REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE No. IV-A
CAVITE 3RD DISTRICT ENGINEERING OFFICE
CARMONA, CAVITE
C.Y. 2021 PROJECT
DETAILED ENGINEERING DESIGN FOR
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS -
FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION
STRUCTURES AND DRAINAGE SYSTEM - CONSTRUCTION OF FLOOD MITIGATION STRUCTURES
AND DRAINAGE SYSTEMS ALONG BACOOR BOULEVARD ROAD (SOUTH BOUND) K00 15 + (-659) -
K0017 + 630 WITH EXCEPTIONS, BACOOR CITY, CAVITE
ROAD SECTION : BACOOR BOULEVARD
LOCATION : BACOOR CITY, CAVITE
STATION LIMITS : K0015 + (-659) - K0017 + 630
NET LENGTH : 2,010.00 L.M.
ROAD SECTION ID : S04271LZ
SUBMITTED:
REIMART REGIN P. BAUTISTA
OIC, PLANNING AND DESIGN SECTION
DATE:
RECOMMENDED:
JENNIFER F. ALMANZOR
OIC, ASSISTANT DISTRICT ENGINEER
DATE:
APPROVED:
DONNIE D. CUNA
DISTRICT ENGINEER
DATE:
B
1
2
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE No. IV-A
CAVITE 3RD DISTRICT ENGINEERING OFFICECARMONA, CAVITE
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED :
PREPARED :
REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
AARON JAY F. FABELLA
ENGINEERING ASSISTANT
KENNETH P. AUSTRIA
ENGINEER II
JESSITO M. BAGUIO JR.
ENGINEER II
REIMART REGIN P. BAUTISTA
OIC, PLANNING AND DESIGN SECTION
JENNIFER F. ALMANZOR
OIC, ASSISTANT DISTRICT ENGINEER
DONNIE D. CUNA
DISTRICT ENGINEER
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND
PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT
PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD
MITIGATION STRUCTURES AND DRAINAGE SYSTEM -
CONSTRUCTION OF FLOOD MITIGATION STRUCTURES AND
DRAINAGE SYSTEMS ALONG BACOOR BOULEVARD ROAD
(SOUTH BOUND) K00 15 + (-659) - K0017 + 630 WITH EXCEPTIONS,
BACOOR CITY, CAVITE
DATE: DATE: DATE: DATE:
32
INDEX OF DRAWING
1
FRONT PAGE A 1
SET NO. SHEET NO.PAGE TITLE
INDEX OF DRAWING B 2
LOCATION MAP, VICINITY MAP, KEY MAP (PHILIPPINE MAP)
D-1, D-2
3
TOPOGRAPHIC LAYOUT MAP
F-1, F-2
GENERAL NOTES, LEGEND & ABBREVIATIONS5,6
E
G
7
8,9
H-1, H-2
10
SUMMARY OF QUANTITIES
I-1 - I-7
11,12
J-1 - J-3
13 - 19
SCHEDULE OF QUANTITIES
L
20 - 22
29
C-2
INDEX OF DRAWING
K-1 - K-6 23 - 28
M 30
4
TYPICAL DRAINAGE CROSS SECTION
LINE CANAL AND MANHOLE DETAILS
DRAINAGE CROSS SECTIONS
PLAN
PROFILE
DRAINAGE LAYOUT
TRAFFIC MANAGEMENT PLAN
C-1
N-1 31DPWH STANDARD FIELD OFFICE
N-2 32DPWH STANDARD PROJECT BILL BOARD
C
1
3
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE No. IV-A
CAVITE 3RD DISTRICT ENGINEERING OFFICECARMONA, CAVITE
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED :
PREPARED :
REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
AARON JAY F. FABELLA
ENGINEERING ASSISTANT
KENNETH P. AUSTRIA
ENGINEER II
JESSITO M. BAGUIO JR.
ENGINEER II
REIMART REGIN P. BAUTISTA
OIC, PLANNING AND DESIGN SECTION
JENNIFER F. ALMANZOR
OIC, ASSISTANT DISTRICT ENGINEER
DONNIE D. CUNA
DISTRICT ENGINEER
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND
PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT
PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD
MITIGATION STRUCTURES AND DRAINAGE SYSTEM -
CONSTRUCTION OF FLOOD MITIGATION STRUCTURES AND
DRAINAGE SYSTEMS ALONG BACOOR BOULEVARD ROAD
(SOUTH BOUND) K00 15 + (-659) - K0017 + 630 WITH EXCEPTIONS,
BACOOR CITY, CAVITE
DATE: DATE: DATE: DATE:
32
LOCATION MAP
VICINITY MAP
KEY MAP
2
CAGAYANAPAYAO
ILOCOS NORTE
ILOCOS SUR
ABRA KALINGA
MOUNTAINPROV.
ISABELA
LAUNION
PANGASINAN
IFUGAO
BENGUET
NUEVAVIZCAYA
NUEVAECIJA
QUIRINO
AURORA
TARLAC
ZAMBALES PAMPANGA
BULACAN
BATAAN
LAOAG
IBA
KABUGAO
TUGUEGARAO
BANGUEDVIGAN
SAN FERNANDO
LINGAYEN
TABUK
BONTOC
ILAGAN
LAGAWE
LA TRINIDAD
BAYOMBONG
CABARROGUIS
TARLAC
PALAYAN
SAN FERNANDO
MALOLOS
BALANGA
BALER
CAVITE
RIZAL
QUEZON
BATANGAS
LAGUNA
TRECE
MARTIRES
STA. CRUZ
LUCENA
BATANGAS
Pasuquin
Culili Pt.
S.Nicolas
Burgos
Pagudpud
Bangul
Dumalneg
Bacarra
Vintar
Sarrat
Paoay
Currimao
Pinili
Batac
Marcos
Dingras
Pidding
Espirito
Carasi
Solsona
Badoc
Sinait
Cabugao
San Juan
Magsingal
Sto. Domingo
San. Vicente
Caoayan
Bolinao
Anda
Bani
Alaminos
Agno
Borgus
Dasol
Infanta
Mabini
Sual
Labrador
Bugalyon
Aguilar
Sn. Clemente
Mangatarem
Urbiztondo
Basista
Malasiqui
Manaoag
Binmaley
Sison
Pozorrubio
Binalunan
Sn.Manuel
Sn.Nicolas
Natividad
Tayug
Asingan
Sta.Maria
Umingan
Villasis
Sn.Fabian
ORIENTALOCCIDENTALMINDORO
MINDORO
MARINDUQUE
ROMBLON
CAMARINESNORTE
CAMARINES SUR
CATANDUANES
ALBAY
SORSOGON
MASBATE
PALAWAN
BOAC
DAET
PILI
LEGAZPI
SORSOGON
VIRAC
MASBATE
ROMBLON
CALAPAN
MAMBURAO
BATANGAS
NORTHERN SAMAR
EASTERNSAMAR
SAMAR
BILIRAN
LEYTE
SOUTHERNLEYTECEBU
BOHOLNEGROSOCCIDENTAL
NEGROSORIENTAL
ILOILO
CAPIZ
AKLAN
ANTIQUE
PANAY
GUIMARAS
CATARMAN
BORONGAN
CATBALOGAN
NAVAL
TACLOBAN
MAASIN
TAGBILARAN
CEBU CITY
DUMAGUETE
SIQUIJOR
SIQUIJOR
BACOLOD
ILOILO CITY
JORDAN
PASSI
ROXAS
KALIBO
SAN JOSE DE
BUENAVISTA
PAGADIAN
DIPOLOG
OROQUIETA
TUBOD
MARAWI
ILIGAN
CAGAYAN
DE ORO
MALAYBALAY
BUTUAN
SURIGAO
TANDAG
PROSPERIDAD
NABUNTURAN
TAGUM
MATI
KIDAPAWAN
SHARIFF
AGUAK
ISABELA
JOLO
PANGLIMA
SUGALA
SURIGAODEL NORTE
SURIGAODEL SUR
AGUSANDEL NORTE
AGUSANDEL SUR
MISAMISORIENTAL
MAMBAJAO
MISAMISOCCIDENTAL
LANAODEL NORTE
LANAODEL SUR
BUKIDNON
DAVAO
COMPOSTELAVALLEY
DAVAOORIENTAL
(NORTH)COTABATO
MAGUINDANAO
SULTAN KORONDAL
ISULAN
KUDARAT
SOUTHCOTABATO
ALADEL
SARANGANI
DIGOS
GEN.
SANTOS
DAVAODEL SUR
(XII)
(XII)
ZAMBOANGADEL NORTE
ZAMBOANGADEL SUR
SULU
TAWI-TAWI
REGION I REGION II
REGION III
REGION IV
LU
Z
O
N
SE
A
LUZON
NCR
CAR
REGION VI
REGION VIII
REGION VI
VISAYAS
REGION VIIREGION XIII(CARAGA)
REGION X
REGION XII
REGION IX
MINDANAO
ARMM
REGION XI
P AL
AW
N
A
AP
AS
SG
E
PH
II
LI
PP
NE
E S
A
S U
UL
S
EA
M I N D A ON A AES
Rosario
Sto.Tomas Pugo
Agoo
Tubao
Aringay
Caba
Bauang
Burgos
Naguilian
S.Juan
Bacnotan
S.Gabriel
Santol
Balaoan
Luna
Bagulin
Bangar
Sudipen
Tagudin
Suyo
Cervantes
Sta.Cruz
Sta.Lucia
Sugay
Salcedo
Gregorio
del PIlar
Quirino
Candon
Galimuyod
Santiago
S.Emillio
Lidlidad
San Esteban
Sta.Maria
Narvacan
Nagbukel
Santa
Sta.Catalina
Bantay
S.Ildefonso
Katipunan
Manukan
Roxas
Polanco
Rizal
Pinan
La Libertad
Mutia
Segio Osmenia
Sapang
Dalaga
Calamba
Plaridel
Lopez Jaena
Aloran
Panaon
Jimenez
Sinacaban
Tudela
Clarin
Bonifacio
Tambulig
Ramon Magsaysay
Mahayag
Dumingas
Aurora
Labangan
Tacuran
Dumalinao
Sindangan
Salug
Guilingan
Bayug
Kumalarang
San Pablo
Dinas
San Miguel
Lapuyan
Margosatubig
Dimataling
Tabina
Alicia
Olutanga
Mabuhay
Payao
Malangas
Imelda
Buug
Piplahan
Siay
Liloy
Kabasalan
Titay
Ipil
Naga
Labason
Siocon
Siraway
Palapag
Mapanas
Gamay
Lapinig
Arteche
San Policarpio
Oras
Dolores
Can-avid
Talt
Sulat
S.Julian
Maydolong
Balangkayan
Llorente
Hernani
Gen. Mac Arthur
Quinapondan
Salcedo
Mercedes
Guiuan
Gipolos
Balangiga
Lawa-an
Marabut
Catubig
Las Navas
Pambuyan
Bobon
Rosario
Allen
Sta. Margarita
Matuguinao
Basey
Talalora
Villareal
Daram
Zumarraga
S.Sebastian
Paranas
Mondragon
S.Antonio
Capul
San Isidro
Calbayog
Gandara
Cagpipi
Gelino
Mojon
Jipadpad
Tumaros
Tagaslian
Palo
Tolosa
Julita
Mayorga
Burauan
Tabontabon
Dagam
Pastrana
Jaro
Barugo
Capoocan
Kanagga
Leyte
Villaba
Tabango
S.Isidro
Calubian
Biliran
Culaba
Caibiran
Cabugayan
Kawayan
Almeria
Palompon
Isabel
Merida
Ormoc
Javier
Abuyog
Baybay
Hilapnitan
Inopacan
Hindang
Hilongo
Bato
Matalom
Macrohon
Padre Burgos
Matildog
Pintuyan
Liloan
S.Francisco
T.Copus
Libagon
St.Bernard
San Juan
Sogod
Hinundayan
Mac Arthur
Pinagmuhaan
Tambo
Esperanza
S. Francisco
Poro
Tudela
Mercedes
Consuelo
Lilo-an
Consolacion
Carmen
Compostela
Danao
Danasan
Binongcalan
Catmon
Sogod
Caritad
Cabalawan
Borbon
Tabogon
Bago
Medellin
San Remegio
Daanbatayan
Calape
Bagay
Taplon
Paypay
Batad
Maraat
Olivo
Logo
Tabuelan
Tuburan
Plaridel
Asturias
Balamban
Toledo City
Bato
Tajao
Pinamungahan
S.Fernando
Naga
Talisay
Carcar
Tapal
Aloguinsan
Barili
Damanjug
Ronda
Alcantara
Moalboal
Badian
Sibunga
Dalaguete
Alcoy
Boljoon
Oslob
Samboan
Ginatilan
Malabuyoc
Santander
Alegria
Argao
El Prado
Caceras
Luka
Mandaue
Cordova
Mingianilla
Baclayon
Albuquerque
Loay
Loboc
Lila
Dimiao
Valencia
Janga
Duero
Anda
Mabini
Balilihan
Batuan
Bilar
Sierra Bullones
Pilar
Maribojoc
Loon
Calape
Tubigon
Clarin
Inapanga
Danao
Dagohoy
S. Miguel
Trinidad
Jetafe
Talibon
Pres. C. P. Garcia
Alicia
Enrique Villanueva
Maria
Lazi
Daulin
Larena
Paliton
Catulayan
Kalango
Zamboanguita
Siaton
Bonawon
S.Francisco
Menalongon
Sta. Catalina
Bayawan
Basay
Calipapa
Hinoba-an
Pamplona
San Jose
Tanjay
Amlan
Bais
Manjuyod
Mabinay
Bindoy
Ayungon
Tayasan
La Libertad
Guihuingan
Canlaon
San Carlos
La Carlota
Isabela
Moises Padilla
La Castellana
Calatrava
Tigbao
Toboso
Tinubagan
Escalante
Rizal
Fabrica
Cervantes
Cadiz
Sagay
Victorias
Manapla
E.B.Magalona
Silay
Talisay
Pulupandan
Valladolid
Bago
S.Enrique
Pontevedra
Hinigaran
Binalbagan
Himaymaylan
Ilog
Kabankalan
Cauayan
Sipalay
Candoni
Inayanan
Murcia
Nueva
Valencia
Alegria
Buenavista
Oton
S.Miguel
Paya
Leganes
Dumangas
Barotac
Nuevo
New
Lucena
Potoran
Anilao
Banate
Barotac Viejo
Dingle
Mina
Zarraga
Cabatuan
Alimodian
Maasin
Janiuay
Badiangan
Dueñas
Limbunao
Dueñas
S.Enrique
S.Rafael
Ajuy
Concepcion
S.Dionisio
Lemery
Sara
Batad
Balasan
Carles
Pilar
Pres. Roxas
Pontevedra
Panay
Ivisan
Sapi-an
Ma-ayon
Cuartero
Dumarao
Dao
Dumatag
Tapaz
Sigma
Jaraindan
Mambusao
S.Joaquin
Toblas Formier
Anini-y
Miagao
Guimbal
Igbaras
Tubungan
Leon
Hamtic
Sibalom
Belison
S. Remigio
Patnongon
Valderama
Bugasong
Laua-an
Barbaza
Tibiao
Culas
Sebaste
Pandan
Libertad
Caluya
Malay
Nabas
Ibahay
Tangalan
Makato
Lezo
Malinao
Banga
Balete
Madalag
Libacao
Batan
New Washington
Altavas
Callan
Bacalan
Nava
Tono
Batonan
Maybonga
S. Carlos
S. Roque
Unidos
Union
ManocManoc
Sibay
Cobiado
Harigue
Buenavista
Sibay
Alegria
Tinabooc
Semirara
Paua
Magsaysay
Baoran
Agutaya
Villa tria
Manamoc
Bantayan
Madridejos
Sta. Fe
Banukan
PHILIPPINE MAPSanchez-Mlra
Pamplona
Abulug
Ballesteros
FUGA ISLAND
CALAYANISLAND
DALUPIRIISLAND
BABUYANISLAND
BATANISLAND
BALINTANGISLAND
SABTANGISLAND
IBUHOS ISLAND
BASCO
Ivana
Uyugan
ITBAYATISLAND
Y'umi Island
North Island
Mubudis Island
Siayan Island
Itbayat
DIOGO ISLAND
CAMIGUINISLAND
PALAUI ISLAND
Aparri
Calmilaniugan
Lai-lo
Alacapan
Buguay
Sta. Teresita
Tapal
Gonzaga
Magim
Bawa
Casamalangan
Lasam
Gamaran
Pudial
Luna
Calanasan
Baggao
Amulung
Iguig
Santo Niño
Solana
Piat
Peñablanca
Alcala
Rizal
Claveria
Sta.
Praxedes
Enrile
Sta. Maria
Cabagan
San Pablo
Sto. Tomaso
Quezon
Delfin Albano
Tumauini
Mallig
Quirino Burgos
Roxas
Gamu
Naguilian
Benito
Soliven
S. Mariano
San Manuel
Aurora
Luna
Cauayan
Cabatuan
Reina
Mercedes
Palanan
Maconacon
Disulap
Gangalan
Dicamary
Alicia
S. Jose
Echague
Angadanan
Ramon
Santiago
Cordon
Jones
S. Agustin
Diffun
Dinapigui
Bagabag
Quezon
Solano
Ambagulo
Divilican
Dilasag
Casiguran
Maddela
Dinalungan
Dupax del Norte
Villa Verde
Kasibu
Sta. Fe
Dargus
Maquebenga
Old Gumiad
Cagandiangan
Pugo
Saguday
Cawayan
Maria Aurora
San Luis
Calabgan
Dinipan
Dingalan
Conner
Tineg
S. Juan
Dolores
La Paz
Danglas
Lagayan
Lacub
Licuan-Baay
Tayum
S. Quintin
Sallapadan
Manabo
Boliney
Luba
Pilar
Villaviciosa
Pinukpuk
Pangul
Rizal
Balbalan
Pasil
Lubuagan
Tanudan
Paracelis
Tinglayan
Sadanga
Besao
Sagada
Tadian
Bauko
Sabangan
Barlig
Natonin
Baguio
Mayayao
Alfonso Lista
Banaue
Hungduan
Kiangan
Lamut
Diadi
Mankayan
Bakun
Buguias
Kibungan
Kabayan
Atok
Sablan
Tublay
Tuba
Itogon
Dipaculao
San Jose
Cabanatuan
Carranglan
Lupao
Muñoz
Pantabangan
Rizal
Bongabon
Llanera
Laur
Talugtug
Cuyapo
Nanpicuan
Gumba
S. Domingo
Ge. M.
Natividad
Quezon
Talavera
Licab
Zaragoza
Aliaga
Gabaldon
Sta. Rosa
S. Leonardo
Reñarada
Gen. Tinio
Jaen
Gapan
S. Antonio
S. Isidro
Cabiao
Bautista
San Carlos
Dagupan
Urdaneta
Sta. Ignacia
Paniqui
Geroñia
Rura
Arao
Camiling
Mayantoc
Victoria
La Paz
Concepcion
Capas
Bamban
Sta. Cruz
Lucapon
S.Lorenzo
Masinloc
Candelaria
Palauig
Botolon
Cabangan
Balintagac
S. Felipe
S. Narciso
S. Antonio
S. Marcelino
Castillejos
Subic
Floridablanca
Hermosa
Olongapo
Abucay
Samal
Orani
Morong
Bagac
Pilar
Orion
Mariveles
Limay
Saysai
Cabraban
Angeles
Arayat
Sta. Ana
S.Simon
Baliuag
Macabebe
Masantol
Hagonoy
Plaridel
S. Miguel
S. Ildefonso
S. Rafael
Angat
Bustos
Pandi
Sta. Maria
Pinotpandian
Quinasactan
Maligayo
Tamala
General Nakar
Infanta
S. Cristobal
Dalahican
Real
Kiloloron
Tignuan
Calasamanga
Magdalo
Tugpan
Polillo
Sabang
Bisliang
Bansalaguin
Burdeos
POLILLOISLAND
San Jose
del Monte
Rodriguez
San Mateo
Obando
Malabon
Navatos
Kalookan
Marikina
Quezon City
Antipolo
Pasay
Cavite City
Baras
Tanay
Pililla
Angono
Binangonan Cardona
S. Pedro
Jalajala
Famy
Pangil
Pakil
Paete
Sinoloag
Mabitac
Kalayan
Lumban
Pagsanjan
Pagsanjan
Biñan
Sta. Rosa
Imus
Dasmariñas
Naic
Carmona
Noveleta
Rosario
Tanza
Los Baños
Ternate
Maragondon
Indang
Magallanes
Amadeo
Alfonso
Gen. E.
Aguinaldo
Nasugbu
Calaca
Calatagan
Balayan
Taal
S. Luis
Agoncillo
Sta.
Teresita
Tuy
Lian
Bauan
Mabini
Lobo
Taysan
Rosario
Alaminos
S. Antonio
Padre Garcia
S. Jose
S. Juan
Ibaan
Lipa
Tagaytay
San Pablo
Magdalena
Luisana
Aganapol
Mauban
Sampaloc
Lucban
Tayabas
Dolores
Mate
Sariaya
Tiaong
Candelaria
Padre Burgos
Perez
Alabat
AlabatIsland
Gordon
Sabang
Quezon
Apad
Olong-tano
Atimonan
Plaridel
Gumaca
Agdangan
Unisan
Pitogo
Macalelon
General Luna
Lopez
Catanauan
Calauag
Guinangayan
Tagkawayan
Negrito Camp
Itoc
Capalonga
Tansa
Jose
Panganiban
Paracale
Labo
Pilanay
Vinzons
Talisay
Mercedes
Basud
S. Vicente
San Lorenzo Ruiz
Pambuhan
Siruma
Dei-Gallego
Ragay
Colasi
Sipocot
Lapi
Cabusao
Libmanan
Calabanga
Bombon
Tinambao
Magarao
Magtan
Canaman
Gainza
Pamplona
S. Fernando
Pasacao
Minalabac
Milaor
Buudan
Garchitorena
Lagonoy
Goa
S. Jose
Tigaon
Sagnay
Presentacion
Caramoan
Pandan
Bagamanoc
Panganiban
Viga
Gigmoto
Baras
Bato
San Andreas
Gitoma
Bugao
Tubli
Quezon
Bocon
S. Miguel
Caramoran
Marilima
Ocampo
Baao
Nabua
Iriga
Bula
Balatan
Tiwi
Malinao
Polangui
Libon
Oas
Ligao
Guinobatan
Tabaco
Malilipot
Bacacay
Santo Domingo
Manito
Daraga
Jovellar
Pio Duran
Castillia
Pilar
Donsol
Magallanes
Casiguran
Bacon
Gubat
Barcellona
Bulusan
Bulan
Irosin
Sta. Magdalena
Matnog
Esperanza
Placer
Cawayan
Pio V.
Corpuz
Catalngan
Dimasalang
Uson
Mobo
Omidep
Baleno
Aroroy
Mataba
Milagros
Balud
Monreal
S. Jacinto
S. Fernando
Butuan
TICAO ISLAND
Pierto Diaz
Rapu-Rapu
S. Pascual
Claveria
BURIAS ISLAND
Buenavista
Doongan
Camugao
S. Narciso
San Andres
Casay
Pugon
Tayuman
Binay
Basan
Mulanay
Sta. Cruz
Mogpog
Gasan
Buenavista
Nook
San Francisco
Torrijos
Sayao
Lusok
Matoyatoya
Lubang
Looc
Paluan
Abra
de Ilog
Calamintao
Amnay
Gulo
Alibug
Sta. Teresa
Ilin
Labangan
Puerto Galera
San Teodoro
Baco
Naujan
Victoria
Pola
Socorro
Pinamalayan
Makati
Sta. Cruz
Sablayan Bansud
Bongabong
Roxas
Mansalay
Balatasan
Bulalakao
Bulogo
Culasi
Magsaysay
Rizal
Calintaan
Magdiwang
San Fernando
Silum
Cambalo
Agtiwa
Lumbang
Mabolo
Otod
Cajidiocan
Corcuera
Concepcion
Calatrava
Linawan
S. Agustin
San Andres
Odiongan
Looc
Alcantara
Sta. Fe
San Jose
Cauayan
Binongaan
Bachauan
Libertad
TugdanBuenavista
Banton
Coron
Busuanga
Culton
Cherry
Minit
Bintuan
Concepcion
Guadalupe
Linapacan
Binalan
Maroyogroyog
Culaylayan
Sta. Monica
Sibaitan
Tiniguiban
El Nido
Mabini
Silanga
Palarican
Taboy
Langi-langiban
Taytay
San Vicente
Bato
Calauag
Dumaran
Araceli
Danlig
Inandeng
Illan
Roxas
Barton
Malcampo
Caramay
Tulariquin
Babuyan
Salvacion
Sacungan
Aborian
Apurahuan
Cabigaan
Magbaelo
Narra
Tagbayong
Quezon
Safronio Española
Brookes Point
Pulot
Saraza
Rizal
Bataraza
Sarap
Coral
Katipunan
Bugsuk
Ramos
Balacbac
Cuyo
Roseller Lim
Tungawan
Danganum
Sibuco
Mamawan
Tamlon
Panubigan
Daap
Cabaluay
Mercedes
S. Ramon
Tinuba
Patalon
Ayala
Landang
Tambunan
Amoyloi
Lamitan
Tuburan
Maloso
Zamboanga City
Panuan
Luuk
Panamao
Pata
Pitogo
Diga
Tandu
Talipao
Parang
Maimbung
Patikul
Lugus
Tapul
Alu Duyong
Pangpang
Siasi
Pisak-pisak
Sipanding
Tandubas
Sapa-Sapa
Latuan Hea
South Libian
Tataan
Pahahpaan
Bato-bato
Baroy
Kolambugan
Maigo
Kapatogan
Bacolod
Linamon
Balo-I
Saguiiran
Bubong
Ramain
Taraka
Rosario
Baungon
Libertad
Gitagum
Initao
Naawan
Manticao
El Salvador
Laguindingan
Libona
Sumilao
Malitbog
Manolo Fortich
Lantapan
Malabang
Balabagan
Buldon
Parang
Sultan kudarat
Cotabato City
Linek
Talayan
Upi
Datu
Piang
Sutton sa Barengis
Pigkawayan
Libungan
Carmen
Kabacan
Matalam
Pagalungan
Pikit
Palandoc
Korropi
Irurus
Banisilan
Kalauaig
Dangcagan
Kibawe
Damulog
Nongnongan
Kalilangan
Maramag
Bacasanon
Tinago
Dulugan
Lumintao
Malambago
Valencia
Alanib
Linabo
Lumbayao
Dalwagan
Impasugong
Tagoloan
Sayawan
Calabugaw
Villanueva
Claveria
Jasaan
Balingasag
Lagonglong
Salay
BInuangan
Sugbonkogon
Kinogitan
Balingoan
Talisayan
Medina
Kolibog
Kataringan
Gingoog
Odiongan
Magsaysay
Carmen
Nasipit
Buenavista
Loreto
Calbayog
Rizal
Tubajon
Libid
Arellaño
Melgar
Wilson
Boa
Cagdianao
Del Carmen
Sta. Monica
Sta. Monica
San Isidro
Pilar
Gen. Luna
San Francisco
Tagaran-an
Placer
Sison
Bacuag
Gigaquit
Mainit
Malimono
Tubod
Alegria
Tigbao
Jubgan
Claver
Kicharao
Masgad
Pili
San Vicente
Jabonga
Jaliobong
Bangonay
SantiagoSan Vicente
Binuangan
Patigan
Tubay
Cabadbaran
Santiago
Magallanes
Sta. Ana
A. Luna
Agay
Bugabus
Las Nieves
Verdu
Bayugan
Bunaquit
Balete
Maasin
Esperanza
Carrascal
Cantillan
Madrid
Lanuza
Cortes
Cabangahan
Bitaogan
Tigao
Matho
Kayogyog
Alba
Umalag
Tago
Bayabas
Gagwait
Marihatag
S. Miguel
San Agustin
Sta. Cruz
San Isidro
Salvation
Lianga
Barbon
S. Francisco
Barobo
Gamul
Tagbina
Soriano
Hinatuan
Bunaquit
Rosario
La Paz
Loreto
Bunawan
Talacogon
Bislig
Lingig
Libertad
Tudela
S. Igancio
Barcelona
Jaguimitar
Veruela
Trento
Sta.Josefa
Laak
Moncayo
Boston
Panaypayan
Nva.Gracia
Walve
Binucayan
Halapintan
Comota
Batang
Kapalong
Tagpani
Cateel
Baganga
Caraga
Manay
Dapnan
Migit
S. Fermin
Manreza
Holy Cross
Segidan
Tarrgona
Banay
Manay
Manay
Manay
Banay
Davao City
Pantukan
Panabo
Carmen
Kapalong
Sto.Tomas
Babak
Kaputi-an
Lamiawan
Asunsion
New Corella
Mawab
Hijo
Maco
Mabini
Montevista
Compostela
New Bataan
Mandaayat
Datu Gulbu
Tangnanan
Magnaga
Lawaan
Mongon
Strib
Bungalum
Calinan
Bungan
Kulapu
Kabatokan
Angsikan
Datu Onot
Magpet
Alibayan
Manaboan
Paco
M'lang
Tulunan
Makilala
Darape
Malasita
Balatokan
Matanao
Bansalan
Datu Ungo
Sta.Cruz
Astorga
Tagulaya
Padada
Malalag
Sta.Maria
Malita
Sulop
Hagonoy
Kabatawan
Jose Abad
Santos
Sarangani
Glan
Malapatan
Maasim
Kiamba
Maitum
Palimbang
Lebak
Kalamansig
Ampatuan
Columbio
Lutayan
Buluan
Tacurong
Tantangan
Norala
Surallan
Sapali
Tampakan
Tupi
Polomolok
T'boli
Lawa
Kalian
Linadasam
Lawayon
Mangili
Kalaka
Tacalma
Kubalen
Belomala
Lampare
Kling
Lumuyan
Panalog
Daliao
Kapala
Punsad
Margus Grande
Mudan
Malabog
Fort Holland
Noing
Kalbay
Maybio
Bato
Tomanao
Tubay
Kalimba
Baliango
Kanipan
Kulaman
Borong
Balinwang
Nuling
Buenavista
Dapitan
Provincial Capital
Legend
Provincial CityMunicipalityAirportHighway 4 lane concreteMaharlika Highway asphalted1st Class Concrete or asphalted2nd Class asphaltedProvincial BoundariesRegional Boundaries
M.MANILA
Sanga-sanga
BONGAO
C E
EB
L E
S
SE
A
CORREGIDOR
KEY MAP (PHILIPPINE MAP)
SCALE: NOT TO SCALE
C
3
VICINITY MAP
SCALE: NOT TO SCALE
C
2
LOCATION MAP
SCALE: NOT TO SCALE
C
1
END OF PROJECT
K0017 + 630
START OF PROJECT
K0015 + (-659)
PROJECT SITE
LOCATION OF
PROJECT
D
1
5
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE No. IV-A
CAVITE 3RD DISTRICT ENGINEERING OFFICECARMONA, CAVITE
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED :
PREPARED :
REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
AARON JAY F. FABELLA
ENGINEERING ASSISTANT
KENNETH P. AUSTRIA
ENGINEER II
JESSITO M. BAGUIO JR.
ENGINEER II
REIMART REGIN P. BAUTISTA
OIC, PLANNING AND DESIGN SECTION
JENNIFER F. ALMANZOR
OIC, ASSISTANT DISTRICT ENGINEER
DONNIE D. CUNA
DISTRICT ENGINEER
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND
PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT
PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD
MITIGATION STRUCTURES AND DRAINAGE SYSTEM -
CONSTRUCTION OF FLOOD MITIGATION STRUCTURES AND
DRAINAGE SYSTEMS ALONG BACOOR BOULEVARD ROAD
(SOUTH BOUND) K00 15 + (-659) - K0017 + 630 WITH EXCEPTIONS,
BACOOR CITY, CAVITE
DATE: DATE: DATE: DATE:
32
GENERAL NOTES
LEGENDS AND ABBREVIATIONS
2
ACP
CUT AND FILL SECTION
BENCH MARK
RECTANGULAR CULVERT
(PLAN)
FLOW
(PLAN)
PIPE CULVERT EXISTING
PIPE CULVERT NEW
EXISTING PCCP
PARAPET WALL PLAN
GOOD / NEW PCCP
PROPOSED BRIDGE
RROW
LENGTH OF VERTICAL CURVE
POINT OF INTERSECTION
P I
ORIGINAL GROUND
( PLAN )
KM
KILOMETER POST
7
(EXISTING)
NORTH SIGN
R2
K0061 + 100
STATION
C
R1
REFERENCE POINT
COMMERCIAL
RIVER / CREEK
TREES EXISTING BRIDGE
ROAD SIGN
PROJECT ROAD
STONE MASONRY
(PLAN)
KM
4 9
(PROFILE)
PLAN FULL KM STATION
CL
PIPE CULVERT NEW
GROUTED RIPRAP EXISTING
(PLAN) (PROFILE)
PIPE CULVERT EXISTING
AZIM
BLDG
BM
BOQ
BR
BRDY
BRGY
BVCE
BVCS
BW
CIM
CL
cm
CS
CU
D
DIST.
DLI - 01
DPWH
E
e
EB
ELEV.
EXTG.
g
HOR
I
I I E
INT'L
KMS
L
Lc
Lm
LT
LVC
M
ASPHALT CONCRETE PAVEMENT
AZIMUTH
BUILDING
BENCH MARK
BILL OF QUANTITIES
BRIDGE
BOUNDARY
BARANGAY
BEGIN OF VERTICAL CURVE ELEV.
BEGIN OF VERTICAL CURVE STATION
BOTHWAYS
CURB INLET MANHOLE
CENTERLINE
CENTIMETER
CURB TO SPIRAL
CULVERT
DEGREE OF CURVE
DISTANCE
DRAINAGE MANHOLE MEMBER
DEPARTMENT OF PUBLIC WORKS AND HIGHWAY
EXTERNAL DISTANCE/EASTING
SUPERELEVATION
EAST BOUND
ELEVATION
EXISTING
GRADIENT
HORIZONTAL
INTERSECTION ANGLE
INLET INVERT ELEVATION
INTERNATIONAL
KILOMETERS
LEFT/LENGTH
LENGTH OF HORIZONTAL CURVE
LINEAR METER
LEFT
LENGTH OF VERTICAL CURVE
METER
Max
MH
mm
Mo
MUN
NB
O.C.
OIE
PC
PCCP
PI
PT
PVI
PVC
PVT
R
RC
RCBC
RCPC
RD
RROW
RT
S
SB
SHLDR
STA
STD
SW
T
TBM
VC
VERT , V
W
WB
WW
N C
MAXIMUM
MANHOLE
MILLIMETER
MIDDLE ORDINATE
MUNICIPAL
NORTH BOUND
ON CENTER
OUTLET INVERT ELEVATION
POINT OF CURVATURE
PORTLAND CONCRETE CEMENT PAVEMENT
POINT OF INTERSECTION
POINT OF TANGENCY
POINT OF VERTICAL INTERSECTION
POINT OF VERTICAL CURVE
POINT OF VERTICAL TANGENCY
RADIUS
REINFORCED CONCRETE
REINFORCED CONCRETE BOX CULVERT
REINFORCED CONCRETE PIPE CULVERT
ROAD
ROAD RIGTH - OF - WAY
RIGHT
NORMAL CROSSFALL
SOUTH BOUND
SHOULDER
STATION
STANDARD
SOUTH WEST
TANGENT
TEMPORARY BENCH MARK
VERTICAL CURVE
VERTICAL
WIDENING
WEST BOUND
WINGWALL
DIAMETER
NORMAL CROWN
N
LEGEND :
ABBREVIATIONS:
GENERAL NOTES
1.0 SPECIFICATIONS :
2.0 DIMENSIONS :
1.1 ALL WORKS SHALL COMPLY WITH THE " DPWH STANDARD SPECIFICATIONS , 2013 EDITIONS , VOLUME II - HIGHWAYS ,
BRIDGES AND AIRPORTS " , SPECIAL PROVISIONS ANDSUPPLEMENTAL SPECIFICATIONS TO THIS PROJECT .
2.1 ALL DIMENSIONS ARE IN METERS UNLESS OTHER SPECIFIED.
2.2 DIMENSIONS ON DRAINAGE , TYPICAL ROAD SECTION AND STANDARD DRAWINGS ARE IN MILLIMETERS UNLESS OTHERWISE
INDICATED ON THE DRAWINGS .
3.0 STATIONINGS AND RADIUS OF HORIZONTAL CURVE :
3.1 THE STATIONINGS OF HORIZONTAL ALIGNMENT OF THE PROJECT ROADS ARE RELATIVE TO THE CENTERLINE SHOWN ON THE PLANS.
3.2 STATIONINGS OF CIM, MH AND OTHER STRUCTURES ARE RECKONED AT THE STATIONINGS OF THE CENTERLINE SHOWN ON THE PLANS.
3.3 THE RADIUS OF HORIZONTAL CURVE SHOWN ON THE PLAN WERE BASED ON THE LAID-OUT ROADWAY CENTERLINE.
4.0 HORIZONTAL CONTROL :
4.1 HORIZONTAL GROUND CONTROLS SHALL BE ESTABLISHED AT OR NEAR AN ACCEPTABLE VICINITY OF SUBJECT PROJECT USING
SECONDARY TRAVERSE PRECISION AND ACCURACY. EXISTING BUREAU OF LANDS LOCATION MONUMENTS (BLLMS), MUNICIPAL
BOUNDARY MONUMENTS (MBM), BARRIO BOUNDARY MONUMENTS (BBM) TRIANGULATION STATIONS WITHIN THE PROJECT SHALL
BE MADE PART OF THE PROJECT CONTROL. THE HORIZONTAL GROUND CONTROLS SHALL BE CONNECTED TO THE PREVIOUSLY APPROVED
BLLM'S AND/OR TRIANGULATION STATIONS OR HIGHER ORDERS ESTABLISHED BY THE BUREAU OF COAST AND GEODETIC SURVEY.
4.2 HORIZONTAL TRAVERSE MUST BE TIED TO A GPS STATION ESTABLISHED IN THE PROJECT ROAD. PRIMARY TRAVERSE STATION SHALL
BE ESTABLISHED USING CONCRETE MONUMENT OF DIMENSIONS 20 CM X 20 CM X 60 CM WITH 10 MM DIAMETER, 60 CM LONG STEEL
BAR EMBEDDED AT THE CENTER OF THE MONUMENT.
4.3 INDICATED AZIMUTH OF LINES ARE TRUE AZIMUTH BASED FROM THE GPS STATIONS ESTABLISHED ALONG THE ROAD.
5.0 VERTICAL CONTROL :
5.1 A VERTICAL GROUND CONTROL SYSTEM SHALL BE ESTABLISHED FOR THE ENTIRE PROJECT WHICH WILL BE CONNECTED AND
REFERRED TO AT LEAST THREE (3) EXISTING BENCHMARKS (BM). ALL ELEVATIONS SHALL BE REFERRED TO A REFERENCE DATUM
PLANE, EITHER THE MEAN SEA LEVEL (MSL) OR THE MEAN LOWER LOW WATER (MLLW) AS ESTABLISHED BY THE THE BUREAU OF
COAST AND GEODETIC SURVEY. IN ALL CASES, THE DATUM PLANE SHALL BE CLEARLY INDICATED IN THE SURVEY PLANS.
5.2 WHEN LEVELING ALONG A HIGHWAY OR A WELL DEFINED ROAD, THE ELEVATION OF THE TOP ROAD HAS TO BE DETERMINED BY
MEANS OF EXTRA FORESIGHTS. IN FRONT OF EACH RAILROAD STATION OR AT EACH INTERSECTION RAILROAD, ROAD OR HIGHWAYS,
AT PRINCIPAL FORKS, AT WELL DEFINED ANGLES IN THE ROAD, AT POINTS OPPOSITE INTERSECTING FENCE LINES DEFINED BY TREES
OR BRUSH, AT POINTS OPPOSITE INTERSECTING FENCE LINES DEFINED BY TREES OR BRUSH, AT POINTS OPPOSITE SHARP BOUNDARIES
BETWEEN CLEARED AND ERODED AREA AND AT BRIDGE FLOORS.
6.0 ELEVATIONS AND GRADES :
6.1 FINISHED GRADE ELEVATIONS ARE RELATIVE TO CENTERLINE OF EACH ROAD .
6.2 THE ELEVATIONS SHOWN ON THE ORIGINAL GROUND ON THE PLAN AND PROFILE ARE RELATIVE TO CENTERLINE OF THE ROAD.
7.0 ROAD CONNECTIONS AND PRIVATE ENTRANCES.
7.1 APPROACHES AND CONNECTIONS SHALL BE CONSTRUCTED BY THE CONTRACTOR AS SHOWN ON THE PLAN OR AS DIRECTED
BY THE ENGINEER IN SUCH MANNER AS ENSURE SMOOTH CONNECTION AND RIDING QUALITY.
7.2 EXACT LOCATIONS OF INTERSECTIONS ROAD AND PRIVATES ENTRANCES OR DRIVEWAYS WHERE ITEM 7.1 ABOVE APPLIES,
SHALL BE VERIFIED BY THE ENGINEER.
7.3 PROVIDE A DROP CURB AND GUTTER TO EXISTING ENTRANCES AS SHOWN ON THE STANDARD CURB AND GUTTER DRAWINGS.
8.0 DRAINAGE STRUCTURES :
8.1 LOCATIONS OF EXISTING DRAINAGE STRUCTURES REFLECTED IN THE PLAN WAS BASED ON THE TOPO SURVEY.
8.2 EXACT LOCATIONS , GRADIENTS OUTFALLS AND TOP AND INVERT ELEVATIONS OF DRAINAGE STRUCTURES SHALL BE
CHECKED AND VERIFIED IN THE FIELD , DURING CONSTRUCTION BY THE ENGINEER . FIELD ADJUSTMENT MAY BE MADE
BY THE ENGINEER TO SUIT ACTUAL FIELD CONDITIONS.
8.3 EXTENSIONS AND OTHER IMPROVEMENTS OF EXISTING DRAINAGE STRUCTURES ARE SUBJECT TO CHANGE AND SHALL
BE VERIFIED BY THE ENGINEER.
8.4 PRIOR TO INSTALLATION OF RCPC AND OTHER DRAINAGE STRUCTURES. ALL MATERIALS MUST BE TESTED AND CONFORMING
WITH THE TECHNICAL SPECIFICATION.
8.5 THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REPLACEMENT OF ANY MATERIALS INSTALLED AND FOUND TO BE
DEFICIENT IN WORKMANSHIP AND QUALITY OF WORK.
8.6 RCPC DIAMETERS ARE IN MILLIMETERS UNLESS OTHERWISE SPECIFIED.
8.7 INLETS AND OUTLETS OF NEW AND EXISTING CULVERTS TO BE UTELIZED SHOULD BE CHANNELIZED AND CLEARED OF
DEBRIS IN ORDER TO HAVE A SMOOTH FLOW OF WATER.
9.0 REMOVAL OF EXISTING STRUCTURES AND RELOCATION
OF EXISTING UTILITIES :
9.1 REMOVAL OF EXISTING BUILDING, HOUSES, AND FENCES, WILL BE THE RESPONSIBILITY OF THE CONTRACTOR, THEY
WILL BE PAID ACCORDING TO THE CONTRACT.
9.2 PORTIONS OF EXISTING UTILITIES, SUCH AS WATER LINES, TELEPHONES TRUCK LINES ELECTRIC LINES ETC. THAT MAY
OBSTRUCT THE CONSTRUCTION OF THE PROJECT SHALL BE RELOCATED BY THE ENTITIES OR OWNER'S CONCERNED.EXTREME
PRECAUTION SHALL BE EXERCISED BY THE CONTRACTOR SO AS NOT DAMAGE THE EXISTING UTILITIES DURING
CONSTRUCTION . ANY DAMAGE THEREOF SHALL BE ON THE ACCOUNT OF THE CONTRACTOR.
10.0 ROAD SIGNS :
10.1 ROAD SIGNS SHALL CONFORM WITH THE LATEST MANUAL ON PHILIPPINES ROAD SIGNS ( REVISED EDITION ) OF THE
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS , TRAFFIC ENGINEERING AND MANAGEMENT PROJECTS. 2012
11.0 ACCESSIBILITY LAW :
11.1 STRICT COMPLIANCE WITH THE BATAS PAMBANSA BILANG 344 AND ITS IMPLEMENTING RULES AND REGULATIONS SHALL
BE IMPOSED .
12.0 DESIGN DATA / REFERENCES :
12.1 GUIDELINES FOR ROAD DRAINAGE, DPWH.
D
2
6
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE No. IV-A
CAVITE 3RD DISTRICT ENGINEERING OFFICECARMONA, CAVITE
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED :
PREPARED :
REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
AARON JAY F. FABELLA
ENGINEERING ASSISTANT
KENNETH P. AUSTRIA
ENGINEER II
JESSITO M. BAGUIO JR.
ENGINEER II
REIMART REGIN P. BAUTISTA
OIC, PLANNING AND DESIGN SECTION
JENNIFER F. ALMANZOR
OIC, ASSISTANT DISTRICT ENGINEER
DONNIE D. CUNA
DISTRICT ENGINEER
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND
PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT
PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD
MITIGATION STRUCTURES AND DRAINAGE SYSTEM -
CONSTRUCTION OF FLOOD MITIGATION STRUCTURES AND
DRAINAGE SYSTEMS ALONG BACOOR BOULEVARD ROAD
(SOUTH BOUND) K00 15 + (-659) - K0017 + 630 WITH EXCEPTIONS,
BACOOR CITY, CAVITE
DATE: DATE: DATE: DATE:
32
GENERAL NOTES
2
13.3. REINFORCED CONCRETE
a. CONCRETE MIX AND PLACING
(1) DESIGN OF CONCRETE MIX SHALL MEET THE DESIGN CONCRETE
STRENGTH SPECIFIED IN ITEM 405.
(2) CONCRETE SHALL BE DEPOSITED, VIBRATED AND CURED IN
ACCORDANCE WITH THE SPECIFICATIONS.
(3) FOR CONCRETE DEPOSITED AGAINST THE GROUND, FOUNDATION FILL
WITH A MINIMUM THICKNESS OF 100mm SHALL BE LAID AND COMPACTED
FIRST BEFORE INSTALLING THE REINFORCEMENT.
D
90 ° HOOK
PIN DIAMETER :
63mm MIN.
180° HOOK
D = 6d FOR 10 THRU 25
D = 8d FOR 28, 32 AND 36
(ii) DIMENSIONS FOR STIRRUPS AND TIE HOOKS
63mm MIN
D
D
D
PIN DIAMETER : D = 6d FOR 10 THRU 25
D = 8d FOR 28, 32 AND 36
d
100mm MIN
d
(9) HOOKS AND BENDS
(i) DIMENSIONS OF 90 - DEGREE AND 180 - DEGREE HOOKS
MAX =
MIN =DIAMETER =
15 d
30 d MAX
18 d MIN
(8) CRANKED SPLICES.
MIN : d
VERTICAL OFFSET
MAX: d + 3 mm
(4) THE CONTRACTOR SHALL SUBMIT TO THE ENGINEER FOR APPROVAL
PLACING SEQUENCES FOR ALL CONCRETE WORK.
b. BAR BENDING, SPLICING, AND PLACING
SHOP DRAWINGS INDICATING THE BENDING, CUTTING, SPLICING AND
(1) THE CONTRACTOR SHALL SUBMIT TO THE ENGINEER FOR APPROVAL OF
INSTALLATION OF ALL REINFORCING BARS.
SHALL NOT BE FIELD BENT UNLESS SHOWN ON THE DRAWING OR SPECIFICALLY
(2) BARS SHALL BE BENT COLD. BARS PARTIALLY EMBEDDED IN CONCRETE
PERMITTED BY THE ENGINEER.
(3) BAR SPLICING SHALL BE AS INDICATED ON DRAWINGS SHALL BE SUBJECT TO THE
APPROVAL OF THE ENGINEER.
(4) NO SPLICING SHALL BE PERMITTED IN BEAMS AND GIRDERS WHERE CRITICAL
BENDING MOMENTS OCCUR. STAGGER SPLICES BETWEEN ADJACENT BARS.
MINIMUM DISTANCE OF 40 BAR DIAMETERS FOR TENSION SPLICES, AND 20
BAR DIAMETER FOR COMPRESSION SPLICES BUT NOT LESS THAN 300mm.
(5) WELDED SPLICES, IF APPROVED BY THE ENGINEER, SHALL DEVELOP IN TENSION
AT LEAST 125% OF THE SPECIFIED YIELD STRENGTH OF THE BAR.
(6) NOT MORE THAN 50% OF THE BARS AT ANY ONE SECTION SHALL BE SPLICED.
(7) UNLESS OTHERWISE SHOWN ON DRAWINGS, THE CLEAR DISTANCE BETWEEN
PARALLEL BARS IN A LAYER SHALL NOT BE LESS THAN 1.5 TIMES THE NOMINAL
DIAMETER OF THE BAR NOR LESS THAN 1.5 TIMES THE MAXIMUM SIZE OF
THE COARSE AGGREGATE. THE CLEAR DISTANCE BETWEEN LAYERS SHALL NOT BE
LESS THAN 25mm NOR ONE BAR DIAMETER. THE BARS IN UPPER LAYER SHALL BE
PLACED DIRECTLY ABOVE THOSE IN THE BOTTOM LAYER.
13.0 CONSTRUCTION
13.1. SPECIFICATION
ALL WORKS CONFORM WITH THE DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (DPWH)
STANDARD SPECIFICATIONS FOR HIGHWAYS, BRIDGES AND AIRPORTS, VOL. ll 2004
13.2. SETTING OUT
THE SETTING OUT AND THE ELEVATIONS OF THE DIFFERENT COMPONENTS OF THE STRUCTURE
SHALL BE APPROVED BY THE ENGINEER PRIOR TO THE STARTS OF ANY
CONSTRUCTION WORKS.
GENERAL NOTES
HYDRAULIC & HYDROLOGIC
DESIGN PARAMETERS
E
1
7
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE No. IV-A
CAVITE 3RD DISTRICT ENGINEERING OFFICECARMONA, CAVITE
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED :
PREPARED :
REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
AARON JAY F. FABELLA
ENGINEERING ASSISTANT
KENNETH P. AUSTRIA
ENGINEER II
JESSITO M. BAGUIO JR.
ENGINEER II
REIMART REGIN P. BAUTISTA
OIC, PLANNING AND DESIGN SECTION
JENNIFER F. ALMANZOR
OIC, ASSISTANT DISTRICT ENGINEER
DONNIE D. CUNA
DISTRICT ENGINEER
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND
PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT
PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD
MITIGATION STRUCTURES AND DRAINAGE SYSTEM -
CONSTRUCTION OF FLOOD MITIGATION STRUCTURES AND
DRAINAGE SYSTEMS ALONG BACOOR BOULEVARD ROAD
(SOUTH BOUND) K00 15 + (-659) - K0017 + 630 WITH EXCEPTIONS,
BACOOR CITY, CAVITE
DATE: DATE: DATE: DATE:
32
SUMMARY OF QUANTITIES
1
SUMMARY OF QUANTITIES
(1
00
0-2
01
0) +
2
00
12
81
50
150 1400 150
24 %
1560
20 mm. Ï LADDER RUNG
16 mm. Ï x 500 mm.
DEFORMED BAR
10 mm. Ï TIES
SPACED @ 150 mm.
O.C.
2-16 mm. Ï x 1200 mm.
DEFORMED BAR
1 %
12 mm. Ï VERTICAL
BAR SPACED 250
mm. O.C.
12 mm. Ï
DEFORMED BAR
SPACED @ 250 mm.
O.C.
CAST IN PLACE
12 mm. Ï DEFORMED
BAR SPACED @ 100
mm. O.C.
12 mm. Ï
DEFORMED BAR
SPACED @ 150 mm.
O.C.
(1
00
0-2
01
0) +
2
00
12
81
50
150 1400 150
1560
20 mm. Ï LADDER RUNG
16 mm. Ï x 500 mm.
DEFORMED BAR
10 mm. Ï TIES
SPACED @ 100 mm.
O.C.
4-16 mm. Ï
DEFORMED BAR
12 mm. Ï VERTICAL
BAR SPACED 300
mm. O.C.
12 mm. Ï DEFORMED
BAR SPACED @ 300
mm. O.C.
CAST IN PLACE
2 CONCRETE BEAMS
EVERY MANHOLE
10 mm. Ï TIES SPACED
@ 150 mm. O.C.
2-16 mm. Ï x 1200 mm.
DEFORMED BAR
1 %
150
14001400
15
01
00
0-2
01
0
12 mm. Ï DEFORMED
BAR SPACED @ 250
mm. O.C.
12 mm. Ï VERTICAL
BAR SPACED 250
mm. O.C.
12 mm. Ï
DEFORMED BAR
SPACED @ 250 mm.
O.C.
CAST IN PLACE
1700
150
12 mm. Ï DEFORMED
BAR SPACED @ 100
mm. O.C.
12 mm. Ï DEFORMED
BAR @ 100 mm. O.C.
15
0
1 %
12 mm. Ï DEFORMED
BAR SPACED @ 150
mm. O.C.
H
1
11
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE No. IV-A
CAVITE 3RD DISTRICT ENGINEERING OFFICECARMONA, CAVITE
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED :
PREPARED :
REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
AARON JAY F. FABELLA
ENGINEERING ASSISTANT
KENNETH P. AUSTRIA
ENGINEER II
JESSITO M. BAGUIO JR.
ENGINEER II
REIMART REGIN P. BAUTISTA
OIC, PLANNING AND DESIGN SECTION
JENNIFER F. ALMANZOR
OIC, ASSISTANT DISTRICT ENGINEER
DONNIE D. CUNA
DISTRICT ENGINEER
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND
PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT
PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD
MITIGATION STRUCTURES AND DRAINAGE SYSTEM -
CONSTRUCTION OF FLOOD MITIGATION STRUCTURES AND
DRAINAGE SYSTEMS ALONG BACOOR BOULEVARD ROAD
(SOUTH BOUND) K00 15 + (-659) - K0017 + 630 WITH EXCEPTIONS,
BACOOR CITY, CAVITE
DATE: DATE: DATE: DATE:
32
LINE CANAL AND MANHOLE CROSS SECTION
DETAILS
2
LINE CANAL AND MANHOLE CROSS
SECTION
NOTES
1. THE FINISH OF THE TOP SHALL CONFORM IN COLOR MARKINGS AND FINISH WITH THE
ADJACENT CEMENT WORK WHERE NO SIDEWALK EXISTS THE SURFACE SHALL BE TROWEL
FINISHED WITHOUT MORTAR COAT.
2. ALL CONCRETE SHALL BE CLASS "A" EXPOSED EDGES SHALL BE FINISHED WITH SUITABLE
EDGER.
3. PULLING IRON SHALL BE PAINTED WITH ONE COAT OF READ LEAD
4. CONSTRUCTION JOINT SHALL CONFORM WITH THE GROOVES OF THE CONCRETE
HOLLOW BLOCKS.
5. STRUCTURAL CONCRETE SHALL BE PORTLAND CEMENT CONCRETE WITH A 14 CALENDAR
DAYS COMPRESSIVE STRENGTH OF 24.0 MPa.
6. REINFORCING STEEL SHALL BE INTERMEDIATE GRADE fy=275MPa.
7. PROVIDE LADDER RUNGS WHEN THE DEPTH OF CURB INLET EXCEED 1200mm.
8. SPACING OF CURB INLETS SHALL BE 10.00m O.C. OR AS SPECIFIED ON THE PLANS.
9. ADDITIONAL DEPTH OF 200mm AT EVERY MANHOLE.
MANHOLE SECTION
SCALE: 1:16 MTS.
H
1
MANHOLE SECTION
SCALE: 1:16 MTS.
H
1
LINE CANAL SECTION
SCALE: 1:16 MTS.
H
1
1
.
3
0
0.52
0.127
2 x 2 x 3/16
∠ BAR FRAMING
REINFORCED
CONCRETE MANHOLE
COVER
PULLING
IRON
WELD
1
2
"
304
(12")
38.1
(1-1/2")
5
8
" U-BOLT
3/1
6"
23
0
(9
")
230
(9")
50
100
900
12 mm. Ï DEFORMED BAR
1000
100
10
0
50
10050 100100100 100 100
33
50
33
33
570
150
2 x 2 x 3/16 ∠ BAR
FRAMING
12 mm. Ï
DEFORMED BAR
@ 100 mm. O.C.
BOTHWAYS
5
8
" U-BOLT
1" Ï PVC PIPE
0.016
CHAMFER
16
32
CHAMFER
32
CHAMFER
19 (3/4")
5
8
" U-BOLT
16
12 mm. Ï DEFORMED BAR @
100 mm. O.C. BOTHWAYS
1" Ï PVC PIPE
353
(14")
250
(10")
450
(18")
100
(4")
250
(10")
13
00
1560
PULLING
IRON
2 x 2 x 3/16
∠ BAR FRAMING
12 mm. Ï
DEFORMED BAR
@ 100 mm. O.C.
BOTHWAYS
520
EXISTING PORTLAND CEMENT
CONCRETE PAVEMENT (0.23m
THICK)
PRECAST CONCRETE GUTTER
CURB INLET WITH GRATINGS
SEE DETAIL DRAWING (SPACING OF
MANHOLE) STRAIGHT LINE DIAGRAM
10.00m 10.00m
CURB INLET PRECAST GUTTER
CONCRETE CURB
C O N C R E T E S I D E W A L K
MANHOLE
0.50 m
0.14 m
1.56 m
C O N C R E T E S I D E W A L K
H
2
12
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE No. IV-A
CAVITE 3RD DISTRICT ENGINEERING OFFICECARMONA, CAVITE
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED :
PREPARED :
REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
AARON JAY F. FABELLA
ENGINEERING ASSISTANT
KENNETH P. AUSTRIA
ENGINEER II
JESSITO M. BAGUIO JR.
ENGINEER II
REIMART REGIN P. BAUTISTA
OIC, PLANNING AND DESIGN SECTION
JENNIFER F. ALMANZOR
OIC, ASSISTANT DISTRICT ENGINEER
DONNIE D. CUNA
DISTRICT ENGINEER
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND
PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT
PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD
MITIGATION STRUCTURES AND DRAINAGE SYSTEM -
CONSTRUCTION OF FLOOD MITIGATION STRUCTURES AND
DRAINAGE SYSTEMS ALONG BACOOR BOULEVARD ROAD
(SOUTH BOUND) K00 15 + (-659) - K0017 + 630 WITH EXCEPTIONS,
BACOOR CITY, CAVITE
DATE: DATE: DATE: DATE:
32
CONCRETE COVER, LADDER RUNG CURB INLET
AND TYPICAL LAYOUT OF CONCRETE COVERS
2
MANHOLE COVER DETAILS
SCALE: 1:20 MTS.
H
1
LADDER RUNG DETAIL
SCALE: 1:10 MTS.
H
3
LADDER RUNG
ISOMETRIC VIEW
SCALE: 1:10 MTS.
H
4
CURB INLET REINFORCEMENT DETAIL
SCALE: 1:8 MTS.
H
10
TOP VIEW DETAIL
SCALE: 1:8 MTS.
H
7
PULLING IRON DETAIL
SCALE: 1:8 MTS.
H
9
SECTION - 1
SCALE: 1:8 MTS.
H
5
SECTION - 2
SCALE: 1:8 MTS.
H
6
MANHOLE COVER
ISOMETRIC VIEW
SCALE: NTS
H
2
TYPICAL LAYOUT OF PRECAST CONCRETE GUTTER
SCALE: 1:200 MTS.
ISOMETRIC LAYOUT OF SIDEWALK, CONCRETE CURB & GUTTER AND PCCP
SCALE: NOT TO SCALE
H
11
H
12
M
1
30
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE No. IV-A
CAVITE 3RD DISTRICT ENGINEERING OFFICECARMONA, CAVITE
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED :
PREPARED :
REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
AARON JAY F. FABELLA
ENGINEERING ASSISTANT
KENNETH P. AUSTRIA
ENGINEER II
JESSITO M. BAGUIO JR.
ENGINEER II
REIMART REGIN P. BAUTISTA
OIC, PLANNING AND DESIGN SECTION
JENNIFER F. ALMANZOR
OIC, ASSISTANT DISTRICT ENGINEER
DONNIE D. CUNA
DISTRICT ENGINEER
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND
PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT
PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD
MITIGATION STRUCTURES AND DRAINAGE SYSTEM -
CONSTRUCTION OF FLOOD MITIGATION STRUCTURES AND
DRAINAGE SYSTEMS ALONG BACOOR BOULEVARD ROAD
(SOUTH BOUND) K00 15 + (-659) - K0017 + 630 WITH EXCEPTIONS,
BACOOR CITY, CAVITE
DATE: DATE: DATE: DATE:
32
TRAFFIC MANAGEMENT PLAN
1
GENERAL NOTES
1. STANDARD SPECIFICATIONS
1.1. ALL ROAD WORKS SAFETY ITEMS SHALL COMPLY WITH THE DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
ROAD WORKS SAFETY MANUAL 2004 EDITION.
2. SIGNS, MARKINGS AND DEVICES
2.1. DETAILS OF SIGNS AND MARKINGS LIKE SIZE, LETTERING AND BACKGROUND COLOR SHALL CONFORM WITH
THE DPWH ROAD WORKS SAFETY MANUAL.
2.2. SIGNS, MARKINGS AND DEVICES SHALL BE MADE OF RETRO-REFLECTIVE MATERIALS
2.3. SIGNS SHOULD BE PLACED IN CONSPICUOUS LOCATION. THEY SHOULD BE ERECTED AT APPROPRIATE
LOCATIONS AS PRESENTED IN THE TRAFFIC MANAGEMENT PLAN.
2.4. REGULAR INSPECTION, CLEANING AND REPLACING OF DAMAGE SIGNS, AS APPROPRIATE, MUST BE CARRIED
OUT TO ENSURE CONTINUED EFFECTIVENESS. THE LAYOUT SHOULD BE DRIVEN THROUGH PERIODICALLY TO
CHECK THAT SIGNS ARE STILL IN PLACE AND STILL APPROPRIATE.
2.5. UPON COMPLETION OF WORKS, SIGNS SHALL BE REMOVED FROM THE WORKSITE AND APPROACHES TO THE
SITE.
3. TRAFFIC CONTROLLERS
3.1. ALL TRAFFIC CONTROLLERS DETAILED IN THE WORK SITE SHOULD HAVE BASIC KNOWLEDGE ON ROAD WORKS
SAFETY ESPECIALLY IN HANDLING TRAFFIC.
3.2. TRAFFIC CONTROLLERS MUST ALWAYS WEAR THE CORRECT CLOTHING WHILE ON DUTY.
4. WORK SITE TRAFFIC MANAGEMENT
4.1. THE DESIGN OF TRAFFIC MANAGEMENT LAYOUT IS BASED ON THE APPROACH SPEED OF 70 KPH
5. THE PROJECT ENGINEER TOGETHER WITH THE CONTRACTOR SHALL MAKE THE NECESSARY TRAFFIC MANAGEMENT
SEQUENCE IN SUCH A WAY THAT ROAD WORKS WILL NOT ADVERSELY AFFECT THE FLOW OF TRAFFIC.
6. SAME SET-UP OF TRAFFIC MANAGEMENT LAYOUT APPLIES AS THE WORK PROGRESSES UP TO THE OTHER SIDE OF THE
ROAD UNTIL THE NEWLY CONSTRUCTED STRUCTURE MAY BE OPENED FOR TRAFFIC.
7. DURING ACTUAL CONSTRUCTION, NECESSARY ADJUSTMENTS MAY BE MADE IN THE ILLUSTRATION AS PRESENTED
HEREIN. CONSIDERATIONS SHOULD BE GIVEN IN THE AVAILABLE SPACE, EXISTING STRUCTURES, TRAFFIC AND
OTHER FACTORS TO ALLOW SAFE MOBILITY OF WORKERS, EQUIPMENT, PEDESTRIANS, AND OTHER ROAD USERS
DURING CONSTRUCTION OPERATION TO PROVIDE THE APPROPRIATE SIGNAGE, BARRIERS, AND THE NECESSARY
TRAFFIC DEVICES.
TRAFFIC MANAGEMENT PLAN
SCALE: NOT TO SCALE
D D D D
ROADWORK
AHEAD
R O A D
M A C H I N E R Y
A H E A D
PREPARE
TO
STOP
30 m 30 m
TRAFFIC CONES SPACED AT 5.0 M
TRAFFIC CONES SPACED AT 5.0 M
DDDD
ROADWORK
AHEAD
R O A D
M A C H I N E R Y
A H E A D
PREPARE
TO
STOP
BARRICADE FLASHER LIGHTS
INSTALLED EVERY AFTER 3 BOLLARDS
50 METER LENGTH WORKSITE AREA
CONFINED WORK SITE AREA DURING
CONSTRUCTION OPERATION. SUCH SET-UP
WILL MOVE FORWARD UP TO THE END
STATION OF THE PROJECT.
20
20
DIMENSION "D"
A DISTANCE EXPRESSED IN METERS
EQUAL TO THE APPROACH SPEED OF
TRAFFIC IN KILOMETERS PER HOUR
600
500
90
120
90
120
60
90
30
W
A B1
2
W
W W D
90
25
0
5
1
4
" THK. ORDINARY PLYWOOD WALL
12
34
0
10
0
1.2 x 1.2 WINDOW
# 26 G.I. CORRUGATED ROOFING SHEET
# 26 RIDGE ROLL
0.9 x 2.1 DOOR
A B
60 600 60
100
500
100
720
700
# 26 RIDGE ROLL
FLOOR LINE
# 26 G.I. CORRUGATED ROOFING SHEET
A B
1
2
N
1
31
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE No. IV-A
CAVITE 3RD DISTRICT ENGINEERING OFFICECARMONA, CAVITE
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED :
PREPARED :
REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
AARON JAY F. FABELLA
ENGINEERING ASSISTANT
KENNETH P. AUSTRIA
ENGINEER II
JESSITO M. BAGUIO JR.
ENGINEER II
REIMART REGIN P. BAUTISTA
OIC, PLANNING AND DESIGN SECTION
JENNIFER F. ALMANZOR
OIC, ASSISTANT DISTRICT ENGINEER
DONNIE D. CUNA
DISTRICT ENGINEER
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND
PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT
PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD
MITIGATION STRUCTURES AND DRAINAGE SYSTEM -
CONSTRUCTION OF FLOOD MITIGATION STRUCTURES AND
DRAINAGE SYSTEMS ALONG BACOOR BOULEVARD ROAD
(SOUTH BOUND) K00 15 + (-659) - K0017 + 630 WITH EXCEPTIONS,
BACOOR CITY, CAVITE
DATE: DATE: DATE: DATE:
32
DPWH STANDARD FIELD OFFICE FOR THE ENGINEER
PERSPECTIVE VIEW
2
N-1
SCALE: 1:70
SIDE ELEVATION VIEW
3
N-1
SCALE: 1:70
ROOF PLAN
5
N-1
SCALE: 1:70
FRONT ELEVATION VIEW
4
N-1
SCALE: 1:70
PERSPECTIVE VIEW
1
N-1
SCALE: NTS
2
CONSTRUCTION OF (Name of Project and Location)CONTRACTOR :
50
90
70
50
60
30
50
DATE STARTED :3
0
50
CONTRACT COMPLETION :
30
50
DATE CONTRACT COST :
30
50
CONSTRUCTION CONSULTANT :
30
50
IMPLEMENTING OFFICE :
30
50
SOURCE OF FUND :
12
20
30
40
50
70
50
50
50
2440
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
TEXT 2920 or call (02) 165-02 for any concern of this project
www.dpwh.gov.ph ROADROADOUR TOPROGRESSROAD
50
30
20
30
20
30
1000
500
1000
1200
50 x 50
WOODEN
STAKE
12
00
10
00
50
0
2400
50 x 50
HORIZONTAL
COCO LUMBER
75 x 75
HORIZONTAL
COCO LUMBER
50 x 50
WOODEN
STAKE
BILLBOARD
EDGE OF ROAD
TRAFFIC DIRECTION
4
5
°
CONSTRUCTION OF (Name of Project and Location)
CONTRACTOR
:
DATE STARTED
:
CONTRACT COMPLETION:
DATE CONTRACT COST:
CONSTRUCTION CONSULTANT:
IMPLEMENTING OFFICE:
SOURCE OF FUND
:D
E
P
A
R
T
M
E
N
T
O
F
P
U
B
L
I
C
W
O
R
K
S
A
N
D
H
I
G
H
W
A
Y
S
T
E
X
T
2
9
2
0
o
r
c
a
l
l
(
0
2
)
1
6
5
-
0
2
f
o
r
a
n
y
c
o
n
c
e
r
n
o
f
t
h
i
s
p
r
o
j
e
c
t
w
w
w
.
d
p
w
h
.
g
o
v
.
p
h
ROADROAD
OUR
TOPROGRESS
ROAD
N
2
32
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE No. IV-A
CAVITE 3RD DISTRICT ENGINEERING OFFICECARMONA, CAVITE
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED :
PREPARED :
REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
AARON JAY F. FABELLA
ENGINEERING ASSISTANT
KENNETH P. AUSTRIA
ENGINEER II
JESSITO M. BAGUIO JR.
ENGINEER II
REIMART REGIN P. BAUTISTA
OIC, PLANNING AND DESIGN SECTION
JENNIFER F. ALMANZOR
OIC, ASSISTANT DISTRICT ENGINEER
DONNIE D. CUNA
DISTRICT ENGINEER
ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND
PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT
PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD
MITIGATION STRUCTURES AND DRAINAGE SYSTEM -
CONSTRUCTION OF FLOOD MITIGATION STRUCTURES AND
DRAINAGE SYSTEMS ALONG BACOOR BOULEVARD ROAD
(SOUTH BOUND) K00 15 + (-659) - K0017 + 630 WITH EXCEPTIONS,
BACOOR CITY, CAVITE
DATE: DATE: DATE: DATE:
32
DPWH STANDARD PROJECT BILLBOARD
PROJECT BILLBOARD
1
N-2
SCALE: 1:100
ISOMETRIC VIEW
2
N-2
SCALE: NTS
SIDE ELEVATION VIEW
3
N-2
SCALE: 1:100
ROOF PLAN
5
N-2
SCALE: 1:100
FRONT ELEVATION VIEW
4
N-2
SCALE: 1:100
2