Deviated Piles Report

10
CADANGAN MEMBINA PEMBANGUNAN BERCAMPUR : A) FASA 1A : 49 UNIT RUMAH TERES 2 TINGKAT (JENIS RT3) DI ATAS LOT 5209, (LOT LAMA 684 & 685), MUKIM 9, PERMATANG TOK MAHAT, DAERAH SEBERANG PERAI SELATAN, PULAU PINANG UNTUK TETUAN JKP SD. BHD. RE-CHECKING AND CALCULATION OF CENTRAL GRAVITY FOR GROUP OF DEVIATED PILES C/W PROPOSED RECTIFICATION WORKS FOR UNITS 69 - 78 1. P3 AT LOCATION OF H3/5 Basic Information and Consideration a) Pile Working Load = 20 tonne (200 kN) b) Column Service Load = 490 kN c) Column Ultimate Load (N) = 490 x 1.5 = 735 kN d) Allowable tolerance for deviation (eccentricity) in between centroid of load with centroid of pile group should not exceeds in any direction Locate New C.G. for Group of Piles About Y Axis X' = - (1.0mm) < 75mm --------------- o.k. About X Axis Y' = - (65.6mm) < 75mm --------------- o.k. Note : SATISFACTORY. ONLY REQUIRE PILECAP ENLARGEMENT (85mm ENLARGEMENT) – REFER TO DRAWING UNDER APPENDIX 1

description

Piling

Transcript of Deviated Piles Report

Page 1: Deviated Piles Report

CADANGAN MEMBINA PEMBANGUNAN BERCAMPUR : A) FASA 1A : 49 UNIT RUMAH TERES 2 TINGKAT (JENIS RT3) DI ATAS LOT

5209, (LOT LAMA 684 & 685), MUKIM 9, PERMATANG TOK MAHAT, DAERAH SEBERANG PERAI SELATAN, PULAU PINANG

UNTUK TETUAN JKP SD. BHD.

RE-CHECKING AND CALCULATION OF CENTRAL GRAVITY FOR GROUP OF

DEVIATED PILES C/W PROPOSED RECTIFICATION WORKS FOR UNITS 69 - 78

1. P3 AT LOCATION OF H3/5

Basic Information and Consideration

a) Pile Working Load = 20 tonne (200 kN)

b) Column Service Load = 490 kN

c) Column Ultimate Load (N) = 490 x 1.5 = 735 kN

d) Allowable tolerance for deviation (eccentricity) in between centroid of load with centroid of pile

group should not exceeds in any direction

Locate New C.G. for Group of Piles

About Y Axis

X' = - (1.0mm) < 75mm --------------- o.k.

About X Axis

Y' = - (65.6mm) < 75mm --------------- o.k.

Note : SATISFACTORY. ONLY REQUIRE PILECAP ENLARGEMENT (85mm ENLARGEMENT) – REFER TO

DRAWING UNDER APPENDIX 1

Page 2: Deviated Piles Report

CADANGAN MEMBINA PEMBANGUNAN BERCAMPUR : A) FASA 1A : 49 UNIT RUMAH TERES 2 TINGKAT (JENIS RT3) DI ATAS LOT

5209, (LOT LAMA 684 & 685), MUKIM 9, PERMATANG TOK MAHAT, DAERAH SEBERANG PERAI SELATAN, PULAU PINANG

UNTUK TETUAN JKP SD. BHD.

2. P3 AT LOCATION OF J3/4

Basic Information and Consideration

a) Pile Working Load = 20 tonne (200 kN)

b) Column Service Load = 535 kN

c) Column Ultimate Load (N) = 535 x 1.5 = 803 kN

d) Allowable tolerance for deviation (eccentricity) in between centroid of load with centroid of pile

group should not exceeds in any direction

Locate New C.G. for Group of Piles

About Y Axis

X' = + (1.67mm) < 75mm --------------- o.k.

About X Axis

Y' = - (62.67mm) < 75mm --------------- o.k.

Note : SATISFACTORY. ONLY REQUIRE PILECAP ENLARGEMENT (85mm ENLARGEMENT) – REFER TO

DRAWING UNDER APPENDIX 1

Page 3: Deviated Piles Report

CADANGAN MEMBINA PEMBANGUNAN BERCAMPUR : A) FASA 1A : 49 UNIT RUMAH TERES 2 TINGKAT (JENIS RT3) DI ATAS LOT

5209, (LOT LAMA 684 & 685), MUKIM 9, PERMATANG TOK MAHAT, DAERAH SEBERANG PERAI SELATAN, PULAU PINANG

UNTUK TETUAN JKP SD. BHD.

3. P3 AT LOCATION OF N/4b

Basic Information and Consideration

a) Pile Working Load = 20 tonne (200 kN)

b) Column Service Load = 520 kN

c) Column Ultimate Load (N) = 520 x 1.5 = 780 kN

d) Allowable tolerance for deviation (eccentricity) in between centroid of load with centroid of pile

group should not exceeds in any direction

Locate New C.G. for Group of Piles

About Y Axis

X' = - (36.0mm) < 75mm --------------- o.k.

About X Axis

Y' = - (55.0mm) < 75mm --------------- o.k.

Note : SATISFACTORY. ONLY REQUIRE PILECAP ENLARGEMENT (85mm ENLARGEMENT) – REFER TO

DRAWING UNDER APPENDIX 1

Page 4: Deviated Piles Report

CADANGAN MEMBINA PEMBANGUNAN BERCAMPUR : A) FASA 1A : 49 UNIT RUMAH TERES 2 TINGKAT (JENIS RT3) DI ATAS LOT

5209, (LOT LAMA 684 & 685), MUKIM 9, PERMATANG TOK MAHAT, DAERAH SEBERANG PERAI SELATAN, PULAU PINANG

UNTUK TETUAN JKP SD. BHD.

4. P2 AT LOCATION OF N/7

Basic Information and Consideration

a) Pile Working Load = 20 tonne (200 kN)

b) Column Service Load = 345 kN

c) Column Ultimate Load (N) = 345 x 1.5 = 518 kN

d) Allowable tolerance for deviation (eccentricity) in between centroid of load with centroid of pile

group should not exceeds in any direction

e) Original Stump size = 125 x 450

Locate New C.G. for Group of Piles

About Y Axis

X' = - (86.5mm) > 75mm --------------- Exceeds allowable tolerance. Required rectification.

About X Axis

Y' = - (50.0mm) < 75mm --------------- o.k.

Page 5: Deviated Piles Report

CADANGAN MEMBINA PEMBANGUNAN BERCAMPUR : A) FASA 1A : 49 UNIT RUMAH TERES 2 TINGKAT (JENIS RT3) DI ATAS LOT

5209, (LOT LAMA 684 & 685), MUKIM 9, PERMATANG TOK MAHAT, DAERAH SEBERANG PERAI SELATAN, PULAU PINANG

UNTUK TETUAN JKP SD. BHD.

Proposed Rectification

i) Enlarge pile cap size about Y axis from 450 x 900 to 540 x 900 (90mm enlargement) with

additional 1 number of T16 for the main bars. Transverse reinforcements remain as original

design that is T10-100. Refer to drawing under Appendix 2.

ii) Enlarge stump size about Y axis as to re-align centroid of load within stump to be coincide with

the new centroid of pile group. With this kind of approach, the additional moment due to

eccentricity will induced within the stump. Stump will be enlarged from 125 x 450 to 300 x 450

(175mm enlargement).

Design will be based on BS 8110-1 Clause 3.8.4.2 and Chart No. 24 – BS 8110-3

N = 518 kN

N'/bh = 3.84

Additional Moment due to eccentricity, M' = 518 x 0.0875

= 46 kNm

For original of 125 x 450 stump, reinforcement provided = 6T12

Asc = 678mm2

Therefore, 100 Asc / bh = 1.21

Gives, Mori = 61 kNm

Therefore then; Total Moment, MT = 107 kNm

For new size stump, 300 x 450

MT / bh2 = 1.76

Therefore, 100 Asc' / bh = 0.5

Gives area of reinforcement required, Asc' = 675mm2 < Asc provided = 678mm

2

Note : NO ADDITIONAL REINFORCEMENT REQUIRED IN NEW STUMP SIZE – REFER TO DRAWING

UNDER APPENDIX 2

Page 6: Deviated Piles Report

CADANGAN MEMBINA PEMBANGUNAN BERCAMPUR : A) FASA 1A : 49 UNIT RUMAH TERES 2 TINGKAT (JENIS RT3) DI ATAS LOT

5209, (LOT LAMA 684 & 685), MUKIM 9, PERMATANG TOK MAHAT, DAERAH SEBERANG PERAI SELATAN, PULAU PINANG

UNTUK TETUAN JKP SD. BHD.

5. P2 AT LOCATION OF N/2

Basic Information and Consideration

a) Pile Working Load = 20 tonne (200 kN)

b) Column Service Load = 312 kN

c) Column Ultimate Load (N) = 312 x 1.5 = 468 kN

d) Allowable tolerance for deviation (eccentricity) in between centroid of load with centroid of pile

group should not exceeds in any direction

e) Original Stump size = 125 x 450

Locate New C.G. for Group of Piles

About Y Axis

X' = - (106.5mm) > 75mm --------------- Exceeds allowable tolerance. Required rectification.

About X Axis

Y' = - (60.5mm) < 75mm --------------- o.k.

Page 7: Deviated Piles Report

CADANGAN MEMBINA PEMBANGUNAN BERCAMPUR : A) FASA 1A : 49 UNIT RUMAH TERES 2 TINGKAT (JENIS RT3) DI ATAS LOT

5209, (LOT LAMA 684 & 685), MUKIM 9, PERMATANG TOK MAHAT, DAERAH SEBERANG PERAI SELATAN, PULAU PINANG

UNTUK TETUAN JKP SD. BHD.

Proposed Rectification

i) Enlarge pile cap size about Y axis from 450 x 900 to 560 x 900 (110mm enlargement) with

additional 1 number of T16 for the main bars. Transverse reinforcements remain as original

design that is T10-100. Refer to drawing under Appendix 3.

ii) Enlarge stump size about Y axis as to re-align centroid of load within stump to be coincide with

the new centroid of pile group. With this kind of approach, the additional moment due to

eccentricity will induced within the stump. Stump will be enlarged from 125 x 450 to 340 x 450

(215mm enlargement).

Design will be based on BS 8110-1 Clause 3.8.4.2 and Chart No. 24 – BS 8110-3

N = 468 kN

N'/bh = 3.06

Additional Moment due to eccentricity, M' = 468 x 0.1075

= 51 kNm

For original of 125 x 450 stump, reinforcement provided = 6T12

Asc = 678mm2

Therefore, 100 Asc / bh = 1.21

Gives, Mori = 61 kNm

Therefore then; Total Moment, MT = 112 kNm

For new size stump, 340 x 450

MT / bh2 = 1.63

Therefore, 100 Asc' / bh = 0.4

Gives area of reinforcement required, Asc' = 612mm2 < Asc provided = 678mm

2

Note : NO ADDITIONAL REINFORCEMENT REQUIRED IN NEW STUMP SIZE – REFER TO DRAWING

UNDER APPENDIX 3

Page 8: Deviated Piles Report

CADANGAN MEMBINA PEMBANGUNAN BERCAMPUR : A) FASA 1A : 49 UNIT RUMAH TERES 2 TINGKAT (JENIS RT3) DI ATAS LOT

5209, (LOT LAMA 684 & 685), MUKIM 9, PERMATANG TOK MAHAT, DAERAH SEBERANG PERAI SELATAN, PULAU PINANG

UNTUK TETUAN JKP SD. BHD.

APPENDIX 1

Page 9: Deviated Piles Report

CADANGAN MEMBINA PEMBANGUNAN BERCAMPUR : A) FASA 1A : 49 UNIT RUMAH TERES 2 TINGKAT (JENIS RT3) DI ATAS LOT

5209, (LOT LAMA 684 & 685), MUKIM 9, PERMATANG TOK MAHAT, DAERAH SEBERANG PERAI SELATAN, PULAU PINANG

UNTUK TETUAN JKP SD. BHD.

APPENDIX 2

Page 10: Deviated Piles Report

CADANGAN MEMBINA PEMBANGUNAN BERCAMPUR : A) FASA 1A : 49 UNIT RUMAH TERES 2 TINGKAT (JENIS RT3) DI ATAS LOT

5209, (LOT LAMA 684 & 685), MUKIM 9, PERMATANG TOK MAHAT, DAERAH SEBERANG PERAI SELATAN, PULAU PINANG

UNTUK TETUAN JKP SD. BHD.

APPENDIX 3