Design Items and Tasks for pol. 3He
• Remain design items: • Support structure
Main supportTube/oven (90% complete)Temp. support in the target lab
• Target ladder assembly holder for optics target Pick-up coil/mounts• Access/safety• Enclosure and viewing • Optics lines (including EPR, spectra-analyzer)• Reference cell support• Compass mounts• BB fringe field shielding/compensation
![Page 2: Design Items and Tasks for pol. 3 He Remain design items: Support structure Main support Tube/oven (90% complete) Temp. support in the target lab Target.](https://reader036.fdocuments.net/reader036/viewer/2022082700/5514e030550346b0338b5815/html5/thumbnails/2.jpg)
Tasks for pol. 3He (I)
• Target lab: • Finish spin-reversal test• RF sweep water calibration • EPR• New oven (arrive next week) test• Test new components • Test new optics• Test/characterize new cells
![Page 3: Design Items and Tasks for pol. 3 He Remain design items: Support structure Main support Tube/oven (90% complete) Temp. support in the target lab Target.](https://reader036.fdocuments.net/reader036/viewer/2022082700/5514e030550346b0338b5815/html5/thumbnails/3.jpg)
Other tasks/issues for pol. 3He (II)
• Other tasks/issues: • Compass• Vertical coils • Optical fibers• Lasers• Cells • Budget• Manpower• Readiness review
• Milestones