D.N.I.T. Engineering Cell
Name of work:- Providing and Fixing 400 KVA Transformer along with Fence & H.T.
Cable for Auditorium in LCW University, Lahore. (Based on 1st August,
2015 to 31st January,2016)
S.
No.
Item No.
CMR.
Description of work Quantity Unit Rate in
Rs.
Amount
in Rs.
1. 29/Ch-4 Dismantling brick or flagged flooring
without concrete foundation.
350.00 Sft 100 Sft 421.85 1476.00
2. 46/Ch-4 Dismantling and removing road
pavement, etc., i/c screening and
stacking of byproducts upto one
chain lead(30 metre)
125.00 Cft 100 Cft 1325.15 1656.00
3. 21(b)/Ch-3 Excavation in foundation of building,
bridges and other structures, i/c
dagbelling, dressing, refilling around
structure with excavated earth,
watering and ramming lead upto one
chain and lift upto 5 ft in ordinary
soil.
100.00 Cft 1000 Cft 5219.30 522.00
4. 44/Ch-3 Excavation of trenches in all kinds of
soil, except cutting rock, for water
supply pipelines upto 5’ depth from
ground level, i/c trimming, dressing
sides, leveling the beds of trenches to
concrete grade and cutting pits for
joints, etc, complete in all respects.
3000.00
Cft
1000 Cft 3725.05 11175.00
5. 13(a)/Ch-3 Rehandling of earthwork Lead upto a
single throw of Kassi, phaorah or
shovel.
1000.00
Cft
1000 Cft 1240.80 1241.00
6. 2/Ch-6 Dry rammed brick or ballast 1 ½” to
2” gauge.
500.00 Cft 100 Cft 3775.20 18876.00
7. 7(i)/Ch-7 Pacca brick work other than building
upto 10’ height cement sand mortar
1:5
600.00 Cft 100 Cft 19657.10 117943.00
8. 39(a)(ii)/Ch-10 Mosaic dado or skirting with one part
of cement and marble powder in the
ratio of 3:1 and two parts of marble
chips, laid over ½" thick cement
plaster 1:3, i/c rubbing and polishing,
complete with finishing Using grey
cement ½” thick.
750.00 Sft 100 Sft 9004.10 67531.00
9. 6(a)(ii)(3)/Ch-6 Reinforced cement concrete in slab
of rafts / strip foundation, base slab
of column and retaining walls; etc
125.00 Cft Per Cft 226.65 28331.00
and other structural members other
than those mentioned in shuttering)
complete in all respects Type C
(nominal mix 1: 2: 4)
10. 9(b)/Ch-6 Fabrication of mild steel
reinforcement for cement concrete,
including cutting, bending, laying in
position, making joints and
fastenings, including cost of binding,
wire and labour charges for binding
of steel reinforcement (also includes
removal of rust form bars) Deformed
bars.
400.00 Kg 100 Kg 11006.60 44026.00
11. 9(b)/Ch-11 Cement plaster 1:4 upto 20’ height
½” thick.
400.00 Sft 100 Sft 1530.55 6122.00
12. 30/Ch-7 Supplying and filling sand under
floor, or plugging in wells.
1400.00
Cft
100 Cft 1466.80 20535.00
13. 5(f)/Ch-6 Cement concrete plain i/c placing,
compacting, finishing and curing
complete (i/c screening and washing
of stone aggregate) 1:2:4.
80.00 Cft 100 Cft 19129.45 15304.00
14. 19/Ch-18 P/L dry brick pavement/ soling in
streets or roads, etc. sand grounted,
laid in proper camber, i/c
preparation, watering, compaction of
bed to proper camber, and sand
cushion.
250.00 Cft 100 Cft 16713.35 41783.00
15.
A
27(b)/Ch-23
Providing, laying, Cutting, jointing,
testing and disinfecting pipe line
trenches, with PVC pipes of B.S.S.
with ‘D’ class working pressure
complete in all respects.
3” dia
15.00 Rft
Per Rft
161.55
2423.00
B
27(e)/Ch-23 6” dia 400.00 Rft Per Rft 573.30 229320.00
16.
A
37(ii)(d)/Ch-23
Providing & installing P.V.C. bends
of B.S.S. ‘D’ class working pressure
3” dia
4.00 Nos.
Each
274.90
1100.00
B 37(ii)(g)/Ch-23 6” dia 4.00 Nos. Each 2114.65 8459.00
Total Schedule Items Rs. 617823.00
Rare quoted percentage above or blew on Schedule Items Rs.
Total Amount Schedule Items Rs.
Total Schedule Items Rs._______________
Total Non Schedule Items Rs._______________
Grand Total Rs.______________
D.N.I.T. Engineering Cell
Name of work:- Providing and Fixing 400 KVA Transformer along with Fence & H.T.
Cable for Auditorium in LCW University, Lahore. (Based on 1st August,
2015 to 31st January,2016)
S.
No.
Item No.
CMR.
Description of work Quantity Unit Rate in Rs. Amount in
Rs.
1. N.S. P/L of warning tape 4” wide over
the underground H.T. cable
complete in all respects.
400.00 Rft Per Rft
2. N.S. Supply & fixing of fence for the
protection of Foundation Type
Transformer as per the actual size
of the foundation and
specification. The fence is
complete anti rusted and PVC
insulated type painted to protect
from H.T. and L.T. voltage and
current flux. All the fixing
arrangement with insulated and
galvanized type material. Whole
frame of the fence made by the 1 x
½” 1x1/2’ and the thickness of the
angle iron is 1x1/2”. The is
assembled is the parts vise because
it is easy to removing and handling
in case of maintenance of the
transformer. The JALI of the fence
is made by the 8 SWG size
galvanized and painted type wire
and properly fixing as per standard
and specification complete in all
respect as directed by the Engineer
in charge.
1.00 No. Each
3. N.S. Dismantling & Refixing of Tuff
Tiles same complete in all
respects.
100.00 Sft Per Sft
4. N.S. P/F of R.C.C. indicator sign plate
for underground H.T. cable
complete in all respects.
6.00 Nos. Each
5. N.S. Supply and erection of Aluminum
conductor cables for service
connection, in prelaid pipe/G.I.
wire/ trenches, etc. PVC insulated,
PVC sheathed 3 core 11KAV,
XLP, volt grade cable, armoured
cable approved by LESCO/Wapda
complete in all respects. (rate for
cable only) 120/mm without joint.
400.00 Rft Per Rft
6. N.S. Supply Erection, Testing, and
Commissioning of Electrical
Transformer 400 KVA rating. Pole
mounted Type with Wapda test
reports, complete in all respect as
per approved from LESCO/Wapda
standard and specifications.
1.00 No. Each
7. N.S. H T 11KV Structure Pole with Ex
– Arm fitting Up to 20 to 36 Feet
height as per Wapda Standard &
specifications, for D- Fuses
installed with required necessary
fitting i.e. nut Bolts, etc. complete
in all respect.
1.00 No. Each
8. N.S. S/E H.T 11 KV “D” Type Fuses
single disc for 400 KVA
Transformer complete set fitting
on structure pole height 30 to 40
feet with wooden Ex arm fitting
galvanized nut boults, Jumper wire
11KV etc, as per Wapda standard
complete in all respects as
direction by the Engineer-in-
Charge.
1.00 No. Each
9. N.S. Supply and installation of Outdoor
Type H. T. 11 KV 240 mm² SC
Termination Kits and lugs
“Raychem” make as per wapda
standard and specification,
complete in all respect as directed
by the Engineer in charge.
2.00 Nos. Each
10. NS Providing, installation, Testing and
commissioning of earthing system
tested resistance less than one ohm
i.e. cost of boring 3” dia up to 150
Rft, G I pipe 2” dia for casting,
pvc pipe 225 Rft and 1” dia earth
rod 01 Nos. 10’ Long, 1” dia thick
made of copper cable conductor 50
mm² 520 Rft, thimble 50 mm² 05
Nos. complete in all respect as per
directed by the Engineer-in-
charge.
2.00 Nos. Each
11. N.S. Supply at site installation testing
and commissioning of LT Panel
frame 14 SWG and door 14 SWG
MS sheet factory fabricated and
tested, manufactured by
SIEMENS / PEL / Eect Ops
Engineering Make OR Approved
by Engineer incharge indoor type
1.00 No. Each
floor standing PFI Plant, LT
switchgear according to IP-44
Standards suitable for 3 phase, 4
wires, 50Hrz system, degreased
and degusted, zinc phosphated,
baked finished with electrostatic
powder coating in approved color,
complete in all respect including
high density, hard drawn
electrolytic copper bus bars,
internal power and control wiring,
equipped as under.
12. N.S. Supply at site installation testing
and commissioning Power Factor
Improvement Plant 250 KVAR
Extendable upto 300, frame 14
SWG and door 14 SWG MS sheet
factory fabricated and tested,
manufactured by SIEMENS/PEL /
Eect Ops Engineering Make OR
Approved by Engineer incharge
indoor type floor standing PFI
Plant, LT switchgear according to
IP-44 Standards suitable for 3
phase, 4 wires, 50Hrz system,
degreased and derusted, zinc
phosphated, baked finished with
electrostatic powder coating in
approved color, complete in all
respect including high density,
hard drawn electrolytic copper bus
bars, internal power and control
wiring, equipped as under.
1.00 No. Each
Total Non-Schedule Rs.__________
D.N.I.T. Engineering Cell
Name of work:- Providing and Fixing 200 KVA Transformer along with Trolley for
emergency purpose used in LCW University, Lahore. (Based on 1st July,
2016 to 31st December,2016)
S.
No.
Item No.
CMR.
Description of work Quantity Unit Rate in Rs. Amount in
Rs.
1. N.S. Supply Erection, Testing, and
Commissioning of Electrical
Transformer 200 KVA with
Wapda test reports made by PEL,
complete in all respect as per
approved from LESCO/Wapda
standard and specifications.
1.00 No. Each
2. N.S. Providing of Transformer Trolley
for 200 KVA complete in all
respect as per approved from
LESCO/Wapda standard and
specifications.
1.00 No. Each
3. N.S. Supply Erection, Testing, and
Commissioning of accessories for
Electrical Transformer 200 KVA,
D-luk fuses 3Nos, Wooden Arm
1No., Channel 6’G.I. 2Nos., H.T.
Pin + Insuto 3Nos., L.T. spool
insuto 4Nos., L.T. 70mm2 4core
60Rft, H.T. 240mm2 XLPE S/core
cable 90Rft, etc. complete in all
respect as per approved from
LESCO/Wapda standard and
specifications.
1.00 Job. Each
Total Non-Schedule Rs.__________
D.N.I.T. Engineering Cell
Name of work:- Miscellaneous work of Principal Intermediate College Office in LCW
University, Lahore. (Based on 1st February, 2016 to 31st July, 2016)
S.
No.
Item No.
CMR.
Description of work Quantity Unit Rate in
Rs.
Amount in
Rs.
1. 13+9(b)/
Ch-11
Applying floating coat of cement
1/32" thick i/c Cement plaster 1:4
upto 20' height ½” thick.
1400.00
Sft
100 Sft 2369.45 33172.00
2. 49(b)/Ch-4 Scraping in Ordinary distemper, oil
bound distemper, or paint of wall.
1050.00
Sft
100 Sft 372.25 3909.00
3. 23(bii)/Ch-11 Distempering on old surface two
coats.
3500.00
Sft
100 Sft 223.90 7837.00
4. 4©/Ch-13 Painting doors & windows any type
i/c edges on old surface two coats.
2300.00
Sft
100 Sft 832.45 19146.00
5. 7(b)/Ch-13 French polishing on old work.
1400.00
Sft
100 Sft 1198.15 16774.00
Total Schedule Items Rs. 80838.00
Rare quoted percentage above or blew on Schedule Items Rs.
Total Amount Schedule Items Rs.
Total Schedule Items Rs._______________
Total Non Schedule Items Rs._______________
Grand Total Rs.______________
D.N.I.T. Engineering Cell
Name of work:- Miscellaneous work of Principal Intermediate College Office in LCW
University, Lahore. (Based on 1st February, 2016 to 31st July, 2016)
S.
No.
Item No.
CMR.
Description of work Quantity Unit Rate in Rs. Amount in
Rs.
1. N.S. P/F false ceiling for gypsum board
2’x2’ with aluminium tee fixing i/c
labour etc. complete in all respects
as directed by the Engineer
incharge.
370.00 Sft Per Sft
2. N.S. Supply of Blind (Imported) roller
type complete in all respects as
directed by the Engineer incharge.
200.00 Sft Per Sft
3. N.S. Removing of existing ceiling etc.
complete in all respects.
1400.00 Sft Per Sft
4. N.S. P/F kail wood gola 1”x1”
complete in all respect.
100.00 Rft Per Rft
Total Non-Schedule Rs.__________
D.N.I.T. Engineering Cell
Name of work:- Painting of 5 Racecourse Road Building in LCW University, Lahore. (Based on
1st July, 2016 to December, 2016)
S.
No.
Item No.
CMR.
Description of work Quantity Unit Rate in
Rs.
Amount
in Rs.
1. 49(b)/Ch-4 Scraping, Ordinary distemper, oil bound
distemper, or paint of wall.
8000.00 Sft 100 Sft 399.95 31996.00
2. 32A(b)/Ch-
13
P/A weather shield paint of approved
quality on external surface of building i/c
preparation of surface, application of
primer complete in all respect (old
surface)
5000.00 Sft 100 Sft 661.75 33088.00
31/Ch-13 Painting with emulsion paint on old
surface two coats.
21600.00
Sft
100 Sft 742.30 160337.00
3. 4(c)/Ch-13 Painting of doors and windows any type
i/c edges on old surface 2 coats.
1800.00 Sft 100 Sft 868.15 15627.00
4. 7(b)/Ch-13 French polishing complete on old
surface.
1000.00 Sft 100 Sft 1277.35 12774.00
Total Schedule Items Rs. 253822.00
Rare quoted percentage above or blew on Schedule Items Rs.
Total Amount Schedule Items Rs.
Total Schedule Items Rs._______________
Total Non Schedule Items Rs._______________
Grand Total Rs.______________
D.N.I.T. Engineering Cell
Name of work:- Painting of Habiba Hall (M.A. Hostel) LCW University, Lahore. (Based on 1st
July, 2016 to 31st December, 2016)
S.
No.
Item No.
CMR.
Description of work Quantity Unit Rate in
Rs.
Amount in
Rs.
1. 49(b)/Ch-4 Scraping Ordinary distemper, oil
bound distemper, ditto or paint of
wall.
23160.00
Sft
100 Sft 399.95 92628.00
2. 23(b)/Ch-11 Distemper on old surface 2 coats.
66170.00
Sft
100 Sft 237.30 157021.00
3. 23(a)/Ch-11 Distemper on new surface 3 coats.
300.00 Sft 100 Sft 369.65 1109.00
4. 4(c)/Ch-13 Painting of doors and windows any
type (i/c edges) on old surface 2
coats.
13280.00
Sft
100 Sft 868.15 115290.00
5. 48/Ch-4 +
9(b)+13/Ch-
11
Removing of cement or lime plaster
i/c Cement plaster 1:4 upto
20’height ½” thick, applying
floating coat of cement.
300.00 Sft 100 Sft 2763.30 8290.00
Total Schedule Items Rs. 374338.00
Rare quoted percentage above or blew on Schedule Items Rs.
Total Amount Schedule Items Rs.
D.N.I.T. Engineering Cell
Name of work:- Painting of Jafrey Hall (B.A. Hostel) LCW University, Lahore. (Based on 1st
July, 2016 to 31st December, 2016)
S.
No.
Item No.
CMR.
Description of work Quantity Unit Rate in
Rs.
Amount
in Rs.
1. 49(b)/Ch-4 Scraping Ordinary distemper, oil
bound distemper, ditto or paint of
wall.
33510.00
Sft
100 Sft 399.95 134023.00
2. 23(b)/Ch-11 Distemper on old surface 2 coats.
166000.00
Sft
100 Sft 237.30 393918.00
3. 23(a)/Ch-11 Distemper on new surface 3 coats.
500.00 Sft 100 Sft 369.65 1848.00
4. 4(c)/Ch-13 Painting of doors and windows any
type (i/c edges) on old surface 2
coats.
25250.00
Sft
100 Sft 868.15 219208.00
5. 4(d)/Ch-13 Painting guard bars, gates of iron
bars, gratings, railing (i/c standards,
braces etc.) and similar open work
on old surface 2coats.
3564.00
Sft
100 Sft 521.60 18590.00
6. 48/Ch-4 +
9(b)+13/
Ch-11
Removing of cement or lime plaster
i/c Cement plaster 1:4 upto
20’height ½” thick, applying
floating coat of cement.
500.00 Sft 100 Sft 2763.30 13817.00
7. 44(b)/Ch-10 Glazing with panes (16oz to 18oz)
using deodar wooden fillets and
putty.
100.00 Sft Per Sft 61.00 6100.00
8. 31(ii)/Ch-24 S/E of switches 5 Amp Piano type.
10.00
Nos.
Each 32.60 326.00
Total Schedule Items Rs. 787830.00
Rare quoted percentage above or blew on Schedule Items Rs.
Total Amount Schedule Items Rs.
Total Schedule Items Rs._______________
Total Non Schedule Items Rs._______________
Grand Total Rs.______________
D.N.I.T. Engineering Cell
Name of work:- Painting of Jafrey Hall (B.A. Hostel) LCW University, Lahore. (Based on 1st
July, 2016 to 31st December, 2016)
S.
No.
Item
No.
CMR.
Description of work Quantity Unit Rate in
Rs.
Amount
in Rs.
1. N.S. P/F of Kundi Chapka made of Iron 4” long
, complete in all respect as directed by the
Engineer incharge.
10.00 Nos. Each
2. N.S. P/F Tower Bolt made of Iron 10” long ,
complete in all respect.
10.00 Nos. Each
3. N.S. S/E of Light plug with box 5 to 13/Amp
Multi Function China fitting made by
KLASS complete in all respects.
2.00 Nos. Each