Objective◦ Be able to use the processes of designing and
producing to complete a design project
![Page 3: Design project safety and risk management, production, final evaluation](https://reader036.fdocuments.net/reader036/viewer/2022062523/587ca7551a28ab356c8b5dfd/html5/thumbnails/3.jpg)
Last week Research Idea generation for possible solutions Project management Experimentation and testing Communication
![Page 4: Design project safety and risk management, production, final evaluation](https://reader036.fdocuments.net/reader036/viewer/2022062523/587ca7551a28ab356c8b5dfd/html5/thumbnails/4.jpg)
This week Safety and risk management Production Project final evaluation
![Page 5: Design project safety and risk management, production, final evaluation](https://reader036.fdocuments.net/reader036/viewer/2022062523/587ca7551a28ab356c8b5dfd/html5/thumbnails/5.jpg)
Where is everyone up to?
![Page 6: Design project safety and risk management, production, final evaluation](https://reader036.fdocuments.net/reader036/viewer/2022062523/587ca7551a28ab356c8b5dfd/html5/thumbnails/6.jpg)
Basic safety◦ Design classroom and Computer room – cords,
materials, ergonomics◦ Workshop – fluids, heat, electrics, dust, fumes,
sparks, chips, shavings, sharps, noise, tools, materials, adhesives, solvents, chemicals, lifting, etc
Work Health & Safety◦ Schools are considered a workplace◦ NSW Work Health and Safety Act 2011
http://www.workcover.nsw.gov.au/newlegislation2012/Pages/default.aspx
◦ WHS laws in NSW are policed by the WorkCover Authority of NSW
![Page 7: Design project safety and risk management, production, final evaluation](https://reader036.fdocuments.net/reader036/viewer/2022062523/587ca7551a28ab356c8b5dfd/html5/thumbnails/7.jpg)
Basic safety – common potential hazards◦ Design classroom and Computer room – cords,
materials, ergonomics◦ Workshop – fluids, heat, electrics, dust, fumes,
sparks, chips, shavings, sharps, noise, tools, materials, adhesives, solvents, chemicals, lifting, etc
![Page 8: Design project safety and risk management, production, final evaluation](https://reader036.fdocuments.net/reader036/viewer/2022062523/587ca7551a28ab356c8b5dfd/html5/thumbnails/8.jpg)
Who is responsible in the classroom?◦ Everyone? Yes, but...◦ Ultimately the trained teacher
all tools and equipment must be safe and sound work space must conform with current safety
standards teacher is to be an authority on the safety issues that
relate to the activities in his or her classroom compromise not appropriate with any decision relating
to safety responsibilities of teachers and students in school
workshops. http://www.curriculumsupport.education.nsw.gov.au/secondary/technology/safety/advice_for_teachers/index.htm
![Page 9: Design project safety and risk management, production, final evaluation](https://reader036.fdocuments.net/reader036/viewer/2022062523/587ca7551a28ab356c8b5dfd/html5/thumbnails/9.jpg)
You need a plan◦ http://www.youtube.com/watch?v=bJbsMKRqYEY
Risk management◦ Identify safety hazards◦ Risk assessment◦ Risk control◦ Review risk assessments
Collins, Cornius-Randall, Annetts, Annetts, Hampson, & McMurtrie, (2006), pp. 51-55.
![Page 10: Design project safety and risk management, production, final evaluation](https://reader036.fdocuments.net/reader036/viewer/2022062523/587ca7551a28ab356c8b5dfd/html5/thumbnails/10.jpg)
Controlling hazards1. Eliminate the hazard2. Change equipment or materials3. Change work methods4. Use Personal Protective Equipment (PPE)
Questions◦ What are some examples of PPE?◦ What are some general rules for safe work?
Collins, Cornius-Randall, Annetts, Annetts, Hampson, & McMurtrie, (2006), pp. 51-55.
![Page 11: Design project safety and risk management, production, final evaluation](https://reader036.fdocuments.net/reader036/viewer/2022062523/587ca7551a28ab356c8b5dfd/html5/thumbnails/11.jpg)
Record some aspects of safety and risk management that you need to consider for your project
![Page 12: Design project safety and risk management, production, final evaluation](https://reader036.fdocuments.net/reader036/viewer/2022062523/587ca7551a28ab356c8b5dfd/html5/thumbnails/12.jpg)
Turning ideas into reality Considerations
◦ Tools◦ Materials◦ Techniques
Collins, Cornius-Randall, Annetts, Annetts, Hampson, & McMurtrie, (2006), pp. 55-57.
![Page 13: Design project safety and risk management, production, final evaluation](https://reader036.fdocuments.net/reader036/viewer/2022062523/587ca7551a28ab356c8b5dfd/html5/thumbnails/13.jpg)
Production-management planning◦ Identify steps◦ List steps/processes sequentially◦ Refer to and/or amend Action Management plan
Collins, Cornius-Randall, Annetts, Annetts, Hampson, & McMurtrie, (2006), pp. 55-57.
Week 6 Sketches of ideas generation- collect evidence of creativity and innovation- sketches of possible types of carriers. Create technical drawings and create card prototype. Had to change ideas here to incorporate second carrier, wood box to meet two material criteria and adjust former design.
Week 7 Evaluate design and process on current model. Revisit consideration of design factors and criteria. Make adaption’s to design. Create 2nd pro forma (wood) small scale to trial attributes. Re-evaluate. Buy materials.
Week 8 Identification and justification of ideas and resources used. Seek out expertise of actual size pattern making and sewing. Source materials, tools. Perform trials on double stitching, joining materials. Trial fasteners, trial boning.
Week 9 Create pattern, pin pattern to material, cut out pattern- commence creating design. Make fasteners. Evaluate and adapt design during production. Presentation of work so far.
Week 10 Finish creating design to a quality standard. Seek professional feedback. Obtain evaluation of finished product. Make final adaptations if possible, if not record what happened. Finalise action, finance and time plans to evaluate how I went.
![Page 14: Design project safety and risk management, production, final evaluation](https://reader036.fdocuments.net/reader036/viewer/2022062523/587ca7551a28ab356c8b5dfd/html5/thumbnails/14.jpg)
Production-management planning◦ Safety – Work Method Statement
Source: Work Cover NSW Guide to writing WMS:http://www.workcover.nsw.gov.au/formspublications/publications/Documents/writing_work_method_statement_plain_english_guidelines_0231.pdf Additional resource: Sample unit for Construction from HSC online: http://hsc.csu.edu.au/construction/other_units/compulsory/bcg1002a/bcg1002a/bcg1002aedit1.html
![Page 15: Design project safety and risk management, production, final evaluation](https://reader036.fdocuments.net/reader036/viewer/2022062523/587ca7551a28ab356c8b5dfd/html5/thumbnails/15.jpg)
Production-management planning◦ Quality control
Aim for highest standard Work accurately Check quality at each step so that mistakes can be
corrected Check overall quality against criteria in the design
brief
Collins, Cornius-Randall, Annetts, Annetts, Hampson, & McMurtrie, (2006), pp. 55-57.
![Page 16: Design project safety and risk management, production, final evaluation](https://reader036.fdocuments.net/reader036/viewer/2022062523/587ca7551a28ab356c8b5dfd/html5/thumbnails/16.jpg)
Evaluations and Product Realisation
Pattern Drawings for Gaming BagFrom the technical drawings I created patterns on paper which I will use to create my gaming bag from materials.
![Page 17: Design project safety and risk management, production, final evaluation](https://reader036.fdocuments.net/reader036/viewer/2022062523/587ca7551a28ab356c8b5dfd/html5/thumbnails/17.jpg)
Evaluations and Product RealisationCreating stencil pattern for gaming box
Using wood saw to cut wood
Sanding the pieces
Using adhesive to join pieces Using clamps to hold box in placeuntil set
![Page 18: Design project safety and risk management, production, final evaluation](https://reader036.fdocuments.net/reader036/viewer/2022062523/587ca7551a28ab356c8b5dfd/html5/thumbnails/18.jpg)
Pinning
, Cutting, linin
g padding
and Sewing, of the gaming bag
![Page 19: Design project safety and risk management, production, final evaluation](https://reader036.fdocuments.net/reader036/viewer/2022062523/587ca7551a28ab356c8b5dfd/html5/thumbnails/19.jpg)
Wood burn design and lacquer for gaming box
![Page 20: Design project safety and risk management, production, final evaluation](https://reader036.fdocuments.net/reader036/viewer/2022062523/587ca7551a28ab356c8b5dfd/html5/thumbnails/20.jpg)
Evaluation: Refer back to the design brief◦ Judge against what you set out to do
No project goes perfectly Aspects to consider
◦ Function◦ Aesthetics◦ Planning
Collins, Cornius-Randall, Annetts, Annetts, Hampson, & McMurtrie, (2006), pp. 57-59.
![Page 21: Design project safety and risk management, production, final evaluation](https://reader036.fdocuments.net/reader036/viewer/2022062523/587ca7551a28ab356c8b5dfd/html5/thumbnails/21.jpg)
Possible questions:◦ Is the project aesthetically pleasing?◦ Does my project function well?◦ How effective was the project planning?
Collins, Cornius-Randall, Annetts, Annetts, Hampson, & McMurtrie, (2006), pp. 57-59.
Process steps
Strengths Weaknesses Improvements
Folio productionOngoing evaluationAnalysisManagementetc
![Page 22: Design project safety and risk management, production, final evaluation](https://reader036.fdocuments.net/reader036/viewer/2022062523/587ca7551a28ab356c8b5dfd/html5/thumbnails/22.jpg)
Evaluations and Product Realisation
Things that worked well Things that I’d change next time
Using various research resources. Not using a social network but using a more professional network i.e. Blog.
Mind maps and brainstorming. Creating technical drawings before pro forma’s so realistic measurements are taken into consideration.
Pro forma’s. Seek professional advice before attempting final design for example on the pro forma.
Variety of sketches- allowed exploration of idea.
Trial of using tools before attempting final design.
Designing patterns/stencils. Work on portfolio on each step of the process instead of completing several steps then trying to catch the folio up.
Evaluating and adjusting every step of the process.
Getting others feedback more frequently.
Keeping photographic evidence at each step.
Start my final design earlier so that it is finished before time and I can get feedback on it.
![Page 23: Design project safety and risk management, production, final evaluation](https://reader036.fdocuments.net/reader036/viewer/2022062523/587ca7551a28ab356c8b5dfd/html5/thumbnails/23.jpg)
What hazards are typical for technology projects
Who is responsible for safety How to approach to risk management How to approach the planning of the
production of your project What criteria you’ll use for the final
evaluation How to go about the project final evaluation
![Page 24: Design project safety and risk management, production, final evaluation](https://reader036.fdocuments.net/reader036/viewer/2022062523/587ca7551a28ab356c8b5dfd/html5/thumbnails/24.jpg)
Reflection on project in relation to the Technology Mandatory curriculum
![Page 25: Design project safety and risk management, production, final evaluation](https://reader036.fdocuments.net/reader036/viewer/2022062523/587ca7551a28ab356c8b5dfd/html5/thumbnails/25.jpg)
Collins, S. Cornius-Randall, R., Annetts, P., Annetts, S., Hampson, R. & McMurtrie, Y. (2006). Switched On: Technology Stage 4. Milton, QLD: John Wiley.