Desirable, warm, affordable homes for life · 2017-12-14 · Dialogue Nov / Dec 17 24 Feb 2018 Mar...
Transcript of Desirable, warm, affordable homes for life · 2017-12-14 · Dialogue Nov / Dec 17 24 Feb 2018 Mar...
Desirable, warm, affordable homes for life
Why Energiesprong?
We are building for tomorrow,free of the constraints of today,
because we all share the same home
This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No 696186
Funded bythe European Union
> How are we changing things?
• Energy performance improvement creates scope for energy service plan
• Performance outcomes rather than procurement outputs
• Encourage innovation and mass-market thinking
> Parameters for Success
ASSURED QUALITY30+ years energy performance warranty
NON-INTRUSIVERefurbishment within one week
AFFORDABLEFinanceable from energy cost savings (guaranteed)
DESIGNImprove look & feel – desirable product
> Performance Specification
Property Performance Level
Thermal performance <30 kWh/m2
Hot Water 140 litre @ 45°C
Heating Levels 21°C/18°C
Net Consumption Zero to 1,500 kWh
Noise in-property services
<30dBA
Noise outside <42dBA
Summer overheating 26°C bedrooms < 300 hours per year28°C living room < 300 hours per year
Monitoring Live/historical temperature, hot water and electricity consumption
Humidity & CO2 New build ACH rate
Installation time <10 days
Air-tightness 0.6 ACH @ 50 Pa
Surface temp
(windows)
>17°C
Summer overheating Max 10% >25°C
Ventilation ~30m3/hr.person
Heating 15 kWh/m2/yr
Primary Energy 120 kWh/m2/year
External Walls (W/m2K) 0.18
Floor (W/m2K) 0.13
Roof (W/m2K) 0.13
Windows (W/m2K) 1.4 (g=0.63)
Air tightness 5
Thermal Bridging (y-
value)
0.15
TER (kgCO2/m2/yr) 18.72
DER (kgCO2/m2/yr) 47.18
TFEE (kwh/m2/yr) 54.26
Ventilation Natural (with extract
fans)
Each year
> £5.2bn spent on existing social housing stock> £4.2bn spent by social housing tenants on energy
Energiesprongturns that into productive investment to make our homes fit for 2050
c£xk investmentToday Tomorrow
> Today: Rent & Utility Bills
Utility Bill
Electricity and Gas from grid
Tenancy Agreement
Rent
Payment byconsumption
Provision of energy
Payment for use (rent)
Provision of home
> Tomorrow: Rent & Energy Services Plan
Utility Bill
Electricity from grid
Tenancy Agreement
Rent + energy service plan
Payment of standing charge and minimal consumption
Provision of electricity at peak times
Payment for use (rent) and comfort package
Provision of home and energy bundle
FiTsECORHI
7
> The time is now
> Energiesprong UK
UK
Market Development
Team
Building the movement:
housing
Building volume: new
build
Preparing for volume:
business case
Proof of concept:
demonstrators
Building the movement:
industry
Policy
SupplyWe have recruited key industry partners to develop high performance innovative solutions…
Demand…and progressive housing providers to create early market demand.
> Together we are creating the UK market
> We are making real progress> Nottingham: the first Energiesprong homes
outside the Netherlands
> c300 demonstrators in pipeline
> Major steps forward in procurement, contracting, legal
> Establishing a supply chain
> New build specification ready
> Working towards a volume deal
> Demonstrators leading to market volume
> The cost curve challengeCosts have been reduced in the Netherlands by organising and optimising the supply chain as well as sub-system innovation, e.g. energy module:
In-home - £25k Gen I Energy Modules - £17k Gen II - £11k + PV Energy Module in the roof?
This happens when the supply chain can see significant volumes in the pipeline
> Netherlands cost saving We have analysed the cost savings delivered in NL and are confident that we can deliver similar in the UK
0
10000
20000
30000
40000
50000
60000
70000
80000
90000
100000
2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
£ c
apit
al e
q
Profit
End Façade
Energy Module Gen 1
Energy Module Gen 2
PV Panels
Roof
Façade
Site Costs
Overheads
Total Capital NL
Total Capital UK
> Current UK pipeline (339 homes)Status Who / where? How
many?Procurement/ Bid Progress Contract sign off/
DecisionEstimated works Estimated
completion
Fully
fu
nd
ed
Nottingham City Homes 10 Complete 21 August 2017 Sep 17 started Dec 17Clarion / London 10 In negotiation October 2017 (Oct 17) Jan 18 -
Mar 1831 Mar 18
Moat / Essex 10 In dialogue w/c 23 Oct 2017 Dec 17 - Mar 18 31 Mar 18Sutton Housing Partnership, Genesis, Moat / GLA Energy Leap London
10 ITT Sep / Oct 2017Dialogue Nov / Dec 17
24 Feb 2018 Mar 18 - May 18 End of May 18
Sanctuary, North Devon Homes, Exeter City Council / ZEBCat Devon
15 ISIT Sep 2017Negotiation Dec 2017Final tender 5 Feb 18
end of Feb 18 Mar 18 start in 3 phases
Un
der
dev
elo
pm
ent
Nottingham City Homes &Derby Homes - D2N2 LEP
231 Full bid submitted 14 July 2017
Croydon Council, Optivo, Clarion, Crawley Council, Moat and Brighton Council - C2C LEP
30 Full bid submitted 25 October 2017
Liverpool Mutual Homes - Liverpool City Region
9 Bid submitted in May 2017
Pioneer Group - Greater Birmingham & Solihull
(14 new build)
Outline bid approved
Inte
rest
Es
tab
lish
ed Greater ManchesterBlack CountryLeeds City RegionScotland (Glasgow)
> Our plans to build UK volume
Year Units Price Budget GrantTotalinvestment
Of whichgrant
2018 100 £70,000 £35,000 £35,000 £7,000,000 £3,500,000 Prototypes
400 £62,500 £45,000 £17,500 £25,000,000 £7,000,000 Early Market
500 £55,000 £42,000 £13,000 £27,500,000 £6,500,000 First scaling
1,000 £47,500 £40,000 £7,500 £47,500,000 £10,000,000Volume scaling
2020 3,000 £45,000 £40,000 £5,000 £135,000,000 Next phaseVolume scaling
First 100 in pipeline with EU grantsNext 400 at bidding stage (200 with ESIF)Need grant/better business case for 500-5000 units
To make this happen,we need…
> A UK Charter: 5,000 homes and beyond
Supply chain Government
Housing providers
> Capital funding for retrofit> Energy service plans for new build> Leadership on whole-house retrofit
> Move rapidly down the cost curve> New business models> Engagement, collaboration, technical innovation
> Develop the portfolio business case> Engage with the Energiesprong model> Obtain funding for early projects
Sign the Charter
Imag
es:
Am
ber
An
der
son
@H
awka
nd
Mo
use
> Going forward
Let us look at your portfolio
> How could it be transformed by Energiesprong?
Find your Net Zero Superhero
> Collaborate
> Build internal capacity to deliver Energiesprong
Commit to volume by signing the Charter
> Add your voice to our message to government and industry:
The UK is ready to create desirable, warm, affordable homes for life
Imag
es:
Am
ber
An
der
son
@H
awka
nd
Mo
use
Thank you
This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No 696186
Funded bythe European Union