Diversion and Evacuation Routes Timing
Development, Implementation and
Applications
Presented by:
Vishal S. Kakkad, PE, PTOE
Traffic Engineering Division Manager
June 23, 2016
![Page 2: Diversion and Evacuation Routes Timing Development ... · Timing Patterns - Evacuation 16 • Base Model (Synchro) • Modify in TruTraffic for Evacuation Conditions –Minor Evacuation](https://reader030.fdocuments.net/reader030/viewer/2022040903/5e76a0d1e0299512850edf8f/html5/thumbnails/2.jpg)
Project Background
2
• History– Incidents on Interstate 75 requiring closures
– Interstate 75 Freeway Management System in Manatee and Sarasota Counties
– Implementation of Manatee County Advanced Traffic Management System (ATMS)
– Past history of incidents on Manatee River bridges (US 41/301, Bus US 41)
– Hurricane Evacuation Planning
Photo Source:
Tampa Bay Times
![Page 3: Diversion and Evacuation Routes Timing Development ... · Timing Patterns - Evacuation 16 • Base Model (Synchro) • Modify in TruTraffic for Evacuation Conditions –Minor Evacuation](https://reader030.fdocuments.net/reader030/viewer/2022040903/5e76a0d1e0299512850edf8f/html5/thumbnails/3.jpg)
3
• Objectives– Strategic plan for maximizing the throughput of diversion or
evacuation route through traffic engineering practices
• Traffic signal timing patterns
• Traffic operational improvements
• Law enforcement deployment strategies
• Decision matrix and operations guide development
– Ease of implementation
Project Background
![Page 4: Diversion and Evacuation Routes Timing Development ... · Timing Patterns - Evacuation 16 • Base Model (Synchro) • Modify in TruTraffic for Evacuation Conditions –Minor Evacuation](https://reader030.fdocuments.net/reader030/viewer/2022040903/5e76a0d1e0299512850edf8f/html5/thumbnails/4.jpg)
Where Will The Traffic Go?
4
• Interstate 75 carries ≈100,000 vehicles per day– Peak hour about 10% or 10,000 vehicles per hour
• Capacity of a signalized arterial ≈ 1,900 vehicles per lane per hour of green– Example: 3 lanes in one direction, 60% green ≈ 3,420
vehicles per hour
• Most arterials already congested during peak periods
• No arterial roadway has capacity to carry full diversion during the heavier hours
![Page 5: Diversion and Evacuation Routes Timing Development ... · Timing Patterns - Evacuation 16 • Base Model (Synchro) • Modify in TruTraffic for Evacuation Conditions –Minor Evacuation](https://reader030.fdocuments.net/reader030/viewer/2022040903/5e76a0d1e0299512850edf8f/html5/thumbnails/5.jpg)
Scenarios
5
![Page 6: Diversion and Evacuation Routes Timing Development ... · Timing Patterns - Evacuation 16 • Base Model (Synchro) • Modify in TruTraffic for Evacuation Conditions –Minor Evacuation](https://reader030.fdocuments.net/reader030/viewer/2022040903/5e76a0d1e0299512850edf8f/html5/thumbnails/6.jpg)
Diversion Scenario 3
8
![Page 7: Diversion and Evacuation Routes Timing Development ... · Timing Patterns - Evacuation 16 • Base Model (Synchro) • Modify in TruTraffic for Evacuation Conditions –Minor Evacuation](https://reader030.fdocuments.net/reader030/viewer/2022040903/5e76a0d1e0299512850edf8f/html5/thumbnails/7.jpg)
Diversion Scenario 7
12
![Page 8: Diversion and Evacuation Routes Timing Development ... · Timing Patterns - Evacuation 16 • Base Model (Synchro) • Modify in TruTraffic for Evacuation Conditions –Minor Evacuation](https://reader030.fdocuments.net/reader030/viewer/2022040903/5e76a0d1e0299512850edf8f/html5/thumbnails/8.jpg)
Evacuation Scenarios
13
![Page 9: Diversion and Evacuation Routes Timing Development ... · Timing Patterns - Evacuation 16 • Base Model (Synchro) • Modify in TruTraffic for Evacuation Conditions –Minor Evacuation](https://reader030.fdocuments.net/reader030/viewer/2022040903/5e76a0d1e0299512850edf8f/html5/thumbnails/9.jpg)
Timing Patterns
14
• For Each Diversion Scenario, 3 Timing Patterns
Developed
– Northbound
– Southbound
– Balanced
• For Each Evacuation Route, 2 Timing Patterns
Developed
– Minor Evacuation
– Major Evacuation
![Page 10: Diversion and Evacuation Routes Timing Development ... · Timing Patterns - Evacuation 16 • Base Model (Synchro) • Modify in TruTraffic for Evacuation Conditions –Minor Evacuation](https://reader030.fdocuments.net/reader030/viewer/2022040903/5e76a0d1e0299512850edf8f/html5/thumbnails/10.jpg)
Timing Patterns - Diversion
15
• Base Model (Synchro)
• Modify in TruTraffic for Diversion Conditions
– Primary movements: add ≈60 seconds of green time
– Secondary movements: add ≈30 seconds of green time
– Progress Diversion traffic at 25 mph
• Define Patterns and FlexGroups on ATMS.now
• Field Check during Late Night
• Ready for staff to implement when needed
![Page 11: Diversion and Evacuation Routes Timing Development ... · Timing Patterns - Evacuation 16 • Base Model (Synchro) • Modify in TruTraffic for Evacuation Conditions –Minor Evacuation](https://reader030.fdocuments.net/reader030/viewer/2022040903/5e76a0d1e0299512850edf8f/html5/thumbnails/11.jpg)
Timing Patterns - Evacuation
16
• Base Model (Synchro)
• Modify in TruTraffic for Evacuation Conditions
– Minor Evacuation – Typical Time of Day Cycle Length
with One-Way Progression at Speed Limit
– Major Evacuation – Increased Cycle Length with One-
Way Progression at Speed Limit
• Define Patterns and FlexGroups on ATMS.now
• Field Check during Late Night
• Ready for staff to implement if needed
![Page 12: Diversion and Evacuation Routes Timing Development ... · Timing Patterns - Evacuation 16 • Base Model (Synchro) • Modify in TruTraffic for Evacuation Conditions –Minor Evacuation](https://reader030.fdocuments.net/reader030/viewer/2022040903/5e76a0d1e0299512850edf8f/html5/thumbnails/12.jpg)
Timing Pattern Development
17
![Page 13: Diversion and Evacuation Routes Timing Development ... · Timing Patterns - Evacuation 16 • Base Model (Synchro) • Modify in TruTraffic for Evacuation Conditions –Minor Evacuation](https://reader030.fdocuments.net/reader030/viewer/2022040903/5e76a0d1e0299512850edf8f/html5/thumbnails/13.jpg)
Implementation Guide
18
![Page 14: Diversion and Evacuation Routes Timing Development ... · Timing Patterns - Evacuation 16 • Base Model (Synchro) • Modify in TruTraffic for Evacuation Conditions –Minor Evacuation](https://reader030.fdocuments.net/reader030/viewer/2022040903/5e76a0d1e0299512850edf8f/html5/thumbnails/14.jpg)
Diversion Scenario 3
19
![Page 15: Diversion and Evacuation Routes Timing Development ... · Timing Patterns - Evacuation 16 • Base Model (Synchro) • Modify in TruTraffic for Evacuation Conditions –Minor Evacuation](https://reader030.fdocuments.net/reader030/viewer/2022040903/5e76a0d1e0299512850edf8f/html5/thumbnails/15.jpg)
Route Details
20
![Page 16: Diversion and Evacuation Routes Timing Development ... · Timing Patterns - Evacuation 16 • Base Model (Synchro) • Modify in TruTraffic for Evacuation Conditions –Minor Evacuation](https://reader030.fdocuments.net/reader030/viewer/2022040903/5e76a0d1e0299512850edf8f/html5/thumbnails/16.jpg)
Benefits
21
• Ready to use timing plans with multiple scenarios
• Coordinated patterns
• Programmed in central software for easy and
quick implementation
• Maximize available resources
![Page 17: Diversion and Evacuation Routes Timing Development ... · Timing Patterns - Evacuation 16 • Base Model (Synchro) • Modify in TruTraffic for Evacuation Conditions –Minor Evacuation](https://reader030.fdocuments.net/reader030/viewer/2022040903/5e76a0d1e0299512850edf8f/html5/thumbnails/17.jpg)
Implementation Comparison
22
6
10
4
0.50
1.501.00
1 2 3 4 5 6
Av
era
ge
do
wn
loa
d t
ime
/In
ters
ect
ion
(m
in)
Traffic Incidents
Diversion and Evacuation Routes Programmed Signal Timings
Before vs. After Implementation
86%
Average Before: 7 minutes
Average After: 1 minute
![Page 18: Diversion and Evacuation Routes Timing Development ... · Timing Patterns - Evacuation 16 • Base Model (Synchro) • Modify in TruTraffic for Evacuation Conditions –Minor Evacuation](https://reader030.fdocuments.net/reader030/viewer/2022040903/5e76a0d1e0299512850edf8f/html5/thumbnails/18.jpg)
Applications
23
• Traffic Incident Management
• Evacuation Route Timing
• Planned/Unplanned Event Management
• Non-Recurring Congestion Management