DISTRIBUTION 'Q' JOB NO. EXECUTE PACKAGE (STS-130/20A ... · distribution 'q' job no. _____ execute...

36
DISTRIBUTION 'Q' JOB NO. _________ EXECUTE PACKAGE (STS-130/20A) MISSION DISTRIBUTION LIST REVISED: 01/06/10 NOTE: FOR ANY CHANGES TO THIS DISTRIBUTION, CALL X35197. CHANGES AND ADDITIONS TO ANY DISTRIBUTION LISTS MUST BE APPROVED BY THE SPAN MANAGER. BLDG 30S/ROOM 4312 (GO THROUGH 4312, TURN LEFT AND LEAVE IN BOX) 1 SPACE RADIATION ANALYSIS GROUP (SRAG) BLDG 30S/ROOM 4301 BLUE MPSR 1 419S HAWK 1 1 414S OSO SUPPORT 1 418S PRO 1 413S ACE 1 410S RAVEN 1 417S POWER 1 416S TCON 1 415S STARCOM BLDG 30S/ROOM 3308 1 306S MATS 2 303S POINTING 2 305S TIMELINE BLDG 30S/ROOM 3307 1 302S RMS 1 348S MSS TASK & MSS SYS 2 301S EVA TASK BLDG 30S/ROOM 3304 (KNOCK ON DOOR AND LEAVE IN BOX) 1 BIOMED BLDG 30S/ROOM 3301 4 308S P/L SYSTEMS 1 AND 2/ JLO BLDG 30S/ROOM 3301A 2 326S SPAN MGR BLDG 30S/ROOM 2306 WHITE FCR 1 212S GC 1 211S ASC/RNDZ/ENT GPO (AT THESE TIMES ONLY) 1 210S FDO 3 ACO/CIO 1 201S PROP 1 202S GNC 1 213S MMACS 1 214S EGIL 1 216S EECOM 2 215S FAO 1 203S DPS 1 205S INCO 1 209S FD 1 231S CAPCOM 1 217S PDRS 1 218S SURGEON 1 208S BOOSTER/EVA 1 207S MOD (Prior to dock and after undock) 2 206S PAO BLDG 30S/ROOMS 2300 & 2334 WHITE MPSR 1 219S IFM 1 220S MECH 1 221S EPS 1 226S THERMAL 1 225S DPS SUPPORT 1 228S LIFE SUPPORT 1 223S INST 1 224S RF/DATA COMM 1 229S GNC/SENSORS 1 240S OREO/CONSUMABLES 1 241S MPS 1 237S NAV/ONAV 1 235S GSO/RPS 1 234S TARGET 1 232S LSO BLDG 30M/ROOM 242 1 242 ESA 5 242 JAXA BLDG 30M/ROOM 231 FCR 1 (Place in dist. rack by the GC console) 1 207M FD (Hand deliver to console) 1 206M CAPCOM 1 217M ADCO 1 201M BME/SURGEON 1 208M CATO 3 210M CIO 1 212M ECLSS 2 202M EVA/MOD 1 200M GC 1 213M ODIN 1 211M OPS PLAN 1 214M OSO 1 231M PAO 1 216M PHALCON 1 230M RIO 1 209M ROBO 1 215M THOR 1 205M TOPO BLDG 30M/ROOM 240 (to 239 door) 1 4671 S/C METEOROLOGIST BLDG 30M/ROOM 225A 2 ACTION CENTER BLDG 30M/CSR ROOM 236 (INBASKET ON DESK) 15 CUSTOMER WORKSTATIONS BLDG 30M/ROOM 212 (folder outside door)) 1 ESC CAMERA BLDG 30M/ROOM 313 1 TO51 LCS 1 T052 LCS 1 T057 SE&IO 1 T058 SPAN CONSOLE 10 MER ADMIN (DOUBLE-SIDED) BLDG 30M/ROOM 336 (FOLDER OUTSIDE DOOR) 1 DOD REP BLDG 30M/ROOM 127 1 163 COM TECH 1 168 HOUSTON TV 142 DOUBLE-SIDED 127+1 for file copy TOTAL 128

Transcript of DISTRIBUTION 'Q' JOB NO. EXECUTE PACKAGE (STS-130/20A ... · distribution 'q' job no. _____ execute...

Page 1: DISTRIBUTION 'Q' JOB NO. EXECUTE PACKAGE (STS-130/20A ... · distribution 'q' job no. _____ execute package (sts-130/20a) mission distribution list revised: 01/06/10 note: for any

DISTRIBUTION 'Q' JOB NO. _________ EXECUTE PACKAGE (STS-130/20A) MISSION DISTRIBUTION LIST REVISED: 01/06/10

NOTE: FOR ANY CHANGES TO THIS DISTRIBUTION, CALL X35197. CHANGES AND ADDITIONS TO ANY DISTRIBUTION LISTS MUST BE APPROVED BY THE SPAN MANAGER.

BLDG 30S/ROOM 4312 (GO THROUGH 4312, TURN LEFT AND LEAVE IN BOX) 1 SPACE RADIATION ANALYSIS GROUP (SRAG) BLDG 30S/ROOM 4301 BLUE MPSR 1 419S HAWK 1 1 414S OSO SUPPORT 1 418S PRO 1 413S ACE 1 410S RAVEN 1 417S POWER 1 416S TCON 1 415S STARCOM BLDG 30S/ROOM 3308 1 306S MATS 2 303S POINTING 2 305S TIMELINE BLDG 30S/ROOM 3307 1 302S RMS 1 348S MSS TASK & MSS SYS 2 301S EVA TASK BLDG 30S/ROOM 3304 (KNOCK ON DOOR AND LEAVE IN BOX) 1 BIOMED BLDG 30S/ROOM 3301 4 308S P/L SYSTEMS 1 AND 2/ JLO BLDG 30S/ROOM 3301A 2 326S SPAN MGR BLDG 30S/ROOM 2306 WHITE FCR 1 212S GC 1 211S ASC/RNDZ/ENT GPO (AT THESE TIMES ONLY) 1 210S FDO 3 ACO/CIO 1 201S PROP 1 202S GNC 1 213S MMACS 1 214S EGIL 1 216S EECOM 2 215S FAO 1 203S DPS 1 205S INCO 1 209S FD 1 231S CAPCOM 1 217S PDRS 1 218S SURGEON 1 208S BOOSTER/EVA 1 207S MOD (Prior to dock and after undock) 2 206S PAO BLDG 30S/ROOMS 2300 & 2334 WHITE MPSR 1 219S IFM 1 220S MECH 1 221S EPS 1 226S THERMAL 1 225S DPS SUPPORT 1 228S LIFE SUPPORT 1 223S INST

1 224S RF/DATA COMM 1 229S GNC/SENSORS 1 240S OREO/CONSUMABLES 1 241S MPS 1 237S NAV/ONAV 1 235S GSO/RPS 1 234S TARGET 1 232S LSO BLDG 30M/ROOM 242 1 242 ESA 5 242 JAXA BLDG 30M/ROOM 231 FCR 1 (Place in dist. rack by the GC console) 1 207M FD (Hand deliver to console) 1 206M CAPCOM 1 217M ADCO 1 201M BME/SURGEON 1 208M CATO 3 210M CIO 1 212M ECLSS 2 202M EVA/MOD 1 200M GC 1 213M ODIN 1 211M OPS PLAN 1 214M OSO 1 231M PAO 1 216M PHALCON 1 230M RIO 1 209M ROBO 1 215M THOR 1 205M TOPO BLDG 30M/ROOM 240 (to 239 door) 1 4671 S/C METEOROLOGIST BLDG 30M/ROOM 225A 2 ACTION CENTER BLDG 30M/CSR ROOM 236 (INBASKET ON DESK) 15 CUSTOMER WORKSTATIONS BLDG 30M/ROOM 212 (folder outside door)) 1 ESC CAMERA BLDG 30M/ROOM 313 1 TO51 LCS 1 T052 LCS 1 T057 SE&IO 1 T058 SPAN CONSOLE 10 MER ADMIN (DOUBLE-SIDED) BLDG 30M/ROOM 336 (FOLDER OUTSIDE DOOR) 1 DOD REP BLDG 30M/ROOM 127 1 163 COM TECH 1 168 HOUSTON TV 142 DOUBLE-SIDED 127+1 for file copy TOTAL 128

Page 2: DISTRIBUTION 'Q' JOB NO. EXECUTE PACKAGE (STS-130/20A ... · distribution 'q' job no. _____ execute package (sts-130/20a) mission distribution list revised: 01/06/10 note: for any

THIS PAGE INTENTIONALLY BLANK

Page 3: DISTRIBUTION 'Q' JOB NO. EXECUTE PACKAGE (STS-130/20A ... · distribution 'q' job no. _____ execute package (sts-130/20a) mission distribution list revised: 01/06/10 note: for any

STS-130/20A FD 02 Execute Package MSG Page(s) Title

003A 1 - 14 FD02 Flight Plan Revision

004A 15 - 16 FD02 Mission Summary

005 --- Daily Summary (Electronic only)

006 17 - 32 REF DATA FS Updates

007 33 FD02 Crew Choice Downlink Approved by FAO: A. Cofrin Last Updated: Feb 8 2010 11:01 PM GMT JEDI (Joint Execute package Development and Integration), v3.0

 

Page 4: DISTRIBUTION 'Q' JOB NO. EXECUTE PACKAGE (STS-130/20A ... · distribution 'q' job no. _____ execute package (sts-130/20a) mission distribution list revised: 01/06/10 note: for any

MSG 003A - FD02 FLIGHT PLAN REVISION

1 MSG INDEX 2

3 MSG NO. TITLE 4

5 6 7 8 9

10 11 12

MSG-003 FD02 Flight Plan Revision MSG-004 FD02 Mission Summary MSG-005 Daily Summary MSG-006 Ref Data FS Updates MSG-007 FD02 Crew Choice Downlink 1. Post-Sleep Cryo Config 13

For today's Post-Sleep cryo config, O2 and H2 Tanks 1 and 5 will be active. 14 15

16 17

18

19 20

A15 CRYO TK5 HTRS O2,H2 A,B (four) - AUTO R1 O2,H2 TK3 HTRS A,B (four) - OFF MANF VLV TK1 (two) - OP (tb-OP) Pre-Sleep Cryo Config 21

22 23 24 25 26

27 28

29 30

31

32

33 34

36 37 38 39 40 41

√MCC for deltas prior to configuring for Pre-Sleep. For tonight's Pre-Sleep cryo config, Manifold 2 will be closed with O2 and H2 Tanks 2 and 4 active. A11 CRYO TK4 HTRS O2,H2 A,B (four) - AUTO A15 CRYO TK5 HTRS O2,H2 A,B (four) - OFF R1 O2,H2 TK2 HTRS A,B (four) - AUTO TK1 HTRS A,B (four) - OFF MANF VLV TK2 (two) - CL (tb-CL)

2. Yesterday, during the hand controller check and the manual augmented modes check of 35 the RHC negative Yaw axis, the ground saw a little cross coupling with the pitch axis, ~14 counts. Prior to starting OBSS Unberth, an additional test of the negative Yaw axis is needed in order to confirm a good RHC with the following steps:

DAP: VERN(FREE)

SM 169 PDRS STATUS 42

43 44 45 46

47 48 49 50

RATE - COARSE (RATE MIN tb-OFF) BRAKES - OFF MODE - TEST, ENTER RHC - negative Yaw, deflect hand controller gradually to hardstop √Commanded rates at full deflection = 4.7 deg/sec in Yaw only BRAKES - ON DAP: as reqd

END OF PAGE 1 OF 2, MSG 003A 1

Page 5: DISTRIBUTION 'Q' JOB NO. EXECUTE PACKAGE (STS-130/20A ... · distribution 'q' job no. _____ execute package (sts-130/20a) mission distribution list revised: 01/06/10 note: for any

MSG 003A - FD02 FLIGHT PLAN REVISION

END OF PAGE 2 OF 2, MSG 003A

5

3. Prior to running the Late Update Disk on the WLES and RPOP2 PGSCs, please make 1 sure that all programs are shut down. This will ensure that the proper files are updated 2 when the disk is run. Upon completion of the late update, restart WLES on both 3 machines. 4

4. The battery of the DSR-25 in the VTR does not hold a charge, requiring you to reset the 6

GMT on the recorder each day. To avoid this issue on future nights, change the PRE-7 SLEEP ACTIVITY (ORB OPS, CREW SYS) as follows: 8 9

10 11 12

14 15 16 17 18 19 20

22 23 24 25 26

28 29 30

32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51

On page 3-4 in step 6, remove L10 (MUX) VTR/CC PWR - off (LED off)

5. Later this morning, you can expect a 'LOMS Tk P' message due to the reoccurrence of 13 Endeavour's Left GN2 Accumulator leak. Please disregard this message.

Today's only OMS Burn is NC-2, and with the slow leak rate of the accumulator the plan will be to use the engine to support NC-2 dual OMS. One additional note for you, our teams are working hard on a GMEM to lower the FDA of the LOMS Accumulator, and we plan to have that in place for future crew sleep periods if required.

6. MSG 006, REF DATA FS Updates, includes information about a number of last minute 21 locker and middeck bag stowage changes. Use this message in place of REF DATA FS pages 1-1 through 1-16. The updates are indicated by change bars and include stowage changes to lockers A17, MF14H, MF43O, MF57C, MF57E, MF57G, MF57O, Bag E and Bag D.

7. To maximize DTV downlink time after OBSS Inspections complete: In OBSS Berth, 27 perform all of page 7-52d including PTU stow. Once this is complete, DTV playback can commence in parallel with sensor deact steps on 7-53.

8. REPLACE PAGES 3-8 THROUGH 3-17. 31

2

Page 6: DISTRIBUTION 'Q' JOB NO. EXECUTE PACKAGE (STS-130/20A ... · distribution 'q' job no. _____ execute package (sts-130/20a) mission distribution list revised: 01/06/10 note: for any

02/08/10 16:43:32

FLT PLN/130/FLT

FD02

NC2∆

ZAMK

A

VIRT

S

HIRE

PATR

ICK

ROBI

NSON

BEHN

KEN

(R1)

(R1)

(R1)

(R2)

(R2)

(R2)

(R3)

(R3)

(R3)

(R3)

(R3)

REPLANNED

2-4

S T S - 1 3 0 S T S

22

23

02/09

01

02

03

04

05

06

07

08

09

GMT 02/08/10 (039)

12

13

14

15

16

17

18

19

20

21

22

23

001/00

MET

Day 000

CDR

SLEEP

MEAL

OMS

BURN

NOSE CAP

SURVEY

M N V R

S T B D

M N V R

N O S E

STBD WING SURVEY

- Z L V

- X V V

I M U

W S B @

M C I U #

G R P B

P W R U P

A P C U 2 *

G R P B

P W R D N

- Z L V

- X V V

P O R T

W I N G

L O G

P O D *

L O A D

D A P S

A F T C / O

I ' C N C T $

POST SLEEP

PLT

SLEEP

MEAL

POST SLEEP

OMS

BURN

PORT WING SURVEY

M N V R

P O R T

NOSE CAP

SURVEY

CRYO

O2

SNSR

CK

F C P R G ^

MIDDECK XFER PREP

G R P B

P W R U P

G R P B

P W R D N

L O G

OMS

POD

SURV

POST

SLEEP

MS1

POST SLEEP

MINI

CAM

D/L

SLEEP

MEAL

POST SLEEP

OBSS UNBERTH

STBD WING SURVEY

PORT WING SURVEY

P / T V 0 1

V I D E O

S E T U P

R H C C / O

MS2

SLEEP

MEAL

POST SLEEP

NOSE CAP

SURVEY

EXERCISE

PORT

WING

SURVEY

PGSC SETUP

(PART II)

E M U *

PORT WING SURVEY

MS3

SLEEP

MEAL

POST SLEEP

OBSS UNBERTH

STBD WING SURVEY

ERG

SETUP

EMU

C/O

PREP

EMU C/O

L O G

E V A P R P

X F E RFRED

SETUP

EMU

DRK

BAG

FIL

MS4

SLEEP

MEAL

POST SLEEP

ERG

SETUP

EXERCISE

EMU

C/O

PREP

EMU C/O

G A L L E Y *

G A L L E Y #

NLP

VAC

ACT1

M D D K C K

EMU

DRNK

BAG

FILL

E V A P R P

X F E RCWC-I

S/U

P O S T

S L E E P

DAY/NIGHT

ORBIT

910

11

12

13

14

15

16

TDRS

W E Z

-ZLV -XVV

NC2

-ZLV -XVV

STBD SURVEY

NOSE SURVEY

PORT SURVEY

ORB ATT

@CNTLR SWAP

#FILTER CK

*DISABLE PWR TO OBSS

*A POD HTR RCNFG

$R OMS TO RCS

^MANUAL

*POWERUP & COMM CHECK

*OVERNIGHT CONFIG

#MORNING CONFIG

NOTES

2-4

FD02

NC2∆

ZAMK

A

VIRT

S

HIRE

PATR

ICK

ROBI

NSON

BEHN

KEN

(R1)

(R1)

(R1)

(R2)

(R2)

(R2)

(R3)

(R3)

(R3)

(R3)

(R3)

REPLANNED

S T S - 1 3 0 S T S

22

23

02/09

01

02

03

04

05

06

07

08

09

GMT 02/08/10 (039)

12

13

14

15

16

17

18

19

20

21

22

23

001/00

MET

Day 000

CDR

SLEEP

MEAL

OMS

BURN

NOSE CAP

SURVEY

M N V R

S T B D

M N V R

N O S E

STBD WING SURVEY

- Z L V

- X V V

I M U

W S B @

M C I U #

G R P B

P W R U P

A P C U 2 *

G R P B

P W R D N

- Z L V

- X V V

P O R T

W I N G

L O G

P O D *

L O A D

D A P S

A F T C / O

I ' C N C T $

POST SLEEP

PLT

SLEEP

MEAL

POST SLEEP

OMS

BURN

PORT WING SURVEY

M N V R

P O R T

NOSE CAP

SURVEY

CRYO

O2

SNSR

CK

F C P R G ^

MIDDECK XFER PREP

G R P B

P W R U P

G R P B

P W R D N

L O G

OMS

POD

SURV

POST

SLEEP

MS1

POST SLEEP

MINI

CAM

D/L

SLEEP

MEAL

POST SLEEP

OBSS UNBERTH

STBD WING SURVEY

PORT WING SURVEY

P / T V 0 1

V I D E O

S E T U P

R H C C / O

MS2

SLEEP

MEAL

POST SLEEP

NOSE CAP

SURVEY

EXERCISE

PORT

WING

SURVEY

PGSC SETUP

(PART II)

E M U *

PORT WING SURVEY

MS3

SLEEP

MEAL

POST SLEEP

OBSS UNBERTH

STBD WING SURVEY

ERG

SETUP

EMU

C/O

PREP

EMU C/O

L O G

E V A P R P

X F E RFRED

SETUP

EMU

DRK

BAG

FIL

MS4

SLEEP

MEAL

POST SLEEP

ERG

SETUP

EXERCISE

EMU

C/O

PREP

EMU C/O

G A L L E Y *

G A L L E Y #

NLP

VAC

ACT1

M D D K C K

EMU

DRNK

BAG

FILL

E V A P R P

X F E RCWC-I

S/U

P O S T

S L E E P

DAY/NIGHT

ORBIT

910

11

12

13

14

15

16

TDRS

W E ZORB ATT

-ZLV -XVV

NC2

-ZLV -XVV

STBD SURVEY

NOSE SURVEY

PORT SURVEY

NOTES

@CNTLR SWAP

#FILTER CK

*DISABLE PWR TO OBSS

*A POD HTR RCNFG

$R OMS TO RCS

^MANUAL

*POWERUP & COMM CHECK

*OVERNIGHT CONFIG

#MORNING CONFIG

3

Page 7: DISTRIBUTION 'Q' JOB NO. EXECUTE PACKAGE (STS-130/20A ... · distribution 'q' job no. _____ execute package (sts-130/20a) mission distribution list revised: 01/06/10 note: for any

02/08/10 16:43:32

FLT PLN/130/FLT

FD02

NC3∆

ZAMK

A

VIRT

S

HIRE

PATR

ICK

ROBI

NSON

BEHN

KEN

(R1)

(R2)

REPLANNED

MNVR

2-5

S T S - 1 3 0 S T S

10

11

12

13

14

15

16

17

18

19

20

21

GMT 02/09/10 (040)

001/00

01

02

03

04

05

06

07

08

09

10

11

12

MET

Day 001

CDR

SLEEP

EXERCISE

PMC

A/G

P R E

S L E E P

F U T M V R

A P C U 2 *

+X

RCS

BURN

- Z L V

- X V V

PRE SLEEP

F D C O N F

PRE SLEEP

I ' C N C T %

PLT

SLEEP

PRE SLEEP

OBSS BERTH

FILTER

CLEANING

+X

RCS

BURN

P R E

S L E E P

MS1

SLEEP

PRE SLEEP

OBSS BERTH

RNDZ TOOLS

C/O

FCMS

OPS

MS2

SLEEP

LDRI

D/L

RNDZ TOOLS

C/O

W L E S

O C A *

EVA PREP

FOR XFER

PRE SLEEP

MS3

SLEEP

PRE SLEEP

C/L

CMR

INSTL

D O C K I N G

R I N G

E X TEVA PRP XFER

MS4

SLEEP

PRE SLEEP

C/L

CMR

INSTL

D O C K I N G

R I N G

E X T

M D D K C K

EVA PRP XFER

T O N O P E NDAY/NIGHT

ORBIT

17

18

19

20

21

22

23

24

TDRS

W E Z

-ZLV -XVV

NC3

-ZLV -XVV

PROGRAMMATIC

-ZLV -XVV

ORB ATT

*REACT FOR N3 HTRS

%RETURN

*D/L RATE 48M PL MAX

(AFTER CREW CHOICE D/L)

NOTES

2-5

FD02

NC3∆

ZAMK

A

VIRT

S

HIRE

PATR

ICK

ROBI

NSON

BEHN

KEN

(R1)

(R2)

REPLANNED

MNVR

S T S - 1 3 0 S T S

10

11

12

13

14

15

16

17

18

19

20

21

GMT 02/09/10 (040)

001/00

01

02

03

04

05

06

07

08

09

10

11

12

MET

Day 001

CDR

SLEEP

EXERCISE

PMC

A/G

P R E

S L E E P

F U T M V R

A P C U 2 *

+X

RCS

BURN

- Z L V

- X V V

PRE SLEEP

F D C O N F

PRE SLEEP

I ' C N C T %

PLT

SLEEP

PRE SLEEP

OBSS BERTH

FILTER

CLEANING

+X

RCS

BURN

P R E

S L E E P

MS1

SLEEP

PRE SLEEP

OBSS BERTH

RNDZ TOOLS

C/O

FCMS

OPS

MS2

SLEEP

LDRI

D/L

RNDZ TOOLS

C/O

W L E S

O C A *

EVA PREP

FOR XFER

PRE SLEEP

MS3

SLEEP

PRE SLEEP

C/L

CMR

INSTL

D O C K I N G

R I N G

E X TEVA PRP XFER

MS4

SLEEP

PRE SLEEP

C/L

CMR

INSTL

D O C K I N G

R I N G

E X T

M D D K C K

EVA PRP XFER

T O N O P E NDAY/NIGHT

ORBIT

17

18

19

20

21

22

23

24

TDRS

W E ZORB ATT

-ZLV -XVV

NC3

-ZLV -XVV

PROGRAMMATIC

-ZLV -XVV

NOTES

*REACT FOR N3 HTRS

%RETURN

*D/L RATE 48M PL MAX

(AFTER CREW CHOICE D/L)

4

Page 8: DISTRIBUTION 'Q' JOB NO. EXECUTE PACKAGE (STS-130/20A ... · distribution 'q' job no. _____ execute package (sts-130/20a) mission distribution list revised: 01/06/10 note: for any

02/08/10 16:44:00

FLT PLN/130/FLT

ZAMK

AVI

RTS

HIRE

02

FD02 EZ ACTIVITIES:

√O

CAC

FILT

ER

TEPC (

STAT

US C

HECK

)

(OR

B OP

S, C

REW

SYS)

HA

RD R

EBOO

T AL

L PG

SCs

EXCE

PT:

S

TS-6

(WLE

S),S

TS-5

(RPO

P2),

&

OCA

ROU

TER.

REPLANNED

3-8

STS-

130

FD

22:00

23:00

00:00

01:00

GMT

Date

02/08

(039)

12:00

13:00

14:00

15:00

16:00

MET

Day 000

WE

Z

T D R S

~~

~

D / N

O R B 9 1 0 1 1

~ ~- Z L V - X V VS T S A T T

CDR

SLEEP

~

SLEEP LOGBOOK (ORB OPS, SDBI)

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

√ HUM SEP FOR H2O ACCUMULATION

~

PLT

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

SLEEP LOGBOOK (ORB OPS, SDBI)

P/TV08 EXTERNAL SURVEY

(PHOTO/TV, SCENES) OMS POD SURVEY

SETUP, Step 1. OPS, Item 1

Optimal Lighting: 15:16-15:57

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)~

MS1

DIGITAL VIA VTR (MINI CAM)

(CUE CARD, DIGITAL PLAYBACK)

KU TDRW: 15:37-16:03

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

Notes

3-8

ZAMK

AVI

RTS

HIRE

02

FD02 EZ ACTIVITIES:

√O

CAC

FILT

ER

TEPC (

STAT

US C

HECK

)

(OR

B OP

S, C

REW

SYS)

HA

RD R

EBOO

T AL

L PG

SCs

EXCE

PT:

S

TS-6

(WLE

S),S

TS-5

(RPO

P2),

&

OCA

ROU

TER.

REPLANNED

STS-

130

FD

22:00

23:00

00:00

01:00

GMT

Date

02/08

(039)

12:00

13:00

14:00

15:00

16:00

MET

Day 000

WE

Z

T D R SD / N

O R B 9 1 0 1 1

S T S A T T ~ ~- Z L V - X V V

CDR

~

SLEEP

SLEEP LOGBOOK (ORB OPS, SDBI)

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

√ HUM SEP FOR H2O ACCUMULATION

PLT

~

SLEEP

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

SLEEP LOGBOOK (ORB OPS, SDBI)

P/TV08 EXTERNAL SURVEY

(PHOTO/TV, SCENES) OMS POD SURVEY

SETUP, Step 1. OPS, Item 1

Optimal Lighting: 15:16-15:57

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

MS1

DIGITAL VIA VTR (MINI CAM)

(CUE CARD, DIGITAL PLAYBACK)

KU TDRW: 15:37-16:03~

SLEEP

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

Notes

5

Page 9: DISTRIBUTION 'Q' JOB NO. EXECUTE PACKAGE (STS-130/20A ... · distribution 'q' job no. _____ execute package (sts-130/20a) mission distribution list revised: 01/06/10 note: for any

02/08/10 16:44:00

FLT PLN/130/FLT

ROBI

NSON

PATR

ICK

BEHN

KEN

02 REPLANNED

3-9

STS-

130

FD

22:00

23:00

00:00

01:00

GMT

Date

02/08

(039)

12:00

13:00

14:00

15:00

16:00

MET

Day 000

WE

Z

T D R S

~~

~

D / N

O R B 9 1 0 1 1

~ ~- Z L V - X V VS T S A T T

MS2

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

MS3

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

SLEEP LOGBOOK (ORB OPS, SDBI)

MS4

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

Notes

3-9

ROBI

NSON

PATR

ICK

BEHN

KEN

02 REPLANNED

STS-

130

FD

22:00

23:00

00:00

01:00

GMT

Date

02/08

(039)

12:00

13:00

14:00

15:00

16:00

MET

Day 000

WE

Z

T D R SD / N

O R B 9 1 0 1 1

S T S A T T ~ ~- Z L V - X V V

MS2

~

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

MS3

~

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

SLEEP LOGBOOK (ORB OPS, SDBI)

MS4

~

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

Notes

6

Page 10: DISTRIBUTION 'Q' JOB NO. EXECUTE PACKAGE (STS-130/20A ... · distribution 'q' job no. _____ execute package (sts-130/20a) mission distribution list revised: 01/06/10 note: for any

02/08/10 16:44:00

FLT PLN/130/FLT

ZAMK

AVI

RTS

HIRE

02

OBSS UNBERTH

(PDRS, OBSS OPERATIONS)

A A14 RCS/OMS HTR L POD A - OFF

B - AUTO

R POD A - OFF

B - AUTO

REPLANNED

PRIOR PWRUP GRP B (ORB PKT, PRIOR PWRDN)

Steps 12 (IMU 2),6 (Dual G2)

3-10

STS-

130

FD

02:00

03:00

04:00

05:00

GMT

Date

02/09

(040)

16:00

17:00

18:00

19:00

20:00

MET

Day 000

WE

Z

T D R S

~ ~

~

~

D / N

O R B 1 1 1 2 1 3 1 4

~ - Z L V - X V V N C 2 - Z L V - X V V ~S T B D S U R V E YS T S A T T

CDR

ON-ORBIT OMS BURN

(ORB OPS, OMS)

< NC2 TIG (17:15)

MNVR (TRK) BIAS +YSI (STBD SURVEY)

TGT=4 BV=5 P=0 Y=40 OM=50

A14/AUTO/VERN, OBSS Unberth Cmplt, Init TRK

OBSS LDRI RCC SURVEY - STBD

(PDRS, OBSS OPERATIONS)

R3

~

MNVR (TRK) -ZLV -XVV

TGT=2 BV=3 OM=0

A1/AUTO/VERN, Init TRK

IMU STAR OF OPPTY ALIGN (ORB OPS, GNC)

R2 BLR CNTLR/HTR (three) - B

L17 Check MCIU filter screen

APCU 2: Disable Power to OBSS

A15 APCU 2 CONV - OFF

PRIOR PWRDN GRP B (ORB PKT, PRIOR PWRDN)

Steps 6(Single G2) & 12(IMU 2 STBY)

RCS/OMS POD HTR RECONFIG A

STS-130 DAP CONFIG

(ORB OPS, DAP TABLES)

AFT CONTROLLER C/O

(ORB OPS, GNC)

I'CNCT: R OMS to RCS (OPCL, RCS)

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

√ HUM SEP FOR H2O ACCUMULATION

~

PLT

MEAL

~

ON-ORBIT OMS BURN

(ORB OPS, OMS)

CRYO 02 TANK HEATER SENSOR CHECK

(ORB OPS, EPS)

FC PURGE - MANUAL

(ORB OPS, EPS)

MIDDECK TRANSFER PREP

PRIOR PWRUP GRP B(ORB PKT, PRIOR PWRDN)

Steps 12 (IMU 2),6 (Dual G2)

PRIOR PWRDN GRP B (ORB PKT, PRIOR PWRDN)

Steps 6(Single G2) & 12(IMU 2 STBY)

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

MS1

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

OBSS LDRI RCC SURVEY - STBD

(PDRS, OBSS OPERATIONS)

R1

~

P/TV01 VIDEO SETUP

(PHOTO/TV, SCENES)

RHC C/O Ref. MSG 003, Item 2

UPDATE

ORBITAL MNVR

PAD

Notes

3-10

ZAMK

AVI

RTS

HIRE

02

OBSS UNBERTH

(PDRS, OBSS OPERATIONS)

A A14 RCS/OMS HTR L POD A - OFF

B - AUTO

R POD A - OFF

B - AUTO

REPLANNED

PRIOR PWRUP GRP B (ORB PKT, PRIOR PWRDN)

Steps 12 (IMU 2),6 (Dual G2)

STS-

130

FD

02:00

03:00

04:00

05:00

GMT

Date

02/09

(040)

16:00

17:00

18:00

19:00

20:00

MET

Day 000

WE

Z

T D R SD / N

O R B 1 1 1 2 1 3 1 4

S T S A T T ~ - Z L V - X V V N C 2 - Z L V - X V V ~S T B D S U R V E Y

CDR

ON-ORBIT OMS BURN

(ORB OPS, OMS)

< NC2 TIG (17:15)

MNVR (TRK) BIAS +YSI (STBD SURVEY)

TGT=4 BV=5 P=0 Y=40 OM=50

A14/AUTO/VERN, OBSS Unberth Cmplt, Init TRK

~

OBSS LDRI RCC SURVEY - STBD

(PDRS, OBSS OPERATIONS)

R3

MNVR (TRK) -ZLV -XVV

TGT=2 BV=3 OM=0

A1/AUTO/VERN, Init TRK

IMU STAR OF OPPTY ALIGN (ORB OPS, GNC)

R2 BLR CNTLR/HTR (three) - B

L17 Check MCIU filter screen

APCU 2: Disable Power to OBSS

A15 APCU 2 CONV - OFF

PRIOR PWRDN GRP B (ORB PKT, PRIOR PWRDN)

Steps 6(Single G2) & 12(IMU 2 STBY)

RCS/OMS POD HTR RECONFIG A

STS-130 DAP CONFIG

(ORB OPS, DAP TABLES)

AFT CONTROLLER C/O

(ORB OPS, GNC)

I'CNCT: R OMS to RCS (OPCL, RCS)

~POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

√ HUM SEP FOR H2O ACCUMULATION

PLT

~MEAL

ON-ORBIT OMS BURN

(ORB OPS, OMS)

CRYO 02 TANK HEATER SENSOR CHECK

(ORB OPS, EPS)

FC PURGE - MANUAL

(ORB OPS, EPS)

MIDDECK TRANSFER PREP

PRIOR PWRUP GRP B(ORB PKT, PRIOR PWRDN)

Steps 12 (IMU 2),6 (Dual G2)

PRIOR PWRDN GRP B (ORB PKT, PRIOR PWRDN)

Steps 6(Single G2) & 12(IMU 2 STBY)

~POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

MS1

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

OBSS LDRI RCC SURVEY - STBD

(PDRS, OBSS OPERATIONS)

R1

P/TV01 VIDEO SETUP

(PHOTO/TV, SCENES)

RHC C/O Ref. MSG 003, Item 2

Notes

UPDATE

ORBITAL MNVR

PAD

7

Page 11: DISTRIBUTION 'Q' JOB NO. EXECUTE PACKAGE (STS-130/20A ... · distribution 'q' job no. _____ execute package (sts-130/20a) mission distribution list revised: 01/06/10 note: for any

02/08/10 16:44:00

FLT PLN/130/FLT

ROBI

NSON

PATR

ICK

BEHN

KEN

02

NLP ACTIVATION(ASSY OPS, P/L)

Activate GAPs A-P

REPLANNED

DIDB FILL -Fill 2 DIDBs from Bag "G" using

galley cold water. Remove gas. Dispose fill

tool in wet trash. Temp stow DIDBs in A/L.

3-11

STS-

130

FD

02:00

03:00

04:00

05:00

GMT

Date

02/09

(040)

16:00

17:00

18:00

19:00

20:00

MET

Day 000

WE

Z

T D R S

~ ~

~

~

D / N

O R B 1 1 1 2 1 3 1 4

~ - Z L V - X V V N C 2 - Z L V - X V V ~S T B D S U R V E YS T S A T T

MS2

MEAL

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

EXERCISE

PGSC SETUP (PART II)

Setup the following:

PGSC NETWORK (ORB OPS, PGSC)

Setup remaining PGSCs

PGSC HARD DISK LATE UPDATE

(ORB OPS, PGSC)

Update remaining PGSCs

Ref. MSG 003, Item 3

MS3

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

OBSS UNBERTH

(PDRS, OBSS OPERATIONS)

OBSS LDRI RCC SURVEY - STBD

(PDRS, OBSS OPERATIONS)

R2

~

CYCLE ERGOMETER OPS

(ORB OPS, CREW SYS)

Perform ERGOMETER SETUP

FRED SETUP

(ORB OPS, FRED)

(Locker: MF71K)

MS4

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

CYCLE ERGOMETER OPS

(ORB OPS, CREW SYS)

Perform ERGOMETER SETUP

EXERCISE

~

GALLEY OVERNIGHT CONFIG (ORB OPS,ECLS)

√All EVA drink bag fills complete,THEN:

GALLEY MORNING CONFIG (ORB OPS,ECLS)

GLACIER STATUS CHECK (ASSY OPS,CC)

DIDB FILL

Fill 2 DIDBs from Bag "G" using galley

cold water. Remove gas. Dispose of fill

tool in wet trash. Temp stow DIDBs in A/L.

CWC-I FILL (ORB OPS, CWC OPS)

Parts A-C

Setup, Purge, and Teardown

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

Notes

3-11

ROBI

NSON

PATR

ICK

BEHN

KEN

02

NLP ACTIVATION(ASSY OPS, P/L)

Activate GAPs A-P

REPLANNED

DIDB FILL -Fill 2 DIDBs from Bag "G" using

galley cold water. Remove gas. Dispose fill

tool in wet trash. Temp stow DIDBs in A/L.

STS-

130

FD

02:00

03:00

04:00

05:00

GMT

Date

02/09

(040)

16:00

17:00

18:00

19:00

20:00

MET

Day 000

WE

Z

T D R SD / N

O R B 1 1 1 2 1 3 1 4

S T S A T T ~ - Z L V - X V V N C 2 - Z L V - X V V ~S T B D S U R V E Y

MS2

~MEAL

~POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

EXERCISE

PGSC SETUP (PART II)

Setup the following:

PGSC NETWORK (ORB OPS, PGSC)

Setup remaining PGSCs

PGSC HARD DISK LATE UPDATE

(ORB OPS, PGSC)

Update remaining PGSCs

Ref. MSG 003, Item 3

MS3

~POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

OBSS UNBERTH

(PDRS, OBSS OPERATIONS)

~

OBSS LDRI RCC SURVEY - STBD

(PDRS, OBSS OPERATIONS)

R2

CYCLE ERGOMETER OPS

(ORB OPS, CREW SYS)

Perform ERGOMETER SETUP

FRED SETUP

(ORB OPS, FRED)

(Locker: MF71K)

MS4

~POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

CYCLE ERGOMETER OPS

(ORB OPS, CREW SYS)

Perform ERGOMETER SETUP

~

EXERCISE

GALLEY OVERNIGHT CONFIG (ORB OPS,ECLS)

√All EVA drink bag fills complete,THEN:

GALLEY MORNING CONFIG (ORB OPS,ECLS)

GLACIER STATUS CHECK (ASSY OPS,CC)

DIDB FILL

Fill 2 DIDBs from Bag "G" using galley

cold water. Remove gas. Dispose of fill

tool in wet trash. Temp stow DIDBs in A/L.

CWC-I FILL (ORB OPS, CWC OPS)

Parts A-C

Setup, Purge, and Teardown

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

Notes

8

Page 12: DISTRIBUTION 'Q' JOB NO. EXECUTE PACKAGE (STS-130/20A ... · distribution 'q' job no. _____ execute package (sts-130/20a) mission distribution list revised: 01/06/10 note: for any

02/08/10 16:44:00

FLT PLN/130/FLT

ZAMK

AVI

RTS

HIRE

02 REPLANNED

3-12

STS-

130

FD

06:00

07:00

08:00

09:00

GMT

Date

02/09

(040)

20:00

21:00

22:00

23:00

00:00

MET

Day 000

WE

Z

T D R S

~ ~~

~

D / N

O R B 1 4 1 5 1 6

~ N O S E S U R V E Y P O R T S U R V E Y ~S T S A T T

CDR

MEAL

OBSS LDRI RCC SURVEY - NOSE CAP

(PDRS, OBSS OPERATIONS)

R1

MNVR (TRK) BIAS +XSI (NOSE CAP SURVEY)

TGT=4 BV=5 P=331 Y=0 OM=105

A14/AUTO/VERN,RCC Srvy-STBD cmplt,Int TRK

OBSS LDRI RCC SURVEY - STBD

(PDRS, OBSS OPERATIONS)

R3

~

MNVR (TRK) -ZLV -XVV

TGT=2 BV=3 OM=0

A14/AUTO/VERN, Init TRK

OBSS LDRI RCC SURVEY - PORT

(PDRS, OBSS OPERATIONS)

R3

PLT

MEAL

~

OBSS LDRI RCC SURVEY - PORT

(PDRS, OBSS OPERATIONS)

R1

MNVR (TRK) BIAS -YSI (PORT SURVEY)

TGT=4 BV=5 P=0 Y=323 OM=95

A14/AUTO/VERN,RCC Srvy-PORT step 3 cmplt,Int TRK

OBSS LDRI RCC SURVEY - NOSE CAP

(PDRS, OBSS OPERATIONS)

R3

MS1

MEAL

OBSS LDRI RCC SURVEY - STBD

(PDRS, OBSS OPERATIONS)

R1

~

OBSS LDRI RCC SURVEY - PORT

(PDRS, OBSS OPERATIONS)

R2

Notes

3-12

ZAMK

AVI

RTS

HIRE

02 REPLANNED

STS-

130

FD

06:00

07:00

08:00

09:00

GMT

Date

02/09

(040)

20:00

21:00

22:00

23:00

00:00

MET

Day 000

WE

Z

T D R SD / N

O R B 1 4 1 5 1 6

S T S A T T ~ N O S E S U R V E Y P O R T S U R V E Y ~

CDR

MEAL

OBSS LDRI RCC SURVEY - NOSE CAP

(PDRS, OBSS OPERATIONS)

R1

MNVR (TRK) BIAS +XSI (NOSE CAP SURVEY)

TGT=4 BV=5 P=331 Y=0 OM=105

A14/AUTO/VERN,RCC Srvy-STBD cmplt,Int TRK

~OBSS LDRI RCC SURVEY - STBD

(PDRS, OBSS OPERATIONS)

R3

MNVR (TRK) -ZLV -XVV

TGT=2 BV=3 OM=0

A14/AUTO/VERN, Init TRK

OBSS LDRI RCC SURVEY - PORT

(PDRS, OBSS OPERATIONS)

R3

PLT

~

MEAL

OBSS LDRI RCC SURVEY - PORT

(PDRS, OBSS OPERATIONS)

R1

MNVR (TRK) BIAS -YSI (PORT SURVEY)

TGT=4 BV=5 P=0 Y=323 OM=95

A14/AUTO/VERN,RCC Srvy-PORT step 3 cmplt,Int TRK

OBSS LDRI RCC SURVEY - NOSE CAP

(PDRS, OBSS OPERATIONS)

R3

MS1

MEAL

~OBSS LDRI RCC SURVEY - STBD

(PDRS, OBSS OPERATIONS)

R1

OBSS LDRI RCC SURVEY - PORT

(PDRS, OBSS OPERATIONS)

R2

Notes

9

Page 13: DISTRIBUTION 'Q' JOB NO. EXECUTE PACKAGE (STS-130/20A ... · distribution 'q' job no. _____ execute package (sts-130/20a) mission distribution list revised: 01/06/10 note: for any

02/08/10 16:44:00

FLT PLN/130/FLT

ROBI

NSON

PATR

ICK

BEHN

KEN

02 REPLANNED

3-13

STS-

130

FD

06:00

07:00

08:00

09:00

GMT

Date

02/09

(040)

20:00

21:00

22:00

23:00

00:00

MET

Day 000

WE

Z

T D R S

~ ~~

~

D / N

O R B 1 4 1 5 1 6

~ N O S E S U R V E Y P O R T S U R V E Y ~S T S A T T

MS2

MEAL

~

OBSS LDRI RCC SURVEY - NOSE CAP

(PDRS, OBSS OPERATIONS)

R2

OBSS LDRI RCC SURVEY - PORT

(PDRS, OBSS OPERATIONS)

R3

EMU CHECKOUT (EVA, CHECKOUTS)

EMU P/U&COMM CK Steps10-14,19-23,94,95,99

OBSS LDRI RCC SURVEY - PORT

(PDRS, OBSS OPERATIONS)

R3

MS3

MEAL

OBSS LDRI RCC SURVEY - STBD

(PDRS, OBSS OPERATIONS)

R2

~

EMU CHECKOUT PREP

(EVA, AIRLOCK CONFIG)

EMU CHECKOUT

(EVA, CHECKOUTS)

EVA PREP FOR TRANSFER TO ISS

(EVA, AIRLOCK CONFIG) ~

MS4

MEAL

EXERCISE

~

EMU CHECKOUT PREP

(EVA, AIRLOCK CONFIG)

EMU CHECKOUT

(EVA, CHECKOUTS)

EVA PREP FOR TRANSFER TO ISS

(EVA, AIRLOCK CONFIG) ~

Notes

3-13

ROBI

NSON

PATR

ICK

BEHN

KEN

02 REPLANNED

STS-

130

FD

06:00

07:00

08:00

09:00

GMT

Date

02/09

(040)

20:00

21:00

22:00

23:00

00:00

MET

Day 000

WE

Z

T D R SD / N

O R B 1 4 1 5 1 6

S T S A T T ~ N O S E S U R V E Y P O R T S U R V E Y ~

MS2

~

MEAL

OBSS LDRI RCC SURVEY - NOSE CAP

(PDRS, OBSS OPERATIONS)

R2

OBSS LDRI RCC SURVEY - PORT

(PDRS, OBSS OPERATIONS)

R3

EMU CHECKOUT (EVA, CHECKOUTS)

EMU P/U&COMM CK Steps10-14,19-23,94,95,99

OBSS LDRI RCC SURVEY - PORT

(PDRS, OBSS OPERATIONS)

R3

MS3

MEAL

~OBSS LDRI RCC SURVEY - STBD

(PDRS, OBSS OPERATIONS)

R2

EMU CHECKOUT PREP

(EVA, AIRLOCK CONFIG)

EMU CHECKOUT

(EVA, CHECKOUTS)

~

EVA PREP FOR TRANSFER TO ISS

(EVA, AIRLOCK CONFIG)

MS4

MEAL

~

EXERCISE

EMU CHECKOUT PREP

(EVA, AIRLOCK CONFIG)

EMU CHECKOUT

(EVA, CHECKOUTS)

~

EVA PREP FOR TRANSFER TO ISS

(EVA, AIRLOCK CONFIG)

Notes

10

Page 14: DISTRIBUTION 'Q' JOB NO. EXECUTE PACKAGE (STS-130/20A ... · distribution 'q' job no. _____ execute package (sts-130/20a) mission distribution list revised: 01/06/10 note: for any

02/08/10 16:44:00

FLT PLN/130/FLT

ZAMK

AVI

RTS

HIRE

02

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

APCU 2: React for Node 3 Heaters

A15 APCU 2 CONV - ON

REPLANNED

I'CNCT RETURN (OPS 2,3) (OPCL, RCS)

EXERCISE

3-14

STS-

130

FD

10:00

11:00

12:00

13:00

GMT

Date

02/09

(040)

00:00

01:00

02:00

03:00

04:00

MET

Day 001

WE

Z

T D R S

~~ ~~

D / N

O R B 1 7 1 8 1 9

~ - Z L V - X V V N C 3 ~- Z L V - X V VS T S A T T

CDR

PRIVATE MEDICAL CONFERENCE

L9 PAYLOAD STATION A/G (two) - OFF

Perform via A/G2

FUTURE LOADED MNVR (INRTL)

R=35 P=344 Y=48

A1/AUTO/VERN, (04:17) Init TRK

ON-ORBIT +X RCS BURN

(ORB OPS, RCS)

< NC3 TIG (02:28)

MNVR (TRK) -ZLV -XVV

TGT=2 BV=3 OM=0

A1/AUTO/VERN, Init TRK

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

FLIGHT DIRECTOR CONFERENCE

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

PLT

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

OBSS BERTH

(PDRS, OBSS OPERATIONS)

R1

FILTER CLEANING

(IFM, SCHEDULED MAINTENANCE)

ON-ORBIT +X RCS BURN

(ORB OPS, RCS)

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

MS1

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

OBSS BERTH

(PDRS, OBSS OPERATIONS)

R2

RNDZ TOOLS CHECKOUT

(RNDZ, RNDZ TOOLS)

FC MONITORING SYS (FCMS) OPS

(ORB OPS, EPS)

TFL 192

TFL 188

Notes

3-14

ZAMK

AVI

RTS

HIRE

02

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

APCU 2: React for Node 3 Heaters

A15 APCU 2 CONV - ON

REPLANNED

I'CNCT RETURN (OPS 2,3) (OPCL, RCS)

EXERCISE

STS-

130

FD

10:00

11:00

12:00

13:00

GMT

Date

02/09

(040)

00:00

01:00

02:00

03:00

04:00

MET

Day 001

WE

Z

T D R SD / N

O R B 1 7 1 8 1 9

S T S A T T ~ - Z L V - X V V N C 3 ~- Z L V - X V V

CDR

PRIVATE MEDICAL CONFERENCE

L9 PAYLOAD STATION A/G (two) - OFF

Perform via A/G2

FUTURE LOADED MNVR (INRTL)

R=35 P=344 Y=48

A1/AUTO/VERN, (04:17) Init TRK

ON-ORBIT +X RCS BURN

(ORB OPS, RCS)

< NC3 TIG (02:28)

MNVR (TRK) -ZLV -XVV

TGT=2 BV=3 OM=0

A1/AUTO/VERN, Init TRK

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

FLIGHT DIRECTOR CONFERENCE

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

PLT

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

OBSS BERTH

(PDRS, OBSS OPERATIONS)

R1

FILTER CLEANING

(IFM, SCHEDULED MAINTENANCE)

ON-ORBIT +X RCS BURN

(ORB OPS, RCS)

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

MS1

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

OBSS BERTH

(PDRS, OBSS OPERATIONS)

R2

RNDZ TOOLS CHECKOUT

(RNDZ, RNDZ TOOLS)

FC MONITORING SYS (FCMS) OPS

(ORB OPS, EPS)

Notes

TFL 192

TFL 188

11

Page 15: DISTRIBUTION 'Q' JOB NO. EXECUTE PACKAGE (STS-130/20A ... · distribution 'q' job no. _____ execute package (sts-130/20a) mission distribution list revised: 01/06/10 note: for any

02/08/10 16:44:00

FLT PLN/130/FLT

ROBI

NSON

PATR

ICK

BEHN

KEN

02

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

REPLANNED

3-15

STS-

130

FD

10:00

11:00

12:00

13:00

GMT

Date

02/09

(040)

00:00

01:00

02:00

03:00

04:00

MET

Day 001

WE

Z

T D R S

~~ ~~

D / N

O R B 1 7 1 8 1 9

~ - Z L V - X V V N C 3 ~- Z L V - X V VS T S A T T

MS2

DIGITAL VIA VTR

(CUE CARD, DIGITAL PLAYBACK)

LDRI SURVEYS

KU TDRE: 23:43-00:39

Gibmal Flip: 00:10

Ref. MSG 003, Item 7

RNDZ TOOLS CHECKOUT

(RNDZ, RNDZ TOOLS)

WLES RNDZ TOOLS C/O PREP(ORB OPS,WLE SNSRS)

RECONFIGURE OCA DOWNLINK RATE (PL MAX)

(ORB OPS, PGSC) Part C (Omit step 4)

*Perform after Crew Choice D/L

EVA PREP FOR TRANSFER TO ISS

(EVA, AIRLOCK CONFIG) ~

MS3

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

C/L CAMR INSTALL

(PHOTO/TV, REF PROC)

DOCKING MECH INITIALIZATION

DOCKING MECH POWERUP

DOCKING RING EXTENSION

DOCKING MECH POWERDOWN

(RNDZ, APDS)

EVA PREP FOR TRANSFER TO ISS

(EVA, AIRLOCK CONFIG)~

MS4

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

C/L CAMR INSTALL

(PHOTO/TV, REF PROC)

DOCKING MECH INITIALIZATION

DOCKING MECH POWERUP

DOCKING RING EXTENSION

DOCKING MECH POWERDOWN

(RNDZ, APDS)

GLACIER STATUS CHECK (ASSY OPS,CC)

EVA PREP FOR TRANSFER TO ISS

(EVA, AIRLOCK CONFIG)~

TONOPEN - Locker: MF57G

TFL 192

TFL 188

Notes

3-15

ROBI

NSON

PATR

ICK

BEHN

KEN

02

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

REPLANNED

STS-

130

FD

10:00

11:00

12:00

13:00

GMT

Date

02/09

(040)

00:00

01:00

02:00

03:00

04:00

MET

Day 001

WE

Z

T D R SD / N

O R B 1 7 1 8 1 9

S T S A T T ~ - Z L V - X V V N C 3 ~- Z L V - X V V

MS2

DIGITAL VIA VTR

(CUE CARD, DIGITAL PLAYBACK)

LDRI SURVEYS

KU TDRE: 23:43-00:39

Gibmal Flip: 00:10

Ref. MSG 003, Item 7

RNDZ TOOLS CHECKOUT

(RNDZ, RNDZ TOOLS)

WLES RNDZ TOOLS C/O PREP(ORB OPS,WLE SNSRS)

RECONFIGURE OCA DOWNLINK RATE (PL MAX)

(ORB OPS, PGSC) Part C (Omit step 4)

*Perform after Crew Choice D/L

EVA PREP FOR TRANSFER TO ISS

(EVA, AIRLOCK CONFIG) ~

MS3

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

C/L CAMR INSTALL

(PHOTO/TV, REF PROC)

DOCKING MECH INITIALIZATION

DOCKING MECH POWERUP

DOCKING RING EXTENSION

DOCKING MECH POWERDOWN

(RNDZ, APDS)

~EVA PREP FOR TRANSFER TO ISS

(EVA, AIRLOCK CONFIG)

MS4

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

C/L CAMR INSTALL

(PHOTO/TV, REF PROC)

DOCKING MECH INITIALIZATION

DOCKING MECH POWERUP

DOCKING RING EXTENSION

DOCKING MECH POWERDOWN

(RNDZ, APDS)

GLACIER STATUS CHECK (ASSY OPS,CC)

~EVA PREP FOR TRANSFER TO ISS

(EVA, AIRLOCK CONFIG)

TONOPEN - Locker: MF57G

Notes

TFL 192

TFL 188

12

Page 16: DISTRIBUTION 'Q' JOB NO. EXECUTE PACKAGE (STS-130/20A ... · distribution 'q' job no. _____ execute package (sts-130/20a) mission distribution list revised: 01/06/10 note: for any

02/08/10 16:44:00

FLT PLN/130/FLT

ZAMK

AVI

RTS

HIRE

02

CREW WAKE AT 01/13:00

REPLANNED

3-16

STS-

130

FD

14:00

15:00

16:00

17:00

GMT

Date

02/09

(040)

04:00

05:00

06:00

07:00

08:00

MET

Day 001

WE

Z

T D R S

~

~ ~

~

D / N

O R B 1 9 2 0 2 1 2 2

~ P R O G R A M M A T I C ~- Z L V - X V VS T S A T T

CDR

SLEEP

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

PLT

SLEEP

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

MS1

SLEEP

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

Notes

3-16

ZAMK

AVI

RTS

HIRE

02

CREW WAKE AT 01/13:00

REPLANNED

STS-

130

FD

14:00

15:00

16:00

17:00

GMT

Date

02/09

(040)

04:00

05:00

06:00

07:00

08:00

MET

Day 001

WE

Z

T D R SD / N

O R B 1 9 2 0 2 1 2 2

S T S A T T ~ P R O G R A M M A T I C ~- Z L V - X V V

CDR

~

SLEEP

~PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

PLT

~

SLEEP

~PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

MS1

~

SLEEP

~PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

Notes

13

Page 17: DISTRIBUTION 'Q' JOB NO. EXECUTE PACKAGE (STS-130/20A ... · distribution 'q' job no. _____ execute package (sts-130/20a) mission distribution list revised: 01/06/10 note: for any

02/08/10 16:44:00

FLT PLN/130/FLT

ROBI

NSON

PATR

ICK

BEHN

KEN

02

CREW WAKE AT 01/13:00

REPLANNED

3-17

STS-

130

FD

14:00

15:00

16:00

17:00

GMT

Date

02/09

(040)

04:00

05:00

06:00

07:00

08:00

MET

Day 001

WE

Z

T D R S

~

~ ~

~

D / N

O R B 1 9 2 0 2 1 2 2

~ P R O G R A M M A T I C ~- Z L V - X V VS T S A T T

MS2

SLEEP

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

MS3

SLEEP

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

MS4

SLEEP

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

Notes

3-17

ROBI

NSON

PATR

ICK

BEHN

KEN

02

CREW WAKE AT 01/13:00

REPLANNED

STS-

130

FD

14:00

15:00

16:00

17:00

GMT

Date

02/09

(040)

04:00

05:00

06:00

07:00

08:00

MET

Day 001

WE

Z

T D R SD / N

O R B 1 9 2 0 2 1 2 2

S T S A T T ~ P R O G R A M M A T I C ~- Z L V - X V V

MS2

~

SLEEP

~PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

MS3

~

SLEEP

~PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

MS4

~

SLEEP

~PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

Notes

14

Page 18: DISTRIBUTION 'Q' JOB NO. EXECUTE PACKAGE (STS-130/20A ... · distribution 'q' job no. _____ execute package (sts-130/20a) mission distribution list revised: 01/06/10 note: for any

MSG 004A - FD02 MISSION SUMMARY

1 2 3 4 5 6 7 8 9

10 11

Good Morning Endeavor!!!! Yesterday’s launch was awesome! It lit up the sky all along the Florida coast! Because of your outstanding work yesterday, STS 130 is off to a grand start! Have a great inspection day!!! YOUR CURRENT ORBIT IS: 181 X 111 NM NOTAMS: 12

13 14 15 16 17 18 19 20 21 22 23 24 25

EDW - TEMP RWY IN USE. PERM RWY CLOSED FOR CONSTRUCTION. EDW - LAKEBED RWYS RED. NOR - LAKEBED RWYS RED. DRYING OUT. WAL- CLOSED. ZZA - ARRESTING NET INSTALLED 40M FROM END OF RWY 30L. ESN - RWY 03R/21L CLOSED. 03L/21R USABLE. YYR - DME CH12O UNSERVICEABLE. GUA - RWY 06L/24R RWY END LIGHTS OUT OF SERVICE. PTN - CLOSED FOR RUNWAY CONSTRUCTION. IKF - NOT USABLE. NO AGREEMENT. BEN - NOT RECOMMENDED/NOT SUPPORTED.

NEXT 2 PLS OPPORTUNITIES: 26

27 28 29 30

KSC15 ORB 17 – 1/00:50 SCT030 SCT200 7 140/6P11 NOR17 ORB 32 – 2/01:06 SCT050 BKN150 7 130/7P12 OMS TANK FAIL CAPABILITY: 31

32 33 34 35 36 37 38 39 40 41

PRE NC-4: L OMS FAILS: YES; SEE OOP WINDOW BELOW R OMS FAILS: YES; SEE OOP WINDOW BELOW POST NC-4: L OMS FAILS: NO R OMS FAILS: NO LEAKING OMS PRPLT BURN: 42

43 44 45 46 47 48 49 50 51

PRE NC-4: L OMS LEAK: BURN OOP AN+70 <= TIG <= AN+33 R OMS LEAK: BURN OOP AN+74 <= TIG <= AN+31 POST NC-4: L OMS LEAK: ALWAYS BURN RETROGRADE R OMS LEAK: ALWAYS BURN RETROGRADE

END OF PAGE 1 OF 2, MSG 004A 15

Page 19: DISTRIBUTION 'Q' JOB NO. EXECUTE PACKAGE (STS-130/20A ... · distribution 'q' job no. _____ execute package (sts-130/20a) mission distribution list revised: 01/06/10 note: for any

MSG 004A - FD02 MISSION SUMMARY

END OF PAGE 2 OF 2, MSG 004A

OMS QUANTITIES(%) 1 2 3 4 5 6 7 8 9

10 11

PRE NC-4: L OMS OX = 33.7 R OMS OX = 32.1 FU = 33.4 FU = 31.9 POST NC-4 : L OMS OX = 32.1 R OMS OX = 30.7 FU = 31.8 FU = 30.6 DELTA V AVAILABLE: 12 PRE NC-4 POST NC-4 13

14 15

OMS 300 FPS 285 FPS ARCS (TOTAL ABOVE QTY1) 55 FPS 50 FPS 16

17 18 19 20 21 22 23 24 25 26 27

TOTAL IN THE AFT 355 FPS 335 FPS ARCS (TOTAL ABOVE QTY2) 84 FPS 79 FPS FRCS (ABOVE QTY 1) 41 FPS 40 FPS AFT QTY 1 88 % 87 % AFT QTY 2 50 % 49 % SYSTEM FAILURE IMPACT WORK AROUND

PDRS Transient MDA Demand Voltage BITE for WP in Direct Drive

Autobrakes are set RMS SEL - OFF then PORT to clear transient BITE

OMS LOMS GN2 Accumulator Leak

Potential for Crew Alarm

Periodic represses may be required to avoid alarm

28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43

16

Page 20: DISTRIBUTION 'Q' JOB NO. EXECUTE PACKAGE (STS-130/20A ... · distribution 'q' job no. _____ execute package (sts-130/20a) mission distribution list revised: 01/06/10 note: for any

MSG 006 - REF DATA FS UPDATES Page 1 of 16

END OF PAGE 1 OF 16, MSG 006

LOCKER STOWAGE

STS-130 FLT DECK STOWAGE ...................................... FS 1-2 STS-130 MIDDECK STOWAGE ....................................... FS 1-4 STS-130 LIGHTWEIGHT MAR ......................................... FS 1-13 STS-130 CONSUMABLES ............................................... FS 1-14

LOC

KER

17

Page 21: DISTRIBUTION 'Q' JOB NO. EXECUTE PACKAGE (STS-130/20A ... · distribution 'q' job no. _____ execute package (sts-130/20a) mission distribution list revised: 01/06/10 note: for any

STS-

130

FLT

DEC

K S

TOW

AG

E

01/2

5/10

FS 1

-2

R

EF/

130/

FIN

C4A

FD

F C

4F

FDF

R3A

FD

F R

3F

FDF

L10

UPP

ER

A

VIU

C

able

, Dig

ital C

C to

Vid

eo P

wr,

15 ft

C

able

, DTV

IEEE

139

4 4-

Pin

to F

emal

e C

able

, DTV

IEEE

139

4 4-

Pin

to M

ale

Cab

le, M

PC

to D

TV M

ux, 3

ft

Cab

le, M

PC

to D

TV M

ux, 9

ft

Cab

le, P

PO

V T

eac

Wye

(Pre

rout

ed)

MP

C

Pw

r Sup

ply,

MP

C

Tape

, Dig

ital V

ideo

(171

) Ta

pe, S

ony

Vid

eo (1

4)

VP

U P

lug,

Gre

en

L10

LOW

ER

C

able

, 12V

DC

Circ

ular

to X

LR

Cab

le, B

alan

ced

Vid

eo

Cab

le, B

NC

to B

NC

(4)

Cab

le, B

NC

to R

CA

(3)

Cab

le, D

TV IE

EE 1

394

4-Pi

n to

Mal

e C

able

, VIP

ATU

I/F

Cab

le, V

IP P

wr

DTV

MU

X V

IP

VTR

(w/T

ape

inst

alle

d)

L11

OIU

P

DIP

2

L12

PD

IP 1

S

SP

-1/S

SP

-2

R12

O

BS

S/O

PP

VP

U

A16

B

ag, C

amer

a A

dapt

er, F

lash

Car

d (4

) B

att D

oor (

Spa

re)

Cab

le, S

hutte

r Rel

ease

w/E

xten

sion

C

ard,

DC

S 7

60 (7

) C

lean

ing

Solu

tion

Cov

er, E

yepi

ece

Dry

Wip

e (2

) Fl

ash/

Diff

user

Le

ns, 1

0.5m

m

Lens

, 17-

35m

m

Lens

, 24-

50m

m (2

) Le

ns, 2

8-70

mm

Le

ns, 2

8mm

Le

ns, 3

5mm

w/F

ilter

Le

ns, 8

0-20

0mm

Th

erm

al B

lank

et, E

VA

B

rack

et, M

ultiu

se (2

) C

able

, PG

SC

DC

Pw

r, 10

ft

Cab

le, P

GS

C D

C P

wr,

6 ft

Cla

mp,

Mul

tiuse

(2)

Com

pute

r Des

k, In

fligh

t (2)

Le

g B

ar, F

RE

D

PILO

T H

and

Con

trolle

r Bu

ngee

(2)

Cab

le, P

ILO

T R

S-2

32 P

wr/D

ata

Y

Tie

Wra

p (1

0)

Pw

r Sup

ply,

DC

LOC

KER

18

Page 22: DISTRIBUTION 'Q' JOB NO. EXECUTE PACKAGE (STS-130/20A ... · distribution 'q' job no. _____ execute package (sts-130/20a) mission distribution list revised: 01/06/10 note: for any

STS-

130

FLT

DEC

K S

TOW

AG

E (C

ont)

01/2

5/10

FS 1

-3

R

EF/

130/

FIN

A17

B

ag, D

TV C

amco

rder

A

dapt

er, A

31p

Vid

eo

Ada

pter

, BN

C-T

B

AL/

UN

BA

L Tr

ansf

orm

er

Bino

cula

rs (2

) B

rack

et, H

UD

C

able

, AV

IU C

C

Cab

le, A

VIU

Vid

eo

Cab

le, B

alan

ced

Vid

eo

Cab

le, B

NC

Vid

eo (2

) C

able

, BP

SM

U A

/V P

atch

C

able

, Con

verte

r, IV

A 1

394

Cab

le, I

EE

E 1

394

4-P

in F

irew

ire

Cab

le, I

EE

E 1

394,

15

ft C

able

, IE

EE

139

4, C

rew

C

able

, Min

i-Cam

Ext

ensi

on

Cab

le, M

ini-C

am O

n-O

rbit

Cab

le, M

ini-C

am/A

VIU

Ada

pter

C

able

, Mon

itor t

o V

IU/C

M, 2

0 ft

Cab

le, P

CM

CIA

to W

IB-R

emot

e C

able

, PD

100

A/V

Ada

pter

C

able

, PP

OV

Tea

c W

ye

Cab

le, R

CA

-RC

A

Cab

le, V

PU

Pat

ch

Cam

era,

Min

i-Cam

(HU

D E

ntry

) C

over

, Con

nect

or

Kit,

DTV

MU

X Fu

se

Lens

, 12m

m M

ini-C

am (E

ntry

) Ti

e W

rap

(2)

VTR

A17

(C

ont)

Bag

, Cor

e C

amco

rder

A

dapt

er, B

NC

-RC

A P

hono

(2)

Ada

pter

, BN

C-T

A

dapt

er, R

CA

-BN

C (2

) B

att C

harg

er, L

i-IO

N (2

) B

att,

Li-IO

N (6

) B

att,

Silv

er O

xide

, 1.5

V (2

) B

rack

et, M

ultiu

se

Cam

cord

er, C

anon

HG

1 w

/Tap

e C

oupl

er, T

WIN

AX

(2)

Hea

dpho

nes

Lens

, Cam

cord

er W

ide

Ang

le

Mic

roph

one,

Cam

cord

er

Rem

ote,

PD

1 (2

) Ta

pe, D

igita

l Vid

eo (2

0)

Pry

Bar

, Win

dow

8

Qui

ck D

on M

ask

(4)

19

Page 23: DISTRIBUTION 'Q' JOB NO. EXECUTE PACKAGE (STS-130/20A ... · distribution 'q' job no. _____ execute package (sts-130/20a) mission distribution list revised: 01/06/10 note: for any

STS-

130

MID

DEC

K S

TOW

AG

E

01/2

5/10

FS 1

-4

R

EF/

130/

FIN

FOR

WA

RD

LO

CK

ERS

MF1

4E

SO

DF

MF1

4G

EM

CS

TR

OPI

(8 e

a)

MF1

4H

FDF

| SO

DF

MF1

4K

PW

R

MF1

4M

Vac

uum

Cle

aner

B

ags

(4)

Cab

le, D

C P

wr,

20 ft

To

ol, C

abin

Fan

Filt

er

Tool

, Cre

vice

To

ol, D

DU

Filt

er/F

lex

Mod

ular

To

ol, F

lex

Hos

e/S

uctio

n H

ose

Tool

, Hos

e A

dapt

er

MF1

4O

Air

Sam

ple

Bot

tle (2

) B

ag, C

hem

ical

Res

ista

nt (2

) B

reak

er B

ar (P

alle

t Rem

oval

) B

reak

out B

ox

Dux

seal

E

xten

sion

, 4 in

Fi

lter,

Was

te W

ater

Dum

p IF

M F

aste

ner R

etai

ner C

ushi

on

Kit,

Foa

m A

pplic

ator

(2)

Kit,

RM

S D

&C

IFM

Lu

bric

ant

Turn

buck

le (3

) M

F28E

/G G

LAC

IER

M

F28H

Fo

od, M

enu

Food

, Men

u M

F28K

Food

, Men

u Fo

od, M

enu

MF2

8M

Food

, Men

u Fo

od, M

enu

MF2

8O

Food

, Men

u Fo

od, M

enu

MF4

3C

Des

icca

nt, A

BR

S (2

) Fi

lter,

AB

RS

(5)

Kit,

AP

EX-

Cam

bium

KS

C F

ixat

ion

Tube

(K

FT)

Kit,

AP

EX-

Cam

bium

Wat

er

Kit,

Car

d B

lood

Sam

ple

Con

tain

er

Kit,

Car

dio

Lab

(CD

L) H

olte

r Arte

rial B

P

Bat

t Kit

(2)

Kit,

TA

GE

S R

epla

nt

MF4

3E

FDF

MF4

3G

Clo

thin

g, M

S1

Clo

thin

g, M

S1

MF4

3H

Food

, Fre

sh

Food

, Fre

sh

20

Page 24: DISTRIBUTION 'Q' JOB NO. EXECUTE PACKAGE (STS-130/20A ... · distribution 'q' job no. _____ execute package (sts-130/20a) mission distribution list revised: 01/06/10 note: for any

STS-

130

MID

DEC

K S

TOW

AG

E (C

ont)

01/2

5/10

FS 1

-5

R

EF/

130/

FIN

FOR

WA

RD

LO

CK

ERS

(Con

t)

MF4

3K

Food

, Fre

sh

Food

, Men

u M

F43M

C

loth

ing,

CD

R

Clo

thin

g, C

DR

M

F43O

A

CTE

X (2

) C

able

, PS

120

Food

War

mer

Is

olat

or

Junc

tion

Box

, PS

120

Nee

dle,

PW

D (2

) S

eals

, Fla

red

Fitti

ng (1

2)

MF5

7A (V

OL

A)

Pan

try F

ood

Acc

esso

ries

Eat

ing

Ute

nsils

MF5

7C

Ada

pter

, Lue

r (P

WD

) (6)

C

artri

dge,

N2

(10)

E

MC

S T

RO

PI (8

ea)

M

YC

O (8

) Ti

e W

rap

(40)

M

F57E

C

able

, Bio

med

(2)

Con

tain

er, S

harp

s K

it, D

osim

eter

K

it, E

lect

rode

K

it, M

edic

al A

cces

sory

K

it, O

pera

tiona

l Bio

inst

rum

enta

tion

Sys

tem

R

estra

int (

4)

Salin

e (2

) S

ubpa

ck, A

irway

S

ubpa

ck, D

rug

Sub

pack

, EE

NT

Sub

pack

, IV

Adm

inis

tratio

n S

ubpa

ck, S

alin

e S

uppl

y S

ubpa

ck, T

raum

a

MF5

7G

Ada

pter

, FS

S-4

01-1

Fi

lter,

Con

tinge

ncy

Was

te W

ater

(C

WW

DF)

To

nope

n Fo

od, M

enu

MF5

7H

Food

, Men

u Fo

od, M

enu

MF5

7K

GA

P

Cyl

inde

r (16

) H

and

Cra

nk

Zipl

ock

Bag

(15)

K

it, S

ampl

e/P

urge

(Wat

er T

rans

fer)

Kit,

Silv

er B

ioci

de (W

ater

Tra

nsfe

r) M

F57M

C

onde

nsat

e C

olle

ctio

n C

WC

(2)

Hos

e, Y

ello

w-Y

ello

w

CS

A-C

P

Bat

t Pac

k, C

SA

-CP

(3)

Sam

plin

g P

ump

Sam

plin

g P

ump

Filte

r Ze

ro F

ilter

H

ose,

SU

PA

(14)

K

it, D

ocki

ng M

echa

nism

Acc

esso

ry

AP

AS

Hat

ch T

ool

Wip

es, S

eal

Kit,

IMV

O-R

ing/

Bra

ycot

e To

wel

(IS

S In

gres

s)

Zipl

ock

Bag

, 36x

36 (4

)

21

Page 25: DISTRIBUTION 'Q' JOB NO. EXECUTE PACKAGE (STS-130/20A ... · distribution 'q' job no. _____ execute package (sts-130/20a) mission distribution list revised: 01/06/10 note: for any

STS-

130

MID

DEC

K S

TOW

AG

E (C

ont)

01/2

5/10

FS 1

-6

R

EF/

130/

FIN

FOR

WA

RD

LO

CK

ERS

(Con

t)

MF5

7O

Bag

, Hef

ty C

inch

(40)

B

oard

, ER

C C

ombo

B

unge

e, M

AC

/Gat

eway

(10)

C

able

, MA

C/G

atew

ay (9

) C

onta

iner

, Fac

estra

p (2

) Fa

cest

rap

Sup

port

(16)

G

atew

ay M

AC

G

lue,

Elm

ers

Inse

rt B

lock

Fac

estra

p (1

2)

Kit,

ICL

Ref

urb

Kit,

GIS

Ple

num

K

it, T

VIS

La

bels

, IS

S (9

) S

eal,

GA

MA

H (4

) M

F71C

A

ir S

ampl

e B

ottle

(3)

Cas

e, C

D S

tow

age

Cov

er, M

WC

(2)

Filte

r (Q

DM

) (5)

H

arne

ss, E

CLS

S W

ire (3

) H

ex D

rive,

3/1

6 in

(2)

Kit,

Wat

er (Q

DM

) O

-Rin

g (3

1)

Soc

ket,

3/8

in

Teth

er, B

ody

Res

train

t Te

ther

, Wai

st

MF7

1E

CG

BA

M

F71G

C

loth

ing,

MS

2 C

loth

ing,

MS

2 M

F71H

B

ag, H

eads

et A

cces

sory

B

ag, I

nflig

ht S

tow

age

Res

train

t (9)

B

ag, J

ettis

on S

tow

age

(5)

Bag,

Men

u Fo

od T

rash

C

anis

ter,

WC

S (C

offe

e C

an)

Cov

er, H

UD

(2)

Cov

er, P

arac

hute

(6)

Hos

e, P

erso

nal H

ygie

ne

Hos

e, W

CS

Can

iste

r M

irror

, Per

sona

l Hyg

iene

(2)

Shu

ttle

Em

erge

ncy

Eye

was

h (S

EE

)/Drin

k B

ag

Sw

itch

Gua

rd, G

PC

Ta

pe, G

ray,

1 in

Ta

pe, G

ray,

2 in

Ti

e W

rap

(20)

W

ipes

, Dis

infe

ctan

t (3

pkg)

MF7

1K

Act

iwat

ches

(3)

Bag

, Hel

met

(2)

Bag

, Jet

tison

(4)

Bun

gee,

Adj

usta

ble

(7)

Cha

ir, N

ada

Kit,

Com

m

Cab

le, C

omm

, 4 ft

C

able

, Com

m, 1

4 ft

Mic

roph

one,

Han

dhel

d V

LHS

(2)

M

F71K

(C

ont)

Pane

l Cov

er, M

A73C

P

IP P

in

O2

Ble

ed O

rific

e P

IP P

in (1

2)

PIP

Pin

, Egr

ess

Pol

e (S

pare

) Ta

pe, G

ray,

2 in

Tr

ay, M

eal

Zipl

ock

Bag

, 8x8

(20)

Zi

ploc

k B

ag, 1

2x12

(8)

Zipl

ock

Bag

, 13x

18 (5

) Zi

ploc

k B

ag, 2

4x24

(2)

FRE

D

22

Page 26: DISTRIBUTION 'Q' JOB NO. EXECUTE PACKAGE (STS-130/20A ... · distribution 'q' job no. _____ execute package (sts-130/20a) mission distribution list revised: 01/06/10 note: for any

STS-

130

MID

DEC

K S

TOW

AG

E (C

ont)

01/2

5/10

FS 1

-7

R

EF/

130/

FIN

FOR

WA

RD

LO

CK

ERS

(Con

t)

MF7

1M

Clo

thin

g, M

S4

Clo

thin

g, M

S4

MF7

1O

BA

L/U

NB

AL

Tran

sfor

mer

B

att C

ap/F

use

(LID

AR

) B

att,

AA

Bat

t, B

PS

MU

(2)

Bat

t, LI

DA

R (2

) B

PS

MU

(2)

Cab

le, B

NC

to B

NC

C

able

, BP

SM

U to

CC

U A

dapt

er (2

) C

able

, LID

AR

I/F

(2)

Cab

le, P

GS

C P

wr,

6 ft

Cab

le, S

SV

to P

DIP

/CIP

(2)

Kit,

SS

V F

use

LID

AR

LI

DAR

w/N

ight

scop

e S

SV

Com

pres

sion

Enc

oder

23

Page 27: DISTRIBUTION 'Q' JOB NO. EXECUTE PACKAGE (STS-130/20A ... · distribution 'q' job no. _____ execute package (sts-130/20a) mission distribution list revised: 01/06/10 note: for any

STS-

130

MID

DEC

K S

TOW

AG

E (C

ont)

01/2

5/10

FS 1

-8

R

EF/

130/

FIN

AFT

LO

CK

ERS

MA

9D/F

K

it, A

mm

onia

Det

ectio

n K

it, H

RM

(2)

Kit,

Med

ical

Acc

esso

ry (M

AK

) K

it, M

iner

al S

yrin

ge

Res

usci

tato

r TR

AD

M

A9G

C

old

Bag

, RC

C

MA

9J

Cab

le, A

C W

C

able

, Par

alle

l Dat

a C

able

, Pw

r, A

C, 2

0 ft

Prin

ter,

Col

or

Car

tridg

e, B

lack

(2)

Car

tridg

e, C

olor

(2)

Pap

er (2

) W

ashc

loth

M

A9L

Tr

ay, C

olor

Prin

ter (

2)

AC

TEX

(2)

Ada

pter

, “D

ash

2”

Filte

r, M

icro

be (S

pare

)

MA

9L

(Con

t) H

ose,

AC

TEX

H

ose,

Filt

er A

ssy

(“M

onst

er H

ose”

) H

ose,

Red

-Yel

low

/“Das

h-2

Ada

pter

” M

icro

bial

Che

ck V

alve

(MC

V)

MA

9N

Kit,

Per

sona

l Hyg

iene

(PH

K) (

6)

Com

mun

ity P

HK

K

it, C

onta

min

ant C

lean

up

Zipl

ock

Bag

, 24x

24 in

(6)

Zipl

ock

Bag

, 36x

36 in

(10)

C

hem

Lig

ht, G

reen

(27)

C

hem

Lig

ht, R

ed (A

CE

S E

ntry

) (28

) Fi

bers

cope

Lig

ht S

ourc

e Fi

bers

cope

, Vid

eo

Kit,

Flui

d Lo

adin

g (2

) R

estra

int,

Foot

Loo

p (S

pare

) (6)

R

estra

int,

Sea

t (S

pare

) (2)

M

A16D

IF

M T

ools

(see

IFM

C/L

) M

A16F

C

loth

ing,

MS

3 C

loth

ing,

MS

3

MA1

6G

Audi

o D

osim

eter

B

att,

AA

(30)

B

att,

D2X

S R

echa

rgea

ble

(9)

Cam

era

Bra

cket

, Loc

-Lin

e Fl

ex (2

) C

amer

a, D

2XS

w/C

ard

CO

AS

Fi

lter,

NI-C

R

Ligh

t Sha

de (2

) W

orkl

ight

(2)

24

Page 28: DISTRIBUTION 'Q' JOB NO. EXECUTE PACKAGE (STS-130/20A ... · distribution 'q' job no. _____ execute package (sts-130/20a) mission distribution list revised: 01/06/10 note: for any

STS-

130

MID

DEC

K S

TOW

AG

E (C

ont)

01/2

5/10

FS 1

-9

R

EF/

130/

FIN

AFT

LO

CK

ERS

(Con

t)

MA1

6J

CTB

, Pho

to T

V S

tow

-N-G

o A

VIU

(5)

Bra

cket

, Bas

e M

ultiu

se

Bra

cket

, Cla

mp

Mul

tiuse

(3)

Bra

cket

, Dua

l Cam

era

Bra

cket

, Loc

klin

e Fl

ex

Bra

cket

, Mul

tiuse

(3)

Cab

le, A

VIU

Vid

eo (4

) C

able

, Bal

ance

d Vi

deo

(2)

Cab

le, D

igita

l CC

Vid

eo P

wr (

4)

Cab

le, P

CM

CIA

to W

IB-R

emot

e C

able

, VP

U P

atch

C

amer

a, D

2XS

w/C

ard

(2)

Com

pute

r Des

k, In

fligh

t (2)

Le

ns, W

ide

Con

vers

ion

PC

MC

IA R

S-4

22 C

ard

Shu

tter R

elea

se (2

) V

TR w

/Tap

e (2

) Ta

pe, D

igita

l Vid

eo (2

6)

MA1

6L

Clo

thin

g, P

LT

Clo

thin

g, P

LT

MA1

6N

Cre

w S

uppo

rt

25

Page 29: DISTRIBUTION 'Q' JOB NO. EXECUTE PACKAGE (STS-130/20A ... · distribution 'q' job no. _____ execute package (sts-130/20a) mission distribution list revised: 01/06/10 note: for any

STS-

130

MID

DEC

K S

TOW

AG

E (C

ont)

01/2

5/10

FS 1

-10

R

EF/

130/

FIN

WA

STE

MG

MT

CO

MP

AR

TME

NT

Bag

, Em

esis

(7)

Pre

filte

r, C

onic

al (2

0)

Scr

aper

Too

l To

wel

s (3

6)

Urin

al F

unne

l, Fe

mal

e O

blon

g U

rinal

Fun

nel,

Fem

ale

Rou

nd

Urin

al F

unne

l, M

ale

(6)

Was

hclo

ths

(32)

W

CS

Tool

Bag

, Elb

ow (1

6)

Clo

thin

g, 1

st D

ay (6

) H

ose,

SU

PA

Tr

ash

Bag

, WM

C (S

pare

)

D

ry W

ipes

, Mul

ti-Pu

rpos

e (2

9 pk

g)

Glo

ves

(2 p

kg)

Tras

h Ba

g, C

offe

e C

an (1

0 pk

g)

Wet

Was

h (“

Bab

y W

ipes

”) (6

pkg

) W

ipes

, Dis

infe

ctan

t (3

pkg)

V

OL

B (M

A4D

) B

ag, E

lbow

(14)

B

ag, E

mes

is (1

3)

Bag

, Inf

light

Sto

wag

e (2

) D

ry W

ipes

, Mul

ti-Pu

rpos

e (6

0 pk

g)

Glo

ves

(4 p

kg)

Glo

ves,

Sho

ulde

r Len

gth

(1 p

kg)

Pre

filte

r, C

onic

al (2

0)

Tow

el (1

3)

Tras

h B

ag, C

offe

e C

an (8

pkg

)

VO

L B

(MA

4D)

(Con

t) W

ashc

loth

(56)

W

et W

ash

(“Bab

y W

ipes

”) (3

4 pk

g)

Wip

es, D

isin

fect

ant (

14 p

kg)

VO

L 3B

(MA

73J)

B

att,

D2X

S R

echa

rgea

ble

Bat

t, Li

-ION

C

amco

rder

, G1

w/T

ape

Cam

era,

D2X

S w

/4G

B C

ard

Flas

h/D

iffus

er

Lens

, 12-

24m

m

Lens

, 400

mm

M

emor

y C

ard,

4G

B

OC

AC

Q

uick

Don

Mas

k (2

) Sp

otlig

ht

VO

L D

(MD

52C

) B

att,

AA

(6)

Coa

x C

able

Tor

que

Ada

pter

(2)

Cra

ck R

epai

r Gun

(Man

ual)

w/T

herm

al

Cov

er (2

) D

ownl

ink

Dat

a M

ultip

lexe

r D

TV V

TR P

ouch

E

VA

Cam

era

Mou

nt w

/The

rmal

Bla

nket

E

VA

Cam

era

Stra

p EV

A Th

erm

al S

enso

r E

VA

Wip

es (5

)

VO

L D

(MD

52C

) (C

ont)

Flow

Shu

t Off

Val

ve (2

) K

it, E

mm

itanc

e W

ash

App

licat

or (2

) M

odul

ar M

WS

RH

Sw

inga

rm

Pal

ette

(2)

RC

C C

rack

Bag

R

CC

CR

M S

crap

er, 2

in (4

) R

CC

CR

M S

crap

er, 5

in (2

) R

CC

Lea

ding

Edg

e Sp

ecia

l Wre

nch

Rul

er a

nd P

rotu

bera

nce

Gau

ge

Teth

er E

xten

sion

(2)

VIP

V

TR, D

SR

-25

VO

L E

(MD

76C

) O

FK/P

PK

VO

L F

(MD

76M

) Tr

ash

Bag

, Wet

V

OL

G (M

D80

R)

Bag

, Apo

llo F

ecal

(40)

C

UC

D, M

ale

(54)

C

WC

(2)

Glo

ves

(1 p

kg)

Pul

l-Ups

(24)

Zi

ploc

k B

ag, 1

3x18

(8)

Zipl

ock

Bag

, 36x

36 (4

)

26

Page 30: DISTRIBUTION 'Q' JOB NO. EXECUTE PACKAGE (STS-130/20A ... · distribution 'q' job no. _____ execute package (sts-130/20a) mission distribution list revised: 01/06/10 note: for any

STS-

130

MID

DEC

K S

TOW

AG

E (C

ont)

01/2

5/10

FS 1

-11

R

EF/

130/

FIN

LiO

H V

OL

(MD

52M

) C

anis

ter,

ATC

O

Can

iste

r, Li

OH

(29)

G

love

s, N

itrile

(40)

G

-Sui

t (6)

M

ask,

Sur

gica

l Filt

er (3

0)

EXTE

RN

AL A

IRLO

CK

P

OR

T E

MU

– E

V2

(see

EV

A C

/L)

STB

D

EM

U –

EV

1 (s

ee E

VA

C/L

) A

IRLO

CK

FLO

OR

BA

G

Bag

, EV

A T

rash

B

ag, I

nflig

ht S

tow

age

CC

C (5

) C

loth

ing,

Ent

ry (6

) D

ISD

B (8

) E

CO

K

Glo

ves,

AC

ES

(Spa

re) (

2 pr

) In

sula

tor,

Tem

plat

e M

ount

(2)

LCV

G

MW

S (2

) P

eel L

ayer

(4)

SA

FER

Han

d C

ontro

ller

Teth

er, R

etra

ctab

le E

quip

(11)

Te

ther

, Saf

ety,

85

ft (2

) Te

ther

, Wai

st (4

)

VO

L H

(MD

23R

) IN

BO

AR

D

See

EV

A C

/L

OU

TBO

AR

D

See

EV

A C

/L

MA

12B

(WIN

DO

W S

HA

DE

BA

G)

Bag

, Win

dow

Sha

de

Bag

, IFM

Con

t Hos

e an

d C

able

Kit

Ada

pter

, Red

/Yel

low

C

able

, AC

Pw

r Con

t Tra

nsfe

r, 15

ft

Cab

le, D

C H

arne

ss, 2

4 ft

(2)

Cab

le, D

C P

igta

il C

onne

ctor

(2)

Cab

le, M

CIU

Dat

a, 1

0 ft

Cab

le, M

CIU

to P

NL

L15,

6 ft

C

able

, OC

A S

pare

C

lam

p, V

ario

us S

izes

(14)

C

over

, Pan

el (3

) G

love

s, C

lean

Roo

m

Hos

e, 1

/4 in

(6 ft

) H

ose,

3/8

in (6

ft)

Hos

e, C

ont B

lue/

Blu

e H

ose,

Con

t Red

/Red

H

ose,

Con

t Yel

low

/Yel

low

, 8 ft

H

ose,

CW

C C

ontin

genc

y (S

teril

e),

20 ft

H

ose,

CW

C C

ontin

genc

y, 2

0 ft

Hos

e, O

2 C

ontin

genc

y

MA

12B

(WIN

DO

W S

HA

DE

BA

G)

(Con

t) B

ag, W

indo

w S

hade

(Con

t) B

ag, I

FM C

ont H

ose

and

Cab

le K

it (C

ont)

Kit,

Par

achu

te R

epac

k (2

) P

rote

ctiv

e C

over

Wire

way

(3)

Sha

de, C

CTV

Mon

itor (

2)

VP

MP

Pan

el C

over

(2)

Wat

er E

quip

men

t Fi

lter,

Wan

d E

xten

der

Gal

ley

Nee

dle

(Spa

re)

Sep

arat

or, W

ater

/Gas

(2)

Supp

ly W

ater

Dum

p Li

ne P

urge

D

evic

e W

ater

Dis

pens

er, C

ontin

genc

y W

indo

w S

hade

, Aft

(2)

Win

dow

Sha

de, O

vhd

(2)

Win

dow

Shi

eld,

Ovh

d (2

) Zi

ploc

ks fo

r CW

C, 3

6x36

(10)

27

Page 31: DISTRIBUTION 'Q' JOB NO. EXECUTE PACKAGE (STS-130/20A ... · distribution 'q' job no. _____ execute package (sts-130/20a) mission distribution list revised: 01/06/10 note: for any

STS-

130

MID

DEC

K S

TOW

AG

E (C

ont)

01/2

5/10

FS 1

-12

R

EF/

130/

FIN

MID

DE

CK

CE

ILIN

G

BA

G E

(Por

t 1)

CH

ECS

B

ag, I

ncub

atio

n C

SA

-CP

Res

uppl

y C

SA

-O2

Mon

itor (

2)

IMA

K (2

) P

acke

t, P

etri

Dis

h (8

) P

acke

t, S

urfa

ce S

ampl

er (1

4)

Rad

iatio

n A

rea

Mon

itor (

RA

M) (

24)

Sub

pack

, New

RA

M (2

) Fi

lter,

Bac

teria

(3)

UP

A F

CP

A

BA

G F

(Por

t 2)

Clo

thin

g, C

rew

C

over

, Fire

Ext

ingu

ishe

r N

ode

3 V

OK

H/W

B

arrie

r, B

VC

Rad

ial

Cap

, Pro

tect

ive

(89)

D

uct,

IMV

(2)

Jum

per (

7)

Lock

ing

Pins

, RTL

(4)

O-R

ing,

Silic

on (4

) W

ire H

arne

ss (7

) Q

uick

Don

Mas

k (Q

DM

)

MID

DE

CK

CE

ILIN

G

(Con

t) B

AG

G (S

tbd

1)

Bag

, EV

A T

rans

fer

Bat

t, E

MU

B

TA

Cap

, Pro

tect

ive

Car

rier,

OIH

(2)

CC

C (2

) C

onne

ctor

, Nod

e 3

P104

-PM

A3

Cov

er, C

onne

ctor

Mul

tiple

Tet

here

d (2

) C

over

, HM

U 2

71 P

lug

Boo

tie

Cov

er, L

ower

Arm

Wris

t (4)

D

ISD

B (6

) G

love

s, E

VA

(2 p

r)

MLI

, Zen

ith C

one

Sta

nchi

on (2

) R

atch

et, 3

/8 in

Driv

e w

/7/1

6 in

soc

ket

Soc

ket E

xten

sion

, 5/1

6 in

x 7

in

Spa

nner

, Gap

(9)

Term

inat

or, 1

553

(2)

Teth

er, A

djus

tabl

e E

quip

(AE

T) (1

6)

Wire

Tie

s, E

VA

(28)

B

AG

H (S

tbd

2)

Bag

, Jet

tison

Sto

wag

e (2

) C

DR

A

MID

DE

CK

FLO

OR

B

AG

A (P

ort 1

) U

PA

DA

B

AG

B (P

ort 2

) O

dor B

acte

ria F

ilter

(WC

S S

pare

) R

ecyc

le F

ilter

Tan

k (R

FTA)

U

tility

Clo

seou

t Pan

el (4

) W

renc

h, T

orqu

e B

AG

C (S

tbd

1)

Jum

pers

, Am

mon

ia N

ode

3 (4

) B

AG

D (S

tbd

2)

Kit,

WP

A E

xter

nal F

ilter

Rep

air

Filte

r, B

acte

ria E

lem

ent (

3)

Nip

ple,

QD

Th

erm

al J

acke

t, A

mm

onia

Jum

pers

N

ode

3 S

EA

T 7

STO

WA

GE

BA

G B

olt,

CB

EF

Fan

Lock

ing

(2)

Cab

le, S

tabi

lizer

Pw

r/Dat

a (T

VIS

) Fo

od, I

SS

S

tabi

lizer

, TV

IS

28

Page 32: DISTRIBUTION 'Q' JOB NO. EXECUTE PACKAGE (STS-130/20A ... · distribution 'q' job no. _____ execute package (sts-130/20a) mission distribution list revised: 01/06/10 note: for any

STS-

130

LIG

HTW

EIG

HT

MA

R

01/2

5/10

FS 1

-13

R

EF/

130/

FIN

ML6

0B

Cab

le, C

CTV

20'

Cab

in

Cab

le, R

S-2

32 9

-Pin

C

able

, TV

Con

trolle

r CIP

C

able

, TV

Con

trolle

r/CTV

M

Cen

terli

ne C

amer

a, P

rime

Feel

er G

auge

(4)

Har

ness

, Cen

terli

ne C

amer

a S

crew

s (2

0)

TV C

ontro

ller U

nit

Was

her (

6)

Wip

es, D

isin

fect

ant (

2)

ML6

0E

Acc

ess

Poi

nt, P

roxi

m (2

) A

dapt

er, R

S-4

22 (2

) B

oard

, OC

A

Cab

le, 1

553

PC

MC

IA (2

) C

able

, A31

p P

wr (

2)

Cab

le, A

31p

Vid

eo A

dapt

er

Cab

le, F

uel C

ell P

CM

MU

C

able

, OP

P to

LC

S R

J45,

20

ft C

able

, PC

MM

U, 2

4 ft

Cab

le, P

CS

-PD

IP 1

553

Cab

le, P

DIP

RS

-422

Y, 2

4 ft

Cab

le, P

GS

C P

wr (

3)

Cab

le, R

J45,

16

ft C

able

, RJ4

5, 3

2 ft

(3)

Cab

le, R

S-2

32 Y

, 15

ft C

able

, RS

-422

Ext

ensi

on, 1

0 ft

ML6

0E

(Con

t) C

able

, RS

-422

Y, 1

5 ft

Cab

le, T

ri P

ort P

CM

CIA

RS

-422

/MC

IU

Car

d (5

) C

able

, VLH

S to

VTS

I/F

(2)

Cab

le, W

AP

Pw

r, 10

ft (2

) C

amer

a, U

ltrap

ort (

2)

Car

d, 1

553

PC

MC

IA (2

) C

ard,

CF

Ada

pter

(2)

Car

d, D

ual P

ort P

CM

CIA

RS

-422

Car

d (2

) C

ard,

Wire

less

RF

Net

wor

k (8

) E

xpan

sion

, OC

A

Exp

ansi

on, P

CM

MU

(2)

Har

ddriv

e, 1

60G

B

Lapt

op, T

61p

(PC

S)

PG

SC

s S

TS-1

– O

CA

Rou

ter

STS-

2 –

Win

deco

m

STS

-3 –

KFX

S

TS-4

– R

PO

P ST

S-5

– R

POP2

S

TS-6

– W

LE

Pw

r Sup

ply,

DC

(10)

R

ecei

ver,

WLE

(2)

Rel

ay, S

yste

m (3

)

ML6

0M

Cen

terli

ne C

amer

a, B

acku

p H

arne

ss, C

ente

rline

Bac

kup

Ultr

ason

ic L

eak

Det

ecto

r A

cous

tic T

ip

Adap

ter

Bat

t, 9V

(2)

Con

cent

rato

r H

eads

et

Pro

be, E

xten

sion

(3)

Rec

eive

r Tr

ansm

itter

29

Page 33: DISTRIBUTION 'Q' JOB NO. EXECUTE PACKAGE (STS-130/20A ... · distribution 'q' job no. _____ execute package (sts-130/20a) mission distribution list revised: 01/06/10 note: for any

STS-130 CONSUMABLES Item Location Total Qty

Contingency Urine/Fecal Collection Devices: CUCDs (Male) Apollo Fecal Bags Pull-Ups

VOL G (MD80R)VOL G (MD80R) VOL G (MD80R)

54 40 24

Disinfectant Wipes

(26/pkg) (6/cm/day) Waste Mgmt CompartmentVOL B (MA4D) ML60B (Top of MAR) MF71K

3 pkg14 pkg2 pkg 3 pkg

78 364 82

78 572

Dry Wipes, Multi-Purpose

(24/pkg) (25/cm/day) Waste Mgmt CompartmentVOL B (MA4D)

29 pkg60 pkg

696 1440 2136

Elbow Bags Waste Mgmt Compartment

VOL B (MA4D) 16 14 30

Emesis Bags Waste Mgmt Compartment

VOL B (MA4D) 7

13 20

Gloves (50/pkg)

(3.5/cm/day) (not incl VOL G)

Waste Mgmt CompartmentVOL B (MA4D) VOL G (MD80R)

2 pkg4 pkg 1 pkg

100 200 50 350

Gloves, Shoulder Length VOL B (MA4D)

1 pkg 25

Prefilters, Conical Waste Mgmt Compartment

VOL B (MA4D) 20 20 40

Towels

(half/cm/day) Waste Mgmt Compartment VOL B (MA4D)

36 13 49

Trash Bags (Coffee Can

Bags) (10/pkg) (2/cm/day)

Waste Mgmt CompartmentVOL B (MA4D)

10 pkg8 pkg

100 80

180

NOTE: The qty/day is based on 6 crewmembers and 14 days

FS 1-14 REF/130/FIN

30

Page 34: DISTRIBUTION 'Q' JOB NO. EXECUTE PACKAGE (STS-130/20A ... · distribution 'q' job no. _____ execute package (sts-130/20a) mission distribution list revised: 01/06/10 note: for any

STS-130 CONSUMABLES (Cont) Item Location Total Qty

Washcloths (1/cm/day)

Waste Mgmt Compartment 32 VOL B (MA4D) 56

88 Wet Washes (“Baby Wipes”)

– (40/pkg) (19/cm/day) Waste Mgmt CompartmentVOL B (MA4D)

6 pkg34 pkg

240 1360 1600

NOTE: The qty/day is based on 6 crewmembers and 14 days

FS 1-15 REF/130/FIN

31

Page 35: DISTRIBUTION 'Q' JOB NO. EXECUTE PACKAGE (STS-130/20A ... · distribution 'q' job no. _____ execute package (sts-130/20a) mission distribution list revised: 01/06/10 note: for any

FS 1-16 REF/130/FIN

This Page Intentionally Blank

32

Page 36: DISTRIBUTION 'Q' JOB NO. EXECUTE PACKAGE (STS-130/20A ... · distribution 'q' job no. _____ execute package (sts-130/20a) mission distribution list revised: 01/06/10 note: for any

MSG 007 - FD02 CREW CHOICE DOWNLINK

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

TDRS  AOS  LOS Delta (min) Notes E-TDS  1/01:57  1/02:13 16  W-171  1/03:10  1/03:24 14  E-TDS  1/03:26  1/03:40 14 Alpha stop at 1/03:35W-171  1/04:22  1/04:58 36

Note: Please notify MCC-H 10 minutes prior to the event to allow for ground network configuration. \

END OF PAGE 1 OF 1, MSG 007

33