DG Installation Overview
description
Transcript of DG Installation Overview
Flow of Activities for
DG Installation
Plant room
• Plant room with clear height of 5.5 Meter clearance and the width as per
the service consultant drawing.
• The final location of HSD tank and the routing of fuel pipe as per the
service consultant drawings.
• The Cable / Buss bar routing as per the service consultants.
• A clear space for the Crain to enter the plant room to shift the DG sets from
trucks to the proper location.
• The plant room to be fully equipped with the fire extinguishers as lot of
insulating material and fire hard material will be used during the
installation of complete system.
• No water should stop in the Plant room and for that all the drainage system
to be ready before DG set arrive to the plant room
Civil works
DG InstallationDG Set plat form casting
HSD Tank location
Plant Room IPS
White wash to the entire plant room
IPS @ plant room
DG set plat form
HSD Tank Construction• As per the service consultants drawing the required height for the
HSD tank …… Meters need to be constructed
• Plat form for HSD tank
• The concrete trench for fuel pipe and LT Cables
• Concrete road for the fuel truck to come for refueling
Concrete wall for HSD tank
Plat form for HSD tank
HSD tank
Fuel Tank
for DG
Cooling Tower
HSD tank