RECEP ALAKUS GIS Administrator - Hume City Council
DEVELOPING
SPATIALLY
LIFE CYCLE ASSET MANAGEMENT
HUME CITY COUNCIL Where is...?
HUME CITY COUNCIL
Melbourne & Suburbs
Sunbury Craigieburn
Broadmedows Melbourne Airport
Ford Motor Co.
Basic Principles of Assets & Facilities Management
ASSETS
WHAT?
HOW?
WHERE?
&
WHAT?
WHERE?
Primary Work Processes of Assets & Facilities Management
Analyze
Data Capture
Storage
Display
Report
Benefits of Utilizing Geospatial Processes
Assets & Facilities Management
Streamlined CAD data Capture
GPS assisted field work
Immediate view of location
Relationship to all other map layers
Themed map display of assets
Themed map display of condition levels & priorities
Assets are selectable and immediate view of attributes
Minimum data entry for locations of assets
Easier data base management processes
Network centric – Web enabled
STREAMLINED ASSETS DATA CAPTURE
Subdivision Digital CAD Drawing
Assets are Identified as Polygons
Asset Features Ready to Export to Data Base
Asset Features Displayed in GIS
GEOCODING & RECORDING OF ATTRIBUTES
Display of Individual Asset Attributes
Dashboard & Themed Reports of Asset components
FIELD DATA CAPTURE & INSPECTIONS
FOOTPATHS
Tablet PC Application Development
Footpath Defect Rating Specification
Tablet PC Defect Capture Interface xKey Component to
Streamlined Defect Capture
Footpaths Desktop Module Recreated on Tablet PC
Defect App. Incorporated
Data Capture Components Tablet PC
xKey Pad
Data Capture & System Workflow
Field Data Synced to GIS Server Daily
System Issues Defect Notices to Inspectors each morning
Inspector Uploads Defect Points
After Repairs “Made Safe” Selected
Data Synced back to Server
Footpaths Field Work Processes
Field Data Recorded and Synced to Server
Daily
Footpaths Inspector Prepares Work Orders
Works Crew Carries out Maintenance
Footpaths Inspector Records on Defects
“Made Safe”
•Condition Rating of all Footpaths
•Last inspection date for Footpath components
•Evidence of recorded Defect type
•Description of defect severity rating
•Evidence and date of defect “Made Safe”
•Actual date of defect item “Closed”
FOOTPATHS MANAGEMENT & MAINTENANCE
Required maintenance activities and work processes demanded by;
Public Safety, Risks & Liabilities Policy
Footpath Components
Footpath Inspection Priority Areas
Locations Footpath Defect - Types and Severity
Defect Calculation for Priority Areas
Medium Priority Areas: (Defect No) x 1.25
High Priority Areas: (Defect No) x 1.5
Footpath Condition Rating
Total Defects x Defect No’s / Surface Area (SQM) = T. Points
Total Points – (Excellent) (Good) (Average) (Repair) (Replace)
Footpath Condition Categories
Interactive Updating of Footpath Components
Footpaths Defect Points
Modifying Map Objects Dynamically
Footpaths Conditions Chat
Depreciated Footpaths Valuation Report
MAP ROOM and Snapshot of Other Asset Modules
PLAYGROUNDS
OPEN SPACE ASSETS
Assets from Other Modules
BUILDINGS
Assets Configuration Form Assets Inspection Form
Asset Inspection Report MANAGEMENT TOOLS
CAD FLOOR PLANS
FEATURE OBJECTS
LEASING DEFINITION
OCCUPANCY DEFINITON
INTERNAL LAYOUT & FURNITURE ASSETS
MAINTENANCE OF TREES & RISK MANAGEMENT PROCESSES
TREE MODULE
Risk Calculation Formula
((FP+FS)x(TP+TV))xDP
Failure Potential None= 0.5 Low= 1 Moderate= 2 High= 3 Very High= 4
Failure Size None= 0.5 0 - 15= 1 15 -45 = 2 45 - 75= 3 75+= 4
Target Presence None= 0.5 Occasional= 1 Intermittent= 2 Frequent= 3 Constant= 4
Target Value None= 0.5 Low= 1 Moderate= 2 High= 3 Very High= 4
Damage Probability None= 0.2 Low= 0.4 Moderate= 0.6 High= 0.8 Very High= 1
Themed Layers to Display
Snapshot views of Tree Status
Useful Life Expectancy
Tree Structure
Tree Health
Hard Waste Collection Processes
Collection call Registered with CRM Collection Recorded in GIS
Hardwaste Module opens with selected property zoomed to view
Next morning Previous day’s Bookings Transmitted to Collection Truck
Collection Data Synced to Server