Nokia Standard Document Template
CHECK LIST FOR BTS SITES1 (5)
SITE ENGINEERING
TELECOM IMPLEMENTATION INSPECTION REPORTSITE ID: ........................SITE NAME: ................................................Date Of Visit: .......................
SITE ADDRESS: ...........Document number: .........................Guard Name and contact No.
Date of submission of Report:.
Notation: Correctly installed / Acceptable
Not correct
S.No.InfrastructureCheck point
1Radio SiteGBT RTT
POLE
2ID/OD/POLE/WALLINDOOR OUTDOOR WALL POLE
3ShelterBuildg. Height (Mtrs/floor) Equipment Room Floor
Chain Pulley required
4Space For Equipments (Sharing sites)Space available for BTS Space Available for TRSM Rack
5FloorLevelled Antistatic Mat Antistatic grounding
6DoorSealing
Locking
7ID LADDERID LADDER INSTALLED SPACE ON EXISTING LADDER
8Lighting
No. of fittings ( 2
Operational P Sockets operational
9Earthing systemNo of Pits with Chamber prepared Earthpits are interconnected
DG,DG-N,Tower,Shelter are conneted to EP Earthing Values EP1 EP2 EP3 Ohms
10Earthing Bus BarsEGB under feeder entry
Connected to Body Earthpit IGB under feeder entry Connected to Eqpt Earthpit
EMP BUS BAR
11PIU/ACDB PIU/ACDB Installed POWER TERMINATION AT PIU/ACDB PIU/ACDB commissioned
12Mains IncomerMains available Energy Meter Installed
13DC Power Availability
DC Power Available MCB available for BTS& TRSM
14DGDG installed DG Commissioned
15Air-conditioningInstalled Sealing around AC units ACs are comm.
16WFT Size of opening made for WFT No of Openings made
Openings are properly sealed
17Tower GBT RTT Tower Height
No of Platforms & height Tower Painting
18TypeTower Type
19Cable ladder (OD) Vertical Cable tray installed Horizontal Cable tray installedSpace available on Vertical/Horizontal tray
20Cable Ladder lengthsLength of Vertcal ladder(above HCT till antenna mount) in mtrs.
Length of HCT ladder in mtrs.
21Lightening Protection
Lightening Rod LA connected to Earthpit
22Aviation LightInstallation
COMMISSIONED
23Cable Inlet For Power & Signal Cables
24Antenna MountGSM antenna mount Installed Antenna Mount for MW at near end Antenna Mount for MW at Far End
25GSM antenna Mount hts.(as per TND)Height of GSM antennas
26GSM antenna Mount hts.(existing)
Height of GSM antennas
27MW Antenna Mount ht. (as per TND)Height of MW antennas
28MW Antenna Mount ht. (Existing)Height of MW antennas
29GSM antenna Azimuth(As per TND)
30GSM antenna Azimuth (existing)
31MW Antenna Azimuth(As per TND)
32MW Antenna Azimuth (Existing)
Problems / Comments (Refer to applicable activity Sl. No.)
_________________________________________________________________________________
__________________________________________________________________________________________________________________________________________________________________
_________________________________________________________________________________Site Engineer Name & Signature:
Name:...
Pls sketch whole Site Plan along with shelter/cage plan (including HCT routing)