Distribution Automation Survey

Presented at SWEDE Conference 2005

By Kevin Clark

Page 2: Distribution Automation Survey

2

Purpose of Survey

Get input from the member utilities of SWEDE:

What are you doing and why?

What are some of the pitfalls?

What are the real world issues?

What are your future plans?

These revelations and more will be uncovered.

Page 3: Distribution Automation Survey

3

Survey Participants

AE - Austin CPS - San Antonio

AEP ERCOT EPE - El Paso

AEP Outside ERCOT PECI - Perdenales

CLECO - Louisiana TNM - Tx New Mexico

CNP - Houston

Page 4: Distribution Automation Survey

4

95 Questions

95 questions that covered many subjects:

Remote controlled PTS

Remote control of line reclosers

Loop sectionalizing

SCADA/Line Monitors

Communications

Installation & Maintenance

Master Station and Cost Benefits

Page 5: Distribution Automation Survey

5

Remote Control Pole Top Switches

Utilities with “working” remote control PTS’s

AE - 6

CNP - 330

CPS - 24

PECI - 3

TXU - 78

Page 6: Distribution Automation Survey

6

Remote Control Pole Top Switches

Most all RC switches had fault sensing capability, but very few reported the magnitude.

The motor operator was either built-in or add-on.

Reasons for RC switches on circuits: customer count, SAIDI, SAIFI, travel time, poor performance, contingency switching, etc.

Location of RC switches on circuits: Midpoint, circuit ties, at major branches, depends on the situation.

Page 7: Distribution Automation Survey

7

Remote Control Pole Top Switches

When are switches operated by Dispatcher: Routinely, during emergencies, for circuit lockouts, to transfer load.

A number of the RC switches also have fault sectionalizing capability.

Problems: Batteries & charging, loss of communications, diagnosing & reporting failures.

Benefits: Reduced outage time, customer satisfaction, improved reliability.

Page 8: Distribution Automation Survey

8

Remote Control Pole Top Switches

Future plans in 2005:

AE - 7

CNP - 20 to 40

CPS - 25

PECI - 10

TXU - 40 plus 36 in S&C intelli-team system

Plans for 2006 & beyond are similar to 2005.

Page 9: Distribution Automation Survey

9

Overhead Line Reclosers

Reclosers with remote control:

AEP ERCOT - 10

CNP - 113

PECI - 40

TXU - 24

Page 10: Distribution Automation Survey

10

Overhead Line Reclosers

Do dispatchers have the capability to do more than trip or close? Yes, work tag, provide loading data, provide number of operations, provide fault current magnitude.

Pitfalls: Communications & SCADA, dispatchers do not take advantage of device, some controls have failed, cost of communications.

Benefits: Reduction in outage minutes, immediate notification, load data, work tags, fault magnitude.

Page 11: Distribution Automation Survey

11

Loop Sectionalizing

Number of circuits with loop sectionalizing:

AEP ERCOT - 6

AEP outside ERCOT - 8

CNP - 6

CPS - 1

EPE - 3

TXU - 3

Page 12: Distribution Automation Survey

12

Loop Sectionalizing

Circuits are sectionalized in 1/2 or 1/3.

Where is LS implemented: various applications, urban & rural, critical loads, for reliability.

Driver for how to break up circuit: customer count, load, circuit topology, convenience.

How does it operate: Peer to peer, individual settings, central controller.

Can the LS be deactivated remotely: Yes & no.

Page 13: Distribution Automation Survey

13

Loop Sectionalizing

How do you figure the loading on the loop sections: Predetermined, primary meters, field measurements.

Does LS have the capability to disable itself if load is too high: No or not enabled.

Account for temporary switching: Deactivated or not a concern.

Does the substation breaker communicate with LS devices: No

Page 14: Distribution Automation Survey

14

Loop Sectionalizing

Problems with LS: Steep learning curve, the timing gets off and opens some switches it shouldn’t, dispatcher has no confidence and deactivates scheme, equipment does not work correctly, need more time to evaluate.

Benefits: Improved SAIDI, reduced outage time.

Future plans in 2005: AEP - $1mil, AEP outside - $2 mil, TXU - 5 or 6.

Page 15: Distribution Automation Survey

15

SCADA / Line Monitors

Most utilities installed fault indicators or line monitors where you had to gather data onsite only.

CNP - Installs remote monitors where load data was critical as well as getting info on fault location.

Communication is through radio & lease lines.

Sensors included PT’s & CT’s. Faulty data < 1%.

Problems: High cost. Benefits: More efficient dispatching, load data. CNP future plans: None

Page 16: Distribution Automation Survey

16

Communications

How do you communicate: Licensed radio, un-licensed radio, telephone wire, wireless, cell site, telemetrics, satelite.

Future communications under consideration: BPL, cellular, PLC, GPRS, fiber, broadband.

Problems: Trees & path obstructions, too many technologies, bandwidth, weak signal, cellular strength, chatter, high cost of satellite.

Rate stability 1-5: Results range from 2 - 5.

Page 17: Distribution Automation Survey

17

Installation & Maintenance

How long does it take to install new field device & make operational: EPE - 1 hour, PECI - 3 days, CNP - 2 weeks, CPS - 9 hours, AE - 24 hours cumulative work time, AEP - to one year.

Problems: Had to fabricate brackets to hold sensors for motor operators, circuits were not ideal candidates, needed a communications repeater & all electric facilities were underground, misalignment of switch blade, receivers out of reach of transmitter, HMI software memory errors.

Page 18: Distribution Automation Survey

18

Installation & Maintenance

Number of times that a device failed to operate:

CNP - 5%, TXU <5%

Separate maintenance program: Mostly no.

Page 19: Distribution Automation Survey

19

Master Control System

Number of control consoles: 1 - 6, typically 3 -5.

Is info coming into master station available to other individuals in company? Yes or unknown. Info is used by planning, engineering or those with access.

Is info from master station tied into SCADA network: mostly yes.

Is master station software supported internally or externally: Mostly internally.

Addressing Cyber security issues: Yes and no.

Page 20: Distribution Automation Survey

20

Cost Benefit Analysis

How do you evaluate the cust-mins saved on a circuit with RC devices or loop sectionalizing:

AEP - historical outages & assumed fault distribution

CNP - Assume 30 mins on 12KV & 45 mins on 35 KV

What have been the savings to system SAIDI:

CNP - 2004 was 9.48 mins

Have you done a cost-benefit analysis for installation of automation: AEP - Yes, based on the above.

Page 21: Distribution Automation Survey

21

Remote Capacitor Controls

How do you remote capacitor controls:

EPE - 545, CNP - 200, TXU - starting in 2005

Communications: One-way radio, one-way paging

Software: RCCS, Cannon/Yukon software

Future Plans: EPE - expand to Las Cruces, CNP - full coverage over next 8 yrs, TXU - 7,100 over 5 yrs

Page 22: Distribution Automation Survey

22

Underground Network Systems

Do you remotely monitor underground network:

CNP - Pilot program w/ Eaton relays & Parijat controlware using phone lines.

TXU - Yes, leased line system.

These systems do not interface with SCADA.

Page 23: Distribution Automation Survey

23

Regulators

Do you have remote control on voltage regulators:

CNP - Yes, 1.

Purpose: To obtain load monitoring & voltage data, but not really used.

Page 24: Distribution Automation Survey

24

Conclusion

There is not as much distribution automation installed as I might have expected.

A copy of all questions and responses is included in the conference disk. It also includes the contact person for each utility that responded if you have any specific questions.