Discussion on Low Voltage Electrical Installation Technology in Building Electrical Equipment Zhao Xiang 1, a , Yang Zhenhu 2 1,2 Shandong Labor Vocational and Technical College,Jinan 250022 ,China a [email protected] Key words: building, electrical low voltage electrical, installation technology Abstract. In recent years, with the rapid development of China's economy and the acceleration of urbanization, the construction industry has also developed rapidly. With the improvement of people's living standard, people have higher and better requirements for their living environment. As a result, people have higher requirements for the construction projects which are closely related to their own lives. Building electrical system is a part of construction project, and low voltage electrical installation technology is the core of building electrical technology. This technology plays an important role in ensuring the safety of electrical engineering and the quality of the whole construction project. Low voltage electrical installation has a great influence on the normal operation of building electrical equipment, and it is a very important link in the construction project. Low voltage electrical installation technology and the procedure is complicated, the quality of the finished directly affects the entire building electrical engineering operation, must be of low voltage electrical installation engineering of comprehensive control to ensure the quality of installation. This article mainly analyzes the low voltage electrical installation technology in building electrical equipment.In recent years, the development of China's construction industry is relatively rapid, in city construction, we can see is the construction of the edifice, however, with the construction industry is becoming increasingly prosperous, we have heard a lot about building the bad rumors, such as tofu engineering etc.. Therefore, improving the quality of construction is particularly important. Electrical installation in building engineering is one of the important factors that affect the quality of building. Therefore, we should improve the electrical installation technology, especially the use of a wide range of low-voltage electrical installation technology, so as to improve the quality of the entire construction project, to meet the requirements of the construction industry. Features of Low Voltage Electrical Installation Technology In the installation of building electrical process, will be affected by many external factors, thereby affecting its quality, there are certain hidden dangers. This requires that the installation engineers in the process of strict checks. Ensure installation quality during engineering implementation. The low voltage electrical installation works with long construction schedule, complex installation process and complicated process, which causes many external factors to be involved in the process.The quality of construction is difficult to guarantee. Before the construction, the grounding grid and pipeline laying should be adequate, and then enter the equipment test stage. At the end of all projects, the staff to debug the system to the best state, by the relevant departments testing acceptance. Construction Project Low Voltage Electrical Debugging When the low voltage electrical installation of building construction project is finished, it is necessary to check the operation of the components in the low voltage electrical installation project to ensure the effectiveness of the installation of low voltage electrical equipment. To be specific, the current and voltage of the set of distribution (control) equipment should be in normal condition. The motor should be electrified to observe its steering and mechanical rotation is normal, and no-load 181 This is an open access article under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/). Copyright © 2017, the Authors. Published by Atlantis Press. 3rd Workshop on Advanced Research and Technology in Industry Applications (WARTIA 2017) Advances in Engineering Research (AER), volume 148

Transcript of Discussion on Low Voltage Electrical Installation ...

Page 1: Discussion on Low Voltage Electrical Installation ...

Discussion on Low Voltage Electrical Installation Technology in Building Electrical Equipment

Zhao Xiang1, a, Yang Zhenhu2 1,2 Shandong Labor Vocational and Technical College,Jinan 250022 ,China

[email protected]

Key words: building, electrical low voltage electrical, installation technology

Abstract. In recent years, with the rapid development of China's economy and the acceleration of urbanization, the construction industry has also developed rapidly. With the improvement of people's living standard, people have higher and better requirements for their living environment. As a result, people have higher requirements for the construction projects which are closely related to their own lives. Building electrical system is a part of construction project, and low voltage electrical installation technology is the core of building electrical technology. This technology plays an important role in ensuring the safety of electrical engineering and the quality of the whole construction project. Low voltage electrical installation has a great influence on the normal operation of building electrical equipment, and it is a very important link in the construction project. Low voltage electrical installation technology and the procedure is complicated, the quality of the finished directly affects the entire building electrical engineering operation, must be of low voltage electrical installation engineering of comprehensive control to ensure the quality of installation. This article mainly analyzes the low voltage electrical installation technology in building electrical equipment.In recent years, the development of China's construction industry is relatively rapid, in city construction, we can see is the construction of the edifice, however, with the construction industry is becoming increasingly prosperous, we have heard a lot about building the bad rumors, such as tofu engineering etc.. Therefore, improving the quality of construction is particularly important. Electrical installation in building engineering is one of the important factors that affect the quality of building. Therefore, we should improve the electrical installation technology, especially the use of a wide range of low-voltage electrical installation technology, so as to improve the quality of the entire construction project, to meet the requirements of the construction industry.

Features of Low Voltage Electrical Installation Technology

In the installation of building electrical process, will be affected by many external factors, thereby affecting its quality, there are certain hidden dangers. This requires that the installation engineers in the process of strict checks. Ensure installation quality during engineering implementation. The low voltage electrical installation works with long construction schedule, complex installation process and complicated process, which causes many external factors to be involved in the process.The quality of construction is difficult to guarantee. Before the construction, the grounding grid and pipeline laying should be adequate, and then enter the equipment test stage. At the end of all projects, the staff to debug the system to the best state, by the relevant departments testing acceptance.

Construction Project Low Voltage Electrical Debugging

When the low voltage electrical installation of building construction project is finished, it is necessary to check the operation of the components in the low voltage electrical installation project to ensure the effectiveness of the installation of low voltage electrical equipment. To be specific, the current and voltage of the set of distribution (control) equipment should be in normal condition. The motor should be electrified to observe its steering and mechanical rotation is normal, and no-load

181 This is an open access article under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Copyright © 2017, the Authors. Published by Atlantis Press.

3rd Workshop on Advanced Research and Technology in Industry Applications (WARTIA 2017)Advances in Engineering Research (AER), volume 148

Page 2: Discussion on Low Voltage Electrical Installation ...

trial run oftimes the ocan start agother paramsystem is ecircuit, and

Types of L

Installaswitchboarpanel instawiring, maelectric cabselected tostructure, tthe circuit the groundmatching oand the disand the ocdistributor,of the matrequiremenfirst determto ensure should be division of

Electric and the linand the wiDistributorthe ear thinelectric shshall be en

Installaengineerinby improvibe guarantconstructio

f the motor opening timgain. No-lometers, to eenergized, thd the contro

Low Voltag

tion technrd mainly iallation proake sure thabinets, electo ensure firthe original interface is

ding of the open door istributor is currence of, attention serial is corrnts. When imine the corthe safety distributed

f each phase

cabinet, elene can not apire of brokr shall be prng terminalock protect

nsured corretion technog include ping the quaeed. Howev

on personne

time is 2 home is more th

ad operatioensure that he control o

ol order of th

ge Electrica

nology of pincludes thecess, to accat the instaltric boxes arm installatdistribution

s strictly opmetal frams provided.kept in goo

f strand breashould be prect and firminstalling thrrect and prand stabilit

d accordinge sequence s

Fig.1 Instal

ectric box anppear out o

ken strand. roperly groul of the opetion shall bectly. ology of pipipe, embedality of pipever, in practel of the tec

ours. AC mhan 5 seconn, to recordto achieve

of the lamp he switch an

al Installati

power diste followingcurately locllation runsand power dtion and non of the boxperated accoe, the electr Make sure

od order andaks. When aid to the sem, so as to

he electric coper installaty of the p to the strushould be op

llation techn

nd wire arraof order probThe metal unded and sen able doorbe set up, an

ipe embedmdment box ae pre embedtice, it will chnical barr

motor no-loands, to ensud the curren

the electriccircuit shound the lamp

ion

tribution pg aspects: icate the inss throughoudistribution ormal technx is strictly ording to thtric box ande that the ind closely cochoosing melection of ensure tha

cabinet, elecation positi

power equipucture of t

operated acc

nology of p

angement oblem, shoulframe of th

set up the cor shall be cnd the push

ment. The and weldingdding, the qbe affectedrier, there h

ad conditionure that the mnt, voltage, tcal propertyuld be the sap should be

panel. The in the cabinstallation pout the power

panels, nonnical paramchecked, an

he drawing ld the distribnternal wirinonnected to

materials forflame retart the technictric box anon, then corpment. Thehe drawing

curately acco

ower distrib

of the switchld be neat ahe electric orrespondinconnected bh and pull

important cg. Pipe emb

quality of bud by many fahave been b

ns continue tmotor temptemperaturey requiremeame as that compared w

constructionet, electricosition. Pror plant. In tn combustib

meters. Accond the area line. To ens

butor of the ng of the ca

avoid the or electric cabdant materiical paramend distributorrectly conn componen

g, and the lording to th

bution pane

hboard shalland orderly, cabinet, theg open doory bare coppaction of th

componentsbedment is uilding elecactors. For buried and

to start twoperature is ne and runninents. After tof the distr

with each ot

on technoloc box and operly connthe processble materialording to this strictly dsure the cor

e basic steelabinet, the eoccurrence

abinet, electial, and the eters meet thor, the buildnect the intents in the eline interfa

he drawing.

el

l be closely not hurt the electric br. The metaper wire, anhe distribut

s of buildinmost impo

ctrical enginexample, thburied. The

o times, twonormal, young time andthe lightingibution boxther.

ogy of thedistributionect internal

s of makings should behe drawing

divided, andrrectness ofl frame, theelectric boxof disorderric box andinstallationhe standardders shouldernal wiringelectric boxace and the

y connected,he core wirebox and theal frame andnd a certaintion cabinet

ng electricalortant. Onlyneering willhe technicalerefore, the

o u d g x

e n l g e g d f e x r d n d d g x e

, e e d n t

l y l l e

182

Advances in Engineering Research (AER), volume 148

Page 3: Discussion on Low Voltage Electrical Installation ...

constructioThe req

specificatioequipment not up to spipe and win operatioburied, somrelated staconstructiorequiremenof the embattention taccordanceshall be exspecificatio

Installatioto in the mfacilitate ththe asphaltlength of ththis procesthe contactThe groundfixed devicLay out tanticorrosilightning pguaranteedprotection grounding electromagand surge the differeelectrical aSurge prot

on technologquirements, ons and drafoundation

standard, timwelding is aon due to dime construandards weron personnents. Field stbedded posito check the with the rxamined in ons.

on technolomain channhe passage t pavement, he modulesss, to do all t distance shding modulce shall be the assembion work wprotection ad through t

devices arwire and

gnetic effectcurrents. Eq

ence betweeand externaltector is use

gy is also vsuch as th

awings to sn constructiomely measuan importanifferent leve

uction workre buried, el in the pitaff need to ition, need the connectirelevant stan

detail and

Fig.2 Ins

ogy of earthnel of the bof people bthe. The di

s should be the indicat

hould be suile is the saminstalled bely line wh

with the paiand groundithe installare mainly d other mts in buildinquipotentialen the needl conductor ed for lightn

ery high. he construcstrictly checon quality pures should nt part of lowels of techners in the oall these wpe pre buricarefully chthe numberion of pipendard fittingclosely. En

stallation te

hing deviceuried depth

better and mistance betw3 to 5 time

tors of recoritable, and t

me as the truelow the corhen exposent in the wing protectiation of inshielding f

measures. Tngs, and prel connectiond of space connected b

ning protect

ction personck the partpass. For thbe taken tow voltage e

nology, can operation i

will lead toied, should heck the fit

r, type and ses, wire bogs. The steensure that t

echnology o

e. In the preh of the pedmore comforween the groes, and the brds. The insthe lead of eunk materiare line of thd. Place th

welding posion, lightni

nternal lighfacilities, eThese facievent buildin to potentiin the lighby wires, thtion of elec

nnel must ts with embhe above reqo remedy it electrical insometimes s not in aco irregular

be strictly ttings accorspecificatioox, bend rel pipe corrthe quality

of pipe em

e buried grodestrian murtable in theounding moburied depthstallation meach modulal. During the plasteringhe device sition of theng protecti

htning proteequipotentialities can

ings from beial metal co

htning protehe space to fctronic equip

advance tobedded partquirements,and avoid

nstallation, clead to leak

ccordance wpipe pre bin accorda

ding to the n and otheradius, bendosion, weldof the emb

mbedment

ounding lineust be over e pipeline a

odules shoulh should be

module shoue should behe concealeg layer, so tas smooth e bracket. Ton within tection devial connectio

reduce lieing harmedomponents ection devicform a goodpment, need

o the embets. Check w, if the phenlosses. Theconstructionkage of bur

with the draburied. Theance with cconstructio

r informatiod, junctionding and pipbedded pipe

e, should par 1 meters, above the bld not be tooe more thanuld be level e welded inted coating othat it can n

as possibThe need fthe buildingice, internaon, lightninightning cud by induceand system

ce, metal cod potential od to be inst

edded partswhether thenomenon ise embeddedn personnelried pipe orawings anderefore, theconstructionon drawingson, and pay

box is inpe handlinge meets the

ay attentionin order toest shop ono small, the

n 0.6mm. Inor vertical,

to one loop.operation, anot be bent.le. Do the

for buildingg mainly isal lightningng arrester,urrent anded lightning

ms to reduceomponents,of the body.talled in the

s e s d l r d e n s y n g e

n o n e n , . a . e g s g , d g e , . e

183

Advances in Engineering Research (AER), volume 148

Page 4: Discussion on Low Voltage Electrical Installation ...

junction oflevel two ainstalled neprotect themeasure toand it will for lightninshould be l

Low Volta

The stesystem, theconnected,conductor. and electrielectrical gtime. There

Long hconstructiowill determprocess is a

Regularinsulation property soccurrenceof low-volto be affecthe highwashould regthe processmany secusustainable

Conclusio

In summtechnologybuilding elvoltage el

f the lightnas the basicear the prote personal so ensure saf

be installeng protectiolaid on the p

age Electric

p is varioue neutral po, and someThis is the

ical equipmgrounding, tefore, the te

hours, moron has a lonmine a lot oaffected by r inspectionof electrica

security of e of such inltage electricted by exteay and the

gularly checs of low-vo

urity risks, te developme

n

mary, throuy that has alectrical englectrical ins

ning protectc protectiontection equisafety and fety, the grod in the stroon, the deptpipe.

Fig.3 In

cal Installa

us and diffoint and thee devices we groundingment connethe installatechnical levre interfereng duration, of interferea variety ofn, effectiveal equipmenthe vast n

ncidents, effical cooperaernal factors

afforestatick, send speoltage electrthen we wient of low-v

ugh the resan importangineering, istallation p

ion divisionn screen insipment in pavoid the ounding lineong electricth of the tru

stallation te

ation Techn

ficult to ine bracket of which are ig technologycted by th

tion steps arvel is relativence. In thinvolving ance factorsf factors, ane operationnt failure, thnumber of efective measation and ms, such as fon of the f

ecial mainterical installaill strictly evoltage elec

search on tnt effect to is an importproject in g

n, a surge pstalled in thlace. Besid

occurrence e will be laicity distribuunk line sho

echnology o

nical Difficu

nstall. In orf the equipmin contact y. The groue groundinre various a

vely high. he construca wide rangs: wide areand there mayn. In the uhen the eleemployees sures shoul

many procesfailures andforest will enance persation and useliminate hictrical.

the construuse low-vo

rtant factor general is

protector inhe electricales, the earthof electric d or fixed o

ution shaft. ould be mor

of earthing d

ulties

rder to prevment and the

with each unding wireng body. Inand complex

ction of lowge, a varietya, cross - sty be a fault

use of low-ectric shock

bring gread be taken sses, the op

circuit aginaffect the onnel to elise will be afidden dange

uction of looltage electrto guarantea relativel

nstalled on tl distributiohing deviceshock. Gro

on the suppoWhen layinre than one

device

vent electrice electrical other are

e is composn the installx, and it tak

w voltage y of processetrong and sif there is avoltage eleaccident w

at risks. In to ground. Deration procng problemtransmissioiminate secuffected by mers, nip in t

ow voltage rical technoee the qualitly complex

the main swon, level thre should be ounding is aort of the cang down th

e meter and

c shock, inequipment connected

sed of metallation of lokes a certain

electrical ies characterso on. The a slight erroectrical procwill occur, t

order to pDue to the cess is extr

ms. The conson line. Thecurity risks. many factorthe bud, to

electrical ology to thety of the pr

x system e

witchboard,ree is to beinstalled to

a necessaryable bridge,e main linethe asphalt

n the powerare usuallyby a goodl conductorow voltagen amount of

installation,ristics. Thisinstallationr. cess, if thethe life andprevent thewide range

remely easystruction oferefore, weIn general,

rs, there are ensure the

installatione quality ofroject. Low

engineering,

, e o y , e t

r y d r e f

, s n

e d e e y f e , e e

n f

w ,

184

Advances in Engineering Research (AER), volume 148

Page 5: Discussion on Low Voltage Electrical Installation ...

therefore, in the construction process, we must uphold a rigorous and scientific work attitude, strict control of the quality of the project. Improve the quality of construction, and thus improve people's quality of life. This requires more attention to the quality of the project supervision work, strengthen the training of relevant personnel, supervision and inspection of the establishment of quality supervision team of practical engineering project quality, so as to promote the sustainable development and use of building electrical low-voltage electrical.

References

[1] T.Wang. Low voltage electrical installation technology in building electrical [J]. business culture, 2013, 04 (11): 38-39.(In Chinese)

[2] Z.C. Liu. Talking about low voltage electrical installations in building electrical equipment [J]. science and technology enrichment guide, 2013, 08 (14): 88-89.(In Chinese)

[3]Xu Shujie; Huang Wei; teaching reform and practice of Architectural Electrical course design; [J]; Shanxi architecture; 2008-28(In Chinese)

[4]W.Wei. Construction of electrical design principles and quality problems [J]; China's new technology and new products; 2009-08(In Chinese)

[5]Editorial department; 2009. China building electrical technology and Application Forum held in Shanghai [J]; low-voltage electrical appliances; 2009 12(In Chinese)

185

Advances in Engineering Research (AER), volume 148