DIAMETER PIPELINE - spireenergy.comB... · pipeline cover soils checked by date eng. approval date...

6
0 M.P. 3.5 STLP-A-004 182+88 M.P. 4.4 232+89 STLP-A-006 X X X X X X X X X X X X X X X X X X X X OH OH PROPOSED 24-INCH DIAMETER PIPELINE 8 9 10 10 11 8 4.0 0 M.P. 3.5 STLP-A-004 182+88 M.P. 4.4 232+89 STLP-A-006 F OL F AG F OW F AG F OL AG 8F 8F 279D2 279B 279D2 279B 279D2 8F 279D2 279B 8F2 242A 3451A 8F 280B 279B 279D2 8F 279D2 279B CLASS I / 1440 PSIG 0.72 5' MIN. 1 5002' 232+89 182+88 OPEN CUT OPEN CUT (FLUMED) OPEN CUT OPEN CUT (FLUMED) OPEN CUT OPEN CUT (FLUMED) OPEN CUT OPEN CUT (FLUMED) OPEN CUT (FLUMED) OPEN CUT OPEN CUT F OL F AG F OW F AG F OL AG 8F 8F 279D2 279B 279D2 279B 279D2 8F 279D2 279B 8F2 242A 3451A 8F 280B 279B 279D2 8F 279D2 279B CLASS I / 1440 PSIG 0.72 5' MIN. 1 5002' 232+89 182+88 OPEN CUT OPEN CUT (FLUMED) OPEN CUT OPEN CUT (FLUMED) OPEN CUT OPEN CUT (FLUMED) OPEN CUT OPEN CUT (FLUMED) OPEN CUT (FLUMED) OPEN CUT OPEN CUT 182+88 199+44 1656' 199+44 212+16 1272' 212+16 220+63 847' 220+63 231+37 1075' 231+37 232+89 152' 182+88 199+44 1656' 199+44 212+16 1272' 212+16 220+63 847' 220+63 231+37 1075' 231+37 232+89 152' EXISTING GRADE CENTERLINE OF STREAM SIL-TMA-010 CENTERLINE OF STREAM SIL-TMA-011 EDGE OF STREAM SIL-JJP-018 EDGE OF STREAM SIL-JJP-018 CENTERLINE OF STREAM SIL-TMA-016 CENTERLINE OF STREAM SIL-TMA-018 EXISTING GRADE CENTERLINE OF STREAM SIL-TMA-010 CENTERLINE OF STREAM SIL-TMA-011 EDGE OF STREAM SIL-JJP-018 EDGE OF STREAM SIL-JJP-018 CENTERLINE OF STREAM SIL-TMA-016 CENTERLINE OF STREAM SIL-TMA-018 300' 350' 400' 450' 500' 550' 600' 650' 700' 750' 800' 850' 900' 950' 300' 350' 400' 450' 500' 550' 600' 650' 700' 750' 800' 850' 900' 950' 300' 350' 400' 450' 500' 550' 600' 650' 700' 750' 800' 850' 900' 950' 300' 350' 400' 450' 500' 550' 600' 650' 700' 750' 800' 850' 900' 950' 184+00 186+00 188+00 190+00 192+00 194+00 196+00 198+00 200+00 202+00 204+00 206+00 208+00 210+00 212+00 214+00 216+00 218+00 220+00 222+00 224+00 226+00 228+00 230+00 230+00 232+00 184+00 186+00 188+00 190+00 192+00 194+00 196+00 198+00 200+00 202+00 204+00 206+00 208+00 210+00 212+00 214+00 216+00 218+00 220+00 222+00 224+00 226+00 228+00 230+00 230+00 232+00 OWNERSHIP / FOOTAGE STATIONING MATERIAL & COATING MATERIAL DESCRIPTION QUANTITY TAG REFERENCE DRAWINGS TITLE DWG. NO. REVISIONS NO. REVISIONS DATE DRAWN CK APPR APPROVALS DRAWN BY DATE CLIENT APPROVAL DATE SCALE DRAWING NO. REVISION LAND USE PIPELINE COVER SOILS CHECKED BY DATE ENG. APPROVAL DATE P.M. APPROVAL DATE SCALE PLAN: SCALE PROFILE H: SCALE PROFILE V: SPIRE STL PIPELINE PROJECT DESIGN FACTOR PREPARED BY PREPARED FOR TO NOTES: 1. THE IMAGERY SHOWN WAS PROVIDED BY AERIAL DATA SERVICES, 2016. ADDITIONAL IMAGERY SUPPLEMENTED FROM USFWS-NWI AND USGS. 2. EXISTING FEATURES SHOWN WERE SURVEYED BY MOTT MACDONALD AND DIGITIZED FROM IMAGERY. ALL LOCATIONS ARE APPROXIMATE AND SHALL BE VERIFIED BY CONTRACTOR. 3. PROPERTY LINES DEPICTED ON THIS PLAN ARE BASED ON GIS TAX MAP DATA. 4. ROAD CENTERLINES SHOWN ARE FROM PUBLICLY AVAILABLE DATA AND HAVE NOT BEEN SURVEYED. 0 100 200 200 1 2 4 ISSUE FOR FERC AMENDMENT TO FERC FERC SUPPLEMENTAL FILING 1/2017 04/2017 10/2017 GH DP DP EB SG RJP DGG DGG DGG DP RJP 03/2017 03/2017 1" = 200' 1" = 200' 1" = 200' 1 PIPE, 24.000" OD X 0.375" WT, API-5L, X70, DSAW, FBE COATED 1" = 200' STLP-A-005 4 D.G.G. J.E.W. 04/2017 04/2017 ALIGNMENT SHEET PROPOSED 24-INCH DIAMETER PIPELINE SCOTT AND GREENE COUNTIES, ILLINOIS STA. 182+88 STA. 232+89 5002' STA. 182+88 STA. 232+89

Transcript of DIAMETER PIPELINE - spireenergy.comB... · pipeline cover soils checked by date eng. approval date...

Page 1: DIAMETER PIPELINE - spireenergy.comB... · pipeline cover soils checked by date eng. approval date p.m. approval date ... alignment sheet proposed 24-inch diameter pipeline scott

M.P.

3.5

ST

LP

-A

-0

04

18

2+

88

M.P.

4.4

23

2+

89

ST

LP

-A

-0

06

X

X

X

XX

X X

XX X

X

X

X

X

X

X

X

X

X

X

OH

OH

PROPOSED 24-INCH

DIAMETER PIPELINE

8

9

10

10

11

8

4

.0

M.P.

3.5

ST

LP

-A

-0

04

18

2+

88

M.P.

4.4

23

2+

89

ST

LP

-A

-0

06

F OL F AG F OW F AG F OL AG

8F 8F 279D2 279B 279D2 279B 279D2 8F 279D2 279B 8F2 242A 3451A 8F 280B 279B 279D2 8F 279D2 279B

CLASS I / 1440 PSIG

0.72

5' MIN.

1

5002'

23

2+

89

18

2+

88

OPEN CUT

OPEN CUT

(FLUMED)

OPEN CUT

OPEN CUT

(FLUMED)

OPEN CUT

OPEN CUT

(FLUMED)

OPEN CUT

OPEN CUT

(FLUMED)

OPEN CUT

(FLUMED)

OPEN CUT OPEN CUT

F OL F AG F OW F AG F OL AG

8F 8F 279D2 279B 279D2 279B 279D2 8F 279D2 279B 8F2 242A 3451A 8F 280B 279B 279D2 8F 279D2 279B

CLASS I / 1440 PSIG

0.72

5' MIN.

1

5002'

23

2+

89

18

2+

88

OPEN CUT

OPEN CUT

(FLUMED)

OPEN CUT

OPEN CUT

(FLUMED)

OPEN CUT

OPEN CUT

(FLUMED)

OPEN CUT

OPEN CUT

(FLUMED)

OPEN CUT

(FLUMED)

OPEN CUT OPEN CUT

18

2+

88

19

9+

44

1656'

19

9+

44

21

2+

16

1272'

21

2+

16

22

0+

63

847'

22

0+

63

23

1+

37

1075'

23

1+

37

23

2+

89

152'

18

2+

88

19

9+

44

1656'

19

9+

44

21

2+

16

1272'

21

2+

16

22

0+

63

847'

22

0+

63

23

1+

37

1075'

23

1+

37

23

2+

89

152'

EXISTING GRADE

CE

NT

ER

LIN

E O

F

ST

RE

AM

SIL-T

MA

-010

CE

NT

ER

LIN

E O

F

ST

RE

AM

SIL-T

MA

-011

ED

GE

O

F S

TR

EA

M

SIL-JJP

-018

ED

GE

O

F S

TR

EA

M

SIL-JJP

-018

CE

NT

ER

LIN

E O

F

ST

RE

AM

SIL-T

MA

-016

CE

NT

ER

LIN

E O

F

ST

RE

AM

SIL-T

MA

-018

EXISTING GRADE

CE

NT

ER

LIN

E O

F

ST

RE

AM

SIL-T

MA

-010

CE

NT

ER

LIN

E O

F

ST

RE

AM

SIL-T

MA

-011

ED

GE

O

F S

TR

EA

M

SIL-JJP

-018

ED

GE

O

F S

TR

EA

M

SIL-JJP

-018

CE

NT

ER

LIN

E O

F

ST

RE

AM

SIL-T

MA

-016

CE

NT

ER

LIN

E O

F

ST

RE

AM

SIL-T

MA

-018

300'

350'

400'

450'

500'

550'

600'

650'

700'

750'

800'

850'

900'

950'

300'

350'

400'

450'

500'

550'

600'

650'

700'

750'

800'

850'

900'

950'

300'

350'

400'

450'

500'

550'

600'

650'

700'

750'

800'

850'

900'

950'

300'

350'

400'

450'

500'

550'

600'

650'

700'

750'

800'

850'

900'

950'

184+00 186+00 188+00 190+00 192+00 194+00 196+00 198+00 200+00 202+00 204+00 206+00 208+00 210+00 212+00 214+00 216+00 218+00 220+00 222+00 224+00 226+00 228+00 230+00230+00 232+00184+00 186+00 188+00 190+00 192+00 194+00 196+00 198+00 200+00 202+00 204+00 206+00 208+00 210+00 212+00 214+00 216+00 218+00 220+00 222+00 224+00 226+00 228+00 230+00230+00 232+00

OWNERSHIP /

FOOTAGE

STATIONING

MATERIAL &

COATING

MATERIAL

DESCRIPTIONQUANTITYTAG

REFERENCE DRAWINGS

TITLEDWG. NO.

REVISIONS

NO. REVISIONS DATE DRAWN CK APPR

APPROVALS

DRAWN BY DATE

CLIENT APPROVAL

DATE

SCALE DRAWING NO. REVISION

LAND USE

PIPELINE COVER

SOILS

CHECKED BY DATE

ENG. APPROVAL DATE

P.M. APPROVAL DATE

SCALE PLAN:

SCALE PROFILE H:

SCALE PROFILE V:

SPIRE STL PIPELINE PROJECT

DESIGN FACTOR

PREPARED BY

PREPARED FOR

TO

NOTES:

1. THE IMAGERY SHOWN WAS PROVIDED BY AERIAL DATA SERVICES, 2016. ADDITIONAL IMAGERY SUPPLEMENTED FROM USFWS-NWI AND USGS.

2. EXISTING FEATURES SHOWN WERE SURVEYED BY MOTT MACDONALD AND DIGITIZED FROM IMAGERY. ALL LOCATIONS ARE APPROXIMATE

AND SHALL BE VERIFIED BY CONTRACTOR.

3. PROPERTY LINES DEPICTED ON THIS PLAN ARE BASED ON GIS TAX MAP DATA.

4. ROAD CENTERLINES SHOWN ARE FROM PUBLICLY AVAILABLE DATA AND HAVE NOT BEEN SURVEYED.

0100200 200

1

2

4

ISSUE FOR FERC

AMENDMENT TO FERC

FERC SUPPLEMENTAL FILING

1/2017

04/2017

10/2017

GH

DP

DP

EB

SG

RJP

DGG

DGG

DGG

DP

RJP

03/2017

03/2017

1" = 200'

1" = 200'

1" = 200'

1 PIPE, 24.000" OD X 0.375" WT, API-5L, X70, DSAW, FBE COATED

1" = 200' STLP-A-005 4

D.G.G.

J.E.W.

04/2017

04/2017

ALIGNMENT SHEET

PROPOSED 24-INCH DIAMETER PIPELINE

SCOTT AND GREENE COUNTIES, ILLINOIS

STA. 182+88 STA. 232+89

5002'

ST

A. 182+

88

ST

A. 232+

89

Page 2: DIAMETER PIPELINE - spireenergy.comB... · pipeline cover soils checked by date eng. approval date p.m. approval date ... alignment sheet proposed 24-inch diameter pipeline scott

M.P.

4.4

ST

LP

-A

-0

05

23

2+

89

M.P.

5.4

28

2+

88

ST

LP

-A

-0

07

X

X

X

XX

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

PROPOSED 24-INCH

DIAMETER PIPELINE

9

10

10

11

12

5.0

M.P.

4.4

ST

LP

-A

-0

05

23

2+

89

M.P.

5.4

28

2+

88

ST

LP

-A

-0

07

AG OL D OL AG OL AG OL AG

279B 279D2 279B 51A 68A 51A 675B 675C2 675B 675C2 3451A 675C2 61A 675C2 279B 61A 51A

CLASS I / 1440 PSIG

0.72 0.6 0.72

5' MIN.

1

538'

23

8+

27

23

2+

89

2

80'

23

9+

07

23

8+

27

1

4382'

28

2+

88

23

9+

07

OPEN CUT BORE OPEN CUT

AG OL D OL AG OL AG OL AG

279B 279D2 279B 51A 68A 51A 675B 675C2 675B 675C2 3451A 675C2 61A 675C2 279B 61A 51A

CLASS I / 1440 PSIG

0.72 0.6 0.72

5' MIN.

1

538'

23

8+

27

23

2+

89

2

80'

23

9+

07

23

8+

27

1

4382'

28

2+

88

23

9+

07

OPEN CUT BORE OPEN CUT

23

2+

89

23

8+

84

595'

23

8+

84

25

2+

48

1365'

25

2+

48

26

5+

87

1339'

26

5+

87

28

2+

88

1701'

23

2+

89

23

8+

84

595'

23

8+

84

25

2+

48

1365'

25

2+

48

26

5+

87

1339'

26

5+

87

28

2+

88

1701'

EXISTING GRADE

OV

ER

HE

AD

LIN

E

CE

NT

ER

LIN

E O

F

BA

RR

OW

R

OA

D

CE

NT

ER

LIN

E O

F

UN

KN

OW

N R

OA

D

EXISTING GRADE

OV

ER

HE

AD

LIN

E

CE

NT

ER

LIN

E O

F

BA

RR

OW

R

OA

D

CE

NT

ER

LIN

E O

F

UN

KN

OW

N R

OA

D

300'

350'

400'

450'

500'

550'

600'

650'

700'

750'

800'

850'

900'

950'

1000'

300'

350'

400'

450'

500'

550'

600'

650'

700'

750'

800'

850'

900'

950'

1000'

300'

350'

400'

450'

500'

550'

600'

650'

700'

750'

800'

850'

900'

950'

1000'

300'

350'

400'

450'

500'

550'

600'

650'

700'

750'

800'

850'

900'

950'

1000'

234+00 236+00 238+00 240+00 242+00 244+00 246+00246+00 248+00 250+00 252+00 254+00 256+00 258+00 260+00 262+00 264+00 266+00 268+00 270+00 272+00 274+00 276+00 278+00 280+00 282+00234+00 236+00 238+00 240+00 242+00 244+00 246+00246+00 248+00 250+00 252+00 254+00 256+00 258+00 260+00 262+00 264+00 266+00 268+00 270+00 272+00 274+00 276+00 278+00 280+00 282+00

OWNERSHIP /

FOOTAGE

STATIONING

MATERIAL &

COATING

MATERIAL

DESCRIPTIONQUANTITYTAG

REFERENCE DRAWINGS

TITLEDWG. NO.

REVISIONS

NO. REVISIONS DATE DRAWN CK APPR

APPROVALS

DRAWN BY DATE

CLIENT APPROVAL

DATE

SCALE DRAWING NO. REVISION

LAND USE

PIPELINE COVER

SOILS

CHECKED BY DATE

ENG. APPROVAL DATE

P.M. APPROVAL DATE

SCALE PLAN:

SCALE PROFILE H:

SCALE PROFILE V:

SPIRE STL PIPELINE PROJECT

DESIGN FACTOR

PREPARED BY

PREPARED FOR

TO

NOTES:

1. THE IMAGERY SHOWN WAS PROVIDED BY AERIAL DATA SERVICES, 2016. ADDITIONAL IMAGERY SUPPLEMENTED FROM USFWS-NWI AND USGS.

2. EXISTING FEATURES SHOWN WERE SURVEYED BY MOTT MACDONALD AND DIGITIZED FROM IMAGERY. ALL LOCATIONS ARE APPROXIMATE

AND SHALL BE VERIFIED BY CONTRACTOR.

3. PROPERTY LINES DEPICTED ON THIS PLAN ARE BASED ON GIS TAX MAP DATA.

4. ROAD CENTERLINES SHOWN ARE FROM PUBLICLY AVAILABLE DATA AND HAVE NOT BEEN SURVEYED.

0100200 200

1

2

4

ISSUE FOR FERC

AMMENDMENT TO FERC

FERC SUPPLEMENTAL FILING

1/2017

04/2017

10/2017

GH

DP

DP

EB

SG

RJP

DGG

DGG

DGG

DP

SG

04/2017

04/2017

1" = 200'

1" = 200'

1" = 200'

1

2

PIPE, 24.000" OD X 0.375" WT, API-5L, X70, DSAW, FBE COATED

PIPE, 24.000" OD X 0.500" WT, API-5L, X70, DSAW, FBE/ARO COATED

1" = 200' STLP-A-006 4

DGG

JEW

04/2014

04/2017

ALIGNMENT SHEET

PROPOSED 24-INCH DIAMETER PIPELINE

GREENE COUNTY, ILLINOIS

STA. 232+89 STA. 282+88

4920'

80'

ST

A. 232+

89

ST

A. 282+

88

Page 3: DIAMETER PIPELINE - spireenergy.comB... · pipeline cover soils checked by date eng. approval date p.m. approval date ... alignment sheet proposed 24-inch diameter pipeline scott

M.P.

5.4

ST

LP

-A

-0

06

28

2+

88

M.P.

6.3

33

2+

87

ST

LP

-A

-0

08

X

X

XX

XX

XX

XX

XX

XX

X

XX

XX

XX

X

X

X

X

X

X

X

X

X

X

X

XX

X

X

XX

X

X

X

XX

XX

X

X

XX

X

X

X

X

X

X

X

X

X

X

X

X

X XX

X

XX

X

XX

X

X

XX

X

FO

OH

OH

OH

OH

OH

OH

OH

OH

OH

OHOH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

T T

T

T

T

T

T

T

T

T

T

T

T

T

PROPOSED 24-INCH

DIAMETER PIPELINE

12

13

6.0

M.P.

5.4

ST

LP

-A

-0

06

28

2+

88

M.P.

6.3

33

2+

87

ST

LP

-A

-0

08

AG W F AG OL D OL AG W AG D AG D AG

51A 675C2 675B 279D2 279B 279D2 257B 279D2 61A 675B 61A 675C2 279D2 279B 279D2 8D2

CLASS I / 1440 PSIG

0.72 0.6 0.72 0.6 0.72

5' MIN.

1

1710'

29

9+

99

28

2+

88

20

29

9+

61

2

80'

30

0+

79

29

9+

99

1

525'

30

6+

04

30

0+

79

20

30

1+

16

2

80'

30

6+

84

30

6+

04

1

2603'

33

2+

87

30

6+

84

OPEN CUT

OPEN CUT

(FLUMED)

OPEN CUT BORE OPEN CUT

OPEN CUT

(FLUMED)

OPEN CUT BORE OPEN CUT

AG W F AG OL D OL AG W AG D AG D AG

51A 675C2 675B 279D2 279B 279D2 257B 279D2 61A 675B 61A 675C2 279D2 279B 279D2 8D2

CLASS I / 1440 PSIG

0.72 0.6 0.72 0.6 0.72

5' MIN.

1

1710'

29

9+

99

28

2+

88

20

29

9+

61

2

80'

30

0+

79

29

9+

99

1

525'

30

6+

04

30

0+

79

20

30

1+

16

2

80'

30

6+

84

30

6+

04

1

2603'

33

2+

87

30

6+

84

OPEN CUT

OPEN CUT

(FLUMED)

OPEN CUT BORE OPEN CUT

OPEN CUT

(FLUMED)

OPEN CUT BORE OPEN CUT

28

2+

88

29

2+

63

975'

29

2+

63

30

0+

28

764'

30

0+

28

30

6+

41

613'

30

6+

41

33

2+

87

2646'

28

2+

88

29

2+

63

975'

29

2+

63

30

0+

28

764'

30

0+

28

30

6+

41

613'

30

6+

41

33

2+

87

2646'

EXISTING GRADE

EN

TE

R W

ET

LA

ND

WIL-JJP

-012A

CE

NT

ER

LIN

E O

F S

TR

EA

M

SIL-JJP

-026

EX

IT

W

ET

LA

ND

WIL-JJP

-012A

EN

TE

R W

ET

LA

ND

WIL-JJP

-012

EX

IT

W

ET

LA

ND

WIL-JJP

-012

OV

ER

HE

AD

LIN

E

CE

NT

ER

LIN

E O

F

UN

KN

OW

N R

OA

D

TE

LE

PH

ON

E LIN

E

EN

TE

R W

ET

LA

ND

WIL-T

MA

-005

CE

NT

ER

LIN

E O

F

ST

RE

AM

SIL-JJP

-027

EX

IT

W

ET

LA

ND

WIL-T

MA

-005

TE

LE

PH

ON

E LIN

E

CE

NT

ER

LIN

E O

F

2575 N

R

OA

D /

PA

TT

ER

SO

N R

OA

D

OV

ER

HE

AD

LIN

E

OV

ER

HE

AD

LIN

E

EXISTING GRADE

EN

TE

R W

ET

LA

ND

WIL-JJP

-012A

CE

NT

ER

LIN

E O

F S

TR

EA

M

SIL-JJP

-026

EX

IT

W

ET

LA

ND

WIL-JJP

-012A

EN

TE

R W

ET

LA

ND

WIL-JJP

-012

EX

IT

W

ET

LA

ND

WIL-JJP

-012

OV

ER

HE

AD

LIN

E

CE

NT

ER

LIN

E O

F

UN

KN

OW

N R

OA

D

TE

LE

PH

ON

E LIN

E

EN

TE

R W

ET

LA

ND

WIL-T

MA

-005

CE

NT

ER

LIN

E O

F

ST

RE

AM

SIL-JJP

-027

EX

IT

W

ET

LA

ND

WIL-T

MA

-005

TE

LE

PH

ON

E LIN

E

CE

NT

ER

LIN

E O

F

2575 N

R

OA

D /

PA

TT

ER

SO

N R

OA

D

OV

ER

HE

AD

LIN

E

OV

ER

HE

AD

LIN

E

300'

350'

400'

450'

500'

550'

600'

650'

700'

750'

800'

850'

900'

950'

300'

350'

400'

450'

500'

550'

600'

650'

700'

750'

800'

850'

900'

950'

300'

350'

400'

450'

500'

550'

600'

650'

700'

750'

800'

850'

900'

950'

300'

350'

400'

450'

500'

550'

600'

650'

700'

750'

800'

850'

900'

950'

284+00 286+00 288+00 290+00 292+00 294+00 296+00 298+00 300+00300+00 302+00 304+00 306+00 308+00 310+00 312+00 314+00 316+00 318+00 320+00 322+00 324+00 326+00 328+00 330+00 332+00284+00 286+00 288+00 290+00 292+00 294+00 296+00 298+00 300+00300+00 302+00 304+00 306+00 308+00 310+00 312+00 314+00 316+00 318+00 320+00 322+00 324+00 326+00 328+00 330+00 332+00

OWNERSHIP /

FOOTAGE

STATIONING

MATERIAL &

COATING

MATERIAL

DESCRIPTIONQUANTITYTAG

REFERENCE DRAWINGS

TITLEDWG. NO.

REVISIONS

NO. REVISIONS DATE DRAWN CK APPR

APPROVALS

DRAWN BY DATE

CLIENT APPROVAL

DATE

SCALE DRAWING NO. REVISION

LAND USE

PIPELINE COVER

SOILS

CHECKED BY DATE

ENG. APPROVAL DATE

P.M. APPROVAL DATE

SCALE PLAN:

SCALE PROFILE H:

SCALE PROFILE V:

SPIRE STL PIPELINE PROJECT

DESIGN FACTOR

PREPARED BY

PREPARED FOR

TO

NOTES:

1. THE IMAGERY SHOWN WAS PROVIDED BY AERIAL DATA SERVICES, 2016. ADDITIONAL IMAGERY SUPPLEMENTED FROM USFWS-NWI AND USGS.

2. EXISTING FEATURES SHOWN WERE SURVEYED BY MOTT MACDONALD AND DIGITIZED FROM IMAGERY. ALL LOCATIONS ARE APPROXIMATE

AND SHALL BE VERIFIED BY CONTRACTOR.

3. PROPERTY LINES DEPICTED ON THIS PLAN ARE BASED ON GIS TAX MAP DATA.

4. ROAD CENTERLINES SHOWN ARE FROM PUBLICLY AVAILABLE DATA AND HAVE NOT BEEN SURVEYED.

0100200 200

1

2

4

ISSUE FOR FERC

AMMENDMENT TO FERC

FERC SUPPLEMENTAL FILING

1/2017

04/2017

10/2017

GH

DP

DP

EB

SG

RJP

DGG

DGG

DGG

DP

SG

04/2017

04/2017

1" = 200'

1" = 200'

1" = 200'

1

2

20

PIPE, 24.000" OD X 0.375" WT, API-5L, X70, DSAW, FBE COATED

PIPE, 24.000" OD X 0.500" WT, API-5L, X70, DSAW, FBE/ARO COATED

INDUCTION BEND, 24.000" OD X 0.500" WT, 5D, X70, FBE COATED

1" = 200' STLP-A-007 4

DGG

JEW

04/2017

04/2017

ALIGNMENT SHEET

PROPOSED 24-INCH DIAMETER PIPELINE

GREENE COUNTY, ILLINOIS

STA. 282+88 STA. 332+87

4838'

160'

2

ST

A. 282+

88

ST

A. 332+

87

Page 4: DIAMETER PIPELINE - spireenergy.comB... · pipeline cover soils checked by date eng. approval date p.m. approval date ... alignment sheet proposed 24-inch diameter pipeline scott

M.P.

6.3

ST

LP

-A

-0

07

33

2+

87

M.P.

7.3

38

2+

89

ST

LP

-A

-0

09

X X

X

X

X

X

X

X

X

X

X

X

X

XX

X

X

X

XX

X

XX

X

X

XX

XX

X

X

X

X

X

X

X

X

X

X

X

X

XX

XX

X

X

XX

X

X

X

X

X

X

X

X

X

X

X

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

T

T

T

T

T

PROPOSED 24-INCH

DIAMETER PIPELINE

12

14

15

167.0

M.P.

6.3

ST

LP

-A

-0

07

33

2+

87

M.P.

7.3

38

2+

89

ST

LP

-A

-0

09

AG OW AG OL D AG OL D OL D AG

8D2 3451A 8F2 279B 61A 279C2 61A 68A

CLASS I / 1440 PSIG

0.72 0.6 0.72 0.6 0.72

5' MIN. 10' MIN. 5' MIN.

1

2284'

35

5+

73

33

2+

87

20

35

5+

35

2

80'

35

6+

53

35

5+

73

1

2191'

37

8+

44

35

6+

53

20

35

7+

62

2

160'

38

0+

04

37

8+

44

1

285'

38

2+

89

38

0+

04

OPEN CUT

OPEN CUT

(FLUMED)

OPEN CUT BORE OPEN CUT BORE OPEN CUT

AG OW AG OL D AG OL D OL D AG

8D2 3451A 8F2 279B 61A 279C2 61A 68A

CLASS I / 1440 PSIG

0.72 0.6 0.72 0.6 0.72

5' MIN. 10' MIN. 5' MIN.

1

2284'

35

5+

73

33

2+

87

20

35

5+

35

2

80'

35

6+

53

35

5+

73

1

2191'

37

8+

44

35

6+

53

20

35

7+

62

2

160'

38

0+

04

37

8+

44

1

285'

38

2+

89

38

0+

04

OPEN CUT

OPEN CUT

(FLUMED)

OPEN CUT BORE OPEN CUT BORE OPEN CUT

33

2+

87

34

6+

32

1345'

34

6+

32

35

6+

24

990'

35

6+

24

37

3+

66

1742'

37

3+

66

37

8+

71

505'

37

8+

71

37

9+

91

120'

37

9+

91

38

2+

89

298'

33

2+

87

34

6+

32

1345'

34

6+

32

35

6+

24

990'

35

6+

24

37

3+

66

1742'

37

3+

66

37

8+

71

505'

37

8+

71

37

9+

91

120'

37

9+

91

38

2+

89

298'

EXISTING GRADE

ED

GE

O

F S

TR

EA

M

SIL-T

MA

-020

ED

GE

O

F S

TR

EA

M

SIL-T

MA

-020

CE

NT

ER

LIN

E O

F

1000 E

R

OA

D

OV

ER

HE

AD

LIN

E

CE

NT

ER

LIN

E O

F

UN

KN

OW

N R

OA

D

CE

NT

ER

LIN

E O

F

KC

S R

AILR

OA

D

EXISTING GRADE

ED

GE

O

F S

TR

EA

M

SIL-T

MA

-020

ED

GE

O

F S

TR

EA

M

SIL-T

MA

-020

CE

NT

ER

LIN

E O

F

1000 E

R

OA

D

OV

ER

HE

AD

LIN

E

CE

NT

ER

LIN

E O

F

UN

KN

OW

N R

OA

D

CE

NT

ER

LIN

E O

F

KC

S R

AILR

OA

D

300'

350'

400'

450'

500'

550'

600'

650'

700'

750'

800'

850'

900'

950'

300'

350'

400'

450'

500'

550'

600'

650'

700'

750'

800'

850'

900'

950'

300'

350'

400'

450'

500'

550'

600'

650'

700'

750'

800'

850'

900'

950'

300'

350'

400'

450'

500'

550'

600'

650'

700'

750'

800'

850'

900'

950'

334+00 336+00 338+00 340+00 342+00 344+00 346+00 348+00 350+00 352+00 354+00 356+00356+00 358+00 360+00 362+00 364+00 366+00 368+00 370+00 372+00 374+00 376+00 378+00 380+00 382+00334+00 336+00 338+00 340+00 342+00 344+00 346+00 348+00 350+00 352+00 354+00 356+00356+00 358+00 360+00 362+00 364+00 366+00 368+00 370+00 372+00 374+00 376+00 378+00 380+00 382+00

OWNERSHIP /

FOOTAGE

STATIONING

MATERIAL &

COATING

MATERIAL

DESCRIPTIONQUANTITYTAG

REFERENCE DRAWINGS

TITLEDWG. NO.

REVISIONS

NO. REVISIONS DATE DRAWN CK APPR

APPROVALS

DRAWN BY DATE

CLIENT APPROVAL

DATE

SCALE DRAWING NO. REVISION

LAND USE

PIPELINE COVER

SOILS

CHECKED BY DATE

ENG. APPROVAL DATE

P.M. APPROVAL DATE

SCALE PLAN:

SCALE PROFILE H:

SCALE PROFILE V:

SPIRE STL PIPELINE PROJECT

DESIGN FACTOR

PREPARED BY

PREPARED FOR

TO

NOTES:

1. THE IMAGERY SHOWN WAS PROVIDED BY AERIAL DATA SERVICES, 2016. ADDITIONAL IMAGERY SUPPLEMENTED FROM USFWS-NWI AND USGS.

2. EXISTING FEATURES SHOWN WERE SURVEYED BY MOTT MACDONALD AND DIGITIZED FROM IMAGERY. ALL LOCATIONS ARE APPROXIMATE

AND SHALL BE VERIFIED BY CONTRACTOR.

3. PROPERTY LINES DEPICTED ON THIS PLAN ARE BASED ON GIS TAX MAP DATA.

4. ROAD CENTERLINES SHOWN ARE FROM PUBLICLY AVAILABLE DATA AND HAVE NOT BEEN SURVEYED.

0100200 200

1

2

4

ISSUE FOR FERC

AMMENDMENT TO FERC

FERC SUPPLEMENTAL FILING

1/2017

04/2017

10/2017

GH

DP

DP

EB

SG

RJP

DGG

DGG

DGG

DP

SG

04/2017

04/2017

1" = 200'

1" = 200'

1

2

20

PIPE, 24.000" OD X 0.375" WT, API-5L, X70, DSAW, FBE COATED

PIPE, 24.000" OD X 0.500" WT, API-5L, X70, DSAW, FBE/ARO COATED

INDUCTION BEND, 24.000" OD X 0.500" WT, 5D, X70, FBE COATED

1" = 200' STLP-A-008 4

DGG

JEW

04/2017

04/2017

ALIGNMENT SHEET

PROPOSED 24-INCH DIAMETER PIPELINE

GREENE COUNTY, ILLINOIS

STA. 332+87 STA. 382+89

4760'

240'

2

ST

A. 332+

87

ST

A. 382+

89

Page 5: DIAMETER PIPELINE - spireenergy.comB... · pipeline cover soils checked by date eng. approval date p.m. approval date ... alignment sheet proposed 24-inch diameter pipeline scott

M.P.

7.3

ST

LP

-A

-0

08

38

2+

89

M.P.

8.2

43

2+

89

ST

LP

-A

-0

10

OHOH

OH

OHOH OH

OH

OHOH

OH

OH

OH

TT

T T T

PROPOSED 24-INCH

DIAMETER PIPELINE

15

16

17

8.0

M.P.

7.3

ST

LP

-A

-0

08

38

2+

89

M.P.

8.2

43

2+

89

ST

LP

-A

-0

10

AG D AG D AG

68A 47A 51A 47A 51A 47A 51A 675B 279B 675B

CLASS I / 1440 PSIG

0.72 0.6 0.72 0.6 0.72

5' MIN.

1

368'

38

6+

57

38

2+

89

2

80'

38

7+

37

38

6+

57

1

2365'

41

1+

02

38

7+

37

2

80'

41

1+

82

41

1+

02

1

2107'

43

2+

89

41

1+

82

OPEN CUT BORE OPEN CUT BORE OPEN CUT

AG D AG D AG

68A 47A 51A 47A 51A 47A 51A 675B 279B 675B

CLASS I / 1440 PSIG

0.72 0.6 0.72 0.6 0.72

5' MIN.

1

368'

38

6+

57

38

2+

89

2

80'

38

7+

37

38

6+

57

1

2365'

41

1+

02

38

7+

37

2

80'

41

1+

82

41

1+

02

1

2107'

43

2+

89

41

1+

82

OPEN CUT BORE OPEN CUT BORE OPEN CUT

38

2+

89

38

6+

94

405'

38

6+

94

40

0+

22

1328'

40

0+

22

41

3+

56

1334'

41

3+

56

42

6+

87

1331'

42

6+

87

43

2+

89

602'

38

2+

89

38

6+

94

405'

38

6+

94

40

0+

22

1328'

40

0+

22

41

3+

56

1334'

41

3+

56

42

6+

87

1331'

42

6+

87

43

2+

89

602'

EXISTING GRADE

CE

NT

ER

LIN

E O

F

2425 N

TE

LE

PH

ON

E LIN

E

OV

ER

HE

AD

LIN

E

OV

ER

HE

AD

LIN

E

CE

NT

ER

LIN

E O

F

2375 N

EXISTING GRADE

CE

NT

ER

LIN

E O

F

2425 N

TE

LE

PH

ON

E LIN

E

OV

ER

HE

AD

LIN

E

OV

ER

HE

AD

LIN

E

CE

NT

ER

LIN

E O

F

2375 N

300'

350'

400'

450'

500'

550'

600'

650'

700'

750'

800'

850'

900'

950'

300'

350'

400'

450'

500'

550'

600'

650'

700'

750'

800'

850'

900'

950'

300'

350'

400'

450'

500'

550'

600'

650'

700'

750'

800'

850'

900'

950'

300'

350'

400'

450'

500'

550'

600'

650'

700'

750'

800'

850'

900'

950'

384+00 386+00 388+00 390+00 392+00 394+00 396+00 398+00 400+00 402+00 404+00 406+00 408+00 410+00 412+00 414+00 416+00 418+00 420+00 422+00 424+00 426+00 428+00 430+00 432+00384+00 386+00 388+00 390+00 392+00 394+00 396+00 398+00 400+00 402+00 404+00 406+00 408+00 410+00 412+00 414+00 416+00 418+00 420+00 422+00 424+00 426+00 428+00 430+00 432+00

OWNERSHIP /

FOOTAGE

STATIONING

MATERIAL &

COATING

MATERIAL

DESCRIPTIONQUANTITYTAG

REFERENCE DRAWINGS

TITLEDWG. NO.

REVISIONS

NO. REVISIONS DATE DRAWN CK APPR

APPROVALS

DRAWN BY DATE

CLIENT APPROVAL

DATE

SCALE DRAWING NO. REVISION

LAND USE

PIPELINE COVER

SOILS

CHECKED BY DATE

ENG. APPROVAL DATE

P.M. APPROVAL DATE

SCALE PLAN:

SCALE PROFILE H:

SCALE PROFILE V:

SPIRE STL PIPELINE PROJECT

DESIGN FACTOR

PREPARED BY

PREPARED FOR

TO

NOTES:

1. THE IMAGERY SHOWN WAS PROVIDED BY AERIAL DATA SERVICES, 2016. ADDITIONAL IMAGERY SUPPLEMENTED FROM USFWS-NWI AND USGS.

2. EXISTING FEATURES SHOWN WERE SURVEYED BY MOTT MACDONALD AND DIGITIZED FROM IMAGERY. ALL LOCATIONS ARE APPROXIMATE

AND SHALL BE VERIFIED BY CONTRACTOR.

3. PROPERTY LINES DEPICTED ON THIS PLAN ARE BASED ON GIS TAX MAP DATA.

4. ROAD CENTERLINES SHOWN ARE FROM PUBLICLY AVAILABLE DATA AND HAVE NOT BEEN SURVEYED.

0100200 200

1

2

4

ISSUE FOR FERC

AMMENDMENT TO FERC

FERC SUPPLEMENTAL FILING

1/2017

04/2017

10/2017

GH

DP

DP

EB

SG

RJP

DGG

DGG

DGG

DP

SG

04/2017

04/2017

1" = 200'

1" = 200'

1" = 200'

1

2

PIPE, 24.000" OD X 0.375" WT, API-5L, X70, DSAW, FBE COATED

PIPE, 24.000" OD X 0.500" WT, API-5L, X70, DSAW, FBE/ARO COATED

1" = 200' STLP-A-009 4

DGG

JEW

04/2017

04/2017

ALIGNMENT SHEET

PROPOSED 24-INCH DIAMETER PIPELINE

GREENE COUNTY, ILLINOIS

STA. 382+89 STA. 432+89

4840'

160'

ST

A. 382+

89

ST

A. 432+

89

Page 6: DIAMETER PIPELINE - spireenergy.comB... · pipeline cover soils checked by date eng. approval date p.m. approval date ... alignment sheet proposed 24-inch diameter pipeline scott

M.P.

8.2

ST

LP

-A

-0

09

43

2+

89

M.P.

9.1

48

2+

89

ST

LP

-A

-0

11

X

XXX

FO

OH

OH

PROPOSED 24-INCH

DIAMETER PIPELINE

4

9

2

+

0

0

490+00488+00486+00484+00482+00480+00478+00476+00474+00472+00470+00468+00466+00464+00462+00460+00458+00456+00454+00452+00450+00448+00446+00444+00442+00440+00438+00436+00434+00432+00430+00428+00426+00424+00

18

19

2

0

20

2

1

18

9.0

M.P.

8.2

ST

LP

-A

-0

09

43

2+

89

M.P.

9.1

48

2+

89

ST

LP

-A

-0

11

AG F AG F AG OL D OL AG

675B 51A 675B 279B 675B 279C2 675B 279C2 279D2 279C2 279D2 279B 17A 279C2 51A 47A 51A

CLASS I / 1440 PSIG

0.72 0.6 0.72

5' MIN.

1

4648'

479+

37

432+

89

2

80'

480+

17

479+

37

1

272'

482+

89

480+

17

OPEN CUT

OPEN CUT

(FLUMED)

OPEN CUT BORE OPEN CUT

AG F AG F AG OL D OL AG

675B 51A 675B 279B 675B 279C2 675B 279C2 279D2 279C2 279D2 279B 17A 279C2 51A 47A 51A

CLASS I / 1440 PSIG

0.72 0.6 0.72

5' MIN.

1

4648'

479+

37

432+

89

2

80'

480+

17

479+

37

1

272'

482+

89

480+

17

OPEN CUT

OPEN CUT

(FLUMED)

OPEN CUT BORE OPEN CUT

432+

89

440+

10

721'

440+

10

453+

34

1324'

453+

34

479+

38

2604'

479+

90

482+

89

299'

479+

38

479+

90

52'

432+

89

440+

10

721'

440+

10

453+

34

1324'

453+

34

479+

38

2604'

479+

90

482+

89

299'

479+

38

479+

90

52'

EXISTING GRADE

CE

NT

ER

LIN

E O

F

ST

RE

AM

SIL

-T

MA

-0

26

OV

ER

HE

AD

L

IN

E

FIB

ER

O

PT

IC

L

IN

E

CE

NT

ER

LIN

E O

F

CO

H

WY

1

0

EXISTING GRADE

CE

NT

ER

LIN

E O

F

ST

RE

AM

SIL

-T

MA

-0

26

OV

ER

HE

AD

L

IN

E

FIB

ER

O

PT

IC

L

IN

E

CE

NT

ER

LIN

E O

F

CO

H

WY

1

0

300'

350'

400'

450'

500'

550'

600'

650'

700'

750'

800'

850'

900'

300'

350'

400'

450'

500'

550'

600'

650'

700'

750'

800'

850'

900'

300'

350'

400'

450'

500'

550'

600'

650'

700'

750'

800'

850'

900'

300'

350'

400'

450'

500'

550'

600'

650'

700'

750'

800'

850'

900'

434+00 436+00 438+00 440+00 442+00 444+00 446+00 448+00 450+00 452+00 454+00 456+00 458+00 460+00 462+00 464+00 466+00 468+00 470+00 472+00 474+00 476+00 478+00 480+00 482+00434+00 436+00 438+00 440+00 442+00 444+00 446+00 448+00 450+00 452+00 454+00 456+00 458+00 460+00 462+00 464+00 466+00 468+00 470+00 472+00 474+00 476+00 478+00 480+00 482+00

OWNERSHIP /

FOOTAGE

STATIONING

MATERIAL &

COATING

MATERIAL

DESCRIPTIONQUANTITYTAG

REFERENCE DRAWINGS

TITLEDWG. NO.

REVISIONS

NO. REVISIONS DATE DRAWN CK APPR

APPROVALS

DRAWN BY DATE

CLIENT APPROVAL

DATE

SCALE DRAWING NO. REVISION

LAND USE

PIPELINE COVER

SOILS

CHECKED BY DATE

ENG. APPROVAL DATE

P.M. APPROVAL DATE

SCALE PLAN:

SCALE PROFILE H:

SCALE PROFILE V:

SPIRE STL PIPELINE PROJECT

DESIGN FACTOR

PREPARED BY

PREPARED FOR

TO

NOTES:

1. THE IMAGERY SHOWN WAS PROVIDED BY AERIAL DATA SERVICES, 2016. ADDITIONAL IMAGERY SUPPLEMENTED FROM USFWS-NWI AND USGS.

2. EXISTING FEATURES SHOWN WERE SURVEYED BY MOTT MACDONALD AND DIGITIZED FROM IMAGERY. ALL LOCATIONS ARE APPROXIMATE

AND SHALL BE VERIFIED BY CONTRACTOR.

0100200 200

1

2

4

ISSUE FOR FERC

AMENDMENT TO FERC

FERC SUPPLEMENTAL FILING

1/2017

04/2017

10/2017

GH

DP

DP

EB

SG

RJP

DGG

DGG

DGG

DP

SG

04/2017

04/2017

1" = 200'

1" = 200'

1" = 200'

1

2

PIPE, 24.000" OD X 0.375" WT, API-5L, X70, DSAW, FBE COATED

PIPE, 24.000" OD X 0.500" WT, API-5L, X70, DSAW, FBE/ARO COATED

1" = 200' STLP-A-010 4

DGG

JEW

04/2017

04/2017

ALIGNMENT SHEET

PROPOSED 24-INCH DIAMETER PIPELINE

GREENE COUNTY, ILLINOIS

STA. 432+89 STA. 482+89

4920'

80'

ST

A. 432+

89

ST

A. 482+

89