Flow of Activities for DG Installation

description

Over view description of DG Installation for Plant room

Transcript of DG Installation Overview

Page 1: DG Installation Overview

Flow of Activities for

DG Installation

Page 2: DG Installation Overview

Plant room

• Plant room with clear height of 5.5 Meter clearance and the width as per

the service consultant drawing.

• The final location of HSD tank and the routing of fuel pipe as per the

service consultant drawings.

• The Cable / Buss bar routing as per the service consultants.

• A clear space for the Crain to enter the plant room to shift the DG sets from

trucks to the proper location.

• The plant room to be fully equipped with the fire extinguishers as lot of

insulating material and fire hard material will be used during the

installation of complete system.

• No water should stop in the Plant room and for that all the drainage system

to be ready before DG set arrive to the plant room

Page 3: DG Installation Overview

Civil works

DG InstallationDG Set plat form casting

HSD Tank location

Plant Room IPS

White wash to the entire plant room

Page 4: DG Installation Overview
Page 5: DG Installation Overview

IPS @ plant room

DG set plat form

Page 6: DG Installation Overview

HSD Tank Construction• As per the service consultants drawing the required height for the

HSD tank …… Meters need to be constructed

• Plat form for HSD tank

• The concrete trench for fuel pipe and LT Cables

• Concrete road for the fuel truck to come for refueling

Concrete wall for HSD tank

Plat form for HSD tank

HSD tank

Page 7: DG Installation Overview
Page 8: DG Installation Overview

Fuel Tank

for DG

Cooling Tower