Ganti Kerugian Oktober – November 2015 Penyerahan Hasil Desember 2015 dan setelahnya 4 Monitoring dan Evaluasi Pemantauan Internal Berkelanjutan Pemantauan Eksternal Secara periodik setiap tahun

pelaksanaan proyek

Page 240: Download 2.56 MB

224 Appendix 5

No. Tahapan Kegiatan Waktu Pelaksanaan 5 Pelaksanaan Program Pemulihan Mata

Pencahariaan September 2015 s.d. September 2019

Siapa yang dapat dihubungi bekenaan dengan proyek?

Jika ada masukan dari masyarakat terkait rancangan dan pelaksanaan projek, termasuk pengadaan tanah , serta masukan lainnya silahkan menghubungi:

Balai Besar Wilayah Sungai Cidanau Ciujung Cidurian

• Bagian Pengadaan Tanah Proyek Pengendalian Banjir DAS Ciujung BBWS C3

• Alamat : Jalan Uztad Uzair Yachya No. 1, Serang, Banten

• Telp : 0254 20 6111

• Fax : 0254 22 7117

Page 241: Download 2.56 MB

Appendix 5 225

APPENDIX 6. TERMS OF REFERENCE FOR EXTERNAL MONITORING I. Project Background and Resettlement Impacts

1. The project will support the government and communities to better manage and mitigate flood risks. Project interventions will include (i) enhance data, information, knowledge base and institutional coordination for management of floods; (ii) upgrade or develop water management infrastructure; (iii) reduce erosion and improve watershed condition; and (iv) prepare communities to manage floods. The main beneficiaries will be floodplain communities in flood prone areas along the Cidanau-Ciujung-Cidurian (3 Cis) and Ambon – Seram river basin territories (RBTs), respectively located in Banten and Maluku Provinces. The construction of new dykes along the Ciujung River was selected as representative of candidate structural subprojects as the core subproject.

2. Dike construction will be sub-parallel to and set back from the Ciujung River commencing approximately 30 km upstream from the river mouth and extending approximately 11 km further upstream to the existing Pamarayan Weir. The area of the dikes is mostly flat mixed crop agriculture at elevations of about 10 to 20 m above sea level. Borrow pit areas are expected to be in mostly mixed land use areas at slightly higher elevations. 3. The land acquisition corridor covers 5 sub districts and 10 villages within the district of Serang in the province of Banten. The total parcels of affected land amount is 1,811 with total of 2,957,246.87 m2 and occupied by 1,887 AHs. There are 83 total structural units occupied by 93 AHs will be affected. These structures are classified as permanent (76%), semi-permanent (14%), and non-permanent (6%). The total affected croplands is 316,166.91 m2 belonging to 655 AHs. In addition, there are 176 stable businesses located in the project sites will be affected. Given the impacts, the land acquisition/resettlement for the FMSRB project is considered A, therefore an external monitoring and evaluation is required for the Ciujung Dyke Construction Sub project.

II. Objectives

4. The Project requires the services of external monitoring and evaluation experts1/qualified non-government organizations (NGOs) to conduct an external assessment of the extent to which resettlement and rehabilitation objectives are being met. Specifically, the objectives of the monitoring program are:

(i) To verify ongoing internal monitoring information; (ii) To verify whether the overall project and resettlement objectives are being met in

accordance with the Resettlement Plan (RP), and if not to suggest corrective measures; (iii) To assess the extent to which implementation of the resettlement plan complies with

ADB’s Safeguard Policy Statement (SPS); 2 (iv) To identify problems or potential problems; (v) To identify methods of responding immediately to mitigate problems and advise the

[name of the borrower or client] accordingly; and (vi) To verify if the livelihoods and the standard of living of affected persons (APs), including

those of the non-titled displaced persons, are restored or improved.

1 External experts mean experts not involved in day-to-day project implementation or supervision.

2 Including updating of the RP.

Page 242: Download 2.56 MB

226 Appendix 6

III. Tasks

5. The external experts will address specific issues such as the following:

(i) Verify the detailed measurement survey (DMS) database generated by the project management unit (PMU), identify differences in inventory of loss (IOL) and/or DMS recorded in the RP, and document changes to the database;

(ii) Confirm that all APs are eligible for compensation, resettlement and rehabilitation assistance, irrespective of tenure status, social or economic standing, and any such factors that may discriminate against achieving the project objectives; Payment of compensation, allowances and other assistance are as per approved RP;

(iii) Confirm timing of disbursement of payment and assess that the level of compensation is sufficient to replace their losses;

(iv) Public consultation and awareness of key information in the resettlement plan;3 (v) Coordination of resettlement activities with construction schedule; (vi) Land acquisition and transfer procedures; (vii) Construction/rebuilding of replacement houses and structures on residual land,

relocation sites (outside the residual land), and self-selected land; (viii) Implementation of gender and/or Indigenous Peoples measures as indicated in the RP; (ix) Level of satisfaction of APs with the provisions and implementation of the RP; (x) Effectiveness of grievance redress mechanism (accessibility, documentation, process,

resolution); (xi) Effectiveness, sufficiency, impact, and sustainability of entitlements and income

restoration programs and the need for further improvement and corrective measures, if any;

(xii) Relocation site development (civic infrastructure and community services as required), identification and selection of sites in consultation with APs and host communities, equivalent or enhanced access to livelihood opportunities, process and timeliness of providing land titles/certificates;

(xiii) Capacity of APs to restore/re-establish livelihoods and living standards. Special attention will be given to severely affected APs and vulnerable APs;

(xiv) Involuntary resettlement impacts caused during construction activities; (xv) Participation of APs in RP implementation; and (xvi) Adequacy of budget and human resources at executing agency/implementing agency

level for resettlement activities, including internal monitoring. 4

IV. Methodology

6. The methods for external monitoring activities include:

(i) Review of DMS process to be able to establish a baseline for monitoring and evaluating project benefits. The external monitoring organization (EMO) to check on a random basis5 the DMS process with APs, from identification to agreement on DMS results. The EMO will also evaluate the DMS process to determine and assess if DMS activities are being carried out/was carried out in a participatory and transparent manner.

(ii) Resettlement audit conducted during monitoring. The EMO will carry out random checks of payments6 disbursed to APs during monitoring. The EMO will submit a resettlement audit report upon completion of compensation payment to APs.

3 Scope of Land Acquisition and Resettlement Impacts, Entitlement Matrix, Grievance Redress Mechanism.

4 Assessment of human resources is in terms of both number of staff assigned, as well as capacity.

5 Depending on number of affected households (AHs).

6 Depending on number of AHs.

Page 243: Download 2.56 MB

Appendix 6 227

(iii) Review of socioeconomic data7 prepared during the Project Preparatory Technical Assistance (PPTA). With this review, the DMS data, and additional data compiled, the EMO will provide the baseline data to be used in comparison to the post-resettlement survey. A post-resettlement survey will be carried out one year following completion of all resettlement activities, including livelihood restoration activities. Sampling will include at least 20% of severely affected and vulnerable households, as well as at least 10% of all other APs. Special attention will be paid to the inclusion of women, ethnic groups, the very poor, the landless and other vulnerable groups, with set questions for women and other target groups. The database will disaggregate information by gender, vulnerability, and ethnicity.

(iv) Participatory Rapid Appraisal (PRA), which will involve obtaining information, identifying existing or potential problems, and finding specific time-bound solutions through participatory means including: (a) key informant interviews including representatives of civil society, community groups, and NGOs; (b) focus group discussions (FGDs) on specific topics such as compensation payment, income restoration and relocation;8 (c) community public meetings to discuss community losses, integration of resettled households in host communities or construction work employment; (d) direct field observations, for example, of resettlement site development; (e) formal and informal interviews with affected households, women, ethnic minorities, and other vulnerable groups to monitor and assess the progress the APs are making to restore their living standards, APs’ perceived need for additional assistance (and type of assistance), and their individual satisfaction with current economic activities; and (f) in-depth case studies of problems identified by internal or external monitoring that required special efforts to resolve. The PRA will also focus on good practices in land acquisition and involuntary resettlement objectives, approaches, and implementation strategies.

(v) Review the results of internal monitoring.

V. Timing & Team Composition

7. Standard large-scale infrastructure project. External monitoring activities will be carried out for a period of 3 year(s) on a semi-annual basis9 starting from the conduct of DMS until the completion of livelihood/income restoration activities. For project components where payment of compensation/allowances has been substantially completed, the external expert will also conduct a resettlement audit to verify completion of payment of compensation/allowances and hand-over of plots. 8. The external monitoring and evaluation experts10/qualified NGOs will be composed of one team leader with extensive experience in monitoring and evaluation of resettlement activities in the country with strong ability in preparing resettlement reports. He/she should demonstrate good communication skills and have at least a bachelor degree in a relevant field. The team leader will be assisted by at least 3 specialists(s) with expertise on land acquisition/resettlement and social development, monitoring and research methodology, and assets valuation. All reports will be submitted in English (and in local language, if required) to the government and ADB simultaneously.

7 Possible data sources include: census, IOL, socioeconomic survey, village records/documents.

8 Groups that may be targeted for involvement in FGDs include AHs in general, and vulnerable AHs such as women-headed

households, the poor, and ethnic minorities. 9 As per ADB SPS (2009). For projects deemed by ADB as highly complex and sensitive, ADB requires quarterly monitoring

reports - refer to ADB. 2010. Safeguard Policy Statement. Operations Manual. OM Section F1/OP, Para 27. Manila (issued on 4 March 2010).

10 External experts mean experts not involved in day-to-day project implementation or supervision.

Page 244: Download 2.56 MB

228 Appendix 6

VI. Deliverables

9. Inception report, including findings of review of baseline data, monitoring methodology and detailed work plan (in terms of sampling, timing, budget, other required resources) 10. Semi-annual monitoring report,11 including (i) methods used by the EMO during the monitoring period; (ii) progress of RP implementation, including any deviations from the provisions of the RP; (iii) identification of problem issues and recommended corrective actions to inform implementing agencies and resolve issues in a timely manner (refer to Table 1); (iv) identification of specific gender and ethnic minorities issues, as relevant; (v) report on progress of the follow-up of issues and problems identified in the previous reports; (vi) lessons learned that might be useful for future activities; and (vii) resettlement audit report.

Table A6.1: Sample Corrective Action Plan Summary Table

No. Survey code

Project Component Village Name of head of

Affected Household/ Name of AP

Name or use of

affected structure

Status of structures

Corrective Action

Budget (USD)

Schedule of implementation

of corrective action

By (date)

Total

11. Include Monitoring and Evaluation indicators (commonly a table in the RP). A set of suggested indicators are in Table 2,12 to be replaced with RP table as required:

Table A6.2: Indicators for Verification by External Experts Monitoring Indicator Basis for Indicator

Basic information on displaced persons’ households (Gender disaggregated data essential for all aspects)

• Location of the project • Composition and structure, ages, educational, and skill levels • Gender of household head

• Ethnic group • Access to health, education, utilities, and other social services • Housing type • Land and other resource-owning and resource-using patterns • Occupations and employment patterns • Income sources and levels • Agricultural production data (for rural households) • Participation in neighborhood or community groups • Access to cultural sites and events • Valuation of all assets

Restoration of living standards • Were house compensation payments made free of depreciation, fees, or transfer costs to the displaced persons?

• Have displaced persons adopted the housing options developed? • Have perceptions of community been restored?

11

Monitoring reports will be disclosed semi-annually/quarterly – depending on complexity of project (see footnote 10), upon receipt from borrower.

12 ADB. 2012. Involuntary Resettlement Safeguards: A Planning and Implementation Good Practice Sourcebook – Draft Working Document. Manila.

Page 245: Download 2.56 MB

Appendix 6 229

Monitoring Indicator Basis for Indicator

• Have displaced persons achieved replacement of key social and cultural elements?

Restoration of livelihoods (Disaggregate data for displaced persons moving to group resettlement sites, self-relocating displaced persons, displaced persons with enterprises affected)

• Were compensation payments free of deductions for depreciations, fees, or transfer costs to the displaced persons?

• Were compensation payments sufficient to replace lost assets? • Was sufficient replacement land available of suitable standard? • Did income substitution allow for reestablishment of enterprises and

production? • Have affected enterprises received sufficient assistance to

reestablish themselves? • Have vulnerable groups been provided income-earning

opportunities? • Are these opportunities effective and sustainable? • Do jobs provided restore pre-project income levels and living

standards? Levels of displaced persons’ satisfaction

• How much do the displaced persons know about resettlement procedures and entitlements?

• Do the displaced persons know their entitlements? • Do they know whether these have been met? • How do the displaced persons assess the extent to which their own

living standards and livelihoods have been restored? • How much do the displaced persons know about grievance

procedures and conflict resolution procedures? Effectiveness of resettlement planning

• Were the displaced persons and their assets correctly enumerated? • Was the time frame and budget sufficient to meet objectives, were

there institutional constraints? • Were entitlements too generous? • Were vulnerable groups identified and assisted? • How did resettlement implementers deal with unforeseen

problems?

Page 246: Download 2.56 MB

Appendix 7 230

APPENDIX 7. INTERNAL MONITORING AND REPORTING TEMPLATE I. General Progress in Resettlement Plan (RP) Implementation

Table 1. General Progress in Land Clearance and Handing Over of Land for Civil Works Project Compone nt/ Location [District/ Village,etc.]

AHs eligible for compensationa and/or

assistance/allowancesb

AHs required to relocate Remaining encumbran ces [Yes/No]

Land handed over for civil works

No. of AHs No. of AHs fully paid

% Progre ss

Total No. of AHs

No. of AHs resettled

c

% Progre ss

Date hand ed over1

Expect ed date to hand over

Civil works contra ct award date

Tot al AH s

N o. IP AH

No. of Femal eheade d AH

Tot al AH s

No . of IP AH

No. of Femal eheade d AH

Tot al AH s

No . of IP AH

No. of Femal eheade d AH

Tot al AH s

N o. of IP AH

No. of Femal eheade d AH

Component A Village 1

Village 2

Component B Village 3

Village 4

Total AH = affected housholds; IP = Indigenous Peoples a. All forms of compensation, including affected assets (land/ non-land, crops, etc.) or loss of income. b. Includes all types of allowances and assistance except income restoration, which is presented separately in Section III below. c. Includes households (HHs) provided interim measures agreed in RP such as rental assistance while waiting for completion of resettlement site.

Page 247: Download 2.56 MB

Appendix 6 231

Table 2. Disbursement and Use of Funds Location LAR Budget

Requiremen t

Source of Funding

1

Allocation Status

Funds Disbursed this Reporting Period

Specific Resettlement activities funded this Reporting Period

2

Timeliness of Fund Disbursement

Cumulative Funds Disbursement

Delay in targets for fund disbursement? (Y/N)

Reasons for delay

LAR = land acquisition and resettlement

Issues Affecting Timely Land Handover [Describe issues affecting timely land clearance or handover of land for civil works such as grievances (including non-agreement to compensation), unresolved encumbrances, funding constraints, other.] II. Resettlement

Table 3: Updated Resettlement Impacts Location AHs with

Affected Houses

AHs with Fully Affected Houses

AHs with Fully Affected Houses Partially Affected AHs

Change in Number of AHs with Fully Affected Houses Compared to Updated RP

Total House Built on Land Eligible for Compensation

Of which Vulnerable

3

Table 4: Confirmed Resettlement Preferences for Households with Fully Affected Houses

Location # of AHs with Fully Affected Houses

# of AHs Required to Relocate

# of AHs Opting for Replacement Land

# of AHs Opting for Self Relocation (HHs)

# of AHs that Can Rebuild on Remaining Land

1 E.g. Central Government, Province, Loan Funds, etc. 2 E.g. Number of resettlement sites developed, number and type of community facilities constructed, number of AHs fully compensated, livelihood restoration activities implemented. 3 E.g. Number of female-headed with dependents; number of poor; number of IPs, etc.

Page 248: Download 2.56 MB

232 Appendix 7

Table 5: Resettlement Solutions Implemented for Vulnerable Households Indigenous

People (HHs) Landless (HHs)

Poor (HHs)

Female Headed Households

Other [add as needed]

Rebuilt on remaining land

Rebuilt on another plot of land already owned

Rebuilt (e.g. moved back) out of COI but on public land

Rebuilt on other person’s land (e.g. relative)

Purchased replacement land elsewhere themselves

Provided with plot at resettlement site

Provided with replacement residential plot (nonresettlement site)

Solution Pending COI = corridor of impact

Table 6: Status of Resettlement Sites Resettlement Site*/ Location

Actual completion date

Scheduled completion date

Current status (briefly describe status of completion of infrastructure , etc.)

No. of plots allocated for project

No. of AHs to be allocated plots

No. of plots handed over to AHs

# AHs issued title

# AHs rebuilt houses

# AHs living in relocation site as of reporting period

* Include also separate residential plots to be provided to AHs even if these are not included in resettlement sites.

Other Remarks on Resettlement [Describe issues identified along with planned and completed remedial actions. Also provide additional information regarding delays in completing resettlement sites, if any, including actions to be taken.]

Page 249: Download 2.56 MB

Appendix 6 233

III. Income Restoration Program Status of Income Restoration Program [Provide updated details of income restoration activities to be provided, institutional/implementation arrangements, resource requirements and schedule.] Consultation with Eligible APs [What consultation activities were undertaken during the reporting period to assess needs and preferences of eligible APs? Describe how women and other vulnerable APs have been included in the consultation process.]

Table 7: Program Participation (Cumulative) Location No. of

eligible APs

Participation in Livelihood Restoration Activities Disaggregated by Gender and ethnicity

4 of AP [examples provided below, revise as

appropriate for specific Income Restoration Program]

Total # of APs

Of which vulnerable

5

No. of APs in Agricultural Extension

No. of APs in Mechanic Course

No. of APs in Sewing Course

No. of APs in Small Business Training

[other]

Village 1 Village 2 Village 3

Table 8: Effectiveness of Income Restoration Program Activities Location No. of

eligible APs

No. of APs employed in project-related jobs as of this monitoring period

# of APs employed in other jobs as of this monitoring period (post-resettlement)

Total # of employed APs

6

Of which vulnerable

7

(Specify type of Project related job)

(Specify type of Projectrelated job)

(Specify type of Projectrelated job)

(Specify type of job)

(Specify type of job)

Village 1 Village 2 Village 3 Other Remarks on Livelihood Restoration [Please describe any issues encountered and approaches taken to resolve these.]

4 In projects where there are IP issues 5 E.g. No. of female-headed with dependents, no. of poor; no. of IP 6 From those who participated in income restoration program 7 E.g. No. of female-headed households with dependents; no. of poor; no. of IP etc.

Page 250: Download 2.56 MB

234 Appendix 7

IV. Disclosure, Consultation & Participation

Table 9: Means of Disclosure of URP by Location Location [Village] Translated

approved URP disseminated to village office? (yes/no)

PIB disseminated to AHs (date/ method*)

PIB posted in public place? (yes/no)

Public meeting to present approved URP (date)

Target date to complete disclosure (date)

Village 1 Village 2 * Dissemination method such as handed out in public meeting, distributed house-to-house, etc.

Consultations Table 10: Consultation/Information Dissemination Meetings Conducted During Reporting

Period Date Venue Participants

[Disaggregated by gender]

Consultation content Meeting Minutes with PMU

V. Operation of Grievance Redress Mechanism (GRM)

Table 11: Summary of Grievance Cases by Level of GRM Location No. of pending

grievance from previous reporting period

No. of new grievance cases for reporting period

Total no. of cases received

No. of cases resolved

No. of cases progressed to next level

Level 1 Level 2 Level 3 Narrative Summary of Grievances [Provide a narrative summary of grievance cases by type of issue and location, for example…] [Where resolution of grievance resulted in any cases of land/assets compulsorily acquired, provide details along with information regarding relevant court or administrative decision and confirmation whether funds due from compensation and assistance have been placed in escrow account or provided to AP.]

Page 251: Download 2.56 MB

Appendix 6 235

VI. Other Issues Resolution of Issues [Provide information on status and/or resolution of issues raised in previous internal monitoring report; ADB monitoring; external monitoring report, etc.] New Issues [Provide information on other newly identified issues impacting the implementation of RP. These may include resource constraints, changes in scope of impacts, etc.] Institutional Matters and Capacity Training [Report on the following as applicable]

(i) Deployment of safeguards-related staff within PMUs. Key activities conducted by PMU safeguards staff during reporting period.

(ii) Capacity development training provided: type and number of trainings, number of staff/officers trained (disaggregated by gender).

(iii) Activities of community based organizations (CBOs)/mass organizations (as applicable).

(iv) Adequacy of resources for PMU staff and consultants.

(v) Issues in undertaking roles/responsibilities of different agencies.

Temporary Impacts during Civil Works [Describe temporary impacts during implementation, including quantities of impacts, #AHs, location, types, etc. and status of restoring temporarily affected assets as appropriate and the responsible agency.]