Developing a Fully Integrated Long-Range Plan

27
ONE Company, ONE Team: Developing a Fully Integrated Long-Range Plan October 30, 2013 Steve Coverick Edgewater Ranzal Strategic Planning Practice Kent Sweezey Cenovus Energy Corporate Planning
  • date post

    13-Sep-2014
  • Category

    Business

  • view

    703
  • download

    3

description

Edgewater Ranzal presented how Cenovus Energy transformed their long-range planning (LRP) process through the implementation of Oracle's Hyperion Strategic Finance (HSF). at the Association for Finance Professionals (AFP) 2013 Annual Conference.

Transcript of Developing a Fully Integrated Long-Range Plan

Page 1: Developing a Fully Integrated Long-Range Plan

ONE Company, ONE Team:

Developing a Fully Integrated

Long-Range Plan

October 30, 2013 Steve Coverick

Edgewater Ranzal

Strategic Planning

Practice

Kent Sweezey

Cenovus Energy

Corporate Planning

Page 2: Developing a Fully Integrated Long-Range Plan

Agenda

Company Overviews

Long-Range Planning Overview

Development Considerations

EPM Platform

High Level Demonstration

Questions & Answers

Page 3: Developing a Fully Integrated Long-Range Plan

Company Overview: Cenovus TSX, NYSE | CVE

Enterprise value $29 billion

Shares outstanding 756 MM

2013F production

Oil & NGLs

Natural gas

183 Mbbls/d

515 MMcf/d

2012 proved & probable

reserves 3.1 BBOE

Bitumen

Economic contingent

resources*

Discovered bitumen

initially in place*

Lease rights**

9.6 Bbbls

93 Bbbls

1.5 MM net

acres

P&NG rights 5.5 MM net

acres

Refining capacity 229 Mbbls/d

Values are approximate. Forecast production based on midpoints of the July 24, 2013 guidance document. Cenovus land at December 31, 2012. *See advisory. **Includes an additional 0.5 million net acres of exclusive lease rights to lease on our behalf and our assignee’s behalf. © 2013 Cenovus Energy Inc.

Page 4: Developing a Fully Integrated Long-Range Plan

Volumes are shown before royalties and net to Cenovus. 2013F based on midpoints of the July 24, 2013 guidance document. 2014F - 2023F based on future price assumptions as noted in the advisory. Forecast volumes are estimates only and subject to regulatory and partner approvals. See advisory. © 2013 Cenovus Energy Inc.

Company Overview: Cenovus Mbbls/d

Page 5: Developing a Fully Integrated Long-Range Plan

Company Overview: Edgewater Edgewater

Founded in

1996

Essbase

Acquired

Vertical Pitch

2007

HFM/

FDM

Acquired

Meridian

2010

HSF

Planning

2001

Planning

Build

OBI Team

2011

OBIEE

Ranzal

Build DRM &

HPCM Teams

2009

DRM &

HPCM

► NASDAQ: EDGW

► The Boston Globe’s Top 100 Business

► Top 500 fastest-growing stocks on Wall Street

► One of the largest Full-Service Oracle/Hyperion EPM and BI practices

► Oracle Platinum Partner

► Multiple Oracle Partner of the Year awards

► Premier Consulting Services in North America and Europe

Acquired by

Edgewater

2004

Data

Integration &

Warehousing/

CRM/

Web 2.0

Page 6: Developing a Fully Integrated Long-Range Plan

Company Overview: Edgewater

Consolidation

Business

Intelligence

Planning

Infrastructure

Training

Support

Services

Data

Services

Project

Management

Page 7: Developing a Fully Integrated Long-Range Plan

LRP Overview: Purpose

Stewardship and Capital Discipline

Collaboration Sensitivity

and Scenario Analysis

Budget Foundation

Page 8: Developing a Fully Integrated Long-Range Plan

LRP Overview: High Level Process

Executive Guidance

Forecasts and Analyses

Review and Communication

Page 9: Developing a Fully Integrated Long-Range Plan

LRP Overview: CP’s Role

• Corporate forecast model

• Data sources integration

• Financial and operational reports

• Sensitivity and scenario analyses

• Reporting consistency

Budget Outlook LRP

Page 10: Developing a Fully Integrated Long-Range Plan

LRP Overview: Challenges

• Complex and segregated spreadsheets

• Cumbersome scenario analyses

• Limited documentation

• Version control

• Duplicated efforts

Page 11: Developing a Fully Integrated Long-Range Plan

Development Considerations

• Spend time on model design

– Actuals Outlook/Budget LRP integration

– Understand routine / non-routine transaction impact

– Focus on strategic imperatives

– Corporate hierarchy views (i.e. legal vs mgmt)

– Customized handling of data sources

– Naming convention

– Global assumptions

Page 12: Developing a Fully Integrated Long-Range Plan

Development Considerations

Documentation

360o training

Micro and Macro Testing

Flexibility

Integration Maintenance

Global Sensitivities

Customized Reports

Page 13: Developing a Fully Integrated Long-Range Plan

13

Essbase

EPM Platform: Integration

HSF

Other Inputs

Ops Planning

Hyperion Planning

Excel Reporting

Page 14: Developing a Fully Integrated Long-Range Plan

EPM Platform: HSF

Corporate Development

Value Management

Long-Term Financial Planning

Treasury Strategies

Predictive Modeling & Simulation

Long-Term (3-5 Year)

Full Financial Statement

Projections

Key Performance Metrics

New Product Offerings

Acquisitions / Divestitures

Discounted Cash Flow

Economic Value Added

Liquidation Value

Capital Structure

Debt Issuances/Payments

Covenant Analysis

Credit Ratings

What-if

Analysis

Economic Shifts

Commodity Pricing

Product Pricing

Growth Initiatives Capacity Planning

Page 15: Developing a Fully Integrated Long-Range Plan

High Level Demonstration

Page 16: Developing a Fully Integrated Long-Range Plan

Pre-Built Accounting Integrity

• Pre-built, fully integrated financial statement foundation

• Pre-built forecast methods and formula functions

• What-if Analysis toolkit

Page 17: Developing a Fully Integrated Long-Range Plan

Powerful Scenario Capabilities

Page 18: Developing a Fully Integrated Long-Range Plan

Easily Analyze Various Combinations

Mix and Match Scenarios

Capital Projects included

Acquisition excluded

Page 19: Developing a Fully Integrated Long-Range Plan

World Class Treasury Analysis

• Calculates net cash surplus or deficit from multiple models and scenarios

• Funding Options tool to re-allocate surpluses and fund deficits

• Debt scheduler

• User-defined reports to monitor covenants, credit ratings, and earnings per share

Page 20: Developing a Fully Integrated Long-Range Plan

Acquisition/Divestiture Modeling

Page 21: Developing a Fully Integrated Long-Range Plan

Set Strategic Targets in HSF

Page 22: Developing a Fully Integrated Long-Range Plan

Align the Planning Process

Page 23: Developing a Fully Integrated Long-Range Plan

Seed Budgets with Strategic Targets

From

Strategic Plan

Page 24: Developing a Fully Integrated Long-Range Plan

Tweak Budget with Targets in Mind

Page 25: Developing a Fully Integrated Long-Range Plan

Update Targets with Latest Forecast

Page 26: Developing a Fully Integrated Long-Range Plan

Cenovus Forward Looking Information

Page 27: Developing a Fully Integrated Long-Range Plan

Cenovus Oil & Gas and Financial Information