DINGMANS CREEK, SITE 4, SMALL SLIDE, DELAWARE
WATER GAP PROJECT VEGETATED KEYS; TRAFFIC
CONTROL STONES; PLANTINGS; SINGLE STONE
BENDWAY WEIRS; & A RANDOM BOULDER FIELD
FOR ROUGHNESS & AQUATIC HABITAT
HIGH WATER-Looking US @ project bank. Stream is obviously eroding this bank, which contributes significant sediment to the system
PRE-PROJECT DINGMANS CR-SITE 4 PIX BY DERRICK 12-15-2008
HIGH WATER-Looking DS toward DS end of project.
PRE-PROJECT DINGMANS CR-SITE 4 PIX BY DERRICK 12-15-2008
Courtesy of Ecological
Restoration, Inc.
Correction: There should be 3 Traffic
Control Stones between each Single Stone
Bendway Weir, not 2.
PLANTS PLANTED
Gray Birch 50 2 gallon pots Gray Birch 200 unrooted poles Buttonbush 25 bare root Silky Dogwood 200 bare root Ninebark 175 bare root Rhododendron 50 3 gallon pots White Pine 150 3 gallon pots
Common Name # Size
Two healthy Single Stone Bendway Weir (SSBW) stones.
CONSTRUCTION DINGMANS CR-SITE 4 PIX BY DERRICK 9-19-2009
Traffic Control Stones (TCS) sized about 3 ft by 3 ft by 4 ft, dug into the bed & bank, designed to stabilize & roughen the bank,
are spaced 3 to 6 ft apart. Every 4th TCS is keyed into the bank & has a Single Stone Bendway Weir attached. 8 SSBW total
Traffic Control Stones (TCS) with Single Stone Bendway Weirs (SSBW)
& vegged keys & pole plantings
Key
Key
TCS
KeyTCS
SSBW
TCS
TCS
TCS
TCS
TCS
TCS
TCS
SSB
W
SSB
W
Key
Key
Key
Thalweg
Key
Rooted–stock container shrubs & trees added to Traffic Control Stones at toe & all bare areas of the entire eroding bank
Key
Key
TCS
KeyTCS
SSBW
TCS
TCS
TCS
TCS
TCS
TCS
TCS
SSB
W
SSB
W
Key
Key
Key
Thalweg
Looking across @ stone being placed in the key for Bendway Weir #4. Live poles have already been placed in the key trench.
CONSTRUCTION DINGMANS CR-SITE 4 PIX BY DERRICK 9-19-2009
Close-up of stone being placed in key for BW #4.
CONSTRUCTION DINGMANS CR-SITE 4 PIX BY DERRICK 9-19-2009
Looking across @ key installation of BW #5.
CONSTRUCTION DINGMANS CR-SITE 4 PIX BY DERRICK 9-19-2009
Looking across @ live poles & key stones in BW #5.
CONSTRUCTION DINGMANS CR-SITE 4 PIX BY DERRICK 9-19-2009
Backfill and overfill with native soils,
then compact (some settling will still
occur)
Detail for key
Flow
Close-up of a Single Stone
Bendway Weir (SSBW) &
vegged key & pole plantings
Thalweg
Key
TCS
SSB
W
Key
Key
CONSTRUCTION COMPLETE
Photos by Dave Derrick
SEPT. 24, 2009
Very natural, minimal structure approach
Construction complete, looking DS @ 175 ft of the 200 ft long project. This should look completely natural in a couple years!!
CONSTRUCTION COMPLETE DINGMANS CR-SITE 4 DERRICK 9-24-2009
Construction complete, looking DS. TCS, Single Stone Bendway Weirs, random boulder field, many pole plantings & rooted-stock plants provide plenty of roughness @ toe of slide.
CONSTRUCTION COMPLETE DINGMANS CR-SITE 4 DERRICK 9-24-2009
Construction complete, DS @ the random boulder field & planted slide.
CONSTRUCTION COMPLETE DINGMANS CR-SITE 4 DERRICK 9-24-2009
Construction complete, looking across @ Bendway Weir #3, along with a vegetated key, hillside plantings, & TCS US & DS.
CONSTRUCTION COMPLETE DINGMANS CR-SITE 4 DERRICK 9-24-2009
Construction complete, looking across @ Bendway Weir #4, along with a vegetated key, hillside plantings, & TCS US & DS.
CONSTRUCTION COMPLETE DINGMANS CR-SITE 4 DERRICK 9-24-2009
Construction complete, looking across @ Bendway Weir #7, along with a vegetated key, hillside plantings, & TCS US & DS.
CONSTRUCTION COMPLETE DINGMANS CR-SITE 4 DERRICK 9-24-2009
Construction complete, looking across @ dense rooted-stock plantings of trees & shrubs on the DS 1/3 of the slide area
CONSTRUCTION COMPLETE DINGMANS CR-SITE 4 DERRICK 9-24-2009
Construction complete, looking across @ Bendway Weir #5, along with a vegetated key, hillside plantings, & TCS US & DS.
CONSTRUCTION COMPLETE DINGMANS CR-SITE 4 DERRICK 9-24-2009
1 YEAR LATER-Looking @ LDB Bendway Weir #1. BW is stable, plantings are growing, upper bank stable.
1 YEAR LATER-DINGMANS CR.-SITE 4-PIX BY DERRICK 9-12-2010
1 YEAR LATER-Bendway Weir #2. Plantings will trap & stabilize eroded material from the upper bank.
1 YEAR LATER-DINGMANS CR.-SITE 4-PIX BY DERRICK 9-12-2010
1 YEAR LATER-Looking @ plantings & Bendway Weir #2.
1 YEAR LATER-DINGMANS CR.-SITE 4-PIX BY DERRICK 9-12-2010
1 YEAR LATER-Looking @ Bendway Weir # 2 & plantings. All stable, growth good, deep pool off stream end of Bendway Weir.
1 YEAR LATER-DINGMANS CR.-SITE 4-PIX BY DERRICK 9-12-2010
1 YEAR LATER-Looking DS @ well-aligned channel with stone & veg roughness on outer bank throughout the bend.
1 YEAR LATER-DINGMANS CR.-SITE 4-PIX BY DERRICK 9-12-2010
1 YEAR LATER-Stream has put almost all of the stone in compression (imbricated)
1 YEAR LATER-DINGMANS CR.-SITE 4-PIX BY DERRICK 9-12-2010
1 YEAR LATER-Mid-project Bendway Weirs, Traffic Control Stones, & vegged floodplain bench.
1 YEAR LATER-DINGMANS CR.-SITE 4-PIX BY DERRICK 9-12-2010
1 YEAR LATER-Mid-project Bendway Weirs, Traffic Control Stones, & vegged floodplain bench.
1 YEAR LATER-DINGMANS CR.-SITE 4-PIX BY DERRICK 9-12-2010
1 YEAR LATER-End of project Bendway Weirs, Traffic Control Stones, & vegged floodplain bench.
1 YEAR LATER-DINGMANS CR.-SITE 4-PIX BY DERRICK 9-12-2010
1 YEAR LATER-Looking US @ great functioning channel & vegged floodplain bench.
1 YEAR LATER-DINGMANS CR.-SITE 4-PIX BY DERRICK 9-12-2010
1 YEAR LATER-Looking US @ Bendway Weirs, Traffic Control Stones, & vegged floodplain bench.
1 YEAR LATER-DINGMANS CR.-SITE 4-PIX BY DERRICK 9-12-2010
1 YEAR LATER-Looking US stable mid-section of project.
1 YEAR LATER-DINGMANS CR.-SITE 4-PIX BY DERRICK 9-12-2010
1 YEAR LATER-Looking US @ robust plantings that will stabilize the bank & trap coluvium for bare areas of upper bank.
1 YEAR LATER-DINGMANS CR.-SITE 4-PIX BY DERRICK 9-12-2010