Phase 1: Problem FindingAaron Pierce
The Powerstation
Jobsite: Shelby Engineering Construction Site ResearchPartition teams 1&2
Plug it in, plug it in…Construction Site ResearchPartition teams 1&2
Phase 2: Problem Research + Initial ConceptsAaron
Construction Site ResearchPartition teams 1&2
Plug It In: jobsite cord management:
Plugging in and getting the power you need to get the job done right.
Construction Site ResearchPartition teams 1&2
Plug it in & Charge it Up…
Addressing the issues of charging more than one Li-Ion battery and plugs that supply power to 3 or more separate extension cords.
Construction Site ResearchPartition teams 1&2
Is there a better way to do this?
While self-built power boxes provide temporary power, they increase the risk of blowing breakers, with the possibility of electrocution.
Construction Site ResearchPartition teams 1&2
Can we appeal to smaller scale construction?
Commercial site renovations encounter the same problem as larger build-outs , but on a smaller scale.
They need to be able to deliver the equivalent amount of power from a smaller junction box.
Construction Site ResearchPartition teams 1&2
OSHA Requirements:
Keep cords free from walkwaysand standing or flowing water
Battery Charging:
Battery charging installations must be located in areas designated for that purpose. When batteries are being charged, vent caps must be maintained in functioning condition and kept in place to avoid electrolyte spray.
Also, charging apparatus must be protected from damage...
Construction Site ResearchPartition teams 1&2
Goals…
Use established temporary power.
Accommodate multiple batteries and cords.
Deliver more power , more efficiently.
Construction Site ResearchPartition teams 1&2
The Fit:
Address the issues found from OSHA to safely provide electricity from a temporary power source
Accommodate existing power cables, multiple outlets and battery chargers, in a rugged and durable way.
Construction Site ResearchPartition teams 1&2
Criteria
Easier to use than existing methods of “jerry-rigging” electrical connections.
Multiple cord and battery bays.
More efficiently use available temporary power.
Construction Site ResearchPartition teams 1&2
Multipurpose ChargerMarket Research
Where is everybody?
Tool Base:Specialized or Tool Variety
Audience: Professional or DIY
Professionals
Specialized
DIYers
Variety
Construction Site ResearchPartition teams 1&2
Battery Product Analysis…
Companies…Makita$25 - $170
12v-18v Single Battery Chargers
Automotive Application
Construction Site ResearchPartition teams 1&2
Battery Product Analysis…
Companies…Bosch$30 - $100
Single and Dual Bay Battery Chargers
Automotive Application
No Cord ManagementOr powerstrip capacity
Construction Site ResearchPartition teams 1&2
Battery Product Analysis…
Companies…Milwaukee$25 - $160
Single to Triple BayLi-ion Battery Chargers
Limited cord management
No power strip capacity
Construction Site ResearchPartition teams 1&2
Battery Product Analysis…
Companies…DeWalt$25 - $160
Single to Triple BayLi-ion Battery Chargers
Jobsite Radio
Light cord management
Construction Site ResearchPartition teams 1&2
Initial Sketches: Power Station
Criteria…
Invincible
Multiple Li-Ion/Nickel Cadmium Battery Chargers
Cord & Plug Management
Powered by 120V Power Source
OSHA Compliant
Construction Site ResearchPartition teams 1&2
Initial Sketches: Power Station
Criteria…
Invincible
Multiple Li-Ion/Nickel Cadmium Battery Chargers
Cord & Plug Management
Powered by 120V Power Source
OSHA Compliant
Phase 3: Concept DevelopmentAaron Pierce
Construction Site ResearchPartition teams 1&2
Plug It In: Jobsite cord management:
Plugging in and getting the power you need to get the job done right.
Construction Site ResearchPartition teams 1&2
The Scenario…
Electricians are required to install the temporary power on many jobsites.
They wire up a few GFCI outlets from the junction box, to provide a semi-reliable power source for the contractor to use.
Construction Site ResearchPartition teams 1&2
A power struggle…
As the workers use cordless tools more, more battery chargers are needed.
These added chargers drain the needed power supply for corded tools, resulting in tripped breakers.
Construction Site ResearchPartition teams 1&2
Time and money wasted…
Repetitious building and tearing down temporary power.
Outlets in an unmanaged way creating problems for battery chargers and corded tools.
Workers having to walk back and forth from chargers.
Chargers being stolen.
Construction Site ResearchPartition teams 1&2
Critical To Qualities…
Use established temporary power methods.
Accommodate multiple batteries and cords in a modular fashion
Deliver power more efficiently.
Save the electrician time and money by eliminating menial installation problems
Construction Site ResearchPartition teams 1&2
The Concept Goals:
Accommodate the issues seen on jobsites with temporary power installation and usage with a new kind of product.
Manage existing power cables, multiple outlets and battery chargers, in a rugged and durable way that is transportable from either vehicles or gang boxes.
Construction Site ResearchPartition teams 1&2
Concept Direction : Lithium Battery Charger
Pros…
Invincible
Multiple Li-Ion/Nickel Cadmium Battery Chargers
Multiple Battery chargers
Powered by 120V Power Source
OSHA Compliant
Construction Site ResearchPartition teams 1&2
Concept Direction : Lithium Battery Charger
Cons…
Patented by Ryobi
Lack of security
No storage or cord management
Not modular
Not enough plugs, batteries are still distant from workers in one location.
Concept Competing Products…
The 10C – Multicharger
Ryobi’s Multi-Battery Charger
Knaack’s Job Boxes: Storage
Where does all this converge?
Construction Site ResearchPartition teams 1&2
Construction Site ResearchPartition teams 1&2
Development…
Construction Site ResearchPartition teams 1&2
Construction Site ResearchPartition teams 1&2
Initial Sketches
Based on feedback from Jim Watson and the BSCI team, I explored those possibilities through sketches
Construction Site ResearchPartition teams 1&2
Initial Sketches
Based on feedback from Jim Watson and the BSCI team, I explored those possibilities through sketching
Feedback on Sketches
Construction Site ResearchPartition teams 1&2
Feedback on Sketches
Based on feedback from Michael Schumacher, a general contractor
“My electricians can use this, the cords just get ‘thrown’ into the back of the truck, and get tangled. This would give the cords a place to go at the end of the day”
Construction Site ResearchPartition teams 1&2
Sequence of Use
After reviewing the sequence of use, It became obvious that I was creating more steps to the process than making each step more efficient. These concepts became simpler.
Construction Site ResearchPartition teams 1&2
Sketch Model Development
Black and Decker Senior Designer Tom Murray visited our studio, providing further feedback into the development of a sketch model
Construction Site ResearchPartition teams 1&2
Sketch Model Development
Black and Decker Senior Designer Tom Murray visited our studio, providing further feedback into the development of a “sketch model”
“…avoid a functionless, flat lid A 5-gallon bucket recess would add further functionality, along with charger bays for cell phones or iPhones.”
Construction Site ResearchPartition teams 1&2
Sketch Model Feedback
Greg Lanier, owner ofAuburn Electrical Construction Co., Inc.
Conversation Notes: -Wire Size to Amperage-Breakers and GFCI outlets-Thinner Wheels-Jobsite Security Problems are #1-DeWalt Tools vs. everyone else
Construction Site ResearchPartition teams 1&2
Sketch Model Feedback
Greg Lanier, owner ofAuburn Electrical Construction Co., Inc.
Model Notes-iPad/Smart phone compatibility-No need to link multiples-Lockable and Secure-More Storage on the lid and back of station-Larger, Sturdier Handle-Thinner wheels, like a bike
Construction Site ResearchPartition teams 1&2
Final Concept:After choosing the concept that best met the end-user needs, and do so in an attractive way within that context.
Construction Site ResearchPartition teams 1&2
Final Concept: The DeWalt PowerStationAfter choosing the concept that best met the end-user needs, and do so in an attractive way within that context.
Construction Site ResearchPartition teams 1&2
Strong Sturdy HandlesCarry handles on both ends allow for easy pick up and set down in the bed of a truck, trailer, or gangbox.
Construction Site ResearchPartition teams 1&2
SecureIncorporates for a padlock through the snap-latch handle to keep chargers and cords safe.
Construction Site ResearchPartition teams 1&2
ModularTwo modular units nest on either side of the DeWalt Powerstation provide two outlets and a multi-chemistry battery charger with a 15’ cord wrapped at the back of the uniit.
Construction Site ResearchPartition teams 1&2
Atop-lid Storage
Clear lidded containers for hard-to-find hardware, charging your connectivity devices.
Construction Site ResearchPartition teams 1&2
Strong Sturdy HandleHandle extends up to the best height for users, approximately 32”
Construction Site ResearchPartition teams 1&2
Snap Latch LidBy squeezing the latch on the front of the Powerstation
Construction Site ResearchPartition teams 1&2
Final Solution: The PowerstationAaron Pierce
The problem…Many solutions available to
electricians have to be adapted or modified to install temporary
power on a jobsite.
The “traditional” way…Most large commercial jobsites construct Spider boxes that are heavy and cumbersome to relocate.
The interface problem…Cordless Drills use batteries that
are plugged into chargers. These must be in an easy and
time-saving location to the workers.
Model DevelopmentAppearance model construction
from welding to painted assembly.
11/19
11/21
11/22
11/29
11/30
Powered Storage ContainerThe Powerstation uses the
power supplied by scope, in a way that is modular. Allowing
the workers to charge and work on the same line.
15’ Working Radii15’ Extension Cords supplied on the unit make working on parts
of the of the building from the same unit possible.
Portable, Secure StorageThe Powerstation makes it easier to take down the equipment at the end of the day, locking up with the extension cords, batteries and chargers.
quence of use: Step 1 Romex Cables are wired into
ystem, powering the interior et, and modular units
Sequence of use: 2Pull out the modular units. plug in any other tools. Begin working.