DISTRIBUTED ENERGY RESOURCES - RMEL
Transcript of DISTRIBUTED ENERGY RESOURCES - RMEL
CPS ENERGY’S FLEXIBLE PATHDISTRIBUTED ENERGY RESOURCES
Presented by: James Boston
B Y T H E N U M B E R S
# Largest Municipally Owned Electric and Gas Utility in the U.S.Solar Power Production in Texas; Seventh in the Nation Most Trusted Brand in the South Region by MSIWind Power Production in Texas
Years of ServingSan Antonio
AA+
Premier Credit Rating
822k 347kOur Customers
Electric
Gas
$11B - Assets $2.6B - Annual Revenue$ $350M annual payment to
City of San Antonio$
MARKET DISRUPTION
IN ACTION!
WHY FLEXIBILITY MATTERS?
• Predictable customer load• Predictable customer growth• Consistent generation levels
Traditional(Historical)
40+ Year Baseload AssetsTraditional Power Plants
Flexible(Future)
• Energy Efficiencyo Equipment using less energyo Declining use per customer
• More Potential for Renewableso Intermittency in generationo Renewables serving off-peak hours
• New technologies on the horizon
Need Ability to AdaptFlexible Generation Path
WHAT ARE WE DOING?
• Installation of over 500MW of solar – PPA• Customer Program Offerings
– Solar Host Program– Customer Rebates– Community Solar
• Smart Grid Infrastructure
Solara 110 MW
Pearl 50 MW (Under Construction)
Sirius 110 MW(In Testing)
Helios 95 MWEclipse 40 MW
CPS ENERGY RENEWABLE INSTALLAT IONS
Sinkin 1&2 20 MWSomerset 11 MW
Alamo 1 40 MW
Alamo 2 ‐ 4.4 MW
Alamo 3 ‐ 5.5 MW
Blue Wing14 MWSweetwater 3 & 4 341 MW
Desert Sky 1 & 2 161 MW
Cedro Hill 150 MW
Los Vientos 200 MW
Penascal 77 MW
Papalote Creek 130 MW
Community 1 MW
Ivory 50 MW
8
Solar ProgramsSimply Solar
Solar Rebates14.8K customers
Roofless Solar 245 solar owners
SolarHostSA592 rooftops
Three ways for customers to participate in solar
SOLAR+STORAGE PROJECT
5 MW AC Solar PV Facility 10 MW Battery Storage System
• Energy Storage System (ESS) co-located with solar production
• Application: Solar shifting and Fast Responding Regulation Service (FRRS)
• Flexible configuration
• 10 MW FRRS with 1 hour duration
• 5 MW stored energy with 2 hour duration
PV+BESS PARTNERSHIP
• SwRI ‐ Research Opportunities
• CPS Energy – Renewable Energy, Reduced Emissions, Operational Experience, Flexible Path
• Both parties – Community Recognition, Data Sharing
SOLAR LAYOUT
Highly visible site located along the Highway 151 corridor
PV+BESS PARTNERSHIP
NEW TECHNOLOGY IMPLEMENTATION GRANT (NTIG)
• Improve the quality of air in Texas
• Facilitate the implementation of new technologies to reduce emissions
• Fund implementation of new technologies while creating new business and industry
CPS Energy was awarded $3M to partially offset the ESS cost
LESSONS LEARNED
• CPS Energy formed a cross‐functional Technical Advisory Team– Direct Buried Cable– Communication Access– Resource Meter– Switchgear – Resiliency– String Inverter
STRING INVERTER
• Technical team approved use of string inverters in centralized design
• Benefits:• O&M does not require specialized
training. Inverter can easily be sent back to factory for repair/replacement
• Higher energy production due to (1) increased flexibility for design optimization (2) more inverters (more MPPTs) reduce losses from partial site shading
Thank You..