![Page 1: DISTRIBUTION FEEDER FAULT ANALYSIS...due to 115 kv underbuild. elbow failure on ug. scada alarm at 17:10 indicates fault on nestucca feeder 39. first step is to connect to form 6 relay](https://reader030.fdocuments.net/reader030/viewer/2022012003/60a852ed2290fe4a41065f0d/html5/thumbnails/1.jpg)
T I L L A M O O K P E O P L E ’ S U T I L I T Y D I S T R I C T
DISTRIBUTION FEEDER FAULT ANALYSIS
![Page 2: DISTRIBUTION FEEDER FAULT ANALYSIS...due to 115 kv underbuild. elbow failure on ug. scada alarm at 17:10 indicates fault on nestucca feeder 39. first step is to connect to form 6 relay](https://reader030.fdocuments.net/reader030/viewer/2022012003/60a852ed2290fe4a41065f0d/html5/thumbnails/2.jpg)
SCADA TO DG SITES
![Page 3: DISTRIBUTION FEEDER FAULT ANALYSIS...due to 115 kv underbuild. elbow failure on ug. scada alarm at 17:10 indicates fault on nestucca feeder 39. first step is to connect to form 6 relay](https://reader030.fdocuments.net/reader030/viewer/2022012003/60a852ed2290fe4a41065f0d/html5/thumbnails/3.jpg)
DIGESTER MW AND MVAR
![Page 4: DISTRIBUTION FEEDER FAULT ANALYSIS...due to 115 kv underbuild. elbow failure on ug. scada alarm at 17:10 indicates fault on nestucca feeder 39. first step is to connect to form 6 relay](https://reader030.fdocuments.net/reader030/viewer/2022012003/60a852ed2290fe4a41065f0d/html5/thumbnails/4.jpg)
INSTANTANEOUS READINGSFROM SEL 751 RELAY
![Page 5: DISTRIBUTION FEEDER FAULT ANALYSIS...due to 115 kv underbuild. elbow failure on ug. scada alarm at 17:10 indicates fault on nestucca feeder 39. first step is to connect to form 6 relay](https://reader030.fdocuments.net/reader030/viewer/2022012003/60a852ed2290fe4a41065f0d/html5/thumbnails/5.jpg)
TRASK SUBSTATION LOADINGDO NOT WANT TO FEED INTO 115 KV
![Page 6: DISTRIBUTION FEEDER FAULT ANALYSIS...due to 115 kv underbuild. elbow failure on ug. scada alarm at 17:10 indicates fault on nestucca feeder 39. first step is to connect to form 6 relay](https://reader030.fdocuments.net/reader030/viewer/2022012003/60a852ed2290fe4a41065f0d/html5/thumbnails/6.jpg)
FAULT LOCATOR TOOL DEVELOPED BY GIS SPECIALIST
![Page 7: DISTRIBUTION FEEDER FAULT ANALYSIS...due to 115 kv underbuild. elbow failure on ug. scada alarm at 17:10 indicates fault on nestucca feeder 39. first step is to connect to form 6 relay](https://reader030.fdocuments.net/reader030/viewer/2022012003/60a852ed2290fe4a41065f0d/html5/thumbnails/7.jpg)
CAR HIT POLE EVENT ANALYSIS
W I L S O N R I V E R S U B S T A T I O N E V E N T O N 9 - 2 - 1 3
![Page 8: DISTRIBUTION FEEDER FAULT ANALYSIS...due to 115 kv underbuild. elbow failure on ug. scada alarm at 17:10 indicates fault on nestucca feeder 39. first step is to connect to form 6 relay](https://reader030.fdocuments.net/reader030/viewer/2022012003/60a852ed2290fe4a41065f0d/html5/thumbnails/8.jpg)
WILSON RIVER SUBSTATION, CIRCUIT 63
Car Pole Accident
Olsen Rd.Recloser
Misty MeadowsGeneration
![Page 9: DISTRIBUTION FEEDER FAULT ANALYSIS...due to 115 kv underbuild. elbow failure on ug. scada alarm at 17:10 indicates fault on nestucca feeder 39. first step is to connect to form 6 relay](https://reader030.fdocuments.net/reader030/viewer/2022012003/60a852ed2290fe4a41065f0d/html5/thumbnails/9.jpg)
SCADA ALARMS DURING EVENTNOTE: DEVICE TIMES ARE NOT
SYNCHED
DG on adjacent circTripped Open
Olsen Rd. RecloserOperations
Ckt 63 RecloserLocks Out
![Page 10: DISTRIBUTION FEEDER FAULT ANALYSIS...due to 115 kv underbuild. elbow failure on ug. scada alarm at 17:10 indicates fault on nestucca feeder 39. first step is to connect to form 6 relay](https://reader030.fdocuments.net/reader030/viewer/2022012003/60a852ed2290fe4a41065f0d/html5/thumbnails/10.jpg)
SOE FROM SUBSTATION RECLOSER
![Page 11: DISTRIBUTION FEEDER FAULT ANALYSIS...due to 115 kv underbuild. elbow failure on ug. scada alarm at 17:10 indicates fault on nestucca feeder 39. first step is to connect to form 6 relay](https://reader030.fdocuments.net/reader030/viewer/2022012003/60a852ed2290fe4a41065f0d/html5/thumbnails/11.jpg)
OLSEN RD. RECLOSER OPERATIONS
![Page 12: DISTRIBUTION FEEDER FAULT ANALYSIS...due to 115 kv underbuild. elbow failure on ug. scada alarm at 17:10 indicates fault on nestucca feeder 39. first step is to connect to form 6 relay](https://reader030.fdocuments.net/reader030/viewer/2022012003/60a852ed2290fe4a41065f0d/html5/thumbnails/12.jpg)
NEXUS 1500 METER ON SUBSTATION BUS
![Page 13: DISTRIBUTION FEEDER FAULT ANALYSIS...due to 115 kv underbuild. elbow failure on ug. scada alarm at 17:10 indicates fault on nestucca feeder 39. first step is to connect to form 6 relay](https://reader030.fdocuments.net/reader030/viewer/2022012003/60a852ed2290fe4a41065f0d/html5/thumbnails/13.jpg)
A PHASE CURRENT – 2 OPERATIONS OF RECLOSER
![Page 14: DISTRIBUTION FEEDER FAULT ANALYSIS...due to 115 kv underbuild. elbow failure on ug. scada alarm at 17:10 indicates fault on nestucca feeder 39. first step is to connect to form 6 relay](https://reader030.fdocuments.net/reader030/viewer/2022012003/60a852ed2290fe4a41065f0d/html5/thumbnails/14.jpg)
3RD INTERRUPTION – MUCH HIGHER FAULT CURRENT
![Page 15: DISTRIBUTION FEEDER FAULT ANALYSIS...due to 115 kv underbuild. elbow failure on ug. scada alarm at 17:10 indicates fault on nestucca feeder 39. first step is to connect to form 6 relay](https://reader030.fdocuments.net/reader030/viewer/2022012003/60a852ed2290fe4a41065f0d/html5/thumbnails/15.jpg)
SEL 751 AT MISTY MEADOWS GENERATION 480 VOLT BUS
![Page 16: DISTRIBUTION FEEDER FAULT ANALYSIS...due to 115 kv underbuild. elbow failure on ug. scada alarm at 17:10 indicates fault on nestucca feeder 39. first step is to connect to form 6 relay](https://reader030.fdocuments.net/reader030/viewer/2022012003/60a852ed2290fe4a41065f0d/html5/thumbnails/16.jpg)
MAX FLT I = 3078 AMPS AT ACCIDENT SITE
![Page 17: DISTRIBUTION FEEDER FAULT ANALYSIS...due to 115 kv underbuild. elbow failure on ug. scada alarm at 17:10 indicates fault on nestucca feeder 39. first step is to connect to form 6 relay](https://reader030.fdocuments.net/reader030/viewer/2022012003/60a852ed2290fe4a41065f0d/html5/thumbnails/17.jpg)
SO HOW DID WE GET 4178 AMPS ON THE CIRCUIT 63 SEQUENCE OF EVENTS FILE?
![Page 18: DISTRIBUTION FEEDER FAULT ANALYSIS...due to 115 kv underbuild. elbow failure on ug. scada alarm at 17:10 indicates fault on nestucca feeder 39. first step is to connect to form 6 relay](https://reader030.fdocuments.net/reader030/viewer/2022012003/60a852ed2290fe4a41065f0d/html5/thumbnails/18.jpg)
SYNERGI PREDICTS A FAULT OF THIS MAGNITUDE SHOULD BE CLOSER IN TO
THE SUBSTATION
![Page 19: DISTRIBUTION FEEDER FAULT ANALYSIS...due to 115 kv underbuild. elbow failure on ug. scada alarm at 17:10 indicates fault on nestucca feeder 39. first step is to connect to form 6 relay](https://reader030.fdocuments.net/reader030/viewer/2022012003/60a852ed2290fe4a41065f0d/html5/thumbnails/19.jpg)
THIS IS SECTION OF LINE THAT SYNERGIPREDICTED THE FAULT SHOULD BE IN
![Page 20: DISTRIBUTION FEEDER FAULT ANALYSIS...due to 115 kv underbuild. elbow failure on ug. scada alarm at 17:10 indicates fault on nestucca feeder 39. first step is to connect to form 6 relay](https://reader030.fdocuments.net/reader030/viewer/2022012003/60a852ed2290fe4a41065f0d/html5/thumbnails/20.jpg)
A SHARP EYED OPS SUPV. FOUND BURN MARKS IN THIS VICINITY. LONG SPANS
DUE TO 115 KV UNDERBUILD
![Page 21: DISTRIBUTION FEEDER FAULT ANALYSIS...due to 115 kv underbuild. elbow failure on ug. scada alarm at 17:10 indicates fault on nestucca feeder 39. first step is to connect to form 6 relay](https://reader030.fdocuments.net/reader030/viewer/2022012003/60a852ed2290fe4a41065f0d/html5/thumbnails/21.jpg)
ELBOW FAILURE ON UG
![Page 22: DISTRIBUTION FEEDER FAULT ANALYSIS...due to 115 kv underbuild. elbow failure on ug. scada alarm at 17:10 indicates fault on nestucca feeder 39. first step is to connect to form 6 relay](https://reader030.fdocuments.net/reader030/viewer/2022012003/60a852ed2290fe4a41065f0d/html5/thumbnails/22.jpg)
SCADA ALARM AT 17:10 INDICATES FAULT ON NESTUCCA FEEDER 39
![Page 23: DISTRIBUTION FEEDER FAULT ANALYSIS...due to 115 kv underbuild. elbow failure on ug. scada alarm at 17:10 indicates fault on nestucca feeder 39. first step is to connect to form 6 relay](https://reader030.fdocuments.net/reader030/viewer/2022012003/60a852ed2290fe4a41065f0d/html5/thumbnails/23.jpg)
FIRST STEP IS TO CONNECT TO FORM 6 RELAY OVER ETHERNET – SEQ COORD. MEANS ANOTHER DEVICE OPERATED
![Page 24: DISTRIBUTION FEEDER FAULT ANALYSIS...due to 115 kv underbuild. elbow failure on ug. scada alarm at 17:10 indicates fault on nestucca feeder 39. first step is to connect to form 6 relay](https://reader030.fdocuments.net/reader030/viewer/2022012003/60a852ed2290fe4a41065f0d/html5/thumbnails/24.jpg)
OSCILLOGRAPHIC FILE FROM THE FORM 6 RELAY – PEAK CURRENT =1737 A
1737 X .707=1228 A RMS
![Page 25: DISTRIBUTION FEEDER FAULT ANALYSIS...due to 115 kv underbuild. elbow failure on ug. scada alarm at 17:10 indicates fault on nestucca feeder 39. first step is to connect to form 6 relay](https://reader030.fdocuments.net/reader030/viewer/2022012003/60a852ed2290fe4a41065f0d/html5/thumbnails/25.jpg)
FAULT LOCATION TOOL THAT GIS SPECIALIST MADE – FLT I FROM SYNERGI PROTECTION STUDY
![Page 26: DISTRIBUTION FEEDER FAULT ANALYSIS...due to 115 kv underbuild. elbow failure on ug. scada alarm at 17:10 indicates fault on nestucca feeder 39. first step is to connect to form 6 relay](https://reader030.fdocuments.net/reader030/viewer/2022012003/60a852ed2290fe4a41065f0d/html5/thumbnails/26.jpg)
FAULT WAS ON SINGLE PHASE UG IN SUBDIVISION – ELBOW FAILED
![Page 27: DISTRIBUTION FEEDER FAULT ANALYSIS...due to 115 kv underbuild. elbow failure on ug. scada alarm at 17:10 indicates fault on nestucca feeder 39. first step is to connect to form 6 relay](https://reader030.fdocuments.net/reader030/viewer/2022012003/60a852ed2290fe4a41065f0d/html5/thumbnails/27.jpg)
EXTENT OF FEEDERPOSSIBLE LOCATIONS ON MULTIPLE BRANCHES
![Page 28: DISTRIBUTION FEEDER FAULT ANALYSIS...due to 115 kv underbuild. elbow failure on ug. scada alarm at 17:10 indicates fault on nestucca feeder 39. first step is to connect to form 6 relay](https://reader030.fdocuments.net/reader030/viewer/2022012003/60a852ed2290fe4a41065f0d/html5/thumbnails/28.jpg)
FIRST RAIN AFTER DRY SUMMER
T I LLAMOOK PEOPLE’S UT I L I TY D ISTR ICT
![Page 29: DISTRIBUTION FEEDER FAULT ANALYSIS...due to 115 kv underbuild. elbow failure on ug. scada alarm at 17:10 indicates fault on nestucca feeder 39. first step is to connect to form 6 relay](https://reader030.fdocuments.net/reader030/viewer/2022012003/60a852ed2290fe4a41065f0d/html5/thumbnails/29.jpg)
FIRST INDICATION OF PROBLEMSCADA SHOWS FAULT ON CKT. 64
![Page 30: DISTRIBUTION FEEDER FAULT ANALYSIS...due to 115 kv underbuild. elbow failure on ug. scada alarm at 17:10 indicates fault on nestucca feeder 39. first step is to connect to form 6 relay](https://reader030.fdocuments.net/reader030/viewer/2022012003/60a852ed2290fe4a41065f0d/html5/thumbnails/30.jpg)
NEXUS 1500 ON SUB BUS
![Page 31: DISTRIBUTION FEEDER FAULT ANALYSIS...due to 115 kv underbuild. elbow failure on ug. scada alarm at 17:10 indicates fault on nestucca feeder 39. first step is to connect to form 6 relay](https://reader030.fdocuments.net/reader030/viewer/2022012003/60a852ed2290fe4a41065f0d/html5/thumbnails/31.jpg)
ZOOM IN ON PHASE A AND B CURRENTS
![Page 32: DISTRIBUTION FEEDER FAULT ANALYSIS...due to 115 kv underbuild. elbow failure on ug. scada alarm at 17:10 indicates fault on nestucca feeder 39. first step is to connect to form 6 relay](https://reader030.fdocuments.net/reader030/viewer/2022012003/60a852ed2290fe4a41065f0d/html5/thumbnails/32.jpg)
THE 3 PHASE CURRENTS ON CIRCUIT 64
![Page 33: DISTRIBUTION FEEDER FAULT ANALYSIS...due to 115 kv underbuild. elbow failure on ug. scada alarm at 17:10 indicates fault on nestucca feeder 39. first step is to connect to form 6 relay](https://reader030.fdocuments.net/reader030/viewer/2022012003/60a852ed2290fe4a41065f0d/html5/thumbnails/33.jpg)
COMPARE WAVEFORMS TO FORM 62ND PHASE GETS INVOLVED
![Page 34: DISTRIBUTION FEEDER FAULT ANALYSIS...due to 115 kv underbuild. elbow failure on ug. scada alarm at 17:10 indicates fault on nestucca feeder 39. first step is to connect to form 6 relay](https://reader030.fdocuments.net/reader030/viewer/2022012003/60a852ed2290fe4a41065f0d/html5/thumbnails/34.jpg)
OUTAGE REPORT SHOWS INSULATOR FLASHED OVER
![Page 35: DISTRIBUTION FEEDER FAULT ANALYSIS...due to 115 kv underbuild. elbow failure on ug. scada alarm at 17:10 indicates fault on nestucca feeder 39. first step is to connect to form 6 relay](https://reader030.fdocuments.net/reader030/viewer/2022012003/60a852ed2290fe4a41065f0d/html5/thumbnails/35.jpg)
PROBLEMS AT TCCA BOILERTCCA=T I LLAMOOK CHEESE FACTORY
![Page 36: DISTRIBUTION FEEDER FAULT ANALYSIS...due to 115 kv underbuild. elbow failure on ug. scada alarm at 17:10 indicates fault on nestucca feeder 39. first step is to connect to form 6 relay](https://reader030.fdocuments.net/reader030/viewer/2022012003/60a852ed2290fe4a41065f0d/html5/thumbnails/36.jpg)
FORM 6 OSCILLOGRAPHPEAK CURRENT = 3820 AMPSRMS CURRENT = 2700 AMPS
![Page 37: DISTRIBUTION FEEDER FAULT ANALYSIS...due to 115 kv underbuild. elbow failure on ug. scada alarm at 17:10 indicates fault on nestucca feeder 39. first step is to connect to form 6 relay](https://reader030.fdocuments.net/reader030/viewer/2022012003/60a852ed2290fe4a41065f0d/html5/thumbnails/37.jpg)
NEXUS 1500 ON SUB BUS
![Page 38: DISTRIBUTION FEEDER FAULT ANALYSIS...due to 115 kv underbuild. elbow failure on ug. scada alarm at 17:10 indicates fault on nestucca feeder 39. first step is to connect to form 6 relay](https://reader030.fdocuments.net/reader030/viewer/2022012003/60a852ed2290fe4a41065f0d/html5/thumbnails/38.jpg)
NEXUS FAULT CURRENT IS CLOSE TO FORM 6 VALUE = 3900A X .707=2757 A,
NOTE DROP IN LOAD
![Page 39: DISTRIBUTION FEEDER FAULT ANALYSIS...due to 115 kv underbuild. elbow failure on ug. scada alarm at 17:10 indicates fault on nestucca feeder 39. first step is to connect to form 6 relay](https://reader030.fdocuments.net/reader030/viewer/2022012003/60a852ed2290fe4a41065f0d/html5/thumbnails/39.jpg)
FROM SYNERGI, FAULT CURRENT AT BOILER MATCHES MEASURED FAULT I
![Page 40: DISTRIBUTION FEEDER FAULT ANALYSIS...due to 115 kv underbuild. elbow failure on ug. scada alarm at 17:10 indicates fault on nestucca feeder 39. first step is to connect to form 6 relay](https://reader030.fdocuments.net/reader030/viewer/2022012003/60a852ed2290fe4a41065f0d/html5/thumbnails/40.jpg)
FAULT LOCATOR TOOL PRETTY CLOSE
![Page 41: DISTRIBUTION FEEDER FAULT ANALYSIS...due to 115 kv underbuild. elbow failure on ug. scada alarm at 17:10 indicates fault on nestucca feeder 39. first step is to connect to form 6 relay](https://reader030.fdocuments.net/reader030/viewer/2022012003/60a852ed2290fe4a41065f0d/html5/thumbnails/41.jpg)
TREE THROUGH LINEMOHLER CIRCUIT 91
![Page 42: DISTRIBUTION FEEDER FAULT ANALYSIS...due to 115 kv underbuild. elbow failure on ug. scada alarm at 17:10 indicates fault on nestucca feeder 39. first step is to connect to form 6 relay](https://reader030.fdocuments.net/reader030/viewer/2022012003/60a852ed2290fe4a41065f0d/html5/thumbnails/42.jpg)
RECLOSER AT SUB SHOWS 428 A FAULT CURRENT ON C PHASE
![Page 43: DISTRIBUTION FEEDER FAULT ANALYSIS...due to 115 kv underbuild. elbow failure on ug. scada alarm at 17:10 indicates fault on nestucca feeder 39. first step is to connect to form 6 relay](https://reader030.fdocuments.net/reader030/viewer/2022012003/60a852ed2290fe4a41065f0d/html5/thumbnails/43.jpg)
OSCILLOGRAPH FROM FORM 6 SHOWS FOUR CYCLES OF FAULT CURRENT
4 CYCLES = .066 SEC.
![Page 44: DISTRIBUTION FEEDER FAULT ANALYSIS...due to 115 kv underbuild. elbow failure on ug. scada alarm at 17:10 indicates fault on nestucca feeder 39. first step is to connect to form 6 relay](https://reader030.fdocuments.net/reader030/viewer/2022012003/60a852ed2290fe4a41065f0d/html5/thumbnails/44.jpg)
FAULT BLEW A 15 A FUSE AT FISH HATCHERY
![Page 45: DISTRIBUTION FEEDER FAULT ANALYSIS...due to 115 kv underbuild. elbow failure on ug. scada alarm at 17:10 indicates fault on nestucca feeder 39. first step is to connect to form 6 relay](https://reader030.fdocuments.net/reader030/viewer/2022012003/60a852ed2290fe4a41065f0d/html5/thumbnails/45.jpg)
TCC CURVE SHOWS THAT 15 A FUSE SHOULD BLOW IN .06 SEC. AT 425 AMPS
![Page 46: DISTRIBUTION FEEDER FAULT ANALYSIS...due to 115 kv underbuild. elbow failure on ug. scada alarm at 17:10 indicates fault on nestucca feeder 39. first step is to connect to form 6 relay](https://reader030.fdocuments.net/reader030/viewer/2022012003/60a852ed2290fe4a41065f0d/html5/thumbnails/46.jpg)
FAULT LOCATOR TOOL TURNED OUT TO BE FAIRLY ACCURATE
Fuse Blew Here
Tree throughLine Here
![Page 47: DISTRIBUTION FEEDER FAULT ANALYSIS...due to 115 kv underbuild. elbow failure on ug. scada alarm at 17:10 indicates fault on nestucca feeder 39. first step is to connect to form 6 relay](https://reader030.fdocuments.net/reader030/viewer/2022012003/60a852ed2290fe4a41065f0d/html5/thumbnails/47.jpg)
SYNERGI PREDICTS 411 AMPS FAULT CURRENT AT THIS LOCATION
![Page 48: DISTRIBUTION FEEDER FAULT ANALYSIS...due to 115 kv underbuild. elbow failure on ug. scada alarm at 17:10 indicates fault on nestucca feeder 39. first step is to connect to form 6 relay](https://reader030.fdocuments.net/reader030/viewer/2022012003/60a852ed2290fe4a41065f0d/html5/thumbnails/48.jpg)
F A U L T E V E N T O N 1 1 - 9 - 1 5
STARLING BRINGS DOWN BLUE HERON
![Page 49: DISTRIBUTION FEEDER FAULT ANALYSIS...due to 115 kv underbuild. elbow failure on ug. scada alarm at 17:10 indicates fault on nestucca feeder 39. first step is to connect to form 6 relay](https://reader030.fdocuments.net/reader030/viewer/2022012003/60a852ed2290fe4a41065f0d/html5/thumbnails/49.jpg)
TUESDAY MORNING AT 8:20 AM
• Public Relations called Operations to find out if a breaker operated at Wilson River Substation• The Mill in town called to report a power dip
• SCADA showed that Circuit 61 had operated and Circuit 62 (Mill Feeder) saw current above Min Trip
![Page 50: DISTRIBUTION FEEDER FAULT ANALYSIS...due to 115 kv underbuild. elbow failure on ug. scada alarm at 17:10 indicates fault on nestucca feeder 39. first step is to connect to form 6 relay](https://reader030.fdocuments.net/reader030/viewer/2022012003/60a852ed2290fe4a41065f0d/html5/thumbnails/50.jpg)
ENGINEERING CONNECTED TO FORM 6 RECLOSER CONTROLS AT SUBSTATION VIA ETHERNET
• The Sequence of Events report from Ckt 61showed that the recloser tripped on Overcurrent, then reclosed and reset
![Page 51: DISTRIBUTION FEEDER FAULT ANALYSIS...due to 115 kv underbuild. elbow failure on ug. scada alarm at 17:10 indicates fault on nestucca feeder 39. first step is to connect to form 6 relay](https://reader030.fdocuments.net/reader030/viewer/2022012003/60a852ed2290fe4a41065f0d/html5/thumbnails/51.jpg)
ALSO DOWNLOADED OSCILLGRAPHYFILES FROM THE RECLOSERS
• Confirmed fault on Ckt 62
![Page 52: DISTRIBUTION FEEDER FAULT ANALYSIS...due to 115 kv underbuild. elbow failure on ug. scada alarm at 17:10 indicates fault on nestucca feeder 39. first step is to connect to form 6 relay](https://reader030.fdocuments.net/reader030/viewer/2022012003/60a852ed2290fe4a41065f0d/html5/thumbnails/52.jpg)
CONTINUATION OF WAVEFORM ON PRIOR SLIDE
• Note that second phase gets involved in fault in the last couple cycles before interruption
![Page 53: DISTRIBUTION FEEDER FAULT ANALYSIS...due to 115 kv underbuild. elbow failure on ug. scada alarm at 17:10 indicates fault on nestucca feeder 39. first step is to connect to form 6 relay](https://reader030.fdocuments.net/reader030/viewer/2022012003/60a852ed2290fe4a41065f0d/html5/thumbnails/53.jpg)
AFTER THE RECLOSER RECLOSED THE TRANSFORMER MAGNETIZING CURRENT WAS PRESENT
• After a few cycles, the magnetizing current decayed to below the minimum pickup value
![Page 54: DISTRIBUTION FEEDER FAULT ANALYSIS...due to 115 kv underbuild. elbow failure on ug. scada alarm at 17:10 indicates fault on nestucca feeder 39. first step is to connect to form 6 relay](https://reader030.fdocuments.net/reader030/viewer/2022012003/60a852ed2290fe4a41065f0d/html5/thumbnails/54.jpg)
NEXUS 1500 METER MONITORING THE TRANSFORMER BUS GIVES A BETTER PICTURE OF THE EVENT
• Note that 2nd phase gets involved before breaker opens. And transformer inrush currents can be seen
![Page 55: DISTRIBUTION FEEDER FAULT ANALYSIS...due to 115 kv underbuild. elbow failure on ug. scada alarm at 17:10 indicates fault on nestucca feeder 39. first step is to connect to form 6 relay](https://reader030.fdocuments.net/reader030/viewer/2022012003/60a852ed2290fe4a41065f0d/html5/thumbnails/55.jpg)
ZOOMING IN TO PHASE B
• The recloser was open for 2010 ms (2 sec.)
![Page 56: DISTRIBUTION FEEDER FAULT ANALYSIS...due to 115 kv underbuild. elbow failure on ug. scada alarm at 17:10 indicates fault on nestucca feeder 39. first step is to connect to form 6 relay](https://reader030.fdocuments.net/reader030/viewer/2022012003/60a852ed2290fe4a41065f0d/html5/thumbnails/56.jpg)
PLUGGED FAULT CURRENTS INTO FAULT LOCATOR TOOL TO PREDICT LOCATION OF FAULT
• Area highlighted in red is most likely fault location
![Page 57: DISTRIBUTION FEEDER FAULT ANALYSIS...due to 115 kv underbuild. elbow failure on ug. scada alarm at 17:10 indicates fault on nestucca feeder 39. first step is to connect to form 6 relay](https://reader030.fdocuments.net/reader030/viewer/2022012003/60a852ed2290fe4a41065f0d/html5/thumbnails/57.jpg)
BLUE HERON RESTAURANT REPORTED HEARING A LOUD BANG – DEAD STARLING WAS FOUND AT
THE BASE OF A POLE NEAR THEM
Blue Heron
Dead Starling
Predicted Fault Location
![Page 58: DISTRIBUTION FEEDER FAULT ANALYSIS...due to 115 kv underbuild. elbow failure on ug. scada alarm at 17:10 indicates fault on nestucca feeder 39. first step is to connect to form 6 relay](https://reader030.fdocuments.net/reader030/viewer/2022012003/60a852ed2290fe4a41065f0d/html5/thumbnails/58.jpg)
IT IS QUESTIONABLE THAT THE STARLING CAUSED THIS FAULT
• Usually takes a bigger bird to cause a phase-to-phase fault
• Phase-to-phase fault current at location where starling was found did not match calculated fault current
• No burn marks from arcing were observed on the pole
![Page 59: DISTRIBUTION FEEDER FAULT ANALYSIS...due to 115 kv underbuild. elbow failure on ug. scada alarm at 17:10 indicates fault on nestucca feeder 39. first step is to connect to form 6 relay](https://reader030.fdocuments.net/reader030/viewer/2022012003/60a852ed2290fe4a41065f0d/html5/thumbnails/59.jpg)
A 10-15-15 FAULT WAS SIMILAR TO THIS ONE AND NO CAUSE WAS FOUND
(COMPARE TO SLIDE 36)
![Page 60: DISTRIBUTION FEEDER FAULT ANALYSIS...due to 115 kv underbuild. elbow failure on ug. scada alarm at 17:10 indicates fault on nestucca feeder 39. first step is to connect to form 6 relay](https://reader030.fdocuments.net/reader030/viewer/2022012003/60a852ed2290fe4a41065f0d/html5/thumbnails/60.jpg)
UG CABLE FAILUREL O C A T I O N P R E D I C T I O N G O O D
F L T I C O N T R I B U T I O N F R O M M I L L M O T O R S
![Page 61: DISTRIBUTION FEEDER FAULT ANALYSIS...due to 115 kv underbuild. elbow failure on ug. scada alarm at 17:10 indicates fault on nestucca feeder 39. first step is to connect to form 6 relay](https://reader030.fdocuments.net/reader030/viewer/2022012003/60a852ed2290fe4a41065f0d/html5/thumbnails/61.jpg)
SCADA ALARMS
![Page 62: DISTRIBUTION FEEDER FAULT ANALYSIS...due to 115 kv underbuild. elbow failure on ug. scada alarm at 17:10 indicates fault on nestucca feeder 39. first step is to connect to form 6 relay](https://reader030.fdocuments.net/reader030/viewer/2022012003/60a852ed2290fe4a41065f0d/html5/thumbnails/62.jpg)
INTERROGATE FEEDER BREAKERS
• Form 6 Recloser Controls did not show anything in Sequence of Events Files
• But they did capture Oscillographic waveforms• The fault was on Circuit 63. The Form 6 on Ckt 63
showed two Oscillographic events• First Event:
![Page 63: DISTRIBUTION FEEDER FAULT ANALYSIS...due to 115 kv underbuild. elbow failure on ug. scada alarm at 17:10 indicates fault on nestucca feeder 39. first step is to connect to form 6 relay](https://reader030.fdocuments.net/reader030/viewer/2022012003/60a852ed2290fe4a41065f0d/html5/thumbnails/63.jpg)
CIRCUIT 63 – SECOND EVENTLINEMAN REFUSED THE RISER POLE
![Page 64: DISTRIBUTION FEEDER FAULT ANALYSIS...due to 115 kv underbuild. elbow failure on ug. scada alarm at 17:10 indicates fault on nestucca feeder 39. first step is to connect to form 6 relay](https://reader030.fdocuments.net/reader030/viewer/2022012003/60a852ed2290fe4a41065f0d/html5/thumbnails/64.jpg)
CIRCUIT 62 CONTRIBUTED FAULT CURRENT DUE TO LARGE MOTOR LOAD
• Note that current is going in the opposite direction as the current in Ckt 63
![Page 65: DISTRIBUTION FEEDER FAULT ANALYSIS...due to 115 kv underbuild. elbow failure on ug. scada alarm at 17:10 indicates fault on nestucca feeder 39. first step is to connect to form 6 relay](https://reader030.fdocuments.net/reader030/viewer/2022012003/60a852ed2290fe4a41065f0d/html5/thumbnails/65.jpg)
FROM PQ METER ON SUB BUSRMS VALUE OF FAULT CURRENT IS CLOSE TO WHAT THE FORM
6 SHOWS: 2165 A ON FORM 6, 2072 A ON NEXUSFAULT LASTED FOR 1.5 CYCLES = .0025 SEC
![Page 66: DISTRIBUTION FEEDER FAULT ANALYSIS...due to 115 kv underbuild. elbow failure on ug. scada alarm at 17:10 indicates fault on nestucca feeder 39. first step is to connect to form 6 relay](https://reader030.fdocuments.net/reader030/viewer/2022012003/60a852ed2290fe4a41065f0d/html5/thumbnails/66.jpg)
FAULT LOCATION PREDICTION NOT FAR OFF
Fault on UG Cable
![Page 67: DISTRIBUTION FEEDER FAULT ANALYSIS...due to 115 kv underbuild. elbow failure on ug. scada alarm at 17:10 indicates fault on nestucca feeder 39. first step is to connect to form 6 relay](https://reader030.fdocuments.net/reader030/viewer/2022012003/60a852ed2290fe4a41065f0d/html5/thumbnails/67.jpg)
SYNERGI PROTECTION STUDY PREDICTS MAX SLG FAULT CURRENT TO BE 2292 A AT
THIS LOCATION
![Page 68: DISTRIBUTION FEEDER FAULT ANALYSIS...due to 115 kv underbuild. elbow failure on ug. scada alarm at 17:10 indicates fault on nestucca feeder 39. first step is to connect to form 6 relay](https://reader030.fdocuments.net/reader030/viewer/2022012003/60a852ed2290fe4a41065f0d/html5/thumbnails/68.jpg)
30 A FUSE SHOULD BLOW IN .019 SEC. AT 2165 AMPS. 1.5 CYCLES = .025 SEC.
![Page 69: DISTRIBUTION FEEDER FAULT ANALYSIS...due to 115 kv underbuild. elbow failure on ug. scada alarm at 17:10 indicates fault on nestucca feeder 39. first step is to connect to form 6 relay](https://reader030.fdocuments.net/reader030/viewer/2022012003/60a852ed2290fe4a41065f0d/html5/thumbnails/69.jpg)
QUESTIONS?G A I L S H A W
G S H A W @ T P U D . O R G