Discovery Pre Launch

48
SHUTTLE PROCESSING (Before Flight Activities Rarely Seen By The General Public) DISCOVER --- DISCOVERY

Transcript of Discovery Pre Launch

Page 1: Discovery Pre Launch

SHUTTLE PROCESSING

(Before Flight Activities Rarely Seen By The General

Public)DISCOVER --- DISCOVERY

Page 2: Discovery Pre Launch

External Tank Arrives by Barge from MS

Page 3: Discovery Pre Launch
Page 4: Discovery Pre Launch

Vertical Assembly Building

External Tank

Page 5: Discovery Pre Launch

Removing

External Tank

From Carrier

Page 6: Discovery Pre Launch
Page 7: Discovery Pre Launch

External Tank Enters VAB

Page 8: Discovery Pre Launch

External Tank in VAB

Page 9: Discovery Pre Launch

Preparing to Lift the Tank to Vertical

Page 10: Discovery Pre Launch

Lifting Tank

Page 11: Discovery Pre Launch

Solid Rockets

Are Attached

Page 12: Discovery Pre Launch

Engines Are

Attached To

Solids

Page 13: Discovery Pre Launch

Engines Are Attached To The Shuttle In The Shuttle Processing Facility

Page 14: Discovery Pre Launch
Page 15: Discovery Pre Launch
Page 16: Discovery Pre Launch
Page 17: Discovery Pre Launch

Shuttle In Sling Ready For Lift In VAB

Page 18: Discovery Pre Launch

Shuttle Has Been

Moved To VAB And

And Will Be Attached

To External Tank

Page 19: Discovery Pre Launch
Page 20: Discovery Pre Launch

Shuttle is Attached

Page 21: Discovery Pre Launch
Page 22: Discovery Pre Launch
Page 23: Discovery Pre Launch
Page 24: Discovery Pre Launch

Payload Preparation Room

(PPR)

Page 25: Discovery Pre Launch

Cargo Package For ISS

Page 26: Discovery Pre Launch

New Module For ISS

Page 27: Discovery Pre Launch

Payload Ready To Be Moved to The

Launch Pad

Page 28: Discovery Pre Launch
Page 29: Discovery Pre Launch

Payload Carrier Leaves PPR

Page 30: Discovery Pre Launch
Page 31: Discovery Pre Launch

Payload Being Moved To Launch Pad

Page 32: Discovery Pre Launch
Page 33: Discovery Pre Launch

Lifting Payload Into Position For

Insertion Into Discovery When It Arrives At The

Pad

Page 34: Discovery Pre Launch
Page 35: Discovery Pre Launch
Page 36: Discovery Pre Launch

Shuttle Discovery Leaves VAB

Page 37: Discovery Pre Launch
Page 38: Discovery Pre Launch

Shuttle & Crawler

Launch Pad

TRIP:

Length--- 3 ½ mi

Time--- 6-8 hours

Page 39: Discovery Pre Launch
Page 40: Discovery Pre Launch

Crawler Control

Page 41: Discovery Pre Launch
Page 42: Discovery Pre Launch

DISCOVERY ARRIVES

AT PAD

Page 43: Discovery Pre Launch
Page 44: Discovery Pre Launch
Page 45: Discovery Pre Launch
Page 46: Discovery Pre Launch

READY FOR LAUNCH

Page 47: Discovery Pre Launch

We Have Lift Off

Page 48: Discovery Pre Launch