District 1 – Team Name

17

description

District 1 – Team Name. 30* 80% = 24. District 2 – Team Name. 20 * 80% = 16. District 3 – Team Name. 17* 80% = 14. District 4 – Team Name. 12 * 80% = 10. April’s Challenge COMPLETE this FORM and Return it to me By April 25 Your Hospital Earns - PowerPoint PPT Presentation

Transcript of District 1 – Team Name

Page 1: District 1 – Team Name
Page 2: District 1 – Team Name

District 1 – Team NameAngel Medical CenterAppalachian Regional Healthcare SystemBlue Ridge Regional HospitalCarolinas HealthcareCarolinas HealthCare SystemCarolinas Medical CenterCarolinas Medical Center - LincolnCherokee Indian Hospital

CMC-University HospitalCommunity Care PartnersFrye Regional Medical CenterGaston Memorial HospitalHighlands-Cashiers Hospital, Inc.Iredell Health SystemMargaret R. Pardee Memorial Hospital

Mission St. Joseph's Health System

Murphy Medical Center

Novant - Forsyth Medical Center

Novant Health-Presbyterian Hospital Huntersville

Pardee Memorial Hospital

Park Ridge Health

Presbyterian Hospital

Presbyterian Hospital Huntersville (Novant Health)

Rutherford Hospital Inc

Sisters of Mercy of NC

Spruce Pine Community Hospital

St. Luke's Hospital

Transylvania Regional Hospital

Watauga Medical Center

Wilkes Regional Medical Center

30* 80% = 24

Page 3: District 1 – Team Name

District 2 – Team NameAlamance Regional Medical CenterCarol Woods Retirement CommunityCarolinas HealthCare SystemCMC - NortheastDuke University Medical CenterFirstHealth Moore Regional HospitalHigh Point Regional Health SystemLexington Memorial HospitalMorehead Memorial HospitalMoses Cone Health SystemMoses Cone – Annie PennMoses Cone - WomensNC Baptist HospitalNovant - Forsyth Medical CenterRandolph HospitalRowan Regional Medical CenterStanly Regional Medical CenterThomasville Medical Center, Novant HealthUNC HospitalsWake Forest Baptist Medical CenterWell-Spring Retirement Community, Inc.

20 * 80% = 16

Page 4: District 1 – Team Name

District 3 – Team Name

17* 80% = 14

Albemarle Hospital

Chowan Hospital, Inc.

Cypress Glen Retirement Community

Duke Health Raleigh Hospital

Duke University Medical Center

Durham Regional Hospital

First Health of the Carolinas

Glenaire Retirement Community

Johnston Health

Nash Health Care System

Person Memorial Hospital

Pitt County Memorial Hospital

REX Healthcare

WakeMed Cary Hospital

WakeMed Raleigh

Wayne Memorial Hospital

Wilson Medical Center

Page 5: District 1 – Team Name

District 4 – Team Name

12 * 80% = 10

Betsy Johnson Regional Hospital

Cape Fear Valley Health System

CarolinaEast Health Systems

Carteret General Hospital

Columbus Regional Healthcare System

Dosher Memorial Hospital

Duplin General Hospital

Harnett Health System

New Hanover Regional Medical Center

Sampson Regional Medical Center

Southeastern Regional Medical Center

Womack Army Medical Center

Page 6: District 1 – Team Name
Page 7: District 1 – Team Name
Page 8: District 1 – Team Name
Page 9: District 1 – Team Name

April’s ChallengeCOMPLETE this FORM

and Return it to me

ByApril 25

Your Hospital Earns

250 pts …..Sheet completed except ESR150 pts …..Energy Star Rating & shared with ASHE400 pts …..Hospital TOTAL

District Earns

Total Hospital Scores(80% # District)

Page 10: District 1 – Team Name

Only use Hospital ft2 that is connected to the meters reported below

NO – Parking DecksNO – Roofs

ONLY- Heat/Cooled Spaces

Page 11: District 1 – Team Name

Meter and Cost data should be for the hospital ONLY if possible

Page 12: District 1 – Team Name

200-

210

190-

200

180-

190

170-

180

160-

170

150-

160

140-

150

130-

140

120-

130

110-

120

0

5

10

15

20

25

30

35

40

NCHEA Hospital Energy Use Index

kBtu / ft2

Num

ber o

f Hos

pita

ls

Concept Only

not real data

Page 13: District 1 – Team Name

Concept Only

not real data20

0-21

0

190-

200

180-

190

170-

180

160-

170

150-

160

140-

150

130-

140

120-

130

110-

120

0

5

10

15

20

25

30

35

40

NCHEA Hospital ELECTRICAL - EUI

kBtu / ft2

Num

ber o

f Hos

pita

ls

Page 14: District 1 – Team Name

May’s Challenge

Complete ONE of the following- Lighting

- LED-Lighting Controls

and Return it to me

ByMay 30th

Your Hospital Earns

150 pts …..completing the form 50 pts….. having VPs signature

District Earns

Total Hospital Scores(80% # District)

Page 15: District 1 – Team Name

June’s Challenge

Complete ONE of the following- Boiler Replacement

-Reduce CFM- Reduce Outside Air

- Free Cooling- - VFD

and Return it to me

ByJune 27th

Your Hospital Earns

150 pts …..completing the form 50 pts….. having VPs signature

District Earns

Total Hospital Scores(80% # District)

Page 16: District 1 – Team Name

July’s Challenge

Complete ONE of the following- RetroCx Worksheet

and Return it to me

ByJuly 25th

Your Hospital Earns

150 pts …..completing the form 50 pts….. having VPs signature

District Earns

Total Hospital Scores(80% # District)

Retro Commissioning- Calibration of controls- Return to working order

(ie – repair leaking hot water reheat valve)

- Improve staging of chillers- Reduce static pressure drop

- ????

Low to NO cost items “Low Hanging Fruit”

Must actually complete this work

Your idea (not already covered)

For technical help, call your design engineer, one of the RCx in our association or Joel.

Page 17: District 1 – Team Name

To Win - requires:

-Participation

-Participation

-Participation