DJAC: PPD CMS ECAL Hardware Tasks

14
PPD CMS Away Day, Cosenors House, 29/9/05 D.J.A. Cockerill 1 DJAC: PPD CMS ECAL Hardware Tasks (i) The next 2.5 years (ii) The following 2.5 years To March 2008 April 2008 – Oct 2010

description

DJAC: PPD CMS ECAL Hardware Tasks. (i) The next 2.5 years (ii) The following 2.5 years. To March 2008 April 2008 – Oct 2010. VPTs. Continued mass production testing to ~Sep 2006 Main contract Replacements contract Database RAL – CERN to ~Dec 2006 VPT sorting to ~ Dec 2006? - PowerPoint PPT Presentation

Transcript of DJAC: PPD CMS ECAL Hardware Tasks

Page 1: DJAC: PPD CMS ECAL Hardware Tasks

PPD CMS Away Day, Cosenors House, 29/9/05 D.J.A. Cockerill 1

DJAC: PPD CMS ECAL Hardware Tasks

(i) The next 2.5 years

(ii) The following 2.5 years

To March 2008

April 2008 – Oct 2010

Page 2: DJAC: PPD CMS ECAL Hardware Tasks

PPD CMS Away Day, Cosenors House, 29/9/05 D.J.A. Cockerill 2

VPTs

Continued mass production testing to ~Sep 2006

Main contract

Replacements contract

Database RAL – CERN to ~Dec 2006

VPT sorting to ~ Dec 2006?

Shipping to CERN – all by Dec 2006?

People

Bruce, Joolz, Martin, Laurie (only to 31 March – X, 2006!)

VPT Production

Page 3: DJAC: PPD CMS ECAL Hardware Tasks

PPD CMS Away Day, Cosenors House, 29/9/05 D.J.A. Cockerill 3

HV cards/Umbilical/Motherboards/VFE cards

Components fully specified by Jan 2006Preproduction for Dee4, 20 SC sets by Spring 2006:

- 105 HV cards- 20 umbilicals- 20 Motherboards- 105 VFE cards

PeopleClaire, Ken, Bob, (Matt, Mark, Werner)

SC Front End

Thermister calibration

20 calibrated thermisters needed for Dee4 SCs by Spring 2006Total of 560 calibrated thermisters, evenly to end 2007

People Paul, Joolz

RAL PPD/RAL ID

ETH-Z

Page 4: DJAC: PPD CMS ECAL Hardware Tasks

PPD CMS Away Day, Cosenors House, 29/9/05 D.J.A. Cockerill 4

VPT HV

HV distributionPreparation for Dee4CAEN HV supply + prototype distribution box by April 2006HV software drivers tested with SC01 at RAL

HV distribution method defined WITHIN a Dee, by April 2006

PeopleClaire, Ken, Bob, Philip, Barbara, (Tony)

Page 5: DJAC: PPD CMS ECAL Hardware Tasks

PPD CMS Away Day, Cosenors House, 29/9/05 D.J.A. Cockerill 5

VPT HV

HV test boxTest pre-production HV card/umbilical assemblies for Dee4

Measure/check continuity, iL at 1500VConstruction by RAL PPD, by March 2006Test of first 20 assemblies by April 2006, ship to CERN

PeopleClaire, Ken, Laurie, Joolz, Barbara, (Tony)

Page 6: DJAC: PPD CMS ECAL Hardware Tasks

PPD CMS Away Day, Cosenors House, 29/9/05 D.J.A. Cockerill 6

Mass production of HV cards/umbilicals, summer 2006 – spring 2007

Procurement RAL PPDTests of HV cards/Umbilical assemblies with HV test box

(Motherboards/VFE cards ETH-Z)

Tests for correct trigger mapping to the motherboards,before mounting on DeesRAL PPD/Virginia ??

PeopleClaire, Ken, Laurie, Joolz, Barbara, Dave, (Tony)

VPT HV mass production

Page 7: DJAC: PPD CMS ECAL Hardware Tasks

PPD CMS Away Day, Cosenors House, 29/9/05 D.J.A. Cockerill 7

VPT LED Stability pulser

Prototype LED firing box for Dee4 by April 2006Up to 5 fibre outlets needed for Dee4

PeoplePaul, Bob, (John Hill/Tony, fixing to patch panel, fibre routings)

Collaboration with Virginia – decide who does what, by Jan 2006- Newer/better LEDs/improved coupling- LED driver- Complete drive boxes- Interface to ECAL DAQ

As an alternative monitoring system, by summer 2006- can we get to 50, 100 GeV equivalent??

PeoplePaul, Bob, Ken, Dave, (Tony)

Page 8: DJAC: PPD CMS ECAL Hardware Tasks

PPD CMS Away Day, Cosenors House, 29/9/05 D.J.A. Cockerill 8

Dee4 at CERN

Dee4 assembly/tests Spring/Summer/Autumn 2006

SC soak test stand by March 2006

Oversight of Dee assembly: SC assembly/mounting on Dee4

Dee4 test stand - collaboration with Virgina for front light injection tests- use prototype HV distribution system

- tests of motherboard trigger configuration- learn to operate ‘mobile’ ECAL electronics test stand

- analysis of data- VPT LED stability pulser

People.

Dave, Claire, Barbara, Joolz, Paul, (Matt, Tony) at CERN

Page 9: DJAC: PPD CMS ECAL Hardware Tasks

PPD CMS Away Day, Cosenors House, 29/9/05 D.J.A. Cockerill 9

Dee4 in beam at CERN

Dee4 in test beam October 2006 and/or April 2007

Installation at H4

Debugging

Shifts

AnalysisProof of VPT stability

People

Dave, Ken, Claire, Bruce, Barbara, Joolz, Paul, Bob

Page 10: DJAC: PPD CMS ECAL Hardware Tasks

PPD CMS Away Day, Cosenors House, 29/9/05 D.J.A. Cockerill 10

Dee1 – Dee4

Dee1 – Dee4 from Summer 2006 – March 2008

Bare SC assembly from Q1 2006 onwards

SC mass production from summer 2006 – Feb 2008

RAL PPD - responsibility for SC soak tests

- analysis of test stand data

- continuity/HV/trigger tests on Dee, in collaboration with Virginia

- analysis of Dee4 test data

- VPT LED pulser systems/checks, in collaboration with Virginia

People

Dave, Claire, Bruce, Barbara, Joolz, Paul, Bob, (Tony, John)

Mounting of Dees on HE± , 2007/2008

PeopleKen, (John, Tony)

Page 11: DJAC: PPD CMS ECAL Hardware Tasks

PPD CMS Away Day, Cosenors House, 29/9/05 D.J.A. Cockerill 11

Dee1 – Dee4

Complete HV distribution systems

- needed for bldg 867 integration tests

- Full Dee4 system by Feb 2007 (keep in 867)- Dee1-3 systems by Dec 2007

People

Claire, Ken, Joolz, Barbara, (Tony)

Mounting of Dees on HE± , 2007/2008

PeopleKen, (John, Tony)

Page 12: DJAC: PPD CMS ECAL Hardware Tasks

PPD CMS Away Day, Cosenors House, 29/9/05 D.J.A. Cockerill 12

The Transition

March 2008

4 Dees installed in CMS

Need to Shepherd our resources

as the group’s Brownian motion diminishes

What do we do?

My personal opinion, particularly for the first (EE) LHC run :

PPD – duty to show EE working as expected

duty to show VPTs are stable

(does not necessarily imply continuous calibration

responsibility)

People

Dave, Ken, Claire, Bruce, RA1, RA2

Page 13: DJAC: PPD CMS ECAL Hardware Tasks

PPD CMS Away Day, Cosenors House, 29/9/05 D.J.A. Cockerill 13

2.5 years of LHC running

Hardware

PPD – responsibility for all things ‘VPT’

keep it all running during LHC on periods

interventions/repairs/upgrades during short/long shutdowns

- Special care/analysis at each substantial luminosity increase

VPT leakage currents, stability, noise…….

- Analysis of data – to check EE performance

People

Dave, Ken, Claire, Bruce, RA1, RA2

CMS run control

Ken

Page 14: DJAC: PPD CMS ECAL Hardware Tasks

PPD CMS Away Day, Cosenors House, 29/9/05 D.J.A. Cockerill 14

Is that all ?????

Rumours that

the Great Bear in the East is

Stirring !!

We may be confronted with all this much sooner than expected !