Design overview The West Gate Tunnel Project will deliver a vital alternative to the West Gate Bridge, providing a much needed second river crossing, quicker and safer journeys, and remove thousands of trucks from residential streets.
A design for the project has been selected. In response to community feedback we’ve developed a design with even better connections, less community impacts, more walking and cycling paths and new green spaces.
Key design updates include:
• a longer tunnel which keeps the westbound exit within the West Gate Freeway but further away from existing homes
• an improved city access design with simplified connections and two fewer crossings of the Moonee Ponds Creek
• over 14 km of new and upgraded cycling and walking paths – including a 2.5 km veloway above Footscray Road
• improved pedestrian and cycling connections between communities along the West Gate Freeway
• nearly 9 ha, the equivalent of almost four MCGs, of new community open space including parkland and wetlands and more than 17,000 trees planted
• world-class architecture, urban and landscape design that celebrates the Aboriginal heritage and maritime history of Melbourne’s west
• high-quality noise walls designed with residents in mind to reduce noise and protect privacy while allowing natural light
New bridge over the Maribyrnong River and MacKenzie Road ramps - night view
Inbound tunnel portal - night view Artist impressions only - does not include detailed design
JUNE 2017
World-class urban design reflecting the cultural
and maritime history of Melbourne’s west
Safer road design with four new lanes including express lanes to and from the West
Gate Bridge
Over 14 km of new and improved cycling and
walking paths
Improved landscaping along the Maribyrnong
River and Kororoit, Stony and Moonee Ponds creeks
Improved community safety and connectivity with multiple new cycling and walking paths
linking both sides of West Gate Freeway
Nearly 9 ha of new open space including parkland and
wetlands and more than 17,000 trees planted along the project
A new 2.5 km elevated veloway above
Footscray Road
High-quality noise walls to reduce traffic noise, protect privacy and improve urban
landscape
Minimised visual and environmental impacts
through a simplified design and fewer crossings of Moonee Ponds Creek
Key benefits of the design
The West Gate Tunnel Project will slash congestion from Geelong to Pakenham
Melbourne’s freeways operate as an interconnected network. What happens on one part of this network can affect people travelling on other parts –
even those that are many kilometres away. An incident on the West Gate Bridge can triple travel times for motorists.
The project will provide a much-needed second river crossing – a vital alternative to the already busy West Gate Bridge. More lanes on the West Gate Freeway will slash travel times, and separated express
lanes will reduce weaving and merging.
It also includes improved access to Webb Dock for trucks which will take trucks off the West Gate Freeway and directly to the
Bolte Bridge and 30 km of extra lanes will be added to the Monash Freeway.
The latest smart technology will be used to control all of these key connections into, and across Melbourne.
Yarraville
Spotswood
Brooklyn
Footscray
Seddon
Docklands
CBD
Southbank
PortMelbourne
AlbertPark
SouthKingsville
AltonaNorth
LavertonNorth
NorthMelbourne
FishermansBend
Gri
eve
Pd
e
Mill
ers
Rd
Princes Hwy
Kororoit Creek Rd
Somerville Rd
Blackshaws Rd
Freight rail
Francis St
Hudsons Rd
Will
iam
sto
wn
Rd
Me
lbo
urn
e R
dH
yde
St
Hyd
e S
t
Wh
iteh
all
St
Ma
cke
nzi
e R
d
Appleton D
ock Rd
Sim
s R
d
Footscray Rd
Footscray Rd
Dynon Rd
Sp
encer S
t
Wurund
jeri Way
Dudley St
Cook St
To
dd
Rd
Dynon Rd
Yarra River
Mo
on
ee P
on
ds
Cre
ek
M
ari
byr
no
ng
Riv
er
Ston
y Creek
Kororoit Cre
ek
Crofts Reserve
Lynch Road Reserve
Donald McLeanReserve
Hyde Street Reserve
McIvorReserve
YarravilleGardens
West Gate Bridge
CoodeIsland
SwansonDock
Bo
lte
Bri
dg
e
WEST GATE FWY
CIT
YLI
NK
ShepherdBridge
AppletonDock
WebbDock
To south eastern suburbs
To Melbourne Airport
To Geelong
To Ballarat
6
10
11 1312
14
9
8
1 35 4
2
Stylised map not to scale
7
1 Completing a missing link in the Kororoit Creek Trail to provide a continuous journey from Altona to Caroline Springs.
2 Completing and upgrading the Federation Trail to provide a separated path from Werribee to the city.
3 A longer tunnel moves the westbound southern tunnel portal and ventilation structure further away from people’s homes.
4 A new 3 ha park in Altona North will create open space for nearby communities and connect with the Federation Trail.
5 Better road design with three express lanes between the M80 interchange and the West Gate Bridge to reduce weaving and merging.
6 High-quality noise walls designed with residents in mind to protect privacy, reduce traffic noise and be visually appealing.
7 A new path between Spotswood Station and Hyde Street Reserve to connect the neighbourhoods of Spotswood and Yarraville.
8 New open space, landscaping and path connections will enhance Hyde Street Reserve.
9 Almost 3 ha of park and wetland opposite Yarraville Gardens will transform the industrial land in this area.
10 A new cycling path on Hyde Street and a pedestrian bridge over Whitehall Street will link Yarraville Gardens and the Maribyrnong River and take cyclists and pedestrians off a dangerous and busy road.
11 A landmark major second river crossing will provide a much needed alternative to the West Gate Bridge and create a new gateway to the west over the Maribyrnong River that speaks to the maritime and Aboriginal history of the area.
12 A new elevated 2.5 km veloway along Footscray Road will give commuter cyclists a safe and express route to and from the city.
13 Better visual and environmental outcomes through a simplified design and two fewer crossings of Moonee Ponds Creek.
14 A pedestrian and cycling bridge over Footscray Road will provide a new and safer connection between the Moonee Ponds Creek, veloway and Capital City Trail.
LegendTunnels
Surface road
Elevated road and structures
Road cutting
Tunnel portals
Shared use paths (existing near project corridor)
Shared use paths (new or upgraded near project corridor)
Open spaces (new or upgraded near project corridor)
Stylised map not to scale
Veloway
Moonee Ponds Creek
Bridge over Footscray Road
West Gate Tunnel Project express lanes Second river crossing
Le Fevre Street, Spotswood
New shared use path along the Hyde Street off-ramp, Yarraville
Altona North open space
Artist impressions only - does not include detailed design
Urban design
The project will feature world-class architecture, urban and landscape design. It considers the form and character of the built environment and how people access, use and enjoy public spaces.
The West Gate Tunnel Project’s urban design has been carefully considered to enhance the local character with better walking and cycling connections and high quality recreational facilities. The infrastructure celebrates the rich history, Aboriginal heritage and maritime history of Melbourne’s west.
Melbourne is well-known for its excellence in urban design - from innovative buildings, attractive structures and landmark bridges to the clever use of public spaces. The project will build on and extend the reputation of leading urban infrastructure in Victoria.
A sustainable design
The West Gate Tunnel Project will meet an ‘excellent’ Infrastructure Sustainability rating by reusing and recycling materials, minimising construction truck movements and using smart design and sustainable equipment and materials to reduce energy during operation.
Northern tunnel portal, Footscray
New boardwalk and wetlands, Footscray
Artist impressions only - does not include detailed design
Environmental Effects Statement (EES)
The EES for the West Gate Tunnel Project has detailed information about how the project could affect people and the environment and how the impacts will be managed. The EES has assessed potential impacts in 17 areas including transport, air quality, noise, landscape and visual, vibration, business, ecology and human health. To view the EES visit www.westgatetunnelproject.vic.gov.au/EES.
Construction will start after we have planning approvals - expected later this year - with works to be completed by the end of 2022.
Contact us
Do you have a question about the project? If you need more information or would like to provide feedback, please get in touch.
westgatetunnelproject.vic.gov.au
1300 280 939
facebook.com/westgatetunnelproject
@westgatetunnel
West Gate Tunnel Project GPO Box 4509 Melbourne Victoria 3001
Interpreter service: 13 14 50
If you are deaf, or have a hearing or speech impairment, contact us through the National Relay Service. For more information, visit: www.relayservice.gov.au.
Find out more and stay involved
• Sign up for email updates or ask a question through our website
• Follow us on Facebook and Twitter
• Talk with your local Community Liaison Group member
• Look out for updates from the team via newsletters, email, project website and local events
Timeline
Concept design consultation
EES required
EES impact assessments commence
Reference design and tender
issued to market
Tender responses submitted
EES public exhibition
Planning approvals
Confirm design
Construction commences
Construction complete
2022
2016 20182017
Community Engagement
EES development EES public exhibition, inquiry and approvals
WE ARE HERE