Dinullah Bayu Ibrahim

48
ADIN ADIN dinullah bayu ibrahim architecture portfolio

description

Architecture Portfolio (2014)

Transcript of Dinullah Bayu Ibrahim

Page 1: Dinullah Bayu Ibrahim

ADINADINdinu l lahbayuib rah im

arch i tectu re por t fo l io

Page 2: Dinullah Bayu Ibrahim

.curriculum vitaeDinullah Bayu Ibrahim (Adin)MaleSurabaya, 3rd June 1992Jl. Sindoro no. 30, Pepelegi Indah, Waru,Sidoarjo, East Java, Indonesia+6281 7511 [email protected]

namesex

birth place, dateaddress

phonee-mail

Public Elementary School Pepelegi 1, WaruPublic Junior High School 1 SurabayaPublic Senior High School 5 SurabayaBachelor of Architecture, Universitas Indonesia

1998-20042004-20072007-20102010-2014

3.607.0

GPAIELTS

SketchUpAutoCADArchiCAD

Adobe PhotoshopAdobe Illustrator

Microsoft

Pusgiwa Universitas Indonesia Competition

House Design CompetitionAsri dan Inovatif

ARBBI Design Award 2014Urban House

Apartment ChallengeDulux Young Talent 2013

Dulux Young Talent 2013Design Competition

Masterclass‘ Jakarta Vertical Kampung’

ARBBI Design Award 2013Modular House

Fisherman House Design CompetitionArchfest

Indomaret Fresh Design Competition

Plaza Indonesia Landscape Competition

Participant

Participant

Participant

Social Media Winner

Architecture CategoryWinner

Participant

Best 75

Best 25

Participant

Best 6

2014

2013

2012

Arsitektur 1:6

‘ Body and Space” Lecture

’ Architecture for EveryOne‘ Discussion

Joint Studio(Universitas Indonesia, University ofMichigan, Hong Kong University)

OMA Lectureby David Gianotten

MVRDV Lecture

‘ School and Passion’ Seminar

‘ Time Management’ Seminar

Speaker

Participant

Participant

Participant

Participant

Participant

Speaker

Speaker

2014

2013

2012

Achievement Seminar, Skill, etc

Page 3: Dinullah Bayu Ibrahim

in[arch] international conference

HITZ! Concert

AFAIR UI 2014

Paragita Choir Universitas Indonesia

Hungry for ParagitaGoes to hungary

Architecture Student OrganizationUniversitas Indonesia

AFAIR UI 2013

Paragita Choir Universitas Indonesia

‘ Timeless Tunes’ Concert Committee

Graduation PartyArchitecture Department 2011

Sunday Ars 2011

Gita Smala ChoirPublic Senior High School 5 Surabaya

Liaison Officer forMarkus Bergers (RISD, USA)

Designer

Head of Material

Multimedia Affairs

Designer

Vice-head ofPublic Relation Affairs

Steering Committee

Head of Multimedia Affairs

Head of Design Affairs

Event Affairs

Event Affairs

Vice-Chairman

2014

2013

2012

2011

2009

Undergraduate Thesis:The Effects of Movements andCrowds Towards Pavement EconomyLocation Choice

Dulux Young Talent Winner

UI-ana

Elle Decoration

2014

2013

Dulux

Architecture DepartmentUniversitas Indonesia

Revastudio

Architecture DepartmentUniversitas Indonesia

Paragita Choir Universitas Indonesia

Freelance Interior Designer

Teaching Assistant

Internship(Kwik House Interior project,Ozone project)

Teaching Assistant

Designer and Design advisor

2014

2013

2012

Dwi Living RoomAsda Reading RoomNares ApartmentGandaria Boarding HouseRosalinda Living RoomDewi Living RoomWindhi TerraceFera Utami Living RoomLaely Living RoomSwistya Living RoomESDM Exhibition BoothIbu Lasmi Boarding House

2014 Interior DesignInterior DesignInterior DesignArchitectural DesignInterior DesignInterior DesignInterior DesignInterior DesignInterior DesignInterior DesignExhibitionArchitectural Design

Kampung Hijau Research

Educative Play Space

Platform for Living

Architecture and Habitation

Dr. Ing. Dalhar Susanto (UI)

Prof. Triatno Yudo Hardjoko (UI)

Herlily M.Urb.Des (UI).& Stephen Cairns (FCL)

Herlily (UI), Etienne Turpin (UofM),Adam Bobbetee (HKU),Meredith Miller (UofM)

2014

2013

Organization Publication

Research

Project Working Exp.

Page 4: Dinullah Bayu Ibrahim

.content

Port-o-GymSplash

of RelaxM Walk

ACADEMIC COMPETITION

WarungInteraksi

ImahCai

TetrisHouse

RumahPak RT

1 3 5 7 108 11

Page 5: Dinullah Bayu Ibrahim

RESEARCH MASTERCLASS PROFESSIONAL

WasteStreams

RumahCerobong

EyeHousing

RorotanVertical

Kampung

RorotanVertical

Kampung(Living Unit)

Niceto meet

Blueetc.

Page

Icon

Title

Type

1413 16 17 18 20 21

Page 6: Dinullah Bayu Ibrahim

Port-o-Gym is a portable building designed by re-inventing the structure of previous existing rigid building to be portable. The chosen building is a gymnasium in Univeritas Indonesia. Making a portable structure means that the structure should be easy-essambled and the pieces are easy to move.

Port-o-gym2013 | Academic | Architecture Design Studio 4

PORTABLE CONSTRUCTIONEvery joinery are designed to be easily assembled and non-permanent join. Steel frame with bolt joint construction is used in whole structure to achieve portability. The size of each part is also measured to be easily moved by truck.

STEP-BY-STEP CONSTRUCTIONThe structure consists of 4 main parts. Those parts are essambled as follows: legs, tops, spectators bench, and tensile covers. Port-o-gym can be set as desired. The spectators bench and the tensile covers can be put off if it is not used..

1 2 3 4

Page 7: Dinullah Bayu Ibrahim
Page 8: Dinullah Bayu Ibrahim
Page 9: Dinullah Bayu Ibrahim

section 1 section 2

Page 10: Dinullah Bayu Ibrahim

Blend

Boundaries

Spread

Relaxation SubjectivityRelaxation Subjectivity

2013 | Academic | Architecture Design Studio 3

Splash of Relax is a relaxation space designed using typology-design-method. The presedences are thermal baths and spa houses that accommodate relaxation activity. From the precedence studies, it is found that relaxation spaces offer various kind of experiences that are spread but blending without disturbing each other. Study about splash ,as the keyword, brings the form.

Splash of Relax

Page 11: Dinullah Bayu Ibrahim

In the precedences studies, spa houses and thermal baths are used to find the main point of relaxation activity and relaxation space. The tracing of the movement of visitors is the intention.The tracing of the movement of visitors shows that the relaxation space consist of several different experiences that are spread, blend, and seperated one another. It also shows that the activity of relaxation is subjective, according to visitors ’ desire to choose certain experience.

PRESEDENCES STUDIESSplash consists of object (water), action (contact), and reaction (splash). It works similiar to relaxation typology.

Model studies are developed by transforming word ‘splash’ into spatial model. The final form is created by connecting modules, developed from model studies, with the vision to achieve the relaxation typology that is multi-experience space..

SPLASH STUDY

splash study 1 Module Making Final Form

MODEL STUDIES AND FORM MAKING

splash study 2

Page 12: Dinullah Bayu Ibrahim
Page 13: Dinullah Bayu Ibrahim

Indoor

outdoor

social

privat

This relaxation place offers spaces with various experience diverse in privacy-level and indoor-outdoor.

MULTI-EXPERIENCE

Page 14: Dinullah Bayu Ibrahim

M Walk is a wide-span structure building that covers the main bus station in Blok M area. It connects 6 places around the bus station. The idea is to create an iconic building using wide-span structure. Analyzing buildings in the surroundings became the first step in the design process.

M Walk

Page 15: Dinullah Bayu Ibrahim
Page 16: Dinullah Bayu Ibrahim
Page 17: Dinullah Bayu Ibrahim

MASS DEVELOPMENTMass development is done by considering connectivity, movement, size of the space, green area, sustainibility, and structure.

WIDE SPAN STRUCTUREThe structure is designed to create a distinct physical looks that differ M Walk to the other building.

ICONICBeing Iconic means being distinct among the surroundings. To achieve it, there should be an action towards the presence of competi-tors around the site. Invading by connecting them is the action chosen.

Page 18: Dinullah Bayu Ibrahim

2013 | Academic | Architecture Design Studio 3

LEARNING FROM CRAFTING

Enhance the interaction by making friction between the communal space and the other spaces around it to create interaction. Clay making shows how to create desired shape by pressing a constantly rotating clay.

OtherSpace

CommunalSpace

CommunalSpace

HandActive ActorPeople in Communal Space

ClayObject

Other People

Warung means small shop, and interaksi means interaction. This project tries to re-design warung to make better interaction between all the actors in kampung. Why warung? Because it is found that warung is the center of interaction in kampung. By intervening warung, it is hoped that the interaction between actors in Kampung will be enhanced.

Warung Interaksi

Page 19: Dinullah Bayu Ibrahim

warung space1 2 3 4

HandActive ActorPeople in Communal Space

MASS DEVELOPMENTMass is developed to achieve pressing-rotating program. The additional 2nd floor is added to give more space for the community. More people use warung space, more interaction will occur.

Page 20: Dinullah Bayu Ibrahim

Imah Cai means Water House. This house uses water as the main trigger for the design. The existence of swimming pool, as dominating water space, is highlighted by exposing it to the other rooms in the house through the void. By then, the void becomes the central life of Imah Cai.

Imah Cai2014 | CompetitionSayembara Rumah Tinggal | Participant

Page 21: Dinullah Bayu Ibrahim

Center void becomes the central area of the house. This void maximizes lighting and air flow to minimize the use of electricity. The big window with one hinge to expose living room and music room. So that, through this void, music room can be seen from the other room. It creates a performance stage experi-ence.

VOID AS THE CENTER OF THE HOUSE

Page 22: Dinullah Bayu Ibrahim

Section B

Music room, dining room, and living room as the core of the house, are created facing each other and connected by opening the big window in the void.

FACE TO FACE FAMILY ROOMS

Page 23: Dinullah Bayu Ibrahim

Living room

Page 24: Dinullah Bayu Ibrahim

Family Activities

Resting Activities

Resting Activities

Service Activities

+

+

+

The brief of the competition is to design a modular house. In this project, module is defined as modules that are arranged to create the building mass. The first thing popped out in mind when hearing the word ‘module’ is tetris, a game that uses blocks as module.

Tetris House2013 | Competition |ARBBI Design Award 2013 Competition | Top 75

Page 25: Dinullah Bayu Ibrahim

2nd Floor Plan

1st Floor Plan

TETRIS MODULES

STACKING THE MODULES

FITTING TO SITE

Each type of tetris modules represents each group of activities in the house according to size and space requirements of each activities.

The exploration is done by stacking the four modules into one mass. In this phase, the connection between modules becomes the main thing to be considered.

The modules are stacked to fit the plot ratio. One module is put upright to decrease the ground floor area. And then modules are rotated to be the respond to the sun exposure. The modules are resized to fit the activities inside the modules and cut by the boundaries of the site. Final steps are materializing the boundaries and creating openings considering privacy, light, and air flow.

Page 26: Dinullah Bayu Ibrahim

19.00Evening

talks

16.00Kids playing

12.00Moms

gathering

09.00Vegetables

sellers

TIME-TO-TIME FUNCTION CHANGESAs a community, the social life is alive all day long, from the sunrise until sunset. The activity changes as the involving actors changes. In the morning vegetables seller sells their goods, at noon moms do chat, in the afternoon kids play around, and in the evening people gather for enjoying their night. All these activities are placed in this small public space in Pak RT House.

Rumah Pak RT (community leader House) is a house that provides a public spaces for the community to do their activity. Although this house become public in the front, the back stil l provides privacy for the family as their living space.

Rumah Pak RT2014 | CompetitionARBBI Design Award Competition 2014 | Participant

Page 27: Dinullah Bayu Ibrahim

PakRumah

Page 28: Dinullah Bayu Ibrahim
Page 29: Dinullah Bayu Ibrahim

MAXIMIZING NATURAL LIGHTINGAND AIRFLOWThis house is made with openings in various side of this house, from the back to the front and from the bottom to the top. All openings are placed in certain place and direction to capture enough sunlight and to let the air flows well. Greeneries are also placed in the front, back, and on the rooftop to increase the air quality.

Page 30: Dinullah Bayu Ibrahim

MASS DEVELOPMENTMass is arranged to make every unit can get enough sunlight. It is achieved by giving atrium in the center of the mass. Public and green spaces are created by shifting each level. Green areas are connected each other between blocks. Parking area and retail area are located in the basement. So that, ground floor can be fil led by all kind of social activity.

Eye housing is an Affordable Housing that tries to offer good quality living for the residents. In this Eye Housing, residents are given green area in front of each unit that is functioned as not only green area but also public spaces.

Eye Housing2013 | CompetitionDulux Young Talent 2013 | Winner

Page 31: Dinullah Bayu Ibrahim

Parking Area Parking Area Retail

Green areas are connected each other between blocks. Parking area and retail area are located in the basement. So that, ground floor can be fil led by all kind of social activity.

PROGRAM

Page 32: Dinullah Bayu Ibrahim

PackagingArea

ProductionArea

Fish dr yingarea

Windmill

Fish rackpulled upby machine

engine

Rumah Cerobong2013 | CompetitionSayembara Rumah Nelayan | Top 25

Rumah cerobong (chimney house) is a fisherman house that considers family living and fish production. The connection between units are important as a fisherman community. Also, the unlimited amount of wind on the shore is used for generating energy for house.

FISH DRYING MECHANISMThe rooftop is the best place to dry fish because of the huge amount of sunlight exposure. A pulley that pulled by an engine is applied in order to move fish rack from the ground level to the rooftop through a fish-rack-size chimney that built in the center of the house. To use less energy, a windwill installed on the top of the chimney to generate electricity using wind energy.

Page 33: Dinullah Bayu Ibrahim

Living

Back area for womento process fish and gossiping

Back area for womento process fish and gossiping

Front area for men preparingfishing and chatting

Living

Street

Living

Living

Front area

Back area

FRONT AND BACK AREAThe front and back area of the house are dedicated for activity that involve neighbourhood relation. Back of the house is used for processing fish and they can chat with others while doing it. So do the front of the house. The front of the house is the place for men to prepare things for fishing and they can talk with others while preparing things.

Page 34: Dinullah Bayu Ibrahim
Page 35: Dinullah Bayu Ibrahim
Page 36: Dinullah Bayu Ibrahim

The research tr y to reveal the unseen network inside kampung (informal housing) around Pluid Reservoir. In this research part, waste is the commodity to track. It is found that this kampung has an important role for the neighbouring area and even regional area in the case of waste management. Street sweeper, trash picker, trash collector, trash seller are some major job of residents in this kampung.

Metal Factory in Tangerang

This diagram shows the location of people dealing with trash. It shows some sample of trash pickers, trash sellers, collectors, and street sweeper.

LOCAL STREAMS

Waste Stream2013 | Research | Architecture & Adaptation| Joint Studio (Universitas Indonesia, Univeristy ofMichigan, Hong Kong University)

Page 37: Dinullah Bayu Ibrahim

Metal Factory in Tangerang

Pluit

Harbour

MutiaraBeach

Marina

PT . Cakra Steel

PT . Master Steel

Godang Tua Jaya.PTLandfill

Banten

Jakarta

West Java

Central Java

East Java

Yogyakarta

PT. Tiga Bintang Terang

Fish farm

Pluit

about 328km

about 1284km

3.7 KM

5.7 KM

4.9 KM

4.6 KM

12.4 KM

2.8 KM

5.7 KM

21.7 KM

6.7 KM12.7 KM

11.7 KM

15.7 KM

34.4 KM

32.3 KM

Metal Factory in Tangerang

Pluit

Harbour

MutiaraBeach

Marina

PT . Master Steel

Banten

Jakarta

West Java

Central Java

East Java

Yogyakarta

PT. Tiga Bintang Terang

Fish farm

Pluit

about 328km

about 1284km

3.7 KM

5.7 KM

4.9 KM

4.6 KM

12.4 KM

2.8 KM

5.7 KM

21

6.7 KM12.7 KM

11.7 KM

15.7 KM

34.4 KM

32.3 KM

These 3 diagrams show the network of trashes from Pluit Area to other places around Jakarta and Java Island. Trashes will be sent to different places according to the types. Some trashes sent to bigger collectors to be collected first and sent to other place later.

REGIONAL STREAMS

Page 38: Dinullah Bayu Ibrahim

Rorotan Vertical Kampung is one of affordable vertical housings planned for relocating kampung (informal housing) people from any places in Jakarta. The main idea is creating a proper living space that is not only fulfi l l ing basic living needs, but also tr ying to fulfi l l the needs of inhabitant as community with good social life.

Rorotan VerticalKampung2013 | Master Class | Jakarta Vertical Kampung

InsertingElementary School

Open Space

Slide and Moveto make a random mass

Lifting Living Unit

Inserting Workshop at GF

Inserting Play Groundand Kindergarten

at 3rd floor

1

2

3

4

5

6

Public Bathroror om

7

MASS DEVELOPMENT Rorotan Vertical Kampung is arranged in blocks. The community needs of public spaces and facilities are the main considera-tion of mass development. It is ensured that each block has good accessibility to any public spaces and facilities.

Page 39: Dinullah Bayu Ibrahim

Elevation 1Elevation 2

Page 40: Dinullah Bayu Ibrahim

The living units in Rorotan Vertical Kampung is designed based on Kampung House Typology. The possibilities of working and living at the same space result a flexible living unit. The chosen kampung (informal housing) for doing the house typology study is Kampung Rorotan.

Rorotan Vertical Kampung

Living Units2013 | Masterclass | Jakarta Vertical Kampung

2nd floor 1st floorHouse of trash pickers group

Toilet

Sleeping room

Relaxing Area

House of cloth sewer

Sewing Area

Bags of product

House with warung

Warung

BenchLiving Area

House of trash picker

TrashesPressing tool

Toilet

Cock+-20box of trash

TV

Sleeping Area

well

House of Pecel Lele Seller

Trashes

Cooking Area

Living Area

Cloth waste industry

Sorting area

Scale

Bench

Page 41: Dinullah Bayu Ibrahim

KAMPUNG HOUSES TYPOLOGY STUDYIn Kampung Rorotan, the type of houses is built according to the family occupation of the family. It is because the house is not only for living, but also for working.

LIVING UNITThe basic idea of living unit in Rorotan Vertical Kampung is the possibilities of each household to express their wants yet fulfilling their needs. By then, the main idea of the living unit is the capability to be changed as desired.

Room Divider can be arranged according to needs

Facade has 2 types according to the window placement. Placement of window and door are based on 3x3 grid.

Facade can be colored as desired.

balcony consists of types that differ in sizes.

Page 42: Dinullah Bayu Ibrahim

Double Unitwith Workspace

Unit with Workspace Double Unit Multiple Unit

Basic Unit

PROTOTYPESThese are some examples of the living unit space arrangements. It shows the possibilities of the space to be freely arranged accord-ing to the family needs.

Page 43: Dinullah Bayu Ibrahim
Page 44: Dinullah Bayu Ibrahim

Nice to meet blue is an interior design project for Dulux Let ’s Colour TV program. This project combines client needs and Dulux Marketing Program. Client needs to respond is creating a cozy living room. Dulux Marketing Program to achieve is Color Future 2015 Campaign and its color schemes.

Nice to meet Blue2014 | Professional | Dulux Redecorate

Colour of the year 2015

3 Colors from Big Nature + Small me scheme

September Cream

Faded Denim

Bark

DULUX CAMPAIGN + CLIENT NEEDS

Page 45: Dinullah Bayu Ibrahim
Page 46: Dinullah Bayu Ibrahim

etc

Pusgiwa2014 | CompetitionSayembara Pusgiwa UI | Participant

Serendipity Diner2013 | Academic | Interior Design

Page 47: Dinullah Bayu Ibrahim

Dewi ’s Living Room2014 | Professional | for Dulux Redecorate

Rosalinda’s Living Room2014 | Professional | for Dulux Redecorate

SamgitaSasta Logo2014 | Professional

Tenun Manikam Logo2014 | Professional

Xiaga Group Logo2014 | Professional

Page 48: Dinullah Bayu Ibrahim