Design 3 R1 - Mass.gov
1
345 Summit Access Road - 4.05 mi. (2.35 m.i up,13% average grade, 1.7 mi. down, 19% average grade) Entrance at the Park Visitor Center on Mountain Rd, (seasonally open to automobile use). Sponsored by:
Transcript of Design 3 R1 - Mass.gov
![Page 1: Design 3 R1 - Mass.gov](https://reader030.fdocuments.net/reader030/viewer/2022012100/6169dc7611a7b741a34c2e7e/html5/thumbnails/1.jpg)
345
Summit Access Road - 4.05 mi. (2.35 m.i up,13% average grade, 1.7 mi. down, 19% average grade)Entrance at the Park Visitor Center on Mountain Rd, (seasonally open to automobile use).
Sponsored by: