COMPANY PROFILECOMPANY PROFILE““Balkan Energy Team” d.o.o.-(“ BET” d.o.o) was founded in 2005, with Head Balkan Energy Team” d.o.o.-(“ BET” d.o.o) was founded in 2005, with Head Office in Belgrade and Agency in Mulheim A.d. Ruhr in Germany.Office in Belgrade and Agency in Mulheim A.d. Ruhr in Germany.
Company has employees who have been designed and constructed many Company has employees who have been designed and constructed many projects within the fields of thermal power plants, industrial plants of all kinds, projects within the fields of thermal power plants, industrial plants of all kinds, chemical processing plant, oil refinery and cement industry.chemical processing plant, oil refinery and cement industry.
There are 19 employees in Balkan Energy Team, with between 5 and 20 years There are 19 employees in Balkan Energy Team, with between 5 and 20 years of working experience, among which there are 11 engineers and 6 technicians of working experience, among which there are 11 engineers and 6 technicians skilled and qualified to design and construct even the most complex industry skilled and qualified to design and construct even the most complex industry and equipment according to the currently valid standard specifications and and equipment according to the currently valid standard specifications and norms accepted worldwide.norms accepted worldwide.
By the permanent on the job training, by education and specialization, this By the permanent on the job training, by education and specialization, this Organization has created a good team of specialists and experts who today Organization has created a good team of specialists and experts who today give a guarantee for successful and high quality performance of design works.give a guarantee for successful and high quality performance of design works.
All employees in “BET”d.o.o have a good knowledge of following All employees in “BET”d.o.o have a good knowledge of following software-- AutoCAD - Plant Design Management System (AVEVA PDMS) - AutoCAD - Plant Design Management System (AVEVA PDMS) -- Bentley MicroStation - Microsoft Office tools- Bentley MicroStation - Microsoft Office tools - COADE Caesar II- COADE Caesar II - AUTODESK ALGOR Pipe Pack - AUTODESK ALGOR Pipe Pack
In the performance of design works abroad Balkan Energy Team has been the In the performance of design works abroad Balkan Energy Team has been the partner of many renowned firms from Germany.partner of many renowned firms from Germany.
Here are some examples of design feature:Here are some examples of design feature:
04/21/23 3
ORDERERORDERER Kind of workKind of work OBJECT OBJECT
„„EP Cg“, MontenegroEP Cg“, Montenegro„„Reconstruction system of main, hot reheat and Reconstruction system of main, hot reheat and cold reheat steam pipelinescold reheat steam pipelines
Power plant Pljevlja, Unit Power plant Pljevlja, Unit ((210MW210MW))Pljevlja MontenegroPljevlja Montenegro
„TE-TO“, N. SadReconstruction of supporting systemReconstruction of supporting system. . Main steam Main steam pipelinepipeline
Power plant Novi Sad, Unit 1; 2 Power plant Novi Sad, Unit 1; 2 and 3, Novi Sad, Serbiaand 3, Novi Sad, Serbia
““NIS”, Serbia NIS”, Serbia As build design Area 24 As build design Area 24 NIS Oil Refinery Pancevo SerbiaNIS Oil Refinery Pancevo Serbia
JP”EPS”, SerbiaJP”EPS”, SerbiaReconstruction of boiler 305MWReconstruction of boiler 305MW EPS TE NIKOLA TESLA A EPS TE NIKOLA TESLA A unit V, unit V,
(320 MW)(320 MW) Obrenovac, Serbia Obrenovac, Serbia
BABCOK Steinmueler, BABCOK Steinmueler, BerlinBerlin
Reconstruction of boiler 200 MWReconstruction of boiler 200 MW Power Plant Kakanj Bosnia and Power Plant Kakanj Bosnia and HerzegovinaHerzegovina
““PETROHEMICAL”, SerbiaPETROHEMICAL”, SerbiaRepair of the boiler super heater B-1002B Repair of the boiler super heater B-1002B Ethylene- Petrochemical complex Ethylene- Petrochemical complex
Pančevo, SerbiaPančevo, Serbia
““NIS”,SerbiaNIS”,SerbiaSteam tracing systemSteam tracing system Refinery "Novi Sad", Novi SadRefinery "Novi Sad", Novi Sad
“USS Steel”, SmederevoEquipment for lifting steel construction in Equipment for lifting steel construction in engineeringengineering
USS USS Steel Steel Smederevo,Smederevo,
JP EPS TE“KOSTOLAC“ JP EPS TE“KOSTOLAC“ BB
Reconstruction of supporting systemReconstruction of supporting system . . Main steam Main steam pipelinepipeline
EPS TE KOSTOLAC B, DrmnoEPS TE KOSTOLAC B, Drmno Unit I and II Unit I and II (2x345 MW)(2x345 MW)
BABCOK Steinmueler, BABCOK Steinmueler, BerlinBerlin
Technical documentation, rTechnical documentation, reconstructioneconstruction internal internal pressure parts of the boilerpressure parts of the boiler
Power PlantsPower Plants BELCHATOW , BELCHATOW , PolandPoland
04/21/23 4
ORDERERORDERER Kind of workKind of work OBJECT OBJECT
Ingenieurbüro PLAKON OhG, Duisburg
Detail engineering and workshop drawings, Detail engineering and workshop drawings, rreconstructioneconstruction internal pressure parts of the boiler internal pressure parts of the boiler
Power Plants, GermanyPower Plants, Germanyp=40bar t=450cp=40bar t=450c
Ingenieurbüro PLAKON OhG, Duisburg
Detail engineering and workshop drawings, Detail engineering and workshop drawings, rreconstructioneconstruction internal pressure parts of the boiler internal pressure parts of the boiler
Power Plants Minero, Peru Power Plants Minero, Peru
TH ARENS, Tvist Germany Detail engineering and workshop drawings, new Duct Detail engineering and workshop drawings, new Duct for Nox for Nox
Power plant Walsum Unit 10, Power plant Walsum Unit 10, Duisburg, GermanyDuisburg, Germany
ELTE Inzenjering, Skoplje Reconstruction of supporting systemReconstruction of supporting system for for steam line steam line Power Plants Oslomej, Kicevo, Power Plants Oslomej, Kicevo, (120 MW)(120 MW) MacedonijaMacedonija
„SPEKTAR CO“, KrusevacBasic, detail engineering and as built documentation Basic, detail engineering and as built documentation of technological, boiler and heavy liquid fluid facility of technological, boiler and heavy liquid fluid facility
Factory for water glass, Gornji Factory for water glass, Gornji StupanjStupanj
JP “District Heating”, Lazarevac
Basic design for district heating main lines in city of Basic design for district heating main lines in city of LazarevacLazarevac
South 2, North 2 and West 2 South 2, North 2 and West 2 main linesmain lines
“TRYAL“ CO, Krusevac Basic design of energy plant and steam lineBasic design of energy plant and steam line ““TRYAL” CO, KrusevacTRYAL” CO, Krusevac
“BIRAC” AD, Zvornik, Serbian Republic
Project report about possible reduction of the capacity Project report about possible reduction of the capacity of existing boiler on liquid fuelof existing boiler on liquid fuel
Factory of alumina “BIRAC”, Factory of alumina “BIRAC”, Zvornik, Serbian RepublicZvornik, Serbian Republic
JP EPS TE“NIKOLA JP EPS TE“NIKOLA TESLA“, Obrenovac TESLA“, Obrenovac
Technical documentation for construction and delivery Technical documentation for construction and delivery of economiser (water heater) 1 and 2of economiser (water heater) 1 and 2
EPS TE NIKOLA TESLA EPS TE NIKOLA TESLA BB, , UNIT 1 and 2,UNIT 1 and 2, (2x620 MW) (2x620 MW) ObrenovacObrenovac
04/21/23 5
ORDERERORDERER Kind of workKind of work OBJECT OBJECT
JP EPS TE“NIKOLA JP EPS TE“NIKOLA TESLA“, Obrenovac TESLA“, Obrenovac
Technical control of main mechanical project for feed Technical control of main mechanical project for feed water pipeline renovation and adaptationwater pipeline renovation and adaptation
EPS TE NIKOLA TESLA A Unit EPS TE NIKOLA TESLA A Unit 4, 4, (320 MW)(320 MW) Obrenovac Obrenovac
JP EPS TE“NIKOLA JP EPS TE“NIKOLA TESLA“, Obrenovac TESLA“, Obrenovac
Technical control of main mechanical project for Technical control of main mechanical project for steam-water soot blower pipeline used on regenerative steam-water soot blower pipeline used on regenerative air preheaterair preheater
EPS TE NIKOLA TESLA A Unit EPS TE NIKOLA TESLA A Unit 4,4, (320 MW) (320 MW) Obrenovac Obrenovac
JP EPS TE“NIKOLA JP EPS TE“NIKOLA TESLA“, Obrenovac TESLA“, Obrenovac
Reconstruction of supporting systemReconstruction of supporting system for for steam steam pipepipelineline that is connecting interheaters MP1 and MP2 that is connecting interheaters MP1 and MP2
EPS TE NIKOLA TESLA A Unit EPS TE NIKOLA TESLA A Unit 6,6, (320 MW) (320 MW) Obrenovac Obrenovac
JP EPS TE“MORAVA“, JP EPS TE“MORAVA“, SvilajnacSvilajnac
Technical documentation, renovation of feed water Technical documentation, renovation of feed water pipeline-RL and reconstruction of supporting system pipeline-RL and reconstruction of supporting system
EPS TE EPS TE ””MORAVAMORAVA””,, (120 MW) (120 MW) SvilajnacSvilajnac
JP “District Heating”, Lajkovac
Basic design of boiler room for district heatingBasic design of boiler room for district heating 3x10MW, coal boiler3x10MW, coal boiler
JP EPS TE“NIKOLA JP EPS TE“NIKOLA TESLA“, Obrenovac TESLA“, Obrenovac
Technical documentation, vessels for ash transport Technical documentation, vessels for ash transport system- Serbian inspection for pressure vessels partssystem- Serbian inspection for pressure vessels parts
EPS TE NIKOLA TESLA A Unit EPS TE NIKOLA TESLA A Unit 6,6, (320 MW) (320 MW) Obrenovac Obrenovac
JP EPS TE“NIKOLA JP EPS TE“NIKOLA TESLA“, Obrenovac TESLA“, Obrenovac
Technical control of main mechanical project for Technical control of main mechanical project for sanitation and adaptation of steam pipesanitation and adaptation of steam pipelineline RA, RB RA, RB and part of RC- lineand part of RC- line
EPS TE NIKOLA TESLA A Unit EPS TE NIKOLA TESLA A Unit 6, 6, (320 MW)(320 MW) Obrenovac Obrenovac
JP EPS TE“NIKOLA JP EPS TE“NIKOLA TESLA“, Obrenovac TESLA“, Obrenovac
Technical documentation and project for dismentling Technical documentation and project for dismentling and erection of steam pipeand erection of steam pipelineline RA, RB and part of RC- RA, RB and part of RC- lineline
EPS TE NIKOLA TESLA A Unit EPS TE NIKOLA TESLA A Unit 6,6,(320 MW)(320 MW) Obrenovac Obrenovac
BABCOK Power Service, BABCOK Power Service, Oberhausen, GermanyOberhausen, Germany
Technical documentation, Reconstruction of clean and Technical documentation, Reconstruction of clean and raw gas ductsraw gas ducts
Power PlantsPower Plants BELCHATOW , BELCHATOW , PolandPoland
04/21/23 6
ORDERERORDERER Kind of workKind of work OBJECT OBJECT
Eisenmann Anlagenbau Eisenmann Anlagenbau GmbH & Co KGGmbH & Co KGZK TermochemZK Termochem
Technical documentation media supplyTechnical documentation media supply FIAT Serbia, new paint shopFIAT Serbia, new paint shop
HAMON HAMON ENVIRONMENTAL GmbH ENVIRONMENTAL GmbH
Detailed mechanical design and workshop Detailed mechanical design and workshop documentation for reparation and adaptation of documentation for reparation and adaptation of electrostatic precipitatorelectrostatic precipitator
EPS TE NIKOLA TESLA B,EPS TE NIKOLA TESLA B,
(620 MW)(620 MW) Obrenovac Obrenovac
HAMON HAMON ENVIRONMENTAL GmbH,ENVIRONMENTAL GmbH,ZK Termochem ZK Termochem
Detailed mechanical design and workshop Detailed mechanical design and workshop documentation for reparation and adaptation of flue documentation for reparation and adaptation of flue gas ducts at the inlet electrostatic precipitatorgas ducts at the inlet electrostatic precipitator
EPS TE NIKOLA TESLA B, EPS TE NIKOLA TESLA B,
(620 MW)(620 MW) Obrenovac Obrenovac
HAMON HAMON ENVIRONMENTAL GmbH ENVIRONMENTAL GmbH
Workshop documentation of electrostatic precipitatorWorkshop documentation of electrostatic precipitator MA’ADEN MINE AND MA’ADEN MINE AND REFINERY PROJECTREFINERY PROJECT
Good organization, expert personnel, maintenance, using updated procedures Good organization, expert personnel, maintenance, using updated procedures standards and technology, are the basic features of this company in the standards and technology, are the basic features of this company in the competition with other companies engaged in this activity.competition with other companies engaged in this activity.
04/21/23 7
Pipeline 3D drawing-petrochemical Pipeline 3D drawing-petrochemical complexcomplex
04/21/23 8
Supporting constructionSupporting construction
04/21/23 9
Openings for soot blowers-side wallsOpenings for soot blowers-side walls
04/21/23 10
Boiler roof-technical drawingBoiler roof-technical drawing
04/21/23 11
Super heater-technical drawingSuper heater-technical drawing
04/21/23 12
Super heaterSuper heaterconnecting pipes & supporting constructionconnecting pipes & supporting construction
04/21/23 13
Combustion chamberCombustion chamberwarm bandageswarm bandages
04/21/23 14
Roof super heater-technical drawingRoof super heater-technical drawing
04/21/23 15
Roof super heater-3D drawingRoof super heater-3D drawing
04/21/23 16
Roof super heater-detailsRoof super heater-details
04/21/23 17
Pressure vesselsPressure vessels
04/21/23 18
Pressure vesselsPressure vessels
04/21/23 19
Raw gas & clean gas ductsRaw gas & clean gas ducts
04/21/23 20
Raw gas & clean gas ductsRaw gas & clean gas ducts
04/21/23 21
Raw gas & clean gas ductsRaw gas & clean gas ducts
04/21/23 22
Raw gas & clean gas ductsRaw gas & clean gas ducts
04/21/23 23
Media supply – 3D drawingsMedia supply – 3D drawings
04/21/23 24
Media supply – disposition & sectionsMedia supply – disposition & sections
04/21/23 25
BoilerBoiler
04/21/23 26
Steel tank acc API 650Steel tank acc API 650
04/21/23 27
Steel rack-hydroelectric Power PlantSteel rack-hydroelectric Power Plant
04/21/23 28
Technological chart-boiler roomTechnological chart-boiler room
04/21/23 29
Reconstruction of main and hot reheat steam pipe linesReconstruction of main and hot reheat steam pipe linespower plant TENT-A block 6 Obrenovacpower plant TENT-A block 6 Obrenovac
04/21/23 30
Isometric-middle steam pipelineIsometric-middle steam pipeline
04/21/23 31
Isometric hot reheat steam pipeline-Isometric hot reheat steam pipeline-as build drawingas build drawing
04/21/23 32
““stress analyses feed water”stress analyses feed water”
04/21/23 33
New SupportsNew Supports
04/21/23 34
Reconstruction of spring hangersReconstruction of spring hangers
04/21/23 35
04/21/23 36
04/21/23 37
04/21/23 38
04/21/23 39
04/21/23 40