DOD Joint Services Readiness Support Center
description
Transcript of DOD Joint Services Readiness Support Center
Distribution Statement A: Approved for public release; distribution unlimited.
1 of 18
DOD Joint Services Readiness Support Center
Robert MillerIntegrated AEW Logistics [email protected]
Distribution Statement A: Approved for public release; distribution unlimited.
2 of 18
Our Vision
“Bring the Power of the ‘Information Age’ to the Warfighters and their
Support Force”
“Bring the Power of the ‘Information Age’ to the Warfighters and their
Support Force”
Distribution Statement A: Approved for public release; distribution unlimited.
3 of 18
Changing our Culture
We must think anew, we must act anew… …to face the challenges of the 21st Century Warfighter
Reactive Repair Stovepipe Information Labor Intensive
Processes Cycle-time Calculations
Reactive Repair Stovepipe Information Labor Intensive
Processes Cycle-time Calculations
Proactive Readiness Shared Knowledge Automated
Processes Real-time Action
Proactive Readiness Shared Knowledge Automated
Processes Real-time Action
Distribution Statement A: Approved for public release; distribution unlimited.
4 of 18
CapabilitiesCapabilities
Today Future
Distance SupportReachback
Common Tools,
Processes and Metrics
Collaborative
Shore/Fleet Support
Knowledge Management/Projection
Total Asset Global Visibility
Fully Implemented
Remote Monitoring,
Troubleshooting, and Analysis
Fully Implemented Remote
Maintenance
Fully Deployed ERP
Joint DistanceSupport and
ResponseSupply SupportPBLs
TechnicalData
Management
Navy IntegratedCall Center
Supply One Touch
Minimized operational reliance on shore infrastructure
Integrated Joint Logistics
Surface Warfare Logistics & Maintenance Vision
Distribution Statement A: Approved for public release; distribution unlimited.
5 of 18
O I D
The Current Process Isolates Support within Maintenance Levels
The Resulting Silos of Information Limit the Skills Growth of Maintainers Resulting in Decreased
Efficiency and Readiness
Today's Mindsets
Distribution Statement A: Approved for public release; distribution unlimited.
6 of 18
ReadinessSupportCenter
The RSC Will Broker Information Among All Maintenance Levels and Transfer Knowledge and
Skills Where & When They are Needed
All Participants Are Part of a Virtual Team -Interconnected by Technology and Focused on a
Single Goal: Support the Warfighters
Tomorrow’s Mindsets
Distribution Statement A: Approved for public release; distribution unlimited.
7 of 18
PolycomVTC
25 feet
22 feet
2
4 5
31
CameraSecure SignSecure Sign
N1N2
N3S1 S2
L1
L2 L3
L4X6423
X6425 X6426
X6427
X6180
X6234
ISDN:Line 1 - X0190 Line 2 - X0191 Line 3 - X0192
ISDN:Line 1 - X0190 Line 2 - X0191 Line 3 - X0192
= Laptop/CLIN
= NIPRNET
= SIPRNET
= Laptop/CLIN
= NIPRNET
= SIPRNET
L#
N#
S#
X7133
DocViewerDTV
A/VEquip
Spkr Spkr
KIV-7Madge
Spkr Spkr
Notes:•N3, S1 & S2 are intermediate legacy solutions.•Laptop/CLIN 0006 & N3 are not wired.
Notes:•N3, S1 & S2 are intermediate legacy solutions.•Laptop/CLIN 0006 & N3 are not wired.
VCR
Readiness Support Center
Distribution Statement A: Approved for public release; distribution unlimited.
8 of 18
Key Benefits
Provides Real-Time Next Generation Distance Support 2.0
Improves Readiness with Reduced Manning
Reduces Support Infrastructure Minimizes Time for Issue resolution Optimizes Training Enables Knowledge Projection
Distribution Statement A: Approved for public release; distribution unlimited.
9 of 18
Demonstration
Our Vision of support possibilities by:Harnessing the Power of Technology for the Warfighter
Our Vision of support possibilities by:Harnessing the Power of Technology for the Warfighter
Distribution Statement A: Approved for public release; distribution unlimited.
10 of 18
RSC Future
Follow-on Work Framework for Technical Document
Content Management Standardized Portal Content
Management System XML Database
Distribution Statement A: Approved for public release; distribution unlimited.
11 of 18
XML Conversion Mandate
DoN Guidance 23 October 2004
“… results of BCA for conversion must be reported by 28 February 2005”
“… plans and schedules submitted no later than 31 December 2005”
DoN Guidance 23 October 2004
“… results of BCA for conversion must be reported by 28 February 2005”
“… plans and schedules submitted no later than 31 December 2005”
Distribution Statement A: Approved for public release; distribution unlimited.
12 of 18
XML Document Conversion
Identified MIL-STD 81927 as source format for Work Package documents
Identified MIL-STD 3001 DTD as target format Identified 3rd party conversion software engine Engaged 3rd party developers to create XML
transformation and PDF XSLT software Processed sample document
NAVAIR 16-35T1250-2 into valid XML Created PDF transform to demonstrate print
capability
Identified MIL-STD 81927 as source format for Work Package documents
Identified MIL-STD 3001 DTD as target format Identified 3rd party conversion software engine Engaged 3rd party developers to create XML
transformation and PDF XSLT software Processed sample document
NAVAIR 16-35T1250-2 into valid XML Created PDF transform to demonstrate print
capability
Distribution Statement A: Approved for public release; distribution unlimited.
13 of 18
XML Conversion (cont’d)
Next Steps Inventory and categorize source documents
to determine the variety of source formats Work with Tech Pubs to refine XML tagging of
81927 format Finalize peripheral source tagging and image
management Complete PDF output transform Define HTML output transform for RSC use Identify XML Repository for RSC
Next Steps Inventory and categorize source documents
to determine the variety of source formats Work with Tech Pubs to refine XML tagging of
81927 format Finalize peripheral source tagging and image
management Complete PDF output transform Define HTML output transform for RSC use Identify XML Repository for RSC
Distribution Statement A: Approved for public release; distribution unlimited.
16 of 18
Instaknow NMCI Certification
Process changed 1 January 2005Pre-submittal to PMO pre-certification facility
(PPF) required before AIT Test labRequest To Deploy (RTD) form required
CDA RFS Registration in ISF Tools - Complete
DADMS (FAM) submission – Completed by Crane and awaiting NAVSEA approval
RTD form submission - In process
Process changed 1 January 2005Pre-submittal to PMO pre-certification facility
(PPF) required before AIT Test labRequest To Deploy (RTD) form required
CDA RFS Registration in ISF Tools - Complete
DADMS (FAM) submission – Completed by Crane and awaiting NAVSEA approval
RTD form submission - In process
Distribution Statement A: Approved for public release; distribution unlimited.
17 of 18
NV
Collaborative Resolution of Fleet Issues
Joint Distance Joint Distance Support and Support and
ResponseResponse
DS Crane
DS RSC Corona
DS RTASS RSC Keyport
EW RSC Crane
DS Pt Hueneme
RSC Crane
Chem Bio
Virtual ISEA
Virtual Sustainment
Fleet Advocate Commodore Chris FieldCOMVAQWINGPAC
RadarEW Pilot
Distribution Statement A: Approved for public release; distribution unlimited.
18 of 18
In ConclusionOur goal is to provide a dynamic, web-based combat system knowledge maintenance tool template that can:
Support combat systems real-time in remote/at sea locations Provide up-to-date maintenance/repair information Reduce equipment down-time with increased access to subject matter expertise Reduce rework and recurring problems through global issue tracking/resolution Be applied to any system – any service
Our goal is to provide a dynamic, web-based combat system knowledge maintenance tool template that can:
Support combat systems real-time in remote/at sea locations Provide up-to-date maintenance/repair information Reduce equipment down-time with increased access to subject matter expertise Reduce rework and recurring problems through global issue tracking/resolution Be applied to any system – any service