CHECK LIST FOR BTS SITES 1 (5) SITE ENGINEERING TELECOM IMPLEMENTATION INSPECTION REPORT SITE ID: ........................ SITE NAME: ................................................Date Of Visit: ....................... SITE ADDRESS: …………………………………………………………...........Document number: ......................... Guard Name and contact No. Date of submission of Report:…………………………………. Notation: Correctly installed / Acceptable Not correct S.No . Infrastructur e Check point 1 Radio Site GBT POLE 2 ID/OD/POLE/WALL INDOOR OUTDOOR WALL POLE 3 Shelter Buildg. Height (Mtrs/floor) Equipment Room Floor Chain Pulley required 4 Space For Equipments (Sharing sites) Space available for BTS Space Available for TRSM Rack 5 Floor Levelled Antistatic Mat Antistatic grounding 6 Door Sealing Locking 7 ID LADDER ID LADDER INSTALLED SPACE ON EXISTING LADDER 8 Lighting No. of fittings 2 Operational P Sockets operational 9 Earthing system No of Pits with Chamber prepared Earthpits are interconnected

description

Rfi check list for New Site

Transcript of Document on RFI_Checklist for BTS

Nokia Standard Document Template

CHECK LIST FOR BTS SITES1 (5)

SITE ENGINEERING

TELECOM IMPLEMENTATION INSPECTION REPORTSITE ID: ........................SITE NAME: ................................................Date Of Visit: .......................

SITE ADDRESS: ...........Document number: .........................Guard Name and contact No.

Date of submission of Report:.

Notation: Correctly installed / Acceptable

Not correct

S.No.InfrastructureCheck point

1Radio SiteGBT RTT

POLE

2ID/OD/POLE/WALLINDOOR OUTDOOR WALL POLE

3ShelterBuildg. Height (Mtrs/floor) Equipment Room Floor

Chain Pulley required

4Space For Equipments (Sharing sites)Space available for BTS Space Available for TRSM Rack

5FloorLevelled Antistatic Mat Antistatic grounding

6DoorSealing

Locking

7ID LADDERID LADDER INSTALLED SPACE ON EXISTING LADDER

8Lighting

No. of fittings ( 2

Operational P Sockets operational

9Earthing systemNo of Pits with Chamber prepared Earthpits are interconnected

DG,DG-N,Tower,Shelter are conneted to EP Earthing Values EP1 EP2 EP3 Ohms

10Earthing Bus BarsEGB under feeder entry

Connected to Body Earthpit IGB under feeder entry Connected to Eqpt Earthpit

EMP BUS BAR

11PIU/ACDB PIU/ACDB Installed POWER TERMINATION AT PIU/ACDB PIU/ACDB commissioned

12Mains IncomerMains available Energy Meter Installed

13DC Power Availability

DC Power Available MCB available for BTS& TRSM

14DGDG installed DG Commissioned

15Air-conditioningInstalled Sealing around AC units ACs are comm.

16WFT Size of opening made for WFT No of Openings made

Openings are properly sealed

17Tower GBT RTT Tower Height

No of Platforms & height Tower Painting

18TypeTower Type

19Cable ladder (OD) Vertical Cable tray installed Horizontal Cable tray installedSpace available on Vertical/Horizontal tray

20Cable Ladder lengthsLength of Vertcal ladder(above HCT till antenna mount) in mtrs.

Length of HCT ladder in mtrs.

21Lightening Protection

Lightening Rod LA connected to Earthpit

22Aviation LightInstallation

COMMISSIONED

23Cable Inlet For Power & Signal Cables

24Antenna MountGSM antenna mount Installed Antenna Mount for MW at near end Antenna Mount for MW at Far End

25GSM antenna Mount hts.(as per TND)Height of GSM antennas

26GSM antenna Mount hts.(existing)

Height of GSM antennas

27MW Antenna Mount ht. (as per TND)Height of MW antennas

28MW Antenna Mount ht. (Existing)Height of MW antennas

29GSM antenna Azimuth(As per TND)

30GSM antenna Azimuth (existing)

31MW Antenna Azimuth(As per TND)

32MW Antenna Azimuth (Existing)

Problems / Comments (Refer to applicable activity Sl. No.)

_________________________________________________________________________________

__________________________________________________________________________________________________________________________________________________________________

_________________________________________________________________________________Site Engineer Name & Signature:

Name:...

Pls sketch whole Site Plan along with shelter/cage plan (including HCT routing)