DEPLOYING FLOATING SOLAR: Key Factors for Decision-Making · DEPLOYING FLOATING SOLAR: Key Factors...

10
DEPLOYING FLOATING SOLAR: Key Factors for Decision-Making Experiences from Singapore Asia Clean Energy Forum 2018 Deep Dive Workshop Gigatech Solutions for Gigaton Problems: Floating Solar Practice and Potential By Atem S. Ramsundersingh, CEO WEnergy Global Pte Ltd - Singapore ADB HQ, Manila, June 8 th , 2018

Transcript of DEPLOYING FLOATING SOLAR: Key Factors for Decision-Making · DEPLOYING FLOATING SOLAR: Key Factors...

Page 1: DEPLOYING FLOATING SOLAR: Key Factors for Decision-Making · DEPLOYING FLOATING SOLAR: Key Factors for Decision-Making Experiences from Singapore Asia Clean Energy Forum 2018 Deep

DEPLOYING FLOATING SOLAR:Key Factors for Decision-Making

Experiences from Singapore

Asia Clean Energy Forum 2018Deep Dive Workshop

Gigatech Solutions for Gigaton Problems: Floating Solar Practice and Potential

By Atem S. Ramsundersingh, CEO WEnergy Global Pte Ltd - Singapore

ADB HQ, Manila, June 8th, 2018

Page 2: DEPLOYING FLOATING SOLAR: Key Factors for Decision-Making · DEPLOYING FLOATING SOLAR: Key Factors for Decision-Making Experiences from Singapore Asia Clean Energy Forum 2018 Deep

Singapore Water Reservoirs

Minimum Deployment could address 80% of the “8% target” of Peak Electricity DemandReduce CO2e emissions per year by 282,000 metric tons (approx. 0.7 – 1% of existing total emissions)

Page 3: DEPLOYING FLOATING SOLAR: Key Factors for Decision-Making · DEPLOYING FLOATING SOLAR: Key Factors for Decision-Making Experiences from Singapore Asia Clean Energy Forum 2018 Deep

Planning Approach – Not only about Equipment

Potential Surface Analysis

Maximum System Size Determined by Water Quality Requirements

Cost Benefit Analysis

Best Size Option

Design of the Optimal Sized Floating Solar PV System

Multi Criteria Analysis

Best Support Structure

Environmental Assessment

Types of Support Structures:Single Floating Unit – Modular Structure – Fixed Structure

Financing – Business - Legal Models

Roadmap for Deployment

Future Factors >>>Speed of Deployment

Large Consumer Needs - Electricity Policies – INDC Commitments – RE Mix

Page 4: DEPLOYING FLOATING SOLAR: Key Factors for Decision-Making · DEPLOYING FLOATING SOLAR: Key Factors for Decision-Making Experiences from Singapore Asia Clean Energy Forum 2018 Deep

Potential Surface Analysis (PSA)Structure and Systems Approach to Multiple Opportunities and Challenges

• Restricted zones/Areas used by public entitieso Militaryo Airportso Heli-bucket zone - firefightingo Water quality sampling zone by water authoritieso Areas in the vicinity of dike and tidal gateso Navigable waterways for reservoir maintenance vesselso Navigation/Maritime/Fishing

• Aquatic environment and vegetation• Areas used for recreational activities• Objects on the bottom of reservoirs

o Areas with aeration lines and pumping stationso Power cableso Shipwrecks

• Distance from shores• Locations of electrical connection points

Page 5: DEPLOYING FLOATING SOLAR: Key Factors for Decision-Making · DEPLOYING FLOATING SOLAR: Key Factors for Decision-Making Experiences from Singapore Asia Clean Energy Forum 2018 Deep

Environmental ConsiderationsAquatic and Eco-system Factors

• Negative Impact of Light Reduction ?• Negative Impact of Utilized Materials ? • Negative Impact of Structure ?• Negative Impact of Construction / Logistics / Dismantling (End of Life Cycle) ?

• Positive Impact: reduction of CO2-equivalents ?• Positive Impact: reduction of evaporation ?• Positive Impact: reduction of unwanted weeds / algae ?

Page 6: DEPLOYING FLOATING SOLAR: Key Factors for Decision-Making · DEPLOYING FLOATING SOLAR: Key Factors for Decision-Making Experiences from Singapore Asia Clean Energy Forum 2018 Deep

Expanded Polystyrene – Single or Modular Local Manufacturing – Local Economic Benefit?

Page 7: DEPLOYING FLOATING SOLAR: Key Factors for Decision-Making · DEPLOYING FLOATING SOLAR: Key Factors for Decision-Making Experiences from Singapore Asia Clean Energy Forum 2018 Deep

CAPEX (in the Singapore Context)Can we reduce cost of floating structures?

Page 8: DEPLOYING FLOATING SOLAR: Key Factors for Decision-Making · DEPLOYING FLOATING SOLAR: Key Factors for Decision-Making Experiences from Singapore Asia Clean Energy Forum 2018 Deep

Speed of Deployment of Floating Solar PVFactors for Consideration in Decision-Making

• Strategic drivers for national development o Energy Security and Sustainability – Carbon Tax?o Choices of Business Models for Solar PV Power Plants

❖ National Agency as Owner ❖ Third Party as Owner (PPA – Fixed Tariff) ❖ Third Party as Owner (PPA – Fixed Discount)

• Readiness of Enabling Physical Infrastructureo The Power Grid – Robustness and Regulationso Administrative Approvals - Complexityo Financing Enabling Infrastructure (Who should pay for

what: Government vs Private Sector)

• Market Attractiveness and Investment Climateo Electricity Price and Existing Contracts and Policieso Third Party / Private Investors’ Expectation o Advancements in Solar Technology and Costs o Execution Capacity / Contractors’ Capabilities

Page 9: DEPLOYING FLOATING SOLAR: Key Factors for Decision-Making · DEPLOYING FLOATING SOLAR: Key Factors for Decision-Making Experiences from Singapore Asia Clean Energy Forum 2018 Deep

Beyond Singapore: Adding Capacity?Solar PV and River Run-Off Turbines on Existing HP Sites

Page 10: DEPLOYING FLOATING SOLAR: Key Factors for Decision-Making · DEPLOYING FLOATING SOLAR: Key Factors for Decision-Making Experiences from Singapore Asia Clean Energy Forum 2018 Deep

The Future is Promising: Thank You!