Dinter Engineering Recently-Completed and Ongoing … · design to replace taxiway lighting and...

1
Dinter Engineering Engineering Confidence. Reno: 385 Gentry Way Reno, NV 89502 Phone: 775.826.4044 Fax: 775.826.4190 Web: dinter.com Phoenix: 3770 North 7th St., Suite 150 Phoenix, AZ 85014 Phone: 602.489.7303 Fax: 602.489.7295 Coeur d’Alene: 15644 Highway 41 Rathdrum, ID 83858 Phone: 208.712.3131 Beale Air Force Base California: Recently-Completed and Ongoing Projects McCarran Airport Las Vegas, Nevada: NASF Vault Fallon, Nevada: Design-Build Airfield Lighting Vault - Electrical design and construction observation services to upgrade the airfield lighting vault. 2010 Baker City Airport Baker City, Oregon: Trinchera Ranch Fort Garland, Colorado: Design/Build MALSR Reconstruction - Electrical design and construction support services to provide a new Medium-intensity Approach Lighting System with Runway Alignment Indicator Lights (MALSR), including conduit infrastructure, power distribu- tion and boat obstruction lighting, mounted on a bridge/pier with a walkway suspended over Lake Pontchartrain where environmental conditions are extremely corrosive due to the lake’s salt water, salt spray, hurricanes, etc Design-Build Project, Replace Airfield Lighting - Electrical design to replace airfield lighting and improve the Night Lighting Vault. Airfield work involved design to replace taxiway lighting and signage. The Night Lighting Vault improvements involved design for new electrical service vault, and a new airfield lighting control system (ALCS). Taxiway Alpha Rehabilitation - Electrical design and construction observation services to provide Medium Intensity Taxiway Lights (MITLs) and lit signs along Taxiway A and the connect- ing taxiways and the taxiway leading to the parking apron and FBO, with new regulator for the taxiway circuit, and runway threshold lights. C-2367 - Taxiway G Reconstruction - Electrical design and construction observation services for three phases of work involving airfield electrical facilities for Taxiway G and portions of Taxiways C, B6 and B7, approximately 6,100 feet. Design was done on a fast-track schedule and completed on time. New Airstrip Electrical engineering to develop an airstrip for private use by the client with a 5,000-foot-long runway with visual approach conditions. Our work included electrical design and construction observation services to provide new elevated runway edge lights, threshold lights, a wind cone, an electrical vault, a Super AWOS, and new cable and conduit to complete the electrical system. Lakefront Airport New Orleans, Louisiana: Dinter Airport Experience by State: Arizona (13); Arkansas (1); California (44); Colorado (5); Florida (1); Idaho (5); Louisiana (1); Massachusetts (1); Montana (1); Nevada (29); New Mexico (8); New York (1); North Dakota (1); Ohio (1); Oregon (4); Texas (3); Utah (3); Washington (5); Wyoming (1); and over 30 military air bases.

Transcript of Dinter Engineering Recently-Completed and Ongoing … · design to replace taxiway lighting and...

Dinter Engineering

Engineering Confidence.

Reno: 385 Gentry Way • Reno, NV 89502 Phone: 775.826.4044 Fax: 775.826.4190 Web: dinter.com

Phoenix: 3770 North 7th St., Suite 150 • Phoenix, AZ 85014 Phone: 602.489.7303 Fax: 602.489.7295

Coeur d’Alene: 15644 Highway 41 • Rathdrum, ID 83858 Phone: 208.712.3131

Beale Air Force BaseCalifornia:

Recently-Completed and Ongoing Projects

McCarran AirportLas Vegas, Nevada:

NASF VaultFallon, Nevada:

Design-Build Airfield Lighting Vault - Electrical design and construction observation services to upgrade the airfield lighting vault. 2010

Baker City Airport Baker City, Oregon:

Trinchera RanchFort Garland, Colorado:

Design/Build MALSR Reconstruction - Electrical design and construction support services to provide a new Medium-intensity Approach Lighting System with Runway Alignment Indicator Lights (MALSR), including conduit infrastructure, power distribu-tion and boat obstruction lighting, mounted on a bridge/pier with a walkway suspended over Lake Pontchartrain where environmental conditions are extremely corrosive due to the lake’s salt water, salt spray, hurricanes, etc

Design-Build Project, Replace Airfield Lighting - Electrical design to replace airfield lighting and improve the Night Lighting Vault. Airfield work involved design to replace taxiway lighting and signage. The Night Lighting Vault improvements involved design for new electrical service vault, and a new airfield lighting control system (ALCS).

Taxiway Alpha Rehabilitation - Electrical design and construction observation services to provide Medium Intensity Taxiway Lights (MITLs) and lit signs along Taxiway A and the connect-ing taxiways and the taxiway leading to the parking apron and FBO, with new regulator for the taxiway circuit, and runway threshold lights.

C-2367 - Taxiway G Reconstruction - Electrical design and construction observation services for three phases of work involving airfield electrical facilities for Taxiway G and portions of Taxiways C, B6 and B7, approximately 6,100 feet. Design was done on a fast-track schedule and completed on time.

New AirstripElectrical engineering to develop an airstrip for private use by the client with a 5,000-foot-long runway with visual approach conditions. Our work included electrical design and construction observation services to provide new elevated runway edge lights, threshold lights, a wind cone, an electrical vault, a Super AWOS, and new cable and conduit to complete the electrical system.

Lakefront Airport New Orleans, Louisiana:

Dinter Airport Experience by State:

Arizona (13); Arkansas (1); California (44); Colorado (5); Florida (1); Idaho (5); Louisiana (1); Massachusetts (1); Montana (1); Nevada (29); New Mexico (8);

New York (1); North Dakota (1); Ohio (1); Oregon (4); Texas (3); Utah (3); Washington (5); Wyoming (1); and over 30 military air bases.