DMc Comb Case Study RECP Internship

14
NATIONAL CLEANER PRODUCTION CENTRE SOUTH AFRICA @NCPC_SA www.ncpc.co.za RECP Student Internship – Class of 2016

Transcript of DMc Comb Case Study RECP Internship

Page 1: DMc Comb Case Study RECP Internship

NATIONAL CLEANER PRODUCTION CENTRE

SOUTH AFRICA

@NCPC_SA

www.ncpc.co.za

RECP Student Internship – Class of 2016

Page 2: DMc Comb Case Study RECP Internship

www.ncpc.co.za

• KZN ABI King Shaka

International Airport Fishwicks

• CPT BBI Solutions Rhodes Food Group GlaxoSmithKline PG Glass

• JHB Directech Dutton Plastics Rhodes Food Group(2

sites) Natures Garden Willards Tigerbrands Zinchem Zimalco Afrox (2 sites)

Thanks to the host companies

Page 3: DMc Comb Case Study RECP Internship

www.ncpc.co.za

RECP Project Life Cycle

Page 4: DMc Comb Case Study RECP Internship

www.ncpc.co.za

Savings Overview

Page 5: DMc Comb Case Study RECP Internship

NATIONAL CLEANER PRODUCTION CENTRE

SOUTH AFRICA

Common Recommendations

Page 6: DMc Comb Case Study RECP Internship

6www.iee-sa.co.za

Radiation Loss + Redundant Piping

~ R600k /annum – 1 yr payback

Page 7: DMc Comb Case Study RECP Internship

7www.iee-sa.co.za

Condensate return

~ R35k /annum – 1 yr payback

• b

Page 8: DMc Comb Case Study RECP Internship

8www.iee-sa.co.za

Steam Leaks

~ R120k /annum – 1 yr payback

Page 9: DMc Comb Case Study RECP Internship

9www.iee-sa.co.za

Common Compressor Recommendations

4. Recover Waste Heat

2. Use Outside Air for Compressor Intakes

3. Reduce Pressure

1. Air Leaks

Page 10: DMc Comb Case Study RECP Internship

10www.iee-sa.co.za

Alternative Heating Systems

~ R1.1Mil /annum – 1-3 yr payback

Assume 300kW available for heat recovery ~ 450kg / hr steam

Page 11: DMc Comb Case Study RECP Internship

www.iee-sa.co.za

• Reduce Peak Demand – 250kVA drop = R400k/annum

Peak demand / load shift / Power factor

1800

1900

2000

2100

2200

03:00

04:00

05:00

06:00

07:00

08:00

09:00

10:00

11:00

12:00

13:00

14:00

15:00

16:00

17:00

18:00

19:00

20:00

21:00

22:00

23:00

00:00

01:00

-

1800

1900

2000

2100

2200 -

Interval data (1800 seconds) for System (Not Assigned) and Periods (Not Assigned)2016-11-30 02:52:33 AM to 2016-12-01 01:58:11 AM

kWh ( -) kVA ( -)

30 Nov 2016

Page 12: DMc Comb Case Study RECP Internship

www.ncpc.co.za

• BBI power factor R160k

• Natures Garden Blanch Water Project R660k in water R240k in kWh

• RFG Krugersdorp water leak repair R500k / annum

• Zinchem – Boiler and Waste Management Boiler Scheduling ~ R120k / annum Solid waste management ~ R50k Water leak repair ~ R100k

Highlighted Interventions

Page 13: DMc Comb Case Study RECP Internship

www.ncpc.co.za

• To be valued one must add value• Great need to address countries skill shortage

“Success is to be measured not so much by the position that one has reached in life as by the obstacles which he has overcome.” Booker T

Washington

Motivational Thoughts

Page 14: DMc Comb Case Study RECP Internship

www.ncpc.co.za

THANK YOU

[email protected]

WEBSITEwww.ncpc.co.za

@NCPC_SA