Background

1

Back by Beijing Coal Designing Institute, FavorSea provide the designing and EPC contracting service of coal storage and blending facilities.

The Sell-One-Store-One strategic mode is adopted in designing coal storage and blending facilities, thus dynamic security of coal strategic reserve is achieved. We provide intensive and environmentally-friendly integrated coal supply value chain to the customer by adoption of digitizing coal blending design idea, reasonably and scientificly allocating coal from different source, adoption of following management model: refinement of coal products, chain operation of buying and selling, integration of logistic,diversification of subject of investment, environment protection and low carbon energy saving, optimization of operation cost, adoption of high tech of coal blending, networking of coal supply, strategic approach of operation management.

Office Building of Beiijing Coal Designing & Research Institute

http//www.FavorSea.com [email protected]

FavorSea Industrial Channel Limited 2307 First Building No.6 Dacheng Street,Beijing China Tel: +86 10 8817 7742 Fax: +86 10 8817 7443

I N D U S T R I A L C H A N N E L

Page 3: Designing of Coal Storage & Blending Facilities

1. Ground Production System for Shenhua Group Huanghua Port Co.,Ltd

D:Planed second stage: Annual handling capacity reach 35 million ton. The static storage capacity of coal storage area is 2.4 million ton.Long-time Planning: Coal handling capacity reach 150 million tons.E:the mode of transport: Inbound: Train; Outbound: Ship.F:Coal storage facilities: large-scale bucket wheel stacker reclaimer.G:The progress of the project: The first and second stage has been in operation, Preparations were started in 2008 for the construction of third stage project. After the completion of the third-phase project, the total coal handling capacity will reach 150 million tons.

A:Investor: It's jointed invested by Shenhua Group and Hebei ProvinceB:Address: Development Zone of Huanghua Port, Cangzhou City, Hebei ProvinceThe position and role of the project: Key project of National "Eleventh Five-Year plan"; Sea outlet of China second largest coal transportion channel by which coal is ship from west to east and north to south;China second largest mordern coal transportation port. C:Capacity: First stage: Annual handling capacity is 35 million ton. The static storage capacity of coal storage area is 1.2 million ton.

2

Profiles of main design project

http//www.FavorSea.com [email protected]

FavorSea Industrial Channel Limited 2307 First Building No.6 Dacheng Street,Beijing China Tel: +86 10 8817 7742 Fax: +86 10 8817 7443

I N D U S T R I A L C H A N N E L

Page 4: Designing of Coal Storage & Blending Facilities

2 Coal storage and blending center in Wuhu Port

Second phase: the coal blending and transportation volumeof departing vessel amount to 50 million tons, t the stockpile static reserves is 5 million tons.E:the mode of transport: Inbound: Train; Outbound: Ship.F:Coal storage facilities: large-scale bucket wheel stacker reclaimer.G:the progress of the project: Phrase one has been put into operation, the second phase are being designed.

A :Investor: It's jointed invested by Huainan mining group and Wuhu Port Storage & Transportation Co.,Ltd.B: Address: North of Yangtze River, Wuhu City Suburb, Anhui ProvinceC:The position and role of the project: National key construction projects. D:Capacity: The project are in two phases:First phase: the coal blending and transportation volume of departing vessel amount to 20 million tons, the stockpile static reserves is 1.8 million tons.

3 http//www.FavorSea.com [email protected]

FavorSea Industrial Channel Limited 2307 First Building No.6 Dacheng Street,Beijing China Tel: +86 10 8817 7742 Fax: +86 10 8817 7443

I N D U S T R I A L C H A N N E L

Page 5: Designing of Coal Storage & Blending Facilities

3. Coal storage and blending project of Shandong Longhai Coal Reserve & Delivery Co.,Ltd

4. Zone A logistics center of Ningxia Baofeng Energy Group Co., Ltd

A: Investor: Ningxia Baofeng Energy Group Co.,LtdB: Address: Ninghe comprehensive industrial park, Lingwu City, Ningxia Hui Autonomous Region. C:The position and role of the project: Key construction projects of Ningxia Hui Autonomous Region. D:Capacity: Design capacity is 16 million tons.

Stockpile static reserves is 1 million tons, the project covers an area of about 100 hectares。E: the mode of transport: Inbound:belt conveyor; Outbound: Train and TruckF:coal storage facilities: Round drop tower-type capping stockpile.G:the progress of the project: under construction.

Second phase: the coal blending and port inbound delivery volume reach 30 million tons , the stockpile static reserves reach 1 million tons.E: the mode of transport: Inbound: ship; Outbound: Train and TruckF:Coal storage facilities: large-scale bucket wheel stacker reclaimer.G:The progress of the project: Phrase one has been put into operation in 2009.

A:Investor: It's jointed invested by Shandong Energy Longkou Mining Group Co.,Ltd and Longkou port authorityB:Address: South of Honggang Port Berth, Yantai City,Shandong ProvinceC:The position and role of the project: Key construction projects of Shandong Province. D:CapacityFirst phase: the coal blending and port inbound delivery volume amount to 10 million tons, the stockpile static reserves is 300 thousand tons. The project covers an area of about 15 hectares.

4 http//www.FavorSea.com [email protected]

FavorSea Industrial Channel Limited 2307 First Building No.6 Dacheng Street,Beijing China Tel: +86 10 8817 7742 Fax: +86 10 8817 7443

I N D U S T R I A L C H A N N E L

Page 6: Designing of Coal Storage & Blending Facilities

5. Coal separation and blending center of Jiangxi Ganxi coal Logistics Co Ltd

Second phrase: Static coal handling capacity of coal storage area is 1 million tons, Dynamic handling capacity is 3 million tons.The project covers an area of about 42 hectares.E:the mode of transport: Inbound: Truck and Train; Outbound: Train.F:coal storage facilities: First phrase: trestle type capping stockpile.Second phrase: Round drop tower-type capping stockpile.G:the progress of the project: Phrase one has been put into operation, the second phrase are being designed.

A: Investor: Jiangxi Tianyu Fuel Group Co., LtdB: Address: Gaokang town, Anyuan district, Pingxiang City, Jiangxi Province.C:The position and role of the project: Key construction projects of Jiangxi Province; Strategy loading and unloading point of Ministry of RailwaysD:Capacity: First phrase: Static coal handling capacity of coal storage area is 300 thousand tons, Dynamic handling capacity is 3 million tons. Feeding coal of coal preparation plant amount to 2 million tons. .

5 http//www.FavorSea.com [email protected]

FavorSea Industrial Channel Limited 2307 First Building No.6 Dacheng Street,Beijing China Tel: +86 10 8817 7742 Fax: +86 10 8817 7443

I N D U S T R I A L C H A N N E L

Page 7: Designing of Coal Storage & Blending Facilities

6. New street coal logistics center of Erdos CityA:Investor: Inner Mongolia Erdos GroupB:Address: New Street Town, Ejin Horo Banner,Erdos City, Inner Mongolia.C:The position and role of the project: Key construction projects of Inner Mongolia Autonomous Region.D:Capacity: Annaual raw coal handling capacity amount to 50 million ton.First Stage:10 million tons, the stockpile static reserves is 300 thousand tons.

Second Stage:20 million tons, the stockpile static reserves is 1 million tons.Third Stage:20 million tons, the stockpile static reserves is 2 million tons.E:the mode of transport: Inbound: Truck; Outbound: Train.F:coal storage facilities: Round drop tower-type capping stockpile.G:the progress of the project: under designing

6 http//www.FavorSea.com [email protected]

FavorSea Industrial Channel Limited 2307 First Building No.6 Dacheng Street,Beijing China Tel: +86 10 8817 7742 Fax: +86 10 8817 7443

I N D U S T R I A L C H A N N E L

Page 8: Designing of Coal Storage & Blending Facilities

7 Coal separation and blending center of Yangchang Bay, Province

A:Investor: Shenhua Ningxia Coal Industry Group Co., LtdB: Address: Lingwu City, Ningxia Hui Autonomous Region.C:The position and role of the project: Key construction projects of Ningxia Hui Autonomous Region.D:Capacity: Annual coal separation and blending capacity is 10 million tons. The static storage capacity is 200 thousand ton.

E:the mode of transport: Inbound:belt conveyor; Outbound: Train F:coal storage facilities: Round drop tower-type capping stockpile.G:The progress of the project: The project has been put into operation in 2005. This project won the 2008 Luban Award of China Construction project(National Quality Project)

7 http//www.FavorSea.com [email protected]

FavorSea Industrial Channel Limited 2307 First Building No.6 Dacheng Street,Beijing China Tel: +86 10 8817 7742 Fax: +86 10 8817 7443

I N D U S T R I A L C H A N N E L

Page 9: Designing of Coal Storage & Blending Facilities

8 Coal blending center of China Pingmei Shenma Energy & Chemical Group Co., Ltd

A:Investor: China Pingmei Energy and Chemical Group.B:Address: Sishan Village, Xinji township, Lushan County, Pingdingshan CityC:The position and role of the project: Major investment project in non-core business of China Pingmei Energy and Chemical Group.D:Capacity First Stage: the coal blending capacity reach 6 million tdons which include 3 million tons outsourcing coal. Static coal reserves reach 125,000 tons.

Second Stage: The capacity reach 10 million tons.The project covers an area of 20.3 heactares. E:the mode of transport: Inbound: Truck and Train; Outbound: conveyor belt to power plantF:Coal storage facilities: large diameter coal siloG:the progress of the project: under designing

8 http//www.FavorSea.com [email protected]

FavorSea Industrial Channel Limited 2307 First Building No.6 Dacheng Street,Beijing China Tel: +86 10 8817 7742 Fax: +86 10 8817 7443

I N D U S T R I A L C H A N N E L

Page 10: Designing of Coal Storage & Blending Facilities

9 Luoqi coal storage and transportation base of Chongqing Thermal Coal Storage and Transportation

A:Investor: Chongqing Thermal Coal Storage and Transportation GroupB:Address: Luoqi town, Yubei District, Chongqing CityC:The position and role of the project: Key project of Chongqing City and eastward shipment of coal from Xinjiang ProvinceD:Capacity: Annual coal blending capacity is 15

million tons, the static storage capacity is 2 million tons. The project covers an area of 70 hectares.Static coal reserves reach 125,000 tons.E:the mode of transport: Inbound: Ship and Train; Outbound: ship and train.F:Coal storage facilities: large-scale bucket wheel stacker reclaimer.G:the progress of the project: under designing

9 http//www.FavorSea.com [email protected]

FavorSea Industrial Channel Limited 2307 First Building No.6 Dacheng Street,Beijing China Tel: +86 10 8817 7742 Fax: +86 10 8817 7443

I N D U S T R I A L C H A N N E L

Page 11: Designing of Coal Storage & Blending Facilities

10 Jingjiang digitized coal storage and blending center of Shanxi Coal International Energy Co., Ltd

A:Investor: Shanxi Coal Import & Export GroupB:Address: New port campus, Jingjiang City, Jiangsu Province. C:The position and role of the project: National strategic coal reserve baseD:Capacity: Annual coal separation and blending capacity is 30 million tons, the static storage capacity is 2 million tons. The project covers an area of 100 hectares.

E:the mode of transport: Inbound: Ship and Train; Outbound: shipF:Coal storage facilities: large-scale bucket wheel stacker reclaimer and circular wheel stacker reclaimerG: the progress of the project: under designing

10 http//www.FavorSea.com [email protected]

FavorSea Industrial Channel Limited 2307 First Building No.6 Dacheng Street,Beijing China Tel: +86 10 8817 7742 Fax: +86 10 8817 7443

I N D U S T R I A L C H A N N E L

Page 12: Designing of Coal Storage & Blending Facilities

11 Zhungeer convened loading station of Inner Mongolia Yitai Group Zhundong Railway Company

A:Investor: Zhundong Railway Co.,Ltd of Inner Mongolia Yitai GroupB:Address: Dongsheng District, ,Erdos City, Inner Mongolia.C:The position and role of the project: Shipping stationof Yitai GroupD:Capacity: Annual storage, loading and shipping capacity is 25 million tons, the static storage

capacity is 1.2 million tons. The project covers an area of 93.4 hectares.E:the mode of transport: Inbound: Truck; Outbound: Train.F:Coal storage facilities: bucket wheel reclaimerG:The progress of the project: The project has been put into operation in 2010.

11 http//www.FavorSea.com [email protected]

FavorSea Industrial Channel Limited 2307 First Building No.6 Dacheng Street,Beijing China Tel: +86 10 8817 7742 Fax: +86 10 8817 7443

I N D U S T R I A L C H A N N E L

Page 13: Designing of Coal Storage & Blending Facilities

12 Coal storage yard of Jiangxi province coal storage center

A:Investor: Jiangxi Province Coal Group Co., LtdB:Address: Industrial park along the Yangtze river, Jiujiang CityC:The position and role of the project: Strategic coal reserve base of Jiangxi ProvinceD:Capacity: Annual storage, loading and shipping capacity is 7 million tons, the static storage capacity is 1 million tons. The project covers an area of 40 hectares.

E:the mode of transport: Inbound: Ship and Train; Outbound: ship, truck and trainF:Coal storage facilities: large-scale bucket wheel stacker reclaimer.G:the progress of the project: under designing

12 http//www.FavorSea.com [email protected]

FavorSea Industrial Channel Limited 2307 First Building No.6 Dacheng Street,Beijing China Tel: +86 10 8817 7742 Fax: +86 10 8817 7443

I N D U S T R I A L C H A N N E L

Page 14: Designing of Coal Storage & Blending Facilities

13 Coal storage and transportation facility of Shenhua Ningxia Coal Group 4million ton indirect coal liqufaction project.

A:Investor: Shenhua Ningxia Province Coal GroupB:Address: East ningxia province energy and chemical base, Ningxia ProvinceC:The position and role of the project: National key project of the "12th Five-Year Plan"D:Capacity: Annual storage, loading and shipping capacity is 26 million tons, the static storage

capacity is 500 thousand tons. The project covers an area of 26.7 hectares.E:the mode of transport: Inbound: Train; Outbound: Belt ConveyorF:Coal storage facilities: large-scale circular stacker reclaimerG:the progress of the project: under designing

13 http//www.FavorSea.com [email protected]

FavorSea Industrial Channel Limited 2307 First Building No.6 Dacheng Street,Beijing China Tel: +86 10 8817 7742 Fax: +86 10 8817 7443

I N D U S T R I A L C H A N N E L

Page 15: Designing of Coal Storage & Blending Facilities

14 10 million ton coal comprehensive handling project for Henan Long Cheng Group

A:Investor: Henan Long Cheng GroupB:Address: No.3 harbor basin of Caofeidian Industrial ParkC:The position and role of the project: Key low-temperature dry distillation project of Henan Long Cheng GroupD:Capacity: (First Stage): Annual coal separation covers an area of 14.7 hectares.

and blending capacity is 10 million tons, the static storage capacity is 220 thousand tons. The project E:the mode of transport: Inbound: Truck and Train; Outbound: ship, truck and trainF:coal storage facilities: Round drop tower-type capping stockpile.G:the progress of the project: under designing

Construction, Structures Schedule Sequence Number

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

Name

The Car DumperThe Car Dumper reproduced by the No. 1 point to belt conveyor trestle of the raw coal bunker

The Car by coal systemCar by coal system to the belt conveyor trestle of the NO.1 transfer pointNO.1 transfer point

The raw coal bunkerThe raw coal bunker to the belt conveyor trestle of the raw coal off the the coal tower coal yardThe raw coal off the the coal tower coal yard

The raw coal off the the coal tower coal yard to the belt conveyor trestle of the raw coal bunkerThe raw coal bunker to the belt conveyor trestle of the clean coal off the the coal tower coal yardThe clean coal off the the coal tower coal yard

The clean coal off the the coal tower coal yard to the belt conveyor trestle of the clean coal bunkerThe clean coal bunkerThe raw coal bunker to the belt conveyor trestle of the Preparation workshopThe beamhouse

The beamhouse to the belt conveyor trestle of the main workshopThe main workshopThe main workshop to the belt conveyor trestle of the clean coal bunker

The clean coal bunker to the belt conveyor trestle of The clean coal off the the coal tower coal yardThe clean coal off the the coal tower coal yard to the belt conveyor trestle of the clean coal bunkerThe main workshop to the belt conveyor trestle of the Dagan blanking point

The king-rod blanking pointThe main workshop to the belt conveyor trestle of the slime blanking pointThe slime blanking pointThe concentration workshop

Fire-fighting pool and pump roomMachine repair shopComprehensive office building

NO.2 transfer pointNo. 2 transfer point to the belt conveyor trestle of the semi-coal stockThe semi-coal stock

The semi-coal stock to the belt conveyor trestle of the car fast loading stationThe car fast loading station2No. 2 transfer point to the belt conveyor trestle of the semi-coal blanking pointThe semi-coal blanking point

The semi-coal storage shedThe semi-coal storage shed to the belt conveyor trestle of the NO.2No. 2 transfer point to the belt conveyor trestle of the NO.3

NO.3 transfer point

NO.4 transfer point

The semi-coalstock to the belt conveyor trestle of the NO.3No. 3 transfer point to the belt conveyor trestle of the NO.4