design , examination & engineering

40
05/16/22 1

description

design , examination & engineering. COMPANY PROFILE “Balkan Energy Team” d.o.o.-(“ BET” d.o.o) was founded in 2005, with Head Office in Belgrade and Agency in Mulheim A.d. Ruhr in Germany. - PowerPoint PPT Presentation

Transcript of design , examination & engineering

Page 1: design , examination & engineering

04/21/23 1

Page 2: design , examination & engineering

04/21/23 2

COMPANY PROFILECOMPANY PROFILE““Balkan Energy Team” d.o.o.-(“ BET” d.o.o) was founded in 2005, with Head Balkan Energy Team” d.o.o.-(“ BET” d.o.o) was founded in 2005, with Head Office in Belgrade and Agency in Mulheim A.d. Ruhr in Germany.Office in Belgrade and Agency in Mulheim A.d. Ruhr in Germany.

Company has employees who have been designed and constructed many Company has employees who have been designed and constructed many projects within the fields of thermal power plants, industrial plants of all kinds, projects within the fields of thermal power plants, industrial plants of all kinds, chemical processing plant, oil refinery and cement industry.chemical processing plant, oil refinery and cement industry.

There are 19 employees in Balkan Energy Team, with between 5 and 20 years There are 19 employees in Balkan Energy Team, with between 5 and 20 years of working experience, among which there are 11 engineers and 6 technicians of working experience, among which there are 11 engineers and 6 technicians skilled and qualified to design and construct even the most complex industry skilled and qualified to design and construct even the most complex industry and equipment according to the currently valid standard specifications and and equipment according to the currently valid standard specifications and norms accepted worldwide.norms accepted worldwide.

By the permanent on the job training, by education and specialization, this By the permanent on the job training, by education and specialization, this Organization has created a good team of specialists and experts who today Organization has created a good team of specialists and experts who today give a guarantee for successful and high quality performance of design works.give a guarantee for successful and high quality performance of design works.

All employees in “BET”d.o.o have a good knowledge of following All employees in “BET”d.o.o have a good knowledge of following software-- AutoCAD - Plant Design Management System (AVEVA PDMS) - AutoCAD - Plant Design Management System (AVEVA PDMS) -- Bentley MicroStation - Microsoft Office tools- Bentley MicroStation - Microsoft Office tools - COADE Caesar II- COADE Caesar II - AUTODESK ALGOR Pipe Pack - AUTODESK ALGOR Pipe Pack

In the performance of design works abroad Balkan Energy Team has been the In the performance of design works abroad Balkan Energy Team has been the partner of many renowned firms from Germany.partner of many renowned firms from Germany.

Here are some examples of design feature:Here are some examples of design feature:

Page 3: design , examination & engineering

04/21/23 3

ORDERERORDERER Kind of workKind of work OBJECT OBJECT

„„EP Cg“, MontenegroEP Cg“, Montenegro„„Reconstruction system of main, hot reheat and Reconstruction system of main, hot reheat and cold reheat steam pipelinescold reheat steam pipelines

Power plant Pljevlja, Unit Power plant Pljevlja, Unit ((210MW210MW))Pljevlja MontenegroPljevlja Montenegro

„TE-TO“, N. SadReconstruction of supporting systemReconstruction of supporting system. . Main steam Main steam pipelinepipeline

Power plant Novi Sad, Unit 1; 2 Power plant Novi Sad, Unit 1; 2 and 3, Novi Sad, Serbiaand 3, Novi Sad, Serbia

““NIS”, Serbia NIS”, Serbia As build design Area 24 As build design Area 24 NIS Oil Refinery Pancevo SerbiaNIS Oil Refinery Pancevo Serbia

JP”EPS”, SerbiaJP”EPS”, SerbiaReconstruction of boiler 305MWReconstruction of boiler 305MW EPS TE NIKOLA TESLA A EPS TE NIKOLA TESLA A unit V, unit V,

(320 MW)(320 MW) Obrenovac, Serbia Obrenovac, Serbia

BABCOK Steinmueler, BABCOK Steinmueler, BerlinBerlin

Reconstruction of boiler 200 MWReconstruction of boiler 200 MW Power Plant Kakanj Bosnia and Power Plant Kakanj Bosnia and HerzegovinaHerzegovina

““PETROHEMICAL”, SerbiaPETROHEMICAL”, SerbiaRepair of the boiler super heater B-1002B Repair of the boiler super heater B-1002B Ethylene- Petrochemical complex Ethylene- Petrochemical complex

Pančevo, SerbiaPančevo, Serbia

““NIS”,SerbiaNIS”,SerbiaSteam tracing systemSteam tracing system Refinery "Novi Sad", Novi SadRefinery "Novi Sad", Novi Sad

“USS Steel”, SmederevoEquipment for lifting steel construction in Equipment for lifting steel construction in engineeringengineering

USS USS Steel Steel Smederevo,Smederevo,

JP EPS TE“KOSTOLAC“ JP EPS TE“KOSTOLAC“ BB

Reconstruction of supporting systemReconstruction of supporting system . . Main steam Main steam pipelinepipeline

EPS TE KOSTOLAC B, DrmnoEPS TE KOSTOLAC B, Drmno Unit I and II Unit I and II (2x345 MW)(2x345 MW)

BABCOK Steinmueler, BABCOK Steinmueler, BerlinBerlin

Technical documentation, rTechnical documentation, reconstructioneconstruction internal internal pressure parts of the boilerpressure parts of the boiler

Power PlantsPower Plants BELCHATOW , BELCHATOW , PolandPoland

Page 4: design , examination & engineering

04/21/23 4

ORDERERORDERER Kind of workKind of work OBJECT OBJECT

Ingenieurbüro PLAKON OhG, Duisburg

Detail engineering and workshop drawings, Detail engineering and workshop drawings, rreconstructioneconstruction internal pressure parts of the boiler internal pressure parts of the boiler

Power Plants, GermanyPower Plants, Germanyp=40bar t=450cp=40bar t=450c

Ingenieurbüro PLAKON OhG, Duisburg

Detail engineering and workshop drawings, Detail engineering and workshop drawings, rreconstructioneconstruction internal pressure parts of the boiler internal pressure parts of the boiler

Power Plants Minero, Peru Power Plants Minero, Peru

TH ARENS, Tvist Germany Detail engineering and workshop drawings, new Duct Detail engineering and workshop drawings, new Duct for Nox for Nox

Power plant Walsum Unit 10, Power plant Walsum Unit 10, Duisburg, GermanyDuisburg, Germany

ELTE Inzenjering, Skoplje Reconstruction of supporting systemReconstruction of supporting system for for steam line steam line Power Plants Oslomej, Kicevo, Power Plants Oslomej, Kicevo, (120 MW)(120 MW) MacedonijaMacedonija

„SPEKTAR CO“, KrusevacBasic, detail engineering and as built documentation Basic, detail engineering and as built documentation of technological, boiler and heavy liquid fluid facility of technological, boiler and heavy liquid fluid facility

Factory for water glass, Gornji Factory for water glass, Gornji StupanjStupanj

JP “District Heating”, Lazarevac

Basic design for district heating main lines in city of Basic design for district heating main lines in city of LazarevacLazarevac

South 2, North 2 and West 2 South 2, North 2 and West 2 main linesmain lines

“TRYAL“ CO, Krusevac Basic design of energy plant and steam lineBasic design of energy plant and steam line ““TRYAL” CO, KrusevacTRYAL” CO, Krusevac

“BIRAC” AD, Zvornik, Serbian Republic

Project report about possible reduction of the capacity Project report about possible reduction of the capacity of existing boiler on liquid fuelof existing boiler on liquid fuel

Factory of alumina “BIRAC”, Factory of alumina “BIRAC”, Zvornik, Serbian RepublicZvornik, Serbian Republic

JP EPS TE“NIKOLA JP EPS TE“NIKOLA TESLA“, Obrenovac TESLA“, Obrenovac

Technical documentation for construction and delivery Technical documentation for construction and delivery of economiser (water heater) 1 and 2of economiser (water heater) 1 and 2

EPS TE NIKOLA TESLA EPS TE NIKOLA TESLA BB, , UNIT 1 and 2,UNIT 1 and 2, (2x620 MW) (2x620 MW) ObrenovacObrenovac

Page 5: design , examination & engineering

04/21/23 5

ORDERERORDERER Kind of workKind of work OBJECT OBJECT

JP EPS TE“NIKOLA JP EPS TE“NIKOLA TESLA“, Obrenovac TESLA“, Obrenovac

Technical control of main mechanical project for feed Technical control of main mechanical project for feed water pipeline renovation and adaptationwater pipeline renovation and adaptation

EPS TE NIKOLA TESLA A Unit EPS TE NIKOLA TESLA A Unit 4, 4, (320 MW)(320 MW) Obrenovac Obrenovac

JP EPS TE“NIKOLA JP EPS TE“NIKOLA TESLA“, Obrenovac TESLA“, Obrenovac

Technical control of main mechanical project for Technical control of main mechanical project for steam-water soot blower pipeline used on regenerative steam-water soot blower pipeline used on regenerative air preheaterair preheater

EPS TE NIKOLA TESLA A Unit EPS TE NIKOLA TESLA A Unit 4,4, (320 MW) (320 MW) Obrenovac Obrenovac

JP EPS TE“NIKOLA JP EPS TE“NIKOLA TESLA“, Obrenovac TESLA“, Obrenovac

Reconstruction of supporting systemReconstruction of supporting system for for steam steam pipepipelineline that is connecting interheaters MP1 and MP2 that is connecting interheaters MP1 and MP2

EPS TE NIKOLA TESLA A Unit EPS TE NIKOLA TESLA A Unit 6,6, (320 MW) (320 MW) Obrenovac Obrenovac

JP EPS TE“MORAVA“, JP EPS TE“MORAVA“, SvilajnacSvilajnac

Technical documentation, renovation of feed water Technical documentation, renovation of feed water pipeline-RL and reconstruction of supporting system pipeline-RL and reconstruction of supporting system

EPS TE EPS TE ””MORAVAMORAVA””,, (120 MW) (120 MW) SvilajnacSvilajnac

JP “District Heating”, Lajkovac

Basic design of boiler room for district heatingBasic design of boiler room for district heating 3x10MW, coal boiler3x10MW, coal boiler

JP EPS TE“NIKOLA JP EPS TE“NIKOLA TESLA“, Obrenovac TESLA“, Obrenovac

Technical documentation, vessels for ash transport Technical documentation, vessels for ash transport system- Serbian inspection for pressure vessels partssystem- Serbian inspection for pressure vessels parts

EPS TE NIKOLA TESLA A Unit EPS TE NIKOLA TESLA A Unit 6,6, (320 MW) (320 MW) Obrenovac Obrenovac

JP EPS TE“NIKOLA JP EPS TE“NIKOLA TESLA“, Obrenovac TESLA“, Obrenovac

Technical control of main mechanical project for Technical control of main mechanical project for sanitation and adaptation of steam pipesanitation and adaptation of steam pipelineline RA, RB RA, RB and part of RC- lineand part of RC- line

EPS TE NIKOLA TESLA A Unit EPS TE NIKOLA TESLA A Unit 6, 6, (320 MW)(320 MW) Obrenovac Obrenovac

JP EPS TE“NIKOLA JP EPS TE“NIKOLA TESLA“, Obrenovac TESLA“, Obrenovac

Technical documentation and project for dismentling Technical documentation and project for dismentling and erection of steam pipeand erection of steam pipelineline RA, RB and part of RC- RA, RB and part of RC- lineline

EPS TE NIKOLA TESLA A Unit EPS TE NIKOLA TESLA A Unit 6,6,(320 MW)(320 MW) Obrenovac Obrenovac

BABCOK Power Service, BABCOK Power Service, Oberhausen, GermanyOberhausen, Germany

Technical documentation, Reconstruction of clean and Technical documentation, Reconstruction of clean and raw gas ductsraw gas ducts

Power PlantsPower Plants BELCHATOW , BELCHATOW , PolandPoland

Page 6: design , examination & engineering

04/21/23 6

ORDERERORDERER Kind of workKind of work OBJECT OBJECT

Eisenmann Anlagenbau Eisenmann Anlagenbau GmbH & Co KGGmbH & Co KGZK TermochemZK Termochem

Technical documentation media supplyTechnical documentation media supply FIAT Serbia, new paint shopFIAT Serbia, new paint shop

HAMON HAMON ENVIRONMENTAL GmbH ENVIRONMENTAL GmbH

Detailed mechanical design and workshop Detailed mechanical design and workshop documentation for reparation and adaptation of documentation for reparation and adaptation of electrostatic precipitatorelectrostatic precipitator

EPS TE NIKOLA TESLA B,EPS TE NIKOLA TESLA B,

(620 MW)(620 MW) Obrenovac Obrenovac

HAMON HAMON ENVIRONMENTAL GmbH,ENVIRONMENTAL GmbH,ZK Termochem ZK Termochem

Detailed mechanical design and workshop Detailed mechanical design and workshop documentation for reparation and adaptation of flue documentation for reparation and adaptation of flue gas ducts at the inlet electrostatic precipitatorgas ducts at the inlet electrostatic precipitator

EPS TE NIKOLA TESLA B, EPS TE NIKOLA TESLA B,

(620 MW)(620 MW) Obrenovac Obrenovac

HAMON HAMON ENVIRONMENTAL GmbH ENVIRONMENTAL GmbH

Workshop documentation of electrostatic precipitatorWorkshop documentation of electrostatic precipitator MA’ADEN MINE AND MA’ADEN MINE AND REFINERY PROJECTREFINERY PROJECT

Good organization, expert personnel, maintenance, using updated procedures Good organization, expert personnel, maintenance, using updated procedures standards and technology, are the basic features of this company in the standards and technology, are the basic features of this company in the competition with other companies engaged in this activity.competition with other companies engaged in this activity.

Page 7: design , examination & engineering

04/21/23 7

Pipeline 3D drawing-petrochemical Pipeline 3D drawing-petrochemical complexcomplex

Page 8: design , examination & engineering

04/21/23 8

Supporting constructionSupporting construction

Page 9: design , examination & engineering

04/21/23 9

Openings for soot blowers-side wallsOpenings for soot blowers-side walls

Page 10: design , examination & engineering

04/21/23 10

Boiler roof-technical drawingBoiler roof-technical drawing

Page 11: design , examination & engineering

04/21/23 11

Super heater-technical drawingSuper heater-technical drawing

Page 12: design , examination & engineering

04/21/23 12

Super heaterSuper heaterconnecting pipes & supporting constructionconnecting pipes & supporting construction

Page 13: design , examination & engineering

04/21/23 13

Combustion chamberCombustion chamberwarm bandageswarm bandages

Page 14: design , examination & engineering

04/21/23 14

Roof super heater-technical drawingRoof super heater-technical drawing

Page 15: design , examination & engineering

04/21/23 15

Roof super heater-3D drawingRoof super heater-3D drawing

Page 16: design , examination & engineering

04/21/23 16

Roof super heater-detailsRoof super heater-details

Page 17: design , examination & engineering

04/21/23 17

Pressure vesselsPressure vessels

Page 18: design , examination & engineering

04/21/23 18

Pressure vesselsPressure vessels

Page 19: design , examination & engineering

04/21/23 19

Raw gas & clean gas ductsRaw gas & clean gas ducts

Page 20: design , examination & engineering

04/21/23 20

Raw gas & clean gas ductsRaw gas & clean gas ducts

Page 21: design , examination & engineering

04/21/23 21

Raw gas & clean gas ductsRaw gas & clean gas ducts

Page 22: design , examination & engineering

04/21/23 22

Raw gas & clean gas ductsRaw gas & clean gas ducts

Page 23: design , examination & engineering

04/21/23 23

Media supply – 3D drawingsMedia supply – 3D drawings

Page 24: design , examination & engineering

04/21/23 24

Media supply – disposition & sectionsMedia supply – disposition & sections

Page 25: design , examination & engineering

04/21/23 25

BoilerBoiler

Page 26: design , examination & engineering

04/21/23 26

Steel tank acc API 650Steel tank acc API 650

Page 27: design , examination & engineering

04/21/23 27

Steel rack-hydroelectric Power PlantSteel rack-hydroelectric Power Plant

Page 28: design , examination & engineering

04/21/23 28

Technological chart-boiler roomTechnological chart-boiler room

Page 29: design , examination & engineering

04/21/23 29

Reconstruction of main and hot reheat steam pipe linesReconstruction of main and hot reheat steam pipe linespower plant TENT-A block 6 Obrenovacpower plant TENT-A block 6 Obrenovac

Page 30: design , examination & engineering

04/21/23 30

Isometric-middle steam pipelineIsometric-middle steam pipeline

Page 31: design , examination & engineering

04/21/23 31

Isometric hot reheat steam pipeline-Isometric hot reheat steam pipeline-as build drawingas build drawing

Page 32: design , examination & engineering

04/21/23 32

““stress analyses feed water”stress analyses feed water”

Page 33: design , examination & engineering

04/21/23 33

New SupportsNew Supports

Page 34: design , examination & engineering

04/21/23 34

Reconstruction of spring hangersReconstruction of spring hangers

Page 35: design , examination & engineering

04/21/23 35

Page 36: design , examination & engineering

04/21/23 36

Page 37: design , examination & engineering

04/21/23 37

Page 38: design , examination & engineering

04/21/23 38

Page 39: design , examination & engineering

04/21/23 39

Page 40: design , examination & engineering

04/21/23 40

Thank youThank you