Design Qualification of a Liner Hanger System for OH … The FracRight DHP Liner Hanger has been...

3
Abstract The FracRight DHP Liner Hanger has been specifically designed for use with open-hole mul-zone compleons focusing on the leading edge operaons in the Bakken. This paper describes the design and qualificaon process through the three core funconalies: DEPLOY – HANG – PACK Introducon It is the combinaon of hydraulic fracturing and horizontal drilling techniques that has made the Bakken one of the most important sources of new oil producon in the U.S. With an esmated 400 billion barrels in place the prize for increasing recovery is great and operators here have led the way: extending lateral lengths and increasing fracture stages. The combinaon of shale and dolomite in the Bakken and Three Forks formaons, and the presence of vercal to sub-vercal natural fractures make open-hole mul-zone compleons the most effecve soluon. An average well drilled in the Bakken today is 10,000ſt long with over 60 frac stages delivering 3% – 6% recovery rates. Reliable performance of the compleon is a prerequisite for economic operaons and while most frac sleeves do deliver, the liner hangers have not always met this requirement. Many hangers have been adapted from use in convenonal cemented applicaons or were designed with shorter, lighter open-hole systems. Combining local experience with our innovave compleon design capability Tendeka has developed a robust and reliable liner hanger system that is effecve and economical in these unconvenonal plays. DHP Liner Hanger Design The FracRight DHP liner hanger has simple funconality combined with fail-safe features to make it a reliable deployment system for mul-stage frac compleons. The key funconalies are defined by the three main areas of operaon: Deploy: – 200,000lbs tensile and compressive load capability for deployment of up to 100 sleeves in a 10,000ſt lateral – Rotaonal lock to allow for high torque to be applied in ght wellbores – Built in an-preset feature combining pressure acvated shear pins and dogs eliminates the risk of premature seng or release from the hanger Hang: – Hydraulic seng mechanism with double grip slips to safeguard hanging system against potenal overload – Efficient hydraulic release features iniated during the seng procedure allows the seng tool to be released by straight pull – Secondary mechanical rotaonal release to ensure successful operaon Pack: – Ulises hydraulic and compression forces to create an effecve 10,000psi seal – An-Extrusion back-up rings on element the DHP meets the standards of ISO 14310 V3 Design Qualificaon Tendeka’s New Product Development (NPD) process establishes internal controls for the rigorous qualificaon of any new equipment prior to field deployment. For the FracRight DHP packer the designed qualificaon program simulated the deployment and seng of the hanger in field condions and established its performance to a standard exceeding ISO 14310 V3. The tesng program was performed using a temperature controlled chamber with annulus and tubing pressure regulaon. A load compensator was used to simulate tubing loads. Tesng was 3rd party witnessed for both minimum and maximum casing ID ranges for 7” 23 – 32 lb/ſt Liner Hanger Design White Paper Design and Qualificaon of a Liner Hanger System for Open-hole Mul-stage Smulaon Compleons Authors: Duncan Harper and Annabel Green, Tendeka

Transcript of Design Qualification of a Liner Hanger System for OH … The FracRight DHP Liner Hanger has been...

AbstractThe FracRight DHP Liner Hanger has been specifically designed for use with open-hole multi-zone completions focusing on the leading edge operations in the Bakken. This paper describes the design and qualification process through the three core functionalities:

DEPLOY – HANG – PACK

IntroductionIt is the combination of hydraulic fracturing and horizontal drilling techniques that has made the Bakken one of the most important sources of new oil production in the U.S. With an estimated 400 billion barrels in place the prize for increasing recovery is great and operators here have led the way: extending lateral lengths and increasing fracture stages. The combination of shale and dolomite in the Bakken and Three Forks formations, and the presence of vertical to sub-vertical natural fractures make open-hole multi-zone completions the most effective solution. An average well drilled in the Bakken today is 10,000ft long with over 60 frac stages delivering 3% – 6% recovery rates.

Reliable performance of the completion is a prerequisite for economic operations and while most frac sleeves do deliver, the liner hangers have not always met this requirement. Many hangers have been adapted from use in conventional cemented applications or were designed with shorter, lighter open-hole systems. Combining local experience with our innovative completion design capability Tendeka has developed a robust and reliable liner hanger system that is effective and economical in these unconventional plays.

DHP Liner Hanger DesignThe FracRight DHP liner hanger has simple functionality combined with fail-safe features to make it a reliable deployment system for multi-stage frac completions. The key functionalities are defined by the three main areas of operation:

Deploy:– 200,000lbs tensile and compressive load capability for

deployment of up to 100 sleeves in a 10,000ft lateral– Rotational lock to allow for high torque to be applied in

tight wellbores– Built in anti-preset feature combining pressure activated

shear pins and dogs eliminates the risk of premature setting or release from the hanger

Hang:– Hydraulic setting mechanism with double grip slips to

safeguard hanging system against potential overload– Efficient hydraulic release features initiated during the

setting procedure allows the setting tool to be released by straight pull

– Secondary mechanical rotational release to ensure successful operation

Pack:– Utilises hydraulic and compression forces to create an

effective 10,000psi seal– Anti-Extrusion back-up rings on element the DHP meets

the standards of ISO 14310 V3

Design QualificationTendeka’s New Product Development (NPD) process establishes internal controls for the rigorous qualification of any new equipment prior to field deployment. For the FracRight DHP packer the designed qualification program simulated the deployment and setting of the hanger in field conditions and established its performance to a standard exceeding ISO 14310 V3.

The testing program was performed using a temperature controlled chamber with annulus and tubing pressure regulation. A load compensator was used to simulate tubing loads. Testing was 3rd party witnessed for both minimum and maximum casing ID ranges for 7” 23 – 32 lb/ft

Liner Hanger Design

White Paper

Design and Qualification of a Liner Hanger System for Open-hole Multi-stage Stimulation CompletionsAuthors: Duncan Harper and Annabel Green, Tendeka

AbstractThe FracRight DHP Liner Hanger has been specifically designed for use with open-hole multi-zone completions focusing on the leading edge operations in the Bakken. This paper describes the design and qualification process through the three core functionalities:

DEPLOY – HANG – PACK

IntroductionIt is the combination of hydraulic fracturing and horizontal drilling techniques that has made the Bakken one of the most important sources of new oil production in the U.S. With an estimated 400 billion barrels in place the prize for increasing recovery is great and operators here have led the way: extending lateral lengths and increasing fracture stages. The combination of shale and dolomite in the Bakken and Three Forks formations, and the presence of vertical to sub-vertical natural fractures make open-hole multi-zone completions the most effective solution. An average well drilled in the Bakken today is 10,000ft long with over 60 frac stages delivering 3% – 6% recovery rates.

Reliable performance of the completion is a prerequisite for economic operations and while most frac sleeves do deliver, the liner hangers have not always met this requirement. Many hangers have been adapted from use in conventional cemented applications or were designed with shorter, lighter open-hole systems. Combining local experience with our innovative completion design capability Tendeka has developed a robust and reliable liner hanger system that is effective and economical in these unconventional plays.

DHP Liner Hanger DesignThe FracRight DHP liner hanger has simple functionality combined with fail-safe features to make it a reliable deployment system for multi-stage frac completions. The key functionalities are defined by the three main areas of operation:

Deploy:– 200,000lbs tensile and compressive load capability for

deployment of up to 100 sleeves in a 10,000ft lateral– Rotational lock to allow for high torque to be applied in

tight wellbores– Built in anti-preset feature combining pressure activated

shear pins and dogs eliminates the risk of premature setting or release from the hanger

Hang:– Hydraulic setting mechanism with double grip slips to

safeguard hanging system against potential overload– Efficient hydraulic release features initiated during the

setting procedure allows the setting tool to be released by straight pull

– Secondary mechanical rotational release to ensure successful operation

Pack:– Utilises hydraulic and compression forces to create an

effective 10,000psi seal– Anti-Extrusion back-up rings on element the DHP meets

the standards of ISO 14310 V3

Design QualificationTendeka’s New Product Development (NPD) process establishes internal controls for the rigorous qualification of any new equipment prior to field deployment. For the FracRight DHP packer the designed qualification program simulated the deployment and setting of the hanger in field conditions and established its performance to a standard exceeding ISO 14310 V3.

The testing program was performed using a temperature controlled chamber with annulus and tubing pressure regulation. A load compensator was used to simulate tubing loads. Testing was 3rd party witnessed for both minimum and maximum casing ID ranges for 7” 23 – 32 lb/ft

Test Objectives To qualify the DHP hanger setting mechanism at simulated field conditions

Successfully passed with all tool operations occurring at the designed conditions

Outline Procedure

Outcome

1. Deploy running tool and hanger into test casing2. Heat chamber to 275°F and apply 1,000psi system pressure 3. Increase tubing pressure in 500psi increments to 4500psi differential pressure to set hanger4. Hold pressure and apply a compressive load of 35,000lbs. to simulate hanging weight of string5. Hold load and bleed off tubing pressure to system pressure6. Increase tubing pressure to 5,500psi to release the torque lock 7. Bleed off pressure and pull the running tool clear of the hanger

Liner Hanger Setting

Hanging Capacity

Test Objectives Confirm anchoring capability of hanger

Successfully passed with full load held and no hanger slippage

Outline Procedure

Outcome

1. Stab test locator seal assembly into hanger PBR and apply 35,000 lbs. compression2. Heat system to 275degF with 1,000 psi system pressure.3. Apply 200,000 lbs. simulated tensile load to the hanger and return to neutral load conditions

ConclusionThe FracRight DHP has been purpose built and tested for application in unconventional plays and open-hole completions. It combines functionality and simplicity to deliver a reliable and economic liner hanger for horizontal multi-zone completions.

Pressure and Load Conditions

Test Objectives – To qualify the DHP hanger for pressures and loads encountered during fracturing operations– To meet the requirement of ISO 14310 V3

Outline Procedure 1. With 35,000 lbs. compression on hanger and 1,000psi system pressure, test upper annulus to 2000psi/ 5,000psi/ 10,000psi differential pressure at 275°F2. Repeat pressure test from lower annulus and tubing3. Repeat steps 1. and 2. twice for a total of three pressure cycles at 275°F4. Reduce temperature to 175°F and repeat three pressure cycles at 2000psi/ 5,000psi/ 10,000psi maximum differential pressure5. Increase temperature to 275°F and repeat three pressure cycles at 2000psi/ 5,000psi/ 10,000psi maximum differential pressure6. Return fixture to ambient temperature, bleed off pressure and remove hanger from casing for inspection

Successfully passed with full load held and no hanger slippage

Outcome

Element System after Testing Slip System after Testing

©2017 Tendeka. All rights reserved. TDK-WP-DQOH-0917

www.tendeka.com