EC File No: 21-6/2013-IA.III dated 14 th July, 2017 By DELHI MUMBAI INDUSTRIAL CORRIDOR DEVELOPMENT CORPORATION LIMITED (DMICDC) PERIOD: April, 2019 To September, 2019 Submitted By: Delhi Mumbai Industrial Corridor Development Corporation Limited 8th Floor, Tower-1, Jeevan Bharti Building, 124, Connaught Place, New Delhi-110001 Contact: +011-23317886 Web: www.dmicdc.com SIX MONTHLY COMPLIANCE REPORT DEVELOPMENT OF JODHPUR PALI MARWAR INDUSTRIAL AREA (JPMIA), DISTRICT PALI, RAJASTHAN SUB-REGION

Transcript of DEVELOPMENT OF JODHPUR PALI MARWAR ......Delhi Mumbai Industrial Corridor, Room No-210, First Floor,...

  • EC File No: 21-6/2013-IA.III dated 14th July, 2017

    By

    DELHI MUMBAI INDUSTRIAL CORRIDOR DEVELOPMENT CORPORATION LIMITED

    (DMICDC)

    PERIOD: April, 2019 To September, 2019

    Submitted By:

    Delhi Mumbai Industrial Corridor Development Corporation Limited 8th Floor, Tower-1, Jeevan Bharti Building, 124, Connaught Place, New Delhi-110001 Contact: +011-23317886 Web: www.dmicdc.com

    SIX MONTHLY COMPLIANCE REPORT

    DEVELOPMENT OF JODHPUR PALI

    MARWAR INDUSTRIAL AREA (JPMIA),

    DISTRICT PALI, RAJASTHAN SUB-REGION

    OF DMIC

    http://www.dmicdc.com/

  • 2

    CONTENTS

    1. Project Background ........................................................................................................................... 3

    2. Information sheet ............................................................................................................................. 4

    3. Status oF EC Letter condition’s Compliance as on 30 th September, 2019 ............................................... 10

    Annexures: .......................................................................................................................................... 24

  • 3

    Project Background

    The Government of India (GoI) has proposed the development of a Dedicated Freight Corridor (DFC)

    between Dadri and Jawahar Lal Nehru Port Trust (JNPT) covering a total length of 1504 km traversing

    via Vadodara-Ahmedabad-Palanpur-Phulera-Rewari through five states. To tap the development

    potential of the proposed freight corridor, a band spanning 150 kilometres on both sides of the freight

    corridor has been identified as the Influence Region and is proposed to be developed as Delhi-Mumbai

    Industrial Corridor (DMIC). Twenty-Four (24) industrial nodes comprising of Investment Regions (IR)

    and Industrial Areas (IA) have been identified along the length of this corridor. In line with this

    development strategy, the Delhi Mumbai Industrial Corridor Development Corporation Limited

    (DMICDC), a SPV formed under Ministry of Commerce and Industry (MoCI), Government of India, is

    undertaking the development of JPMIA in district Pali, Rajasthan in partnership with the State

    Government. Department of DMIC, Govt. of Rajasthan is the nodal agency responsible for coordination

    between the DMICDC and state government for proposed project implementation.

    The Project involves development of Jodhpur Pali Marwar Industrial Area (JPMIA) in a total area of

    about 154.37 sq kms. The proposed Urbanisable area is about 64.25 sq. km, while rest will be planned

    as Peripheral Control Belt with agriculture and controlled development. This is planned to be located at

    the Jodhpur- Pali District border and at about 40 Kms from Jodhpur and 25 km from Pali.

    Manufacturing Industries with a large base of SMSE’s is identified as the major economic driver for the

    proposed development of the region. Total Water requirement for Potable purpose is about 60 MLD

    and water for industrial use is about 50 MLD. Source of fresh water identified is Indira Gandhi Nahar

    Pariyojna (IGNP) through Rajiv Gandhi Lift Canal (RGLC). Solid Waste generation will be about 82 MTD.

    Public transport will be developed at two levels, 1) Within JPM IA and 2) between JPM IA with

    neighboring Urban Centers of Jodhpur and Pali. This will comprise of BRTS along with dedicated Cycle

    and pedestrian tracks within the JPM IA. For regional connectivity, BRTS through bus fleet

    augmentation and development of Pali- Sojat bypass (about 21 km length) has been planned.

    There is a provision for the development of Integrated Multi Modal Logistics Hub (MMLH) with an area

    of about 2 sq.km within the JPMIA. The components of MMLH are 1) Transportation facility and rail

    sidings, 2) Warehousing Facilities, 3) Supporting utilities and infrastructure and 4) Value added services

    such as Packaging, etc. This MMLH is expected to handle a Cargo of about 25 MT per annum in 2042.

    There is no Reserved or Protected forest in the identified JPM IA. There is no existence of any Wildlife

    Park/ Bird Sanctuary/ Notified Eco-sensitive Zone within a distance of 10 km from the periphery of JPM

    IA.

    The project has been accorded Environmental Clearance vide F. No. 21-6/2013-IA.III dated 14th July,

    2017. (Refer Annexure 1)

  • 4

    1. INFORMATION SHEET

    Monitoring the Implementation of Environmental Safeguards

    Ministry of Environment Forest & Climate Change,

    Regional Office (Central Region),

    Lucknow

    MONITORING REPORT

    PART – I

    DATA SHEET

    Sl. No.

    Particulars Details

    1. Project type: River Valley / Mining / Industry / Thermal / Nuclear / Others (specify)

    : Other- Industrial Area The project falls under item 7(c) i.e Industrial Estate/ park and 8(b) i.e Township and Area development under the provisions of the Environment Impact Assessment Notification, 2006 and amendments thereto and Circulars issued thereon.

    2. Name of the Project : ‘Jodhpur –Pali- Marwar Industrial Area (JPMIA)’ in

    District Pali, Rajasthan by M/s Delhi Mumbai Industrial

    Corporation (DMICDC)

    3. Clearance letter (s) / OM No. and date

    : File No.: 21-6/2013-IA.III dated 14th July, 2017

    4. Location a) District (s)

    :

    Pali

    b) State (s) : Rajasthan

    c) Location latitude / longitude

    : The project area is bounded by Latitude

    25°52'42.57"N to 26°1'41.38"N and Longitude

    73°0'52.86" E to 73° 1' 26.72" E.

    5. Address for Correspondence a) Address of the Concerned

    Project Chief Engineer (with Pin code & Telephone / Telex / Fax Numbers)

    : CEO & Managing Director,

    Delhi Mumbai Industrial Corridor Development Corporation Limited, 8th Floor, Tower-1, Jeevan Bharti Building, 124, Connaught Place, New Delhi-110001 Contact: +011-23317886

  • 5

    b) Name & address of Nodal Officer (with Phone No./Fax Number(s)/Mobile No.s)

    S.L.Sethi, Senior Town Planner, Delhi Mumbai Industrial Corridor 3rd Floor, RFC Wing, Udyog Bhawan, Jaipur, Rajasthan Phone No- 0141-222820 Mobile-9414045069

    c) Name & address of the Concerned Project In-charge (with Phone No. /Fax Number(S)/ Mobile No.s

    Commissioner, Delhi Mumbai Industrial Corridor, Room No-210, First Floor, RFC Wing, Udyog Bhawan, Jaipur, Rajasthan Phone No- 0141-2227810

    d)Present Status of the project; date of commencement of construction work along with quantum of work completed/date of operation.

    Project yet to be started.

    6. Salient features a) of the Project

    : Project Spectrum

    The JPMIA is proposed as a major new industrial hub located on a greenfield site at about 25 km from Pali and 40 km from Jodhpur. The development of the JPM IA will span over three decades where it moves from a fledgling Industrial area, kick started by the DFC, MMLH and dependent on the existing urban centers of Jodhpur and Pali to evolve as a Primary Industrial city in the Marwar Region.

    Total Plot Area Total area delineated as an Industrial area would be approximately 154.37 sq. km. The proposed site of industrial area consists of agricultural land under both private and government ownership, land for cattle grazing, barren land, village settlements and village ponds etc.

    Project Resident Population size

    Population projections have been carried out based on the relationship of employment potential with expected industrial

  • 6

    output production. The Development Plan has been prepared for the overall resident population of 3.92 lac until the horizon year of 2042.

    Employment The project is generally expected to bring in positive social impacts in terms of employment for locals. In addition to employment, the infrastructure facilities in the project area and surroundings will improve significantly. However, in the absence of due care, development of the JPMIA may induce negative impacts, during the construction and operational phases. It is estimated that project will provide about 66000 jobs by the horizon year 2022 and 315,000 jobs by the horizon year 2042.

    Water Demand During Operation: water demand for the project is expected 14 MLD by 2022, 32 MLD by 2032, and 61 MLD by 2042.

    Source of Water The prime source of water will be Rajiv Gandhi Lift Canal. Water from this canal will be brought to Jodhpur. From Jodhpur water will be transmitted through an existing pipeline after its rehabilitation.

    Waste Water generation

    Wastewater generated in the JPMIA will be treated in phases at sewage treatment plants (STPs) for this a STP of 41 MLD capacity has been planned. For industrial waste water treatment, common effluent treatment plant (CETPs) of 10 MLD for Phase (up to horizon year 2022) and 35 MLD for the year 2042.

    Sewage Treatment Plant (STP)

    Approx. 41 MLD STP MBR technology

    Effluent Treatment Plant (ETP)

    Individual industries to treat effluent up to secondary treatment.

  • 7

    Common Effluent Treatment Plant (CETP)

    For industrial waste water treatment, common effluent treatment plant (CETPs) of 10 MLD for Phase (up to horizon year 2022) and 35 MLD for the year 2042.

    Municipal Solid Waste generation

    The solid waste generated during construction works and from labour camps shall be disposed off in authorized landfill through the vendor. The sewage generated from labour camp shall be disposed off in soak pits and septic tanks.

    During the operational phase, an integrated approach will be adopted in the JPMIA to efficiently manage the solid waste generated in the region. The waste that will be generated in the JPMIA can be broadly categorized as municipal waste and industrial waste.

    An area of about 100 ha has been identified for the Integrated Waste Management Facility (IWMF) to be provided in the JPMIA to deal with all wastes.

    Power requirement for MIP

    Total power requirement during construction phase will be about 2 MVA and will be met through installation of DG sets at construction sites. During operation phase power demand has been estimated as 91, 294 and 755 MVA in the horizon year 2022, 2032 and 2042 respectively. This power demand will be met from 132/220 Grid Substations available in project region. Suitable electric supply network will be developed in the JPMIA.

    Cost of the Project

    Infrastructure Development Cost -Approx. INR 10,000 Crore

    b) of the Environmental Management Plans

    7. Breakup of the Project Area : There is no diversion of Forest Land involved.

  • 8

    a) Submergence area: forest & non-forest

    b) Others Total Area: 15,437 ha.

    8. Breakup of the project affected population with the enumeration of those losing Houses / Dwelling units only, Agricultural Land & Landless Laborers / Artisans:

    a) SC, ST / Adivasi b) Others

    (please indicate whether these figures are based on any scientific and systematic survey carried out or only provisional figures, if a survey is carried out give details & year of survey)

    : The propose site for Industrial area would be approximately of about 154.37 sq km. Out of this urbanisable area would be 58.99 sq km. Existing land use primarily consists of agricultural land under both private and government ownership, land for cattle grazing, village settlements and village ponds. There will be permanent change in land use as per provisions of master plan. The topography of the site is plain. Different set of activities like industrial, residential, and basic facilities required in a city have been proposed in the master plan of JPM IA.

    9 a) Financial Details: Project cost as originally planned and subsequent revised estimates and the year of price reference

    : Infrastructure Development Cost -Approx. INR 10,000 Crores.

    b) Allocation made for environmental management plans with item wise and year wise breakup

    : NA Project yet to be started

  • 9

    c) Benefit cost ratio/Internal rate of Return and the year of assessment

    : NA Project yet to be started

    d) Whether includes the cost of environmental management as shown in the above

    : NA Project yet to be started

    e) Actual expenditure incurred on

    the project so far

    : NIL Project yet to be started

    f) Actual expenditure incurred on

    the environmental management

    plans so far

    : None Project yet to be started

    10 Forest Land Requirement There is no diversion of Forest Land under this project.

    a) The status of approval for diversion of forest land for non-forestry use

    : NA

    b) The status of clearing felling : NA

    c) The status of compensatory afforestation, if any

    : NA

    d) Comments on the viability & sustainability of compensatory afforestation program in the light of actual field experience so far

    : NA

    11 The status of clear felling in non-forest areas (such as submergence area or reservoir, approach roads.), if any with quantitative information required.

    : NA

    12 Status of construction (Actual & /or planned)

    : Construction work is not commenced yet

    a) Date of commencement (Actual & / or planned)

    : Construction work is not commenced yet

    b) Date of completion (Actual &/or planned)

    : Construction work is not commenced yet

    13 Reasons for the delay if the project is yet to start

    : Construction work is not commenced yet

    14 Dates of Site Visits

    a) The dates on which the project was monitored by the Regional Office on previous occasions, if any

    : NA

    b) Date of site visits for this monitoring report

    : NA

  • 10

    Compliance of conditions of Environmental Clearance (F.No. 21-6/2013-IA.III dated 14.7.2017) for

    October, 2018 to March, 2019. .

    PART A: SPECIFIC CONDITIONS

    I. Construction Phase

    Sl. No. Conditions Compliance Status

    (i.) “Consent for Establishment" shall be

    obtained from State Pollution Control

    Board under Air (Prevention and

    Control of Pollution) Act, 1981 and

    Water (Prevention and Control of

    Pollution) Act, 1974.

    Noted.

    Consent to Establish would be obtained from

    State Pollution Control Board.

    (ii.) To achieve the Zero Liquid Discharge,

    waste water generated from

    different industrial operations should

    be properly collected, treated to the

    prescribed standards and then

    recycled or discharged for the

    identified uses.

    Noted & will be complied.

    (iii.) Necessary authorization required

    under the Hazardous and Other

    Wastes (Management and Trans-

    Boundary Movement) Rules, 2016,

    Solid Waste Management Rules,

    2016 shall be obtained and the

    provisions contained in the Rules

    shall be strictly adhered to.

    Noted & will be complied.

    (iv.) During construction phase, air

    pollution and the solid waste

    management aspects need to be

    properly addressed ensuring

    compliance of the Construction and

    Demolition Waste Management

    Rules, 2016.

    Noted & will be complied.

    (v.) As per the provisions of the

    Notification dated 9th December,

    2016 amending the Principal EIA

    Notification, 2006, all the building

    and construction projects (built up

    Noted & will be complied.

  • 11

    area 5000 sqm - 150000 sqm) in the

    industrial area, shall require

    clearances for their building plans

    from the State/local bodies or the

    concerned regulating authority, as

    applicable. In case of project sizes

    having built up areas more than

    150000 sqm, environmental

    clearances shall continue to be

    required from the concerned

    regulatory authorities.

    (vi.) For all the individual

    units/infrastructure requirements,

    environmental clearances, as

    applicable, shall be obtained from the

    respective regulatory authorities.

    Noted.

    (vii.) A site-specific biodiversity

    conservation plan including

    mitigation measures to be developed

    from competent

    nationally/internationally recognized

    institute with appropriate financial

    allocation for its implementation.

    Noted and will be complied.

    (viii.) Green belt shall be developed using

    local tree and shrub species. No

    exotic species to be used for green

    belt development.

    Noted and will be complied.

    (ix.) There shall be a continuous green

    belt along the plant premises, except

    at the designated entry and exit

    points.

    Noted and will be complied.

    (x.) The quantity of fresh water usage,

    water recycling and rainwater

    harvesting shall be measured and

    recorded to monitor the water

    balance as projected by the project

    proponent. The record shall be

    submitted to the Regional Office,

    Noted & will be complied.

  • 12

    MoEF&CC along with six monthly

    Monitoring reports.

    (xi.) Special purpose vehicle shall be

    established for implementation,

    monitoring and compliance of the

    environmental safeguards.

    Noted & will be complied.

    (xii.) All the recommendation of the EMP

    shall be complied with letter and

    spirit. All the mitigation measures

    submitted in the EIA report shall be

    prepared in a matrix format and the

    compliance for each mitigation plan

    shall be submitted to RO, MoEF&CC

    along with half yearly compliance

    report.

    Noted & will be complied.

    (xiii.) The member units shall provide

    storage tanks for storage of effluent

    for monitoring the characteristics of

    effluent and to treat the same to

    meet the prescribed inlet norms

    before taking into the CETP for

    further treatment.

    Noted & will be complied.

    (xiv.) Proper meters with recording

    facilities shall be provided to monitor

    the effluent quality and quantity

    from member industries to CETP and

    from CETP to the final disposal/re-use

    on a continuous basis.

    Noted & will be complied.

    (xv.) The project proponent shall establish

    an environmental monitoring cell

    with all the potential polluting units

    as members to review the

    environmental monitoring data and

    suggest for improvements.

    Noted & will be complied.

    (xvi.) Internal Road widths within the

    industrial estate shall be minimum 24

    m ROW.

    Noted & will be complied.

    (xvii.) Common facilities such as repair Noted & will be complied.

  • 13

    shops, rest rooms for drivers and

    attendants shall be provided.

    (xviii.) All required sanitary and hygienic

    measures should be in place before

    starting construction activities and to

    be maintained throughout the

    construction phase.

    Noted & will be complied.

    (xix.) Soil and ground water samples will be

    tested to ascertain that there is no

    threat to ground water quality by

    leaching of heavy metals and other

    toxic contaminants.

    Noted & will be complied.

    (xx.) Construction spoils, including

    bituminous material and other

    hazardous materials, must not be

    allowed to contaminate watercourses

    and the dump sites for such material

    must be secured so that they should

    not leach into the ground water.

    Noted & will be complied.

    (xxi.) Parking space to accommodate

    trucks, cars, two wheelers and

    bicycles shall be provided as per the

    norms.

    Noted & will be complied.

    (xxii.) Any hazardous waste generated

    during development/ construction

    phase, should be

    disposed off as per applicable rules

    and norms with necessary approvals

    of the State Pollution Control Board.

    Noted & will be complied.

    (xxiii.) The diesel generator sets to be used

    during development/ construction

    phase should be low sulphur diesel

    type and should conform to

    Environment (Protection) Rules

    prescribed for air and noise emission

    standards

    Noted & will be complied.

    (xxiv.) The diesel required for operating DG

    sets shall be stored in underground

    Noted & will be complied.

  • 14

    tanks and if required, clearance from

    Chief Controller of Explosives shall be

    taken.

    (xxv.) Vehicles hired for bringing

    construction material to the site

    should be in good condition and

    should have a pollution check

    certificate and should conform to

    applicable air and noise emission

    standards and should be operated

    only during non-peak hours.

    Noted & will be complied.

    (xxvi.) Ambient noise levels should conform

    to residential standards both during

    day and night. Incremental pollution

    loads on the ambient air and noise

    quality should be closely monitored

    during development/ construction

    phase. Adequate measures should be

    made to reduce ambient air and

    noise level during construction phase,

    so as to conform to the stipulated

    standards by CPCB/SPCB.

    Noted & will be complied.

    (xxvii.) Fly ash should be used as building

    material in the construction as per

    the provisions of Fly Ash Notification

    of September, 1999 and amended as

    on 2th August, 2003.

    Noted & will be complied.

    (xxviii.) Ready mixed concrete must be used

    in site development and building

    construction.

    Noted & will be complied.

    (xxix.) Storm water control and its re-use as per CGWB and BIS standards for various applications

    Noted & will be complied.

    (xxx.) Water demand during development/construction should be reduced by use of premixed concrete, curing agents and other best practices referred.

    Noted and will be complied.

    (xxxi.) Permission to draw ground water, if any, shall be obtained from the

    Noted and will be complied.

  • 15

    competent Authority prior to construction/operation of the project.

    (xxxii.) Separation of grey and black water should be done by the use of dual plumbing line for separation of grey and black water.

    Noted and will be complied.

    (xxxiii.) Fixtures for showers, toilet flushing and drinking should be of low flow either by use of aerators or pressure reducing devices or sensor-based control.

    Noted and will be complied.

    (xxxiv.) Use of glass may be reduced by upto 40% to reduce the electricity consumption and load on air-conditioning. If necessary, use high quality low E value glass.

    Noted and will be complied.

    (xxxv.) Roof should meet prescriptive requirement as per Energy Conservation Building Code by using appropriate thermal insulation material to fulfil requirement.

    Noted and will be complied.

    (xxxvi.) Opaque wall should meet prescriptive requirement as per Energy Conservation Building Code which is proposed to be mandatory for all airconditioned spaces while it is aspirational for non-airconditioned spaces by use of appropriate thermal insulation material to fulfil requirement.

    Noted and will be complied.

    (xxxvii.) The approval of the competent authority shall be obtained for structural safety of the buildings due to earthquake, adequacy of firefighting equipment’s, etc. as per National Building Code including protection measures from lightening etc.

    Noted and will be complied.

    (xxxviii.) Regular supervision of the above and other measures for monitoring should be in place all through the development/ construction phase, so as to avoid disturbance to the surroundings.

    Noted and will be complied.

  • 16

    (xxxix.) The responses/commitments made

    to the issues raised during public hearing shall be complied with in letter and spirit, and action taken shall be submitted to the Ministry.

    Noted Annexure 2: Public hearing minutes and responses.

    (xl.) For Corporate Environment Responsibility activities, 2% of the project cost shall be earmarked. The CSR funds shall be allocated for vocational training programme, development of infrastructure like construction of public toilets etc. and also to allot additional land for Lord 'Sri Ranganatha Swamy' temple as per the requirement.

    NA

    (xli.) All member industries shall be instructed to comply with the consent conditions given by PCB/MoEF&CC strictly to maintain ambient air quality within the stipulated standards of CPCB.

    Noted and will be complied.

    (xlii.) Existing State/Central Government norms shall be followed for providing employment, preference will be given to local educated and unemployed people based on their educational qualification. Vocational training shall be conducted to improve the skills of local people so that they can get employment/self-employment.

    Noted

    (xliii.) Compensation will be paid as per the land acquisition act of State.

    Noted

    (xliv.) Corporate Environment Responsibility:

    Noted and will be complied

    a) The Company shall have a well laid

    down Environment Policy approved

    by the Board of Directors

    b) The Environment Policy shall

    prescribe for standard operating

    process/ procedures to bring into

    focus any infringements/ deviation/

    violation of the environmental or

    forest norms/ conditions

  • 17

    c) The hierarchical system or

    Administrative Order of the company

    to deal with environmental issues

    and for ensuring compliance with the

    environmental clearance conditions

    shall be furnished

    d) To have proper checks and

    balances, the company shall have a

    well laid down system of reporting of

    non-compliances/ violations of

    environmental norms to the Board of

    Directors of the company and/ or

    shareholders or stakeholders at large

    II. Operation Phase

    i.) All the topsoil excavated during

    development/ construction activities

    should be stored for use in

    horticulture/ landscape development

    within the project site.

    Noted & will be complied.

    ii.) Disposal of muck during development

    / construction phase should not

    create any adverse effect on the

    neighbouring communities and be

    disposed taking the necessary

    precautions for general safety and

    health aspects of people, only in

    approved sites with the approval of

    competent authority.

    Noted & will be complied.

    iii.) The solid waste generated should be

    properly collected and segregated.

    Wet garbage should be composted

    and dry/inert solid waste should be

    disposed off to the approved sites for

    land filling after recovering recyclable

    material.

    Noted & will be complied.

    iv.) Diesel power generating sets

    proposed as source of back-up power

    Noted & will be complied.

  • 18

    for elevators and common area

    illumination during operation phase

    should be of enclosed type and

    conform to rules made under the

    Environment (Protection) Act, 1986.

    The height of stack of DG sets shall be

    equal to the height needed for the

    combined capacity of all proposed

    DG sets. The location of the DG sets

    may be decided with in consultation

    with State Pollution Control Board.

    v.) Noise shall be controlled to ensure

    that it does not exceed the

    prescribed standards. During night

    time the noise levels measured at the

    boundary of the building shall be

    restricted to the permissible levels to

    comply with the prevalent

    regulations.

    Noted & will be complied.

    vi.) The green belt of the adequate width

    and density preferably with local

    species along the periphery of the

    plot shall be raised so as to provide

    protection against particulates and

    noise.

    Noted & will be complied.

    vii.) Weep holes in the compound walls

    shall be provided to ensure natural

    drainage of rain water in the

    catchment area during the monsoon

    period.

    Noted & will be complied

    viii.) Rain water harvesting for roof run-off

    and surface run- off, as plan

    submitted shall be implemented.

    Before recharging the surface run off,

    pre-treatment must be done to

    remove suspended matter, oil and

    grease. The borewell for rainwater

    recharging shall be kept at least 4 m.

    Noted & will be complied

  • 19

    above the highest ground water

    table.

    ix.) The ground water level and its quality shall be monitored regularly in consultation with Central Ground Water Authority.

    Noted & will be complied

    x.) Traffic congestion near the entry and

    exit points from the roads adjoining

    the proposed project site must be

    avoided. Parking, loading and

    unloading shall be fully internalized

    and no public space shall be utilized.

    Noted. Traffic movement will be controlled as per traffic management plan delineated in EIA report.

    xi.) A Report on the energy conservation

    measures confirming to energy

    conservation norms finalise by

    Bureau of Energy Efficiency shall be

    prepared incorporating details about

    building materials & technology, R &

    U Factors etc. and submit to the

    Ministry in three months.

    Noted & will be complied after initiation of project development activities.

    xii.) Energy conservation measures like

    installation of CFLs/ TFLs for the

    lighting the areas outside the building

    shall be integral part of the project

    design and shall be in place before

    project commissioning. Use CFLs and

    TFLs shall be properly collected and

    disposed of/ sent for recycling as per

    the prevailing guidelines/ rules of the

    regulatory authority to avoid mercury

    contamination. Use of solar panels

    may be done to the extent possible.

    Noted and efforts should be taken to conserve the energy.

    xiii.) The building should have adequate

    distance between them to allow

    movement of fresh air and passage of

    natural light, air and ventilation.

    Noted and will be compiled.

    PART-B-GENERAL CONDITIONS

    i.) The environmental safeguards Noted & will be complied.

  • 20

    contained in the EIA Report should be

    implemented in letter and spirit.

    ii.) Provision should be made for supply

    of kerosene or cooking gas and

    pressure cooker to the labourers

    during construction phase

    Noted & will be complied.

    iii.) Six monthly monitoring reports

    should be submitted to the Ministry

    and its Regional Office, Lucknow.

    Complied. Six monthly Compliance report for August-September, 2017, October, 2017 to March, 2018 , April-September, 2018 & October, 2018- March, 2019 has been submitted on 01.12.2017, 21.05.2018 , 30.11.2018 & 28.05.2019 respectively.

    iv.) A copy of the environmental

    clearance letter shall also be

    displayed on the website of the

    concerned State Pollution Control

    Board. The EC letter shall also be

    displayed at the Regional Office,

    District Industries centre and

    Collector's Office/ Tehsildar's office

    for 30 days.

    Pertains to State Pollution Control Board. The EC letter has been circulated to District Authorities to be displayed at their respective Offices.

    v.)

    The project proponent shall set up a

    separate environmental management

    cell for effective implementation of

    the stipulated environmental

    safeguards under the supervision of a

    Senior Executive

    Complied. Manger, Environment & Public Health Engineering has been appointed at DMICDC Corporate office, New Delhi in Technical & Projects Division.

    vi.) The funds earmarked for

    environment management plan shall

    be included in the budget and this

    shall not be diverted for any other

    purpose

    Noted.

    5. The above stipulations would be

    enforced among others under the

    provisions of Water (Prevention and

    Control of Pollution) Act, 1974, the

    Air (Prevention and control of

    Pollution) act 1981, the Environment

    (Protection) Act, 1986, the Public

    Noted.

  • 21

    Liability (Insurance) Act, 1991 and EIA

    Notification, 2006.

    6. Officials from the Regional Office of

    MoEF&CC at Lucknow who would be

    monitoring the implementation of

    environmental safeguards should be

    given full cooperation, facilities and

    documents/data by the project

    proponents during their inspection. A

    complete set of all the documents

    submitted to MoEF&CC should be

    forwarded to the APCCF, Regional

    Office of MoEF&CC at Lucknow.

    Full cooperation would be extended to officials from MoEF&CC, Regional Office, Lucknow for undertaking site inspection.

    7. The Ministry reserves the right to add

    additional safeguard measures

    subsequently, if found necessary, and

    to take action including revoking of

    the environment clearance under the

    provisions of the Environmental

    (Protection) Act, 1986, to ensure

    effective implementation of the

    suggested safeguard measures in a

    time bound and satisfactory manner.

    Noted.

    8. All other statutory clearances such as

    the approvals for storage of diesel

    from Chief

    Controller of Explosives, Fire

    Department, Civil Aviation

    Department, Forest Conservation

    Act, 1980 and Wildlife (Protection)

    Act, 1972 etc. shall be obtained, as

    applicable by project proponents

    from the respective competent

    authorities.

    Noted.

    9. The project proponent should

    advertise in at least two local

    Newspapers widely circulated in the

    region, one of which shall be in the

    Complied. The Environmental Clearance issued to ‘Jodhpur Pali Marwar Industrial Area’ project has been advertised in Dainik Bhaskar (Hindi daily), Jaipur edition on 14.09.2017 &

  • 22

    vernacular language informing that

    the project has been accorded

    Environmental Clearance and copies

    of clearance letters are available with

    the State Pollution Control Board and

    may also be seen on the website of

    the Ministry of Environment, Forest

    & Climate Change at

    http://www.envfor.nic.in. The

    advertisement should be made

    within Seven days from the date of

    receipt of the Clearance letter and a

    copy of the same should be

    forwarded to the Regional office of

    this Ministry at Lucknow.

    Rajasthan Patrika (Hindi daily), Jaipur edition on 14.09.2017. A copy of the advertisement is enclosed as Annexure 3 for ready reference.

    10. This clearance is subject to final order

    of the Hon'ble Supreme Court of

    India in the matter of Goa

    Foundation Vs Union of India in Writ

    Petition (Civil) No.460 of 2004 as may

    be applicable to this project.

    NA

    11. Any appeal against this clearance

    shall lie with the National Green

    Tribunal, if preferred, within a period

    of 30 days as prescribed under

    Section 16 of the National Green

    Tribunal Act, 2010.

    No appeal has been made against this Environment Clearance as on date.

    12. A copy of the clearance letter shall be

    sent by the proponent to concerned

    Panchayat, Zila Parishad/Municipal

    Corporation, Urban Local Body and

    the Local NGO, if any, from whom

    suggestions/ representations, if any,

    were received while processing the

    proposal. The clearance letter shall

    also be put on the website

    permanently of the company by the

    proponent.

    Complied. EC letter has been uploaded on DMICDC’s website at link as below: http://dmicdc.com/downloads/environmental-clearance

    http://dmicdc.com/downloads/environmental-clearancehttp://dmicdc.com/downloads/environmental-clearance

  • 23

    13. The proponent shall upload the

    status of compliance of the stipulated

    EC conditions,

    Including results of monitored data

    on their website and shall update the

    same periodically. It shall

    simultaneously be sent to the

    Regional Office of MoEF&CC, the

    respective Zonal Office of CPCB and

    the SPCB. The criteria pollutant levels

    namely; SPM, RSPM, S02, NOx

    (ambient levels as well as stack

    emissions) or critical sectoral

    parameters, indicated for the project

    shall be monitored and displayed at a

    convenient location near the main

    gate of the company in the public

    domain.

    Complied. Six Monthly Compliance report of EC conditions for August-September, 2017, October, 2017 to March, 2018 , April-September, 2018 & October, 2018 – March, 2019 has been uploaded on DMICDC’s website at link below: http://dmicdc.com/downloads/environmental-clearance

    14. The environmental statement for

    each financial year ending 31st

    March in Form-V as is mandated to

    be submitted by the project

    proponent to the concerned State

    Pollution Control Board as prescribed

    under the Environment (Protection)

    Rules, 1986, as amended

    subsequently, shall also be put on the

    website of the company along with

    the status of compliance of EC

    conditions and shall also be sent to

    the respective Regional Offices of

    MoEF&CC by e-mail.

    As on date project work is not commenced yet.

    Annexure:

    Annexure 1: EC Letter

    Annexure 2: Public hearing minutes and responses.

    Annexure 3: EC advertisement.

    http://dmicdc.com/downloads/environmental-clearancehttp://dmicdc.com/downloads/environmental-clearance

  • uJ wだ 爾 繭漏 衡諭 ―藤

    赫 謙― ―

    節 漏 調 呻 書 f赫 輸 う鏑 飾 ゎ 諭柳 輛 竜 躙ほ 輛 赫 n命 飲 飾 15032017奇 椰楡 同赫 耐 前 可 _,回 |Ч・

    :― Чヽgυ`輸 載 無 R補 哺 的 )飾 :15032017

    ●"●

    :腑 :11論

    ―赫

    ―ミ:―

    辮 鳥帯 蓼 簿 珊 鑑 臨 鼎 臨 鶏庸輛

    臨 騰 '眈 謂∫締鴇 3雪 編 |…蝠節f甲綴織l木髯黒Tは・赫哺繭

    。 W I,一 で 頭 面1 Чヽ H`は

    繹 魃輛 Ⅲ ■動 赫 ご

    霜 器 瀑

    2 ●"ヽ

    口 |● ね

    濶 鶉SInさ 1論阿 命 赫 _諭赫 蒻 可 破 赫 箭 TII姉

    cMq-{r A ftri frffi fi q-on+t Tfr sir erfi rrur*ernwron d cdqn fiM d rrofu-qr qtt.fl rrd e* u6"wro w oft-qr+ wrO affcr+rff I irr Errq gtr qrq 6ivorcr vfud *.rr r

    1

  • 軒謡評翼聰 幕ヽΨ需蒋珈 WttP

    ・ …

    ゛せ命劇・ 奇可南nl

    靭熟T息鸞電器翼晰 ミξ哺̈

    赫 詢 詢 録 T。マ・

    ゛て赫 n

    鞣禦輛赫赫 鋪

    Y{.gq.6s d inr +{ d wqq 6gernvor $+u d fuc 6-6r .rqr enq-rS rd aru rfi ft-qrrqr

    Wrdr n frqrd oi a+r Scmwffi.n ? q-c Sc-qrg o.r Aflqc vr$q.sqrqn qi i Bqr Q.Ir qr< A rFE tTO \ffi ;gfr dsw "ff ilq srd ilaA- -fr c

  • MF哺鰤 輸 師

    ■面 調 喩 面 命飲 ■ 諭Ч■爺 マ赫 調 捐 ,輸 諭●●l゛qlさ

    |

    書膊 聯 ,:耳筒 1_

    "s、υ 赫 薇 南 鴨

    ●くo、 輸 刺 o¬ _

    → 億Ⅵ

    0■ GぺI瞭イトご

    ' '日

    「ヽ1)|

    中ホ可 厳中河 命奇輌tud赫 哺 飯 町 ЧI、 `ll

    紺翻用冨孵

    やw令 命ず餘 ぅR栞書 o命甲 3籠ぎマ ,雨前f河 さ′書―n釧嘔 n ttm l

    ゴ浦雨■結 吉 赫 て甫

    ―諭 劇 !ゅ 謙 `ぃ 赫

    赫 命 輸 前 ¨諭 赫

    5

    ヽЧヽ ЧCu t

    ・‖ 夢 鷲鳳

    °鳥譜

    哺れ tさ …可|

    |・

    諭 、¬q"さ|

    0 ゛ホ南 命珊翔 ゛輛 奇苛奇う衡昭,゛命ψ

    需誡葺赫 諭叩

    赫 Ⅲ…

    |・ 赫 薇 捕 。 前・

    ― ・φヽ×命

    "くR輛

    ЧIヽ `|1弱"令

    腋 赫 、"Ч

    wn国 赫 赫 |

    ・ 命 輸 円哺 ゛蒻 き さ命

    _J■ ■両 爺 爺 | |繭 tHl、 計 涯罫鶏W獅黒1'満

    鏃 鶏盟前赫

    ・署獅馴翻 響鋪 瀾 命 令輌 司鶯 鮨fヤolR常。 討 |

    ・ 電 ―輸 q刺 赫 諭 軸可 姉 諭 飾赫 aさ

    |

    喩ホ面 命爾 輌 書

    n―

    コ・

    3鷹"口

    製卜さ 17 ■1ヽ1010 爺 訥向 硫に、師綸 油 ,

    器 鑑 霧訃繭

    赫 可 寸、 コ 呵 輸 咆

    …心 蝕 m・ ま日

    赫 中 町 可 躙田 さ|

    認 糞町雷師命 ЧΦ 諭ヽ ."Ч l in赫喩ホ司 3 m ttnHゃ 、諭 ゛ 命マg轟

    …劇、ゃ、箭 ― 爺 甫 命

    わ3

  • . t3rdr + cy{nff 3ri qr$ fi-6 d mi-s,rn fr sfuo qqen dt rdqffiq-qr t ot{ sncfu rfi tr

    qi qrirff | vfl grl-q iF qr.rd var* sfuo d.n

    o rwrfta cmfir i Rrrftqffi oi tYqqn d er+srft-&,i r d.ff.\'q.3n{.c d fu6Rii # or !+{rd Fc-o.rg ffd.n rons-crs d +, t Tf-ioi fi qlmrq ffi.n r

    赫 軸 赫 軸 葺驀 面 針 3可輛誦 wh論 奇 赫 哺 さ1取

    ざ譲ヽ 1%諭 w浦 奇赫 奇 赫

    vffiqq1 6 frri frffi rft c-drRiff 1fr eih erd; v-wemqron si {+qn +M ddfiI fu-qr oK.rI E.€-d ifrqsfua sqq w cfuqs-fl qfisff qr+rn r as grq rs qaro\ varcr gfod 6t n

    … 鶉 雉 臨爺 取 鋪 マさ蒻 針 m―書9口 ,暉Π さ|

    o sfua1qr q ,i-qq Tfr oik frrm3rar ctER ol qff 61 3r+rrtlnatn w{6R +1 {*qTrffftqt d n-Fd fu'qr qKrrtEs-d fuq vfud qqq qIqfr-Eq-fl vtt d qr*,ff |c-Frfua sndFro f, dorm-qrq qw qti(BUFFERZON E)Elsr :rqr i afl qw+r(BUFFER ZONE) orelara ss.sa Ef ft.ff.t r

    繭 tl■ 苗 減 ・ご詰鷺窯辮脚網押赫

    薇 蒻 口 面 箭 硼

    °調雪ざ鳳襦可瓢岬臨 辮 |

    11 市 爺 →訳 ● 瞳 日 f漸 俸 て繭 命 論 薇

    ■ 劇 肺 ヾ u赫 可油 命6■ oF新専赫 きに 0謙 輸哺 捕 輔 命 捕 赫 薇 爺喩 取 可 缶m静 町

    ● マ飩満可 命 捕 ゛輌 青

    翼雲恥墾WI赫

    れ olo 0ヨ 繭 畷 捕 さら きて いママヒ命奇麟鋼は で 可輛 可 赫

    器 聯濯 1畷―

    ・ ]弔m― ・ 。ヽR命 謙辮呵、、● 命ヽT齢 命飾命

    “言缶 ITお m¨ 酬 ゛

    哺円 釘引 奇n薇 弱 命舗 創漏 ¬ 話 針 爾論 |

    , | ‖ fヨ FTTて ,. 0 ●て舅Ⅵ●喩ホ同 ゛椰乖狛■0さ 0資 ●●●l fttRttЧ

    ―ポφN→ 匈 TヽR赫

    薇赫

    …・

    … …

    命ЧマЧIo Ч・飾 m tt m.“ I Ч qЧ ●さ鎌 希赫 m嚇 赫 |

    r qffiqqr fu'qr€-r + fttqrd trtirn sitc trq{arrrrrron d am q6 \'s ff ff(Special purpose vehicle)6r rTdr +fl nc'{-qr( {rserrnsr?DI{ \ro et+q fu6r€crtu6-{,r (REGIONALDEVELOPMENTAUTHORITY) orrc+otff r qa +ffq h-orff

    4

    η レ

  • 赫 哺 賊 命命令衛)―儲

    "1可鋪 裔赫 |

    crE-fiYvr drrrl ol Rror*fr orftFnur 6tr[ |

    . rrwt srnrq d s-ffir n 6tsraff6rs \d qffergr furqerq\fua ftri qr$,i r

    ¬Ч"0[ua平

    キ寺減 ●嚇 お う6700■綸 繭 Fpa面

    1面 鋪 画 n調 画 ゛ 3rORTさ|

    糀 繋「

    赫萌

    赫 簿― ・ ・

    画 1

    ■ 針■3● oЧ !雨 T,さ 1輛 取 命鋪 ぃ雨 図 お ■

    さ|

    qlЧ|ヽ」 繭 . ctJqrfio) d ffi Eqr azrten fu

    qrt ff r・ 彙漏 m含 跡 碕 含奇 命輛

    Ч爛 平 編"ゃ

    ぃ 油 歯 `口 |

    さ1弱金Чも¶。.寺 調 n●"Ч

    I爺 諭 硼 薗 囀 さ|Wtt u」 ●円

    "蒻|

    +*qqffi, orFd.ftrdro-n€rlTq. c-{Yq ftaqq qrs6, crfr t{q)

    crfr fiM)

  • τ

     

    . 

    ¨

    ¨ 

     

    . 

    一 

     

    . 

     

    一 

     

    一 

    一一

    一一

    . 

    一二泰

    一 

    ・一

    &嘉‐=| ′fl`21′ フJ―‐|=11:, ' ぎち;` 11ヽ′1 )i ;'r li.r =f:'a;rX$.ar', a..-\

    _ T [tr.'\\ TiT.41

  • θ4

    一一 一

    0L

    )。ど百d

  • ハ締姻 ん 1品 1″?Hイ)てむミ Ro″ rr‐■

    $tr.rn

    〕 i41V

    シミンヽ“

    l簡 ぃヽ、、■

    t瀧‐轟

  • ?lot',1 d I

  • c,く ,― aql●

    ~フЧJ

    夕ο

    ,Od′

    _1∠け2d纂ら二_

    名へ ε

    ″ ・―ρ ρpttf

  • 耐―

    ぜ≦ゴ:こ=:」6______

    ゅ ノ /マ

  • -17 OJttk Bhaskar cPapor Ralashm l anabl Hayar● l Madhya pradosh l」harkhand i Chlt Soarh

    mqfol{rcfrc / *.q ffi 7 srql-233 7 R'{i.n:- fi/oz/2017

    …Ⅲ 衡 れ 命 わ

    ・竃 命 m鋼 円¬国

    1.覇 劇‖ドЧ載 つ て f満 uloIさ 稀 青網 R尋―■覆 蓼 嘲 円。椰 謙 GⅨ:締琴 寺 R瓢 晰奇青繭 麟 油 爾 舗 瀾 鮨町 ul■ |爾 蔽 1き 頭 隷 ¬耐 臨 耐 千 硼 ¬ 赫 面 響 油 奇 Ⅲ 金 ヾ

    戸 だ れ Ч輛 :q― 日 く:W ЧttЧ ∩齢 阿 w蒻 籐 1可¶

    2や輛曲I棗雲即柵町」鼎 輌甲鰤"υ

    su哺ヤも輛赫 諭―

    辮 鷺 1謂閻鷲ゝ顆 鯰 黒. 襦 駅

    聴葺獅

    “汗

    Pl~lTさ |

    8聰層:塩鳩凛斌論Ⅶ命8M鰊 爛畑 、 刊 、.爺 口m晰 彎 、

    l翼 篭 ぎЧ5`Ⅵ鰤 Husu_4-Tl.」 ゛町fヤ5油 瓢 耐

    171輔■― ―輌 蒻 輛 ,。爾 蒻 `拳鋼 襴 `撤 甲

    18),l‖ ЧЧ:qq誦

    ,豪ヾ日 誦

    `師 可命31e:― 可奇 晰 誨 命 耶 調 ゛ wttNI可ヽ

    '烈

    T司爾 き鮨 き

    織 姻 瀾輔 (".)'面 漏 電凛 齢満 /ゴ猥諫ゎan耳 /、事lq yヽlq市マ珀暉き さ 1民田 繭 青f謝竜同 釧哺阿/tョ lq

    軍口押」1命 H● :マ‖諭 孵階金30簿調 命3TR鮮油 ― くlu劇 IJくIW‖,Ч R幸河‖uも。′可命請命en ttTマ国轟き| Mq qM

    vr.s.fi.q.. qrdl

    J

    http://@apr.btEskar.csn/detaiUl 14O82O/210461020&Omadtabs- 1/m- 1 G m1714017 hma€,al

    gal;t 1!t.ryl

  • ヽ一たヽ■上Fミ●∝ビ菫Rヽミ一一o2“

    甕,,

    〓2

    、多

    ■■モ

    ピ‘

    ●E

    こ一

    こ^

    ●ヽ■0

    ,一■■02■

    き0〕

    一∝

    X一0一ヽ

    さ贄0

    つoE

    贅ヽ

    ‘う

    い0⊆aEOこ●

    t●ξ

    ρ

    P季

    〓^

    oヽ

    Rら

    卜8●

    ¨

    FO

    ヽ0こ1

    70

    ニー

    ●●

    ,X

    ●〓菫で

    38

    ■1

    ξ

    ,整

    ‥f

    F‥

    c8

    一3

    嘗菫

    ●■

    〓E

    “8

    S■

    ■■

    δ

    >■

    一お

    ´3

    88

    ‘あ『る

    0メ■■〓

    毀ピe06

    0EFE8

    摯2一 一ユこう0 、2R浮一 一■X3 』p

    ,■ヽきヽ三 コス

    , P”〓 2h二〇

    さもう

    一〇0」

    ,bOあ■

    ,8一ジ^ニエOC

    こ̈蜃沢)4■●■0●■口Lこ

    〓5

    L〓

    ξ

    OLLO

    燿̈)εO〓●●0

    」0

    ,Cつ

    じεFf

    r・‥E‥‥工膵露,)

    ・・・・・・・・重

    c手

    fE■■

    ,一,C

    ti

    ,こ

    ,‘ヽ

    ,V´ヽ■う

    ,lr

    ,a

    t,gI〓うヽこS

    ・^)

    ■ 

     

     

     

     

    ヽ卜●

    ■〓〓モ

    ち,

    ,1

    一〓■●●●増ヽく

    ●二

    ■諄

    ■羹

    “■ロ

    一■〓

    8,

    さz宮

    雲ヨ

    菫督E

    彗塵面〓8≡

    ≦画面■38

    ●■●

    3́Ec

    ●6

    ■ヽ

    0属●E晏‘●■

    ,L03一,33月

    ヽと

    ‥IS「p重壼豆e貢)

    ,υ皇卜〓)一日E●●―ヨ■

    ,ヽ

    ■一〓〓ョ´∽ κ一●

    ,ε 一“o

    ,0

    It晨”E”2

    ●■2LO

    ■P

    ,Ӭ

    ■一ヨH3

    1F

    31

    ξ

    〓〓

    日‥

    ―一ョ■

    ,富〓0●F8●嗜“〓〓●ヨメ●一●“

    〓fBE●

    ■1甍晏0むEEL

    一彗

    ヌ薔

    一8

    一F

    0̈,

    ”●  一o、“0つ菫Ь〓o〓)〓o

    0̈●OE』〓一

    〇1●

     

    ●,

    P電うミF一18

    ち〓

    ち”

    ^五

    :員

    じ〓¨ヽ

    ,おS一

    0饉

    自■

    ●,

    ●0

    こ̈冒5E●

    ,〓0工

    富́●ヌ

    ●̈ヨ^,

    さu■P■B

    ●●

    〓一〓

    一●工三

    ●ごヨ●●¨な0●

    ,΅

    0,´4一C●

    ・む

    目“の̈く属僣「】「日の場「目o

    一■●こ目o当】壺0≧゛暉

    ”壱目H

    ぽ轟輝∫

    ,お●

    OL●〓「

    ,)三

    ‘E

    ●■一2●

    〓5

    一●〓

    ョ鋼■

    「ヨ“B〓

    ,,

    ■三ラロ

    ■●

    ●0も‘0菫一B

    ,o●

    コ場

    ●〓Я●も

    ,●2理一ターョ0■ヨユ

    ,EII片ιヽ9

    4手

    ■FI

    ,“●一

    寮●●ごロ

    留ヽ8

    〓●■

    ,ョ●8ち〓ヨロgヽお

    興●B署●

    させI

    一●■●」

    8a

    Fョ

    ”●●●8一

    ,憑

    “凛

    一ョ〓b〓■ご●3も‘ど■●Bヽ

    ●ヽ

    ■■ヨ8

    一3ヨ■一8

    ,0■¨

    ,FI‘、11

    ら,

    ´、警8

    スコ

    曽,

    t■い霧一t

    ‘蘇西‘

    〓息言うちo■ヨ綺〓ヨロ■■

    ,――11

    ・〓ヨヨinり

    ,a

    ::

    ‘雇

    8一2

    一o

    ■督

    ョ∞

    ,こ

    一と

    こF●

    曽蜃

    3ミ

    薔ミ■り一四饉〓

    熙】〓ロ

    日■■日ョロヨHヨロ「ヨ

    一l

    2に

    お,

    謹の』綱≧〕o】o】①弓①』

    の目L蜜F

    、”目〓コ6o下弓に、『目●「L

    卜一〇

    N ”一>に

    >く0

    一く

    一工

    JU

    く卜0

    〓X8二

    ,■〓■6

    L02

    .●●2月υ■一●コ●Ce00

    c〓̈“二●ヽL●コ

    ゞ,コ匡

    ■3

    ●”●C

    EE

    一■

    (E●つく”X‘卜Ш〓002)

    卜一0一ヽ

    ∞一R

    一〇3う

    一‘〓ス』箋02

    ご5

    9〓0

    ¨〓一コ●CCo●

    ・Cet●〓●

    』コさ●ヨ

    0●

    0■

    00

    ”一

    一2

    っ0〓

    0■

    QS

    oS

    一〓≒0

    〓X8二

    一■■■6一

    ■62

    .螢要ピ

    一0

    一〓一コ●CC00

    ど●生●‘●

    .ぉ0こ

    6o●”o62

    ●8

    cΦ‘

    ε9■8I08〓

    00 C“0 のCO一〓OC00 0こ“ ““ヒ0一 ‘〓≧ら一C〇一” コヨ●00

    0‘■

    ,螢8

    卜̈●〕ぉ0啜ド 〓d

    8^一o

    一一●

    卜菫胃瀾8NN

    ‘ 』●OCp 』0 一,0ご

     も 

    ,”■

    一い■ 0‘ト 

    コヨa●

    ●〓いOC卜

     

    ●■

     

    CO

     

    一コ

    ≧¨ 

    Oa

     

    曽只ぢ颯ご

    g0

    0こ“ 

    OE

    一o一 

    一0 

    一●

    一 

    0‘ト 

    一〓

    り 

    0〓

    ¥RF ヨ

    ,〓

    α

    ど“シ●‘● 

    』ョε〓

     

    c一

    ξ

    ●ヨ

    Ъ

    0薔

    BE

    ●贅菫

    卜¨0●■〓Ч●●

    ¨■●e

    ,口                      

    ‐‐

    〓ヽ

    〓P尋〓

    マスこg*●■と

    ,”B●一●■

    ●F【

    ⊇セ

    「おョ

    〓を

    負)

    コつこ

    ,ヽ

    コ一E虫〕

    ,F (3●τpじ

    一●ヨ

    FうFセ2

    ,ご

    菫80こ●γ

    0,

         

         

         

    0こ“

    ゛〓彎贅]

    ■■

    ‘■

    ■ 

     

     

     

     

     

     

     

    一晏毒

    〓8

    ´ 

     

     

     

     

    一 

     

     

     

     

     

     

     

     

     

     

     

    oi

    ご‥

    FE

    な●I

    菫‘

    ,≧

    }■■ト

    デコ●

    ●̈■●●

    P,aIEコ一

    J●■o

    ■̈〓晏■●RIPヨ″■

    ,8」

    b一●

    ■̈,

    P^2螢ゝ

    熱T2I

    .3魚卜

    ■ヽ,

    コ0だの

    ÖE■こ0ヽ■●●L〓螢メF>

    ,コ“0

    2̈E■こ

    1,

     

     

     

     

     

     

     

     

     

     

     

    こe

    ⊆壺

    ●■E

    五壕

    ξ

    9■

    だ8

    ●e

    ヽ1

    “至

    〓■O

    rE層

     ̈0こ

    o●も

    ,■ュ

    Of

    0う1

    0ヽ

    te

    61

    ●E

    E8

    ゞ静

    〓3

    J8

    E富

    〓R〓

    ●̈8

    QC

    一,,

    〓ヽ¥∽ ‘∽

    oあ る●、F

    >饉書0

    〓こさ

    ●8

    8ヽ

    ●8

    一1一

    BEも一s

    Fヽ2

    ,ヽ■

    ,3つ」「おこ00

  • Ч■llur I17

    鰤 籠 ftt ЧlqIき ヽ 引抽 |‖ _… 却 1`|[li¨ 令̈ 摘 薇

    為 習

    f赫 ∞Юa細7翁 闘 N鋼 嚇 可赫 可 wFT翻 取 輛

    赫 計゙市出1鳥

    Tl円 iF711● d 、、、■111■

    ―ヽ]、「ll.|

    期 Чヽ●

    り|‖ ЧЧlq。 _ぞ11■ 1……

    qn.rqfdq ,..1q qand qqrra sftffr t"[c ffi-fi qrff

    TRPr嘱

    ,輌綸 踊 硼=麻

    F:'■ 日 咆面 lrilil幸 ゛、 黒駅 a画 倉柿 03032017■)Rくれ I=41哺 ごlh“ 猜 ηふ 昴:噂日 、凛 li取 鎌 i41● ,さ |:

    o.rqtdq qrq tqrco .........-r..,.,.s_......... .. c-qr{d sRfr e_ac fudr crd

    す。

    i

    職 神 二、キ

  • 赫 朝 |‖ 輛q-drqd Hftfr +6e fumr crff

    Ч‖lUI可可

    赫 輛 朝ldlさ fお=¬「

    aり |‖ Ч.l劇0「イム1■ it三二̈ 命̈→た可鷲W31M鮨怖 o3032“ 7諭 闘 Fゴ OM濡 ポ 融 可 ЧI■ ●劇1孤 輛・Iqlさ | ダ

    ′‐1

    ッ ‖ 爺 澪 輛 可衡 可

    りI‖ Ч●I● 0 ■=1__■ …… りl‖

    赫 州 τ繭 …轟 ビ

    … ・輛 爾 減 師 輔

    Ч‖:u:ロ

    赫 舗 輛 諭 甜 州 赫 …豊 薫 :冷 摘 朧

    w ttf称万o3032017諭 熊 ■I藤 命鋪 師 ポ 謙 可 ЧI■ ■劇I訳 帥・lЧ Iさ |

    ...tilT:!:七 111〔:キョ「ヽッl‖ 0同可テ可含■‐喪千≒oFf● (■■て

    ,l‖ 輛 …・

    l li'1子 (・:計

    )

    |⊃ノ多易フ

    1ヽく Ч司

  • JPMIA EC Compliance letter.pdfJPMIAECComplianceDec2019EC_Compliance Report_JPMIA_Mar_Oct_2019.pdfAnnexure-1_EC_MoEF&CCAnnexure-2_PH_MOMAnnexure-3_EC Advertisement1.pdf2