CADANGAN MEMBINA PEMBANGUNAN BERCAMPUR : A) FASA 1A : 49 UNIT RUMAH TERES 2 TINGKAT (JENIS RT3) DI ATAS LOT
5209, (LOT LAMA 684 & 685), MUKIM 9, PERMATANG TOK MAHAT, DAERAH SEBERANG PERAI SELATAN, PULAU PINANG
UNTUK TETUAN JKP SD. BHD.
RE-CHECKING AND CALCULATION OF CENTRAL GRAVITY FOR GROUP OF
DEVIATED PILES C/W PROPOSED RECTIFICATION WORKS FOR UNITS 69 - 78
1. P3 AT LOCATION OF H3/5
Basic Information and Consideration
a) Pile Working Load = 20 tonne (200 kN)
b) Column Service Load = 490 kN
c) Column Ultimate Load (N) = 490 x 1.5 = 735 kN
d) Allowable tolerance for deviation (eccentricity) in between centroid of load with centroid of pile
group should not exceeds in any direction
Locate New C.G. for Group of Piles
About Y Axis
X' = - (1.0mm) < 75mm --------------- o.k.
About X Axis
Y' = - (65.6mm) < 75mm --------------- o.k.
Note : SATISFACTORY. ONLY REQUIRE PILECAP ENLARGEMENT (85mm ENLARGEMENT) – REFER TO
DRAWING UNDER APPENDIX 1
CADANGAN MEMBINA PEMBANGUNAN BERCAMPUR : A) FASA 1A : 49 UNIT RUMAH TERES 2 TINGKAT (JENIS RT3) DI ATAS LOT
5209, (LOT LAMA 684 & 685), MUKIM 9, PERMATANG TOK MAHAT, DAERAH SEBERANG PERAI SELATAN, PULAU PINANG
UNTUK TETUAN JKP SD. BHD.
2. P3 AT LOCATION OF J3/4
Basic Information and Consideration
a) Pile Working Load = 20 tonne (200 kN)
b) Column Service Load = 535 kN
c) Column Ultimate Load (N) = 535 x 1.5 = 803 kN
d) Allowable tolerance for deviation (eccentricity) in between centroid of load with centroid of pile
group should not exceeds in any direction
Locate New C.G. for Group of Piles
About Y Axis
X' = + (1.67mm) < 75mm --------------- o.k.
About X Axis
Y' = - (62.67mm) < 75mm --------------- o.k.
Note : SATISFACTORY. ONLY REQUIRE PILECAP ENLARGEMENT (85mm ENLARGEMENT) – REFER TO
DRAWING UNDER APPENDIX 1
CADANGAN MEMBINA PEMBANGUNAN BERCAMPUR : A) FASA 1A : 49 UNIT RUMAH TERES 2 TINGKAT (JENIS RT3) DI ATAS LOT
5209, (LOT LAMA 684 & 685), MUKIM 9, PERMATANG TOK MAHAT, DAERAH SEBERANG PERAI SELATAN, PULAU PINANG
UNTUK TETUAN JKP SD. BHD.
3. P3 AT LOCATION OF N/4b
Basic Information and Consideration
a) Pile Working Load = 20 tonne (200 kN)
b) Column Service Load = 520 kN
c) Column Ultimate Load (N) = 520 x 1.5 = 780 kN
d) Allowable tolerance for deviation (eccentricity) in between centroid of load with centroid of pile
group should not exceeds in any direction
Locate New C.G. for Group of Piles
About Y Axis
X' = - (36.0mm) < 75mm --------------- o.k.
About X Axis
Y' = - (55.0mm) < 75mm --------------- o.k.
Note : SATISFACTORY. ONLY REQUIRE PILECAP ENLARGEMENT (85mm ENLARGEMENT) – REFER TO
DRAWING UNDER APPENDIX 1
CADANGAN MEMBINA PEMBANGUNAN BERCAMPUR : A) FASA 1A : 49 UNIT RUMAH TERES 2 TINGKAT (JENIS RT3) DI ATAS LOT
5209, (LOT LAMA 684 & 685), MUKIM 9, PERMATANG TOK MAHAT, DAERAH SEBERANG PERAI SELATAN, PULAU PINANG
UNTUK TETUAN JKP SD. BHD.
4. P2 AT LOCATION OF N/7
Basic Information and Consideration
a) Pile Working Load = 20 tonne (200 kN)
b) Column Service Load = 345 kN
c) Column Ultimate Load (N) = 345 x 1.5 = 518 kN
d) Allowable tolerance for deviation (eccentricity) in between centroid of load with centroid of pile
group should not exceeds in any direction
e) Original Stump size = 125 x 450
Locate New C.G. for Group of Piles
About Y Axis
X' = - (86.5mm) > 75mm --------------- Exceeds allowable tolerance. Required rectification.
About X Axis
Y' = - (50.0mm) < 75mm --------------- o.k.
CADANGAN MEMBINA PEMBANGUNAN BERCAMPUR : A) FASA 1A : 49 UNIT RUMAH TERES 2 TINGKAT (JENIS RT3) DI ATAS LOT
5209, (LOT LAMA 684 & 685), MUKIM 9, PERMATANG TOK MAHAT, DAERAH SEBERANG PERAI SELATAN, PULAU PINANG
UNTUK TETUAN JKP SD. BHD.
Proposed Rectification
i) Enlarge pile cap size about Y axis from 450 x 900 to 540 x 900 (90mm enlargement) with
additional 1 number of T16 for the main bars. Transverse reinforcements remain as original
design that is T10-100. Refer to drawing under Appendix 2.
ii) Enlarge stump size about Y axis as to re-align centroid of load within stump to be coincide with
the new centroid of pile group. With this kind of approach, the additional moment due to
eccentricity will induced within the stump. Stump will be enlarged from 125 x 450 to 300 x 450
(175mm enlargement).
Design will be based on BS 8110-1 Clause 3.8.4.2 and Chart No. 24 – BS 8110-3
N = 518 kN
N'/bh = 3.84
Additional Moment due to eccentricity, M' = 518 x 0.0875
= 46 kNm
For original of 125 x 450 stump, reinforcement provided = 6T12
Asc = 678mm2
Therefore, 100 Asc / bh = 1.21
Gives, Mori = 61 kNm
Therefore then; Total Moment, MT = 107 kNm
For new size stump, 300 x 450
MT / bh2 = 1.76
Therefore, 100 Asc' / bh = 0.5
Gives area of reinforcement required, Asc' = 675mm2 < Asc provided = 678mm
2
Note : NO ADDITIONAL REINFORCEMENT REQUIRED IN NEW STUMP SIZE – REFER TO DRAWING
UNDER APPENDIX 2
CADANGAN MEMBINA PEMBANGUNAN BERCAMPUR : A) FASA 1A : 49 UNIT RUMAH TERES 2 TINGKAT (JENIS RT3) DI ATAS LOT
5209, (LOT LAMA 684 & 685), MUKIM 9, PERMATANG TOK MAHAT, DAERAH SEBERANG PERAI SELATAN, PULAU PINANG
UNTUK TETUAN JKP SD. BHD.
5. P2 AT LOCATION OF N/2
Basic Information and Consideration
a) Pile Working Load = 20 tonne (200 kN)
b) Column Service Load = 312 kN
c) Column Ultimate Load (N) = 312 x 1.5 = 468 kN
d) Allowable tolerance for deviation (eccentricity) in between centroid of load with centroid of pile
group should not exceeds in any direction
e) Original Stump size = 125 x 450
Locate New C.G. for Group of Piles
About Y Axis
X' = - (106.5mm) > 75mm --------------- Exceeds allowable tolerance. Required rectification.
About X Axis
Y' = - (60.5mm) < 75mm --------------- o.k.
CADANGAN MEMBINA PEMBANGUNAN BERCAMPUR : A) FASA 1A : 49 UNIT RUMAH TERES 2 TINGKAT (JENIS RT3) DI ATAS LOT
5209, (LOT LAMA 684 & 685), MUKIM 9, PERMATANG TOK MAHAT, DAERAH SEBERANG PERAI SELATAN, PULAU PINANG
UNTUK TETUAN JKP SD. BHD.
Proposed Rectification
i) Enlarge pile cap size about Y axis from 450 x 900 to 560 x 900 (110mm enlargement) with
additional 1 number of T16 for the main bars. Transverse reinforcements remain as original
design that is T10-100. Refer to drawing under Appendix 3.
ii) Enlarge stump size about Y axis as to re-align centroid of load within stump to be coincide with
the new centroid of pile group. With this kind of approach, the additional moment due to
eccentricity will induced within the stump. Stump will be enlarged from 125 x 450 to 340 x 450
(215mm enlargement).
Design will be based on BS 8110-1 Clause 3.8.4.2 and Chart No. 24 – BS 8110-3
N = 468 kN
N'/bh = 3.06
Additional Moment due to eccentricity, M' = 468 x 0.1075
= 51 kNm
For original of 125 x 450 stump, reinforcement provided = 6T12
Asc = 678mm2
Therefore, 100 Asc / bh = 1.21
Gives, Mori = 61 kNm
Therefore then; Total Moment, MT = 112 kNm
For new size stump, 340 x 450
MT / bh2 = 1.63
Therefore, 100 Asc' / bh = 0.4
Gives area of reinforcement required, Asc' = 612mm2 < Asc provided = 678mm
2
Note : NO ADDITIONAL REINFORCEMENT REQUIRED IN NEW STUMP SIZE – REFER TO DRAWING
UNDER APPENDIX 3
CADANGAN MEMBINA PEMBANGUNAN BERCAMPUR : A) FASA 1A : 49 UNIT RUMAH TERES 2 TINGKAT (JENIS RT3) DI ATAS LOT
5209, (LOT LAMA 684 & 685), MUKIM 9, PERMATANG TOK MAHAT, DAERAH SEBERANG PERAI SELATAN, PULAU PINANG
UNTUK TETUAN JKP SD. BHD.
APPENDIX 1
CADANGAN MEMBINA PEMBANGUNAN BERCAMPUR : A) FASA 1A : 49 UNIT RUMAH TERES 2 TINGKAT (JENIS RT3) DI ATAS LOT
5209, (LOT LAMA 684 & 685), MUKIM 9, PERMATANG TOK MAHAT, DAERAH SEBERANG PERAI SELATAN, PULAU PINANG
UNTUK TETUAN JKP SD. BHD.
APPENDIX 2
CADANGAN MEMBINA PEMBANGUNAN BERCAMPUR : A) FASA 1A : 49 UNIT RUMAH TERES 2 TINGKAT (JENIS RT3) DI ATAS LOT
5209, (LOT LAMA 684 & 685), MUKIM 9, PERMATANG TOK MAHAT, DAERAH SEBERANG PERAI SELATAN, PULAU PINANG
UNTUK TETUAN JKP SD. BHD.
APPENDIX 3