    3500 DIESEL EPGCOMMISSIONING - FIELDDATA RECODING SHEETS

  • 8/17/2019 Diesel 3500 Commissioning Check Lists

    2/12

    ECM Parameter Settings Record:

    For EUI engines list all the programmed parameters. Keep a record of any changes byrecoding the settings before and after a change.

    Engine Serial Number

    ECM Serial Number

    Rated Fuel Position

    Low Idle Speed

     Acceleration Delay Time

     Acceleration Ramp Rate

    Cooldown Time

    Cooldown Speed

    Prelube Time

    Crank Duration

    Total Number of Crank Cycles

     Air ShutoffFuel Control

    Direct Fuel Control Mode

    Record the following information from the engineinformation plate.Engine serial numberRecord the following information from the enginemonitoring system.ECM Voltage

    Warning Trip Point

    Warning Delay Time

    Engine Oil Pressure

    Warning Trip Point

    Warning Delay Time

    Shutdown Trip Point

    Shutdown Delay Time

    High Coolant Temperature

    Warning Trip Point

    Warning Delay Time

    Derate Trip Point

    Derate Delay Time

    Shutdown Trip Point

    Shutdown Delay Time

    Low Coolant Temperature

    Warning Trip Point

    Warning Delay Time

    Engine Overspeed

    Warning Trip Point

    Warning Delay Time

    Shutdown Trip Point

    Shutdown Delay Time

     Air Inlet Restriction

    Warning Trip Point

    Warning Delay Time

    Derate Trip Point

    Derate Delay Time

     Altitude

    Derate Trip Point

    High Exhaust Temperature

    Warning Trip Point

    Warning Delay Time

    Derate Trip Point

    Delay Time

    Engine Oil Filter Differential Pressure

    Warning Trip Point

    Warning Delay Time

    Fuel Filter Differential Pressure

    Warning Trip Point

    Warning Delay Time

    Crankcase Pressure

    Warning Trip Point

    Warning Delay Time

    Shutdown Trip Point

    Shutdown Delay Time

     Aftercooler Temperature

    Warning Trip Point

    Warning Delay Time

    Derate Trip Point

    Derate Delay Time

    Shutdown Trip Point

    Shutdown Delay Time

    - 2 -

  • 8/17/2019 Diesel 3500 Commissioning Check Lists

    3/12

    Customer Data:

    Name Start up date

    Contact Time

    Telephone

    SiteType of Installation

     Application: PP Continuous Peak Shave Standby Marine Industrial Other

    Engine Data: Generator Data:

    Engine Model Serial Number

    Serial Number Arrangement

     Arrangement Rating

    TMI Spec Voltage

    Rating BHP BkW Amperage

    Environment:

     Ambient Temperature Room Temperature

    Elevationr Relative Humidity

     Atmospheric Condition Salty Dusty Wet Clean Other:

    Safety:

    Heat Shields on Engine OK - Not OK - N/A All Guards in place OK - Not OK - N/A

    Emergency Stop Operates OK - Not OK - N/A Floor Openings Covered OK - Not OK - N/A

    Engine Room Noise Level OK - Not OK - N/A Floors Clean OK - Not OK - N/A

    Warning Decals in Place OK - Not OK - N/A Hot Pipes Wrapped OK - Not OK - N/A

    Fire Extinguisher OK - Not OK - N/A Wiring Secure OK - Not OK - N/A

    Fire Suppression System OK - Not OK - N/A Piping and Hoses Secure OK - Not OK - N/A

     Access to Fluid Fill Areas OK - Not OK - N/A OK - Not OK - N/

    Serviceability:

    Overhead Clearance Gauges Accurate

    Side Clearance Oil OK - Not OK - N/A

     Air Filters Accessible OK - Not OK - N/A Water OK - Not OK - N/A

    Oil Filter Accessible OK - Not OK - N/A Fuel OK - Not OK - N/A

    Fuel Filter Accessible OK - Not OK - N/A Air OK - Not OK - N/A

    Site Glass Visible OK - Not OK - N/A Exhaust OK - Not OK - N/A

    Level Indicators OK - Not OK - N/A

    - 3 -

  • 8/17/2019 Diesel 3500 Commissioning Check Lists

    4/12

     Customer Orientation

    Safety practices (Refer to OMM) OK - Not OK - N/A

    Manuals OK - Not OK - N/A

    Operation and Maintenance Manual delivered and explained OK - Not OK - N/A

    Reviewed start up procedure OK - Not OK - N/A

    Pre-delivery Report OK - Not OK - N/A

    Service manual delivered and explained OK - Not OK - N/A

    Parts manual delivered and explained OK - Not OK - N/A

    Proper levels OK - Not OK - N/A

    Proper fluids OK - Not OK - N/A

    Delivery Service Completed OK - Not OK - N/A

    Warranty information explained OK - Not OK - N/A

    SOS service explained and offered OK - Not OK - N/A

    Maintenance contract advantages explained and offered. OK - Not OK - N/A

    Load Test Report Presented OK - Not OK - N/A

     As Built Drawings Delivered OK - Not OK - N/A

    Customer Acceptance Test OK - Not OK - N/A

    - 4 -

  • 8/17/2019 Diesel 3500 Commissioning Check Lists

    5/12

    Engine Commissioning Checklist:

    Governor:

    Governor / Actuator type

    Linkage free OK - Not OK - N/A

    Oil Level OK - Not OK - N/A

    Fuel System Information:

    High Idle Setting: Specification

    Low Idle Setting Specification

    Fuel Type: Fuel Treatment OK - Not OK - N/A

    Fuel API: Fuel Line Isolated OK - Not OK - N/A

    Fuel Filter Pressure Differential: Fuel Tanks Full & lines Open OK - Not OK - N/A

    Fuel Pressure: Specification: Check for Fuel Leaks OK - Not OK - N/A

     Anti Siphon Valves Fitted OK - Not OK - N/A Day Tank operation OK - Not OK - N/A

    (1)Day Tank Elevation OK - Not OK - N/A (2)Day tank Distance to Engine OK - Not OK - N/A

    (1) The full level of the day tank should be lower than the injector height of the engine(2) The day tank should be no more than 15m away.

    Cooling System:

    +JW Inlet Temp: +JW Outlet Temp

    +SCAC Water Inlet Temp +SCAC Water Outlet Temp

    *Fill Test OK - Not OK Full Load Temperature OK - Not OK - N/A

    *Draw Down Test OK - Not OK Antifreeze OK - Not OK - N/A

    *Cavitation Test OK - Not OK Radiator Temp Differential OK - Not OK - N/A

    *Air Venting Test OK - Not OK Coolant Level Check OK - Not OK - N/A

    *Ambient Capability Value Check for Leaks OK - Not OK - N/A

    + At Rated Load* Refer to EDS 50.5

    Lubrication System:

    Oil Filter pressure Differential OK - Not OK - N/A Oil Level Check OK - Not OK - N/A

    Oil Pressure Level OK - Not OK - N/A Check for Oil Leaks OK - Not OK - N/A

    Combustion Air:

    Temperature in Duct Isolation OK - Not OK - N/A

    Temperature AC Check for Leaks OK - Not OK - N/A

    +Air Filter Pressure Diff +Intake Manifold Pressure

    +Total Inlet Restriction +Intake Manifold Temperature

    + At Rated Load 

    - 5 -

  • 8/17/2019 Diesel 3500 Commissioning Check Lists

    6/12

     Exhaust System-*

    Exhaust Back Pressure Exhaust Pipe Isolation

    Exhaust Temperature Before Turbo Check for Leaks

    Exhaust Stack temperature

    Port Temperatures

    Right Bank Left Bank

    Cylinder 1: Cylinder 2:

    Cylinder 3: Cylinder 4:

    Cylinder 5: Cylinder 6:

    Cylinder 7: Cylinder 8:

    Cylinder 9: Cylinder 10:

    Cylinder 11: Cylinder12:

    Cylinder 13: Cylinder 14:

    Cylinder 15: Cylinder 16:

     Average Right Bank: Average Left Bank:

    Total Average: Maximum difference from Average:

    Hottest to coldest Differential: All Figures OK / NOT OK

    * All to be done at Rated load

    Mechanical:

    Loose Bolts OK - Not OK - N/A Attachments OK - Not OK - N/A

    Inspect Belts OK - Not OK - N/A Alternator OK - Not OK - N/A

    Inspect fan OK - Not OK - N/A Air Shut-off OK - Not OK - N/A

    Hoses and Connections OK - Not OK - N/A Check for Leaks OK - Not OK - N/A

    Inspect Supports OK - Not OK - N/A Unusual Noises OK - Not OK - N/A

    Lubrication Points OK - Not OK - N/A Cleanliness OK - Not OK - N/A

    Vibration Isolator Type Vibration Isolator Adjustment OK - Not OK - N/A

    - 6 -

  • 8/17/2019 Diesel 3500 Commissioning Check Lists

    7/12

    Vibration Levels:

    Order of Vibration – Measured in mm

    Overall m/s ½ 1st

    1 ½ 2nd

    2 ½ 3rd

    EFV(1)

    EFH(2)

    ERV(3)

    ERH(4)

    GFV(5)

    GFH(6)

    GRV(7)

    GRH(8)

    GRA(9)

    ERR(10)

    BASE(11)

    Limits are as follows.Peak to Peak Half Order - 0.13mmPeak to Peak First Order - 0.13mmOverall Displacement - 0.22 mmOverall Velocity - 34.3 mm/s

    Batteries

    Charged OK - Not OK - N/A Trickle Charger OK - Not OK - N/A

    Electrolyte OK - Not OK - N/A Charge rate OK - Not OK - N/A

    Isolated from floor OK - Not OK - N/A Leads well secured OK - Not OK - N/A

    Jacket Water Heaters

    Temperature Setting Wired Correctly OK - Not OK - N/A

    Correct Orientation OK - Not OK - N/A Power on OK - Not OK - N/A

    Starter

    Type Inspect wirings OK - Not OK - N/A

    - 7 -

  • 8/17/2019 Diesel 3500 Commissioning Check Lists

    8/12

    Crankcase Ventilation

    Type of Fumes Disposal Ingestive – Y / N Number of Breathers

    Filter Y / N Liquid Discharge Trap Y / N

    Location of Discharge Leaks OK - Not OK - N/A

    *Crankcase pressure Separate system per Engine OK - Not OK - N/A

    * Limits on Crankcase pressure:For an injestive system the minimum crankcase pressure allowed is 25mm H 2O Vacuum.For a non-injestive system the maximum crankcase pressure allowed is 13mm H2O Positive.

    Protection System Accuracy & Functional Tests.

    High Water Temp OK - Not OK - N/A Low Water OK - Not OK - N/A

    Low Oil Pressure OK - Not OK - N/A Shutdown Devices OK - Not OK - N/A

    High Oil temperature OK - Not OK - N/A High Air Inlet Temperature OK - Not OK - N/A

    Over Speed OK - Not OK - N/A

    - 8 -

  • 8/17/2019 Diesel 3500 Commissioning Check Lists

    9/12

    Generator Startup Checklist:

    RATING INFORMATION 

    Engine Serial Number:

     ___________________________________

     Arrangement Number: ___________________

    Generator Serial Number: _________________________________

     Arrangement Number: ___________________

    GENERATOR NAME PLATE INFORMATION 

    Voltage: ___________________ Package (prime, continuous, standby): _________________

     Amperage: _________________ Kilowatts: ________________________________________

    Storage Location:

    Crankshaft Deflection:

    Generator Alignment:

    Main Stator MegohmmeterReading:

    Before Storage: After Storage:

    Generator dried for 24 hours prior to startup? (Y/N) Drying method:

    SPACE HEATERS   Yes  No  Comments 

    Space heaters operating properly?

    Space heater operated 48 hrs.before startup?

    MEGOHMMETER TEST(SEHS9124) 

    30 sec.reading

    60 sec.reading

    30 sec.corrected

    60 sec.corrected

     Ambienttemp.

    Comments

    Main Stator

    Main Rotor

    Exciter Stator

    Exciter Rotor

    Beginning ofStorage

    PMG Stator

    Main Stator

    Main Rotor

    Exciter Stator

    Exciter Rotor

    Start-up

    PMG Stator

    - 9 -

  • 8/17/2019 Diesel 3500 Commissioning Check Lists

    10/12

     

    Regulator   Voltage  Amps  Comments 

    F1 to F2 DC

    20 to 22 AC

    20 to 24 AC

    22 to 24 AC24 to 30 (SE only) AC

    26 to 28 (PM only) AC

    26 to 30 (PM only) AC

    No Load

    28 to 30 (PM only) AC

    GeneratorExcitation NamePlate Information:

    DC Compare with F1 to F2

    F1 to F2 DC

    20 to 22 AC

    20 to 24 AC

    22 to 24 AC

    24 to 30 (SE only) AC

    26 to 28 (PM only) AC

    26 to 30 (PM only) AC

    Full Load

    28 to 30 (PM only) AC

    ELECTRICAL   Yes  No  Comments 

    Unit properly grounded

    Check diodes

    Over current protection

    Over voltage protection

    Check for loose wiring

     Adjust voltage

     Adjust frequency

    MECHANICAL  Data  Comments 

    Bearing temperature readings at full load Front __________ Rear ___________

    Stator temperature readings at full load A0 _______ B0 _______ C0 _______

     Air gap on main stator Top __________ Bottom __________

     Air gap on exciter stator Top __________ Bottom __________

     Air gap of PMG Top __________ Bottom __________

     Ambient air to generator at full load Temperature ____________________

    Supplier air opening to generator Size of Opening _________________

    - 10 -

  • 8/17/2019 Diesel 3500 Commissioning Check Lists

    11/12

     

    SWITCH GEAR/PARALLEL OPERATION 

    Manufacturer:

    Utility Grade:

    PLC Manufacturer:

    Software:Busbar Current Rating:

    Circuit Breaker Manufacturer:

    Data Communication: SCADA

    Communication OK - Not OK - N/A

    Setting 1  Setting 2  Setting 3  Comments 

    Circuit breaker type

    Overload setting

    Reverse power relay

    VAR/PF Controller

    Load share

    INSTALLATION & LOAD INFORMATION 

    Neutral grounding system UPS

    Enclosure type - Size

    Motor: Other loads:

    - Total SKVA - Lighting

    - Total HP - Computers

    - Welding

    - Non-linear

    - Other

    AC Functional Tests 

     AC Protection Function Test OK - Not OK - N/A

    Reverse Power Protection OK - Not OK - N/A

    Under Frequency Protection OK - Not OK - N/A

    Over Frequency Protection OK - Not OK - N/A

    Over Voltage Protection OK - Not OK - N/A

    Cable Installation 

    Cable Entry Location Top / Bottom

    Cable Size

    Number of Cores OK - Not OK - N/A

    Cable Try OK - Not OK - N/A

    Cable Ladder OK - Not OK - N/A

    Cable Lay Out OK - Not OK - N/A

    FULL LOAD DATA 

    Voltage Amps KW KVARS P.F.

    - 11 -

  • 8/17/2019 Diesel 3500 Commissioning Check Lists

    12/12

     Statement of Completion:

    The following section I to be completed and signed off by the authorizedmechanic, or mechanics, that have carried out the works to verify that thenumbers contained in this report are an accurate reflection of the readingstaken during the commissioning of the Generator Set / Engine.

    The Caterpillar authorized selling dealer is to also sign off that all works havebeen completed to their satisfaction and the customer to sign off as havingreceived a coy of this document for their records.

    Installation Mechanic:

    Name:

    Title:

    Signature:

    Date:

    Additional Mechanic:

    Name:

    Title:

    Signature:

    Date:

    Selling Dealer:

    Name:

    Title:

    Signature:

    Date:

    Customer:

    Name:

    Title:

    Signature:

    Date:

    - 12 -