DEVELOPMENT APPLICATION NOT FOR … · Site Analysis Plan Proposed Site Plan Proposed Floor plan...

7
amendment date project issue Skydive the Beach and Beyond Sydney Drop Zone at Stuart Park 1304.051 DA 01 client scale drawn checked AR NC/ AR plot date 25/11/14 project no. drawing no. issue The contractor shall confirm on site existing dimensions and conditions before commencement of works. All discrepancies should be reported to the architect for instructions Designinggreenarchitecture does not accept responsibility for the dimensional accuracy of any data contained in CAD or other attachements as it may be based on third party origin information. All information should be verified in writing. drawing Cover Sheet Skydive the Beach and Beyond DEVELOPMENT APPLICATION DRAWING SCHEDULE No: DA 01 DA 02 DA 03 DA 04 DA 05 DA 06 DA 07 DA 08 DA 09 DA 10 DA 11 DA 12 DA 13 Drawing Name Cover Sheet Location Plan Site Analysis Plan Proposed Site Plan Proposed Floor plan Proposed Roof Plan North and South Elevation East and West Elevation Sections Shadow Diagram Signage Plan South 3D View North 3D View Rev D D D E E D D D C B C B B Adjustable Bath Bulkhead Bitumen Basin Brickwork Carpet Cement Render Ceramic Tiles Check On Site Chrome Plated Cistern (concealed) Concrete Blockwork Colour backed glass Concrete Column Control Joint Cupboard Damp Proof Course Dishwasher Downpipe Drawer Existing Ceiling Level Existing Floor Level Existing Ground Line Existing Reused Expansion Joint Face Brickwork Fibre Cement Finished Ceiling Level Finished Floor Level Finished Ground Level Finished Structural Level Fire Hose Reel Fire Hydrant Fixed Glazing Floor Waste Granolithic Hardwood Hot Plate Hot Water Unit Laminate Finish Louvre Main Switchboard Med. Density Fibreboard Metal Roofing ms m mx mr mt opgl ov pbd pconc ply rwh RL ref s sc sp sh shr sr sk sl ss st stpv stsl tc trt trz td tf tv trh tph tr trgl ur vm vl vj wr wc wrc wb wpm Mild Steel Mirror Mixer Moisture Resistant Mosaic Tile Opaque Glazing Oven Plasterboard Polished Concrete Plywood Rainwater Head Reduced Level Refrigerator Sink Satin Chrome Set Plaster Shadow Line Shower Shower Rose Skirting Skylight Stainless Steel Stone Stone Paving Stone Slab Terracotta Terracotta Roof Tiles Terrazzo Timber Decking Timber Strip Floor Timber Veneer (MDF) Toilet Roll Holder Toilet Paper Holder Towel Rail Translucent Glass Urinal Vermiculite Vinyl V-Joint Wardrobe Water Closet Waterproofing Membrane Weatherboard Western Red Cedar a b bkhd bit bsn bwk cpt cr ct cos cp cst cblk cbg conc cl cj cbd dpc dw dp dr ECL EFL EGL exr ej Fbwk fc FCL FFL FGL SRL fhr fh fg fw grano hwd hp hwu lam lv msb mdf mrf Legend: DEVELOPMENT APPLICATION NOT FOR CONSTRUCTION New tree / landscaping as specified Existing trees to be retained New Footpath New Gravel Path Bin travel path to waste collection point Shade Sail Metal Roofing New walls, roof and ceiling structure Concrete slab and footing to engineers detail Joinery item to further detail Existing building to be demolished New 230 cavity brick walls New timber framed walling (sound insulation) New 150 precast concrete walls NOTES - Refer to figured dimension only, do not scale - Verify dimensions on site, where appropriate - Refer to any discrepancies to architect before proceeding - This architectural set is to be read in conjunction with; Site Contour Survey SITE DATA Leased Land Area = 461m 2 Proposed Gross Floor Area (GFA) = 400m 2 Proposed Deck Area (GFA) = 66m 2 Preliminary Issue A 16/12/13 D Preliminary Issue B 19/12/13 Development Application C 29/01/14 Amended DA D 26/11/14 Attachment 8 - Plans

Transcript of DEVELOPMENT APPLICATION NOT FOR … · Site Analysis Plan Proposed Site Plan Proposed Floor plan...

amendment date

project

issue

Skydive the Beach and Beyond SydneyDrop Zone at Stuart Park 1304.051 DA 01

client scale drawn checked

AR NC/ ARplot date

25/11/14project no. drawing no. issue

The contractor shall confirm on site existing dimensions and conditions beforecommencement of works. All discrepancies should be reported to the architect forinstructions

Designinggreenarchitecture does not accept responsibility for the dimensionalaccuracy of any data contained in CAD or other attachements as it may be based onthird party origin information. All information should be verified in writing.

drawing

Cover SheetSkydive the Beach and Beyond

DEVELOPMENT APPLICATION DRAWING SCHEDULE

No:DA 01

DA 02

DA 03

DA 04

DA 05

DA 06

DA 07

DA 08

DA 09

DA 10

DA 11

DA 12

DA 13

Drawing NameCover Sheet

Location Plan

Site Analysis Plan

Proposed Site Plan

Proposed Floor plan

Proposed Roof Plan

North and South Elevation

East and West Elevation

Sections

Shadow Diagram

Signage Plan

South 3D View

North 3D View

Rev

D

D

D

E

E

D

D

D

C

B

C

B

B

AdjustableBathBulkheadBitumenBasinBrickworkCarpetCement RenderCeramic TilesCheck On SiteChrome PlatedCistern (concealed)Concrete BlockworkColour backed glassConcreteColumnControl JointCupboardDamp Proof CourseDishwasherDownpipeDrawerExisting Ceiling LevelExisting Floor LevelExisting Ground LineExisting ReusedExpansion JointFace BrickworkFibre CementFinished Ceiling LevelFinished Floor LevelFinished Ground LevelFinished Structural LevelFire Hose ReelFire HydrantFixed GlazingFloor WasteGranolithicHardwoodHot PlateHot Water UnitLaminate FinishLouvreMain SwitchboardMed. Density FibreboardMetal Roofing

msmmxmrmtopglovpbdpconcplyrwhRLrefsscspshshrsrskslssststpvstsltctrttrztdtftvtrhtphtrtrglurvmvlvjwrwcwrcwbwpm

Mild SteelMirrorMixerMoisture ResistantMosaic TileOpaque GlazingOvenPlasterboardPolished ConcretePlywoodRainwater HeadReduced LevelRefrigeratorSinkSatin ChromeSet PlasterShadow LineShowerShower RoseSkirtingSkylightStainless SteelStoneStone PavingStone SlabTerracottaTerracotta Roof TilesTerrazzoTimber DeckingTimber Strip FloorTimber Veneer (MDF)Toilet Roll HolderToilet Paper HolderTowel RailTranslucent GlassUrinalVermiculiteVinylV-JointWardrobeWater ClosetWaterproofing MembraneWeatherboardWestern Red Cedar

abbkhdbitbsnbwkcptcrctcoscpcstcblkcbgconcclcjcbddpcdwdpdrECLEFLEGLexrejFbwkfcFCLFFLFGLSRLfhrfhfgfwgranohwdhphwulamlvmsbmdfmrf

Legend:

DEVELOPMENT APPLICATIONNOT FOR CONSTRUCTION

New tree / landscaping as specified

Existing trees to be retained

New Footpath New Gravel Path

Bin travel path to waste collection point

Existing building to be demolished

Shade Sail

Metal Roofing

New walls, roof and ceiling structure

Concrete slab and footing to engineers detail

Joinery item to further detail

Existing building to be demolished

New 230 cavity brick walls

New timber framed walling (sound insulation)

New 150 precast concrete walls

NOTES

- Refer to figured dimension only, do not scale- Verify dimensions on site, where appropriate- Refer to any discrepancies to architect before proceeding- This architectural set is to be read in conjunction with; Site Contour Survey

SITE DATA

Leased Land Area = 461m2

Proposed Gross Floor Area (GFA) = 400m2

Proposed Deck Area (GFA) = 66m2

Preliminary IssueA 16/12/13

D

Preliminary IssueB 19/12/13

Development ApplicationC 29/01/14

Amended DAD 26/11/14

Attachment 8 - Plans

Landscape

Hydraulic

Survey

-

-

The contractor shall confirm on site existing dimensions andconditions before commencement of works. All discrepancies shouldbe reported to the architect for instructionsDesigninggreenarchitecture does not accept responsibility for thedimensional accuracy of any data contained in CAD or otherattachements as it may be based on third party origin information. Allinformation should be verified in writing.

This drawing has been prepared in conjunctionwith the following drawings:

drawing

scale drawn checked

project no. issue

amendment date

project

issue

Skydive the Beach and Beyond SydneyDrop Zone at Stuart Park

Location Plan

1304.051

AR AR

DA 02

plot date

25/11/14

A

drawing no.

North Wollongongclient

JRK Survey, Dr.No. 13-096 P1

Skydive the Beach and Beyond

DEVELOPMENT APPLICATIONNOT FOR CONSTRUCTION

N

Preliminary IssueA 16/12/13Preliminary IssueB 19/12/13

D

Development Application IssueC 29/01/14

01 Location Plan

1

View 1

Amended LocationD 26/11/14

N

drawing

scale drawn checked

project no. issue

amendment date

Landscape

Hydraulic

Survey

-

-

JRK Survey, Dr.No. 13-096 P1

The contractor shall confirm on site existing dimensions andconditions before commencement of works. All discrepancies shouldbe reported to the architect for instructionsDesigninggreenarchitecture does not accept responsibility for thedimensional accuracy of any data contained in CAD or otherattachements as it may be based on third party origin information. Allinformation should be verified in writing.

This drawing has been prepared in conjunctionwith the following drawings:

project

issue

Skydive the Beach and Beyond SydneyDrop Zone at Stuart Park

Site Analysis Plan

1304.051

AR AR

DA 03

plot date

25/11/14

A

drawing no.

North Wollongong

Skydive the Beach and Beyondclient

STUART PARKSKYDIVERS

LANDING ZONE

DECK

BINLOC.

EXISTING CAR PARK

5

4.84.8

4.8

5

4.6

4.6

4.4

4.4

4.2

4.2

4

4

3.8

3.8

3.6

3.6

3.4

3.4

3.2

3

3

N

Wint

er S

un

Path

Sum

mer

Sun

Path

2- WAY TRAFFIC

FALL

OF LA

ND

Temperate

South-Easterly

Breeze

Summ

er

Cooling

CUSTOMERPICK UP & DROP OFF

NEW

FO

OTP

ATH

BUS ZONE

Winter SunPath

Summ

er Sun

Path

Tem

pera

te

North

-Eas

terly

Bree

ze

Win

ter

Col

dSou

ther

lyBre

eze

EXISTINGDROP-ZONEBUILDING

EXISTINGCOUNCIL WORKERSEQUIPMENT SHED

20 25 metres0 5 10 15

DEVELOPMENT APPLICATIONNOT FOR CONSTRUCTION

AdjustableBathBulkheadBitumenBasinBrickworkCarpetCement RenderCeramic TilesCheck On SiteChrome PlatedCistern (concealed)Concrete BlockworkColour backed glassConcreteColumnControl JointCupboardDamp Proof CourseDishwasherDownpipeDrawerExisting Ceiling LevelExisting Floor LevelExisting Ground LineExisting ReusedExpansion JointFace BrickworkFibre CementFinished Ceiling LevelFinished Floor LevelFinished Ground LevelFinished Structural LevelFire Hose ReelFire HydrantFixed GlazingFloor WasteGranolithicHardwoodHot PlateHot Water UnitLaminate FinishLouvreMain SwitchboardMed. Density FibreboardMetal Roofing

msmmxmrmtopglovpbdpconcplyrwhRLrefsscspshshrsrskslssststpvstsltctrttrztdtftvtrhtphtrtrglurvmvlvjwrwcwrcwbwpm

Mild SteelMirrorMixerMoisture ResistantMosaic TileOpaque GlazingOvenPlasterboardPolished ConcretePlywoodRainwater HeadReduced LevelRefrigeratorSinkSatin ChromeSet PlasterShadow LineShowerShower RoseSkirtingSkylightStainless SteelStoneStone PavingStone SlabTerracottaTerracotta Roof TilesTerrazzoTimber DeckingTimber Strip FloorTimber Veneer (MDF)Toilet Roll HolderToilet Paper HolderTowel RailTranslucent GlassUrinalVermiculiteVinylV-JointWardrobeWater ClosetWaterproofing MembraneWeatherboardWestern Red Cedar

abbkhdbitbsnbwkcptcrctcoscpcstcblkcbgconcclcjcbddpcdwdpdrECLEFLEGLexrejFbwkfcFCLFFLFGLSRLfhrfhfgfwgranohwdhphwulamlvmsbmdfmrf

New tree / landscaping as specified

Existing trees to be retained

Existing building to be demolished

scale 1:500 @ A2

1:500 @ A2

01 Site Analysis Plan

Preliminary IssueA 16/12/13Preliminary IssueB 19/12/13

D

Development Application IssueC 29/01/14

Legend:

Amended LocationD 26/11/14

N

drawing

scale drawn checked

project no. issue

amendment date

Landscape

Hydraulic

Survey

-

-

JRK Survey, Dr.No. 13-096 P1

The contractor shall confirm on site existing dimensions andconditions before commencement of works. All discrepancies shouldbe reported to the architect for instructionsDesigninggreenarchitecture does not accept responsibility for thedimensional accuracy of any data contained in CAD or otherattachements as it may be based on third party origin information. Allinformation should be verified in writing.

This drawing has been prepared in conjunctionwith the following drawings:

project

issue

Skydive the Beach and Beyond SydneyDrop Zone at Stuart Park

Proposed Roof Plan

1304.051

AR AR

DA 06

plot date

25/11/14

A

drawing no.

North Wollongong

Skydive the Beach and Beyondclient

metres0 1 2 3 4 5

DEVELOPMENT APPLICATIONNOT FOR CONSTRUCTION

AdjustableBathBulkheadBitumenBasinBrickworkCarpetCement RenderCeramic TilesCheck On SiteChrome PlatedCistern (concealed)Concrete BlockworkColour backed glassConcreteColumnControl JointCupboardDamp Proof CourseDishwasherDownpipeDrawerExisting Ceiling LevelExisting Floor LevelExisting Ground LineExisting ReusedExpansion JointFace BrickworkFibre CementFinished Ceiling LevelFinished Floor LevelFinished Ground LevelFinished Structural LevelFire Hose ReelFire HydrantFixed GlazingFloor WasteGranolithicHardwoodHot PlateHot Water UnitLaminate FinishLouvreMain SwitchboardMed. Density FibreboardMetal Roofing

msmmxmrmtopglovpbdpconcplyrwhRLrefsscspshshrsrskslssststpvstsltctrttrztdtftvtrhtphtrtrglurvmvlvjwrwcwrcwbwpm

Mild SteelMirrorMixerMoisture ResistantMosaic TileOpaque GlazingOvenPlasterboardPolished ConcretePlywoodRainwater HeadReduced LevelRefrigeratorSinkSatin ChromeSet PlasterShadow LineShowerShower RoseSkirtingSkylightStainless SteelStoneStone PavingStone SlabTerracottaTerracotta Roof TilesTerrazzoTimber DeckingTimber Strip FloorTimber Veneer (MDF)Toilet Roll HolderToilet Paper HolderTowel RailTranslucent GlassUrinalVermiculiteVinylV-JointWardrobeWater ClosetWaterproofing MembraneWeatherboardWestern Red Cedar

abbkhdbitbsnbwkcptcrctcoscpcstcblkcbgconcclcjcbddpcdwdpdrECLEFLEGLexrejFbwkfcFCLFFLFGLSRLfhrfhfgfwgranohwdhphwulamlvmsbmdfmrf

500 15,150 3,000 Overhang

18,650

1,97

09,

150

1,90

0

13,0

20

14,330 550 270

9,65

04,

050

21,500

Shade sale toCustomer TrainingArea

Existing Council works admin buildingto be demolished shown red dotted

Existing public toilet building to bedemolished shown red dotted

STAFFENTRY

BINSTORAGE

AREA

NEW

FOO

TPA

TH

NEW

FO

OTP

ATH

A A

B B

CC

NEW FOOTPATHNEW FOOTPATH

W.tankW.tank

External wall belowshown dotted

Line of lower roof shown dotted

External wall belowshown dotted

Customer deck under

External wall belowshown dotted Entry Porch under shown dotted

Water tank under shown dotted

Existing palm tree to be retained

mrf3o fall

sl

sl

sl

sl sl

mrf3o fallsl

sl

sl

sl slsl

sl

sl

dp

dp

dp

dp dp

dp

mrf3o fall

mrf3o fall sl

mrf 10o fall

mrf 10o fall

Overhang

Ove

rhan

gO

verh

ang

Lower Roof

Low

er R

oof

Ramp

Shade Sail

Metal Roofing

scale 1:100 @ A2

1:100 @ A201 Proposed Roof Plan

Preliminary IssueA 16/12/13

Preliminary IssueB 19/12/13

D

Development Application IssueC 29/01/14

Amended Location and Floor PlanD 26/11/14

Landscape

Hydraulic

Survey

-

-

The contractor shall confirm on site existing dimensions andconditions before commencement of works. All discrepancies shouldbe reported to the architect for instructionsDesigninggreenarchitecture does not accept responsibility for thedimensional accuracy of any data contained in CAD or otherattachements as it may be based on third party origin information. Allinformation should be verified in writing.

This drawing has been prepared in conjunctionwith the following drawings:

drawing

scale drawn checked

project no. issue

amendment date

project

issue

Skydive the Beach and Beyond SydneyDrop Zone at Stuart Park

North and South Elevation

1304.051

AR AR

DA 07

plot date

25/11/14

A

drawing no.

North Wollongongclient

JRK Survey, Dr.No. 13-096 P1

Skydive the Beach and Beyond

metres0 1 2 3 4 5

DEVELOPMENT APPLICATIONNOT FOR CONSTRUCTION

AdjustableBathBulkheadBitumenBasinBrickworkCarpetCement RenderCeramic TilesCheck On SiteChrome PlatedCistern (concealed)Concrete BlockworkColour backed glassConcreteColumnControl JointCupboardDamp Proof CourseDishwasherDownpipeDrawerExisting Ceiling LevelExisting Floor LevelExisting Ground LineExisting ReusedExpansion JointFace BrickworkFibre CementFinished Ceiling LevelFinished Floor LevelFinished Ground LevelFinished Structural LevelFire Hose ReelFire HydrantFixed GlazingFloor WasteGranolithicHardwoodHot PlateHot Water UnitLaminate FinishLouvreMain SwitchboardMed. Density FibreboardMetal Roofing

msmmxmrmtopglovpbdpconcplyrwhRLrefsscspshshrsrskslssststpvstsltctrttrztdtftvtrhtphtrtrglurvmvlvjwrwcwrcwbwpm

Mild SteelMirrorMixerMoisture ResistantMosaic TileOpaque GlazingOvenPlasterboardPolished ConcretePlywoodRainwater HeadReduced LevelRefrigeratorSinkSatin ChromeSet PlasterShadow LineShowerShower RoseSkirtingSkylightStainless SteelStoneStone PavingStone SlabTerracottaTerracotta Roof TilesTerrazzoTimber DeckingTimber Strip FloorTimber Veneer (MDF)Toilet Roll HolderToilet Paper HolderTowel RailTranslucent GlassUrinalVermiculiteVinylV-JointWardrobeWater ClosetWaterproofing MembraneWeatherboardWestern Red Cedar

abbkhdbitbsnbwkcptcrctcoscpcstcblkcbgconcclcjcbddpcdwdpdrECLEFLEGLexrejFbwkfcFCLFFLFGLSRLfhrfhfgfwgranohwdhphwulamlvmsbmdfmrf

RL 10,098

RL 8,528RL 8,500

Fibre cement sheeting

Concrete precast panels

Signage Panel

Shade sail to Customer Training Area

STUART PARK

CUSTOMERTRAINING

fc

conc

dp

dp

fc

DECK

mrf

conc

ENTRY

fc

fcfc

+4,600Ground Floor

900 3,000 3,000 3,000 3,000 3,000 3,000 3,000

SKYDIVERSDROP ZONE

123456789

900 3,000 3,000 3,000 3,000 3,000 3,000 3,000

Signage Panel

Entry path ramps up in accordancewith AS 1428.1-2009

RL 10,098

RL 8,500

Fibre cement sheeting

Concrete precast panels

Highlight windows to reception manifest

Concrete precast panels

STUART PARKSKYDIVERSDROP ZONE

Ramp(1in14)

conc

dpdp

fc fc

fc

fc

BIN STORAGE AREA

+4,600Ground Floor

Two 4000L Rainwater TankAccess ramp to Unisex WCs in accordance with AS 1428.1-2009

987654321

3,000 3,000 3,000 3,000 3,000 3,000 3,000 900

scale 1:100 @ A2

1:100 @ A2

01 Proposed North Elevation

02 Proposed South Elevation

Preliminary IssueA 16/12/13

Preliminary IssueB 19/12/13

D

Development Application IssueC 29/01/14

Amended Location and ElevationD 26/11/14

Landscape

Hydraulic

Survey

-

-

The contractor shall confirm on site existing dimensions andconditions before commencement of works. All discrepancies shouldbe reported to the architect for instructionsDesigninggreenarchitecture does not accept responsibility for thedimensional accuracy of any data contained in CAD or otherattachements as it may be based on third party origin information. Allinformation should be verified in writing.

This drawing has been prepared in conjunctionwith the following drawings:

drawing

scale drawn checked

project no. issue

amendment date

project

issue

Skydive the Beach and Beyond SydneyDrop Zone at Stuart Park

East and West Elevation

1304.051

AR AR

DA 08

plot date

25/11/14

A

drawing no.

North Wollongongclient

JRK Survey, Dr.No. 13-096 P1

Skydive the Beach and Beyond

metres0 1 2 3 4 5

DEVELOPMENT APPLICATIONNOT FOR CONSTRUCTION

AdjustableBathBulkheadBitumenBasinBrickworkCarpetCement RenderCeramic TilesCheck On SiteChrome PlatedCistern (concealed)Concrete BlockworkColour backed glassConcreteColumnControl JointCupboardDamp Proof CourseDishwasherDownpipeDrawerExisting Ceiling LevelExisting Floor LevelExisting Ground LineExisting ReusedExpansion JointFace BrickworkFibre CementFinished Ceiling LevelFinished Floor LevelFinished Ground LevelFinished Structural LevelFire Hose ReelFire HydrantFixed GlazingFloor WasteGranolithicHardwoodHot PlateHot Water UnitLaminate FinishLouvreMain SwitchboardMed. Density FibreboardMetal Roofing

msmmxmrmtopglovpbdpconcplyrwhRLrefsscspshshrsrskslssststpvstsltctrttrztdtftvtrhtphtrtrglurvmvlvjwrwcwrcwbwpm

Mild SteelMirrorMixerMoisture ResistantMosaic TileOpaque GlazingOvenPlasterboardPolished ConcretePlywoodRainwater HeadReduced LevelRefrigeratorSinkSatin ChromeSet PlasterShadow LineShowerShower RoseSkirtingSkylightStainless SteelStoneStone PavingStone SlabTerracottaTerracotta Roof TilesTerrazzoTimber DeckingTimber Strip FloorTimber Veneer (MDF)Toilet Roll HolderToilet Paper HolderTowel RailTranslucent GlassUrinalVermiculiteVinylV-JointWardrobeWater ClosetWaterproofing MembraneWeatherboardWestern Red Cedar

abbkhdbitbsnbwkcptcrctcoscpcstcblkcbgconcclcjcbddpcdwdpdrECLEFLEGLexrejFbwkfcFCLFFLFGLSRLfhrfhfgfwgranohwdhphwulamlvmsbmdfmrf

RL 10,098

RL 8,534 RL8,500

RL 7,86310°

Fibre cement sheeting

Concrete precast panels

fc

fc

fc

dp

10°

dp

ENTRY

lllllllll

concconcconc

fc

fall

fall

+4,600Ground Floor

2000L Rainwater Tanks

Louvers to highlight window

4000L Rainwater Tanks

3,000 3,000 3,000 1,200 3,000 2,600 2,300 2,300 2,300

ABCDEFGHIJ

RL 10,098

RL 8,534RL 8,500

RL 7,863

10°

Fibre cement sheeting

Concrete precast panels

Folding door to Gear up & down storage

Shade sail to Customer Training Area

Bin Storage Area beyond

Signage Panel CUSTOMERDECK

CUSTOMERTRAININGSTAFF

ENTRY

conc

fcfc

ff

conc

conc conc

fc fall10o

fall

dp dp

dp

lllllllll

ENTRY

fc

+4,600Ground Floor

Servery window to coffee shop

2,300 2,300 2,300 2,600 3,000 1,200 3,000 3,000 3,000

JIHGFEDCBA

scale 1:100 @ A2

1:100 @ A2

01 Proposed West Elevation

02 Proposed East Elevation

Preliminary IssueA 16/12/13

Preliminary IssueB 19/12/13

D

Development Application IssueC 29/01/14

Amended Location and ElevationD 26/11/14

Landscape

Hydraulic

Survey

-

-

The contractor shall confirm on site existing dimensions andconditions before commencement of works. All discrepancies shouldbe reported to the architect for instructionsDesigninggreenarchitecture does not accept responsibility for thedimensional accuracy of any data contained in CAD or otherattachements as it may be based on third party origin information. Allinformation should be verified in writing.

This drawing has been prepared in conjunctionwith the following drawings:

drawing

scale drawn checked

project no. issue

amendment date

project

issue

Skydive the Beach and Beyond SydneyDrop Zone at Stuart Park

Sections

1304.051

AR AR

DA 09

plot date

25/11/14

A

drawing no.

North Wollongongclient

JRK Survey, Dr.No. 13-096 P1

Skydive the Beach and Beyond

AdjustableBathBulkheadBitumenBasinBrickworkCarpetCement RenderCeramic TilesCheck On SiteChrome PlatedCistern (concealed)Concrete BlockworkColour backed glassConcreteColumnControl JointCupboardDamp Proof CourseDishwasherDownpipeDrawerExisting Ceiling LevelExisting Floor LevelExisting Ground LineExisting ReusedExpansion JointFace BrickworkFibre CementFinished Ceiling LevelFinished Floor LevelFinished Ground LevelFinished Structural LevelFire Hose ReelFire HydrantFixed GlazingFloor WasteGranolithicHardwoodHot PlateHot Water UnitLaminate FinishLouvreMain SwitchboardMed. Density FibreboardMetal Roofing

msmmxmrmtopglovpbdpconcplyrwhRLrefsscspshshrsrskslssststpvstsltctrttrztdtftvtrhtphtrtrglurvmvlvjwrwcwrcwbwpm

Mild SteelMirrorMixerMoisture ResistantMosaic TileOpaque GlazingOvenPlasterboardPolished ConcretePlywoodRainwater HeadReduced LevelRefrigeratorSinkSatin ChromeSet PlasterShadow LineShowerShower RoseSkirtingSkylightStainless SteelStoneStone PavingStone SlabTerracottaTerracotta Roof TilesTerrazzoTimber DeckingTimber Strip FloorTimber Veneer (MDF)Toilet Roll HolderToilet Paper HolderTowel RailTranslucent GlassUrinalVermiculiteVinylV-JointWardrobeWater ClosetWaterproofing MembraneWeatherboardWestern Red Cedar

abbkhdbitbsnbwkcptcrctcoscpcstcblkcbgconcclcjcbddpcdwdpdrECLEFLEGLexrejFbwkfcFCLFFLFGLSRLfhrfhfgfwgranohwdhphwulamlvmsbmdfmrf

New timber framed walling (sound insulation)

New walls, roof and ceiling structure

Concrete slab and footing to engineers detail

Joinery item to further detail

RL 10,098

RL 8,500

900 3,000 3,000 3,000 3,000 3,000 3,000 3,000

2,65

0

Fibre cement sheeting

Concrete precast panels

Signage Panel 1700x1400mm

Shade sail to Customer Training Area

Steps to staff entry beyond

Timber handrail

Steel post for shade sale to engineers detail

Fibre cement board to fascia

Fibre cement board to eaves

Fibre cement board to fascia

Fibre cement board to eaves

STUART PARK

RECEPTION

CUSTOMERAREA

DECK

CUSTOMER TRAINING

fc

cl

1 2 3 4

cl

1 2+4,600

Ground Floor

2000L Rainwater Tank

123456789

Bulkhead over reception area

Joinery item to further detail

Concrete slab to structural engineers detail

Screw pile foundation to further structural engineers detail

Metal roofing 10o

Concrete deck

Concrete stair to deck

Open raked ceiling to customer area

SKYDIVERSDROP ZONE

conc

cr

pdb pdb pdb

pdbpdbpdb

mrf

conc

RL 4,000

Timber handrail

Fibre cement board to fascia

Fibre cement board to eaves

Fibre cement board to fascia

Fibre cement board to eaves

STUART PARKSKYDIVERSDROP ZONE

CUSTOMERDECK

fc

1234

fc

ENTRYMERCHANDISE SHOP+4,600

Ground Floor

Servery window to coffee shop

Concrete precast panels

Joinery item to further detail

Concrete slab to structural engineers detail

Screw pile foundation to furtherstructural engineers detail

Metal roofing at 10o fall

Concrete deck

Concrete stair to deck

Raked ceiling to customer area

COFFEESHOP

conc

RL 8,650

RL 10,098

RL 8,52310°

10°

Fibre cement sheeting

Fibre cement board to eaves

Fibre cement board to fascia

Fibre cement sheeting

STAFF /MEETING

MANAGEROFFICE

RECEPTION

CUSTOMERAREA

COFFEESHOP Ramp

(1in14)

BINSTORAGE AREA

dp

f f

lll l l ldp

fall

fall

ENTRY

fc

Ramp(1in14)

+4,600Ground Floor

Access ramp to Unisex WCs and BinStorage Area in accordance withAS 1428.1-2009

1.6m high timber screen to Bin Storage Area

SS-Handrail to access ramp inaccordance with AS 1428.1-2009

Two 4000L Rainwater Tank

Access ramp to Entry in accordancewith AS 1428.1-2009

ABCDEFGHIJ

3,000 3,000 3,000 1,200 3,000 2,600 2,300 2,300 2,300

Concrete precast panels

Joinery item to further detail

Concrete slab to structural engineers detail

Screw pile foundation to furtherstructural engineers detail

Metal roofing at 10o fall

Fibre cement board to fascia

Fibre cement board to eaves

Servery bi-fold window to coffee shop

Raked ceiling to customer area

Joinery item to further detail

Bulkhead over reception area

Louvers to highlight windows

Metal roofing at 3o fallSkylights

Metal roofing at 3o fall

STORAGE

pdb

Kitchenette

pdb

pdb

crcl cl

pdbpdb

1:100 @ A2

01 Section A

02 Section B

03 Section C

Preliminary IssueA 19/12/13

Development Application IssueB 29/01/14

C

Amended Location and SectionC 26/11/14

DEVELOPMENT APPLICATIONNOT FOR CONSTRUCTION

metres0 1 2 3 4 5

scale 1:100 @ A2