MINISTRY OF PUBLIC WORKS DIRECTORATE GENERAL OF HIGWAY AND ROAD MAINTENANCE GENERAL STATION OF IMPLEMENTATION OF NATIONAL ROAD CERTAIN NON VERTICAL UNIT P2JJ BENGKULU Jl. Kenanga RT. 3, No. 28, Bengkulu, Tel. (0736) 22218 LARAP STUDY (Land Acquisition and Resettlement Action Plan) IPUH-BANTAL ROAD PRESERVATION PROJECT MUKO-MUKO REGENCY LAMPUNG PROVINCE MARCH 2011 1 RP1040 V6

Transcript of Documents & Reports - All Documents | The World Bank€¦  · Web view1 Permanent building...

Page 1: Documents & Reports - All Documents | The World Bank€¦  · Web view1 Permanent building 1.600.000,- per m2 2 Semi permanent building 1,050.000,- per m2 3 Non Permanent building

MINISTRY OF PUBLIC WORKS DIRECTORATE GENERAL OF HIGWAY AND ROAD MAINTENANCE GENERAL STATION OF IMPLEMENTATION OF NATIONAL ROAD CERTAIN NON VERTICAL UNIT P2JJ BENGKULU

Jl. Kenanga RT. 3, No. 28, Bengkulu, Tel. (0736) 22218

LARAP STUDY(Land Acquisition and Resettlement Action Plan)

IPUH-BANTAL ROAD PRESERVATION PROJECTMUKO-MUKO REGENCY

LAMPUNG PROVINCEMARCH 2011

1

RP1040 V6

Page 2: Documents & Reports - All Documents | The World Bank€¦  · Web view1 Permanent building 1.600.000,- per m2 2 Semi permanent building 1,050.000,- per m2 3 Non Permanent building

TABLE OF CONTENTS

I. INTRODUCTION AND PROJECT DESCRIPTION................................................................................3

II. SOCIAL ECONOMIC SURVEY AND ASSET INVENTORY.....................................................................4

III. LAND ACQUISITION AND RESETTLEMENT POLICY..........................................................................7

IV. PUBLIC CONSULTATIONS..............................................................................................................9

V. INSTITUTIONAL RESPONSIBILITES AND COMPLAINTS HANDLING................................................10

VI. MONITORING AND REPORTING..................................................................................................12

VII. IMPLEMENTATION SCHEDULE AND FINANCING..........................................................................13

Annex 1: WORKPLAN OF LAND ACQUISITON AND RESETTLEMENT (RK-PTPK).....................................15

Annex 2: DATA OF IMPACTED RESIDENTS – AFFECTED PERSONS AND ASSETS.....................................17

Annex 3: ESTIMATION OF COMPENSATION AMOUNTS.......................................................................21

Annex 4: FLOW CHART OF GRIEVANCE REDRESS MECHANISM............................................................25

Annex 5: SAMPLE FORM OF MONTHLY MONITORING OF LARAP IMPLEMENTATING...........................26

Annex 6: SAMPLE FORMAT OF SOCIALIZATION RESULTS.....................................................................28

Annex 7: MINUTES OF MEETING.........................................................................................................29

Annex 8. PHOTOS OF LIST OF PAPs ANNOUNCEMENT........................................................................32

2

Page 3: Documents & Reports - All Documents | The World Bank€¦  · Web view1 Permanent building 1.600.000,- per m2 2 Semi permanent building 1,050.000,- per m2 3 Non Permanent building

I. INTRODUCTION AND PROJECT DESCRIPTION

1. Background. The Indonesian Government, through the Ministry of Public Works, plans to implement a project of capacity improvement for the National Road segment of Ipuh – Bantal (herein referred to as ‘the Project’) located in the District of Muko Muko, Province of Bengkulu. This project will be financed by a loan from the World Bank through its Western Indonesia National Road Improvement Project (WINRIP). The road segment falls within the Sumatra Central Corridor, which is an alternative road for distributing goods and services on Sumatra.

2. To meet the minimum width requirements of a National Road designation, the existing road will be widened by 7m of carriage way and the new right of way total will be at least 14m. According to an initial survey, the needed improvements will require additional land acquisition from the existing Right of Way.

3. Based on the Loan Agreement document signed by the World Bank with the Government of Indonesia (GOI), in the event of any road development that requires additional land acquisition, a Land Acquisition and Resettlement Plan (LARAP) will be prepared following the relevant World Bank policies. The purpose and objectives of the LARAP are to:

Gather information on the social and economic conditions of Project Affected Persons (PAPs) whose land or other assets are affected by the project, and to determine the aspirations of local inhabitants regarding the Project as well as their requested compensation for assets affected by the Project or land acquisition;

Prepare policy alternatives for land acquisition and resettlement toward PAPs; Prepare a workplan for land acquisition and resettlement as guidance as well as planning

efforts for the land acquisition and resettlement process for PAPs.

4. Process and Methodology. This LARAP has been prepared based on direct information obtained from PAPs, both through interviews and focus group discussions involving community groups. This information was obtained through a social economic survey, with samples taken from a census of all affected households. The social economic survey was conducted by interviewing PAPs using both structured and non-structured lists of questions. Secondary data was obtained from several institutions, including the Public Works Agency of the District of Muko Muko, the Regional Development Planning Agency (Bappeda) of the District of Muko Muko, the Regional Government of the District of Muko Muko and the Agricultural Agency of the District of Muko Muko.

5. Analysis of the data was done using descriptive statistical methods equipped with tables, pictures, and detailed maps with qualitative descriptions. Descriptions on the inhabitants’ perceptions of the Project, needs to improve the environmental condition as well as their social economic lives are presented in the form of qualitative analysis. The result of analysis and findings found in the field are presented in the Workplan of Land Acquisition and Resettement, which will guide the implementation of agreed Land Acquisition. This workplan is prepared in a matrix containing types of activities/program, funds needed, fund resources and implementating agency as well as the responsible person for the agreed activities. The workplan is included in Annex 1.

6. Project Location and Description. The LARAP for the Ipuh-Bantal segment covers 42km of National roads, starting from KM 167 + 270 BKS to KM 209 + 420 BKS, which is the part of the Sumatra Road Network of Middle Trans Sumatra. Administratively, the Ipuh Bantal road segment belongs to the District of Muko Muko and the Sub-Districts of Ipuh, Sungai Rumbai, Pondok Suguh and Tramang Jaya. A location map is included in Figure 1.1. A brief description of the Project is included in Table 1.1. Based on the plan to widen the existing Right of Way, the Project will require additional lands as wide as + 2,730 m2 to be acquired by the Regional Government through land acquisition.

3

Page 4: Documents & Reports - All Documents | The World Bank€¦  · Web view1 Permanent building 1.600.000,- per m2 2 Semi permanent building 1,050.000,- per m2 3 Non Permanent building

Table 1.1 Project Description of Ipuh Bantal Road ImprovementDescription Existing Planned Activity

Length of segment 42 + 150 km 42 + 150 km Width of soil

reinforcement4 – 6 m 7.0 m

RUMIJA 12 – 13 m 14 m

Figure 1.1 Location Map of the Project Segment

II. SOCIAL ECONOMIC SURVEY AND ASSET INVENTORY

7. Identification of the Project Affected Persons and Assets. The identification of PAPs, an inventory of the affected assets, and the social economic study was conducted on November 11-16, 2010. This date will be the cut off date to record PAPs entitled to compensation, resettlement assistance and livelihood restoration assistance. In case there is a time gap between the LARAP approval and the implementation of WINRIP or sub-projects under WINRIP, the Land Acquisition Committee (LAC) will conduct verifications of the current situation based on a list of PAPs and assets from the survey. The LAC will announce the list of PAPs and begin consultations and negotiation. The announcement of the affected people along with the affected assets has been conducted since March 12, 2011 (the documentation can be seen in annex 8) and Land Acquisition Commitee will proceed to conduct socialization to the affected persons.

8. There are 167 households and 11 institutions affected by the Project, with a total affected area of 2,730 m2 consisting of 167 plots/parcels (owned by 165 Households) and 4 state owned plots/parcels. As for the inventory of assets affected by project, see Table 2.1. On average, about 1.7% of each affected household’s land will be acquired by the land acquisition process of the Project. There are no households whose land will be completely acquired. For affected buildings, most are partly affected and the remaining parts are considered suitable for living.

9. Out of 167 individual plots, 120 plots are certified and 47 plots are not certified. Instead they have the Land Ownership Certificate/SKT issued by local Sub-District. There are two buildings that must be completely demolished: one (1) food stall (6 m2) and one (1) neighborhood nightwatch post in Desa

4

Page 5: Documents & Reports - All Documents | The World Bank€¦  · Web view1 Permanent building 1.600.000,- per m2 2 Semi permanent building 1,050.000,- per m2 3 Non Permanent building

Air Bikuk. It is not necessary to displace these two buildings, since they can be easily relocated and re-constructed. Data of the names, areas of plots owned and areas of affected plots is presented in Annex 1.

Table 2.1. Summary of Residents and Assets Affected by the Project

No Description QuantityAreas (m2)

RemarksTotal Affected

1 Number of Affected People (Hhs) 178

a. Individuals 167b. Institutions 11

2 Land to be acquiredA Area of land 2,730 m2B Number of plots to be acquired

a. Individualsb. State Owned/Public Lands

171 parcels167 parcels 4 parcels

C Number of Owners whose lands: a. Totally acquiredb. Partly acquired

-

171 parcels (165 Hh/4 institution)

E Land Title Statusa. Property/Certified Rightb. Property/Uncertified Rightc. State/Public Land

120 parcels47 parcels4 parcels

3 Building to be affected by ProjectA Individuals

Permanent buildingSemi permanent buildingNon-permanent buildingWooden terracePermanent terrace

184 units3 units 1 units34 units67 units24 units

207 1121.432,5

35 8183,8474221,3

Partly affectedPartly affected1 totally affected*

Wooded fencePermanent fenceWire fenceFoundationPondTombs

22 units23 units06 units2 units2 units

238195,2

52 9,5

B Institutions :

Permanent buildingWooden terracePermanent terraceWooden fenceBrick/permanent fenceWire fence

11 units

1262 units 16 1 Neighborhood security post totally acquired

2 units

1 unit5 units1 unit

14

2062,215

4 PlantsA Number of Plants Palm = 11

Pepaya = 2Banana = 5Jambu = 1Jackfruit = 1

32 trees

5

Page 6: Documents & Reports - All Documents | The World Bank€¦  · Web view1 Permanent building 1.600.000,- per m2 2 Semi permanent building 1,050.000,- per m2 3 Non Permanent building

No Description QuantityAreas (m2)

RemarksTotal Affected

Coconut = 8Rambutan = 1Mango = 2Coklat = 1

10. Social Economic Conditions of Project Affected Persons. The identity of PAPs can be determined by their residence longevity. Generally speaking, most (87%) have been living in the same houses for more than 10 years (145 respondents). Some 15 respondents (9%) have lived in their current residence for 6 – 10 years and the remaining 6 respondents (4%) for 2-5 years. From the longevity of their residence it is evident that their settlement in the Project area is hereditary.

11. Age of Respondents. The age classification of respondents it as follows: 62 respondents (37%) are between 31 – 40 years old; 44 respondents (26%) are between 41 – 50 years old; 30 respondents (18%) are between 20 – 30 years old; 14 respondents (8%) are between 51-55 years old; 12 respondents (7%) are between 55 years old and over; and the remaining 5 respondents (3%) are below 20 years old. From the above age classification it is identified that the majority of respondents (81%) fall into productive ages (20 – 50 years old). They mostly work as farmers for oil palm plantation estates.

12. Employment Profile of Respondents. Most respondents work as farmers, i.e. 94 respondents (52%). The other 39 respondents (23%) are traders. 12 (7%) respondents classified themselves as entrepeneurs and 9 (5%) respondents classified themselves as Public Servants or Members of the Armed Forces. The remaining respondents work as either laborers, drivers or members of the local representative assembly (DPRD).

13. Education of Respondents. Most respondents have at least an Elementary School education, with 60 persons (36%) holding that qualification. There is a nearly equal portion of respondents, 58 (35%) who have their Senior Secondary Certificates (SLTA). 32 respondents (19%) hold Junior Secondary Certificates and 16 respondents (10%) attend tertiary education programs.

14. Average Monthly Income of Respondents. Most respondents (163, or 98%) have an average monthly income above IDR 1.000.000. Generally, they are farmers. Four respondents (2%) answered that their average income was between IDR 500.000-1.000.000/month.

15. Community Perceptions of the Project. The majority of communities said that they were uninformed about plans for the Project. This was because there had been little to no socialization efforts conducted by the local administration or other parties. Nevertheless, these communities expressed support for the road development plans. However, they expected formal socialization exercises from the Local Administration or Project authorities, especially in regards to the acquisition of land and assets for the Project. Intensive socialization and public consultation is key for the success of land acquisition and resettlement plans related to the Project. All respondents agreed that improved traffic movement will be benefit of road betterment and widening. Smooth traffic will promote the marketing of their agriculture products, and in turn augment the economic conditions of residents living adjacent to the Project link.

16. Adverse impacts of the Project include reduced productive assets (farms), buildings, and land. However, given the total size of lands owned by PAPs, the relatively low average amount of land acquisition expected to take place (on average, about 1.7% of each affected household’s land will be acquired for the Project), and the expected fair compensation for the acquired assets, the negative impacts of the Project will be minimized. Most respondents expressed preference for cash compensation for assets

6

Page 7: Documents & Reports - All Documents | The World Bank€¦  · Web view1 Permanent building 1.600.000,- per m2 2 Semi permanent building 1,050.000,- per m2 3 Non Permanent building

acquired by the Project.

17. Market price and Sales Value of Tax Objects. Interviews with local residents and village/kecamatan officials managed to collect information concerning market price and the sales value of tax objects (NJOP) of lands by village/kelurahan affected by project in Table 2.2.

Table 2.2: Sales Value of Tax Objects (NJOP)

No Village/Desa KecamatanLand Price

NJOP Market1 Desa Medan Jaya

Ipuh10.000 40.000 - 150.000

2 Desa Pulai Payung 1.200 40.000 - 150.0003 Desa Sibak 1.200 40.000 - 150.0004 Desa Retak Mudik

Sungai Rumbai

1.700 60.000 - 150.000 5 Desa Sumber Makmur 1.700 60.000 - 150.000 6 Desa Gajah Mati 1.700 80.000 - 150.0007 Desa Gading Jaya 1.700 60.000 -125.0008 Desa Tunggang

Pondok Suguh

1.200 60.000 -125.0009 Desa Karya Mulya 1.200 60.000 -125.00010 Desa Pondok Kandang 1.200 80-000 - 160.000 11 Desa Pondok Suguh 1.700 80-000 - 160.00012 Desa Air Berau 1.200 80-000 - 160.00013 Desa Lubuk Bento 1.200 80-000 - 160.00014 Desa Air Bikuk 1.200 80-000 - 160.00015 Desa Ejung

Tramang Jaya3.000 100.000 - 200.000

16 Desa Bunga Tanjung 3.000 100.000 - 200.000

III. LAND ACQUISITION AND RESETTLEMENT POLICY

18. The preparation of this LARAP adhers to policies mutually agreed to by the Government of Indonesia and World Bank concerning land acquisition and resettlement as set out into Guideline for Environmental and Social Management Framework (ESMF).

19. Calculating compensation for land. Land to be acquired will be compensated according to its real replacement cost. The sum of compensation will be jointly discussed between PAPs and the Local Government based on land valuation made by the Independent Land Appraisal Team in accordance with land acquisition mechanisms as spelled out in Presidential Decree No. 36/2005, Presidential Decree RI No. 65/2006 and the Head of Land Agency Regulation No. 3/2007 on land acquisition for public purposes. The appraisal result will be given to Land Acquisition Committee as a basis to conduct s with PAPs. Costs of any registration and transfer taxes will be paid by the Government.

20. Calculating compensation for buildings. Compensation for the building is made based on the market price of materials used to construct the affected building without considering depreciation. Costs

7

Page 8: Documents & Reports - All Documents | The World Bank€¦  · Web view1 Permanent building 1.600.000,- per m2 2 Semi permanent building 1,050.000,- per m2 3 Non Permanent building

to replace building structures affected by project will be estimated based on unit price of construction materials set by Human Settlement Agency (Dinas Cipta Karya) of Bengkulu Province. Accordingly, replacement cost for other assets to be affected by project will be calculated with the same method. The basic rate is outlined in Table 3.1.

Table 3.1. Basic Price for the Acquisition of Building and Other AssetsNo Description Price (Rp.) Unit1 Permanent building 1.600.000,- per m22 Semi permanent building 1,050.000,- per m23 Non Permanent building 650.000,- per unit4 Wall fence 350.000,- per m25 Wooden fence 45.000,- per m’6 Wire (BRC) fence 300,000,- per m27 Foundation 400,000,- per m28 Wooden Terrace 350,000,- per m29 Permanent Terrace (concrete) 450,000,- per m210 Ponds 1,500,000,- per m211 Cemetery 800,.000,- per m2

Source: Calculations based on material prices in Bengkulu Province

21. For the owner of food stalls whose kiosk must be entirely affected (1 person), the displacement or demolition of the affected structure will be carried out after the replacement kiosk is ready. This is to minimize income loss impact. No PAPs will be relocated. Detailed calculation are provided in Annex 3. 22. Calculating compensation for plants. Since no basic rates for the compensation of plants have been issued by the Agriculture/Plantation Agency of Kabupaten Muko-Muko, the compensation of plants is based on rates gathered during interviews with PAPs. Until the preparation of this report, referential rates were still being sought afer for plant compensation from Bengkulu Province administration. If available, these referential rates will be used to calculate plant compensation.

Table 3.2. Basic Rate for Plant Compensation

No Name of Trees Unit Price

1 Oil Palm 500.0002 Pepaya 40.0003 Banana 50.0004 Jambu 75.0005 Jackfruit 100.0006 Coconut 10.0007 Rambutan 1.000.0008 Mango 400.0009 Cacao 150.000

23. Financial assistance for the relocation of affected tombs. Apart from compensation for affected tombs (IDR 800,000 per tomb) there will be financial assistance for the ceremony of relocating the tombs, i.e. IDR 1,500,000 per tomb. This assistance has been added to the compensation for affected assets.

8

Page 9: Documents & Reports - All Documents | The World Bank€¦  · Web view1 Permanent building 1.600.000,- per m2 2 Semi permanent building 1,050.000,- per m2 3 Non Permanent building

24. Calculating Land Certification Fees. For certified lands, land will be split and the local government will do certification for the remaining land together with the uncertified lands which will also be certified. Fees for land administration until the issuance of new land certificates will be charged to the Government and are expected to amount to IDR 750.000 per certificate.

25. Land Compensation Budget. Basic rates to estimate land compensation will adopt the average market price based on information obtained from Village Head/Camat along the road routes. For the prices of payment, the rate will be jointly discussed between PAPs and the Land Acquisition Committee using appraisal results from the Independent Land Appraisal Team. Costs for land compensation are estimated to reach IDR 286,743,000. For a detailed calculation of the estimates, please see Annex 3, Table A3.3.

26. Budget for Compensation of Buildings and Other Assets. The estimated total cost for compensating building structures (permanent, semi permanent and non permanent), brick fences, wooden fences, foundations, terraces (wood and concrete), fish pond and tombs are IDR 681,455,000.

27. Budget for the Compensation of Plants Affected by Project. The estimated total cost for compensating plants is IDR 8,035,000. Detailed calculations are provided in Table A3.5 of Annex 3.

28. Estimated Certification Fees. Certification will be made for all lands purchased by project. There will be 171 parcels. Out of this certification, 120 certificates will be awarded to the newly split lands. Meanwhile, the other 51 parcels will need new certificates. It is estimated that the budget required for this certification will reach IDR 128,250,000.

29. Estimated Costs for Land Safeguard. To secure the plots that have been purchased, a billboard bearing warning of building erection ban will be put up in several strategic points along the effective length of the link. It is anticipated that every billboard will require a budget of IDR 500,000, or in total IDR 10,000,000 for 20 billboards. Detailed work plans, implementation schedule, activity responsibilities and cost breakdowns are provided in Annex 1.

IV. PUBLIC CONSULTATIONS

30. Participation of PAPs is paramount for the planning and implementation of the action plan, as well as to identify their perceptions of the Project and the Project Implementation Plan (PIP). It is likely that residents whose houses or other assets will be acquired by the Project will file complaints because of the effect of the Project on their daily lives. To minimize the impact and to improve the effectiveness of complaints handling, it is crucial to engage PAPs beginning with the consultation process. The Directorate-General of Highways (DGH, or Dirjen Bina Marga) assures the World Bank that information about the project will be fully conveyed to the communities and other stakeholders prior to project execution. Intensive consultation involving local communities and PAPs will facilitate consensus building for the proper compensation of affected assets. This will facilitate the Project’s successful implementation. 31. Public Consultation Mechanisms. Public consultations will be carried out by the LAC, the Local Administration of Kabupaten Muko-Muko, and the DGH. Consultations may delivered in the form of face-to-face dialogue with PAPs on an individual or group basis or through focus group discussions. This system has some advantages since it enables participants to submit feedback to express their complaints, inquiries or objections towards the Project. Other methods include announcing details of the Project in billboards, magazines, or in the immediate surroundings of the Project site.

32. Socialization was conducted when determining the borders of the Right of Way during a 9

Page 10: Documents & Reports - All Documents | The World Bank€¦  · Web view1 Permanent building 1.600.000,- per m2 2 Semi permanent building 1,050.000,- per m2 3 Non Permanent building

preliminary survey carried out by consultants along with P2JJ of Bengkulu Province from 11 to 16 November 2010. This social-economic survey was made by interviews using questionnaires, from which the respondents consisting of local residents had opportunities to address their comments, opinions, aspirations and preferences, and indicate their preferred form of compensation.

33. A consultation and socialization on Land Acquisition and Resettlement Policy Framework of WNRIP was conducted on 14 December 2010 in a workshop attended by Provincial officers and sub-districts affected by the Project. Minutes of these meetings are included in Annex 7. The announcement of the affected people list has been conducted since March 12, 2011 in sub-district offices that are easily accessible for the affected people (please see the documentation in annex 8).

34. Scope of Socialization and Compensation. Socialization will inform PAPS on details regarding: Land acquisition plans, implementation mechanism and schedule including joint site mapping

and measurement; The rights of PAPs including details of compensation to be given as mentioned in LARAP

document and how PAPs will receive such compensation; Outlines of the negotiation process to reach consensus on the sum of compensation; Elaboration of compensation payments and the payment schedule; Elaboration of complaints procedures.

35. All consultation and socialization meetings must be documented. A sample form for monthly monitoring is included in Annex 5. A summary of the LARAP will be attached to billboards that can be found in village offices or other venues accessible to PAPs for at least one month to give them an opportunity to express objections to the Project.

36. Pre-Plenary LARAP meeting. Consultations and discussions of the LARAP at the local administration level that involve all related stakeholders is key for the smooth progress of land acquisition. This preliminary discussion may consist of pre-plenary meetings at the district level followed by the plenary meeting to reach agreement and sign the LARAP document.

37. The plenary meeting will seek inputs and suggestions on the LARAP in order to build consensus for the programs and activities indicated for the Project. The draft LARAP was submitted to the Kabupaten Muko-Muko administration on 4 January 2011. Minutes of the meeting are attached as Annex 7. This preliminary meeting needs to be followed up with similar meetings in order to reach consensus on the compensation mechanism and payment structuring.

38. To follow the results of pre-plenary meeting at district level, the addressed comments will be used as inputs for the revisions of LARAP document. If there is agreement from all parties and no objections from the World Bank, the document is then brought to a plenary forum in order to seek reach mutual agreement on the work plan included as Annex 1.

39. The agreed work plan must be signed by the Regent as the expression of his/her approval to provide the budget for the implementation of the LARAP as well as a commitment to execute the LARAP accordingly. This legalized Work Plan Document will serve as a guideline in performing land acquisition and resettlement activities at the Project site.

V. INSTITUTIONAL RESPONSIBILITES AND COMPLAINTS HANDLING

40. The DGH will act as the executing agency of WINRIP. Issues related to land acquisition and resettlement are also the responsibility of DGH. On the other side, as required by laws, the Local Government shall be held responsible for the implementation of land acquisition and resettlement process in there.

10

Page 11: Documents & Reports - All Documents | The World Bank€¦  · Web view1 Permanent building 1.600.000,- per m2 2 Semi permanent building 1,050.000,- per m2 3 Non Permanent building

41. DGH, in this case deputized by the Project Management Unit (PMU), shall be responsible for the land acquisition activities, external monitoring and any matters required for reporting to World Bank. The Project Task Force (Satker) for Road and Bridge Development of Bengkulu Province shall be held responsible for the implementation of sub-projects.

42. To oversee these sub-projects, PMU and Satker shall be assisted by consultants. Kabupaten Muko-Muko Administration shall be required to establish the LAC pursuant to the following regulations: BPN (National Land Agency) Regulation Number 3/ 2007 concerning the Implementation of Presidential Regulation, Number 36/2006 concerning Land Provisions for the Execution of Development for Public Interests as subsequently amended by Presidential Regulation Number 65/2006 concerning Amendment to Presidential Regulation Number 36/2005 concerning Land Provisions for the Execution of Development for Public Interests. As mandated in the above mentioned regulations, PPT Kabupaten shall assign an Independent Land Appraisal Team, subject to consent of the Regent, tasked with valuing affected lands. In the absence of such an Independent Land Appraisal Team, the Regent can form a Team as stated in the Regulations.

43. Land Acquisition Committee (LAC) at District Level. The Lanc Acquisition Committee consists of a maximum of 9 (nine) persons with composition as follows:

District Secretary as the Chairperson cum member; Provincial official equal to echelon II as Vice Chairperson cum member; Head of BPN Regional Office or other assigned official as Secretary cum member; Head of provincial agency/office/body engaged in land acquisition implementation or other

assigned official as member.

44. Pursuant to Article 7 of Presidential Regulation No. 65 of 2006 concerning Land Provision for the Implementation of Development for Public Interest, the major tasks and duties of LAC shall be as follows:

Provide elaboration or counseling to the communities; Conduct investigation and inventory of lands, building structures, trees and other assets

relevant to the lands, which their land titles are about to be released or surrendered; Examine the legal status of lands, which their land titles are about to be released or

surrendered including the corroborating documents; Announce the findings of examination and inventory referred to in letter b and letter c; Receive the appraisal rate for affected land and/or building, and/or plants and/or other assets

relevant to the affected land set by Independent Land Appraisal Institution/Team and other official responsible to value the building and/or plant and/or other assets relevant to the affected land;

Organize consensus meeting (negotiation) with the holders of land titles and government agency and/or local administration requiring lands to decide the forms and/or sums of compensation;

Set the compensation of lands which their land titles are about to be released or surrendered; Witness the payment of compensation to the holders of land titles; Prepare Land Right Release Report; Administer and document all land acquisition files for submission to government institutions

requiring lands and Kabupaten/Kota Land Agency.

45. Apart from the aforesaid tasks and duties, the LAC in the Muko-Muko District shall perform the following activities:

Facilitate the processing of legal status changes for the acquired lands and building; Accommodate any complaint, objection and suggestion from the affected people for

discussion to look for resolution, and the results will be published; 11

Page 12: Documents & Reports - All Documents | The World Bank€¦  · Web view1 Permanent building 1.600.000,- per m2 2 Semi permanent building 1,050.000,- per m2 3 Non Permanent building

Prepare a monthly LARAP Implementation Report during LARAP implementation; Submit the LARAP Implementation Report to the Bupati and Land Acquisition Monitoring

Team.

46. Independent Land Appraisal Team. The Land Appraisal Team shall be tasked to assess the value of land to be affected by Ipuh-Bantal Link Improvement Project. The valuation made by this Land Appraisal Teamwill be submitted to LAC used as basis in discussing/negotiating the sum of land compensation. Land Appraisal Institution is professional institution that has accreditation as professional appraisal from Finance Department, and in addition for land appraisal, they also obtain license from National Land Agency. They are member of Indonesia Appraisal Association. In the case that Land Appraisal Institution does not present in the project location, the Local Government will form Land Appraisal Team. If necessary, the membership of Land Appraisal Team may be added with the representatives of NGOs or Universities. For monitoring summary, a template in Annex 6 is provided. Membership of the Land Appraisal Team includes the following persons:

Representative of agency responsible for Building and/or Park; Representative of local government agency responsible for national land affairs; Representative of Land and Building Tax (PBB) Agency; Land Valuation Expert/Specialist; Academician capable of assessing the value of land and/or building and/or trees and/or other

assets over the affected lands.

47. Complaint resolution procedure. The main goal of complaint resolution procedure is to give an opportunity for PAPs to voice their dissatisfaction, address complaints and express grievances in verbal or written forms. Complaints may express the discontentment against all aspects of land acquisition and resettlement including its validity, the sum of compensation and facilitation for the affected people to receive the offered compensation. Mechanism to deal with complaints, objections or proposals concerning LARAP implementation will follow stages below:

All complaints must first be addressed to the Internal Monitoring Team/Bappeda/Project Manager (Pimpro)/LAC or directly to PMU WINRIP concerning any aspect of LARAP including its preparation process. Written complaints may be submitted within 14 days after the announcement of compensation;

Based on complaints, objections and proposals addressed by the affected people, Local Administration and PMU-WINRIP via the chairperson of Bappeda, Head of SNVT for Road and Bridge Development of Bengkulu Province and Monitoring and Evaluation Team will make verification;

The results of verification will be informed to the affected people no later than 12 days for discussion with the affected people to look for win-win solution;

The resolutions of problems or complaints, objections and proposals will be documented and accessible to the public and published in billboards of project office, local administration office and village/kelurahan office (please see the flow chart in annex 3)

48. In the case that no consensus is reached regarding the sum of compensation between the PAPs and Local Government after more than a year, the sub-project will be excluded from WINRIP or the sub-project will seek alternatives for Project realignment.

VI. MONITORING AND REPORTING

49. The Internal Monitoring and Evaluation Team will be established by the Local Government of Kabupaten Muko-Muko before the start of the land acquisition process. The team consists of representatives from Kabupaten Muko-Muko Administration (Bappeda), PAPs, universities or Non-Government Organizations (NGOs). The Monitoring and Evaluation Team will be chaired by a

12

Page 13: Documents & Reports - All Documents | The World Bank€¦  · Web view1 Permanent building 1.600.000,- per m2 2 Semi permanent building 1,050.000,- per m2 3 Non Permanent building

chairperson directly elected by the team members. The tasks of this team include: Supervisory activities over the program implementation as indicated in the action plan

including socialization, land acquisition, preparation and development of resettlement sites, public/social facility reconstruction, and community empowerment to recover the living conditions of the affected people. Monitoring will continue until all RAP activities and commitments have been met, including certifications.

Internal Monitoring Team will be in service during land acquisition and resettlement process. The team will be stationed in a secretariat office to facilitate the affected people in addressing their complaints and grievances

Coordinating on a monthly basis with the LAC, Bappeda and PMU to discuss any problem and constraint, especially any issue relating to the resolution of complaint/grievance expressed by the affected people. However, the resolutions will be sought after by Land Acquisition Committee and other related local government institutions.

Preparing Monthly Progress Reports on Program Implementation and at the end of the fiscal year the performance of land acquisition work plan will be evaluated to assess target realization, notably to identify whether or not the affected people now shoulder additional hardships as the results of project implementation.

50. Budget required for monitoring and evaluation shall be taken from local budget (APBD) of Kabupaten Muko-Muko Administration. internal monitoring reports consist of progress report and final report when the compensation payment reaches 100%.

a. Progress Report. The first progress report will be produced/submitted when the payment reaches around 50%. This progress report will be prepared by the chairperson of Monitoring Team for submission to PMU WINRIP, Bupati and Project. Thereafter, progress of compensation payment will be reported on monthly basis. For monitoring summary, format in Annex 5 can be referred to. This report contains: Detailed data of socialization that has been performed ranging from preparation stage to

discussion meeting to reach agreement on compensation rate. The results of land valuation from Independent Appraisal Team as reference in achieving

agreement on basic rate of compensation for other affected assets. Type and time of compensation payment as indicated in land acquisition and resettlement

action plan. Complaints and grievances addressed by PAP relating to overall aspects of land

acquisition and resettlement. b. Final Progress Report (when compensation payment reaches 100%). It contains information

concerning the realization of physical progress, financial progress (to the allocated budget), social-economic progress of the affected people (especially the displaced persons), certification of the affected land, problems/constraints encountered and their resolution action plan as well as work plan for the next fiscal year. This report will be prepared by the chairperson of Monitoring Team for submission to PMU WINRIP, Bupati and Project.

VII. IMPLEMENTATION SCHEDULE AND FINANCING

51. Implementation schedule. The land acquisition and resettlement implementation schedule are included in Annex 1.

52. Funding policy. Budgets required for land acquisition to support Ipuh – Bantal Link Improvement Project in Bengkulu Province will come from local budget (APBD) Kabupaten Muko-Muko Administration. This includes budgets allocated for the LAC. This budgeting conforms to Decree of Financial Minister No. 58/PMK.02/2008 concerning Budget Allocation for Land Acquisition Committee for the implementation of development for public interest. This allocation is 4% of total land acquisition budget. Budget for Internal Monitoring Team will be also taken from APBD Kabupaten Muko-Muko.

13

Page 14: Documents & Reports - All Documents | The World Bank€¦  · Web view1 Permanent building 1.600.000,- per m2 2 Semi permanent building 1,050.000,- per m2 3 Non Permanent building

Land Acquisition, Resettlement and Community Action Plan (program, activities, estimated fund requirement, source of fund, implementation, responsibilities) is elaborated in Table 7.1. that follows.

14

Page 15: Documents & Reports - All Documents | The World Bank€¦  · Web view1 Permanent building 1.600.000,- per m2 2 Semi permanent building 1,050.000,- per m2 3 Non Permanent building

Annex 1: WORKPLAN OF LAND ACQUISITON AND RESETTLEMENT (RK-PTPK)ROAD SEGMENT IMPROVEMENT OF IPUH BANTAL, DISTRICT OF MUKO-MUKO, PROVINCE OF BENGKULU

No. Program Activity Output Location Unit Responsible Period ofImplementation

CostNeeded

Sumber Biaya RemarksREGIONAL

BUDGET2011

REGIONAL BUDGET

2012

NATIONALBUDGET 2011

1 Laad Acquisition Team a. Establishment of TPT already done for Project Remarksb. Preparation of Workplan of the Implementation of land acquisition

with the area of 2730 m2, locatd in Ipuh Sub district, Sungai Rumbai Sub District, Pandak Suguh Sub District, and Tramang Jaya sub District

c. To facilitate the establishment of Independent Monitoring Team d. To conduct activities upon the workplan already prepared

- The establishment of Land Acquisition Committee at district level

- Documents of Land Acquisition workplan

Regency of Muko-muko

Package Regency Governmenet of Muko-muko

March-April 2011 LS LS

2. Establishment/ Determination of Independent Team for Land Price Evaluation

1. The Land Acquisition Ommittee of the District Nagakeo assigns a committee for Land Price determined by the district

2. Where necessary, involve LSM as a member3. Data collection of Land Price based on the NJOP or the actual/real

value while considering the NJOP of current year, based on location variables and land ishlah, justification of land use against the RTRW, structures and infrastructures available, and other factors influencing the price.

- The establishment/ appointment of the Land Perice Evaluation Team

- To input comparable basic price

Regency of Muko-muko

Package Regency Governmenet of Muko-muko

March-April 2011 LS LS

3. Socialization of Land Acquisition to the WTP candidates

1. To invite WTP Candidates who will have their lands extracted2. To perform socialization about land acquisition plan3. To perform socialization about the procedure of calculation of

compensation and payment procedure4. Signing of minutes of socialization

Already socialized project and land acquisition plan, eqiuipped with minutes and presence list

Sub District of IpuhSub District of Sungai RumbaiSub District of Puguh Jaya Sub District of Tramang Jaya

Package Land Acquisition Committee P2JJ or SMT of Bengkulu Road and Bridge Development

April-May 2011 LS LS

4. Identification and Inventory 1. TPT performs measurement of land shapep to be acquired (Villalgel ROW) together with Project WTW and Village Authority)

2. Joint Determination of land borders to be given boundary pole3. To calculate the price residents’ assets to be acquired4. To prepare a minutes on measurement and poling

- Land boundary Poles are set, for easier acquisition

- List of WTP and their assets to be acquired

- Preparation of Project Impacted Land Piece Map

Sub District of IpuhSub District of Sungai RumbaiSub District of Puguh Jaya Sub District of Tramang Jaya

Package Land Acquisition Committee P2JJ or SMT of Bengkulu Road and Bridge Development

June-July 2011 LS LS

5. Consultation to determine the amount of compensation

1. Consultation with WTP (Project impacted Residents)2. Agreement of amount and forms of compensation3. Calculation of Compansation amount, together with WTP basead on

the measurement and poling result 4. Agreement on the Schedule for Compensation Right5. Preparation of Official Report, Minutes of Negotiation / Consultation

The accomplishment of consultation / negotiation process, equipped with official report, minutes and presence list.

Sub District of IpuhSub District of Sungai RumbaiSub District of Puguh Jaya Sub District of Tramang Jaya

Lumpsum Land Acquisition Committee P2JJ or SMT of Bengkulu Road and Bridge Development August-September

2011 LS LS

No. Program Activity Output Location Unit Responsible Period ofImplementation

CostNeeded

Sumber Biaya RemarksREGIONAL

BUDGET2011

REGIONAL BUDGET

2012

NATIONALBUDGET 2011

6. Program of Land Acquisition Implementation

1. Implementation of compensation payment of the residents’ land

2. Proces documentation of compensation delivery3. Signing of Statemtent Letter of Right Relrease (SPH).

Implementation of compensation payment upon the residenets’ lands is agreed

Sub District of Ipuh, Sungai Rumbai

2.730M2 Land Acquisition Committee

October-November 2011

285.743.000 285.743.000

Implementation of compensation payment for structure buildings

242BM2 209.470.00 209.470.000

Implementation of compensation for boundaries (fence)

530.4M 185.350.000 185.360.000

Implementation of compensation for terrace

.... 243.375.000 243.375.000

Implementation of compensation for foundation and ponds

61.5M2 37.50.000 37.650.000

Implementation of compensation for cemeteries

2 line 4.500.000 4.500.000

Implementation of compensation for plants

32 trees 8.035.000 8.035.000

7. Project-impacted Land 1. Separation of Impacted land certificate - Implementation of Sub District BPN (National Land 2012 60.000.000 80.020.000

15

Page 16: Documents & Reports - All Documents | The World Bank€¦  · Web view1 Permanent building 1.600.000,- per m2 2 Semi permanent building 1,050.000,- per m2 3 Non Permanent building

Certification 2. Processing of new certificate upon land not certified yet certificate saparation- Implementation of new

certificate processing

of Ipuh, Sungai Rumbai

Agency) 38.250.000 85.250.000

8. Destruction of the impacted assets

1. Destruction of project-impacted permanent assets (Rp 600.000,- per unit)

2. Destruction of other non permanent assets for fencing (boundary), terraces etc. (IDR 300.000,-)

Implementation of safe destruction

Sub District of Ipuh, Sungai Rumbai, Pupuh Jaya, Trimang Jaya

Regency Government of Mukomuko

November-December 2011

60.000.000

27.900.000

63.000.000

27.900.000

9. Control against the lands already acquired

Prohibition sign for lands already acquired..............tidak terbaca

Implementation of establishment of prohibition fenceing

Sub District of Ipuh, Sungai Rumbai, Pupuh Jaya, Trimang Jaya

Regency Government of Mukomuko

November-December 2011

10.000.000 10.000.000

10. Monitoring Implementation and program evaluation

1. Establishment of Monitoring TeamMonitoring and evaluation of implementation of activity planning by PPT

2. Recommendation of follow up activity to do

Establishment of Monitoring Team under the Decree of District HeadDocuments of monitoring report on LARAP Implementation

Sub District of Ipuh, Sungai Rumbai, Pupuh Jaya, Trimang Jaya

Regency Government of Mukomuko

May-December 2011

LS LS

1.284.383.000 1.075.133.000 128.250.000 -

MukomukoBupati of Mukomuko

16

Page 17: Documents & Reports - All Documents | The World Bank€¦  · Web view1 Permanent building 1.600.000,- per m2 2 Semi permanent building 1,050.000,- per m2 3 Non Permanent building

Annex 2: DATA OF IMPACTED RESIDENTS – AFFECTED PERSONS AND ASSETS

17

Page 18: Documents & Reports - All Documents | The World Bank€¦  · Web view1 Permanent building 1.600.000,- per m2 2 Semi permanent building 1,050.000,- per m2 3 Non Permanent building

18

Page 19: Documents & Reports - All Documents | The World Bank€¦  · Web view1 Permanent building 1.600.000,- per m2 2 Semi permanent building 1,050.000,- per m2 3 Non Permanent building

19

Page 20: Documents & Reports - All Documents | The World Bank€¦  · Web view1 Permanent building 1.600.000,- per m2 2 Semi permanent building 1,050.000,- per m2 3 Non Permanent building

20

Page 21: Documents & Reports - All Documents | The World Bank€¦  · Web view1 Permanent building 1.600.000,- per m2 2 Semi permanent building 1,050.000,- per m2 3 Non Permanent building

Annex 3: ESTIMATION OF COMPENSATION AMOUNTS

Table A3.1. Data of Land Area per Village

No Village Name Sub-district number of WTP

Piece of Land (m2)Initial Impected acted

Individual 1 Desa Medan Jaya

Ipuh19 11.112,8 187,3

2 Desa Pulai Payung 11 14,697.5 322,93 Desa Sibak 3 3.560,0 124,0

Sub Total of Ipuh Sub district 33 29.370,3 634,24 Desa Retak Mudik

Sungai Rumbai

29 13.921,3 455,85 Desa Sumber Makmur 3 860,0 26,06 Desa Gajah Mati 11 14.222,0 138,07 Desa Gading Jaya 11 12.240,0 191,0

Sub Total of Sungai Rumbai Sub district 54 41243,3 810,88 Desa Tunggang

Pondok Suguh

21 32.735,0 2819 Desa Karya Mulya 16 9,428,0 283,010 Desa Pondok Kandang 9 6.905,0 160,011 Desa Pondok Suguh 7 4.605,0 124,012 Desa Air Berau 5 2.930,0 103,013 Desa Lubuk Bento 4 11.750,0 27,014 Desa Air Bikuk 5 7.548,0 59,0

Sub Total of Pondok Suguh Sub district 67 75,901 103715 Desa Ejung

Tramang Jaya7 3.483,0 103,5

16 Desa Bunga Tanjung 4 1.100,0 48,5Sub Total of Tramang Jaya Sub district 11 4,583 152

Total 1 165 151.047,6 2.639,5Institution

1 Pulai Payung Ipuh 2 120 142 Retak Mudik Sungai Rumbai 1 775 46,53 Air Berau Pondok Suguh 1 200 30

Total 2 4 1,095 90,5Total 169 152,192.6 2,729.9

21

Page 22: Documents & Reports - All Documents | The World Bank€¦  · Web view1 Permanent building 1.600.000,- per m2 2 Semi permanent building 1,050.000,- per m2 3 Non Permanent building

Table A3.2. Status of Data of Land per Village

No Village Name sub district number of WTPStatus of Land (Total )

Certificate Not yet Certificate (SKT)

1 Medan Jaya Ipuh

19 19 02 Desa Pulai Payung 11 13 0

3 Desa Sibak 3 3 0

Sub Total of Ipuh Sub district 33 35 0

4 Desa Retak Mudik

Sungai Rumbai

29 9 20

5 Desa Sumber Makmur 3 3 0

6 Desa Gajah Mati 11 6 5

7 Desa Gading Jaya 11 8 3

Sub Total of Sungai Rumbai Sub district 54 26 28

8 Desa Tunggang

Pondok Suguh

21 13 8

9 Desa Karya Mulya 16 10 6

10 Desa Pondok Kandang 9 8 1

11 Desa Pondok Suguh 7 7 0

12 Desa Air Berau 5 5 0

13 Desa Lubuk Bento 4 4 0

14 Desa Air Bikuk 5 5 0

Sub Total of Pondok Suguh Sub district 67 52 15

15 Desa EjungTramang Jaya

7 5 2

16 Desa Bunga Tanjung 4 2 2

Sub Total of Tramang Jaya Sub district 11 7 4

Total 165 120 47

Number of Land plots = 16727

22

Page 23: Documents & Reports - All Documents | The World Bank€¦  · Web view1 Permanent building 1.600.000,- per m2 2 Semi permanent building 1,050.000,- per m2 3 Non Permanent building

Table A3.3. Estimated Land Compensation Amount

23

Page 24: Documents & Reports - All Documents | The World Bank€¦  · Web view1 Permanent building 1.600.000,- per m2 2 Semi permanent building 1,050.000,- per m2 3 Non Permanent building

Table A3.4. Estimated Building Development Cost and Other Asset Compensation Amount

No. Types Asset Total Area Impacted

Unit Price(Rp)

Total (Rp)

1 Permanent Building 51,0 1.600.000 81.600.0002 Semi Permanent Building 8,0 1.050.000 8.400.0003 Emergency Building 183,8 650.000 119.470.0004 Wooden Terrace 419,4 350.000 146.790.0005 Permanent Terrace 221,3 450.000 99.585.0006 Woodent Fence 258,0 300.000 77.400.0007 Permanent Fence 257,4 400.000 102.960.0008 Wire 15,0 400.000 6.000.0009 Foundation 52,0 450.000 23.400.00010 Pond 9,5 1.500.000 14.250.00011 Cemetery 2,0 800.000 1.600.000

681.455.000

Table A3.5. Estimated Impacted Plant Cost Compensation

No. Name of Tree Total Unit Price Total

1 Palm 11 500.000 5.500.0002 Papaya 2 40.000 80.0003 Banana 5 50.000 250.0004 Buava 1 75.000 75.0005 Jackfruit 1 100.000 100.0006 Coconut 8 10.000 80.0007 Rambutan (Nephelium Lappaceum) 1 1.000.000 1.000.0008 Mango 2 400.000 800.0009 Cocoa 1 150.000 150.000

Total 32 8.035.000

24

Page 25: Documents & Reports - All Documents | The World Bank€¦  · Web view1 Permanent building 1.600.000,- per m2 2 Semi permanent building 1,050.000,- per m2 3 Non Permanent building

Annex 4: FLOW CHART OF GRIEVANCE REDRESS MECHANISM

25

Grievance redress mechanism of LARAP implementation

Process

Within 12 working

days

MONTORING

PAPs

PMU WINRIP

- Bappeda- Head of Satker P2JJ (Sub

project manager)- LAC- Monitoring Team

Investigation conducted by Bappeda & Satker

Consultation with PAPs

Local disclosure

Agreement with PAPs

Implementation

Page 26: Documents & Reports - All Documents | The World Bank€¦  · Web view1 Permanent building 1.600.000,- per m2 2 Semi permanent building 1,050.000,- per m2 3 Non Permanent building

Annex 5: SAMPLE FORM OF MONTHLY MONITORING OF LARAP IMPLEMENTATING

Regency/Municipality: ……………… Sub-project: …………………… Reporting Period: …………….

Activity

Work Plan of LARAP Progress Report 1

RemarksDate Target Progress/ Status

in the fieldProblem &

Planned Follow-upCONSULT 1. Compensation2 Attach: Copy of

Agreement

2. Relocation3 Attach: copy of published relocation schedule

IMPLEMENTATION 1. Payment of compensation/benefit/severance pay including relocation cost

Attach: copy of receipt

2. Relocation location preparations for: - Number of houses

- Number of kiosks Number of facilities (Mosques, Schools, healt center)

1 If the column is not sufficient, please use additional blank paper 2 Consultation for sompensation is about (1) market Price, (ii) compensation payment Schedule, and (iii) assets ownership, amount and 3 Consultation for relocation is about (i) relocation schedule,(ii) relocation location, (iii) relocations of facilities (such as mosque,

school) and public facilities 26

Page 27: Documents & Reports - All Documents | The World Bank€¦  · Web view1 Permanent building 1.600.000,- per m2 2 Semi permanent building 1,050.000,- per m2 3 Non Permanent building

Activity

Work Plan of LARAP Progress Report 4

Remarksdate Target Progress/ Status

in the fieldProblem &

Planned Follow-upNumber of public facilities (electricity network, water)3. Relocation- Number of people relocated number of facilities

number of public facilities

4. Land certification - Number of new certificate at relocation area

Attach: copy of certificate

- Number of revised certificate

5. Complaint – Number of received complaints

Attach : - List of complaints submitted

- Number of complaints accomplished

Attach:– copy of responses sent

4 If the column is not sufficient, please use additional blank paper

27

Page 28: Documents & Reports - All Documents | The World Bank€¦  · Web view1 Permanent building 1.600.000,- per m2 2 Semi permanent building 1,050.000,- per m2 3 Non Permanent building

Annex 6: SAMPLE FORMAT OF SOCIALIZATION RESULTS

Date of the meetingLocation for the meetingPurpose of the meetingWho participated from project proponentWho participated from the community: Community leaders/representatives Community members (# of persons)

Issues raised (bisa setiap pertanyaan atau apapun yang muncul)

Actions agreed

28

Page 29: Documents & Reports - All Documents | The World Bank€¦  · Web view1 Permanent building 1.600.000,- per m2 2 Semi permanent building 1,050.000,- per m2 3 Non Permanent building

Annex 7: MINUTES OF MEETING

Workshop Land Acquisition and Resettlement Policy Framework (LARPF) for the Preparation of Western Indonesia National Road Improvement Project (WINRIP)Day/Date : Tuesday, 14 December 2010Place : Meeting Room of Public Works Agency, Bengkulu ProvinceTime : 10.30 – 16.30Chairperson : Head of Sub-Directorate for Region IIParticipants : AttachedAgenda : Workshop Land Acquisition and Resettlement Policy Framework (LARPF) for the

Preparation of Western Indonesia National Road Improvement Project (WINRIP)

Meeting organized on this Tuesday is as follow up of Workshop on LARPF for the Preparation of Western Indonesia National Road Improvement Project (WINRIP). The meeting is opened by Bapak Andi Roslinsyah, Head of Public Works Agency.

Generally speaking, the meeting was to discuss Overview of Western Indonesia National Road Improvement Project (WINRIP) presended by Slamet Muljono of Sub-Directorate for General Planning, Directorate of Programming. As to ISMR presentation it was elaborated by Ibu Nurmala of Sub-Directorate of Environmental Engineering and Road Safety, Directorate of Engineering Development. After brief opening speech by the chairperson, the meeting was followed with a question and answer session. The majority of participants raised questions around Land Acquisition. Comments and inputs addressed during the discussion can be summarized as follows:

a. Environment Office of Kabupaten Muko-Muko

WINRIP project concerns road improvement. Meanwhile some links have yet to be developed. This meeting should be organized by Bappeda [instead of Public Works Agency]. Some roads in damaged conditions may be liable for inclusion in this WINRIP project. Any issue regarding Land Acquisition should be jointly discussed. APBD 2011 budget has been proposed to DPR. The Bupati of Kabupaten Muko-Muko has incentive for land acquisition. Compensation will be made in a single package. Local Administration should not bear all costs incurred from land acquisition process. It is expected that the Government assist this land acquisition process in terms of funding. Socialization will take place in district capital of Kabupaten Muko-Muko.

b. Camat (Sub-District Head) of Bantal Muko-Muko

Hopefully the participants may have the softcopy versions of presentations. Compensation will be given to the affected residents who are willing to take it. Land acquisition should reach broad communities so that more social elements can benefit the link to be developed.

c. PPK Northern Region II

Air Manulah bridge has been deleted from WINRIP, whereas the required lands consisting of protection forest have been acquired. The Ministry of Environment has issued Land Acquisition Permit for the affected plots.

RepliesIbu Nurmala

Since the fund to be financed this project comes from loan, some approvals as required by World Bank are still necessary. The local administration of district as project location should understand requirements proposed by World Bank.

Donor agency/creditor never promises to cover land acquisition costs. It is the pledge of the Government to World Bank.

As to the granted land, Sub-District Office (Kecamatan) must keep statement certifying the donation of lands from the local residents to the Government. However, public socialization with local communities is deemed necessary.

29

Page 30: Documents & Reports - All Documents | The World Bank€¦  · Web view1 Permanent building 1.600.000,- per m2 2 Semi permanent building 1,050.000,- per m2 3 Non Permanent building

Since it is related to national roadway, than the socialization shall be conducted in the province. However it will be conducted in the regency (Kabupaten) for socializing land acquisition.

Bapak Selamet From economic wise, Air Manulah bridge fails to meet the requirements set by World Bank.

Moreover, there are protection forest areas adjacent to the bridge site. The fund not only come from WINRIP but may be financed under APBN budget.

Bapak Langgeng Please prepare letter from Balai addressed to the Government certifying that Air Manulah bridge

is ready. Also attached, land acquisition permit from the Ministry of Environment.

This meeting will be continued with a plenary meeting and socialization to the affected districts (kabupaten). Thank you.

MINUTES OF MEETINGDay /Date : Tuesday, 4 January 2011 Place : The Offices of Mukomuko Bupati, Bengkulu Province Agenda : Discussion of draft LARAP Ipuh-Bantal Road Segment, Mukomuko Regency Attendees : 1. Head of Bappeda of Mukomuko Regency

1. Head of Sunram Division, Mukomuko Regency Government 2. Head of Legal Section, Mukomuko Regency Government 3. Head of Division of Bina Marga (Highway Development), Mukomuko Regency Government 4. Land Affairs Division, Mukomuko Regency Government 5. P2JJ of Bengkulu Province, (Mr. Supriadi) 6. Consultants Developers of LARAP for Ipuh-Bantal Road Segment (Dwi Apriyanti).

Summary of Proceedings of the Meeting : Consultants said a few words as follows: That this meeting was a follow up from meetings in Bengkulu, December 14, 2010. There are some roads in Mukomuko Regency which were planned to be enhanced through the

West Indonesia National Road Improvement Project (WINRIP) which will be funded by loans from the World Bank, one segment that is expected to be implemented first is a segment of Ipuh-Bantal. In accordance with the agreement between the Government of Indonesia with the World Bank, if there are plan road issues outside the existing Rumija, the government (Department of Public Works) are required to prepare documents on Land Acquisition and Resettlement (LARAP), where the basis for providing compensation and land procurement mechanisms shall refer to the Policy of the World Bank on Land Procurement.

Document LARAP for roads has been prepared and the results as has been conveyed through Tramang Raya Sub-district Head who attended the meeting in Bengkulu, December 14, 2010. Some things to note in this land acquisition process is as follows: a. The amount of compensation for land prices should be based on the real price as the results

of assessment by an Independent Land Appraisal Team and should be discussed with the WTP.

b. The basis of the calculation of building assets does not take into account the existence of the depreciation of buildings and materials prices that are still used.

c. Compensation can be a local government program, which can be applied such as housing programs for the poor which can be used to repair house buildings of the affected residents.

d. All of the socialization process must be well documented. e. In addition to the Land Procurement Committee, the Regency Government was also asked to

set up an Internal Monitoring Team that will monitor the land acquisition process and accommodate complaints from the WTP.

f. The measures undetaken towards the procurement of land need to be approved by the Bupati through a plenary meeting.

30

Page 31: Documents & Reports - All Documents | The World Bank€¦  · Web view1 Permanent building 1.600.000,- per m2 2 Semi permanent building 1,050.000,- per m2 3 Non Permanent building

Through this meeting it is expected to receive some input from local government especially in relation to the amount of compensation issues and possible budgeting. 2. Responses from Mukomuko Regency Government

Mukomuko Regency Government in principle was willing to deal with this land acquisition, but the basic objection is that the compensation policies should follow the provisions of the World Bank. They will form working groups to discuss problems and magnitude of this compensation will usually refer to the policy adopted in the procurement of land.

Mukomuko Regency Budget for 2011 has been set, and budget changes will be disbursed around September-October.

Pemkab Mukomuko asked for the certainty as to the physical implementation of the road, because they are worried if the land and other assets had been released the physical project do not go ahead / long delayed.

Pemkab Mukomuko asked for any official explanation from the Department of Public Works / Directorate General of Highways on issues relating to the WINRIP program and that could be held at the Mukomuko Regency (some agencies were unable to attend at the time of the event in Bengkulu).

3. Conclusion and Follow-up Steps A more intensive discussion process is needed relating to the compensation amount issues between

the Directorate General of Bina Marga (Highways) and Bengkulu Regency Government, so as to reach a deal that better suits the World Bank policy and that does not weigh down Mukomuko Regency Government.

Given the fact that there are 2 road segments in Bengkulu that are located within Mukomuko Regency areas (of which the cost allocation for the procurement of the land is expected from the Bengkulu Regency Budget, an official explanation concerning the WINRIP program from the Public Works Department at Mukomuko Regency level should be needed.

31

Page 32: Documents & Reports - All Documents | The World Bank€¦  · Web view1 Permanent building 1.600.000,- per m2 2 Semi permanent building 1,050.000,- per m2 3 Non Permanent building

Annex 8. PHOTOS OF LIST OF PAPs ANNOUNCEMENT

32

List of PAPs in the village of Pulau Payung

SUB-DISTRICT OF IPUH

List of PAPs in the villages of Sibak and Medan Jaya

Page 33: Documents & Reports - All Documents | The World Bank€¦  · Web view1 Permanent building 1.600.000,- per m2 2 Semi permanent building 1,050.000,- per m2 3 Non Permanent building

33

SUB-DISTRICT OF SUNGAI RUMBAI

List of PAPs in the villages of Retak Mudik, Sumber Makmur, Gajah Mati, Gading Jaya

Page 34: Documents & Reports - All Documents | The World Bank€¦  · Web view1 Permanent building 1.600.000,- per m2 2 Semi permanent building 1,050.000,- per m2 3 Non Permanent building

34

SUB DISTRICT OF PONDOK SUGUH

List of PAPs in the villages of Tunggang,Pondok Kandang,Karya Mulya,Air

Bikuk

List of PAPs in the villages of Pondok Kandang, Air Bikuk,Lubuk Bento

List of PAPs in the villages of Karya Mulya,Air Bikuk,Podok Suguh,Air Berau,Lubuk Bento

Page 35: Documents & Reports - All Documents | The World Bank€¦  · Web view1 Permanent building 1.600.000,- per m2 2 Semi permanent building 1,050.000,- per m2 3 Non Permanent building

35

SUB DISTRICT OF TRAMANG JAYA

List of PAPs in the villages of Enjung and Bunga Tanjung