DIABLO VALLEY COLLEGE AE Selection Process Pre-Proposal Conference Art Complex Project Overview September 8, 2016

Transcript of DIABLO VALLEY COLLEGE AE Selection Process Pre ... DVC Art Complex...AE Selection Process...

Page 1: DIABLO VALLEY COLLEGE AE Selection Process Pre ... DVC Art Complex...AE Selection Process Pre-Proposal Conference Art Complex Project Overview September 8, 2016 2 Diablo Valley College

DIABLO VALLEY COLLEGE

AE Selection Process Pre-Proposal Conference Art Complex Project Overview

September 8, 2016

Page 2: DIABLO VALLEY COLLEGE AE Selection Process Pre ... DVC Art Complex...AE Selection Process Pre-Proposal Conference Art Complex Project Overview September 8, 2016 2 Diablo Valley College

2

Diablo Valley College 2014 Measure E Bond Language

All Colleges and District Sites:

• ADA Barrier Removal and Path of Travel Projects • Infrastructure and Site Improvements• Building System Projects

Pleasant Hill:

• Modernize the engineering technology building.• Construct new science and learning center complex.• Modernize or construct new art building.• Modernize the physical education complex.

San Ramon Campus:

• Expand the Center, including, but not limited to: • Expanded parking• Expanded space for library services• Improvements to classrooms and labs for transfer and career technical programs.

Pleasant Hill Campus

Page 3: DIABLO VALLEY COLLEGE AE Selection Process Pre ... DVC Art Complex...AE Selection Process Pre-Proposal Conference Art Complex Project Overview September 8, 2016 2 Diablo Valley College

3

Measure E Existing Buildings

A. Physical Education

B. Art

C. Liberal Arts

D. Faculty Office

E. Learning Center

F. Counseling Building

G. Engineering Technology

H. Science

Pleasant Hill Campus existing buildings:

Legend:

Demolish -

Remodel –

Remain -

A

B

CD

E F

G

H

Page 4: DIABLO VALLEY COLLEGE AE Selection Process Pre ... DVC Art Complex...AE Selection Process Pre-Proposal Conference Art Complex Project Overview September 8, 2016 2 Diablo Valley College

ART COMPLEX

Art Complex –Maximum Affordable Project Area: 26,467 ASF Construction Budget: $26M

4

Measure E Projects

Project Design Program:• General classrooms of varying size for college wide use• Art Spaces: Art (includes Printmaking), Painting / 

Drawing, Sculpture, Ceramics, Jewelry & Photography• Art DM & BCA Studio space, including move from ATC & 

Liberal Arts programs• Full time & part‐time faculty, staff & administrative office 

space• Gallery Space / Storage• Art Outdoor space

Page 5: DIABLO VALLEY COLLEGE AE Selection Process Pre ... DVC Art Complex...AE Selection Process Pre-Proposal Conference Art Complex Project Overview September 8, 2016 2 Diablo Valley College

5

SEQUENCE (as related to the Art Complex Project Details)

Step 1 - Demolition

New Art Site:• Prepare PAC/Lot 9 building site

New Field House Site:• Demolish concession/toilet• Relocate shot put yard• Prepare Field House site for 

construction

Page 6: DIABLO VALLEY COLLEGE AE Selection Process Pre ... DVC Art Complex...AE Selection Process Pre-Proposal Conference Art Complex Project Overview September 8, 2016 2 Diablo Valley College

6

Step 2 - Construction

FIELD HS

P

PE/Kinesiology Complex:• Proximity to the new Art 

Project site for infrastructure and ADA improvements

• Pool: new pool coping and  interior surface

• Gym: minor renovation• New Field House 

GYM

ARTArt Complex:• Build new multistory Art 

Building • Collocate the Applied Arts & 

Digital Arts Programs from Liberal Arts Building & Advanced Tech Center

• Considers Digital Media (DM) & Broadcast Communications (BCA) program spaces

SEQUENCE

Page 7: DIABLO VALLEY COLLEGE AE Selection Process Pre ... DVC Art Complex...AE Selection Process Pre-Proposal Conference Art Complex Project Overview September 8, 2016 2 Diablo Valley College

7

Step 3 - Move

PE/Kinesiology Project: Field House• Move PE office and existing 

portable classrooms into new Field House

Locker rooms• Convert Men’s locker in to 

temporary men’s and women’s locker

FIELD HS

P

GYM

Art Complex: • Art functions move in to new 

building from: 

WL

ML

ART

• ATC & Liberal ArtsPortions of/or all of DM and BCA    will move to new Art Facility as   budget allows

• PACOral Communication Classes can be accommodated in new Art facility

SEQUENCE

Page 8: DIABLO VALLEY COLLEGE AE Selection Process Pre ... DVC Art Complex...AE Selection Process Pre-Proposal Conference Art Complex Project Overview September 8, 2016 2 Diablo Valley College

8

Step 4 – Demolish/Reno

FIELD HS

P

GYM

Academic/Front Door Complex Project: • Demolish all buildings and 

structures  • Prepare site  for construction of 

new Front Door Academic Complex

• Potential for a unified campus front 

M & WL

PE/Kinesiology Project: Locker rooms• Remodel existing women’s 

locker into M/W aquatic lockers

WL

ML

PE Office• Demolish PE office building

ART

SEQUENCE

Page 9: DIABLO VALLEY COLLEGE AE Selection Process Pre ... DVC Art Complex...AE Selection Process Pre-Proposal Conference Art Complex Project Overview September 8, 2016 2 Diablo Valley College

9

Final Build Out PH Campus

FIELD HS

P

GYM

WL

ML

ART

FUTURE

FUTU

RE

FUT

ET

CLASS/OFF

FUTURE

SEQUENCE

CLASS/OFFICE

Page 10: DIABLO VALLEY COLLEGE AE Selection Process Pre ... DVC Art Complex...AE Selection Process Pre-Proposal Conference Art Complex Project Overview September 8, 2016 2 Diablo Valley College

THANK YOU!

QUESTIONS 

10