DOCUMENT RESUME ED 409 643 EA 028 503 TITLE Program Demand Cost Model for Alaskan Schools. 6th Edition. Revised. INSTITUTION Alaska State Dept. of Education, Juneau. PUB DATE Aug 96 NOTE 98p. PUB TYPE Guides Non-Classroom (055) EDRS PRICE MF01/PC04 Plus Postage. DESCRIPTORS *Construction Costs; *Cost Effectiveness; *Cost Estimates; Educational Facilities; Educational Facilities Improvement; *Educational Facilities Planning; Elementary Secondary Education; Models; Public Schools; *School Expansion; Supply and Demand IDENTIFIERS *Alaska ABSTRACT The Program Demand Cost Model for Alaskan Schools (Cost Model) is a tool for use by school districts and their consultants in estimating school construction costs in the planning phase of a project. This document sets out the sixth edition of the demand-cost model, a rewrite of the whole system. The model can be used to establish a complete budget for each facility or to determine the current replacement value for insurance purposes. The document explains, using detailed worksheets, how to use the demand-cost model for new school construction, school expansion, and renovation work. Three tables are included. (Contains six references.) (LMI) ******************************************************************************** Reproductions supplied by EDRS are the best that can be made from the original document. ********************************************************************************

Transcript of DOCUMENT RESUME Program Demand Cost Model for Alaskan ... · DOCUMENT RESUME. ED 409 643 EA 028...

Page 1: DOCUMENT RESUME Program Demand Cost Model for Alaskan ... · DOCUMENT RESUME. ED 409 643 EA 028 503. TITLE Program Demand Cost Model for Alaskan Schools. 6th Edition. Revised. INSTITUTION

DOCUMENT RESUME

ED 409 643 EA 028 503

TITLE Program Demand Cost Model for Alaskan Schools. 6th Edition.Revised.

INSTITUTION Alaska State Dept. of Education, Juneau.PUB DATE Aug 96NOTE 98p.

PUB TYPE Guides Non-Classroom (055)EDRS PRICE MF01/PC04 Plus Postage.DESCRIPTORS *Construction Costs; *Cost Effectiveness; *Cost Estimates;

Educational Facilities; Educational Facilities Improvement;*Educational Facilities Planning; Elementary SecondaryEducation; Models; Public Schools; *School Expansion; Supplyand Demand

IDENTIFIERS *Alaska

ABSTRACTThe Program Demand Cost Model for Alaskan Schools (Cost

Model) is a tool for use by school districts and their consultants inestimating school construction costs in the planning phase of a project. Thisdocument sets out the sixth edition of the demand-cost model, a rewrite ofthe whole system. The model can be used to establish a complete budget foreach facility or to determine the current replacement value for insurancepurposes. The document explains, using detailed worksheets, how to use thedemand-cost model for new school construction, school expansion, andrenovation work. Three tables are included. (Contains six references.) (LMI)

********************************************************************************

Reproductions supplied by EDRS are the best that can be madefrom the original document.

********************************************************************************

Page 2: DOCUMENT RESUME Program Demand Cost Model for Alaskan ... · DOCUMENT RESUME. ED 409 643 EA 028 503. TITLE Program Demand Cost Model for Alaskan Schools. 6th Edition. Revised. INSTITUTION

NJ

IN0

00 0

0V

D C

A 4

s. Is

.)(7

%

Nas

ka"'D

epar

tmen

tof

Edu

catio

n

Pro

gf:a

rri.'

Per

riand

CO

St M

odel

Ala

Oka

nSc

hool

s

6th

Edi

tion

(Aug

ust 1

996

Rev

isio

n

0,_s

rpop

y:-A

yAli

i

U.S

. DE

PA

RT

ME

NT

OF

ED

UC

AT

ION

Offi

e o

f Edu

catio

nal R

esea

rch

and

Impr

ovem

ent

ED

CA

TIO

NA

L R

ES

OU

RC

ES

INF

OR

MA

TIO

NC

EN

TE

R (

ER

IC)

Thi

s do

cum

ent h

as b

een

repr

oduc

ed a

sre

ceiv

ed fr

om th

e pe

rson

or

orga

niza

tion

orig

inat

ing

it.M

inor

cha

nges

hav

e be

en m

ade

toim

prov

e re

prod

uctio

n qu

ality

.

oP

oint

s of

vie

w o

r op

inio

ns s

tate

d in

this

docu

men

t do

not n

eces

saril

y re

pres

ent

offic

ial O

ER

I pos

ition

or

polic

y.

PE

RM

ISS

ION

TO

RE

PR

OD

UC

E A

ND

DIS

SE

MIN

AT

E T

HIS

MA

TE

RIA

LH

AS

BE

EN

GR

AN

TE

D B

Y

TO

TH

E E

DU

CA

TIO

NA

L R

ES

OU

RC

ES

INF

OR

MA

TIO

N C

EN

TE

R (

ER

IC)

3

Page 3: DOCUMENT RESUME Program Demand Cost Model for Alaskan ... · DOCUMENT RESUME. ED 409 643 EA 028 503. TITLE Program Demand Cost Model for Alaskan Schools. 6th Edition. Revised. INSTITUTION

MEMORANDUMrA\

Department of EducationEducational Support ServicesFacilities Section

To: All School Districts and Date: October 14, 1996District Building Consultants

From: Michael MorganSpecial Projects Manager

Phone: 465-8666

Subject: Appropriate Use andApplication of the DOEProgram Demand CostModel for AlaskanSchools

The Program Demand Cost Model for Alaskan Schools (Cost Model) is a tool kir use by schooldistricts and their consultants in estimating school construction costs in the planning phase of aproject. The Cost Model is based on a specific building system and location with generalallowances to accommodate variations in construction and locale. The tool is designed to assist informulating an estimate for a project during its conceptual phase. The estimate produced is oftentermed a "rough order of magnitude" estimate. It is definitely NOT a construction level estimate.It would normally be expected that the model's estimates would almost always be higher that aconstruction quality estimate.

The Cost Model is not intended as a total replacement for other methods of estimation, such as:detailed material takeoffs, labor hours unit rate estimates or construction systems estimates.

Consider the following as guidelines when applying the model:

When to Use

When working on a conceptual plan.In the early planning stages of a project.When little detail is known.When trying to formulate a budget prior to beginning planning and design.To check an estimate from an architect/engineer for reasonableness.

When not to Use

When a project specific estimate from an architect/engineer is available.When requesting construction funding (provide a construction level estimate).Any time better information is available (quotes, contractor estimates, actual costs, etc.)

4ire printed on recycled paper b y C.D.

Page 4: DOCUMENT RESUME Program Demand Cost Model for Alaskan ... · DOCUMENT RESUME. ED 409 643 EA 028 503. TITLE Program Demand Cost Model for Alaskan Schools. 6th Edition. Revised. INSTITUTION

ALA

SK

A D

EP

AR

TM

EN

T O

F E

DU

CA

TIO

NP

RO

GR

AM

DE

MA

ND

CO

ST

MO

DE

L F

OR

ALA

SK

AN

SC

HO

OLS

AU

GU

ST

199

6

TA

BLE

OF

CO

NT

EN

TS

PA

GE

NO

.

I.IN

TR

OD

UC

TIO

N2

II.H

OW

TO

US

E T

HE

DE

MA

ND

CO

ST

MO

DE

L3

III.

PR

OG

RA

M D

EM

AN

D C

OS

T M

OD

EL

New

Sch

ool o

r A

dditi

ons

14

IV.

PR

OG

RA

M D

EM

AN

D C

OS

T M

OD

EL

- R

enov

atio

n W

ork

27

V.

PR

OG

RA

M D

EM

AN

D C

OS

T M

OD

EL

Sum

mar

y N

ew S

choo

l or

Add

ition

san

d R

enov

atio

n W

ork

38

VI.

TA

BLE

S44

Tab

le N

o. 1

- C

onst

ruct

ion

Cos

t Geo

grap

hic

Are

a C

ost F

acto

rT

able

No.

2S

ize

Adj

ustm

ent F

acto

rT

able

No.

3 -

Esc

alat

ion

Inde

x

VII.

BIB

LIO

GR

AP

HY

50

NO

TE

S: P

rogr

am D

eman

d C

ost M

odel

S: F

irst E

ditio

nM

ay 1

981;

Sec

ond

Edi

tion

Nov

embe

r 19

83(C

ompu

teriz

ed D

ecem

ber

1984

); T

hird

Edi

tion

Aug

ust 1

986;

Fou

rth

Edi

tion

Aug

ust 1

988;

and

Fift

h E

ditio

n Ju

ne 1

991.

Sup

plem

enta

ry in

form

atio

n to

the

Six

th E

ditio

n of

the

Dem

and

Cos

t Mod

el c

onta

ins

base

cost

est

imat

es, b

asis

of u

nit c

osts

for

new

wor

k an

d re

nova

tions

.

6

(.1

Page 5: DOCUMENT RESUME Program Demand Cost Model for Alaskan ... · DOCUMENT RESUME. ED 409 643 EA 028 503. TITLE Program Demand Cost Model for Alaskan Schools. 6th Edition. Revised. INSTITUTION

ALA

SK

A D

EP

AR

TM

EN

T O

F E

DU

CA

TIO

NP

RO

GR

AM

DE

MA

ND

CO

ST

MO

DE

L F

OR

ALA

SK

AN

SC

HO

OLS

AU

GU

ST

199

6

I.IN

TR

OD

UC

TIO

N

PA

GE

2

The

cos

t est

imat

e de

man

d m

odel

for

Ala

skan

sch

ools

was

orig

inal

ly d

evel

oped

for

the

Sta

te o

f Ala

ska,

Dep

artm

ent o

f Edu

catio

n in

198

1; a

nd h

as b

een

used

ove

r th

e ye

ars

with

som

e su

cces

s.It

has

been

upd

ated

from

tim

e to

tim

e th

roug

h th

e 5t

h E

ditio

n.

Thi

s ne

w 6

th E

ditio

n of

the

Dem

and

Cos

t Mod

el, d

evel

oped

by

HM

S In

c., 4

103

Min

neso

taD

rive,

Anc

hora

ge,

Ala

ska

9950

3, is

a c

ompl

ete

rew

rite

of th

e w

hole

sys

tem

, and

incl

udes

dem

and

cost

mod

els

for

both

new

cons

truc

tion

(or

maj

or a

dditi

ons)

and

ren

ovat

ion.

The

app

roac

h is

als

o di

ffere

nt in

that

all s

pace

uni

t cos

ts w

ere

gene

rate

d us

ing

com

pute

rized

sys

tem

s. T

he D

eman

d C

ost M

odel

itse

lf w

as d

evel

oped

for

com

pute

r us

e fir

st a

ndad

apte

d fo

r m

anua

l use

for

thos

e w

ho d

o no

t hav

e th

e ne

cess

ary

hard

war

e or

sof

twar

e.T

hus,

the

6th

Edi

tion

ofth

e D

eman

d C

ost i

s av

aila

ble

in b

oth

pape

r an

d el

ectr

onic

med

ia.

The

new

Dem

and

Cos

t Mod

el is

a 9

0's

prod

uct,

prov

idin

g a

syst

em th

at is

tech

nolo

gica

llycu

rren

t; be

ing

prod

uced

in E

xcel

5.0

for

Win

dow

s. A

lso,

the

cost

mod

el v

alue

s ha

ve b

een

incl

uded

for

grea

ter

use

of lo

w v

olta

ge e

lect

rical

syst

ems

to a

llow

for

incr

ease

d co

mpu

ter

netw

orks

, com

mun

icat

ion

syst

ems,

addr

essa

ble

syst

ems

and

secu

rity

syst

ems

in s

choo

ls.

The

inte

nt o

f the

cos

t dem

and

mod

el is

to e

stab

lish

a co

mpl

ete

budg

et fo

r ea

ch fa

cilit

y,us

eful

for

legi

slat

ive

requ

ests

or

bond

issu

es o

r ot

her

form

s of

app

ropr

iatio

n to

be

plac

ed b

efor

eth

e el

ecto

rate

.O

r, it

can

be

used

mer

ely

as a

feas

ibili

ty a

naly

sis

with

out g

oing

to th

e ex

pens

e of

pro

duci

ng a

rchi

tect

ural

draw

ings

or

engi

neer

ing

repo

rts,

but

sim

ply

with

the

deve

lope

d ed

ucat

iona

l spe

cific

atio

ns a

nd th

is p

rogr

amde

man

d m

odel

. The

sec

onda

ryus

e fo

r th

e co

st e

stim

ate

prog

ram

dem

and

mod

elis

to e

stab

lish

the

pres

ent r

epla

cem

ent v

alue

for

insu

ranc

epu

rpos

es.

Pric

es a

nd u

nit r

ates

are

bas

ed o

n m

id-1

996

cost

s fo

r m

ater

ials

, equ

ipm

ent a

nd fr

eigh

t, al

soT

itle

36 la

bor

rate

s.It

shou

ld b

e no

ted

that

this

is a

met

hod

to d

evel

op a

bud

get o

nly

and

actu

al c

osts

will

var

y.

78

Page 6: DOCUMENT RESUME Program Demand Cost Model for Alaskan ... · DOCUMENT RESUME. ED 409 643 EA 028 503. TITLE Program Demand Cost Model for Alaskan Schools. 6th Edition. Revised. INSTITUTION

t`ta

ddai

iLi

g-a

L-4J

ALA

SK

A D

EP

AR

TM

EN

T O

F E

DU

CA

TIO

NP

RO

GR

AM

DE

MA

ND

CO

ST

MO

DE

L F

OR

ALA

SK

AN

SC

HO

OLS

AU

GU

ST

199

6

II.H

OW

TO

US

E T

HE

DE

MA

ND

CO

ST

MO

DE

L

A.

CO

MP

UT

ER

(E

LEC

TR

ON

IC)

OP

ER

AT

ION

Dem

and

Cos

t Mod

el w

as c

reat

ed in

Mic

roso

ft E

xcel

5.0

.

1.O

pen

pert

inen

t Dem

and

Cos

t Mod

el T

empl

ate

on y

our

disk

.

NE

WW

OR

K.X

LTR

EN

OV

AT

E.X

LTN

EW

-RE

N.X

LT

(New

Sch

ool o

r A

dditi

on)

{Ren

ovat

ion

Wor

k)(N

ew a

nd R

enov

atio

n W

ork

Com

bine

d)

PA

GE

T-

2.S

tart

ing

with

the

Sum

mar

y sh

eet,

fill i

n th

e ne

cess

ary

info

rmat

ion

in th

e re

d ce

lls (

all o

ther

shee

ts w

illbe

form

atte

d ac

cord

ingl

y). T

he s

quar

e fo

ot q

uant

ity m

ust b

e pl

aced

on

the

Ren

ovat

ion

Dem

and

Mod

el o

nly;

New

Add

ition

is c

alcu

late

d by

qua

ntiti

es p

lace

d in

mod

el.

Nex

t, go

to T

ab 1

.0 fo

r N

ew C

onst

ruct

ion

or T

ab 1

1.00

for

Ren

ovat

ion

Wor

k, p

lace

quan

titie

s in

appl

icab

le r

ed c

ells

. NO

TE

: The

red

cel

ls a

re th

e on

ly c

ells

that

can

be

edite

d.If

you

hit t

he T

abke

y, y

ou w

ill m

ove

from

cel

l-to-

cell

that

req

uire

s in

put.

If a

red

cell

is a

per

cent

age,

the

num

ber

need

s to

be

ente

red

as a

dec

imal

(fo

r ex

ampl

e:.2

5 w

illsh

ow in

the

cell

as 2

5.00

%).

Pro

ceed

to y

our

othe

r ta

bbed

she

ets.

All

subt

otal

calc

ulat

ions

and

sum

mar

y sh

eets

will

be

calc

ulat

ed a

utom

atic

ally

.

3.A

fter

com

plet

ing

the

varia

ble

info

rmat

ion

save

you

r w

orkb

ook

as a

n ap

prop

riate

file

nam

e, th

enpr

int

the

entir

e w

orkb

ook.

NO

TE

: Tab

les

refe

rred

to in

the

Dem

and

Cos

t Mod

els

are

loca

ted

on th

e di

sk a

sT

AB

LES

.XLT

.

10

Page 7: DOCUMENT RESUME Program Demand Cost Model for Alaskan ... · DOCUMENT RESUME. ED 409 643 EA 028 503. TITLE Program Demand Cost Model for Alaskan Schools. 6th Edition. Revised. INSTITUTION

SK

PA

Wit/

1E01

6FI

CO

MP

RO

GR

AM

DE

MA

ND

CO

ST

MO

DE

L F

OR

ALA

SK

AN

SC

HO

OLS

AU

GU

ST

199

6

II.H

OW

TO

US

E T

HE

DE

MA

ND

CO

ST

MO

DE

L

B.

MA

NU

AL

OP

ER

AT

ION

6111

1111

11

!JA

G E

NE

W S

CH

OO

L O

R A

DD

ITIO

NS

INS

TR

UC

TIO

NS

: Pho

toco

pies

of p

ages

15

thro

ugh

24sh

ould

be

mad

efo

r us

e in

acc

ompl

ishi

ng a

man

ual c

alcu

latio

n of

sch

ool c

onst

ruct

ion

cost

s us

ing

the

Pro

gram

Dem

and

Cos

tM

odel

. SU

MM

AR

Y

To

be c

ompl

eted

afte

r al

l the

follo

win

g ca

lcul

atio

ns h

ave

been

per

form

ed.

1.0

LEA

RN

ING

AN

D V

OC

AT

ION

AL

AR

EA

S

Mul

tiply

app

ropr

iate

are

as x

$/S

F to

arr

ive

at c

ost.

(NO

TE

: Not

all

cate

gorie

s w

illne

cess

arily

hav

e a

squa

re fo

ot q

uant

ity).

AD

D L

ine

Item

s 1.

011.

12 (

area

s an

d co

sts)

to a

rriv

e at

Sub

tota

ls.

Car

ry fo

rwar

d S

ubto

tals

to n

ext p

age.

2.0

SU

PP

OR

T A

RE

AS

Mul

tiply

app

ropr

iate

are

as x

$/S

F to

arr

ive

at c

ost.

AD

D S

ubto

tals

Car

ried

For

war

d (L

ine

1.13

) pl

us L

ine

Item

s 2.

012.

06 to

arr

ive

atS

ubto

tals

(Li

ne 2

.07)

.

Car

ry fo

rwar

d C

ost S

ubto

tal o

nly

to n

ext p

age.

11

Page 8: DOCUMENT RESUME Program Demand Cost Model for Alaskan ... · DOCUMENT RESUME. ED 409 643 EA 028 503. TITLE Program Demand Cost Model for Alaskan Schools. 6th Edition. Revised. INSTITUTION

ALA

SK

A D

EP

AR

TM

EN

T O

F E

DU

CA

TIO

NP

AG

E 5

PR

OG

RA

M D

EM

AN

D C

OS

T M

OD

EL

FO

R A

LAS

KA

N S

CH

OO

LSA

UG

US

T 1

996

II.H

OW

TO

US

E T

HE

DE

MA

ND

CO

ST

MO

DE

L

B.

MA

NU

AL

OP

ER

AT

ION

(C

ontin

ued)

NE

W S

CH

OO

L O

R A

DD

ITIO

NS

INS

TR

UC

TIO

NS

(C

ontin

ued)

3.0

OP

TIO

NA

L S

PE

CIA

L R

EQ

UIR

EM

EN

TS

Mul

tiply

app

ropr

iate

qua

ntiti

es x

uni

t rat

es to

arr

ive

at c

osts

.

AD

D S

ubto

tal C

arrie

d F

orw

ard

(Lin

e 2.

07)

plus

Lin

e Ite

ms

3.01

3.05

10 a

rriv

e at

Sub

tota

l (Li

ne 3

.06)

.

Car

ry fo

rwar

d S

ubto

tal t

o ne

xt p

age.

4.0

SIT

EW

OR

K

Mul

tiply

app

ropr

iate

qua

ntiti

es x

uni

t rat

es to

arr

ive

at c

ost.

AD

D S

ubto

tal C

arrie

d F

orw

ard

(Lin

e 3.

06)

plus

Lin

e Ite

ms

4.01

4.06

to a

rriv

e at

Tot

al B

uild

ing

Cos

ts (

Line

4.0

7).

Car

ry fo

rwar

d T

otal

Bui

ldin

g C

osts

to n

ext p

age.

5.0

CO

NS

TR

UC

TIO

N G

EN

ER

AL

RE

QU

IRE

ME

NT

S

Mul

tiply

Car

ried

For

war

d S

ubto

tal (

Line

4.0

7) x

per

cent

age

(15.

00%

).

Exa

mpl

e: $ 10

0,00

0x

15%

$15

,000

1314

Page 9: DOCUMENT RESUME Program Demand Cost Model for Alaskan ... · DOCUMENT RESUME. ED 409 643 EA 028 503. TITLE Program Demand Cost Model for Alaskan Schools. 6th Edition. Revised. INSTITUTION

wid

aA

LAS

KA

DE

PA

RT

ME

NT

OF

ED

UC

AT

ION

PR

OG

RA

M D

EM

AN

D C

OS

T M

OD

EL

FO

R A

LAS

KA

N S

CH

OO

LSA

UG

US

T 1

996

II.H

OW

TO

US

E T

HE

DE

MA

ND

CO

ST

MO

DE

L

B.

MA

NU

AL

OP

ER

AT

ION

(C

ontin

ued)

NE

W S

CH

OO

L O

R A

DD

ITIO

NS

INS

TR

UC

TIO

NS

(C

ontin

ued)

5.0

CO

NS

TR

UC

TIO

N G

EN

ER

AL

RE

QU

IRE

ME

NT

S (

Con

tinue

d)

AD

D L

ine

Item

s 4.

07 +

5.0

1 to

arr

ive

at B

ase

Tot

al (

Line

5.0

2).

Car

ry fo

rwar

d B

ase

Tot

al to

nex

t pag

e.

6.0

GE

OG

RA

PH

IC A

RE

A C

OS

T F

AC

TO

R

Ref

er to

Tab

le N

o. 1

for

perc

enta

ge a

dditi

on.

If pe

rcen

tage

add

ition

app

lies,

follo

w th

e sa

me

inst

ruct

ions

as

Sec

tion

5.0.

AD

D L

ine

Item

5.0

2 +

6.0

1 to

arr

ive

at S

ubto

tal (

Line

6.0

2).

Car

ry fo

rwar

d S

ubto

tal t

o ne

xt p

age.

7.0

SIZ

E F

AC

TO

R

15

PA

GE

-6-

Ref

er to

Tab

le N

o. 2

for

deta

ils o

n ho

w to

arr

ive

at a

siz

e fa

ctor

.If

size

adj

ustm

ent f

acto

r ap

plie

s,m

ultip

ly C

arrie

d F

orw

ard

Sub

tota

l (Li

ne 6

.02)

by

the

size

adj

ustm

ent f

acto

r (L

ine

7.01

) as

ape

rcen

tage

. Thi

s w

ill g

ive

you

a ne

w S

ubto

tal.

Car

ry fo

rwar

d S

ubto

tal t

o ne

xt p

age.

Page 10: DOCUMENT RESUME Program Demand Cost Model for Alaskan ... · DOCUMENT RESUME. ED 409 643 EA 028 503. TITLE Program Demand Cost Model for Alaskan Schools. 6th Edition. Revised. INSTITUTION

ALA

SK

A D

EP

AR

TM

EN

T O

F E

DU

CA

TIO

NP

RO

GR

AM

DE

MA

ND

CO

ST

MO

DE

L F

OR

ALA

SK

AN

SC

HO

OLS

AU

GU

ST

199

6

II.H

OW

TO

US

E T

HE

DE

MA

ND

CO

ST

MO

DE

L

B.

MA

NU

AL

OP

ER

AT

ION

(C

ontin

ued)

17

G E

7

NE

W S

CH

OO

L O

R A

DD

ITIO

NS

INS

TR

UC

TIO

NS

(C

ontin

ued)

8.0

CO

NT

ING

EN

CIE

S

Mul

tiply

Car

ried

For

war

d S

ubto

tal (

Line

7.0

1) w

ith 8

.01

Gen

eral

Con

tinge

ncy

(10.

00%

).

AD

D L

ine

7.01

+ 8

.01

to a

rriv

e at

Sub

tota

l (Li

ne 8

.02)

.

For

sec

tion

8.03

use

the

esca

latio

n pe

rcen

tage

s gi

ven

acco

rdin

g to

the

year

you

antic

ipat

eco

nstr

uctio

n to

beg

in (

Tab

le N

o. 3

). T

hat p

erce

ntag

e is

then

mul

tiplie

d by

the

Sub

tota

l (Li

ne 8

.02)

.

AD

D L

ine

8.02

+ 8

.03

to a

rriv

e at

Tot

al E

stim

ated

Con

stru

ctio

n V

alue

(Li

ne8.

04).

Car

ry fo

rwar

d T

otal

Est

imat

ed C

onst

ruct

ion

Val

ue to

nex

t pag

e.

9.0

PR

OJE

CT

OV

ER

HE

AD

AN

D O

TH

ER

CO

ST

S

Pla

ce p

erce

ntag

es a

nd q

uant

ities

in a

ppro

pria

te c

ells

, Lin

e Ite

ms

9.01

9.03

and

9.0

5 (u

se th

esu

gges

ted

DO

E p

erce

ntag

e ra

nges

for

a gu

ide)

.

Mul

tiply

Item

s 9.

01 th

roug

h 9.

03 in

divi

dual

ly b

y th

e S

ubto

tal C

arrie

dF

orw

ard

(Lin

e 8.

04).

AD

D L

ine

Item

s 8.

04 +

9.0

19.

03 to

arr

ive

at S

ubto

tal O

ne (

Line

9.0

4).

Som

e pr

ojec

t ove

rhea

d co

sts

are

not s

ubje

ct to

an

esca

latio

n co

ntin

genc

y as

cons

truc

tion

para

met

ers

are

clar

ified

.E

scal

atio

n co

ntin

genc

y w

ill b

e ad

ded

to th

e to

tal o

f Lin

e Ite

ms

9.01

- 9

.03

only

. Mul

tiply

Lin

e 9.

04 b

y Li

ne 9

.05

perc

enta

ge.

AD

D 9

.04

and

9.05

to a

rriv

e at

Sub

tota

l Tw

o (L

ine

9.06

).

18

Page 11: DOCUMENT RESUME Program Demand Cost Model for Alaskan ... · DOCUMENT RESUME. ED 409 643 EA 028 503. TITLE Program Demand Cost Model for Alaskan Schools. 6th Edition. Revised. INSTITUTION

ALA

SK

A D

EP

AR

TM

EN

T O

F E

DU

CA

TIO

NP

RO

GR

AM

DE

MA

ND

CO

ST

MO

DE

L F

OR

ALA

SK

AN

SC

HO

OLS

AU

GU

ST

199

6

II.H

OW

TO

US

E T

HE

DE

MA

ND

CO

ST

MO

DE

L

B.

MA

NU

AL

OP

ER

AT

ION

(C

ontin

ued)

NE

W S

CH

OO

L O

R A

DD

ITIO

NS

INS

TR

UC

TIO

NS

(C

ontin

ued)

9.0

PR

OJE

CT

OV

ER

HE

AD

AN

D O

TH

ER

CO

ST

S (

Con

tinue

d)

9

Fill

in th

e ap

prop

riate

qua

ntiti

es fo

r Li

ne It

ems

9.07

- 9

.10,

if a

pplic

able

. Mul

tiply

Line

Item

s 9.

08 a

nd

9.09

by

Sub

tota

l Con

stru

ctio

n V

alue

(Li

ne 8

.04)

.

AD

D S

ubto

tal T

wo

(Lin

e 9.

06)

and

Line

Item

s 9.

07 th

roug

h 9.

10 to

arr

ive

atT

otal

Pro

ject

Cos

t (Li

ne

9.11

).

SU

MM

AR

Y

The

sum

mar

y on

Pag

e 15

now

can

be

com

plet

ed.

Gro

ss F

loor

Are

a is

the

tota

l are

a of

Lin

e 2.

07. T

otal

Est

imat

ed C

onst

ruct

ion

Val

ue is

Lin

e 8.

04, a

ndP

roje

ct T

otal

Cos

ts is

Lin

e 9.

11.

NO

TE

: Fig

ures

from

eac

h of

the

func

tiona

l cat

egor

ies

(1.0

0 -

9.00

) ca

n al

so b

e m

anua

llyen

tere

d on

the

deta

iled

sum

mar

y sh

eets

foun

d on

Pag

es 2

5 an

d 26

.

20

Page 12: DOCUMENT RESUME Program Demand Cost Model for Alaskan ... · DOCUMENT RESUME. ED 409 643 EA 028 503. TITLE Program Demand Cost Model for Alaskan Schools. 6th Edition. Revised. INSTITUTION

Va.

k

ALA

SK

A D

EP

AR

TM

EN

T O

F E

DU

CA

TIO

NP

RO

GR

AM

DE

MA

ND

CO

ST

MO

DE

L F

OR

ALA

SK

AN

SC

HO

OLS

AU

GU

ST

199

6

II.H

OW

TO

US

E T

HE

DE

MA

ND

CO

ST

MO

DE

L

B.

MA

NU

AL

OP

ER

AT

ION

(C

ontin

ued)

21

PA

GE

9

RE

NO

VA

TIO

N W

OR

K IN

ST

RU

CT

ION

S: P

hoto

copi

es o

f pag

es 2

8 th

roug

h 35

shou

ld b

e m

ade

for

use

inac

com

plis

hing

a m

anua

l cal

cula

tion

of s

choo

l ren

ovat

ion

cost

s us

ing

the

Pro

gram

Dem

and

Cos

t Mod

el.

SU

MM

AR

Y

To

be c

ompl

eted

afte

r al

l the

follo

win

g ha

s be

en p

erfo

rmed

.

11.0

RE

MO

DE

L

Mul

tiply

app

ropr

iate

qua

ntiti

es x

$/U

nit t

o ar

rive

at c

ost.

(Not

e: N

otal

l cat

egor

ies

will

nec

essa

rily

have

a s

quar

e fo

ot q

uant

ity).

AD

D L

ine

Item

s 11

.01

11.1

8 to

arr

ive

at S

ubto

tal (

Line

11.

19).

Car

ry fo

rwar

d S

ubto

tal t

o ne

xt p

age.

12.0

AD

DIT

ION

AL

CO

ST

S F

OR

HA

ZA

RD

OU

S M

AT

ER

IALS

RE

MO

VA

L

Mul

tiply

app

ropr

iate

qua

ntiti

es x

$/U

nit t

o ar

rive

at c

ost.

AD

D S

ubto

tal C

arrie

d F

orw

ard

(Lin

e 11

.19)

plu

s Li

ne It

ems

12.0

112

.10

to a

rriv

e at

Sub

tota

l (Li

ne 1

2.11

).

Car

ry fo

rwar

d S

ubto

tal t

o ne

xt p

age.

22

Page 13: DOCUMENT RESUME Program Demand Cost Model for Alaskan ... · DOCUMENT RESUME. ED 409 643 EA 028 503. TITLE Program Demand Cost Model for Alaskan Schools. 6th Edition. Revised. INSTITUTION

44:c

-,41

ALA

SK

A D

EP

AR

TM

EN

T O

F E

DU

CA

TIO

NP

RO

GR

AM

DE

MA

ND

CO

ST

MO

DE

L F

OR

ALA

SK

AN

SC

HO

OLS

AU

GU

ST

199

6

II.H

OW

TO

US

E T

HE

DE

MA

ND

CO

ST

MO

DE

L

B.

MA

NU

AL

OP

ER

AT

ION

(C

ontin

ued)

RE

NO

VA

TIO

N W

OR

K IN

ST

RU

CT

ION

S (

Con

tinue

d)

13.0

CO

NS

TR

UC

TIO

N G

EN

ER

AL

RE

QU

IRE

ME

NT

S

Mul

tiply

Car

ried

For

war

d S

ubto

tal (

Line

12.

11)

x pe

rcen

tage

(20.

00%

).

Exa

mpl

e: $ 10

0,00

0x

20%

$ 20

,000

PA

GE

10

AD

D L

ine

12.1

1 +

13.

01 to

arr

ive

at B

ase

Tot

al (

Line

13.

02).

Car

ry fo

rwar

d B

ase

Tot

al to

nex

t pag

e.

14.0

GE

OG

RA

PH

IC A

RE

A C

OS

T F

AC

TO

R

Ref

er to

Tab

le N

o. 1

for

perc

enta

ge a

dditi

on.

If pe

rcen

tage

add

ition

app

lies,

follo

w th

e sa

me

inst

ruct

ions

as

Sec

tion

13.0

AD

D L

ine

13.0

2 +

14.

01 to

arr

ive

at S

ubto

tal (

Line

14.

02).

Car

ry fo

rwar

d S

ubto

tal t

o ne

xt p

age.

2324

Page 14: DOCUMENT RESUME Program Demand Cost Model for Alaskan ... · DOCUMENT RESUME. ED 409 643 EA 028 503. TITLE Program Demand Cost Model for Alaskan Schools. 6th Edition. Revised. INSTITUTION

YM

ttlit

iitA

LAS

KP

AA

EF

ecA

ttP

RO

GR

AM

DE

MA

ND

CO

ST

MO

DE

L F

OR

ALA

SK

AN

SC

HO

OLS

AU

GU

ST

199

6

II.H

OW

TO

US

E T

HE

DE

MA

ND

CO

ST

MO

DE

L

B.

MA

NU

AL

OP

ER

AT

ION

(C

ontin

ued)

RE

NO

VA

TIO

N W

OR

K IN

ST

RU

CT

ION

S (

Con

tinue

d)

15.0

SIZ

E F

AC

TO

R

25

PA

U E

1T

Ref

er to

Tab

le N

o. 2

for

deta

ils o

n ho

w to

arr

ive

at a

siz

e fa

ctor

.If

size

adj

ustm

ent f

acto

r ap

plie

s,m

ultip

ly C

arrie

d F

orw

ard

Sub

tota

l (Li

ne 1

4.02

) by

the

size

adj

ustm

ent f

acto

r(L

ine

15.0

1) a

s a

perc

enta

ge. T

his

will

giv

e yo

u a

new

Sub

tota

l.

Car

ry fo

rwar

d S

ubto

tal t

o ne

xt p

age.

16.0

CO

NT

ING

EN

CIE

S

Mul

tiply

Car

ried

For

war

d S

ubto

tal (

Line

15.

01)

with

16.

01 -

Gen

eral

Con

tinge

ncy

(15.

00%

).

AD

D L

ine

15.0

1 +

16.

01 to

arr

ive

at S

ubto

tal (

Line

16.

02).

For

sec

tion

16.0

3 us

e th

e es

cala

tion

perc

enta

ges

give

n ac

cord

ing

to th

e ye

ar y

ouan

ticip

ate

cons

truc

tion

to b

egin

(T

able

No.

3).

Tha

t per

cent

age

is th

en m

ultip

lied

by th

e S

ubto

tal

(Lin

e 16

.02)

.

AD

D L

ine

16.0

2 +

16.

03 to

arr

ive

at T

otal

Est

imat

ed C

onst

ruct

ion

Val

ue (

Line

16.0

4).

Car

ry fo

rwar

d T

otal

Est

imat

ed C

onst

ruct

ion

Val

ue to

nex

t pag

e.

26

Page 15: DOCUMENT RESUME Program Demand Cost Model for Alaskan ... · DOCUMENT RESUME. ED 409 643 EA 028 503. TITLE Program Demand Cost Model for Alaskan Schools. 6th Edition. Revised. INSTITUTION

ALA

SK

);-`

11tP

kiiti

vIdi

r6F

PR

OG

RA

M D

EM

AN

D C

OS

T M

OD

EL

FO

R A

LAS

KA

N S

CH

OO

LSA

UG

US

T 1

996

II.H

OW

TO

US

E T

HE

DE

MA

ND

CO

ST

MO

DE

L

B.

MA

NU

AL

OP

ER

AT

ION

(C

ontin

ued)

RE

NO

VA

TIO

N W

OR

K IN

ST

RU

CT

ION

S (

Con

tinue

d)

17.0

PR

OJE

CT

OV

ER

HE

AD

AN

D O

TH

ER

CO

ST

S

27

PA

GE

12-

--

Pla

ce p

erce

ntag

es a

nd q

uant

ities

in a

ppro

pria

te c

ells

, Lin

e Ite

ms

17.0

117

.03

and

17.0

5 (u

se th

esu

gges

ted

DO

E p

erce

ntag

e ra

nges

for

a gu

ide)

. Mul

tiply

Item

s17

.01

thro

ugh

17.0

3 in

divi

dual

ly b

yth

e S

ubto

tal C

arrie

d F

orw

ard

(Lin

e 16

.04)

. AD

D L

ine

Item

s 16

.04

+17

.01

17.0

3 to

arr

ive

atS

ubto

tal O

ne (

Line

17.

04).

Som

e pr

ojec

t ove

rhea

d co

sts

are

not s

ubje

ct to

an

esca

latio

nco

ntin

genc

y as

con

stru

ctio

npa

ram

eter

s ar

e cl

arifi

ed.

Esc

alat

ion

cont

inge

ncy

will

be

adde

d to

the

tota

l of L

ine

Item

s 17

.01

17.0

3 on

ly. M

ultip

ly L

ine

17.0

4 by

Lin

e 17

.05

perc

enta

ge.

AD

D 1

7.04

and

17.

05 to

arr

ive

at S

ubto

tal

Tw

o (L

ine

17.0

6).

Fill

in th

e ap

prop

riate

qua

ntiti

es fo

r Li

ne It

ems

17.0

7 an

d 17

.08,

if ap

plic

able

. Mul

tiply

Lin

e Ite

m17

.08

by S

ubto

tal C

onst

ruct

ion

Val

ue (

Line

16.

04).

AD

D S

ubto

talT

wo

(Lin

e 17

.06)

and

Lin

e Ite

ms

17.0

7 th

roug

h 17

.08

to a

rriv

e at

Tot

al P

roje

ct C

ost (

Line

17.0

9).

SU

MM

AR

Y

The

sum

mar

y on

Pag

e 28

now

can

be

com

plet

ed.

Gro

ss F

loor

Are

a is

pla

ced

here

. Tot

al E

stim

ated

Con

stru

ctio

n V

alue

isLi

ne 1

6.04

, and

Pro

ject

Tot

alC

osts

is L

ine

17.0

9.

NO

TE

: Fig

ures

from

eac

h of

the

func

tiona

l cat

egor

ies

(11.

0017

.00)

can

als

o be

man

ually

ent

ered

on th

e de

taile

d su

mm

ary

shee

ts fo

und

onP

ages

36

and

37.

23

Page 16: DOCUMENT RESUME Program Demand Cost Model for Alaskan ... · DOCUMENT RESUME. ED 409 643 EA 028 503. TITLE Program Demand Cost Model for Alaskan Schools. 6th Edition. Revised. INSTITUTION

Witt

iA

LAS

KA

DE

PA

RT

ME

NT

OF

ED

UC

AT

ION

PR

OG

RA

M D

EM

AN

D C

OS

T M

OD

EL

FO

R A

LAS

KA

N S

CH

OO

LSA

UG

US

T 1

996

II.H

OW

TO

US

E T

HE

DE

MA

ND

CO

ST

MO

DE

L

29

B.

MA

NU

AL

OP

ER

AT

ION

(C

ontin

ued)

PA

GE

13

NE

W S

CH

OO

L O

R A

DD

ITIO

N A

ND

RE

NO

VA

TIO

N W

OR

KIN

ST

RU

CT

ION

S: P

hoto

copi

es o

f pag

es 1

5th

roug

h 24

(ne

w w

ork

or a

dditi

ons)

and

28

thro

ugh

35(r

enov

atio

n) s

houl

d be

mad

e fo

r us

e in

acc

ompl

ishi

nga

man

ual c

alcu

latio

n of

pro

ject

s in

volv

ing

both

sch

ool c

onst

ruct

ion

and

scho

ol r

enov

atio

n co

sts

usin

gth

eP

rogr

am D

eman

d C

ost M

odel

. Fol

low

the

inst

ruct

ions

foun

d on

pag

es4

thro

ugh

8 to

cal

cula

te p

roje

ct c

osts

for

new

wor

k or

add

ition

s an

d pa

ges

9 th

roug

h 12

for

proj

ects

invo

lvin

g re

nova

tion

wor

k.

SU

MM

AR

Y

The

sum

mar

y on

Pag

e 39

now

can

be

com

plet

ed.

Gro

ss F

loor

Are

as fo

r ea

ch c

ateg

ory

of p

roje

ct is

pla

ced

here

.T

otal

Est

imat

ed C

onst

ruct

ion

Val

ue is

Line

8.0

4 fo

r N

ew W

ork

or A

dditi

ons

and

Line

16.

04 fo

rR

enov

atio

n. P

roje

ct T

otal

Cos

ts is

Lin

e 9.

11fo

r N

ew W

ork

or A

dditi

ons

and

Line

17.

09 fo

r R

enov

atio

n.

NO

TE

: Fig

ures

from

eac

h of

the

func

tiona

l cat

egor

ies

(1.0

0 -

9.00

,an

d 11

.00

- 17

.00)

can

als

o be

man

ually

ent

ered

on

the

deta

iled

sum

mar

y sh

eets

foun

d on

Pag

es 4

0 th

roug

h 43

.

Page 17: DOCUMENT RESUME Program Demand Cost Model for Alaskan ... · DOCUMENT RESUME. ED 409 643 EA 028 503. TITLE Program Demand Cost Model for Alaskan Schools. 6th Edition. Revised. INSTITUTION

ALA

SK

A D

EP

AR

TM

EN

T O

F E

DU

CA

TIO

NP

RO

GR

AM

DE

MA

ND

CO

ST

MO

DE

L F

OR

ALA

SK

AN

SC

HO

OLS

AU

GU

ST

199

6

III. P

RO

GR

AM

DE

MA

ND

CO

ST

MO

DE

LN

EW

SC

HO

OL

OR

AD

DIT

ION

S

PA

GE

14

The

follo

win

g pa

ges

are

for

use

in a

man

ual c

alcu

latio

n of

sch

oolc

onst

ruct

ion

cost

s. T

he p

ages

as

they

app

ear

in th

e.

elec

tron

ic v

ersi

on's

Exc

el s

prea

dshe

ets

will

diff

er s

light

ly in

form

at. E

ach

estim

atin

g ca

tego

ry (

e.g.

, Lea

rnin

g an

dV

ocat

iona

l Are

a, S

uppo

rt A

reas

, Geo

grap

hic

Cos

t Fac

tors

, etc

.) r

esid

es o

n its

ow

n pa

ge.

Tw

o su

mm

arie

s ar

e pr

ovid

ed. P

age

15 h

as a

sum

mar

y of

ove

rall

cost

sfo

r co

nstr

uctio

n an

d to

tal p

roje

ct c

osts

. Pag

es 2

5th

roug

h 26

pro

vide

a d

etai

led

sum

mar

y w

hich

cap

ture

s al

l lin

e ite

m c

osts

in a

con

cise

tabu

latio

n.

3132

Page 18: DOCUMENT RESUME Program Demand Cost Model for Alaskan ... · DOCUMENT RESUME. ED 409 643 EA 028 503. TITLE Program Demand Cost Model for Alaskan Schools. 6th Edition. Revised. INSTITUTION

14"4

ALA

SK

A D

EP

AR

TM

EN

T O

F E

DU

CA

TIO

NP

RO

GR

AM

DE

MA

ND

CO

ST

MO

DE

L F

OR

ALA

SK

AN

SC

HO

OLS

NE

W S

CH

OO

L O

R A

DD

ITIO

NS

SC

HO

OL

DIS

TR

ICT

:

PR

OJE

CT

:

LOC

AT

ION

:

SU

MM

AR

Y

New

Sch

ool o

r A

dditi

ons

TO

TA

L N

EW

SC

HO

OL

OR

AD

DIT

ION

S:

NO

TE

S: G

ross

Flo

or A

rea

is th

e ar

ea to

tal o

f Lin

e 2.

07.

Tot

al C

onst

ruct

ion

Cos

ts fr

om L

ine

8.04

.T

otal

Pro

ject

Cos

ts fr

om L

ine

9.11

.

33

DA

TE

OF

ES

TIM

AT

E:

PA

L it

15

GR

OS

SC

ON

ST

RU

CT

ION

PR

OJE

CT

TO

TA

LF

LOO

R A

RE

AC

OS

TS

CO

ST

S

SF

34

Page 19: DOCUMENT RESUME Program Demand Cost Model for Alaskan ... · DOCUMENT RESUME. ED 409 643 EA 028 503. TITLE Program Demand Cost Model for Alaskan Schools. 6th Edition. Revised. INSTITUTION

ALA

SK

A D

EP

AR

TM

EN

T O

F E

DU

CA

TIO

NP

RO

GR

AM

DE

MA

ND

CO

ST

MO

DE

L F

OR

ALA

SK

AN

SC

HO

OLS

NE

W S

CH

OO

L O

R A

DD

ITIO

NS

1.00

LE

AR

NIN

G A

ND

VO

CA

TIO

NA

L A

RE

AS

AR

EA

$/S

FC

OS

T

1.01

Sta

ndar

d C

lass

room

'S

Fx

$ 85

.74

=

1.02

Kin

derg

arte

n/P

rimar

y C

lass

room

2S

F x

90.7

9=

1.03

Dam

p C

lass

room

/Lab

orat

ory3

SF

x10

1.86

=

1.04

Mul

ti-P

urpo

se R

oom

'S

Fx

104.

37=

1.05

Gym

nasi

um'

SF

x12

1.70

=

1.06

Libr

ary

and

Med

ia C

ente

rS

Fx

90.8

4=

1.07

Mus

ic R

oom

SF

x87

.57

=

1.08

Aud

itoriu

SF

x12

2.06

=

1.09

Hom

e E

cono

mic

sS

Fx

100.

48=

1.10

Indu

stria

l Art

s'S

Fx

119.

25=

1.11

Lock

ers/

Sho

wer

sS

Fx

153.

27=

1.12

Oth

erS

F x

1.13

SU

BT

OT

ALS

(Li

nes

1.01

thru

1.1

2):

SF

NO

TE

S:

Incl

udes

gen

eral

edu

catio

nal s

pace

as

wel

l as

spec

ial i

nstr

uctio

nal a

reas

to in

clud

e: b

usin

ess,

driv

ers'

edu

catio

n, ty

ping

, lan

guag

ela

bora

tory

,

and

spec

ial e

duca

tion.

Cos

t for

com

pute

r ou

tlets

incl

uded

in c

lass

room

s.

2 In

clud

es a

toile

t.

3 In

clud

es a

rt, s

cien

ces,

cra

ft an

d co

smet

olog

y.

Lunc

h ro

oms,

etc

.

s P

hysi

cal e

duca

tion

(dre

ssin

g ro

oms

and

heal

th c

lass

room

s).

6 In

clud

es s

tage

and

sup

port

are

a sq

uare

foot

age.

7 In

clud

es w

ood/

met

al s

hop,

aut

omot

ive

shop

and

agr

icul

ture

.

Page 20: DOCUMENT RESUME Program Demand Cost Model for Alaskan ... · DOCUMENT RESUME. ED 409 643 EA 028 503. TITLE Program Demand Cost Model for Alaskan Schools. 6th Edition. Revised. INSTITUTION

ALA

SK

A D

EP

AR

TM

EN

T O

F E

DU

CA

TIO

NP

RO

GR

AM

DE

MA

ND

CO

ST

MO

DE

L F

OR

ALA

SK

AN

SC

HO

OLS

NE

W S

CH

OO

L O

R A

DD

ITIO

NS

SU

BT

OT

AL

CA

RR

IED

FO

RW

AR

D (

Line

1.1

3):

2.00

SU

PP

OR

T A

RE

AS

AR

EA

$/S

FC

OS

T

SF

2.01

Adm

inis

trat

ion'

SF

x$

98.0

6=

2.02

Caf

eter

ia/F

ood

Pre

para

tion'

SF

x27

9.45

=

2.03

Sto

rage

SF

x75

.13

=

2.04

Toi

lets

SF

x17

4.20

=

2.05

Circ

ulat

ion

SF

x88

.76

=

2.06

Mec

hani

caV

Ele

ctric

al'

SF

x75

.86

=

2.07

SU

BT

OT

ALS

(Li

nes

1.13

+ 2

.01

thru

2.0

6):

SF

'

NO

TE

S:

Incl

udes

spa

ce fo

r co

unse

lor's

are

a, c

linic

are

as a

nd a

dmin

istr

ativ

e ar

eas.

2 In

clud

es k

itche

n an

d se

rvin

g ar

eas

(Din

ing

in 1

.04

- M

ultip

urpo

se R

oom

).

3 D

oes

not i

nclu

deeq

uipm

ent o

r sy

stem

s, ju

st s

pace

.

4 T

he to

tal

squa

re fo

ot a

rea

arriv

ed a

t fro

m S

ectio

ns 1

.00

and

2.00

isth

e gr

oss

floor

are

a of

the

build

ing.

3738

PA

GE

17

Page 21: DOCUMENT RESUME Program Demand Cost Model for Alaskan ... · DOCUMENT RESUME. ED 409 643 EA 028 503. TITLE Program Demand Cost Model for Alaskan Schools. 6th Edition. Revised. INSTITUTION

ALA

SK

A D

EP

AR

TM

EN

T O

F E

DU

CA

TIO

NP

RO

GR

AM

DE

MA

ND

CO

ST

MO

DE

L F

OR

ALA

SK

AN

SC

HO

OLS

NE

W S

CH

OO

L O

R A

DD

ITIO

NS

SU

BT

OT

AL

CA

RR

IED

FO

RW

AR

D (

Line

2.0

7):

CO

ST

3.00

OP

TIO

NA

L S

PE

CIA

L R

EQ

UIR

EM

EN

TS

3.01

125

KW

Ele

ctric

al G

ener

ator

LS x

$ 78

,560

=

3.02

Fue

l Oil

1,00

0 G

allo

n S

tora

ge fo

r G

ener

ator

LS x

10,4

65=

3.03

Spr

inkl

er S

yste

m'

SF

x2.

37=

3.04

Wat

er S

tora

ge o

r S

peci

al S

uppl

y R

equi

rem

ents

(Tec

hnic

al A

ssis

tanc

e R

equi

red)

LS x

3.05

Oth

er S

peci

al R

equi

rem

ents

LS x

3.06

SU

BT

OT

AL

(Lin

es 2

.07

+ 3

.01

thru

3.0

5):

NO

TE

S:

Spr

inkl

er s

yste

m c

ost a

ssum

es e

asy

acce

ss to

wat

er s

uppl

y an

d a

suita

ble

pres

sure

.

3940

PA

GE

18

Page 22: DOCUMENT RESUME Program Demand Cost Model for Alaskan ... · DOCUMENT RESUME. ED 409 643 EA 028 503. TITLE Program Demand Cost Model for Alaskan Schools. 6th Edition. Revised. INSTITUTION

DE

1410

41M

EN

4F E

404A

TI6

1L'

"JP

RO

GR

AM

DE

MA

ND

CO

ST

MO

DE

L F

OR

ALA

SK

AN

SC

HO

OLS

NE

W S

CH

OO

L O

R A

DD

ITIO

NS

SU

BT

OT

AL

CA

RR

IED

FO

RW

AR

D (

Line

3.0

6):

Qra

moi

lmia

;

CO

ST

4.00

SIT

EW

OR

K (

TE

CH

NIC

AL

AS

SIS

TA

NC

E R

EQ

UIR

ED

)

4.01

Site

Pre

para

tion'

(Est

imat

e)1

LS x

$

4.02

Site

Impr

ovem

ents

2(E

stim

ate)

1LS

x

4.03

Pla

ygro

und

Equ

ipm

ent/S

port

s E

quip

men

t(E

stim

ate)

1LS

x

4.04

Util

ities

and

Fue

l Oil

(Est

imat

e)1

LS x

4.05

Site

Lig

htin

g(E

stim

ate)

1LS

x

4.06

Spe

cial

Circ

umst

ance

s A

dditi

onal

Cos

ts'

(Est

imat

e)1

LS x

4.07

TO

TA

L B

UIL

DIN

G C

OS

TS

(Li

ne 3

.06

+ 4

.01

thru

4.0

6):

NO

TE

S:

Cle

arin

g, g

radi

ng a

nd d

rain

age,

exc

avat

ion

and

fill.

2La

ndsc

apin

g, p

lay

field

s, s

port

s fie

lds,

sig

nage

, nat

ure

trai

ls, e

tc.

3 S

tand

ard

pilin

g in

are

as w

here

pili

ng is

the

norm

are

not

spe

cial

circ

umst

ance

s. C

osts

for

pilin

g is

adj

uste

d in

the

geog

raph

ic c

ost f

acto

r.

The

add

ition

al c

ost f

or th

erm

opile

s or

sim

ilar

are

to b

e co

nsid

ered

a s

peci

al c

ircum

stan

ce c

ost.

4142

Page 23: DOCUMENT RESUME Program Demand Cost Model for Alaskan ... · DOCUMENT RESUME. ED 409 643 EA 028 503. TITLE Program Demand Cost Model for Alaskan Schools. 6th Edition. Revised. INSTITUTION

ALA

SK

A D

EP

AR

TM

EN

T O

F E

DU

CA

TIO

NP

RO

GR

AM

DE

MA

ND

CO

ST

MO

DE

L F

OR

ALA

SK

AN

SC

HO

OLS

NE

W S

CH

OO

L O

R A

DD

ITIO

NS

SU

BT

OT

AL

CA

RR

IED

FO

RW

AR

D (

BU

ILD

ING

CO

ST

S)

(Lin

e 4.

07):

5.00

CO

NS

TR

UC

TIO

N G

EN

ER

AL

RE

QU

IRE

ME

NT

S

5.01

Mob

iliza

tion,

Gen

eral

Ope

ratin

g C

osts

and

Con

trac

tor's

Pro

fitLi

ne 4

.07

x15

.00%

=

5.02

BA

SE

TO

TA

L (L

ine

4.07

+ 5

.01)

:

43

CO

ST

PA

GE

20

Page 24: DOCUMENT RESUME Program Demand Cost Model for Alaskan ... · DOCUMENT RESUME. ED 409 643 EA 028 503. TITLE Program Demand Cost Model for Alaskan Schools. 6th Edition. Revised. INSTITUTION

ALA

SD

Ehf

"ME

*F E

illitA

T18

11"

j"j2

PA

cac

z1

PR

OG

RA

M D

EM

AN

D C

OS

T M

OD

EL

FO

R A

LAS

KA

N S

CH

OO

LS

NE

W S

CH

OO

L O

R A

DD

ITIO

NS

SU

BT

OT

AL

CA

RR

IED

FO

RW

AR

D (

BA

SE

TO

TA

L) (

Line

5.0

2):

6.00

GE

OG

RA

PH

IC A

RE

A C

OS

T F

AC

TO

R

6.01

Pla

ce G

eogr

aphi

c A

rea

Her

e(R

efer

to T

able

No.

1 fo

r pe

rcen

tage

add

ition

)Li

ne 5

.02

x

6.02

SU

BT

OT

AL

(Lin

e 5.

02 +

6.0

1):

°A

CO

ST

Page 25: DOCUMENT RESUME Program Demand Cost Model for Alaskan ... · DOCUMENT RESUME. ED 409 643 EA 028 503. TITLE Program Demand Cost Model for Alaskan Schools. 6th Edition. Revised. INSTITUTION

ALA

biC

A D

EI5

M1-

ME

ht6F

Etit

tAT

I6iti

aP

RO

GR

AM

DE

MA

ND

CO

ST

MO

DE

L F

OR

ALA

SK

AN

SC

HO

OLS

NE

W S

CH

OO

L O

R A

DD

ITIO

NS

SU

BT

OT

AL

CA

RR

IED

FO

RW

AR

D (

Line

6.0

2):

7.00

SIZ

E F

AC

TO

R

NO

TE

:I R

efer

to T

able

No.

2 fo

r de

tails

on

how

the

size

adju

stm

ent f

acto

r is

arr

ived

at.

7.01

Siz

e A

djus

tmen

t Fac

tor

SU

BT

OT

AL:

FO

RM

ULA

:

Pro

pose

d S

choo

l Siz

e

Bas

e S

choo

l Siz

e

0.1w

ii

Line

6.0

2 x

SF

25,0

00 S

F

NO

TE

: Div

ide

prop

osed

sch

ool s

ize

(SF

) by

bas

e sc

hool

siz

e (2

5,00

0 S

F).

How

ever

, if t

he p

ropo

sed

new

sch

ool e

xcee

ds 2

5,00

0 S

F,

this

cal

cula

tion

is d

isre

gard

ed.

47

0/0

CO

ST

48

PA

crc-

z2

Page 26: DOCUMENT RESUME Program Demand Cost Model for Alaskan ... · DOCUMENT RESUME. ED 409 643 EA 028 503. TITLE Program Demand Cost Model for Alaskan Schools. 6th Edition. Revised. INSTITUTION

Waa

lA

LAS

KA

DE

PA

RT

ME

NT

OF

ED

UC

AT

ION

PR

OG

RA

M D

EM

AN

D C

OS

T M

OD

EL

FO

R A

LAS

KA

N S

CH

OO

LS

NE

W S

CH

OO

L O

R A

DD

ITIO

NS

SU

BT

OT

AL

CA

RR

IED

FO

RW

AR

D (

Line

7.0

1):

8.00

CO

NT

ING

EN

CIE

S

8.01

GE

NE

RA

LF

or c

onst

ruct

ion

unkn

owns

and

the

unan

ticip

ated

.

8.02

SU

BT

OT

AL

(Lin

e 7.

01 +

8.0

1):

8.03

ES

CA

LAT

ION

Esc

alat

ion

is to

be

adde

d fo

r fu

ture

cos

t est

imat

es.

Ple

ase

put t

he y

ear

you

antic

ipat

e th

e pr

ojec

tto

be

esca

late

d to

. Esc

alat

ion

has

been

estim

ated

onl

y to

the

year

200

0. U

se th

e fo

llow

ing

esca

latio

n pe

rcen

tage

s fo

r th

e ap

prop

riate

yea

r.

1996

- 0.

00%

;19

97-

3.10

%; 1

998

- 6.

10%

;19

99-

9.00

%;

2000

- 12

.00%

Line

7.0

1 x

10.0

0%. =

YE

AR

I1

Line

8.0

2 x

1%

I.

8.04

TO

TA

L E

ST

IMA

TE

D C

ON

ST

RU

CT

ION

VA

LUE

(Li

ne 8

.02

+ 8

.03)

:

49

CO

ST

50

Page 27: DOCUMENT RESUME Program Demand Cost Model for Alaskan ... · DOCUMENT RESUME. ED 409 643 EA 028 503. TITLE Program Demand Cost Model for Alaskan Schools. 6th Edition. Revised. INSTITUTION

L:LL

ALA

SK

A D

EP

AR

TM

EN

T O

F E

DU

CA

TIO

NP

RO

GR

AM

DE

MA

ND

CO

ST

MO

DE

L F

OR

ALA

SK

AN

SC

HO

OLS

NE

W S

CH

OO

L O

R A

DD

ITIO

NS

CO

ST

PA

GE

SU

BT

OT

AL

CA

RR

IED

FO

RW

AR

D (

CO

NS

TR

UC

TIO

N V

ALU

E)

(Lin

e 8.

04):

9.00

PR

OJE

CT

OV

ER

HE

AD

AN

D O

TH

ER

CO

ST

S

$S

ee B

elow

for

Sug

gest

ed D

OE

Ran

ges

9.01

Con

stru

ctio

n M

anag

emen

tLi

ne 8

.04

2% to

4%

30/

c

9.02

Indi

rect

Cos

ts (

Adm

inis

trat

ion)

Line

8.0

4 x

0/0

2% to

4%

9.03

Des

ign

Cos

tsLi

ne 8

.04

x0/

06%

to 8

%

9.04

SU

BT

OT

AL

ON

E (

Line

8.0

4 +

9.0

1 th

ru 9

.03)

:

9.05

Pro

ject

Con

tinge

ncy

for

Cha

nges

'Li

ne 9

.04

x5%

to 7

")/0

0/0

9.06

SU

BT

OT

AL

TW

O (

Line

9.0

4 +

9.0

5):

$

9.07

Site

Inve

stig

atio

n (E

stim

ate)

9.08

Fur

nish

ings

& E

quip

men

t Cos

ts2

Line

8.0

4 x

0/0

0% to

7%

9.09

Art

(W

here

App

licab

le)

Line

8.0

4 x

0/0

1.00

% (

Sta

tuto

ry)

9.10

Lan

d P

urch

ase

Cos

ts (

Est

imat

e)1

LS

9.11

PR

OJE

CT

TO

TA

L C

OS

T (

Line

9.0

6 +

9.0

7 th

ru 9

.10)

:

NO

TE

S:

Item

s 9.

07 th

roug

h 9.

10 a

re n

ot s

ensi

tive

to P

roje

ct C

ontin

genc

y.

2 In

clud

es fo

rco

mpu

ters

and

oth

er lo

w v

olta

ge e

quip

men

t. N

ote:

Cos

tsfo

r co

ndui

t, w

ire, b

ackb

oard

s, o

utle

ts, e

tc.

are

incl

uded

with

bui

ldin

g co

sts.

Che

ck s

tatu

tory

lim

itatio

n.

52

51

Page 28: DOCUMENT RESUME Program Demand Cost Model for Alaskan ... · DOCUMENT RESUME. ED 409 643 EA 028 503. TITLE Program Demand Cost Model for Alaskan Schools. 6th Edition. Revised. INSTITUTION

ALASKA DEPARTMENT OF EDUCATIONPROGRAM DEMAND COST MODEL FOR ALASKAN SCHOOLS

NEW SCHOOL OR ADDITIONS

SCHOOLDISTRICT:

PROJECT:

LOCATION:

DATE OF ESTIMATE:

PAGE 25

CONSTRUCTION SUMMARY

New School or Additions

TOTAL NEW SCHOOL OR ADDITIONS:

Gross FloorArea

Construction . Project TotalCosts Costs

SF $

$ fs

1.00 LEARNING AND VOCATIONAL AREAS AREA

1.01 Standard Classroom SF

1.02 Kindergarten/Primary Classroom SF

1.03 Damp. Classroom/Laboratory SF

1.04 Multi-Purpose Room SF

1.05 Gymnasium SF

1.06 Library and Media Center SF

1.07 Music Room SF

1.08 Auditorium SF

1.09 Home Economics SF

1.10 Industrial Arts SF

1.11 Lockers/Showers SF

1.12 Other SF

1.13 SUBTOTALS: SF

2.00 SUPPORT AREAS

2.01 Administration SF

2.02 Cafeteria/Food Preparation SF

2.03 Storage SF2.04 Toilets SF

2.05 Circulation SF

2.06 MechanicaVElectrical SF

2.07 SUBTOTALS: SF

3.00 OPTIONAL SPECIAL REQUIREMENTS

3.01 125 KW Electrical Generator LS

3.02 Fuel Oil 1,000 Gallon Storage for Generator LS

3.03 Sprinkler System' SF3.04 Water Storage or Special Supply Requirements

(Technical Assistance Required) LS

3.05 Other Special Requirements LS

3.06 SUBTOTAL:

53

$/S F COST

$ 85.7490.79

101.86104.37121.70

90.8487.57

122.06100.48119.25153.27

JS

S

S

S

S

S

S

S

S

S

S

S

S

$ 98.06279.4575.13

174.2088.7675.86

$

$$

$

$

78,56010,465

2.37 $

Page 29: DOCUMENT RESUME Program Demand Cost Model for Alaskan ... · DOCUMENT RESUME. ED 409 643 EA 028 503. TITLE Program Demand Cost Model for Alaskan Schools. 6th Edition. Revised. INSTITUTION

ALASKA DEPARTMENT OF EDUCATIONPROGRAM DEMAND COST MODEL FOR ALASKAN SCHOOLS

NEW SCHOOL OR ADDITIONS

PAGE 26

4.00 SITEWORK (TECHNICAL ASSISTANCE REQUIRED)

4.01 Site Preparation (Estimate) 1 LS

4.02 Site Improvements (Estimate) 1 LS

4.03 Playground Equipment/Sports Equipment (Estimate) 1 LS

4.04 Utilities and Fuel Oil (Estimate) 1 LS

4.05 Site Lighting (Estimate) 1 LS

4.06 Special Circumstances Additional Costs (Estimate) 1 LS

4.07 TOTAL BUILDING COSTS:

5.00 CONSTRUCTION GENERAL REQUIREMENTS

5.01 Mobilization, General Operating Costs and Contractor's Profit

5.02 BASE TOTAL:

6.00 GEOGRAPHIC AREA COST FACTOR

6.01 Geographic Area Cost Factor

6.02 SUBTOTAL:

7.00 SIZE FACTOR

7.01 Size Adjustment Factor SUBTOTAL:

8.00 CONTINGENCIES

8.01 GENERAL: For construction unknowns and the unanticipated.

8.02 SUBTOTAL:

8.03 ESCALATION: Allowance for escalation fromSummer 1996 to ...

8.04 TOTAL ESTIMATED CONSTRUCTION VALUE:

9.00 PROJECT OVERHEAD AND OTHER COSTS

9.01 Construction Management9.02 Indirect Costs (Administration)9.03 Design Costs

9.04 SUBTOTAL ONE:

9.05 Project Contingency for Changes

9.06 SUBTOTAL TWO:

9.07 Site Investigation (Estimate)9.08 Furnishings & Equipment Costs9.09 Art (Where Applicable)9.10 Land Purchase Costs (Estimate)

9.11 PROJECT TOTAL COST:

5.

1 LS

$ $$ $

$ $

$ $

$ $

$ S

$

15.00 %I $

10.00%

$

S

$

$

S

$

$

% $

% $

$

$

-- $

$% $

$

fI

Page 30: DOCUMENT RESUME Program Demand Cost Model for Alaskan ... · DOCUMENT RESUME. ED 409 643 EA 028 503. TITLE Program Demand Cost Model for Alaskan Schools. 6th Edition. Revised. INSTITUTION

CrA

SK

trtt

Pkt

itlE

hr5F

bItI

CA

rtni

\l1"

--j

PR

OG

RA

M D

EM

AN

D C

OS

T M

OD

EL

FO

R A

LAS

KA

N S

CH

OO

LSA

UG

US

T 1

996

IV. P

RO

GR

AM

DE

MA

ND

CO

ST

MO

DE

LR

EN

OV

AT

ION

WO

RK

PA

6E 2

T--

-

The

follo

win

g pa

ges

are

for

use

in a

man

ual c

alcu

latio

n of

sch

ool r

enov

atio

n co

sts.

The

pag

es a

s th

ey a

ppea

r in

the

elec

tron

ic v

ersi

on's

Exc

el s

prea

dshe

ets

will

diff

er s

light

ly in

form

at. E

ach

estim

atin

g ca

tego

ry (

e.g.

, Lea

rnin

g an

dV

ocat

iona

l Are

a, S

uppo

rt A

reas

, Geo

grap

hic

Cos

t Fac

tors

, etc

.) r

esid

es o

n its

ow

n pa

ge.

Tw

o su

mm

arie

s ar

e pr

ovid

ed. P

age

28 h

as a

sum

mar

y of

ove

rall

cost

s fo

r co

nstr

uctio

n an

d to

tal p

roje

ct c

osts

. Pag

es 3

6th

roug

h 37

pro

vide

a d

etai

led

sum

mar

y w

hich

cap

ture

s al

l lin

e ite

m c

osts

in a

con

cise

tabu

latio

n.

5556

Page 31: DOCUMENT RESUME Program Demand Cost Model for Alaskan ... · DOCUMENT RESUME. ED 409 643 EA 028 503. TITLE Program Demand Cost Model for Alaskan Schools. 6th Edition. Revised. INSTITUTION

ALA

SK

A D

EP

AR

TM

EN

T O

F E

DU

CA

TIO

NP

RO

GR

AM

DE

MA

ND

CO

ST

MO

DE

L F

OR

ALA

SK

AN

SC

HO

OLS

RE

NO

VA

TIO

N W

OR

K

SC

HO

OL

DIS

TR

ICT

:

PR

OJE

CT

:

LOC

AT

ION

:

NO

TE

S:

SU

MM

AR

Y

Ren

ovat

ion

Wor

k

TO

TA

L R

EN

OV

AT

ION

WO

RK

:

The

squ

are

foot

are

a fo

r re

nova

tion

need

s to

be

inse

rted

.

57

DA

TE

OF

ES

TIM

AT

E:

PA

GE

-28

GR

OS

SC

ON

ST

RU

CT

ION

PR

OJE

CT

TO

TA

LF

LOO

R A

RE

AC

OS

TS

CO

ST

S

S F

'

58

Page 32: DOCUMENT RESUME Program Demand Cost Model for Alaskan ... · DOCUMENT RESUME. ED 409 643 EA 028 503. TITLE Program Demand Cost Model for Alaskan Schools. 6th Edition. Revised. INSTITUTION

ALA

SK

A D

EP

AR

TM

EN

T O

F E

DU

CA

TIO

NP

RO

GR

AM

DE

MA

ND

CO

ST

MO

DE

L F

OR

ALA

SK

AN

SC

HO

OLS

RE

NO

VA

TIO

N W

OR

K

11.0

0 R

EM

OD

EL

NO

TE

S:

11.0

1 H

eavy

Ren

ovat

ion

(Int

erio

r R

epla

cem

ent)

11.0

2 R

epla

ce R

oof (

Roo

f Are

a)

11.0

3 E

xter

ior

Upg

rade

s (R

epla

ce D

oors

and

Win

dow

s)

11.0

4 R

epla

ce In

terio

r an

d R

efin

ish

11.0

5 R

epla

ce P

lum

bing

Fix

ture

s

11.0

6 R

epla

ce H

eatin

g an

d V

entil

atio

n S

yste

ms

11.0

7 N

ew S

prin

kler

Sys

tem

11.0

8 N

ew S

tand

by P

ower

11.0

9 N

ew F

ire A

larm

Sys

tem

11.1

0 N

ew C

ompu

ter

Out

lets

(R

ough

-In

)

11.1

1 N

ew T

elep

hone

/Pub

lic A

ddre

ss/In

terc

om S

yste

m

11.1

2 N

ew P

ublic

Add

ress

(G

ym a

nd S

tage

)

11.1

3 N

ew S

ecur

ity S

yste

m

11.1

4 N

ew M

AT

V S

yste

m

11.1

5 N

ew H

earin

g Im

paire

d A

udio

sys

tem

11.1

6 R

epla

ce F

uel O

il T

ank

(Bel

ow G

roun

d)

11.1

7 R

epla

ce F

uel O

il T

ank

(Abo

ve G

roun

d)

11.1

8 O

ther

Ren

ovat

ion

.

11.1

9 S

UB

TO

TA

L (L

ines

11.

01 th

ru 1

1.18

):

$ /U

NIT

CO

ST

It is

pro

babl

e th

at te

chni

cal a

ssis

tanc

e w

ill b

e ne

eded

to c

ompl

ete

thos

e fo

rms.

59

SF

xS

F x

SF

xS

F x

EA

x

SF

xS

F x

LS x

SF

xS

Fx

SF

x

LS x

SF

xS

Fx

LS x

GA

LS x

GA

LS x

x

64.0

6 =

6.86

=10

.27

=

12.0

5 =

1,83

7.79

=

17.4

5 =

4.59

=90

,790

.00

=

0.75

=0.

43 =

1.51

=29

,665

.00

=

0.55

=0.

42 =

6,86

4.00

=14

.79

=

11.2

4 =

PA

GE

29

so

Page 33: DOCUMENT RESUME Program Demand Cost Model for Alaskan ... · DOCUMENT RESUME. ED 409 643 EA 028 503. TITLE Program Demand Cost Model for Alaskan Schools. 6th Edition. Revised. INSTITUTION

14"id

A''

LArt

rDE

kric

+M

EE

T1O

Y

PR

OG

RA

M D

EM

AN

D C

OS

T M

OD

EL

FO

R A

LAS

KA

N S

CH

OO

LS

RE

NO

VA

TIO

N W

OR

K

SU

BT

OT

AL

CA

RR

IED

FO

RW

AR

D (

Line

11.

19):

$ /U

NIT

CO

ST

12.0

0 A

DD

ITIO

NA

L C

OS

TS

FO

R H

AZ

AR

DO

US

MA

TE

RIA

LSR

EM

OV

AL

(OP

TIO

NS

)(S

UP

PLE

ME

NT

TO

SE

CT

ION

11.

00)

12.0

1H

eavy

Ren

ovat

ion

(Int

erio

r),

SF

x$

18.0

6=

12.0

2R

oof R

epla

cem

ent (

Roo

f Are

a)S

Fx

3.13

=

12.0

3E

xter

ior

Upg

rade

(N

umbe

r of

Doo

rs)

EA

x41

6.08

=

12.0

4R

epla

ce In

terio

rsS

Fx

6.53

=

12.0

5R

epla

ce P

lum

bing

Fix

ture

sE

Ax

390.

09=

12.0

6R

epla

ce H

eatin

g an

d V

entil

atio

n S

yste

Ms

SF

x2.

67=

12.0

7N

ew S

prin

kler

Sys

tem

SF

x2.

47=

12.0

8W

ork

in C

onne

ctio

n w

ith N

ew E

lect

rical

Inst

alla

tions

SF

x0.

59=

12.0

9S

oil R

emed

iatio

nC

Y x

161.

11=

12.1

0O

ther

Spe

cific

Aba

tem

ent

12.1

1S

UB

TO

TA

L (L

ines

11.

19 +

12.

01 th

ru 1

2.10

):

NO

TE

S: T

he a

reas

or

quan

titie

s to

be

inse

rted

mus

t onl

y be

the

loca

tions

whe

re h

azar

dous

mat

eria

ls a

re fo

und,

NO

T th

e to

tal b

uild

ing

area

.

61

---"

PAU

sc.)

62

Page 34: DOCUMENT RESUME Program Demand Cost Model for Alaskan ... · DOCUMENT RESUME. ED 409 643 EA 028 503. TITLE Program Demand Cost Model for Alaskan Schools. 6th Edition. Revised. INSTITUTION

ALA

SK

AO

F E

D C

AT

ION

s)

PR

OG

RA

M D

EM

AN

D C

OS

T M

OD

EL

FO

R A

LAS

KA

N S

CH

OO

LS

RE

NO

VA

TIO

N W

OR

K

SU

BT

OT

AL

CA

RR

IED

FO

RW

AR

D (

Line

12.

11):

13.0

0 C

ON

ST

RU

CT

ION

GE

NE

RA

L R

EQ

UIR

EM

EN

TS

13.0

1 M

obili

zatio

n, G

ener

al O

pera

ting

Cos

ts a

ndC

ontr

acto

r's P

rofit

Line

12.

11 x

20.0

0% =

13.0

2 B

AS

E T

OT

AL

(Lin

e 12

.11

+ 1

3.01

):

CO

ST

Page 35: DOCUMENT RESUME Program Demand Cost Model for Alaskan ... · DOCUMENT RESUME. ED 409 643 EA 028 503. TITLE Program Demand Cost Model for Alaskan Schools. 6th Edition. Revised. INSTITUTION

ALA

SK

A D

EP

AR

TM

EN

T O

F E

DU

CA

TIO

NP

RO

GR

AM

DE

MA

ND

CO

ST

MO

DE

L F

OR

ALA

SK

AN

SC

HO

OLS

RE

NO

VA

TIO

N W

OR

K

SU

BT

OT

AL

CA

RR

IED

FO

RW

AR

D (

BA

SE

TO

TA

L) (

Line

13.

02):

14.0

0 G

EO

GR

AP

HIC

AR

EA

CO

ST

FA

CT

OR

14.0

1P

lace

Geo

grap

hic

Are

a H

ere

(Ref

er to

Tab

le N

o. 1

for

perc

enta

ge a

dditi

on)

Line

13.

02 x

14.0

2 S

UB

TO

TA

L (L

ine

13.0

2 +

14.

01):

CO

ST

$

Page 36: DOCUMENT RESUME Program Demand Cost Model for Alaskan ... · DOCUMENT RESUME. ED 409 643 EA 028 503. TITLE Program Demand Cost Model for Alaskan Schools. 6th Edition. Revised. INSTITUTION

IOW

io*i

giJ

ALA

SK

A u

EP

AR

ME

N1

OF

ED

UC

AT

ION

PR

OG

RA

M D

EM

AN

D C

OS

T M

OD

EL

FO

R A

LAS

KA

N S

CH

OO

LS

RE

NO

VA

TIO

N W

OR

K

SU

BT

OT

AL

CA

RR

IED

FO

RW

AR

D (

Line

14.

02):

15.0

0 S

IZE

FA

CT

OR

NO

TE

: Ref

er to

Tab

le N

o. 2

for

deta

ils o

n ho

w th

e si

ze

adju

stm

ent f

acto

r is

arr

ived

at.

15.0

1 S

ize

Adj

ustm

ent F

acto

r

SU

BT

OT

AL:

FO

RM

ULA

:

Pro

pose

d S

choo

l Siz

e

Bas

e S

choo

l Siz

e

Line

14.

02 x

SF

25,0

00 S

F

NO

TE

: Div

ide

prop

osed

sch

ool s

ize

(SF

) by

bas

e sc

hool

siz

e (2

5,00

0 S

F).

How

ever

, if t

he p

ropo

sed

new

sch

ool e

xcee

ds 2

5,00

0 S

F,

this

cal

cula

tion

is d

isre

gard

ed.

Als

o, d

isre

gard

this

cal

cula

tion

whe

n th

ere

nova

tion

is p

art o

f an

addi

tion

and

the

tota

lar

ea (

reno

vatio

n an

d ad

ditio

n) is

abo

ve 2

5,00

0 S

F.

g7

%

CO

ST

--T

AG

68

Page 37: DOCUMENT RESUME Program Demand Cost Model for Alaskan ... · DOCUMENT RESUME. ED 409 643 EA 028 503. TITLE Program Demand Cost Model for Alaskan Schools. 6th Edition. Revised. INSTITUTION

ALA

SK

A U

EP

ritlE

t\ht*

ED

'Ott"

'1L

IP

RO

GR

AM

DE

MA

ND

CO

ST

MO

DE

L F

OR

ALA

SK

AN

SC

HO

OLS

RE

NO

VA

TIO

N W

OR

K

SU

BT

OT

AL

CA

RR

IED

FO

RW

AR

D (

Line

15.

01):

16.0

0 C

ON

TIN

GE

NC

IES

16.0

1 G

EN

ER

AL

For

con

stru

ctio

n un

know

ns a

nd th

e un

antic

ipat

ed.

16.0

2 S

UB

TO

TA

L (L

ine

15.0

2 +

16.

01):

16.0

3 E

SC

ALA

TIO

NE

scal

atio

n is

to b

e ad

ded

for

futu

re c

ost e

stim

ates

.

Ple

ase

put t

he y

ear

you

antic

ipat

e th

e pr

ojec

tto

be

esca

late

d to

. Esc

alat

ion

has

been

estim

ated

onl

y to

the

year

200

0. U

se th

e fo

llow

ing

esca

latio

n pe

rcen

tage

s fo

r th

e ap

prop

riate

yea

r.19

96 -

0.0

0%; 1

997

- 3.

10%

; 199

8 -

6.10

%;

1999

- 9

.00%

; 200

0 -

12.0

0%

Line

15.

01 x

15.0

0% =

YE

AR

Line

16.

02 x

Io/

d=

16.0

4 T

OT

AL

ES

TIM

AT

ED

CO

NS

TR

UC

TIO

N V

ALU

E (

Line

16.

02 +

16.

03):

69

CO

ST

70

Page 38: DOCUMENT RESUME Program Demand Cost Model for Alaskan ... · DOCUMENT RESUME. ED 409 643 EA 028 503. TITLE Program Demand Cost Model for Alaskan Schools. 6th Edition. Revised. INSTITUTION

ALA

SK

A D

EP

AR

TM

EN

T O

F E

DU

CA

TIO

NP

RO

GR

AM

DE

MA

ND

CO

ST

MO

DE

L F

OR

ALA

SK

AN

SC

HO

OLS

RE

NO

VA

TIO

N W

OR

K

SU

BT

OT

AL

CA

RR

IED

FO

RW

AR

D (

CO

NS

TR

UC

TIO

N V

ALU

E)

(Lin

e 16

.04)

:

CO

ST

PA

GE

35

17.0

0PROJECT OVERHEAD AND OTHER COSTS

See

Bel

ow fo

rS

ugge

sted

DO

E R

ange

s

17.0

1 C

onst

ruct

ion

Man

agem

ent

Line

16.

04 x

2% to

4°/

03%

17.0

2 In

dire

ct C

osts

(A

dmin

istr

atio

n)Li

ne 1

6.04

x2%

to 4

`)/0

17.0

3 D

esig

n C

osts

Line

16.

04 x

0/0

6% to

8%

17.0

4 S

UB

TO

TA

L O

NE

(Li

ne 1

6.04

+ 1

7.01

thru

17.

03):

17.0

5 P

roje

ct C

ontin

genc

y fo

r C

hang

es'

Line

17.

04 x

5% to

7%

°A

17.0

6 S

UB

TO

TA

L T

WO

(Li

ne 1

7.04

+ 1

7.05

):$

17.0

7 S

ite In

vest

igat

ion

(Est

imat

e)17

.08

Fur

nish

ings

& E

quip

men

t Cos

ts2

Line

16.

04 x

c/0

0% to

7%

17.0

9PROJECT TOTAL COST

(Lin

e 17

.06

+ 1

7.07

thru

17.

08):

$

NO

TE

S:

Item

s 17

.07

and

17.0

8 ar

e no

t sen

sitiv

e to

Pro

ject

Con

tinge

ncy.

2 In

clud

es fo

r co

mpu

ters

and

oth

er lo

w v

olta

ge e

quip

men

t. N

ote:

Cos

ts fo

r co

ndui

t, w

ire, b

ackb

oard

s, o

utle

ts, e

tc.

are

incl

uded

with

bui

ldin

g co

sts.

3C

heck

sta

tuto

ry li

mita

tion.

7271

Page 39: DOCUMENT RESUME Program Demand Cost Model for Alaskan ... · DOCUMENT RESUME. ED 409 643 EA 028 503. TITLE Program Demand Cost Model for Alaskan Schools. 6th Edition. Revised. INSTITUTION

ALASKA DEPARTMENT OF EDUCATIONPAGE 36

PROGRAM DEMAND COST MODEL FOR ALASKAN SCHOOLS

RENOVATION WORK

SCHOOLDISTRICT:

PROJECT:

LOCATION:

DATE OF ESTIMATE:

CONSTRUCTION SUMMARY

Renovation Work

TOTAL RENOVATION WORK:

Gross FloorArea

Construction Project TotalCosts Costs

SF $ S

S

11.00 REMODEL

11.01 Heavy Renovation (Interior Replacement)11.02 Replace Roof (Roof Area)11.03 Exterior Upgrades (Replace Doors and Windows)

11.04 Replace Interior and Refinish11.05 Replace Plumbing Fixtures11.06 Replace Heating and Ventilation Systems11.07 New Sprinkler System11.08 New Standby Power11.09 New Fire Alarm System11.10 New Computer Outlets (Rough -In)11.11 New Telephone/Public Address/Intercom System

11.12 New Public Address (Gym and Stage)11.13 New Security System11.14 New MATV System11.15 New Hearing Impaired Audio system11.16 Replace Fuel Oil Tank (Below Ground)11.17 Replace Fuel Oil Tank (Above Ground)11.18 Other Renovation

11.19 SUBTOTAL:

AREA $/8F COST

SF 64.06 $SF 6.86 $SF 10.27 $SF 12.05 SEA 1,837.79 $SF 17.45 $SF 4.59 SLS 90,790.00 SSF 0.75 SSF 0.43 SSF 1.51 S

LS 29.665.00 SSF 0.55 SSF 0.42 SLS 6,864.00 $GALS 14.79 $GALS 11.24 $

I$

12.00 ADDITIONAL COSTS FOR HAZARDOUS MATERIALS REMOVAL (OPTIONS)

(SUPPLEMENT TO SECTION 11.00)

12.01 Heavy Renovation (Interior)12.02 Roof Replacement (Roof Area)12.03 Exterior Upgrade (Number of Doors)12.04 Replace Interiors12.05 Replace Plumbing Fixtures12.06 Replace Heating and Ventilation Systems12.07 New Sprinkler System12.08 Work in Connection with New Electrical

Installations12.09 Soil Remediation12.10 Other Specific Abatement

12.11 SUBTOTAL: 73

SF $ 18.06SF 3.13

EA 416.08

SF 6.53

EA 390.09

SF 2.67

SF 2.47

$

$

$

SF 0.59 $CY 161.11 $

Page 40: DOCUMENT RESUME Program Demand Cost Model for Alaskan ... · DOCUMENT RESUME. ED 409 643 EA 028 503. TITLE Program Demand Cost Model for Alaskan Schools. 6th Edition. Revised. INSTITUTION

ALASKA DEPARTMENT OF EDUCATIONPROGRAM DEMAND COST MODEL FOR ALASKAN SCHOOLS

RENOVATION WORK

13.00 CONSTRUCTION GENERAL REQUIREMENTS

13.01 Mobilization, General Operating Costs and Contractor's Profit

13.02 BASE TOTAL:

14.00 GEOGRAPHIC AREA COST FACTOR

14.01 Geographic Area Cost Factor

14.02 SUBTOTAL:

15.00 SIZE FACTOR

15.01 Size Adjustment Factor SUBTOTAL:

16.00 CONTINGENCIES

16.01 GENERAL: For construction unknowns.and the unanticipated.

16.02 SUBTOTAL:

16.03 ESCALATION: Allowance for escalation from

Summer 1996 to ...

16.04 TOTAL ESTIMATED CONSTRUCTION VALUE:

17.00 PROJECT OVERHEAD AND OTHER COSTS

17.01 Construction Management17.02 Indirect Costs (Administration)17.03 Design Costs

17.04. SUBTOTAL ONE:

17.05 Project Contingency for Changes

17.06 SUBTOTAL TWO:

17.07 Site Investigation (Estimate)17.08 Furnishings & Equipment Costs

17.09 PROJECT TOTAL COST:

BEST COPY AVM SOLE

74

20.00')/0

PAGE 37

$

$

15.00%

$

$

$

S

%I$$

0,0 S

0/d $

$

$

jl $

Page 41: DOCUMENT RESUME Program Demand Cost Model for Alaskan ... · DOCUMENT RESUME. ED 409 643 EA 028 503. TITLE Program Demand Cost Model for Alaskan Schools. 6th Edition. Revised. INSTITUTION

ALA

SK

A D

EP

AR

TM

EN

T O

F E

DU

CA

TIO

NP

RO

GR

AM

DE

MA

ND

CO

ST

MO

DE

L F

OR

ALA

SK

AN

SC

HO

OLS

AU

GU

ST

199

6

V. P

RO

GR

AM

DE

MA

ND

CO

ST

MO

DE

LS

UM

MA

RY

FO

R N

EW

SC

HO

OL

OR

AD

DIT

ION

AN

D R

EN

OV

AT

ION

WO

RK

PA

GE

38

The

follo

win

g pa

ges

are

only

the

sum

mar

y sh

eets

for

this

cat

egor

y of

estim

ate.

Wor

kshe

ets

for

a m

anua

l cal

cula

tion

shou

ld b

e ob

tain

ed fr

om th

e in

divi

dual

New

Wor

k an

d R

enov

atio

n se

ctio

ns.

Tw

o su

mm

arie

s ar

e pr

ovid

ed. P

age

39 h

asa

sum

mar

y of

ove

rall

cost

s fo

rco

nstr

uctio

n an

d to

tal p

roje

ct c

osts

. Pag

es 4

0 th

roug

h 43

pro

vide

a d

etai

led

sum

mar

yw

hich

cap

ture

s al

l lin

e ite

m c

osts

in a

con

cise

tabu

latio

n.

76

75

Page 42: DOCUMENT RESUME Program Demand Cost Model for Alaskan ... · DOCUMENT RESUME. ED 409 643 EA 028 503. TITLE Program Demand Cost Model for Alaskan Schools. 6th Edition. Revised. INSTITUTION

ALA

SK

A D

EP

AR

TM

EN

T O

F E

DU

CA

TIO

NP

RO

GR

AM

DE

MA

ND

CO

ST

MO

DE

L F

OR

ALA

SK

AN

SC

HO

OLS

NE

W S

CH

OO

L O

R A

DD

ITIO

NS

AN

D R

EN

OV

AT

ION

WO

RK

SC

HO

OL

DIS

TR

ICT

:

PR

OJE

CT

:

LOC

AT

ION

:

SU

MM

AR

Y

New

Sch

ool o

r A

dditi

ons

Ren

ovat

ion

Wor

k

TO

TA

L N

EW

SC

HO

OL

AN

D R

EN

OV

AT

ION

WO

RK

:

L.

DA

TE

OF

ES

TIM

AT

E:

"--P

AG

E-3

-9-

GR

OS

SC

ON

ST

RU

CT

ION

PR

OJE

CT

TO

TA

LF

LOO

R A

RE

AC

OS

TS

CO

ST

S

SF

SF

1

7778

Page 43: DOCUMENT RESUME Program Demand Cost Model for Alaskan ... · DOCUMENT RESUME. ED 409 643 EA 028 503. TITLE Program Demand Cost Model for Alaskan Schools. 6th Edition. Revised. INSTITUTION

ALASKA DEPARTMENT OF EDUCATION PAGE 40

PROGRAM DEMAND COST MODEL FOR ALASKAN SCHOOLS

NEW SCHOOL OR ADDITIONS AND RENOVATION WORK

SCHOOLDISTRICT:

PROJECT:

LOCATION:

DATE OF ESTIMATE:

CONSTRUCTION SUMMARY

New School or Additions

Renovation Work

TOTAL NEW SCHOOL AND RENOVATION WORK:

Gross FloorArea

Construction Project TotalCosts Costs

SF

SF IS

S Is

NEW SCHOOL OR ADDITIONS

1.00 LEARNING AND VOCATIONAL AREAS

1.01 Standard Classroom1.02 Kindergarten/Primary Classroom1.03 Damp Classroom/Laboratory1.04 Multi-Purpose Room1.05 Gymnasium1.06 Library and Media Center1.07 Music Room1.08 Auditorium1.09 Home Economics1.10 Industrial Arts1.11 Lockers/Showers1.12 Other

1.13 SUBTOTALS:

2.00 SUPPORT AREAS

2.01 Administration2.02 Cafeteria/Food Preparation2.03 Storage2.04 Toilets2.05 Circulation2.06 MechanicaVElectrical

2.07 SUBTOTALS:

3.00 OPTIONAL SPECIAL REQUIREMENTS

3.01 125 KW Electrical Generator3.02 Fuel Oil 1,000 Gallon Storage for Generator

3.03 Sprinkler System'3.04 Water Storage or Special Supply Requirements

(Technical Assistance Required)3.05 Other Special Requirements

3.06 SUBTOTAL: 79

AREA $/SF COST

WSF $ 85.74SF 90.79SF 101.86SF 104.37

SF 121.70

SF 90.84SF 87.57SF 122.06

SF 100.48

SF 119.25

SF 153.27

SF

SF

SFSFSFSFSFSF

SF

LSLS

SF

LSLS

S

$

$

$

S

$

S

$

$

S

S

$

$ 98.06 $279.45 $75.13 $

174.20 $88.76 $75.86 $

78,56010,465

2.37

$

$

Page 44: DOCUMENT RESUME Program Demand Cost Model for Alaskan ... · DOCUMENT RESUME. ED 409 643 EA 028 503. TITLE Program Demand Cost Model for Alaskan Schools. 6th Edition. Revised. INSTITUTION

J

1

ALASKA DEPARTMENT OF EDUCATIONPAGE 41

PROGRAM DEMAND COST MODEL FOR ALASKAN SCHOOLS

NEW SCHOOL OR ADDITIONS AND RENOVATION WORK

NEW SCHOOL OR ADDITIONS (CONTINUED)

4.00 SITEWORK (TECHNICAL ASSISTANCE FIEOUIRED)

4.01 Site Preparation (Estimate) 1 LS

4.02 Site Improvements (Estimate) 1 LS

4.03 Playground Equipment/Sports Equipment (Estimate) 1 LS

4.04 Utilities and Fuel Oil (Estimate) 1 LS

4.05 Site Lighting (Estimate) 1 LS

4.06 Special Circumstances Additional Costs (Estimate) 1 LS

4.07 TOTAL BUILDING COSTS:

5.00 CONSTRUCTION GENERAL REQUIREMENTS

5.01 Mobilization, General Operating Costs and Contractor's Profit

5.02 BASE TOTAL:

6.00 GEOGRAPHIC AREA COST FACTOR

6.01 Geographic Area Cost Factor

6.02 SUBTOTAL:

7.00 SIZE FACTOR

7.01 Size Adjustment Factor SUBTOTAL:

8.00 CONTINGENCIES

8.01 GENERAL: For construction unknowns and the unanticipated.

8.02 SUBTOTAL:

8.03 ESCALATION: Allowance for escalation fromSummer 1996 to ...

8.04 TOTAL ESTIMATED CONSTRUCTION VALUE:

9.00 PROJECT OVERHEAD AND OTHER COSTS

9.01 Construction Management9.02 Indirect Costs (Administration)9.03 Design Costs

9.04 SUBTOTAL ONE:

9.05 Project Contingency for Changes

9.06 SUBTOTAL TWO:

9.07 Site Investigation (Estimate)9.08 Furnishings & Equipment Costs9.09 Art (Where Applicable)9.10 Land Purchase Costs (Estimate)

. 19.11 PROJECT TOTAL COST (NEW SCHOOL OR ADDITIONSP

1 LS

$ $

$ $

$ $

$ $

$ S

$

S

15.00% $

S

$

$

10.00 %I S

$

$

$

% $% $

- 1

%1$

$

% $

% $$

Page 45: DOCUMENT RESUME Program Demand Cost Model for Alaskan ... · DOCUMENT RESUME. ED 409 643 EA 028 503. TITLE Program Demand Cost Model for Alaskan Schools. 6th Edition. Revised. INSTITUTION

ALASKA DEPARTMENT OF EDUCATION PAGE 42

PROGRAM DEMAND COST MODEL FOR ALASKAN SCHOOLS

NEW SCHOOL OR ADDITIONS AND RENOVATION WORK

RENOVATION WORK

11.00 REMODEL AREA $/SF COST

11.01 Heavy Renovation (Interior Replacement)11.02 Replace Roof (Roof Area)11.03 Exterior Upgrades (Replace Doors and Windows)11.04 Replace Interior and Refinish11.05 Replace Plumbing Fixtures11.06 Replace Heating and Ventilation Systems11.07 New Sprinkler System11.08 New Standby Power11.09 New Fire Alarm System11.10 New Computer. Outlets (Rough -In)11.11 New Telephone/Public Address/Intercom System11.12 New Public Address (Gym and Stage)11.13 New Security System11.14 New MATV System11.15 New Hearing Impaired Audio system11.16 Replace Fuel Oil Tank (Below Ground)11.17 Replace Fuel Oil Tank (Above Ground)11.18 Other Renovation

11.19 SUBTOTAL:

SF 64.06 $SF 6.86 $SF 10.27 $SF 12.05 $EA 1,837.79 SSF 17.45 SSF 4.59 SLS 90,790.00 SSF 0.75 SSF 0.43 SSF 1.51 S

LS 29,665.00 SSF 0.55 .S

SF 0.42 SLS 6,864.00 $GALS 14.79 SGALS 11.24 S

12.00 ADDITIONAL COSTS FOR HAZARDOUS MATERIALS REMOVAL (OPTIONS)

(SUPPLEMENT TO SECTION 11.00)

12.01 Heavy Renovation (Interior)12.02 Roof Replacement (Roof Area)12.03 Exterior Upgrade (Number of Doors)12.04 Replace Interiors12.05 Replace Plumbing Fixtures12.06 Replace Heating and Ventilation Systems12.07 New Sprinkler System12.08 Work in Connection with New Electrical

Installations12.09 Soil Remediation12.10 Other Specific Abatement

SF S 18.06

SF 3.13EA 416.08 SSF 6.53

EA 390.09SF 2.67SF 2.47

S

SF 0.59CY 161.11

Is

S

$

$

$

$

12.11 SUBTOTAL:

13.00 CONSTRUCTION GENERAL REQUIREMENTS

13.01 Mobilization, General Operating Costs and Contractor's Profit

13.02 BASE TOTAL:

14.00 GEOGRAPHIC AREA COST FACTOR

14.01 Geographic Area Cost Factor

14.02 SUBTOTAL: 81

20.00%

%1$

Page 46: DOCUMENT RESUME Program Demand Cost Model for Alaskan ... · DOCUMENT RESUME. ED 409 643 EA 028 503. TITLE Program Demand Cost Model for Alaskan Schools. 6th Edition. Revised. INSTITUTION

..1

ALASKA DEPARTMENT OF EDUCATIONPROGRAM DEMAND COST MODEL FOR ALASKAN SCHOOLS

NEW SCHOOL OR ADDITIONS AND RENOVATION WORK

PAGE 43

RENOVATION WORK (CONTINUED)

15.00 SIZE FACTOR

15.01 Size Adjustment Factor SUBTOTAL:

16.00 CONTINGENCIES

16.01 GENERAL: For construction unknowns and the unanticipated.

16.02 SUBTOTAL:

16.03 ESCALATION: Allowance for escalation fromSummer 1996 to ...

16.04 TOTAL ESTIMATED CONSTRUCTION VALUE:

17.00 PROJECT OVERHEAD AND OTHER COSTS

17.01 Construction Management17.02 Indirect Costs (Administration)17.03 Design Costs

17.04 SUBTOTAL ONE:

15.00% S

S

%% S

% S

S

17.05 Project Contingency for Changes

17.06 SUBTOTAL TWO:

17.07 Site Investigation (Estimate)17.08 Furnishings & Equipment Costs

17.09 PROJECT TOTAL COST (RENOVATION WORK):

0.'01 S

S

S

0/0 S

32

Page 47: DOCUMENT RESUME Program Demand Cost Model for Alaskan ... · DOCUMENT RESUME. ED 409 643 EA 028 503. TITLE Program Demand Cost Model for Alaskan Schools. 6th Edition. Revised. INSTITUTION

LkW

LJA

LAS

KA

DE

PA

RT

ME

NT

OF

ED

UC

AT

ION

PR

OG

RA

M D

EM

AN

D C

OS

T M

OD

EL

FO

R A

LAS

KA

N S

CH

OO

LSA

UG

US

T 1

996

VI.

TA

BLE

S

No.

1 -

Geo

grap

hic

Are

a C

ost F

acto

rN

o. 2

- S

ize

Adj

ustm

ent C

hart

No.

3 -

Ala

skan

Con

stru

ctio

n E

scal

atio

n In

dex

Page 48: DOCUMENT RESUME Program Demand Cost Model for Alaskan ... · DOCUMENT RESUME. ED 409 643 EA 028 503. TITLE Program Demand Cost Model for Alaskan Schools. 6th Edition. Revised. INSTITUTION

ALA

SK

A6E

AT

TY

ME

fret

FE

DU

CA

TIO

NP

RO

GR

AM

DE

MA

ND

CO

ST

MO

DE

L F

OR

ALA

SK

AN

SC

HO

OLS

AU

GU

ST

199

6

TA

BLE

NO

. 1

GE

OG

RA

PH

IC A

RE

A C

OS

T F

AC

TO

R

JUN

E 1

996

IND

EX

PE

RC

EN

TA

GE

SO

UT

HC

EN

TR

AL

Anc

hora

ge10

0.00

0.00

%

Mat

-Su

Val

ley

97.0

0-3

.00%

Ken

ai98

.60

-1.4

0%

Hom

er10

4.50

-4.5

0%

Kod

iak

111.

4011

.40%

Tow

n on

Roa

d S

yste

m12

1.90

21.9

0%

SO

UT

HE

AS

TE

RN

June

au10

1.60

1.60

%

Ket

chik

an10

9.80

9.80

%

Sm

alle

r T

own

118.

9018

.90%

Vill

age

130.

4030

.40%

INT

ER

IOR

Fai

rban

ks.1

05.0

05.

00%

Tow

n on

Roa

d S

yste

m11

0.90

10.9

0%

Rem

ote

Vill

age

136.

8036

.80%

8586

Page 49: DOCUMENT RESUME Program Demand Cost Model for Alaskan ... · DOCUMENT RESUME. ED 409 643 EA 028 503. TITLE Program Demand Cost Model for Alaskan Schools. 6th Edition. Revised. INSTITUTION

ALA

SK

A D

EP

AR

TM

EN

T O

F E

DU

CA

TIO

NP

RO

GR

AM

DE

MA

ND

CO

ST

MO

DE

L F

OR

ALA

SK

AN

SC

HO

OLS

AU

GU

ST

199

6

PA

GE

46

TA

BLE

NO

. 1

GE

OG

RA

PH

IC A

RE

A C

OS

T F

AC

TO

R

(Con

tinue

d)

IND

EX

PE

RC

EN

TA

GE

ALE

UT

IAN

Vill

age

121.

9021

.90%

Rem

ote

Vill

age

138.

2038

.20%

WE

ST

ER

N

Bet

hel

151.

1051

.10%

Low

er K

usko

kwim

Vill

age

162.

1062

.10%

NO

RT

HW

ES

T

Kot

zebu

e15

9.70

59.7

0%

Vill

age

176.

5076

.50%

NO

RT

H S

LOP

E

Bar

row

165.

8065

.80%

Vill

age

177.

2077

.20%

88

Page 50: DOCUMENT RESUME Program Demand Cost Model for Alaskan ... · DOCUMENT RESUME. ED 409 643 EA 028 503. TITLE Program Demand Cost Model for Alaskan Schools. 6th Edition. Revised. INSTITUTION

ALA

gR-A

t EP

*Frf

-ME

itH)F

ICA

TIN

PR

OG

RA

M D

EM

AN

D C

OS

T M

OD

EL

FO

R A

LAS

KA

N S

CH

OO

LSA

UG

US

T 1

996

.011

101.

P-A

GE

-47

TA

BLE

NO

. 1

GE

OG

RA

PH

IC A

RE

A C

OS

T F

AC

TO

R(C

ontin

ued)

NO

TE

S

Bac

k-up

dat

a fo

r th

is a

naly

sis

is h

eld

at H

MS

Inc.

, 410

3 M

inne

sota

Driv

e, A

ncho

rage

, Ala

ska.

Thi

s is

an

estim

ate

of g

eogr

aphi

c ar

ea c

ost f

acto

rs b

ased

on

aver

ages

for

mat

eria

ls, f

reig

ht a

nd e

quip

men

t cos

ts,

also

cur

rent

Titl

e 36

labo

r ra

tes

as o

f Jan

uary

199

6. T

he c

ost f

acto

rs a

re b

ased

on

an in

stitu

tiona

l bui

ldin

g in

Ala

ska

usin

g a

stan

dard

AIA

con

trac

t or

sim

ilar

cont

ract

.

Thi

s is

onl

y a

guid

e an

d no

t nec

essa

rily

corr

ect f

or a

ny s

peci

fic n

eed.

It r

epre

sent

s on

ly a

col

lect

ion

of c

osts

norm

ally

foun

d on

som

e co

nstr

uctio

n pr

ojec

ts, r

athe

r th

an th

e cu

stom

req

uire

men

ts o

f a p

artic

ular

pro

ject

.

Thi

s is

not

an

inde

x. T

his

is a

geo

grap

hic

area

cos

t fac

tor

whi

ch in

clud

es n

ot m

erel

y co

st c

hang

es a

nd lo

gist

ical

cons

ider

atio

n, b

ut a

lso

desi

gn c

riter

ia a

nd h

ow it

is a

pplie

d in

diff

eren

t loc

atio

ns.

Suc

h de

sign

con

side

ratio

ns in

clud

e th

e ob

viou

s st

anda

rd c

oncr

ete

foot

ings

use

d m

ostly

in S

outh

cent

ral a

nd S

outh

east

ern

Ala

ska,

to p

iling

req

uire

men

ts in

Arc

tic a

nd s

ub-A

rctic

, Ala

ska,

to th

e no

t so

appa

rent

for

a lo

cal a

udie

nce

for

land

scap

ein

Anc

hora

ge to

non

e in

rur

al a

reas

.

The

cal

cula

tions

use

d in

dev

elop

ing

thes

e co

st fa

ctor

s ar

e ba

sed

on r

easo

nabl

e as

sum

ptio

ns. F

or e

xam

ple,

bar

gefr

eigh

t is

mos

tly in

clud

ed r

athe

r th

an a

ir fr

eigh

t for

all

mat

eria

ls a

nd e

quip

meh

t.It

is a

lso

assu

med

that

loca

l lab

orca

n be

use

d to

the

fulle

st g

ener

al a

vaila

bilit

y, r

athe

r th

an a

ll im

port

ed w

orke

rs.

Vill

age-

to-v

illag

e co

sts

will

var

y pl

us o

r m

inus

5%

. Whe

n us

ing

this

geo

grap

hic

cost

fact

or c

onsi

der

how

the

loca

tion

for

whi

ch th

e es

timat

e is

bei

ng p

repa

red

is d

iffer

ent f

rom

oth

er s

urro

undi

ng p

lace

s.

8920

Page 51: DOCUMENT RESUME Program Demand Cost Model for Alaskan ... · DOCUMENT RESUME. ED 409 643 EA 028 503. TITLE Program Demand Cost Model for Alaskan Schools. 6th Edition. Revised. INSTITUTION

IOU

ALA

SK

A D

EP

AR

TM

EN

T O

F E

DU

CA

TIO

NP

RO

GR

AM

DE

MA

ND

CO

ST

MO

DE

L F

OR

ALA

SK

AN

SC

HO

OLS

AU

GU

ST

199

6

SIZ

EA

DJU

ST

ME

NT

FA

CT

OR

TA

BLE

NO

. 2

SIZ

E A

DJU

ST

ME

NT

CH

AR

T

1.25

1.20

1.15

1.10

1.05

1.00

0.95

0.93

(mm

)

I,.:1

, ....

......

... .

......

.....

..

A!'

.. . .

. . .

... .

.

......

. . .

, FA

CT

OR

LIN

E

777r

-

0.5

......

..

.. ..

. ....

......

......

.

airl

omm

444

1.0

1.5

AR

EA

RE

LAT

ION

SH

IP

EX

AM

PLE

: The

Siz

e A

djus

tmen

t Fac

tor

is d

esire

d fo

r a

16,0

00 S

F A

cade

mic

Fac

ility

.

AR

EA

RE

LAT

ION

SH

IP:

2.0

2.5

PR

OP

OS

ED

FA

CIL

ITY

SIZ

E16

,000

=0.

64

TY

PIC

AL

FA

CIL

ITY

SIZ

E25

,000

Fin

d .6

4 on

the

horiz

onta

l axi

s. T

race

a v

ertic

al li

ne to

the

fact

or c

urve

and

then

trac

e a

horiz

onta

l lin

e to

the

vert

ical

axi

s' S

ize

Adj

ustm

ent F

acto

r w

hich

is 1

.05.

91So

urce

: Mili

tary

Han

dboo

k C

ost E

ngin

eeri

ng: P

olic

y an

d Pr

oced

ures

- M

IL-1

1DliK

-101

0A, d

ated

Aug

ust 1

992.

3.0

PA

GE

48

92

Page 52: DOCUMENT RESUME Program Demand Cost Model for Alaskan ... · DOCUMENT RESUME. ED 409 643 EA 028 503. TITLE Program Demand Cost Model for Alaskan Schools. 6th Edition. Revised. INSTITUTION

LkLA

SR

-A-b

EP

ME

10;tF

aR

rIC

Alli

btP

RO

GR

AM

DE

MA

ND

CO

ST

MO

DE

L F

OR

ALA

SK

AN

SC

HO

OLS

AU

GU

ST

199

6

F49

TA

BLE

NO

. 3

ALA

SK

AN

CO

NS

TR

UC

TIO

N E

SC

ALA

TIO

N IN

DE

XA

NC

HO

RA

GE

, ALA

SK

A

SE

PT

EM

BE

R 1

995

Bas

e Y

ear

1990

Inde

x10

0.00

Bas

e Y

ear

1990

Inde

x10

0.00

Per

cent

age

1980

100.

0019

9113

4.30

1981

104.

4019

9213

8.80

1982

107.

7019

9314

3.30

1983

115.

6019

9414

4.40

1984

118.

6019

9514

3.40

1985

117.

7019

9614

6.50

1986

121.

4019

9714

9.50

Est

imat

e3.

10%

1987

123.

0019

98E

stim

ate

6.10

%19

8812

4.80

1999

Est

imat

e9.

00%

1989

126.

4020

00E

stim

ate

12.0

0%19

9013

1.80

NO

TE

S

Bac

k-up

dat

a fo

r th

is a

naly

sis

is h

eld

at H

MS

Inc.

, 410

3 M

inne

sota

Driv

e, A

ncho

rage

, Ala

ska.

Thi

s es

timat

e is

an

inde

x ba

sed

on a

vera

ges

for

mat

eria

ls.,

frei

ght a

nd e

quip

men

t, al

so c

urre

nt T

itle

36 la

bor

rate

s as

of

Sep

tem

ber

1995

. The

inde

x is

bas

ed o

n an

inst

itutio

nal b

uild

ing

in A

ncho

rage

usi

ng a

sta

ndar

d A

IA c

ontr

act o

r si

mila

r co

ntra

ct.

It sh

ould

be

note

d th

at w

hile

the

inde

x is

a u

sefu

l gui

de, i

t will

not

nec

essa

rily

be c

orre

ct fo

r a

spec

ific

need

.

Rem

embe

r al

way

s th

at a

n in

dex

is o

nly

a gu

ide

and

not n

eces

saril

y co

rrec

t for

any

spe

cific

nee

d.It

repr

esen

ts o

nly

a co

llect

ion

of c

osts

nor

mal

ly fo

und

on s

ome

cons

truc

tion

proj

ects

, rat

her

than

the

cust

om r

equi

rem

ents

of a

part

icul

ar p

roje

ct.

The

pre

dict

ion

for

1996

and

199

7 ar

e es

timat

es a

ssum

ing

mor

e of

the

sam

e lo

w e

scal

atio

n ba

sed

on r

ecen

t fac

tors

.

9394

BE

ST C

OPY

AV

AIL

AB

LE

Page 53: DOCUMENT RESUME Program Demand Cost Model for Alaskan ... · DOCUMENT RESUME. ED 409 643 EA 028 503. TITLE Program Demand Cost Model for Alaskan Schools. 6th Edition. Revised. INSTITUTION

WW

ALA

SK

A D

EP

AR

TM

EN

T O

F E

DU

CA

TIO

NP

RO

GR

AM

DE

MA

ND

CO

ST

MO

DE

L F

OR

ALA

SK

AN

SC

HO

OLS

AU

GU

ST

199

6

VII.

BIB

LIO

GR

AP

HY

95

PA

GE

50

96

Page 54: DOCUMENT RESUME Program Demand Cost Model for Alaskan ... · DOCUMENT RESUME. ED 409 643 EA 028 503. TITLE Program Demand Cost Model for Alaskan Schools. 6th Edition. Revised. INSTITUTION

ALA

SK

A D

EP

AR

TM

EN

T O

F E

DU

CA

TIO

NP

RO

GR

AM

DE

MA

ND

CO

ST

MO

DE

L F

OR

ALA

SK

AN

SC

HO

OLS

AU

GU

ST

199

6

BIB

LIO

GR

AP

HY

PA

GE

51

Gui

de fo

r S

choo

ls F

acili

ty A

ppra

isal

- A

lask

a E

ditio

n (A

dapt

ed fo

r th

e S

tate

of A

lask

a D

epar

tmen

t of E

duca

tion)

:T

he C

ounc

il of

Edu

catio

n F

acili

ty P

lann

ers,

Inte

rnat

iona

l May

199

4.

Cos

t Est

imat

e P

rogr

am D

eman

d M

odel

Sta

te o

f Ala

ska,

Dep

artm

ent o

f Edu

catio

n. H

MS

Inc.

- F

irst E

ditio

n, M

ay19

81; S

econ

d E

ditio

n, N

ovem

ber

1983

; Thi

rd E

ditio

n, A

ugus

t 198

6; F

ourt

h E

ditio

n, A

ugus

t 198

8; a

nd F

ifth

Edi

tion,

Jun

e 19

91.

Cos

t Dat

a F

iles

and

Rec

ords

. HM

S In

c., 1

980

to 1

996.

Titl

e 36

, Pub

lic C

ontr

acts

: Lab

orer

s an

d M

echa

nics

Min

imum

Rat

es o

f Pay

: Sta

te o

f Ala

ska,

Dep

artm

ent

ofLa

bor.

Con

stru

ctio

n C

ost E

scal

atio

n In

dex

for

Sta

te o

f Ala

ska.

HM

S In

c., S

epte

mbe

r 19

95.

Mili

tary

Han

dboo

k C

ost E

ngin

eerin

g: P

olic

y an

d P

roce

dure

s. M

IL-H

DB

K-1

010A

, dat

ed A

ugus

t 199

2.

9897

Page 55: DOCUMENT RESUME Program Demand Cost Model for Alaskan ... · DOCUMENT RESUME. ED 409 643 EA 028 503. TITLE Program Demand Cost Model for Alaskan Schools. 6th Edition. Revised. INSTITUTION

(9/92)

U.S. DEPARTMENT OF EDUCATIONOffice of Educational Research and improvement (OERI)

Educational Resources Information Center (ERIC)

NOr7CE

REP ODUCTION ASIS

E IC

This document is covered by a signed "Reproduction Release(Blanket)" form (on file within the ERIC system), encompassing allor classes of documents from its source organization and, therefore,does not require a "Specific Document" Release form.

This document is Federally-funded, or carries its own permission toreproduce, or is otherwise in the public domain and, therefore, maybe reproduced by ERIC without a signed Reproduction Releaseform (either "Specific Document" or "Blanket").