DAVID G CAMERON-ELLIS DIRECTOR: DAMS & HYDRO PAGE 1 OF 12 David Cameron-Ellis’ 29 years of post-graduate experience has focused primarily on the design and rehabilitation of dams. His experience extends from basic planning through to construction implementation. He has worked on numerous dam types, including earthfill, rockfill, RCC, Hardfill, RMC and conventional concrete dams. David has been involved in several hydro-electric projects with contributions ranging from design and management of small schemes to team member on larger ones. In addition, he has extensive experience in project management, the design of civil structures, such as reservoirs and bridges, and the design and implementation of civil engineering services projects, such as water and wastewater systems. His experience in water retaining structures includes his early construction monitoring experience as resident engineer on the Grand Central Reservoir and Pressure Tower and has progressed though the rehabilitation of a number of reservoirs in Malawi and the design of numerous water treatment works and dam related structures. David is currently a director in the Dams and Hydro division at ARQ. In addition to being a Management Committee member and Treasurer of South African Committee on Large Dams; he also serves as South Africa’s representative on the International Commission on Large Dams’ Cemented Materials Committee. K EY E XPERIENCE Name of firm ARQ (Pty) Ltd PERSONAL INFORMATION Profession Civil Engineer Date of Birth 08.03.1969 Years with firm 24 Years Nationality South African Qualifications B.Eng (Cum Laude) – University of Pretoria, RSA 1990 B.Eng (Hons) (Cum Laude) - University of Pretoria, RSA 1995 Membership of Professional Institutions Registered Professional Engineer (RSA): No 970608 Member of the South African Institution of Civil Engineers Treasurer for the South African Commission on Large Dams Countries of Work Experience Central African Republic, Democratic Republic of Congo, India, Kenya, Lao PDR, Liberia, Malawi, Mauritius, Mozambique, Namibia, Pakistan, Panama, Philippines, Saudi Arabia, South Africa, Swaziland, Tanzania, Zambia and Zimbabwe Languages English first language Afrikaans Years’ experience 28 Years Employment Record June 1995 to present ARQ (Pty) Ltd. Director/ Civil Engineer Jan 1992 to May 1995 BKS (Pty) Ltd. Civil Engineer/ Eng in Training Email address [email protected] PONGOLAPOORT DAM REHABILITATION EXPERIENCE Project Duration: May 2018 to date Location: Jozini, Kwazulu-Natal, South Africa Client: Department of Water and Sanitation (ARQ sub-consultants to LTE Consulting (Pty) Ltd) Project Description: 89 m double-curvature arch dam with insufficient spillway capacity Value of Project: R 500 million (preliminary estimate) Position & Duties: Lead Design Engineer responsible for dam rehabilitation including flood hydrology, spillway capacity determinations, structural review and instrumentation.

Transcript of DIRECTOR: DAMS & HYDRO · His experience in water retaining structures includes his early...

Page 1: DIRECTOR: DAMS & HYDRO · His experience in water retaining structures includes his early construction monitoring experience as resident engineer on the Grand Central Reservoir and

DAVID G CAMERON-ELLIS DIRECTOR: DAMS & HYDRO

PAGE 1 OF 12

David Cameron-Ellis’ 29 years of post-graduate experience has focused primarily on the design and rehabilitation of dams. His experience extends from basic planning through to construction implementation. He has worked on numerous dam types, including earthfill, rockfill, RCC, Hardfill, RMC and conventional concrete dams.

David has been involved in several hydro-electric projects with contributions ranging from design and management of small schemes to team member on larger ones.

In addition, he has extensive experience in project management, the design of civil structures, such as reservoirs and bridges, and the design and implementation of civil engineering services projects, such as water and wastewater systems. His experience in water retaining structures includes his early construction monitoring experience as resident engineer on the Grand Central Reservoir and Pressure Tower and has progressed though the rehabilitation of a number of reservoirs in Malawi and the design of numerous water treatment works and dam related structures.

David is currently a director in the Dams and Hydro division at ARQ. In addition to being a Management Committee member and Treasurer of South African Committee on Large Dams; he also serves as South Africa’s representative on the International Commission on Large Dams’ Cemented Materials Committee.

KE

Y E

XP

ER

IEN

CE

Name of firm ARQ (Pty) Ltd

PE

RS

ON

AL

IN

FO

RM

AT

ION

Profession Civil Engineer

Date of Birth 08.03.1969

Years with firm 24 Years

Nationality South African

Qualifications B.Eng (Cum Laude) – University of Pretoria, RSA 1990

B.Eng (Hons) (Cum Laude) - University of Pretoria, RSA 1995

Membership of

Professional

Institutions

Registered Professional Engineer (RSA): No 970608

Member of the South African Institution of Civil Engineers

Treasurer for the South African Commission on Large Dams

Countries of Work

Experience

Central African Republic, Democratic Republic of Congo, India, Kenya, Lao

PDR, Liberia, Malawi, Mauritius, Mozambique, Namibia, Pakistan, Panama,

Philippines, Saudi Arabia, South Africa, Swaziland, Tanzania, Zambia and

Zimbabwe

Languages English first language

Afrikaans

Years’ experience 28 Years

Employment

Record

June 1995 to present ARQ (Pty) Ltd. Director/ Civil Engineer

Jan 1992 to May 1995 BKS (Pty) Ltd. Civil Engineer/ Eng in Training

Email address [email protected]

PONGOLAPOORT DAM REHABILITATION

EX

PE

RIE

NC

E

Project Duration: May 2018 to date Location: Jozini, Kwazulu-Natal, South Africa

Client: Department of Water and Sanitation (ARQ sub-consultants to LTE Consulting (Pty) Ltd)

Project Description: 89 m double-curvature arch dam with insufficient spillway capacity Value of Project: R 500 million (preliminary estimate)

Position & Duties: Lead Design Engineer responsible for dam rehabilitation including flood hydrology, spillway capacity determinations, structural review and instrumentation.

Page 2: DIRECTOR: DAMS & HYDRO · His experience in water retaining structures includes his early construction monitoring experience as resident engineer on the Grand Central Reservoir and

DAVID G CAMERON-ELLIS DIRECTOR: DAMS & HYDRO

PAGE 2 OF 12

MEWA Dams

SE

LE

CT

ED

DA

MS

& H

YD

RO

PO

WE

R E

XP

ER

IEN

CE

Project Duration: Feb-Dec 2018 Location: Kingdom of Saudi Arabia

Client: Ministry of Environment, Water & Agriculture via AECOM Project Description: Consultancy services for the study & preparation of project documents for the

design & execution of 600 dams Value of Project: R1 million

Position & Duties: Review Engineer

SCHRODA & LUCILLIA POORT DAM SAFETY INSPECTIONS Project Duration: Feb-Oct 2018

Location: Zimbabwe &, South Africa Client: Anglo American

Project Description: Dam Safety Inspections for two dams Value of Project: R3 million

Position & Duties: Project Director, Hydrology, Reporting, Instrumentation Review, Critical Controls, Water Balance, Site Inspection

MUKURUMUDZI DAM SPILLWAY EXTENSION Project Duration: January 2018 – date

Location: Msabweni division, Kwale District, Kenya Client: Base Titanium Ltd

Project Description: 23 m earthfill dam with by-wash spillway Value of Project: US$ 3 million

Position & Duties: Project Director, Engineer: Design, compilation of FIDIC contract document for spillway chute lining extension, tender adjudication. The “Engineer” in terms of the contract.

NTSONYINI DAM Project Duration: 2015 - present

Location: Eastern Cape, South Africa Client: Thuso Development Consultants.

(ARQ sub-consultant to Thuso Development Consultants) Project Description: Design for 35m high hardfill dam with impervious upstream membrane.

Value of Project: R 250 million Position & Duties: Approved Professional Person (APP) and Lead Design Engineer responsible for

reconnaissance studies, dam type selection, detailed dam design for construction, river diversion, Hardfill mix development and QA review of construction.

MOUNT COFFEE HEPP EMERGENCY SPILLWAY, LIBERIA Project Duration: 2017

Location: Monrovia, Liberia Client: The Liberian Electricity Corporation

Project Description: Rehabilitation of breached dam & looted Hydropower station (66 MW). Value of Project: US$ 330 million

Position & Duties: Rubble masonry specialist, advice and assistance to PMU and contractor

MALOTI MINNOWS FISH BARRIER Project Duration: Feb 2016 to June 2017

Location: Senquanyane River, Lesotho Client: Lesotho Highlands Development Authority (LHDA)

Project Description: 7m high Rubble Masonry Concrete weir Value of Project: R 30 million

Position & Duties: Chief Design Engineer responsible detailed design and tender.

Page 3: DIRECTOR: DAMS & HYDRO · His experience in water retaining structures includes his early construction monitoring experience as resident engineer on the Grand Central Reservoir and

DAVID G CAMERON-ELLIS DIRECTOR: DAMS & HYDRO

PAGE 3 OF 12

NWAMITWA DAM TENDER DESIGN

SE

LE

CT

ED

DA

MS

& H

YD

RO

PO

WE

R E

XP

ER

IEN

CE

Project Duration: Feb 2016 to May 2017 Location: Limpopo Province, South Africa

Client: Department of Water Affairs and Sanitation. (ARQ sub-consultants to LTE Consulting (Pty) Ltd)

Project Description: 34m high composite earthfill embankment with a RCC/CVC river section to accommodate the spillway and outlet works.

Value of Project: R 3.2 billion Position & Duties: Approved Professional Person (APP) and Lead Design Engineer responsible for

dam design for tender, including flood hydrology, spillway and outlet works hydraulics, river diversion design, RCC and earthfill structural design and stability, etc

TZANEEN DAM RAISING Project Duration: Feb 2016 – Present

Location: South Africa Client: Department of Water Affairs and Sanitation

(ARQ sub-consultants to Blackhead Consulting) Project Description: 52m high composite CVC/embankment – 3 m fixed labyrinth spillway raising

Value of Project: R 350 million Position & Duties: Lead Design Engineer responsible for the detailed design of new labyrinth

spillway and embankment raising, including demolitions, model studies, assistance with construction monitoring, etc.

AMBARAU HEPP Project Duration: 2014-2016

Location: Democratic Republic of Congo Client: Rand Gold – Kibali Mine

Project Description: Symmetrical Hardfill diversion dam for hydropower generation Value of Project: US$ 80 million, including HEPP works

Position & Duties: Lead Dam Engineer, Responsible for dam type selection, dam design, spillway hydraulics, river management concepts during construction, Hardfill design and advice to client during construction.

REHABILITATION OF EMMARENTIA DAM Project Duration: 2014-2016

Location: South Africa Client: Johannesburg Roads Agency

Project Description: Rehabilitation of 13m high embankment dam to Dam Safety Standards Value of Project: R 26 Million

Position & Duties: Approved Professional Person (APP) for rehabilitation design and dam construction quality control. Responsible for rehabilitation design and construction monitoring as APP & quality control & assurance assistance.

HOPEWELL MINE WATER SUPPLY DAM RECONNAISSANCE STUDY Project Duration: 2015

Location: Zimbabwe Client: Global Platinum Resources through Worley Parsons

Project Description: Reconnaissance study into new water supply dams for the development of the Hopewell Mine near Harare

Value of Project: US$ 11 Million Position & Duties: Dam Design Engineer. Identification of dam sites, basic dam designs, yield and

cost estimation.

Page 4: DIRECTOR: DAMS & HYDRO · His experience in water retaining structures includes his early construction monitoring experience as resident engineer on the Grand Central Reservoir and

DAVID G CAMERON-ELLIS DIRECTOR: DAMS & HYDRO

PAGE 4 OF 12

PADCAL MINE DAM

SE

LE

CT

ED

DA

MS

& H

YD

RO

PO

WE

R E

XP

ER

IEN

CE

Project Duration: 2014 - present Location: Philippines

Client: Phylex Mine ( ARQ sub-consultant to Golder Australia) Project Description: Feasibility study, detail & construction design for construction of 46m high

concrete dam for tailings closure Value of Project: US$ 50 million

Position & Duties: Design Engineer. Feasibility studies, detail & construction design, Compilation of tender specifications and BoQ, advice to Golder during construction.

KENYA MINI-HYDRO SCHEMES Project Duration: 2013-2014

Location: Western Kenya Client: KFIR Partners Limited

Project Description: Feasibility studies of six mini-hydropower generation schemes – Kaptis, Bachangu, Chepkumia, Sirwa, Kipkaren and Lugari

Value of Project: US$ 75 million Position & Duties: Lead Hydropower Design Engineer. Professional consulting services relating to

feasibility studies. Design management. Hydrological, hydraulic and structural design including power studies.

RATLE DAM & HEPP Project Duration: 2013 – 2015

Location: Chenab River, Jammu & Kashmir, India Client: Larsen & Toubro Ltd

Project Description: 133 m RCC gravity dam (reviewing change to arch) & 850 MW power station Value of Project: US$ 1.5 billion

Position & Duties: Lead Dam Design Engineer. Design team leadership for detailed design & construction. Full final construction design, involving, management of Client’s design team, design concepts, design of river management during construction, detailed stability designs, spillway design, input into RCC mix design & development programme, etc.

FULENI WATER SUPPLY DAM Project Duration: 2014

Location: Kwa Zulu Natal; South Africa Client: Prodelco (ARQ sub-consultants to Wave Solutions)

Project Description: Feasibility design of 12m high embankment dam Value of Project: Value of service: ZAR 400 000.

Position & Duties: Chief Dam Design Engineer. Feasibility design, including stability and structural design hydrology, hydraulics, sedimentation studies, embankments dam with side channel spillway.

RAISING OF DE PUT WEIR Project Duration: 2013-2014

Location: Senekal, South Africa Client: Mol Pro Consulting (Pty) Ltd

Project Description: Raising of the De Put’s Weir by 3.5 m to increase its yield Value of Project: R 20 million

Position & Duties: Lead Design Engineer. Approved Professional Person (APP) for rehabilitation design and dam construction quality control. Detailed design, including stability and structural design hydrology, hydraulics, sedimentation studies, preparation of tender documentation for concrete weir.

Page 5: DIRECTOR: DAMS & HYDRO · His experience in water retaining structures includes his early construction monitoring experience as resident engineer on the Grand Central Reservoir and

DAVID G CAMERON-ELLIS DIRECTOR: DAMS & HYDRO

PAGE 5 OF 12

MY OWN DAM

SE

LE

CT

ED

DA

MS

& H

YD

RO

PO

WE

R E

XP

ER

IEN

CE

Project Duration: 2013 Location: Baberton, South Africa

Client: Dunn-Roman Holdings (Pty) Ltd Project Description: 25m High Clay core Embankment dam. Alternative spillway design and dam

rehabilitation. Value of Project: R 10 million

Position & Duties: Lead Design Engineer. Approved Professional Person (APP) for rehabilitation design and dam construction quality control. Detailed design, including stability and structural design hydrology, hydraulics, preparation of tender documentation.

DASU DAM Project Duration: 2012

Location: Pakistan Client: WAPDA (ARQ sub-consultants to Nippon Koei)

Project Description: 230 m High RCC gravity dam Value of Project: US$ 6 million (Instrumentation only)

Position & Duties: Instrumentation Design Engineer. RCC Dam instrumentation design and specification.

PORT ST JOHNS DAM Project Duration: 2012 – 2013

Location: Eastern Cape, South Africa Client: OR Thambo District Municipality

Project Description: 23 m Rubble Masonry Arch. Conceptual and detailed structural design Value of Project: R 50 million

Position & Duties: Responsible person (APP) & design expert for supervision. Detailed design, including stability and structural design, hydrology, spillway and outlet works hydraulics.

SEMONKONG DAM Project Duration: 2012

Location: Lesotho Client: Lesotho Water and Sewage Authority (ARQ sub-consultants to PDNA)

Project Description: 30 m High Massive Arch Buttress dam Value of Project: Maloti 98 million

Position & Duties: Chief Dam Design Engineer. Design management, reconnaissance, dam type selection. Feasibility design.

KWALE TAILINGS FACILITY Project Duration: 2012 - 2013

Location: Msabweni division, Kwale District Kenya Client: Base Titanium Ltd (ARQ sub-consultants to Wave Solutions)

Project Description: 50 m Tailings facility embankment with outlet works Value of Project: Starter works US$ 6 million, whole facility > US$ 30 million

Position & Duties: Senior Design Engineer. Design management, flood hydrology, detailed dam design, including embankment, spillway and outlet works and preparation of all tender documentation. Advice to Wave during construction.

Page 6: DIRECTOR: DAMS & HYDRO · His experience in water retaining structures includes his early construction monitoring experience as resident engineer on the Grand Central Reservoir and

DAVID G CAMERON-ELLIS DIRECTOR: DAMS & HYDRO

PAGE 6 OF 12

KOTANLI DAM & HEPP (50 MW)

SE

LE

CT

ED

DA

MS

& H

YD

RO

PO

WE

R E

XP

ER

IEN

CE

Project Duration: 2010 – 2015 Location: North eastern Turkey

Client: Ünal AS Construction & Trade Project Description: 72 m (240 000 m3) RCC Arch/gravity.

Value of Project: US$ 120 million Position & Duties: Senior Dam Design Engineer. Design management. Basic design for dam and

hydropower scheme, flood hydrology, Spillway and outlet works hydraulics, river management during construction, final dam design, etc. Advice to Unal during construction.

KOROGLU DAM & HEPPs (80 MW) Project Duration: 2013 – 2016

Location: North eastern Turkey Client: Ünal AS Construction & Trade

Project Description: 105 m (650 000 m3) & RCC arch/gravity. Value of Project: US$ 165 million

Position & Duties: Senior Dam Design Engineer. Design management. Basic design for dam and hydropower scheme, flood hydrology, Spillway and outlet works hydraulics, river management during construction, final dam design, etc. Advice to Unal during construction.

MUKURUMUDZI DAM Project Duration: 2011 – 2013

Location: Msabweni division, Kwale District Kenya Client: Base Titanium Ltd (ARQ sub-consultants to Wave Solutions)

Project Description: 23 m earthfill dam with by-wash spillway Value of Project: US$ 15 million

Position & Duties: Chief Dam Design Engineer. Design management, flood hydrology, detailed dam design, including embankment, spillway and outlet works and preparation of all tender documentation. Advice to client during construction.

ARNAUD DAM AND CANAL Project Duration: 2011- 2013

Location: Mauritius Client: Water Resources Unit, Ministry of Energy and Public Utilities, Mauritius (ARQ sub-

consultants to Lux-Consult and PDNA International) Project Description: 20m high Embankment dam and diversion canal

Value of Project: US$ 8.5 million Position & Duties: Chief Dam Design Engineer. Dam, spillway and canal design for construction,

including tender documentation and construction monitoring assistance.

MALAWI MINI-GRIDS PROJECT, MINI-HYDRO Project Duration: 2010, 1.5 months involvement

Location: Malawi Client: Rural Maintenance

Project Description: Feasibility study for three mini-hydro schemes, 2 x 2MW & 1 x 1 MW Value of Project: US$ 32 million

Position & Duties: Senior Hydropower Engineer/Hydrologist. Hydrological and power investigations, feasibility design, costing.

Page 7: DIRECTOR: DAMS & HYDRO · His experience in water retaining structures includes his early construction monitoring experience as resident engineer on the Grand Central Reservoir and

DAVID G CAMERON-ELLIS DIRECTOR: DAMS & HYDRO

PAGE 7 OF 12

MNDWAKA DAM SAICE National Award of Water Engineering -2015 and Eastern Cape SAICE Regional Award for Labour Based Projects -2015

SE

LE

CT

ED

DA

MS

& H

YD

RO

PO

WE

R E

XP

ER

IEN

CE

Project Duration: 2009 – 2015 Location: Eastern Cape, South Africa

Client: Amathole District Municipality Project Description: 29 m Masonry multiple arch buttress. Conceptual and detailed structural design

Value of Project: R 65 million Position & Duties: Responsible person (APP) & design expert for supervision.

Preliminary Designs, Tender and Construction Design & Specifications, etc., including structural, stability designs and spillway and energy dissipation design. Construction monitoring as APP & quality control & assurance assistance.

CHANGUINOLA I DAM & HEPP ICOLD – RCC International Milestone Project Award

Project Duration: 2006 – 2013 Location: Panama

Client: Changuinola Civil Works Joint Venture Project Description: 101 m RCC Gravity Dam, 1 050 000 m3 for 230 MW hydropower scheme.

Value of Project: US$ 400 million Position & Duties: Senior Dam Engineer. Design and design management for construction design &

implementation verification: river diversion design, mini-hydropower offtake design, spillway design, foundation verification and grouting, structural analyses, etc, for EPC Contractor in team with Fosec and MDA. Advice to Contractor during construction.

LOWER ORANGE RIVER HYDRO Project Duration: 2009

Location: Namibia Client: Clackson Power

Project Description: No fatal flaw investigation: Hydrology and power investigation Value of Project: R 2.1 billion

Position & Duties: Senior Dam Engineer. Hydrological investigations and power studies, scheme layout design and verification.

CHUNIESPOORT DAM Project Duration: 2006 – 2011

Location: North West Province, South Africa Client: Department of Water Affairs and Forestry

Project Description: Rehabilitation of 15m high embankment dam. New fuse spillway Value of Project: R 35 million

Position & Duties: Deputy Chief Design Engineer.

Conceptual design, detailed design, embankment design, spillway design, model studies, specifications, tender documents, etc. Supervision assistance

BOSPOORT DAM Project Duration: 2006 – 2010

Location: North West Province, South Africa Client: Department of Water Affairs and Forestry

Project Description: Rehabilitation of 28m high concrete gravity dam and embankment saddle dams. New labyrinth spillway, new side channel spillway, raising and general rehabilitation

Value of Project: R 110 million Position & Duties: Deputy Chief Design Engineer. Construction design, including model studies and

tender. Acting as “the Engineer” in terms of FIDIC Contract.

Page 8: DIRECTOR: DAMS & HYDRO · His experience in water retaining structures includes his early construction monitoring experience as resident engineer on the Grand Central Reservoir and

DAVID G CAMERON-ELLIS DIRECTOR: DAMS & HYDRO

PAGE 8 OF 12

MOLEPO DAM

SE

LE

CT

ED

DA

MS

& H

YD

RO

PO

WE

R E

XP

ER

IEN

CE

Project Duration: 2006 – 2011 Location: Limpopo Province, South Africa

Client: Department of Water Affairs and Forestry Project Description: Rehabilitation of 16m high embankment. New RMC spillway, embankment raising

and general rehabilitation Value of Project: R 90 million

Position & Duties: Deputy Chief Design Engineer. Conceptual design, detailed design, embankment design, structural and stability design from RMC multiple arch, spillway design, model studies, specifications, tender documents, etc. Supervision assistance.

CROCODILE RIVER (EAST) DAM RECONNAISSANCE STUDY Project Duration: 2008

Location: Mpumulanga Province, South Africa Client: Department of Water Affairs and Forestry

Project Description: Reconnaissance study into new water supply dams in the Crocodile River catchment in Mpumulanga for the Department of Water Affairs & Forestry

Value of Project: US$ 100 000 Position & Duties: Identification of dam sites, basic dam designs and cost estimation.

KEMBE HEPP Project Duration: 2007 – 2008

Location: Central African Republic Client: Hydro Finance

Project Description: 60MW hydroelectric power station on the Kotto River. RCC diversion weir Value of Project: US$ 360 million

Position & Duties: Team leader, feasibility design.

NAM THEUN 1 Project Duration: 2006 – 2007

Location: Laos PDR Client: Gamuda Berhad

Project Description: 180m RCC arch/gravity dam for 500MW hydropower scheme Value of Project: US$ 600 million

Position & Duties: Detailed & construction design for EPC Contractor. In team with Maunsell.

STIEGLER’S GORGE DAM & HEPP Project Duration: 2008

Location: Tanzania Client: Hydro Finance Limited

Project Description: 135 m high, 1, 0 million m3 double-curvature RCC arch dam for hydropower (1000 MW) and flood control. Update of 1980 preliminary design study

Value of Project: US$ 2.3 billion Position & Duties: Feasibility design.

MALAGARASI HYDRO Project Duration: 2005

Location: Tanzania Client: Ministry of Energy

Project Description: On-site investigations and design of an 8 MW HEPP on the Malagarasi River Value of Project: US$ 24 million

Position & Duties: Senior Hydropower Engineer. Hydrological and power investigations, scheme layout design, costing.

Page 9: DIRECTOR: DAMS & HYDRO · His experience in water retaining structures includes his early construction monitoring experience as resident engineer on the Grand Central Reservoir and

DAVID G CAMERON-ELLIS DIRECTOR: DAMS & HYDRO

PAGE 9 OF 12

TANZANIAN SMALL HYDRO

SE

LE

CT

ED

DA

MS

& H

YD

RO

PO

WE

R E

XP

ER

IEN

CE

Project Duration: 2005 Location: Tanzania

Client: Tanesco (ARQ sub-consultants to ECON) Project Description: On-site investigations, evaluation and design of three small HEPP schemes:

4MW Njombe Hydro, 4.6MW Mngeta Hydro, 3MWMufundi Tea Hydro Value of Project: US$ 20 million

Position & Duties: Senior Dam Engineer. Hydrological and power investigations, scheme layout design, costing.

BRAAMHOEK PUMPED STORAGE SCHEME Project Duration: 2004 – 2007

Location: South Africa Client: Eskom Holdings Limited

Project Description: 1350 MW Pumped storage hydropower scheme with an operating head of approximately 500m. Project includes 50m high rockfill upper dam and 38m RCC bottom dam

Value of Project: US$ 1.3 billion Position & Duties: Senior Dam Engineer. Detail and tender design.

KAMUZU DAM II Project Duration: 2003 – 2004

Location: Malawi Client: Hydroplus International

Project Description: Rehabilitation of 26m high composite concrete -embankment dam Value of Project: Euro 300 000

Position & Duties: Dam Engineer. Rehabilitation design and tender documentation.

BELLAIR DAM Project Duration: 2004 – 2005

Location: Barrydale, Western Cape, South Africa Client: Jasper van Breda Consulting Engineers

Project Description: 18m high RMC multiple arch Value of Project: R 10 million

Position & Duties: Dam Engineer. Structural design.

MIDMAR DAM Project Duration: 1998 – 2003

Location: Kwa-Zulu Natal Province, South Africa Client: Department of Water Affairs

Project Description: 32m high embankment/concrete – 3,5m fixed labyrinth spillway raising Value of Project: R 30 million

Position & Duties: Senior Dam Engineer. Detailed design and supervision assistance.

ALOE COVE DAM Project Duration: 2000 – 2006

Location: Gauteng, South Africa Client: Heia Safari Ranch

Project Description: 23m high rubble masonry concrete multiple arch buttress dam Value of Project: R 8 million

Position & Duties: Design engineer.

Page 10: DIRECTOR: DAMS & HYDRO · His experience in water retaining structures includes his early construction monitoring experience as resident engineer on the Grand Central Reservoir and

DAVID G CAMERON-ELLIS DIRECTOR: DAMS & HYDRO

PAGE 10 OF 12

EIKENHOF DAM

SE

LE

CT

ED

DA

MS

& H

YD

RO

PO

WE

R E

XP

ER

IEN

CE

Project Duration: 1998 Location: Western Cape, South Africa

Client: Hydroplus International Project Description: 47m high embankment dam raising incorporating Hydroplus fusegates

Value of Project: R 1, 5 million Position & Duties: Dam Engineer. Detailed design.

BIRI DAM Project Duration: 1996 – 1997

Location: Zimbabwe Client: Biri Irrigation Board

Project Description: 44m gravity spillway section and inlet/outlet, incorporating Hydroplus fusegates, reinforced earth and high RC retaining walls

Value of Project: R 80 million Position & Duties: Dam Engineer. Design.

THUKELA WATER PROJECT Project Duration: 1997-2000

Location: Kwazulu-Natal, South Africa Client: Department of Water Affairs & Forestry

Project Description: Water Transfer scheme encompassing 185m high dam on the Thukela River (RCC or Rockfill) and 98m high dam on the Bushmans River (RCC arch or rockfill)

Value of Project: US$ 1.5 billion Position & Duties: Senior Dam Engineer. Feasibility level design.

STERKSPRUITDAM Project Duration: 1991 – 1995

Location: Mpumalanga, South Africa Client: Former Government of Lebowa (Now RSA Government)

Project Description: 27m concrete massive arch buttress – Design and supervision from HO Value of Project: R 6 million

Position & Duties: Dam Design Engineer. Detailed design, tender and supervision assistance.

RELEVANT CIVIL INFRASTRUCTURE EXPERIENCE:

HARTEBEESFONTEIN WATER CARE WORKS Project Duration: 2003 – 2007

Location: Gauteng, South Africa Client: East Rand Water Care Company (ERWAT)

Project Description: Rehabilitation and upgrading of the Hartebeesfontein Water Care Works. Value of Project: R 45 million

Position & Duties: Chief Design Engineer. Civil design and co-ordination of multidisciplinary team.

INFRASTRUCTURE REHABILITATION FOR LILONGWE WATER BOARD Project Duration: 2003 – 2004

Location: Malawi Client: Lilongwe Water Board in Malawi

Project Description: Rehabilitation of 11 reservoirs, 3 elevated towers & 35Ml/d water treatment plant Value of Project: Euro 5 million

Position & Duties: Team leader of a multi-disciplinary team of professionals to design and specify for tender the necessary rehabilitation works.

Page 11: DIRECTOR: DAMS & HYDRO · His experience in water retaining structures includes his early construction monitoring experience as resident engineer on the Grand Central Reservoir and

DAVID G CAMERON-ELLIS DIRECTOR: DAMS & HYDRO

PAGE 11 OF 12

GROOTVLEI-ANCOR RHODES BioSURE TREATMENT PLANT

SE

LE

CT

ED

DA

MS

& H

YD

RO

PO

WE

R E

XP

ER

IEN

CE

Project Duration: 2004 – 2006 Location: Gauteng, South Africa

Client: Grootvlei Mine (Petrex) Project Description: Design of the acidic mine water treatment plant, including new reactors,

rehabilitation of existing reinforced concrete tanks and transfer pipelines and pumping facilities

Value of Project: R 25 million Position & Duties: Chief Design Engineer. Civil design and project management.

EXTENSION AREA 2 OF THE MATSHAPHA INDUSTRIAL ESTATE Project Duration: 2000 – 2001

Location: Swaziland Client: Swaziland Ministry of Enterprise and Employment

Project Description: Extensions to the existing waste water conveyance system including pipe, network, pumping station and rising main

Value of Project: R 2.1 million Position & Duties: Design Engineer. Feasibility, preliminary design and design.

WELGEDACHT WASTEWATER TREATMENT PLANT Project Duration: 1999 – 2003

Location: South Africa Client: East Rand Water Care Company (ERWAT)

Project Description: Civil design, including pipework, earthworks, roads and stormwater Value of Project: R 80 million

Position & Duties: Chief Design Engineer. Detailed design. Acted as “The Engineer” during construction phase.

DD5a REGIONAL OUTFALL SEWERS Project Duration: 1996 – 2001

Location: South Africa Client: East Rand Water Care Company (ERWAT)

Project Description: Design of 23km of large diameter outfall sewers, in five major links Value of Project: R 95 million

Position & Duties: Chief Design Engineer. Feasibility design, preliminary design, design and construction supervision. This included inter-alia the design and specification of diversion structures, service deviations, pipe jacking, community liaison and environmental controls. Acted as “The Engineer” during construction phases.

Other Civil Structures Design Project Duration: Various bridges and culverts

Bridge inspections for the South African Roads Agency Limited Duties: Investigation, design and tender

Other Civil Services Project Duration: Various townships developments

Various building complexes

Various pump stations

Various reservoirs and pressure towers

Various floodline studies Duties: Design, reporting, tender and construction monitoring.

Page 12: DIRECTOR: DAMS & HYDRO · His experience in water retaining structures includes his early construction monitoring experience as resident engineer on the Grand Central Reservoir and

DAVID G CAMERON-ELLIS DIRECTOR: DAMS & HYDRO

PAGE 12 OF 12

1. Energy Dissipation Provisions for Stepped Spillways: Are Additional Measures Necessary? A Southern African Perspective.” Co-authored HJ Wright. SANCOLD Conference on Sustainable Dam Engineering in an Ever-changing World. Somerset West, 2018.

2. Dam Safety Evaluations – Scope of Evaluations in Relation to Information Available.” SANCOLD Conference on Sustainable Dam Engineering in an Ever-changing World. Somerset West,2018

3. “USBR Stilling Basins on Steep Slopes, with Ntsonyeni Dam as a Case Study.” Co-authored with S Anderson and HJ Wright. SANCOLD Conference on Management of Dams and Reservoirs in Southern Africa. Centurion. 2017.

4. “Spillway Modification Requires Modified Energy Dissipation at the Toe of a Dam.” Co-authored with A Roos and HJ Wright. SANCOLD Conference on Management of Dams and Reservoirs in Southern Africa. Centurion. 2017.

5. “Material Exploitation Constraints Dictate Embankment Design.” Co-authored with M Blaeser. SANCOLD Conference on Management of Dams and Reservoirs in Southern Africa. Centurion. 2017.

6. “Rubble Masonry Concrete as applied to Dams and Mndwaka Dam in particular.” The Concrete

Conference. Johannesburg. 2017.

7. “Hardfill Dam Technology: The Optimal Solution in Two Very Different Situations” Co-authored

with Pierre Agresti and Dr Quentin Shaw at the 2nd workshop on Cemented Material Dams (CMD) in

Prague, 3 July 2017.

8. “Hardfill Manufacture – Appropriate Dam Technology for Africa” ICOLD Symposium 2016,

Johannesburg.

9. “South Africa’s Highest Rubble Masonry Concrete Dam.” SANCOLD Conference on Advances in dam

technology for water and energy in Southern Africa. 2013.

10. “Construction of an RCC Dam in a Very Wet Climate” J Waters, M Dunstan, L Houlberg and C Hicks.

6th Symposium on Roller Compacted Concrete Dams. Zaragosa, Spain. October 2012.

11. “The Development of the Design of Changuinola 1 Dam”. Co-authored with G Erlendsson, Q Shaw &

M Dunstan. 6th Symposium on Roller Compacted Concrete Dams. Zaragosa, Spain. October 2012.

12. “Post Tensioning Anchor Cables to Ensure Foundation Stability of an Arch Gravity Dam” Co-

authored with M Blaeser. SANCOLD Conference on Management and Design of Dams in Africa.

2011.

13. “The rehabilitation of the Bospoort Dam.” - The Civil Engineer Vol 18 No 2 March 2010.

14. “Grouting – Art or Science. Procedures adopted at Changuinola, Panama” - The Civil Engineer Vol 18

No 2 March 2010.

15. “Innovation in Dam Rehabilitation.” Co-authored with Q Shaw. Proceedings. SANCOLD Congress.

November 2009. Also published in IMESA Volume 34 No 2 February 2010.

16. “Fusegates Enhance Safety and Increase Capacity at Eikenhof.” Co-authored with Q Shaw and B

Hakin. The International Journal of Hydropower and Dams. Vol. 6 Issue 6. 1999.

TE

CH

NIC

AL

PA

PE

RS, E

TC

.