DEVELOPMENT APPLICATION NOT FOR … · Site Analysis Plan Proposed Site Plan Proposed Floor plan...
Transcript of DEVELOPMENT APPLICATION NOT FOR … · Site Analysis Plan Proposed Site Plan Proposed Floor plan...
amendment date
project
issue
Skydive the Beach and Beyond SydneyDrop Zone at Stuart Park 1304.051 DA 01
client scale drawn checked
AR NC/ ARplot date
25/11/14project no. drawing no. issue
The contractor shall confirm on site existing dimensions and conditions beforecommencement of works. All discrepancies should be reported to the architect forinstructions
Designinggreenarchitecture does not accept responsibility for the dimensionalaccuracy of any data contained in CAD or other attachements as it may be based onthird party origin information. All information should be verified in writing.
drawing
Cover SheetSkydive the Beach and Beyond
DEVELOPMENT APPLICATION DRAWING SCHEDULE
No:DA 01
DA 02
DA 03
DA 04
DA 05
DA 06
DA 07
DA 08
DA 09
DA 10
DA 11
DA 12
DA 13
Drawing NameCover Sheet
Location Plan
Site Analysis Plan
Proposed Site Plan
Proposed Floor plan
Proposed Roof Plan
North and South Elevation
East and West Elevation
Sections
Shadow Diagram
Signage Plan
South 3D View
North 3D View
Rev
D
D
D
E
E
D
D
D
C
B
C
B
B
AdjustableBathBulkheadBitumenBasinBrickworkCarpetCement RenderCeramic TilesCheck On SiteChrome PlatedCistern (concealed)Concrete BlockworkColour backed glassConcreteColumnControl JointCupboardDamp Proof CourseDishwasherDownpipeDrawerExisting Ceiling LevelExisting Floor LevelExisting Ground LineExisting ReusedExpansion JointFace BrickworkFibre CementFinished Ceiling LevelFinished Floor LevelFinished Ground LevelFinished Structural LevelFire Hose ReelFire HydrantFixed GlazingFloor WasteGranolithicHardwoodHot PlateHot Water UnitLaminate FinishLouvreMain SwitchboardMed. Density FibreboardMetal Roofing
msmmxmrmtopglovpbdpconcplyrwhRLrefsscspshshrsrskslssststpvstsltctrttrztdtftvtrhtphtrtrglurvmvlvjwrwcwrcwbwpm
Mild SteelMirrorMixerMoisture ResistantMosaic TileOpaque GlazingOvenPlasterboardPolished ConcretePlywoodRainwater HeadReduced LevelRefrigeratorSinkSatin ChromeSet PlasterShadow LineShowerShower RoseSkirtingSkylightStainless SteelStoneStone PavingStone SlabTerracottaTerracotta Roof TilesTerrazzoTimber DeckingTimber Strip FloorTimber Veneer (MDF)Toilet Roll HolderToilet Paper HolderTowel RailTranslucent GlassUrinalVermiculiteVinylV-JointWardrobeWater ClosetWaterproofing MembraneWeatherboardWestern Red Cedar
abbkhdbitbsnbwkcptcrctcoscpcstcblkcbgconcclcjcbddpcdwdpdrECLEFLEGLexrejFbwkfcFCLFFLFGLSRLfhrfhfgfwgranohwdhphwulamlvmsbmdfmrf
Legend:
DEVELOPMENT APPLICATIONNOT FOR CONSTRUCTION
New tree / landscaping as specified
Existing trees to be retained
New Footpath New Gravel Path
Bin travel path to waste collection point
Existing building to be demolished
Shade Sail
Metal Roofing
New walls, roof and ceiling structure
Concrete slab and footing to engineers detail
Joinery item to further detail
Existing building to be demolished
New 230 cavity brick walls
New timber framed walling (sound insulation)
New 150 precast concrete walls
NOTES
- Refer to figured dimension only, do not scale- Verify dimensions on site, where appropriate- Refer to any discrepancies to architect before proceeding- This architectural set is to be read in conjunction with; Site Contour Survey
SITE DATA
Leased Land Area = 461m2
Proposed Gross Floor Area (GFA) = 400m2
Proposed Deck Area (GFA) = 66m2
Preliminary IssueA 16/12/13
D
Preliminary IssueB 19/12/13
Development ApplicationC 29/01/14
Amended DAD 26/11/14
Attachment 8 - Plans
Landscape
Hydraulic
Survey
-
-
The contractor shall confirm on site existing dimensions andconditions before commencement of works. All discrepancies shouldbe reported to the architect for instructionsDesigninggreenarchitecture does not accept responsibility for thedimensional accuracy of any data contained in CAD or otherattachements as it may be based on third party origin information. Allinformation should be verified in writing.
This drawing has been prepared in conjunctionwith the following drawings:
drawing
scale drawn checked
project no. issue
amendment date
project
issue
Skydive the Beach and Beyond SydneyDrop Zone at Stuart Park
Location Plan
1304.051
AR AR
DA 02
plot date
25/11/14
A
drawing no.
North Wollongongclient
JRK Survey, Dr.No. 13-096 P1
Skydive the Beach and Beyond
DEVELOPMENT APPLICATIONNOT FOR CONSTRUCTION
N
Preliminary IssueA 16/12/13Preliminary IssueB 19/12/13
D
Development Application IssueC 29/01/14
01 Location Plan
1
View 1
Amended LocationD 26/11/14
N
drawing
scale drawn checked
project no. issue
amendment date
Landscape
Hydraulic
Survey
-
-
JRK Survey, Dr.No. 13-096 P1
The contractor shall confirm on site existing dimensions andconditions before commencement of works. All discrepancies shouldbe reported to the architect for instructionsDesigninggreenarchitecture does not accept responsibility for thedimensional accuracy of any data contained in CAD or otherattachements as it may be based on third party origin information. Allinformation should be verified in writing.
This drawing has been prepared in conjunctionwith the following drawings:
project
issue
Skydive the Beach and Beyond SydneyDrop Zone at Stuart Park
Site Analysis Plan
1304.051
AR AR
DA 03
plot date
25/11/14
A
drawing no.
North Wollongong
Skydive the Beach and Beyondclient
STUART PARKSKYDIVERS
LANDING ZONE
DECK
BINLOC.
EXISTING CAR PARK
5
4.84.8
4.8
5
4.6
4.6
4.4
4.4
4.2
4.2
4
4
3.8
3.8
3.6
3.6
3.4
3.4
3.2
3
3
N
Wint
er S
un
Path
Sum
mer
Sun
Path
2- WAY TRAFFIC
FALL
OF LA
ND
Temperate
South-Easterly
Breeze
Summ
er
Cooling
CUSTOMERPICK UP & DROP OFF
NEW
FO
OTP
ATH
BUS ZONE
Winter SunPath
Summ
er Sun
Path
Tem
pera
te
North
-Eas
terly
Bree
ze
Win
ter
Col
dSou
ther
lyBre
eze
EXISTINGDROP-ZONEBUILDING
EXISTINGCOUNCIL WORKERSEQUIPMENT SHED
20 25 metres0 5 10 15
DEVELOPMENT APPLICATIONNOT FOR CONSTRUCTION
AdjustableBathBulkheadBitumenBasinBrickworkCarpetCement RenderCeramic TilesCheck On SiteChrome PlatedCistern (concealed)Concrete BlockworkColour backed glassConcreteColumnControl JointCupboardDamp Proof CourseDishwasherDownpipeDrawerExisting Ceiling LevelExisting Floor LevelExisting Ground LineExisting ReusedExpansion JointFace BrickworkFibre CementFinished Ceiling LevelFinished Floor LevelFinished Ground LevelFinished Structural LevelFire Hose ReelFire HydrantFixed GlazingFloor WasteGranolithicHardwoodHot PlateHot Water UnitLaminate FinishLouvreMain SwitchboardMed. Density FibreboardMetal Roofing
msmmxmrmtopglovpbdpconcplyrwhRLrefsscspshshrsrskslssststpvstsltctrttrztdtftvtrhtphtrtrglurvmvlvjwrwcwrcwbwpm
Mild SteelMirrorMixerMoisture ResistantMosaic TileOpaque GlazingOvenPlasterboardPolished ConcretePlywoodRainwater HeadReduced LevelRefrigeratorSinkSatin ChromeSet PlasterShadow LineShowerShower RoseSkirtingSkylightStainless SteelStoneStone PavingStone SlabTerracottaTerracotta Roof TilesTerrazzoTimber DeckingTimber Strip FloorTimber Veneer (MDF)Toilet Roll HolderToilet Paper HolderTowel RailTranslucent GlassUrinalVermiculiteVinylV-JointWardrobeWater ClosetWaterproofing MembraneWeatherboardWestern Red Cedar
abbkhdbitbsnbwkcptcrctcoscpcstcblkcbgconcclcjcbddpcdwdpdrECLEFLEGLexrejFbwkfcFCLFFLFGLSRLfhrfhfgfwgranohwdhphwulamlvmsbmdfmrf
New tree / landscaping as specified
Existing trees to be retained
Existing building to be demolished
scale 1:500 @ A2
1:500 @ A2
01 Site Analysis Plan
Preliminary IssueA 16/12/13Preliminary IssueB 19/12/13
D
Development Application IssueC 29/01/14
Legend:
Amended LocationD 26/11/14
N
drawing
scale drawn checked
project no. issue
amendment date
Landscape
Hydraulic
Survey
-
-
JRK Survey, Dr.No. 13-096 P1
The contractor shall confirm on site existing dimensions andconditions before commencement of works. All discrepancies shouldbe reported to the architect for instructionsDesigninggreenarchitecture does not accept responsibility for thedimensional accuracy of any data contained in CAD or otherattachements as it may be based on third party origin information. Allinformation should be verified in writing.
This drawing has been prepared in conjunctionwith the following drawings:
project
issue
Skydive the Beach and Beyond SydneyDrop Zone at Stuart Park
Proposed Roof Plan
1304.051
AR AR
DA 06
plot date
25/11/14
A
drawing no.
North Wollongong
Skydive the Beach and Beyondclient
metres0 1 2 3 4 5
DEVELOPMENT APPLICATIONNOT FOR CONSTRUCTION
AdjustableBathBulkheadBitumenBasinBrickworkCarpetCement RenderCeramic TilesCheck On SiteChrome PlatedCistern (concealed)Concrete BlockworkColour backed glassConcreteColumnControl JointCupboardDamp Proof CourseDishwasherDownpipeDrawerExisting Ceiling LevelExisting Floor LevelExisting Ground LineExisting ReusedExpansion JointFace BrickworkFibre CementFinished Ceiling LevelFinished Floor LevelFinished Ground LevelFinished Structural LevelFire Hose ReelFire HydrantFixed GlazingFloor WasteGranolithicHardwoodHot PlateHot Water UnitLaminate FinishLouvreMain SwitchboardMed. Density FibreboardMetal Roofing
msmmxmrmtopglovpbdpconcplyrwhRLrefsscspshshrsrskslssststpvstsltctrttrztdtftvtrhtphtrtrglurvmvlvjwrwcwrcwbwpm
Mild SteelMirrorMixerMoisture ResistantMosaic TileOpaque GlazingOvenPlasterboardPolished ConcretePlywoodRainwater HeadReduced LevelRefrigeratorSinkSatin ChromeSet PlasterShadow LineShowerShower RoseSkirtingSkylightStainless SteelStoneStone PavingStone SlabTerracottaTerracotta Roof TilesTerrazzoTimber DeckingTimber Strip FloorTimber Veneer (MDF)Toilet Roll HolderToilet Paper HolderTowel RailTranslucent GlassUrinalVermiculiteVinylV-JointWardrobeWater ClosetWaterproofing MembraneWeatherboardWestern Red Cedar
abbkhdbitbsnbwkcptcrctcoscpcstcblkcbgconcclcjcbddpcdwdpdrECLEFLEGLexrejFbwkfcFCLFFLFGLSRLfhrfhfgfwgranohwdhphwulamlvmsbmdfmrf
500 15,150 3,000 Overhang
18,650
1,97
09,
150
1,90
0
13,0
20
14,330 550 270
9,65
04,
050
21,500
Shade sale toCustomer TrainingArea
Existing Council works admin buildingto be demolished shown red dotted
Existing public toilet building to bedemolished shown red dotted
STAFFENTRY
BINSTORAGE
AREA
NEW
FOO
TPA
TH
NEW
FO
OTP
ATH
A A
B B
CC
NEW FOOTPATHNEW FOOTPATH
W.tankW.tank
External wall belowshown dotted
Line of lower roof shown dotted
External wall belowshown dotted
Customer deck under
External wall belowshown dotted Entry Porch under shown dotted
Water tank under shown dotted
Existing palm tree to be retained
mrf3o fall
sl
sl
sl
sl sl
mrf3o fallsl
sl
sl
sl slsl
sl
sl
dp
dp
dp
dp dp
dp
mrf3o fall
mrf3o fall sl
mrf 10o fall
mrf 10o fall
Overhang
Ove
rhan
gO
verh
ang
Lower Roof
Low
er R
oof
Ramp
Shade Sail
Metal Roofing
scale 1:100 @ A2
1:100 @ A201 Proposed Roof Plan
Preliminary IssueA 16/12/13
Preliminary IssueB 19/12/13
D
Development Application IssueC 29/01/14
Amended Location and Floor PlanD 26/11/14
Landscape
Hydraulic
Survey
-
-
The contractor shall confirm on site existing dimensions andconditions before commencement of works. All discrepancies shouldbe reported to the architect for instructionsDesigninggreenarchitecture does not accept responsibility for thedimensional accuracy of any data contained in CAD or otherattachements as it may be based on third party origin information. Allinformation should be verified in writing.
This drawing has been prepared in conjunctionwith the following drawings:
drawing
scale drawn checked
project no. issue
amendment date
project
issue
Skydive the Beach and Beyond SydneyDrop Zone at Stuart Park
North and South Elevation
1304.051
AR AR
DA 07
plot date
25/11/14
A
drawing no.
North Wollongongclient
JRK Survey, Dr.No. 13-096 P1
Skydive the Beach and Beyond
metres0 1 2 3 4 5
DEVELOPMENT APPLICATIONNOT FOR CONSTRUCTION
AdjustableBathBulkheadBitumenBasinBrickworkCarpetCement RenderCeramic TilesCheck On SiteChrome PlatedCistern (concealed)Concrete BlockworkColour backed glassConcreteColumnControl JointCupboardDamp Proof CourseDishwasherDownpipeDrawerExisting Ceiling LevelExisting Floor LevelExisting Ground LineExisting ReusedExpansion JointFace BrickworkFibre CementFinished Ceiling LevelFinished Floor LevelFinished Ground LevelFinished Structural LevelFire Hose ReelFire HydrantFixed GlazingFloor WasteGranolithicHardwoodHot PlateHot Water UnitLaminate FinishLouvreMain SwitchboardMed. Density FibreboardMetal Roofing
msmmxmrmtopglovpbdpconcplyrwhRLrefsscspshshrsrskslssststpvstsltctrttrztdtftvtrhtphtrtrglurvmvlvjwrwcwrcwbwpm
Mild SteelMirrorMixerMoisture ResistantMosaic TileOpaque GlazingOvenPlasterboardPolished ConcretePlywoodRainwater HeadReduced LevelRefrigeratorSinkSatin ChromeSet PlasterShadow LineShowerShower RoseSkirtingSkylightStainless SteelStoneStone PavingStone SlabTerracottaTerracotta Roof TilesTerrazzoTimber DeckingTimber Strip FloorTimber Veneer (MDF)Toilet Roll HolderToilet Paper HolderTowel RailTranslucent GlassUrinalVermiculiteVinylV-JointWardrobeWater ClosetWaterproofing MembraneWeatherboardWestern Red Cedar
abbkhdbitbsnbwkcptcrctcoscpcstcblkcbgconcclcjcbddpcdwdpdrECLEFLEGLexrejFbwkfcFCLFFLFGLSRLfhrfhfgfwgranohwdhphwulamlvmsbmdfmrf
RL 10,098
RL 8,528RL 8,500
Fibre cement sheeting
Concrete precast panels
Signage Panel
Shade sail to Customer Training Area
STUART PARK
CUSTOMERTRAINING
fc
conc
dp
dp
fc
DECK
mrf
conc
ENTRY
fc
fcfc
+4,600Ground Floor
900 3,000 3,000 3,000 3,000 3,000 3,000 3,000
SKYDIVERSDROP ZONE
123456789
900 3,000 3,000 3,000 3,000 3,000 3,000 3,000
Signage Panel
Entry path ramps up in accordancewith AS 1428.1-2009
RL 10,098
RL 8,500
Fibre cement sheeting
Concrete precast panels
Highlight windows to reception manifest
Concrete precast panels
STUART PARKSKYDIVERSDROP ZONE
Ramp(1in14)
conc
dpdp
fc fc
fc
fc
BIN STORAGE AREA
+4,600Ground Floor
Two 4000L Rainwater TankAccess ramp to Unisex WCs in accordance with AS 1428.1-2009
987654321
3,000 3,000 3,000 3,000 3,000 3,000 3,000 900
scale 1:100 @ A2
1:100 @ A2
01 Proposed North Elevation
02 Proposed South Elevation
Preliminary IssueA 16/12/13
Preliminary IssueB 19/12/13
D
Development Application IssueC 29/01/14
Amended Location and ElevationD 26/11/14
Landscape
Hydraulic
Survey
-
-
The contractor shall confirm on site existing dimensions andconditions before commencement of works. All discrepancies shouldbe reported to the architect for instructionsDesigninggreenarchitecture does not accept responsibility for thedimensional accuracy of any data contained in CAD or otherattachements as it may be based on third party origin information. Allinformation should be verified in writing.
This drawing has been prepared in conjunctionwith the following drawings:
drawing
scale drawn checked
project no. issue
amendment date
project
issue
Skydive the Beach and Beyond SydneyDrop Zone at Stuart Park
East and West Elevation
1304.051
AR AR
DA 08
plot date
25/11/14
A
drawing no.
North Wollongongclient
JRK Survey, Dr.No. 13-096 P1
Skydive the Beach and Beyond
metres0 1 2 3 4 5
DEVELOPMENT APPLICATIONNOT FOR CONSTRUCTION
AdjustableBathBulkheadBitumenBasinBrickworkCarpetCement RenderCeramic TilesCheck On SiteChrome PlatedCistern (concealed)Concrete BlockworkColour backed glassConcreteColumnControl JointCupboardDamp Proof CourseDishwasherDownpipeDrawerExisting Ceiling LevelExisting Floor LevelExisting Ground LineExisting ReusedExpansion JointFace BrickworkFibre CementFinished Ceiling LevelFinished Floor LevelFinished Ground LevelFinished Structural LevelFire Hose ReelFire HydrantFixed GlazingFloor WasteGranolithicHardwoodHot PlateHot Water UnitLaminate FinishLouvreMain SwitchboardMed. Density FibreboardMetal Roofing
msmmxmrmtopglovpbdpconcplyrwhRLrefsscspshshrsrskslssststpvstsltctrttrztdtftvtrhtphtrtrglurvmvlvjwrwcwrcwbwpm
Mild SteelMirrorMixerMoisture ResistantMosaic TileOpaque GlazingOvenPlasterboardPolished ConcretePlywoodRainwater HeadReduced LevelRefrigeratorSinkSatin ChromeSet PlasterShadow LineShowerShower RoseSkirtingSkylightStainless SteelStoneStone PavingStone SlabTerracottaTerracotta Roof TilesTerrazzoTimber DeckingTimber Strip FloorTimber Veneer (MDF)Toilet Roll HolderToilet Paper HolderTowel RailTranslucent GlassUrinalVermiculiteVinylV-JointWardrobeWater ClosetWaterproofing MembraneWeatherboardWestern Red Cedar
abbkhdbitbsnbwkcptcrctcoscpcstcblkcbgconcclcjcbddpcdwdpdrECLEFLEGLexrejFbwkfcFCLFFLFGLSRLfhrfhfgfwgranohwdhphwulamlvmsbmdfmrf
RL 10,098
RL 8,534 RL8,500
RL 7,86310°
Fibre cement sheeting
Concrete precast panels
fc
fc
fc
dp
10°
dp
ENTRY
lllllllll
concconcconc
fc
fall
fall
+4,600Ground Floor
2000L Rainwater Tanks
Louvers to highlight window
4000L Rainwater Tanks
3,000 3,000 3,000 1,200 3,000 2,600 2,300 2,300 2,300
ABCDEFGHIJ
RL 10,098
RL 8,534RL 8,500
RL 7,863
10°
Fibre cement sheeting
Concrete precast panels
Folding door to Gear up & down storage
Shade sail to Customer Training Area
Bin Storage Area beyond
Signage Panel CUSTOMERDECK
CUSTOMERTRAININGSTAFF
ENTRY
conc
fcfc
ff
conc
conc conc
fc fall10o
fall
dp dp
dp
lllllllll
ENTRY
fc
+4,600Ground Floor
Servery window to coffee shop
2,300 2,300 2,300 2,600 3,000 1,200 3,000 3,000 3,000
JIHGFEDCBA
scale 1:100 @ A2
1:100 @ A2
01 Proposed West Elevation
02 Proposed East Elevation
Preliminary IssueA 16/12/13
Preliminary IssueB 19/12/13
D
Development Application IssueC 29/01/14
Amended Location and ElevationD 26/11/14
Landscape
Hydraulic
Survey
-
-
The contractor shall confirm on site existing dimensions andconditions before commencement of works. All discrepancies shouldbe reported to the architect for instructionsDesigninggreenarchitecture does not accept responsibility for thedimensional accuracy of any data contained in CAD or otherattachements as it may be based on third party origin information. Allinformation should be verified in writing.
This drawing has been prepared in conjunctionwith the following drawings:
drawing
scale drawn checked
project no. issue
amendment date
project
issue
Skydive the Beach and Beyond SydneyDrop Zone at Stuart Park
Sections
1304.051
AR AR
DA 09
plot date
25/11/14
A
drawing no.
North Wollongongclient
JRK Survey, Dr.No. 13-096 P1
Skydive the Beach and Beyond
AdjustableBathBulkheadBitumenBasinBrickworkCarpetCement RenderCeramic TilesCheck On SiteChrome PlatedCistern (concealed)Concrete BlockworkColour backed glassConcreteColumnControl JointCupboardDamp Proof CourseDishwasherDownpipeDrawerExisting Ceiling LevelExisting Floor LevelExisting Ground LineExisting ReusedExpansion JointFace BrickworkFibre CementFinished Ceiling LevelFinished Floor LevelFinished Ground LevelFinished Structural LevelFire Hose ReelFire HydrantFixed GlazingFloor WasteGranolithicHardwoodHot PlateHot Water UnitLaminate FinishLouvreMain SwitchboardMed. Density FibreboardMetal Roofing
msmmxmrmtopglovpbdpconcplyrwhRLrefsscspshshrsrskslssststpvstsltctrttrztdtftvtrhtphtrtrglurvmvlvjwrwcwrcwbwpm
Mild SteelMirrorMixerMoisture ResistantMosaic TileOpaque GlazingOvenPlasterboardPolished ConcretePlywoodRainwater HeadReduced LevelRefrigeratorSinkSatin ChromeSet PlasterShadow LineShowerShower RoseSkirtingSkylightStainless SteelStoneStone PavingStone SlabTerracottaTerracotta Roof TilesTerrazzoTimber DeckingTimber Strip FloorTimber Veneer (MDF)Toilet Roll HolderToilet Paper HolderTowel RailTranslucent GlassUrinalVermiculiteVinylV-JointWardrobeWater ClosetWaterproofing MembraneWeatherboardWestern Red Cedar
abbkhdbitbsnbwkcptcrctcoscpcstcblkcbgconcclcjcbddpcdwdpdrECLEFLEGLexrejFbwkfcFCLFFLFGLSRLfhrfhfgfwgranohwdhphwulamlvmsbmdfmrf
New timber framed walling (sound insulation)
New walls, roof and ceiling structure
Concrete slab and footing to engineers detail
Joinery item to further detail
RL 10,098
RL 8,500
900 3,000 3,000 3,000 3,000 3,000 3,000 3,000
2,65
0
Fibre cement sheeting
Concrete precast panels
Signage Panel 1700x1400mm
Shade sail to Customer Training Area
Steps to staff entry beyond
Timber handrail
Steel post for shade sale to engineers detail
Fibre cement board to fascia
Fibre cement board to eaves
Fibre cement board to fascia
Fibre cement board to eaves
STUART PARK
RECEPTION
CUSTOMERAREA
DECK
CUSTOMER TRAINING
fc
cl
1 2 3 4
cl
1 2+4,600
Ground Floor
2000L Rainwater Tank
123456789
Bulkhead over reception area
Joinery item to further detail
Concrete slab to structural engineers detail
Screw pile foundation to further structural engineers detail
Metal roofing 10o
Concrete deck
Concrete stair to deck
Open raked ceiling to customer area
SKYDIVERSDROP ZONE
conc
cr
pdb pdb pdb
pdbpdbpdb
mrf
conc
RL 4,000
Timber handrail
Fibre cement board to fascia
Fibre cement board to eaves
Fibre cement board to fascia
Fibre cement board to eaves
STUART PARKSKYDIVERSDROP ZONE
CUSTOMERDECK
fc
1234
fc
ENTRYMERCHANDISE SHOP+4,600
Ground Floor
Servery window to coffee shop
Concrete precast panels
Joinery item to further detail
Concrete slab to structural engineers detail
Screw pile foundation to furtherstructural engineers detail
Metal roofing at 10o fall
Concrete deck
Concrete stair to deck
Raked ceiling to customer area
COFFEESHOP
conc
RL 8,650
RL 10,098
RL 8,52310°
10°
Fibre cement sheeting
Fibre cement board to eaves
Fibre cement board to fascia
Fibre cement sheeting
STAFF /MEETING
MANAGEROFFICE
RECEPTION
CUSTOMERAREA
COFFEESHOP Ramp
(1in14)
BINSTORAGE AREA
dp
f f
lll l l ldp
fall
fall
ENTRY
fc
Ramp(1in14)
+4,600Ground Floor
Access ramp to Unisex WCs and BinStorage Area in accordance withAS 1428.1-2009
1.6m high timber screen to Bin Storage Area
SS-Handrail to access ramp inaccordance with AS 1428.1-2009
Two 4000L Rainwater Tank
Access ramp to Entry in accordancewith AS 1428.1-2009
ABCDEFGHIJ
3,000 3,000 3,000 1,200 3,000 2,600 2,300 2,300 2,300
Concrete precast panels
Joinery item to further detail
Concrete slab to structural engineers detail
Screw pile foundation to furtherstructural engineers detail
Metal roofing at 10o fall
Fibre cement board to fascia
Fibre cement board to eaves
Servery bi-fold window to coffee shop
Raked ceiling to customer area
Joinery item to further detail
Bulkhead over reception area
Louvers to highlight windows
Metal roofing at 3o fallSkylights
Metal roofing at 3o fall
STORAGE
pdb
Kitchenette
pdb
pdb
crcl cl
pdbpdb
1:100 @ A2
01 Section A
02 Section B
03 Section C
Preliminary IssueA 19/12/13
Development Application IssueB 29/01/14
C
Amended Location and SectionC 26/11/14
DEVELOPMENT APPLICATIONNOT FOR CONSTRUCTION
metres0 1 2 3 4 5
scale 1:100 @ A2