Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit....

90
Department of Energy Washington, DC 20585 'U t. FEB12 92 Mr. John J. Linehan Deputy Director, Division of High-Level Waste Management Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555 Dear Mr. Linehan: Enclosed for your information is a copy of Volume 3 of the U.S. Department of Energy (DOE) Fiscal Year (FY) 1993 Congressional Budget which provides a summary of estimates by major activity of the Nuclear Waste Fund Budget Authority for the DOE Office of civilian Radioactive Waste Management. Sincerely, John P. Roberts Acting Associate Director for Systems and Compliance Office of Civilian Radioactive Waste Management Enclosure: Volume 3, DOE FY 1993 Congressional Budget Nuclear Waste Fund 92O2~~~920212d b1 D 022D0030; PDBR WASTE PDR ill

Transcript of Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit....

Page 1: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

Department of EnergyWashington, DC 20585

'U t. FEB12 92

Mr. John J. LinehanDeputy Director, Division of High-LevelWaste Management

Office of Nuclear Material Safetyand Safeguards

U.S. Nuclear Regulatory CommissionWashington, DC 20555

Dear Mr. Linehan:

Enclosed for your information is a copy of Volume 3 of the U.S.

Department of Energy (DOE) Fiscal Year (FY) 1993 Congressional

Budget which provides a summary of estimates by major activity of

the Nuclear Waste Fund Budget Authority for the DOE Office of

civilian Radioactive Waste Management.

Sincerely,

John P. RobertsActing Associate Director forSystems and Compliance

Office of Civilian RadioactiveWaste Management

Enclosure:Volume 3, DOE FY 1993 Congressional Budget

Nuclear Waste Fund

92O2~~~920212d b1D 022D0030;PDBR WASTE PDR ill

Page 2: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

i

2

cc w/o Enclosure:C. Gertz, YMPOR. Loux, State of NevadaK. Whipple, Lincoln County, NVM. Baughman, Lincoln County, NVJ. Bingham, Clark County, NVD. Bechtel, Clark County, NVS. Bradhurst, Nye County, NVB. Raper, Nye County, NVP. Niedzielski-Eichner, Nye County, NV

R. Campbell, Inyo County, CAR. Michener, Inyo County, CAG. Derby, Lander County, NVP. Goicoechea, Eureka, NVC. Schank, Churchill County, NVC. Jackson, Mineral County, NVF. Sperry, White Pine County, NVL. Vaughan, Esmeralda County, NV

,.

Page 3: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

( C C

NUCLEAR WASTE FUND

VOLUME 3

221

Page 4: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

NUCLEAR WASTE FUND

VOLUME 3

222

(. C (

Page 5: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

( C C Department of Energy

FY 1993 Congressional Budget ,-

Summary of Estimates by Major ActivityNuclear Waste Fund

Budget Authority(Dollars in Million)

FY 1993FY 1991 FY 1992 DepartmentalEnacted Enacted Reauest

Nuclear Waste FundTotal, Nuclear Waste Fund

$242.8 $275.1 $392.0$242.8 $275.1 $392.0

223

Page 6: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

DEPARTMENT OF ENERGY

Proposed Appropriation Language

Nuclear Waste Disposal Fund

For nuclear waste disposal activities to carry out the purposes of Public Law 97-425, as amended, includingthe acquisition of real property or facility construction or expansion, $275,071,000] $391,976,000, to remainavailable until expended, to be derived from the Nuclear Waste Fund. To the extent that balances in the fundare not sufficient to cover amounts available for obligation in the account, the Secretary shall exercise hisauthority pursuant to section 302(e)(5) of said Act to issue obligations to the Secretary of the Treasury:Provided, That of the amount herein appropriated, within available funds, not to exceed [$5,000,000] $6,900,000may be provided to the State of Nevada, for the conduct of its oversight responsibilities pursuant to theNuclear Waste Policy Act of 1982, Public Law 97-425, as amended: Provided further, That of the amount hereinappropriated, not more than [$4,000,000] $8,500,000 may be provided to affected local governments, as definedin the Act, to conduct appropriate activities pursuant to the Act: Provided further, That the distribution ofthe funds herein provided among the affected units of local government shall be determined by the Departmentof Energy (DOE) and made available to the State and affected units of local government by direct payment:Provided further, That within 90 days of the completion of each Federal fiscal year, each entity shall providecertification to the DOE, that all funds expended from such direct payment moneys have been expended foractivities as defined in Public Law 97-425, as amended. Failure to provide such certification shall cause suchentity to be prohibited from any further funding provided for similar activities: Provided further, That noneof the funds herein appropriated may be used directly or indirectly to influence legislative action on anymatter pending before Congress or a State legislature or for any lobbying activity as provided in 18 U.S.C.1913: Provided further, That none of the funds herein appropriated may be used for litigation expenses: Providedfurther, That of the amount appropriated herein, up to [$3,500,000] $1,700,000 shall be available forinfrastructure studies and other research and development work to be carried out by the University of Nevada,Las Vegas (UNLV) and the University of Nevada, Reno. Funding to the universities will be administered by theDOE through a cooperative agreement.

(224-

Page 7: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

( C (

DEPARTMENT OF ENERGY

Proposed Appropriation Language

Nuclear Waste Disposal Fund (continued)

In paying the amounts determined to be appropriate as a result of the decision in Consolidated Edison Companyof New York v. Department of Energy 870 F.2d 694 (D.C. Cir. 1989), the Department of Energy shall pay interestat a rate to be determined by the Secretary of the Treasury and calculated from the date the amounts weredeposited into the Nuclear Waste Fund. Such payments may be made by credits to future utility payments intothe Fund.

225

Page 8: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

DEPARTMENT OF ENERGYFY 1993 CONGRESSIONAL BUDGET REQUEST

NUCLEAR WASTE FUND

OVERVIEW

NUCLEAR WASTE FUND

The success of the Office of Civilian Radioactive Waste Management (OCRWM) Program is critical for the United States to manage and permanentlydispose of spent nuclear fuel and high-level nuclear waste and to reestablish confidence in the nuclear energy option. The program must conformto all applicable environmental and safety standards and, in fact, implement national policy on the safe management and disposal of spent nuclearfuel and high-level radioactive waste. Projections for electric power production reflect that, absent any new orders, nuclear-generatedelectricity will cease to be a contributor by the year 2040. The financial community and the nuclear utility ndustry view successfulimplementation of this program as the cornerstone of a viable, continuing United States nuclear energy option. For these reasons, it isessential that the Administration and the Congress demonstrate Federal resolve to move forward aggressively with the Civilian Radioactive WasteManagement Program.

The Nuclear Waste Policy Act of 1982 (NWPA), as amended, authorizes the Department of Energy (DOE) to site, construct, and operate a geologicrepository for the disposal of spent nuclear fuel and high-level radioactive waste; to site, construct, and operate one Monitored RetrievableStorage (MRS) facility; and to provide for the safe transportation of spent nuclear fuel and high-level radioactive waste in casks certified bythe Nuclear Regulatory Commission (NRC) and In accordance with regulations promulgated by the U.S. Department of Transportation. The NWPA asamended, directs the DOE to characterize the Yucca Mountain candidate site in Nevada to assess whether or not it is suitable for a geologicrepository. To ensure the safe management and disposal of waste, the program must execute all activities related to radiological safety and wasteisolation in accordance with an NRC-accepted quality assurance program.

OCRWM ts FY 1993 Congressional budget request seeks to achieve balance among the major Program components -- the Yucca Mountain SiteCharacterization Project and the MRS Project, along with the supporting transportation system. However, while building on the momentum generatedby the initiation, In July 1991, of new surface-based testing at Yucca Mountain, the request recognizes that the Program continues to facepotential political obstacles with respect to the scientific investigations at that site, and that the Nuclear Waste Negotiator has not yetidentified a volunteer host for an MRS facility.

GEOLOGIC REPOSITORY: A critical prerequisite to new scientific investigations at Yucca Mountain is receipt of the necessary eironmentalpermits from the State of Nevada. Substantial progress has been made in this regard since the FY 1992 Congressional budget submisssion. On June12, 1991 and July 17, 1991, respectively, the State of Nevada issued two envirorwental permits -- an air quality permit and an undergroundinjection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume surface-disturbing work at YuccaMountain for the first time since 1986. Further, on September 13, 1991, the State of Nevada issued a one-year temporary water appropriationpermit for Well H-1. Under this permit, OCRWM is able to obtain water although it is from a well which is 45 miles from the Yucca Mountainsite. Unless the State fails to renew the temporary water permit, OCRWM now has in hand all the environmental permits necessary to carry out allplanned work In FY 1992 and FY 1993 at the site.

The State Engineer has recently completed hearings regarding the issuance of a permanent water permit, and a decision Is expected by the end ofJanuary 1992. As site characterization progresses, OCRWM will need additional permits. Therefore, to preclude further delays by Nevada in thepermitting process, or prolonged legal battles with the State over future permit applications, the Administration included a legislativeinitiative as part of the proposed National Energy Strategy Act (S.570 and H.R. 1301), which would remand permitting authority from the State ofNevada to the Federal Government and waive any requirements for permits under State, local, or tribal law. In May 1991, Senators Johnston andWallop introduced S. 1138, a free-standing bill, which is virtually identical to Sections 511 & 512 of S.570 and H.R. 1301. This bill wasreported out of committee on June 12, 1991, by a vote of 14 to 5. The House Energy and Commerce Committee is also considering legislation similarto S. 1138 as part of an omnibus energy bill.

227

Page 9: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

Overview - NUCLEAR WASTE FUND (Cont'd)

MONITORED RETRIEVABLE STORAGE: This activity supports the siting, design, construction, Licensing through the NRC, and operation of a facilityto perform spent fuel receipt, handling, and storage, as necessary, prior to permanent emplacement in a geologic repository. The Office of theNuclear Waste Negotiator is making significant progress in seeking a volunteer host for an MRS facility. The Department fully supports itseffort and the continuation of this process. In support of the Nuclear Waste Negotiator, OCRUH recently awarded two phase-I MRS feasibilityassessment grants, one to the Mescalero Apache Indian Tribe, and the other to Grant County, North Dakota. Since then, 5 additional phase-I grantapplications have been received, and others are expected by the end of the second quarter, FY 1992. These awards may be followed by phase-lIgrant applications in FY 1992. The phase-II grants will be used by potential hosts to support negotiations with the Nuclear Waste Negotiator,possibly Leading to a siting agreement for Congressional approval. If the current statutory linkages between the 4RS and repository schedulesare modified, the MRS facility will provide the Federal nucLear waste management system with the capability for earlier acceptance of spentnuclear fuel than would be possible at a repository.

TRANSPORTATION: The purpose of this activity is to ensure that a safe, environmentally acceptable, and cost-effective transportation system is inplace to transport spent fuel to a waste management facility; provide for the design, development, certification, and testing of necessarytransportation equipment and services; identify and resolve institutional issues; and provide for the operational aspects of the shipment ofspent fuel and high-level wastes to storage and/or final disposal facilities.

SYSTEMS and COMPLIANCE: This activity encompasses the former Systems Integration activity, with the addition of regulatory complianceactivities. It serves to ensure that waste management components are integrated into a single waste management system.

PROGRAM MANAGEMENT and TECHNICAL SUPPORT: This activity includes Federal salaries, benefits, travel, and administrative and technical supportfor the overall civilian radioactive waste management program.

In carrying out all of OCRWM's activities, emphasis is being placed on the implementation of a comprehensive quality assurance program. Thequality assurance program will provide OCRUM the assurances that activities are conducted in a manner to appropriately address those issuesrelative to public health and safety and the protection of the environment, and meet NRC licensing requirements.

2Z8

C ( C

Page 10: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

§

DEPARTMENT OF ENERGYFY 1993 CONGRESSIONAL BUOGET REQUEST

NUCLEAR WASTE FUND(dollars in thousands)

LEAD TABLE

Nuclear Waste Fund

FY 1991Activity Enacted.... ........ ...........

First RepositoryOperating Expenses S 151,832Capital Equipment 3,348

...........

Subtotal, FirstRepository S 155,180

Monitored RetrievableStorageOperating Expenses S 7,947Construction 0

...... ....... ..

Subtotal, MonitoredRetrievable Storage S 7,947

Transportation, SystemsIntegration, andEngineering Development

Operating Expenses S 28,333Capital Equipment 0Construction 0

..... ....... ..

Subtotal,Transportation, SystemsIntegration, andEngineering Development S 28,333

Systems and ComplianceOperating Expenses S 0

FY 1MEnacted

...........

S 156,9228,628

...........

S 165,550

S 16,2250

...........

S 16,225

S 33,68300

...........

S 33,683

FY 1993Base

...........

S 156,9228,628

...........

S 165,550

S 16,2250

S 16,225

S 33,68300

.. .3363

S 33,683

FY 1993Request

...........

S 229,71018,600

...........

S 248,310

S 40,7430

...........

S 40,743

$ 28,96500

S 28,965

S

S

Program ChangeRequest vs Base--------------- FY 1994Dollar Percent Request

472,788 .46% S 212,410+9,972 +116% 35,900

.......... ....... ...........

+82,760 +50% S 248,310

S +24,5180

............

S +24,518

S -4,71800

+151%0%

.......

+151%

-14%0%0%

.......

S 40,7430

S 40,743

$ 28,96500

FY 1995Request

...........

S 219,61028,700

...........

S 248,310

S 40,7430

...........

S 40,743

S 28,96500

...........

S -4,718 -14% S 28,965 S 28,965

S 0 S 0 S 19,599 S +19,599 >997X S 19,599 S 19,599

229

Page 11: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

LEAD TABLE - Nuclear Waste Fund (cont'd)

Activity........

Program Management andTechnical SupportOperating ExpensesCapital Equipment

Subtotal, ProgramManagement andTechnical Support

FY 1991Enacted

S 51,3700

FY 1992Enacted

S 59,6130

FY 1993Base

S 596130

$ 59,613

FY 1993Request

..... ...

$ 54,3590

Program ChangeRequest vs Base

Dollar Percent........-- .......... ...

S -5,254 -9%O OX

... . . . . . . .

FY 1994 FY 1995Request Request....... .... ..............

S 54,3590

S 54,3590

.........

S 51,370 S 59,613 S 54,359 S -5,254 -9% S 54,359 S 54,359

TOTAL

........

S 242,830========

... 2....

S 275,071

_ __ _......._

S 275,071===..======

.. .... ..... . ...........

S 391,976 S +116,905=====5=Z3==

+42% S 391,976 $ 391,976=3==== =Z3g====== ======Z==

SummaryOperating ExpensesCapital EquipmentConstruction

Total Program a/

Staffing (FTE's)

S 239,4823,348

0..... ....... .

242,830=========.

Z25

S 266,4438,628

0

275,071…=====

S 266,4438,628

0

275,071========5Z3

$ 373,37618,600

0

391,976=======

S +106,933+9,972

0...........

S +116,905============

+40%+116%

.....

+42%=====.=

S 356,07635,900

0

S 391,976======Z…===

S 363,27628,700

0,.... . . .

S 391,976=-=33==X==

258 258 258 258 258

........ ................ ........ ....................... ........ ............... ...... ......... ... .... ........ .................... ......... ............................... ....

Authorizations:P.L. 97-425, uNucLear Waste Policy Act of 1982"P.L. 100-203, "Nuclear Waste Policy Amendhents Act of 1987".... ..................... .......... ............. .... ...... .......... ....... ......... . .. . .. . .. . . .. . . .. . . . . . . . . . . . . ..

a/ utyear funding amounts reflect the Administration's policy to assume straight funding for all programs. The actual outyear funding will bereevaluated as part of the FY 1994 budget process.

230

<~~~~~~~~~~ (

Page 12: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

( CDEPARTMENT OF ENERGY

FY 1993 CONGRESSIONAL BUDGET REQUESTOFFICE OF CIVILIAN RADIOACTIVE WASTE MANAGEMENT

NUCLEAR WASTE FUND

PROJECTED RECEIPTS BY FISCAL YEAR

(Dollars in Thousands)

S.

a1

FY 1991

One mill/kWh Fee 1/ ..... 594,230

Fee Credits 2/.

One-time Fee ............. 6,000

Defense Waste Fee 3/ .... 5,000

Subtotal............. 605,230

Interest Income 4/ ...... 241,030

TotaL Income ............. 846,260

FY 1992

554,700

(30,000)

6,000

7,500

538,200

231,100

769,300

FY 1993

553,700

(160,000)

6,000

FY 1994

560,800

(190,000)

6,000

FY 1995

570,500

(30,000)

6,000

FY 1996

577,100

6,000

FY 1997

585,900

6,000

......... ......... 546,5 0 ..... .... 59

399,700 376,800 546,500 583,100 591,900

241,400

641,100

255,500

632,300

267,100

813,600

281,500

864,600

294,000

885,900

1/ Based on projected net nuclear electricity generation as a result ofet al. v. Hodet, 84-8571, decided December 6, 1985.

2/ Result of Consolidated Edison v. DOE, decided March 17, 1989.

Wisconsin Electric Power Company,

3/ Defense Waste Fee payments have not been determined beyond FY 1992.

4/ FY 1992 through FY 1997 represent net earnings on investments available for appropriation.

Note: Receipt estimates for the one mill/kWh fee were derived from the Energy Information Administration'sNuclear Waste Fund Revenue Projections through FY 1993. (Based on October 5, 1991 revised projections).

231

Page 13: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

DEPARTMENT OF ENERGYFY 1993 CONGRESSIONAL BUDGET REQUEST

NUCLEAR WASTE FUND(dollars in thousands)

SUMMARY OF CHANGES

FY 1992 Appropriation................. ................. .......................

Adjustments ...................................................................

FY 1993 Base..................................................................

$ 275,071

-0-

$ 275,071

First Repository

o Transfer of regulatory compliance activities to Systems and Compliance.....

o Increase due to the following activities: A trenching program will begin;a saturated zone drilling program and a systematic drilling program willbe initiated for early site suitability evaluation; Title II design forthe Exploratory Studies Facility (ESF) first access buildings and surfacefacilities will be completed; Title II design for first and second accessportals will be initiated and completed; site preparation and surfacefacilities construction at the first access will begin; Title II designfor first access ramp will be initiated; Title II design for ESF secondaccess site preparation and buildings and surface facilities will beinitiated and completed ....................................................

- 3,240

+ 86,000

Monitored Retrievable Storage

o Transfer of MRS technical support from the Program Management and TechnicalSupport decision unit.....................................................

o Transfer of Engineering Development activities from the formerTransportation, Systems Integration, and Engineering Developmentdecision unit...................................................... .......

+ 2,115

+ 2,268

232

C ( (

Page 14: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

( cV

Monitored Retrievable Storage (cont.)

o Increase due to the following additional activities: Review, prepare, andissue final Environmental Assessment (EA) for MRS site; establish ProjectOffice in vicinity of selected site; fund and administer financialassistance to host site; collect, analyze, and integrate site data inplanning for the Environmental Impact Statement (EIS); initiate andcomplete MRS Title I design and initiate Title II design.................. + 20,135

Transportation. Systems Integration. and Engineering Develoiment

o Transfer of Transportation activities to Transportation and WasteAcceptance .................................................................

o Transfer of Systems Integration activities to Systems and Compliance.......

o Transfer of Engineering Development activities to MRS.....................

- 18,355

- 13,060

- 2,268

Transportation and Waste Acceptange

o Transfer of Transportation activities from the former Transportation,Systems Integration, and Engineering Development decision unit.............

o Transfer of Waste Acceptance activities from the Program Managementand Technical Support decision unit ........................................

o Increase due to the following additional activities: Award ofcontract(s) for acquisition of complementary casks from privateindustry for early shipment capability; develop draft Section 180 (c),NWPA, policy options for program implementation; initiatedetermination of rail routing criteria; initiate transportationsystem risk assessment; initiate development of criteria toestablish total system software, personnel, and equipmentrequirements; continue and complete Cask Maintenance Facility (CMF)pre-conceptual design studies .........................................

+ 18,355

+ 2,479

+ 8,131

233

Page 15: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

Systems and ComDliance

o Transfer of regulatory compliance activities from the First Repositorydecision unit..............................................................

o Transfer of Systems Integration activities from the formerTransportation, Systems Integration, and Engineering Developmentdecision unit ..............................................................

o Transfer of Systems-related technical support from the ProgramManagement and Technical Support decision unit..... ....................

o Increase due to detailed systems engineering studies in support ofrepository and MRS design efforts ..........................................

Program Management and Technical SupDort

o Transfer of technical support to MRS activity............................

o Transfer of technical support to Systems and Compliance activity...........

o Transfer of waste acceptance activities to Transportation and WasteAcceptance activity........................................................

o Increase to provide for program-wide technical support, inflationon salaries, and benefits............................................

FY 1993 Congressional Budget Request ..........................................

+ 3,240

+ 13,060

+ 2,600

+ 699

- 2,115

- 2,600

- 2,479

+ 1,940___391,976

$ 391,976

234

( Q (.

Page 16: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

( C(

DEPARTMENT OF ENERGYFY 1993 CONGRESSIONAL BUDGET REQUEST

NUCLEAR WASTE FUND(dollars in thousands)

KEY ACTIVITY SUMMARY

NUCLEAR WASTE FUND

1. Preface: First Repository

With passage of the Nuclear Waste Policy Amendents Act (PAA) in December 1987, the tuff candidate repository site at Yucca Mountain, Nevada,was selected for detailed nvestigation to determine site suitability.

A critical prerequisite to new scientific investigations at the Yucca Mountain candidate site is receipt of the necessary environmental permitsfrom the State of Nevada. n June 12. 1991 and July 17. 1991. respectively, the State of Nevada issued two of the three pending permits -- an airquality permit and an underground Injection control permit. with these permits in hand, OCRWM began limited new surface-based testing activitiesat the candidate site on July 8, 1991. using water trucked in from California for dust suppression. Subsequently, on September 13, 1991, theState issued a temporary (one-year) water appropriation permit. The State Engineer recently completed hearings on issuance of a permenent waterpermit, with a decision expected by the end of January 1992. Barring non-renewal of the temporary water permit, OCRUM now has in hand a(t theenvirormental permits required to carry out all planned work in FY 1992 and FY 1993 at the site.

The scientific investigation of the Yucca Mountain candidate site Involves a program of surface-based tests, including the collection andanalysis of geologic, hydrologic, geochemical, and climatological data; environmental and socioeconomic evaluation: the construction of anunderground test facility, and the conduct of the in-situ test program within the facility; nstitutional interactions with the State of Nevadaand affected local governments; payents-equal-to-taxes to the State of Nevada and appropriate local jurisdictions; financial assistance forinvestigation and mitigation and oversight by the State of Nevada; implementation of the Benefits Agreements program as required; extensiveinteractions with the NRC and with the Presidentially-appointed Nuclear aste Technical Review Board; and project management activities,including a rigorous quality assurance program to ensure that all aspects of the work are conducted effectively and efficiently. If the YuccaMountain candidate site Is found suitable and is designated as the repository site, the site investigation program wilt culminate in subsissionof a license application to the NRC to construct a high-level nuclear waste repository. In addition to the site-specific work to be mplemented,geoscientific analysis, risk assessments, Material Characterization Center tasks related to spent fuel and high-level waste forms, developmentand analysis of performance assessment models, defense high-level waste design and performance studies, and participation n and reviews ofselected foreign waste management activities, will be conducted.

During FY 1992, OCRWM will maintain the momentum generated by the start of new surface-based testing at Yucca Mountain in July 1991, byconducting as uch drilling as possible as soon as possible to optimize early site suitability evaluation and hydrologic considerations.Concurrently, during FY 1992, OCRUM will pursue early issue closure to the maximum extent possible and focus on putting the necessary performanceassessment toots in place.

In FY 1993, OCRWM plans to conduct the following activities at the Yucca Mountain candidate site:

o A trenching program wilt begin; a saturated zone drilling program and a systematic drilling program wilt be initiated for site suitabilityevaluation; data collection on calcite-silica studies and Midway Valley studies wilt continue.

o Title II design for Exploratory Studies Facility (ESF) first access buildings and surface facilities wilt be completed; Title II design for ESFfirst and second access portals will be initiated and completed; site preparation and surface facilities construction at first access will begin;Title II design for the first access ramp will be initiated; Title II design for second access site preparation, buildings and surface facilitieswill be initiated and completed.

o The Yucca Mountain Field Operations Center will be staffed for the continued expansion of surface-based testing and start of ESF construction;

235

Page 17: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

I. First Repository (Cont'd)

long-lead procurement for electrical power tines and material upgrades will start; Area 25 infrastructure improvements will continue.

o Enhancement of the project-level Planning and Control System (PACS) will continue; implementation of participant-level cost/schedule controlsystems will be completed; expansion of the program-wide area network, to include the field operations center, wilt continue; and the qualityassurance program will keep pace with the accelerated project activities.

o To meet the overall project goal to submit a repository license application to the Nuclear Regulatory Commission in 2001. as currentlyscheduled, a more aggressive funding profile will be required for the outyears

I. A. Summary Table: First Repository

FT 1991 FY 1992 FT 1993 FT 1994 FT 1995Program Activity Enacted Enacted Request X Change Request Request

....................................... ......... . .... ...... .. ......... .. . .. ........... ........... . ..... ........... ................................. _.....

Systems ......................................... S 16,781 S 18,600 S 24,000 + 29 S 24,000 S 24,000Waste Package.. 6,833 5,000 6,800 + 36 6,800 6,800Site ........................................... 32,561 37,800 57,200 + 51 57,200 57,200Repository ...................................... 10,927 9,729 14,310 + 47 14,310 14,310Regulatory/Institutional . . 18,199 21,775 22,000 + 1 22,000 22,000Exploratory Studies Facility ...... 0 0 35,000 999 35,000 35,000Exploratory Shaft ............................... 9,944 7,000 0 -100 0 0Test Facilities ................................. 3,223 6,000 15,000 4150 15.000 15,000Project anagement .............................. 40,980 47,146 54,000 + 15 54,000 54,000Financial and Technical Assistance . . 15,732 12,500 20,000 + 60 20,000 20,000

Total, First Repository S 155,180 S 165,550 S 248,310 + 50 S 248,310 S 248,310~~NUZUU se~~~u uUUzUz2zz :u==zzuuu u=auzuu szuzzzuu

11. . Major Laboratory and Facility Funding

Argonne National Laboratory (East) ...... ......... S 1,245 S 400 S 400 0 S 400 S 400Brookhaven National Laboratory ...... ............. S 105 S 120 S 100 - 17 S 100 S 100DOE Field Office, Chicago (Chicago) ..... ......... S 4,908 S 1,200 S 0 -100 S 0 S 0Lawrence Berkeley National Laboratory ..... ....... S 3,274 S 2,543 S 1,998 - 21 S 1,998 S 1,998Lawrence Livermore National Laboratory ..... ...... 5 8,815 S 8,521 S 7,857 - 8 S 7,857 S 7,857Los Alamos National Laboratory ...... ............. S 8,814 S 12,418 S 14,959 + 20 S 14,959 S 14,959DOE Field Office, Nevada ........ ................. S 105,284 S 121,004 S 203,104 + 68 S 203,104 S 203,104Oak Ridge National Laboratory ....... ............. S 35 S 33 S 0 -100 S 0 S 0DOE Field Office, Oak Ridge ....... ............... S 65 S 65 S 0 -100 S 0 S 0Pacific Northwest Laboratory ....... .............. S 3,675 S 2,831 S 2,913 + 3 S 2,913 S 2,913Sandia National Laboratories ....... .............. 5 19,901 S 16,423 S 16,979 3 S 16,979 $ 16,979

236

( (

Page 18: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

( C

III. Activity Descriptions: (New BA in thousands of dollars)

Program Activity FY 1991 FY 1992 FY 1993 FY 1994 FY 1995…................... ....................... ----------------------- . ....................... . ....................... . .......................

First Repository

Systems Continued maintenanceof the Systems Engin-eering Management Plan(SEMP), ConfigurationManagement Plan (CP),and implementing pro-cedures. Continuedsystems engineeringactivities to supportinitiation of limitedsurface-based testing(SOT) activities.Continued to identifyand define YuccaMountain Site Caracter-ization Project (YMPO)interfaces for the SiteCharacterization SBTactivities and Explora-tory Studies Facility(ESF) design. Expandedconfiguration manage-ment to encompass fieldactivities by estab-establishing fieldchange control. Updatedthe Q-List, QualityActivities List, andthe Project Require-ments List to supportESF design resumption.Performed a specificfunctional analysis forthe Yucca MountainMined Geologic DisposalSystem (MGDS). Con-tinued implementationof the ManagementSystem ImprovementStrategy (MSIS).Established an interimtechnical baselinehierarchy for the ESF

Continue maintenance ofthe SEMP, CMP and imp-lementing procedures.Continue systemsengineering activitiesto support SBT activi-ties and detailed de-sign of the ESF.Update, as necessary,the -List, QualityActivities List, andProject RequirementsList to support ESFdesign and fieldactivities. Continuefield configurationmanagement to supportSBT. Initiate systemsengineering activitiesto support ESF con-struction. Continue toidentify and defineYMPO interfaces for SBTactivities and ESF de-sign. Continue mainten-ance of the technicalbaseline to supportperformance assessment.Update YMPO's technicaldocument hierarchy toserve as the require-ments basis for theinitiation of the wastepackage and repositoryAdvanced ConceptualDesign (ACD). Continueimplementation of themSIS. Continue reviewand update the TDB andthe RIB. Input informa-tion to ATDT. Prepareto input data from siteinvestigations to the

Continue maintenance ofthe SEMP, CMP, andimplementingprocedures. Continuesystems engineeringactivities to supportSBT activities anddesign of the ESF firstaccess sitepreparation. Acceleratesystems engineeringactivities in supportof SOT activities.Update, as necessary,the a-List, QualityActivities List, andProject RequirementsList to support ESFsite preparation designand field activities.Complete a systemsstudy plan for the YMP.Complete, and initiateimplementation of plansfor specialtyengineering (e.g.,Rehabilitation Plan,Maintainability Plan,and Value EngineeringPlan). Continue fieldconfigurationmanagement to supportSBT. Initiate systemsengineering activitiesto support ESF sitepreparation design.Continue implementationof the field changecontrol system.Continue to identifyand define YMPOinterfaces for SBTactivities and ESF site

Provide overall manage-

ment of the systemsactivities, includingplanning, scheduling,budgeting, controlling,and reporting. Maintainconsistency with YMPplanning guidance.Essential tasksrequired in the programplanning documents millbe reviewed foradequacy to ensure thattasks are identified,prioritized, andproperly assigned.Provide System Engi-neering Integration,Performance Assessment,and Technical Data BaseIntegration support.Prepare and implementOA program procedures.Support the TechnicalAssessment Team,Quality Review Board,and the PlanningCouncil. Maintain theYMP 0-List, and YMPRequirements List asnecessary. Provide forinteraction with YMPparticipants.Coordinate participantactivities to implementthe YMP SEMP. Maintainthe technical elementof the YMP TechnicalBaseline in accordancewith the YMP SEMP andrelated controlprocedures. Continuemaintenance of the

Provide overallmanagement of thesystems activitiesincluding planning,scheduling, budgeting,controlling, andreporting. Maintainconsistency with YMPplanning guidance.Essential tasksrequired in the programplanning documents willbe reviewed foradequacy to ensure thattasks are identified,prioritized, andproperly assigned.Provide System Engi-neering Integration,Performance Assessment,and Technical Data BaseIntegration support.Prepare and implementQA program procedures.Support the TechnicalAssessment Team,Quality Review Board,and the PlanningCouncil. Maintain theYMP 0-List and YMPRequirements List.Provide for interactionwith YMP participants.Coordinate theparticipant activitiesto implement the YMPSEMP. Maintain thetechnical element ofthe YMP TechnicalBaseline in accordancewith the YMP SEMP andrelated controlprocedures. Continue

237

Page 19: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

III. First Repository (Cont'd):

Program Activity.... ..... .. .. . ..

FY 1991 FY 1992........ ............... ......

FY 1993........ ...........-.. .....

FY 1994 FY 1995.......................

Systems (Cont'd) in accordance with afunctional analysis tosupport resumption ofESF design studies.

Continued review andupdate of technicaldata bases (TDB) andthe Reference Infor-mation Base (RIB).Continued developmentof Geographic Informa-tion System (GIS) tosupport site character-ization. Developed anAutomatic TechnicalData Tracking (ATDT)System. Continuedstudy of radionuclidetransport throughporous and fracturedrock. Continued toperform preliminaryPerformance Assessment(PA) analysis. Con-tinued benchmarking andverification of codesand validation ofmodels for total sys-tems performance.Completed a PerformanceAssessment Implementa-tion Plan (PAIP) for FY1992 activities. Con-tinued waste package PAand uncertainty analy-sis. Updated E03/6 codeand data base. Contin-ued to use PA to pri-oritize SBT and reviseplans for additionaltesting as appropriate.Iterated PerformanceAssessment Calculation-al Exercise (PACE)calculations with newly

TDB. Prepare to assistin production ofQuarterly Project DataCatalogue. Continuework on Ground-WaterTravel Time (GWTT)model and develop PAcodes. Restart modeldevelopment work onprectosure source termand scenario classes.Complete a PAIP for FY1993 activities.Continue waste packagePA and uncertaintyanalysis. Update E3/6code and data base.Continue integration ofPA and ST. IntegratePA and ES designactivities. Continueintegration of PA withthe Early Site Suita-bility Evaluation(ESSE) process. Prepareto support sitesuitability evaluationmodeling of totalsystem performance andindividual processes,the evaluation ofpotentially favorableand adverse conditions,and the formulation ofhigher-level findings.Prepare to supportWaste Package (WP) andrepository design withPerformance Analyses.Support ESF Title 11design re-start. Con-duct Limited modeldevelopment, valida-tion, and documenta-tion. Continue todevelop scenario event

preparation design.Requirements documentswill be updated tosupport futureRepository ACD, whichwill begin in FY 1995.Continue maintenance ofthe technical baselineto support performanceassessment. UpdateYMPO's technicaldocument hierarchy toserve as therequirements basis forthe initiation of theWaste Package ACD.Waste Package ACD willstart in FY 1994.Continue implementationof the SIS. Continuereview and update ofthe TDB and the RIB.Input information toATDT. Prepare toprovide PA and TDBintegration support.Input data from siteinvestigations to theTDB. Assist inproduction of QuarterlyProject Data Catalogue.Continue work on GWTTmodel and develop PAcodes. Continuedevelopment ofpreclosure riskassessment approach.Complete a PAIP forFY94 activities.Continue WP PA anduncertainty analysis.Update EQ3/6 code anddata base. Integrate PAand EBS designactivities. Supportsite-suitability

technical baseline tosupport PA. Maintainthe systems study plan.Assist the YPO inconducting formalreviews during thedesign and engineeringphase of the YP.Review System StudyReports as required.Implement and maintainplans for specialtyengineering, e.g.,Reliability ProgramPlan, aintainabilityPlan, and RiskManagement Pan. Reviewand update the RIB.Implement and maintainplans and procedures tosupport configurationmanagement and changecontrol requirements.Input data from siteinvestigations to theTDB. Prepare standardand special requestproducts from the TDO,including the Site andEngineering PropertiesData Base (SEPD)Quarterly Report, SiteAtlas, and Plarned SiteInvestigations Report.Continue development ofdata base for 3-Dmodeling system used inmanagement assessmentsof site investigations.Input information tothe ATDT. Use ATDT toproduce the QuarterlyProject Data Catalog.Continue work on GTTmodel and develop PAcodes. Continue devel-

maintenance of thetechnical baseline tosupport PA. Maintainthe systems studyplans. Assist the YMPOin conducting formalreviews during thedesign and engineeringphase of the YMP.Review System StudyReports as required.Implement and maintainplans for specialtyengineering, e.g.,Reliability ProgramPlan, MaintainabilityProgram Plan, and RiskManagement Plan. Reviewand update the RIB.Implement and maintainplans and procedures tosupport configurationmanagement and changecontrol requirements.Input data from siteInvestigations to theTDOB. Prepare standardand special requestproducts from the TDB,Including the SEPDBQuarterly Report, SiteAtlas, and Planned SiteInvestigations Report.Obtain new ortho-photography of the siteto update GIS coveragesand produce new basemaps. Update GIScoverages and releaserevised base maps.Continue development ofdata base for 3-Dmodeling system used inmanagement assessmentsof site investigations.Input information to

(.238

(

Page 20: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

C C

Ill. First Repository (Cont'd):

Program Activity FY 1991 FY 1992 FY 1993 FY 1994---.- . -- . . . . . . ....---- ------ ----- ----- ----- ----- ------ --- . - ------ ----- ------ - --- ------ ----- -----

FY 1995........ ............... .... ..

Systems (Cont'd) acquired site data. trees and preliminaryConducted Early Site scenario models suit-Suitability Evaluation able for mathematical(ESSE) with definitions analyses. Document theof potentially diquali- 1991 Total System Per-fying scenarios and formance assessmentconditions. Provided (TSPA) capabilityinput to Test Prioriti- demonstration and pre-zation Task. Supported pare for an expandedESF alternative studies iteration in FY93.and ESF design and test Perform laboratory andplanning. Supported field experiments ofCalico Hills Risk/ fluid flow and contam-Benefit Analysis and inant transport incompeted di*6entation order to improve con-of PACE-90 analyses. ceptual models forThese activities fractured rocks, toutilized S6,156K of provide data for modelprior-year unobligated validation, and tofunds. formulate a model

validation approach.Evaluate, document, andintegrate new site datafrom ST. Continueentry of performanceassessment computercodes into the QualityAssurance (GA) softwarecx6figuration manage-ment system.

evaluations with theanalysis of potentiallydisqualifying scenariosand conditions.Continue preparationsto support sitesuitability evaluationswith modeling of totalsystem performance andindividual processes,the evaluation ofpotentially favorableand adverse conditions,and the formulation ofhigher-level findings.Provide input totesting prforitization.Continue performanceanalyses for the ESFdesign packages inparallel with the ESFTitle 11 design toevaluate Impacts of ESFconstruction andoperation on theplanned tests and datacollection and on pre-and post-closurerepository performance.Initiate performanceanalyses in support ofthe Waste Package andRepository ACD. Resumeseal performanceassessments andmethodologydevelopment. Continuemodel and codedevelopment,improvement,verification, anddocumentation. Continueto develop scenarioevent trees andpreliminary scenariomodels suitable for

opment of preclosurerisk assessmentapproach. Complete aPAIP for FY95 activi-ties. Continue WastePackage (WP) PA anduncertainty analysis.Update E3/6 code anddata base. Integrate PAand EBS designactivities. Supportsite-suitabilityevaluations withanalysis of potentiallydisqualifying scenariosand conditions;modeling of totalsystem performance andindividual processes;evaluation of poten-tially favorable andadverse conditions; andformulation of higher-level findings. Provideinput to testing prior-itization. Continueperformance analyses ofESF design packages Inparallel with the ESFTitle II design toevaluate Impacts of ESFconstruction andoperation on plannedtests and datacollection, and on pre-and post-closurerepository performnce.Continue similaranalyses in support ofthe WP and repositoryACD. Continue sealperformance assess-ments. Continue modeldevelopment, improve-ment, verification, anddocumentation for Waste

the ATOT. Use ATDT toproduce the QuarterlyProject Data Catalog.Continue work on GWTTmodel and develop PAcodes. Continuedevelopment of pre-closure risk assessmentapproach. Complete aPAIP for FY96activities. Continue WPPA and uncertaintyanalysis. Update E03/6code and data base.Integrate PA and EBSdesign activities.Supportsite-sultabilityevaluations withanalysis of potentiallydisqualifying scenariosand conditions;modeling of totalsystem performance andIndividual processes;evaluation ofpotentially favorableand adverse conditions;and formulation ofhigher-level findings.Provide input totesting prioritization.Complete a total systemperformance assessmentof final ESF Title Itdesign to evaluateimpacts of ESF con-struction and operationon planned tests anddata collection and onpre- and post-closurerepository performance.Continue PA in supportof the WP and reposi-tory ACD. Continue sealperformance assess-

239

Page 21: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

Ill. First Repository (Cont'd):

Program Activity FY 1991 FY 1992......- - -- -- - --- -- - - -- -- - -- - - - ....- -- --- ---.....- -- -- -- -- ---.-. ... .... ....

FY 1993................ ................... .

Systems Cont'd) mathematical analyses.Continue the demonstra-tion of TSPA capabilityfor the computation ofcomplementary cummula-tive distributionfunctions CCDFs)considering scenarioprobabilities andconceptual model anddata uncertainties.Continue laboratory andfield experiments offluid flow andcontaminant transportin order to improveconceptual models forunsaturated andsaturated fracturedrocks and to providedata for model valida-tion. Resume bench-marking and validationof performance assess-ment codes and models.Evaluate, document, andintegrate new site datafrom surface-basedtesting. Continue entryof performance assess-ment computer codesinto the OA softwareconfiguration manage-ment system.

FY 1994

Package and totalsystem performanceassessment; andsimulations of fluidflow, radionuclidetransport, geochemicalreactions, and thermo-mechanical processes.Initiate documentationof scenario event treesand of preliminaryscenario models suit-able for mathematicalanalyses. Continue thedemonstration of totalsystem PA capabilityfor the computation ofCCDFs consideringscenario probabilitiesand conceptual modeland data uncertainties.Continue laboratory andfield experiments offluid flow andcontaminant transportto improve conceptualmodels for unsaturatedand saturated fracturedrocks and to providedata for model valida-tion. Continue bench-marking and validationof performance assess-ment codes and models.Evaluate, document, andintegrate new site datafrom SBT and from theESF portal construc-tion. Continue entry ofPA computer codes intothe OA software config-uration managementsystem.

FY 1995

ments. Continue modeldevelopment, improve-ment, verification, anddocumentation for WastePackage and totalsystem performanceassessment; andsimulations of fluidflow, radionuclidetransport, geo-chemicalreactions, and thermo-mechanical processes.Continue documentationof scenario event treesand of preliminaryscenario modelssuitable for mathe-matical analyses.Continue the demon-stration of totalsystem PA capabilityfor the computation ofCCDFs consideringscenario probabilitiesand conceptual modeland data uncertainties.Continue laboratory andfield experiments offluid flow andcontaminant transportto improve conceptualmodels for unsaturatedand saturated fracturedrocks and to providedata for modelvalidation. Continuebenchmarklng andvalidation ofperformance assessmentcodes and models.Evaluate, document, andintegrate new site datafrom ST and from theESF portal con-struction. Continueentry of performance

(240

(

Page 22: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

( C (

III. First Repository (Cont'd):

Program Activity FY 1991 FY 1992 FY 1993 FY 1994 FY 1995-- - - - -- - - - - -- - -- - - -- - - -- - -- - - -- - - -- - - -- - -- - - -- - - -- - - ....................... ........ ................ ...

Systems (Cont'd) assessment computercodes into the Asoftware configurationmanagement system.

S 16,781

Waste Package Continued near-fieldenvironment testing andmodeling in support ofsite characterization.Continued preparationof study plans for thenear-field environmentactivities. RevisedSite CharacterizationPlan (SCP) study plans.Completed the prelim-inary near-field envi-ronment report and thepreliminary Waste FormCharacterizationReport. Performed wasteform testing andmodeling in support ofperformance assessment.Continued limitedbarrier material test-ing and modeling andupdated the materialselection criteria andthe list of candidateEngineered BarrierSystem (EBS) materials.Identified the method-ology and criteria fordefining and selectingcandidate waste packagedesign concepts anddeveloped a list ofpotential candidates.

Maintained the

S 18,600

Finalize Near-FieldEnvi ronment Report.Complete study plansand associated activityplans. Implement thesoftware A plan forthe hydrothermal code,V-TOUGH. Maintainlaboratory capabilityand ESF interfaces.Finalize Waste FormCharacterizationReport. Maintain spentfuel and glass samplesand perform limitedoxidation anddissolution testing.Continue limited wasteform model development.Develop ES conceptsfor Advanced ConceptualDesign ACD). Performfeasibility studies.Continue limitedintegrated testing oninteractions ofactinide-bearingsolutions with rocksunder static andflowing conditions.Maintain the IntegratedManagement ControlSystem, ensuringappropriate A controlsare applied to wastepackage activities.

S 24,000

Perform rock/waterinteraction tests usingcore samples from therepository horizon.Continue hydrothermalcode enhancements.Perform hydrologictests on fracturedblocks of tuff tosupport modelvalidation. Continuelimited waste formtesting. Continue wasteform model development.Develop list ofcandidate EBS materialsfor proposed concepts.Continue limitedintegrated testing oninteractions ofactinide-bearingsolutions with rocksunder static andflowing conditions.Review EBS conceptsproposed and select twomore EBS concepts forACD. Continuefeasibility analysisand initiate moredetailed evaluations,including structural,thermal, and nuclearanalysis.

S 24,000

Continue rock/waterinteraction tests usingcore samples from therepository horizon.Start vadose waterextraction using coresamples. Continuehydrothermal codeenhancements. Continuehydrologic tests onfractured blocks oftuff to support modelvalidation. Continuelimited waste formtesting. Continue wasteform model development.Select ES materials insupport of ACD anddevelop plans fortesting of thesematerials. Continueintegrated testing oninteractions ofactinide-bearingsolutions with rocksunder static andflowing conditions.Initiate limited ACD.Develop selected EBSconcepts to sufficientdetail to allowadequate evaluation forfurther selection.Perform design reviews.

S 24,000

Continue rock/waterinteraction tests usingcore samples from therepository horizon.Continue vadose waterextraction using coresamples. Startvalidation ofgeo-chemical modelingcodes. Continuehydrologic tests onfractured blocks oftuff to support modelvalidation. Performhydrothermal scopingcalculations for ESFtesting. Prepare testplan for prototypetesting of equipmentand procedures to beused in the ESF EBStests. Continue limitedwaste form testing.Continue waste formmodel development.Initiate limitedtesting of EBSmaterials. Continueintegrated testing oninteractions ofactinide-bearingsolutions with rocksunder static andflowing conditions.Continue limited ACD.Select and initiate

241

Page 23: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

III. First Repository (Cont'd):

Program Activity...... ......... ... ......

FY 1991 FY 1992 FY 1993 FY 1994.. ............... ...... ......................... ..........

FY 1995.............. - -- --

Waste Package(Cont'd)

Site

Integrated ManagementControl System, ensur-ing appropriate QA con-roLs were applied towaste package activi-ties. Continued toapply OA control pro-cedures to all testingand provided QA staffparticipation in re-views of all documenta-tion associated withwaste package. Theseactivities utilizedS5,196K of prior-yearunobligated funds.

S 6,833

Deepened and length-ened the Midway Valleytrench. Ongoing geo-logic, hydrologic,geochemical, and cHima-tological investiga-tions were continued atYucca Mountain.Completed all studyplans for field sitecharacterizationactivities. Monitoringof climate, seismolo-gical, and hydrologicconditions continued.The Sample ManagementFacility (SNF)continued operations.Volcanism and geo-chronologic studiescontinued. Continueddevelopment of studyplans for field sitecharacterization

Continue to apply Acontrol procedures toall testing and provideOA staff participationin reviews of alldocumentationassociated with wastepackage.

$ 5,000

Complete trench excava-tion at Midway Valley.Begin analysis of dataretrieved from theMidway Valley Trenchingactivities. Continueoperation of the SF.Provide geotechnicalsupport to ESF Title 11design (site prepara-tion). Focus drillingprogram to optimizeearly site suitabilityevaluation (ESSE) andhydrologic considera-tions. Drill prototypeUZ borehole using theLM-300 dril rig onlocation south of thepotential repositoryblock. Complete dril-ling programs for theUZ infiltration, small-plot rain fall, and

S 6,800

Continue analysis ofdata retrieved from theMidway Valley Trenchingactivity. ContinueQuaternary Faulttrenching and othertrenching studies.Continue non-surfacedisturbing activitiessuch as field mapping,rain gauge installationand monitoring.Continue monitoring theseismic line, andcontinue monitoring inthe geology, hydrology,climatology andmeteorology areas.Continue laboratoryanalysis of geochem-istry and geochronol-ogy. Provide geologicand soils engineeringsupport to obtain soil

S 6800

Continue analysis ofdata retrieved from theMidway Valley trenchingactivity. Providemanagement and Integra-tion for field engi-neering office activi-ties. Provide supportfor the drillingmanagement of sitecharacterizationactivities. Prepare andimplement A Programprocedures for siteactivities. Update andmaintain surface-basedattribute data base andintegrate with siteatlas mappingcapability. Reportswill document resultsof the Bow Ridge, WindyWash, and Fatigue Washfault zones. Topogra-

S 6,800

Continue analysis ofdata retrieved from theMidway Valley trencingactivity. Providemanagement andintegration for fieldengineering officeactivities. Providesupport for overalldrilling management ofsite characterizationactivities. Prepare andimplement QA Programprocedures for siteactivities. Update andmaintain the surface-based attribute database and integrate withsite atlas mappingcapability. Preparereport summarizingprehistoric flooding atYucca Mountain. Issuethe annual summary

detail design ofconcepts for prototypefabrication.

(242

(

Page 24: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

( CIII. First Repository (Cont'd):

Program Activity FY 1991.- - - - - - - - - - -

FY 1992 FY 1993 FY 1994------- - ..........--

FY 1995...... ....................... __

Site (Cont'd) activities. Laboratoryanalysis, integrationand documentation ofsite data continued insupport of the DraftEnvironmental ImpactStatement (DEIS).Revised SCP study plansin response to NuclearRegulatory (NRC) andNuclear Waste TechnicalReview Board (NWTRB)reviews. Continued todevelop, implement, andmaintain the proceduresto ensure that all YMPOactions are conductedin accordance withapplicable technicaland QA requirements andto ensure that suchactions do not com-promise the suitabilityof the site. Includedin this were managementcontrols for all siteinvestigation samples(solid, liquid, andgaseous). Theseactivities utilizedS4,369K of prior- yearunobligated funds.

large-plot rain fallsimulation programs.Complete the drillingof a ground-watermonitoring well(commitment to the U.S.Park Service). Initiatedrilling activities tostudy percolation inthe deep UZ and YuccaMountain rock char-acteristics. Completeprerequisites for drydrilling/coring for theFY 1993 UZ program.Complete geochronologyinvestigation ofLathrop Wells andSleeping Butte volcaniccenters. Study andprepare a report on thehydrology of theAmargosa Desert. Con-tinue laboratory test-ing and analysis ofexisting core. Initiatepreliminary UZ geo-chemistry experiments.Continue code and modeldevelopment for sitegeology, hydrology, andgeochemistry. Continuegeochemistry laboratorytests and experiments.Continue hydrologic,meteorologic, andclimatologic tests andanalyses. Continueclimate modeling work.Design field investiga-tions for the geo-chemical, geophysical,and resource potentialinvestigations.

and rock data tosupport siting anddesign requirements forsurface facilities.Provide drillingsupport to provide datafor the ramp designrequirements. One drillrig will be requiredthroughout FY 93 tosupport ramp designrequirements. Addition-nal site characteriza-tion drilling programactivities include:Drill volcanic holes;drill deep unsaturatedzone and/or geologicdrill holes to supportstudy of percolation inthe unsaturated zoneand Yucca Mountain rockcharacteristics;initiate systematicdrilling program;initiate saturated zonedrilling program. Placeemphasis on studieswhich supportinvestigations of theunsaturated zonehydrology and steephydraulic gradient.Emphasize the system-atic drilling programsfor early site suita-bility testing.Continue volcanologystudies and paleoclima-tological studiesrelated to issueresolution. Accelerategaseous transport andrelease scenariostudies. Continuedevelopment of test

phical maps will beissued for the BullfrogNE and SW, and BeattySW. A report onpreliminary predictionsof flooding and debrismovement at YM will beprepared. The annualsummary report onmeteorological monitor-ing will be issued.Continue collection ofdown hole data fromshallow and deep UZboreholes. OuaternaryFault trenching andother trenching forgeologic studies willbe continued. Continuelaboratory analysis ofgeochemistry andgeochronology. ProvideTitle 11 support forall surface-based fieldactivities. Start watertable drilling. Cowplete shallow UZ dril-ling program. Continuedeep UZ drilling.Initiate systematicdrilling program.Borehole logging capa-bility will be main-tained. Place emphasison studies whichsupport investigationsof the unsaturated zonehydrology and steephydraulic gradient.Emphasize the systema-tic drilling programsfor ESSE testing.Continue volcanologystudies andpaleoclimatologicalstudies related to

report on meteorologi-cal monitoring.Complete the finalgeologic map of YuccaMountain. Issue prelim-inary report on theevaluation of UZmodeling. Continuecollection of down holedata from shallow anddeep UZ boreholes.Continue QuaternaryFault trenching andother trenching forgeologic studies millbe continued. Continuelaboratory analysis ofgeochemistry andgeochronology. Initiateanalysis of ESF samplesto determine mineralogyand alteration history.Begin support activi-ties for north andsouth ramp wall mappingand north ramp seismicstudy. Continue deep UZdrilling. Continuewater table drilling.Continue the systematicdrilling program.Continue geologicdrilling program.Borehole loggingcapability will bemaintained and downholelogging servicesprovided at drillholelocations. Placeemphasis on studieswhich support

investigations of theunsaturated zonehydrology and steephydraulic gradient.Emphasize the

243

Page 25: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

Ill. First Repository (Cont'd):

Program Activity FY 1991 FY 1992-- - - - -- - - - - -- - - - - - - - - - - . .. ......... . . . . .

FY 1993-- -- -. .- -- -- -

Site (Cont'd) planning packages andjob packages to supportthe site characteriza-tion program. ReviseSCP study plans asnecessary. Continueoperation of the SampleManagement Facility.Continue code and modeldevelopment for site,geology, hydrology andgeochemistry. Continueclimate modelingactivities.

FY 1994

issue resolution.Continue gaseoustransport and releasescenario studies. Basedon data from surface-water monitoring net-work and paleofloodevaluation, a reportsummarizing modernflooding events will beprepared. Begin effortsto determine theeffects of futureground-water with-drawals on the hygo-logic system at YuccaMountain. Identifygeologic conditionsfavorable for theformation or concentra-tion of mineral depo-sits at or near therepository site.Maintain currentdrilling equipment insupport of ongoingdrilling programscontinuing In FY 95.Revise SCP study plansas necessary. ContinueSNF operations andprocess core from thedrilling program andsamples from the ESF.Continue development ofthe conceptual model ofground-water chemistryand experiments toverify and validate themodel. Completesimulation of fracturematrix transportcoupling, begin studiesof geochemical process-es that affect trans-port, and continue de-

FY 1995...... .......... ....

systematic drillingprogram for early sitesuitability testing.Continue volcanologystudies and paleocli-matological studiesrelated to Issueresolution. Continuegaseous transport andrelease scenariostudies. Identifygeologic conditionsfavorable for theformation of mineraldeposits at or near therepository site.Complete probabilitycalculation to magmaticdisruption of therepository. Laboratorystudies and boreholelogging will provide adata base for fault andfracture analysis.Begin sorption studiesof radionuclides onparticulates andcolloids. Initiateanalysis of ESF samplesfor micro-organisms.Initiate monitoring ofhydrologic conditionsat the Analog RechargeSites to supportchemical and waterbudget models ofinfiltration. Continuestudies of hydrogenicdeposits. aintaincurrent drillingequipment in support ofongoing drillingactivities. Revise SCPstudy plans asnecessary. Continue SFoperations and process

(244

(

Page 26: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

C C (

111. First Repository (Cont'd):

Program Activity FY 1991 FY 1992 FY 1993......... . . . . . - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

FY 1994 FY 1995.................

Site (Cont'd) velopment, and optimi-zation of transportcodes.

S 32,561

Repository Completed interfaceactivities betweenrepository and the ESFTitle 11 design.Performed Tunnel BoringMachine (TBM) designtests to support ESFTitle II design andsite characterizationtesting. Begananalyzing completedG-Tunnel prototypeexperiments. Revisedsite characterizationstudy plans in responseto NRC and NWTRBreviews. Updated theRIB for ESF Title 11design. Performedcalculations ofpotential performanceimpacts and evaluationof nterferenceconsiderations insupport of ESF design.Continued support ofESF Alternatives Studyto establish a

S 37,800

Assemble data needed todesign the ESF and theRepository and evaluatesubsystem design op-tions. Maintain inter-faces and prepare in-terface drawings asneeded with surface-based testing (SBT),ESF design, and WastePackage design. Initi-ate thermal analyses ofplanned ESF experimentsas needed to establishthe test space require-ments. Continue therock mechanics directshear tests. Initiateanalyses of potentialrepository loadingsfrom faults and othergeologic conditionsusing two- and three-dimensional analysismethods. Analyze thethermal and mechanicalrock mechanics data toupdate the RIB and

S 57,200

Maintain interfaces andupdate interfacedrawings as needed withSBT, ESF design, andWaste Package design.Continue thermalanalyses of planned ESFexperiments as neededto establish the testspace requirements.Continue the rockmechanics direct sheartests. Continueanalyses of potentialrepository loadingsfrom faults and othergeologic conditionsusing two- and three-dimensional analysismethods. Initiatelaboratory tests usingdrill core from SBT andupdate the RIB to sup-port ESF Title IIdesign. Continue studyplans development. Planprototype in situexperiments on

S 57,200

Prepare EngineeringPlan and Basis forDesign documents neededfor start of ACE. Con-tinue to develop men-agement and controlprocedures for ACD.Define engineeringstudies to evaluatealternative facilityconfigurations. Providetechnical support toESF construction.Maintain interfaces andupdate interfacedrawings, as needed,with SBT, ESF design,and Waste Packagedesign. Continueanalyses of potentialrepository loadingsfrom faults and othergeologic conditionsusing two- and three-dimensional analysismethods. Conductlaboratory tests usingdrill core from SBT.

core from the ESFrams. Continuedevelopment of thegroundwater chemistrymodel. Precipitationrun-off models of YuccaMountain willsynthesize availabledata to makepreliminary predictionsof future run-off dueto climate change.

S 57,200

Continue technicalsupport to ESFconstruction and planearly constructionphase ESF excavationinvestigationexperiments. Initiatelimited Repository ACD,including engineeringstudies to evaluatealternative facilityconfigurations, designof subsurfacefacilities, includingseating components forrepository blockopenings and EBSsystems. Maintaininterfaces and updateinterface drawings, asneeded, with SBT, ESFdesign, and WastePackage design.Continue to developdraft configuration ofsite preparation andsurface and undergroundfacilities. Continue

245

Page 27: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

III. First Repository (Cont'd):

Program Activity FY 1991 FY 1992…...... ----------------------- .......................

FY 1993 FY 1994 FY 1995…...... -- - - - - - - - - - - -----------------------

Repository (Cont'd) preferred ESFconfiguration andESF/repositoryinterface. Continuedscoping activities toassess currenttechnologies availableto emplace sealingcomponents in borehoLesand in the undergroundfacility, with emphasison ESF design andtesting support andsite suitability.Updated the RepositoryDesign Requirements(RDR) for the ESF TitleII with input resultingfrom the ESFAlternatives Study.

Technical support ofinternational activi-ties continued. Contin-nue Phase 3 of theStripa project agree-ment. Complete finaldocumentation of thePocos De Caldas naturalanalogue project. Co-operative work startedfor the DOE/AECL sub-sidiary Agreement No.2. Activities focusedon rock mechanicstests, fluid flow andsorption tests, andcode verification.Cooperative workstarted for theDOE/NAGRA ProjectAgreement No. 3.Activities focused onfluid flow mechanisms,geophysical,tomography, and

support ESF design.Complete scientificinvestigations oftunnel boring equip-ment. Perform systemassessments as neededto support repositoryaspects of ESF and SBTdesign. Perform calcu-lations of potentialperformance impacts andinterference consider-ations of the ESF.Prepare manuals fordesign codes and modelsand continue codevalidation. Initiatethermomechanicalanalyses. Publishsealing strategydocument and prepare adraft report onavailable technologyfor underground testingand seal emplacement.Prepare study plans forlaboratory and fieldtesting of seals. Re-vise seal degradationmodel and publish re-port.

Continue technical sup-port of internationalcooperative work, suchas in-situ rock mech-anics tests, fluid flowand sorption tests, andtotal systems code ver-ification with AECL.Complete Stripa Phase 3activities and issuefinal reports. Partici-pate in the developmentand start hydrological,geochemicaL tests in

simulated rock masses.Prepare designmanagement and controlprocedures for ACD.Update repositorydesign requirements forAM. Provide interfacedesign support to EBSconcept development andevaluation. Continuethermomechanicalanalyses. Publishreport on availabletechnology forunderground testing andseal emplacement.Initiate laboratorytesting of thecandidate seatingmaterials. Continueinterface designsupport to ES conceptdevelopment andevaluation.

Continue technical andmanagement support forAECL Subsidiary No. 2,NAGRA Project AgreementNo. 3, and SKB HardRock Laboratory ProjectAgreement No. 1. Com-plete natural analoguestudies with theAlligator River Ana-logue Program. Initiatethe natural analogueprogram to measure andanalyze radionuclidemigration, retention,and modeling at theOKLO mine site inAfrica.

Continue code verifica-tion and validationactivities focused onthe pretest simulationof rock mechanicsexperiments. Initiate aseries of laboratorytests on the sealmaterials recommendedfor use in LicenseApplication Design(LAD).

Continue technical andmanagement support forongoing internationalactivities. Participatein seismologic, tomo-graphic, and hydrologicfracture flow develop-ment with NAGRA. Part-icipate in radionuclidemigration analyses andmodeling for the OKLOproject in Africa.Participate in interna-tional activities whichbenefit the early sitesuitability of theYucca Mountain candi-date site.

code verification andvalidation activitiesfocused on the pretestsimulation of rockmechanics experiments.Continue laboratorytests on seal materialsrecommended for use inLAD.

Continue technical andmanagement support forthe internationalcooperative work.Continue to participatein radionuclidemigration analyses andmodelling for the OKLAproject in Africa.Participate in interna-tional activities whichbenefit early sitesuitability of theYucca Mountaincandidate site.

c246

(

Page 28: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

C ( C

III. First Repository (Cont'd):

Program Activity--...... ..--.-----.-

FY 1991 FY 1992 FY 1993 FY 1994 FY 1995..-- -- - - -- - - - -- - - - - - - - - - - -- - - - - - - - - - -

Repository (Cont'd) fracture flow codedevelopment. For theAlligator River NaturalAnalogue Project, DOEparticipation commencedand will continue forthe next three years.These activitiesutilized 1,100K ofprior-year unobligatedfunds.

Regulatory/Instftutional

S 10,927

Developed responses toNRC's SiteCharacterizationAnalysis (SCA) andimplemented a changecontrol system for sitecharacterizationactivities. Completedtwo SiteCharacterization Plan(SCP) progress reports.Continued to respond toexternal coaments onthe SCP and completedthe State of Nevada SCPcomment responsedocument. Developedmaterials andparticipated inmeetings with the NRC,NHTRB, AdvisoryCommitte on NuclearWaste (ACNW), andothers as requested.Reviewed and approvedstudy plans for ongoingand high-priority

Sweden's Hard RockLaboratory. Participatein seismologic, tomo-graphic, hydologicfracture flow code de-velopment, and geochem-ical sorption testswith NAGRA. Participatein radionuclide migra-tion analyses on satur-ated media for theAlligator River Pro-ject.

S 9,729

Continue to respond to,and track, commitmentsresulting from externalcomments on the SCP ndrelated documents.Support Interactionswith the NRC, NTRB,ACNW and similar organ-izations includingplanning, review,result analysis,summary development,and open item trackingand response. Continuesupport of study planpreparation, review,and approval. Increasesupport to regulatoryissue resolutionprocess in coordinationwith other programparticipants includingdevelopment of issueresolution reports andworking papers, supportof NRC interactionsnecessary to reach

S 14,310

Continue to respond to,and track, commitmentsresulting from externalcomments on the SCP andrelated documents.Support interactionswith NRC, NTRB, ACNW,and similar organi-zation, includingplanning, review,result analysis,summary development,and open-item trackingand response. Continuesupport study planpreparation, review,and approval. Increasesupport to regulatoryissue resolutionprocess emphasizingpreparation ofdocumentation based onavailability of sitecharacterization dataand regulatory inter-actions necessary toreach closure. Continue

S 14,310

Continue to respond to,and track, commitmentsresulting from externalcomnents on the SCP andrelated documents.Support Interactionswith NRC, NTRB, ACNU,and similarorganizations,including planning,review, resultanalysis, and summaryresponse. Continue tosupport study planpreparation, review,and approval. Increasesupport to regulatoryissue resolution basedon data availabilityand concerns that maydevelop as a result ofcompletion of Title IIdesign, continuepreparation of draftSAR sections as databecomes available andis analyzed. Track and

S 14,310

Continue to respond to,and track, commitmentsresulting from externalcomments on the SCP andrelated documents.Support nteractionswith NRC, NTRB, ACNV,and similarorganizations ncludingplanning, review,result analysis, andsunmary response.Continue to supportstudy plan preparation,review, and approval.Increase support toregulatory issueresolution process.Continue increasinglevel of effort devotedto regulatory issueresolution based ondata availability andconcerns that maydevelop as a result ofcompletion of Title IIdesign. Continue

247

Page 29: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

III. First Repository (Cont'd):

Program Activity FY 1991 FY 1992 FY 1993…-- - - - - - - - - - - - - - - - - - - - -FY 1994 FY 1995

Regulatory/Institutional (Cont'd)

activities. Continuedtechnical supportdocument planning anddevelopment ofTechnical RegulatoryInformation ManagementSystem.

Filed all applicablepermit applications andcompleted envi ronmentalregulatory compliancerequirements, asrequired by applicableagencies. The hazardousmaterials managementand handling programwas implemented. Anannual EnvironmentalProtectionImplementation Plan, anannual ProgrammaticAgreement Report, andone EnvironmentalMonitoring andMitigation Plan (EMMP)Progress Report wereprepared. The permittracking system wasmaintained.Environmentalmonitoring continued inair quality,meteorology,radiological, waterresources, archaeology,soils, and terrestrialecosystems. A limitednumber of pre-activitysurveys were conducted,and a limitedarchaeological datarecovery program began.Desert tortoisemonitoring studiescontinued. Limited

early closure and docu-mentation of results,and support of rule-making activities asappropriate. Continuesupport for developmentof annotated SAR out-line. Provide technicaland regulatory reviewsof DOE, NRC, EPA, andother documentsrelative to licensingand regulatory needs.Develop regulatorystrategies and supporttheir implementation.Provide, or support,regulatory trainingprogram. Supportimplementation ofnuclear regulatoryrequirement flow-downwithin the YMP andevaluate compliance.Provide regulatoryreview support, asrequired to ESF designand testing programdevelopment and con-duct. Continue prepara-tion of semiannualprogress reports andsupport change controlfor site investigationactivities, includingupdates and revisionsof regulatory baselinedocuments e.g. SiteCharacterization PlanBaseline (SCPB).

Continue activitiessupporting permitapplication preparationand submittal. Conductenvironmental regula-

preparation of draftSAR section based onannotated outline.Provide technical andregulatory review ofDOE initiatives. Sup-port rule-makingactivities, licensingand regulatory needs.Develop regulatorystrategies and supporttheir implementation.Provide, or support,regulatory trainingprogram. Supportimplementation ofnuclear regulatoryrequirement flow-downwithin the YP andevaluate compliance.Support ESF Title 11design. Continuepreparation of semi-annual progress reportsand support changecontrol for sitecharacterizationactivities, includingupdates and revisionsof regulatory baselinedocuments (SCPB).

Activities supportingpermit applicationpreparation andsubmittal will con-tinue. Environmentalregulatory complianceactivities will beconducted in accordancewith the ERCP. The ERCPcompliance trackingsystem and the HHPwill continue to beimplemented. Ahazardous materials

document status ofissue closureinitiative. Continuepreparation of draftSAR sections based onannotated outline.Provide technical andregulatory reviews ofDOE, NRC, EPA, andother documentsrelative to licensingand regulatory needs.Develop regulatorystrategies and supporttheir implementation.Provide, or support,*regulatory trainingprogram. Supportimplementation ofnuclear regulatoryrequirement flow-downwithin the YMP andevaluate compliance.Provide regulatoryreview support, asrequired, to ESF designand testing programdevelopment andconduct. Continuepreparation ofsemiannual progressreports and to supportchange control for sitecharacterizationactivities, includingupdates and revisionsof regulatory baselinedocuments (SCPB).

Activities supportingpermit applicationpreparation andsubmittal willcontinue. Conductenvironmental regula-tory compliance

preparation of draftSAR sections as databecomes available andis analyzed. Track anddocument status ofissue closureinitiative. Continuepreparation of draftSAR sections based onannotated outline.Provide technical andregulatory reviews ofDOE, RC, EPA, andother documentsrelative to licensingand regulatory needs.Develop regulatorystrategies and supporttheir implementation.Provide, or support,regulatory trainingprogram. Supportimplementation ofnuclear regulatoryrequirement flow-downwithin the YP andevaluate compliance.Provide regulatoryreview support, asrequired, to ESF designand testing programdevelopment andconduct. Continuepreparation ofsemiannual progressreports and to supportchange control for sitecharacterizationactivities, includingupdates and revisionsof regulatory baselinedocuments SCPB).

Activities supportingpermit applicationpreparation and

(E248

(

Page 30: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

( C C

111. First Repository (Cont'd):

Program Activity FY 1991 FY 1992 FY 1993 FY 1994 FY 1995................-- -----------------------. . .. .. ----- ----- ----- ---- -----------------------. . .. .--- -- -- --- -- -- -- -----------------------... ..... .. .................. ..........

ReguLatory/Instituti support was provided toonal (Cont'd) the NTRB.

A YMPO socioeconomicmonitoring program wascontinued, such asdevelopment and testingof small-areademographic andeconomic modelingmethods.Payments-Equal-to-Taxes(PETT) program supportcontinued at the YMPOlevel only. Grantrequests from the Stateof Nevada and localgoverprients werereviewed, and equitablegrant awards were made.Socioeconomic profileswere updated, andsupport to theradiological studiesprogram was provided.operation ofinformation offices inBeatty and Las Vegascontinued. Six YMPupdate meetings weresupported,presentations andexhibit showings weregiven. Support wasprovided to other YMPOinteractions with theState of Nevada andaffected localgovernments. Aspeaker's bureau wascontinued.

Feasibility analysis,conceptual design, andcost analysis werecompleted for first

tory compliance activi-ties In accordance withthe EnvironmentalRegulatory CompliancePlan (ERCP). Continueimplementation of theERCP compliance track-ing system and theHazardous MaterialsManagement and HandlingProgram (HMMHP). Reviewinternal requests forsite characterizationactivities for com-pliance with theEnvironmental Monitor-ing and Mitigation Plan(EMMP). Update EMMP asrequired. Preparesemiannual EMMIP Pro-gress Reports. Monitorcompliance with recla-mation requirements,and conduct on-siteaudits of reclamationcompliance.

Continue implementationof field activities inthe following technicalareas: air quality,meteorology, archeolo-gy, radiological stu-dies, terrestrialecosystems, reclama-tion, and water re-sources. Conductarchaeological,terrestrial ecosystem,and radiologicalpreactivity surveycommensurate withsurface-disturbing andsite preparationactivities. Continuewater level and spring

storage facility willbe implemented.Requests for sitecharacterizationactivities will bereviewed for compliancerequirements.Compliance withreclamation require-ments will bemonitored, and on-siteaudits of reclamationcompliance will beconducted. Oversightand surveillanceactivities willcontinue as sitecharacterizationactivities progress.Implementation of thefield activities in thefollowing technicalareas will continue:air quality, meteoro-logy, archeology,radiological studies,soils, terrestrialecosystems, reclama-tion, and waterresources. Conductarchaeological,terrestrial ecosystem,and radiologicalpreactivity surveyscommensurate withsurface-disturbing andsite preparationactivities. Water leveland spring flowmonitoring activitieswill continue, as wellas preparation of datareports; implementationof water monitoringplans, and developmentof conceptual models.

activities inaccordance with theERCP. The ERCPcompliance trackingsystem and the HMMHPwill continue to beimplemented. Continuemanagement andoperation of hazardousmaterials storagefacility. Requests forsite characterizationactivities will bereviewed for compliancerequirements.Compliance withreclamationrequirements will bemonitored, and on-site audits ofreclamation compliancewill be conducted.Oversight andsurveillance activitieswill continue as sitecharacterizationactivities progress.

Continue implementationof field activities inthe following technicalareas: air quality,meteorology,archaeology,radiological studies,soils, terrestrialecosystems,reclamation, and waterresources. Conductarchaeological andterrestrial ecosystem,and radiologicalpreactivity surveyscoanensurate withsurface-disturbing andsite preparation

submittal willcontinue. Conductenvironmental regula-tory complianceactivities inaccordance with theERCP. The ERCPcompliance trackingsystem and the HMMHPwill continue to beimplemented. Continuemanagement andoperation of hazardousmaterials storagefacility. Requests forsite characterizationactivities wilt bereviewed for compliancerequirements.Compliance withreclamationrequirements will bemonitored, and on-siteaudits of reclamationcompliance will beconducted. Oversightand surveillanceactivities willcontinue as sitecharacterizationactivities progress.

Continue implementationof field activities inthe following technicalareas: air quality,meteorology,archaeology,radiological studies,soils, terrestrialecosystems,reclamation, and waterresources. Conductarchaeological,terrestrial ecosystem,and radiological

249

Page 31: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

111. First Repository (Cont'd):

Program Activity FY 1991 FY 1992 FY 1993 FY 1994 FY 1995

Regulatory/InstitutionaL (Cont'd)

alternative rail spuraccess route.Participation by localgovernments wasfacilitated in railaccess developmentthrough outreachprograms. Theseactivities utilized5,813K of prior-yearunobligated funds.

flow monitoringactivities, as well aspreparation of datareports; implementationof water monitoringplans, and developmentof conceptual models.Update planning docu-ments relative to theseactivities as neces-sary, i.e.: Meteorolo-gical Monitoring Plan;Radiological MonitoringPlan; EnvironmentalField Activities Plansfor Air Quality,Cultural Resources(Archaeology and NativeAmerican components),Soils, TerrestrialEcosystems, and WaterResources; ReclamationImplementation Plan;and ReclamationFeasibility Plan.

Implement monitoringrequirements of thefollowing documents:Research Design andData Recovery Plan(addressing commitmentsin the area of deserttortoise study/research, protection,and impact mitigation),National Park ServiceWater Monitoring Plan(addressing waterquantity monitoring),and U.S. Fish and Wild-life biological opin-ion. Develop topicaland data reports asrequired. Continueinteractions with

Planning documentsrelative to theseactivities will bemaintained and updatedas necessary:MeteorologicalMonitoring Plan;Radiological MonitoringPlan; EnvironmentalField Activities Plansfor Air Quality,Cultural Resources(Archaeology and NativeAmerican components),Soils, TerrestrialEcosystems, and WaterResources; ReclamationImplementation Plan;and ReclamationFeasibility Plan.

Continue monitoringrequirements of thefollowing documents:Research Design andData Recovery Plan(addressing commitmentsin the area of deserttortoisestudy/research,protection, and impactmitigation), NationalPark Service WaterMonitoring Plan(addressing waterquantity monitoring),and U.S. Fish andWildlife biologicalopinion. Topical anddata reports will begenerated as required.Interactions withNative American groupswill be maintainedthrough the OfficialTribal Contact

activities. Continuewater level and springflow monitoringactivities, as well aspreparation of datareports; andimplementation of watermonitoring plans.Maintain and updateplanning documentsrelative to theseactivities asnecessary, .e.MeteorologicalMonitoring Plan;Radiological MonitoringPlan; EnvironmentalField Activities Plansfor Air Quality,Cultural Resources(Archaeology and NativeAmerican components),Soils, TerrestrialEcosystems, and WaterResources; ReclamationImplementat oa pLanrand ReclamationFeasibility Plan.

Continue implementationof monitoring require-ments of the followingdocuments: ResearchDesign and Data Recov-ery Plan (addressingcommitments in area ofdesert tortoise study/research, protection,and impact mitigation),National Park ServiceWater Monitoring Plan(addressing waterquantity monitoring),and U.S. Fish andWildlife biologicalopinion. Develop

preactivity surveyscommensurate withsurface-disturbing andsite preparationactivities. Continuewater level and springflow monitoringactivities, as well aspreparation of datareports; implementationof water monitoringplans. Maintain andupdate planningdocuments relative tothese activities asnecessary, i.e.MeteorologicalMonitoring Plan;Radiological MonitoringPlan; EnvironmentalField Activities Plansfor Air Quality,Cultural Resources(Archaeology and NativeAmerican components),Soils, TerrestrialEcosystems, and WaterResources; ReclamationImplementation Plan;and ReclamationFeasibility Plan.

Continue implementationof monitoring require-ments of the followingdocuments: ResearchDesign and Data Recov-ery Plan (addressingcommitments in the areaof desert tortoisestudy/ research, pro-tection, and impactmitigation), NationalPark Service WaterMonitoring Plan(addressing water

Q250

c

Page 32: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

C ( (

III. First Repository (Cont'd):

Program Activity FY 1991------------------- --- -- -- --- -- -- --

FY 1992 FY 1993------- -------. --.-.

FY 1994 FY 1995.........- -- - - -- --- -- --- ---- -- -- --- ----.....

Regulatory/InstitutionaL (Cont'd)

Native American groupsthrough the OfficialTribal ContactRepresentatives,including conduct ofsite visits. Continuecoordination support ofall environmental fieldactivities. Providesupport, as required,for presentations tothe NWTRB, site tours,and other externalInteractions.

Process and enter datacollected into the RIBand other YMP databases.

Implement YMP socio-economic program. De-velop, maintain, andimplement a socio-economic plan whichaddresses the acquisi-tion of data, identifi-cation of potentialeffects, and develop-ment of strategies tomitigate adverse im-pacts. Acquire,analyze, and reportsocioeconomic monior-ing data concerningYMP-related effects onthe region and thecommunities that may beaffected by developmentof a repository.Prepare monitoringreports. Develop andmaintain socioeconomicprofiles that reportdata concerning thesocioeconomic

Representatives,including conduct ofsite visits. Supportwill be provided asrequired forpresentations to theNWTRB, site tours, andother externalinteractions.

All monitoring programswill be expandedcommensurate withexpanding surface-disturbing and sitecharacterizationactivities. Initiatemonitoring programs forsupport to ESF sitepreparation, anadditional LM-300 drillrig and electric powerrequirements.

No funding fortransportation relatedtasks this fiscal year.

Implement thesocioeconomic programfor the YP. Develop,maintain, and implementa socioeconomic planfor the acquisition ofdata, identification ofpotential effects, anddevelopment of mitiga-tion strategies.Acquire, analyze, andreport socioeconomicmonitoring dataconcerning YMP-relatedeffects on the regionand the affectedcommunities. Developand maintain

topical and datareports as required.Continue interactionswith Native Americangroups through theOfficial Tribal ContactRepresentatives,including conduct ofsite visits. Supportwill be provided asrequired forpresentations to theNWTRB, site tours, andother externalinteractions.

All monitoring programswill be expandedcommensurate withexpandingsurface-disturbing andsite characterizationactivities. Expendmonitoring support toESF site preparationactivities, andadditional LM-300 drillrig and electricalpower requirements.Technical program willbe initiated in thearea of noise,including EFAPdevelopment.

No funding fortransportation relatedtasks this fiscal year.

Implement socioeconomicprogram for the YMP.Develop, maintain, andimplement a socio-economic plan for theacquisition of data,identification of

quantity monitoring),and U.S. Fish andWildlife biologicalopinion. Developtopical and datareports as required.Continue interactionswith Native Americangroups through theofficial Tribal ContactRepresentatives,including conduct ofsite visits.Provide support asrequired forpresentations to theNIJTRB, site tours, andother externalinteractions.

Expand all monitoringprograms commensuratewith scope of surface-disturbing and sitecharacterizationactivities. Continuemonitoring support toESF site activities,drill rigs andelectrical powerrequirements. Technicalprograms will beinitiated in the areasof aesthetics and landuse/resource lands.

No funding fortransportation relatedtasks this fiscal year.

Implement thesocioeconomic programfor the YP. Develop,maintain, and implementa socioeconomic planfor the acquisition of

251

Page 33: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

111. First Repository (Cont'd):

Program Activity FY 1991...... ................ -----------------...------ .

FY 1992- - - -- -- -- .........- -

FY 1993...... -- -- -- -- -

FY 1994 FY 1995..- - -- - - -- - - .. . . ...............

Regulatory/lnstitutional (Cont'd)

characteristics of theSouthern Nevada regionand the communitiessurrounding YuccaMountain. Supportformal and informalinteractions with alllevels of government,external groups, andofficials concerningthe socioeconomicprogram. Support theradiological monitoringprogram by developingand implementing a planto acquire and analyzedetailed socioeconomicdata on populationdensity and distribu-tion, agriculturalcharacteristics, andcultural character-istics in the areasurrounding YuccaMountain.

socioeconomic dataprofiles concerning thesocioeconomiccharacteristics of theSouthern Nevada regionand the communitiessurrounding YuccaMountain. Develop andmaintain a program toacquire, analyze, andreport informationnecessary to addressPETT requirements.Support formal andinformal interactionswith all levels ofgovernment, externalgroups, and officialsconcerning the socio-economic program.Support the radio-logical monitoringprogram implementing aplan to acquire andanalyze the detailedsocioeconomic data inthe areas of populationdensity and distribu-tion, agricultural andcultural character-istics , in the areasurrounding YuccaMountain.

Operation ofInformation Offices inBeatty, Las Vegas, andPahrump will continue.Support six YP updatemeetings. Continuespeaker's bureauactivities, YuccaMountain tours, andexhibit showings.Support YPO inter-actions with the State

potential effects, anddevelopment ofmitigation strategies.Acquire, analyze, andreport socioeconomicmonitoring dataconcerning YP-relatedeffects on the regionand the affectedcommunities. Developand maintainsocioeconomic dataprofiles concerning thesocioeconomiccharacteristics f thesouthern Nevada regionand the communitiessurrounding YuccaMountain. Develop andmaintain a program toacquire, analyze, andreport informationnecessary to addressPETT requirements.Support formal andinformal interactionswith all levels ofgovernment, externalgroups, and officialsconcerning thesocioeconomic program.Support theradiological monitoringprogram implementing aplan to acquire andanalyze the detailedsocioeconomic data onpopulation density anddistribution,agricultural andculturalcharacteristics, in thearea surrounding YuccaMountain.

Continue operation of

data, identification ofpotential effects, anddevelopment ofmitigation strategies.Acquire, analyze, andreport socioeconomicmonitoring dataconcerning YMP-relatedeffects on the regionand the affectedcommunities. Developand maintainsocioeconomic dataprofiles concerning thesocioeconomiccharacteristics of thesouthern Nevada regionand the coumunitiessurrounding YuccaMountain. Develop andmaintain a program toacquire, analyze, andreport informationnecessary to addressPETT requirements.Support formal andinformal Interactionswith all levels ofgovernment, externalgroups, and officialsconcerning thesocioeconomic program.Support theradiological monitoringprogram implementing aplan to acquire andanalyze detailedsocioeconomic data onpopulation density anddistribution,agricultural andculturalcharacteristics in thearea surrounding YuccaMountain.

Continue operation ofInformation Offices inBeatty and Las Vegas.Support six YP updatemeetings. ContinueSpeaker's Bureau acti-vities, Yucca Mountaintours, and exhibitshowings. Provide sup-port to YMPO interac-tions with the State ofNevada, public interestgroups, the Nevadabusiness community, andgovernment agencies.Further implement RuralOutreach Program toexpand interactionswith "affected"counties. Continue sup-

252

Q ( (

Page 34: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

( ( C

1I1. First Repository (Cont'd):

Program Activity FY 1991 FY 1992 FY 1993 FY 1994 FY 1995-- - - - -- - - - -- - - - - - - - - - - -- - - -- - - -- - - - -- - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - -

ReguLatory/Institutional (Cont'd)

port to DOE/HQ inter-actions and developeducational materialsand programs at aminimal level. Open aPahrump InformationOffice and develop orupupdate variouspublications, models,and exhibits as needed.

of Nevada, publicinterest groups, theNevada businesscommunity, andgoverrment agencies.The Rural OutreachProgram will alsocontinue on a limitedbasis to maintaininteractions with"affected" counties.Support to DOE/HQinteractions willcontinue and variouspublications, models,and exhibits will bedeveloped or updated asneeded. Limitededucational programmingenhancements will besupported and emphasiswill be placed onenhancing tour formats,materials, andfrequency based uponstart of ESFactivities.

S 22,000

Information Offices inBeatty, Las Vegas, andPahrump. Six MP updatemeetings will besupported. ContinueSpeaker's Bureauactivities, YuccaMountain tours, theEducational Program,and exhibit showings.Support YMPOinteractions with theState of Nevada, publicinterest groups, Nevadabusiness community, andgovernment agencies.The Rural OutreachProgram will alsocontinue on a limitedbasis to maintaininteractions with"affected" counties.Continue support toDOE/HO interactions anddevelop or updatevarious publications,models, and exhibits asneeded. Limitededucational programingenhancements will besupported and emphasiswill be placed onenhancing tour formats,materials, andfrequency based uponstart of ESFactivities.

S 22,000

Continue operation ofInformation Offices inBeatty, Las Vegas, andPahrump. Support sixYMP update meetings.Continue speaker'sBureau activities,Yucca Mountain tours,Educational Program,and exhibit showings.Support YMPO inter-actions with the Stateof Nevada, publicinterest groups, Nevadabusiness community, andgovernment agencies.The Rural OutreachProgram will alsocontinue on a limitedbasis to maintaininteractions with"affected" counties.Support to DOE/HQinteractions willcontinue and variouspublications, models,and exhibits will bedeveloped as needed.When possible,additional emphasiswill be given to allareas due to start ofESF activitiesresulting in greatermedia, political, andpublic interest anddemand.

S 22,000S 18,199 S 21,775

253

Page 35: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

111. First Repository (Cont'd):

Program Activity FY 1991 FY 1992 FY 1993 FY 1994.................... -----------------------.......... -----------------------......... ................... . . . ..... ............... .............. . ------------

FY 1995-----------------------

Exploratory StudiesFacility

This activity budgeted This activity budgetedunder Exploratory Shaft under Exploratory Shaftfor FY 1991. for FY 1992.

Complete TitLe 11design for first accessbuildings and surfacefacilities. initiateand complete Title 11design for first andsecond access portals.Initiate Title 11design for first accessramp. Initiate and com-plete Title 11 designfor second access sitepreparation andbuildings and surfacefacilities. PerformTitle III designactivities to supportconstruction. Recom-mence IDS total systemsdesign and initiateTitle I design. Startsite preparation andsurface facilitiesconstruction at firstaccess. Prepare RFP andprocure an undergroundconstruction contract-or. Initiate procure-ment activities forcontinuous miningequipment. Providesafety and healthtraining for surfaceand underground con-struction activities.

S 35,000

Complete Title 11design for first accessportal and continueTitle I design forfirst access ramp.Initiate Title 11design for secondaccess ramp. InitiateTitle 1I design forsubsurface excavationsincluding exploratorydrifts and core testarea. Perform Ttle IIIdesign activities tosupport construction.Continue IDS Title 11design. Continueprocurement activitiesfor continuous miningequipment. Completesite preparation andsurface facilitiesconstruction, and startportal construction atfirst access. Startsite preparationactivities at secondaccess. Provide safetyand health training forsurface and undergroundconstruction.

S 35,000

Continue Title 11design for first accessramp. Continue Title 11design for secondaccess ramp. ContinueTitle I design forsubsurface excavationsincluding exploratorydrifts and core testarea. Initiate Title 11design for optionalaccess. Perform TitleIII design activitiesto supportconstruction. ContinueIDS Title It design andcommence procurementactivities for IDSequipment. Continueprocurement activitiesfor continuous miningequipment. Completeportal construction andstart development offirst 200 ft. of rampfor first access.Complete sitepreparation, start andcomplete surfacefacilitiesconstruction, and startportal construction ofsecond access. Providesafety and healthtraining for surfaceand undergroundconstruction. Provideconstruction supportfor undergroundtesting.

S 35,000So S O

254

(

Page 36: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

( C, C

III. First Repository (Cont'd):

Program Activity-- -- -... - -- -

FY 1991 FY 1992 FT 1993 FY 1994 FY 1995....- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

Exploratory Shaft Completed the ESFAlternatives Study(ESAS) and provided anearly report on theNFindings of the ESFAlternatives Study."Completed thetransition of theNevada Test Site CNTS)selected A/E. Performeda design study,conducted tradeoffstudies, prepared newgeneral arrangementdrawings, and modifiedthe existing Title IDesign Sur-ery Report,utilizing informationderived from the ESAS,in order to provideinput to support afinal decision on ESFconfiguration prior toresumption of Title Itdesign. Issued theOffice of GeologicDisposal (OGD) ESFRequirements Document(ESFRD) as a controlleddocument for use In thedesign study. DevelopedIntegrated Data Systems(IDS) design schedules,design criteria, andfabrication data forearly IDS procurements.Made a presentation tothe Energy SystemsAcquisition AdvisoryBoard (ESAAB) forapproval of cost andschedule baselines forresumption of Title 11design, and long-leadprocurements. Completed

Complete Title 11design for sitepreparation activitiesfor the north and southramp portals includingaccess roads.construction pads,topsoil pad, drainagesystems, surfaceutilities, andcommunication systems.Commence Title tdesign for rampportals, buildings, andsurface facilities atthe north and southramps. Commence sitepreparationconstruction activitieswith earth and rockexcavations, cut/fill,compact, and grade toprovide access roadsand construction padsfor the north and southramp portals. Perform asoil and rock study toverify designparameters. Initiateprocurement oflong-lead equipment fortunnel boring machines(TBMs). Complete IDStotal system design andcommence IDS Title Itdesign.

For FY 1993 and beyond,this activity is bud-budgeted uder Explora-tory Studies Fcility.

255

Page 37: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

111. First Repository (Cont'd):

Program Activity

Exploratory Shaft(Cont' d)

FY 1991 FY 1992 FY 1993 FY 1994 FY 1995..- - -- - - -- - - - --- -- -- --- -- -- -- -----------------------. ............... ......................... .... ... ......................... .

and published the finalESAS report. Theseactivities utilizedS2,681K of prior- yearunobLigated funds.

S 9,944 S 7,000 So S 0 S O

Test Facilities Initiated master plan-ning for the testfacilities infrastruc-ture. Completed designfor the construction ofthe fire protection up-grade in Building 4015,the electrical servicein Building 4215, andthe upgrade at the Area25 waterline Loop.Completed the design ofthe radio network.Conducted Power Avail-ability Study at theNTS and developed aconceptual design ofthe NTS power distri-bution system thatmeets the site charac-terization infrastruc-ture needs. Providedmanagement, administra-tive, and Logisticservices support forthe Field OperationsCenter and preparationfor the resumption ofTitle II design and theexpansion of servicesupon receipt of per-mits. Provided opera-tions and maintenanceservices for Area 25's85 sq. miles and 10

Continue masterplanning. Completeprocurement of thecommunications network.Produce ConceptualDesign Report of PowerSystem Upgrades tosupport the Area 25requirements and theESF. Staff YuccaMountain FieldOperations Center forthe ramp-up in surface-based testing. Provideadministrativeservices, includingGeneral EmployeeTraining, and Healthand Safety Programs inpreparation for sitecharacterizationactivities.

Provide operations andmaintenance servicesfor Area 25's 90 squaremiles and 10 buildings.Continue interface withNTS relative to sharedfacilities. Continuesupport of YuccaMountain PublicOutreach Tours.

Start and completeTitle I and start Title11 design of PowerSystem Upgrades, andinitiate procurement oflong Lead items for thepower system. Startconstruction of on-sitePower Upgrades. Startprocurement of theaggregate plant andconcrete batch plant tosupport ongoing SurfaceBased Testing and ESFconstructionactivities. Support theSite Manager inadministering the SiteCharacterizationactivities.

Provide administrativeservices includingGeneral EmployeeTraining, and Healthand Safety Programs forSite Characterizationactivities.

Provide operations andmaintenance servicesfor Area 25's 90 squaremiles and 10 buildings.Continue interface withNTS relative to shared

Complete design ofon-site Power Upgradesand initiate design andland acquisition fornew Off-site PowerLine. Continueprocurement for on-sitePower Upgrades andinitiate procurementsfor new Off-site PowerLine. Continueconstruction of on-sitePower Upgrades andstart Off-site PowerLine construction.Continue operation ofthe aggregate andconcrete batch plants.Initiate design andconstruction of Area 25General SupportFacilities and Roads.

Support the SiteManageradministratively duringSite Characterizationactivities, andcontinue administrativeservices and training.Continue operation andmaintenance servicesand support of tours.

Complete design ofOff-site Power Line,and procurement ofoff-site powerconstruction materials,and continueconstruction ofOff-site Power Line.Complete constructionof on-site PowerUpgrades.

Continue design andconstruction of Area 25General SupportFacilities and roads,and operation ataggregate and batchplants.

Continue supporting theSite Manager inadministrativeprocedures for SiteCharacterizationactivities, continueadministrativeservices, training andtour support.

Q,56

(

Page 38: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

( C (

IIII. First Repository (Cont'd):

Program Activity FY 1991 FY 1992 FY 1993 FY 1994 FY 1995-- -- - -- - - - - -- - - - - - - - - - - .. . . . . . . . . . ..-- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

Test Fcilities(Cont'd)

buildings. Theseactivities utilized$2,354K of prior-yearunobligated funds.

facilities. Continuesupport of YuccaMountain PublicOutreach Tours.

Project Management

S 3,223

Continued to performproject management andcontrol functions, in-cluding project pan-ning, budgeting, finan-ciaL analysis, and costand schedule control;developed and issuedprogress reports. Con-tinued development ofthe Project-level Plan-ning and Control System(PACS). Provided admin-istrative support, in-cluding training, Legalservices, procurement,subcontract administra-tion, security, publi-cations, graphics,facilities, and equip-ment operations andmaintenance. Conductedinformation resourcesmanagement activitiesinvolving computerhardware and softwaresystems, telecommunica-tions, data management,and records management.Continued developmentand implementation ofthe A program tosatisfy DOE and NRC OArequirements. Devel-oped, revised, andmaintained OA plans and

S 6,000

Continue to performproject management andcontrol functions, in-cluding project plan-ning, budgeting, finan-cial analysis, and costand schedule control;prepare and issue pro-gress reports. Conductmanagement assessments,attend meetings, andmake presentations.Maintain operation ofthe Project-level PACSwith participant data.Continue limited devel-opment and operation ofthe participants'internal cost/schedulecontrol systems thatprovide data to theProject-level PACS.Provide for cost/schedule performancemeasurement analysisand reporting. Provideessential administra-tive support services,including training,legal services, pro-curement, subcontractadministration, secur-ity, publications,graphics, facilitiesand equipment opera-tions and maintenance.

S 15,000 S 15,000 S 15,000

Continue to maintaininfrastructure workscope, such as facili-ties management, rent,telephones, securityservices, and officeequipment rental andleases. Perform Techni-cal Project Office(TPO) management, YMPmanagement, and CA. YMPtraining coordinationand control will con-tinue, and will focuson training for fieldoperations centerquality related tasks.Administrative ser-vices, such as procure-ment, contract manage-ment, personnel, andlegal services will beprovided. InformationResources Management(IRM) will be enhancedto support field oper-ations. Support ser-vices, such as print-ing, graphics, repro-duction, publicationservices, word pro-cessing, editing, tech-nical writing, photoservices, mail distri-bution, and clericalsupport wilt continue

Continue to maintaininfrastructure workscope, such as facili-ties management, rent,telephones, securityservices, and officeequipment rental andleases. Perform Techni-cal Project Office(TPO) management, YMPmanagement, and CA. YMPtraining coordinationand control will con-tinue, and will focuson training for fieldoperations centerquality related tasks.Administrative ser-vices, such as pro-curement, contractmanagement, personnel,and legal services willbe provided. Informa-tion Resources Manage-ment (IRM) will beenhanced to supportfield operations.Support services, suchas printing, graphics,reproduction, publica-tion services, wordprocessing, editing,technical writing,photo services, maildistribution, andclerical support will

Continue to maintaininfrastructure workscope, such as facili-ties management, rent,telephones, securityservices, and officeequipment rental andleases. Perform Tech-nical Project Office(TPO) management, YMPmanagement, and GA. YMPtraining coordinationand control will con-tinue, and will focuson training for fieldoperations centerquality related tasks.Administrative ser-vices, such as procure-ment, contract manage-ment, personnel, andlegal services will beprovided. Motorpoolservices wil bestreamlined and fundedto support YMP activi-ties. InformationResources Management(IRM) will be enhancedto support fieldoperations. Supportservices, such asprinting, graphics,reproduction, publica-tion services, wordprocessing, editing,

257

Page 39: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

III. First Repository (Cont'd):

Program Activity FY 1991 FY 1992 FY 1993 FY 1994------- ----- .......-

FY 1995

Project Management procedures. Performed(Cont'd) GA audits and surveil-

lances to ensure tech-nical programs arebeing conducted incompliance with DOErequirements and Feder-al regulations. Con-tinued review of plans,procedures, drawings,specifications, andother deliverables toensure GA requirementswere satisfied. Begandevelopment of therequired quality con-cerns program. Theseactivities utilizedS12,6841K of prior-yearunobligated funds.

Continue to supportQA-related training.Conduct informationresources managementactivities involvingcomputer hardware andsoftware systems,telecommunications,data management, andrecords management.Continue softwaredevelopment, and thewide area networkcommunication linkbetween the YMPO andDOE/HQ. Expand recordsmanagement functions tosupport new fieldactivities. Initiateplans to Implement alocal records anddocument control centerat the Yucca MountainSite Office. Continuedevelopment and imple-mentation of the QAprogram to satisfy DOEand RC A require-ments. Develop, revise,and maintain A plansand procedures asnecessary. Perform QAaudits and surveil-lances to ensure tech-nical programs arebeing conducted incompliance with DOErequirements andFederal regulations.Continue review ofplans, procedures,drawings, specifica-tions, and other docu-ments to ensure Arequirements are satis-fied. Continue develop-

to be funded. Recordsmanagement activitiesto support LocalRecords Center oper-ations, microfilming,Document Control Centeroperations, CentralRecords Facilityoperations, and recordmanagement trainingactivities will beconsolidated. Computersystem enhancements andsoftware developmentwi l l continue tosupport projectrequirements. Expansionof the wide areanetwork communicationslink wl continue.Operate, maintain, andenhance the Project-Level Planning andControl Systems PACS).Complete implementationof participant-levelcost/schedule controlsystems that providedata to the Project-level PACS. Continue toperform project manage-ment and controlfunctions, includingproject planning,budgeting, financialanalysis, cost/schedulecontrol, and progressreporting. Continuedevelopment andimplementation of theGA program to satisfyDOE and NRC A require-ments. Develop, revise,and maintain A plansand procedures. PerformGA audits and surveil-

continue to be funded.Records managementactivities to supportLocal Records Centeroperations, micro-filming, DocumentControl Center opera-tions, Central RecordsFacility operations,and record managementtraining activitieswill be consolidated.Computer systemenhancements andsoftware developmentwill continue to sup-port project require-ments. Expansion of thewide area networkcommunications linkwill continue. Operate,maintain, and enhancethe Project-levelPlanning and ControlSystems (PACS).Complete implementationof participant-levelcost/schedule controlsystems that providedata to the Project-level PACS. Continue toperform project manage-ment and controlfunctions, includingproject planning,budgeting, financialanalysis, cost/schedulecontrol, and progressreporting. Continuedevelopment andimplementation of theQA program to satisfyDOE and NRC A require-ments. Develop, revise,and maintain GA plansand procedures. Perform

technical writing,photo services, maltdistribution, andclerical support willcontinue to be funded.Records managementactivities to supportLocal Records Centeroperations, micro-filming, DocumentControl Center opera-tions, Central RecordsFacility operations,and record managementtraining activitieswill be consolidated.Computer systemenhancements andsoftware developmentwill continue to sup-port project require-ments. Expansion of thewide area networkcommunications linkwill continue. Operate,maintain, and enhancethe Project-levelPlanning and ControlSystems (PACS).Complete implementationof participant-levelcost/schedule controlsystems that providedata to the Project-level PACS. Continue toperform project manage-ment and controlfunctions, includingproject planning,budgeting, financialanalysis, cost/schedulecontrol, and progressreporting. Continuedevelopment andimplementation of theOA program to satisfy

(258

(

Page 40: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

( C (

1II. First Repository (Cont'd):

Program Activity FY 1991........- - - - - - - --- ---- ---- -......- - ---- --- -...

FY 1992... .. .- -- -- --

Project Management(Cont'd)

ment of the requiredquality concerns pro-gram.

FY 1993

lances to ensure tech-nical programs such asESF construction andsurface drilling arebeing conducted incompliance with DOErequirements andFederal regulations.Continue review ofplans procedures,drawings, specifica-tions, and otherdeliverables to ensure4A requirements aresatisfied. The CA pro-gram will be maintainedat its high level ofactivity with regardsto audits andsurveillances. Addi-tional procedures willbe prepared nd imple-mented as required. TheOA program should meetall NRC requirementsand expectations.

S 54,000

FY 1994

OA audits and surveil-lances to ensure tech-nical programs such asESF construction andsurface drilling arebeing conducted incompliance with DOErequirements andFederal regulations.Continue review ofplans, procedures,drawings, specifica-tions, and otherdeliverables to ensureGA requirements aresatisfied. The CA pro-gram will be maintainedat its high level ofactivity with regardsto audits and surveil-lances. Additionalprocedures will be pre-pared and plementedas required. The CAprogram should meet allNRC requirements andexpectations.

S 54,000

FY 1995

DOE and NRC CArequirements. Develop,revise, and maintain GAplans and procedures.Perform GA audits andsurveillances to ensuretechnical programs suchas ESF construction andsurface drilling arebeing conducted Incompliance with DOErequirements ndFederal regulations.Continue review ofplans, procedures,drawings, specifics-tions, and otherdeliverables to ensureOA requirements aresatisfied. The OA pro-gram will be maintainedat its high level ofactivity with regardsto audits and surveil-lances. Additionalprocedures will beprepared and impLment-ed as required. The CAprogram should meet allNRC requirements andexpectations.

S 54,000S 40,980 S 47,146

2593

Page 41: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

111. First Repository (Cont'd):

Program Activity...........--- --

FY 1991 FY 1992 FY 1993 FY 1994 FY 1995...... ......... .......... -- -- -- -- -- -- -- - ............. ................... . ................. ......................

Financial andTechnical Assistance

Continued PETT inaccordance with theNWPA, as amended. Nofunds were requestedfor the BenefitsAgreements Program.Continued grants to theState of Nevada inaccordance with theNWPA, as amended andthe guidance providedby Congress in the FY1991 AppropriationsAct.

Continued grants toLocal governments inaccordance with theNWPA, as amended andthe guidance providedby the Congress in theFY 1991 AppropriationsAct. These activitiesutilized S4,994K ofprior-year unobligatedfunds.

$ 15,732

Provide direct paymentsto the State of Nevadaand affected ocalgovernments in accord-ance with Nuclear WastePolicy Act of 1982(NWPA), as amended, fordocument review/monitoring, informationtransfer, and comment-ing on statutorydocuments, impact miti-gation assistance, andtechnical assistance asrequested. ContinuePETT in accordance withNWPA, as amended. Pro-vide funding to theUniversity of Nevadasystem for scientificstudies in support ofthe YMP.

S 12,500

Provide direct paymentsto the State of Nevadaand affected localgovernments in accord-ance with NWPA asamended, for documentreview/monitoring,information transfer,and commenting onstatutory documents,impact, mitigationassistance in accord-ance with NWPA, asamended, and technicalassistance as requestedin accordance withNUPA, as amended.Continue PETT inaccordance with NWPA,as amended. Providefunding to theUniversity of Nevadasystem for scientificstudies in support ofthe YHP. Provide impactassistance to affectedLocal governments andprovide funding toallow for developmentof potential benefitsagreement.

$ 20,000

Provide direct paymentsto the State of Nevadaand affected localgovernments in accord-ance with NWPA asamended, for documentreview/monitoring,information transfer,and commenting onstatutory documents,impact, mitigationassistance in accord-ance with NWPA asamended, and technicalassistance as requestedin accordance withNWPA, as amended.Provisions of PETT inaccordance with NWPA,as amended. Providefunding to theUniversity of Nevadasystem for scientificstudies in support ofthe YMP. Provide impactassistance to affectedLocal governments andprovide funding toallow for developmentof potential benefitsagreement.

S 20,000

Provide direct paymentsto the State of Nevadaand affected localgovernments in accord-ance with WPA asamended, for documentreview/monitoring,information transfer,and commenting onstatutory documents,impact, mitigationassistance in accord-ance with UWPA, asamended, and technicalassistance as requestedin accordance withNWPA, as amended.Provisions of PETT inaccordance with NUWPA,as amended. Providefunding to theUniversity of Nevadasystem for scientificstudies in support ofthe YP. Provide impactassistance to affectedlocal governments andprovide funding toallow for developmentof potential benefitsagreement.

S 20,000

first Repository$ 155,180 S 165,550 S 248,310 S 248,310 S 248,310

.......................................................................................................... ......................................

260

( Q (

Page 42: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

(C C (

DEPARTMENT OF ENERGYFY 1993 CONGRESSIONAL BUDGET REQUEST

OFFICE OF CIVILIAN RADIOACTIVE WASTE MANAGEMENTNUCLEAR WASTE FUND

(dollars in thousands)

KEY ACTIVITY CONSTRUCTION PROJECT SUMMARY

First Repository

IV. A. Not applicable

IV. B. Construction Project Descriptive Summary

1. Project title and location:

11

Exploratory Studies Facilityat Yucca Mountain, Nye County,Nevada

Project TEC: $441,429Start Date: 1st QTR FY 1993Completion Date: 2nd QTR FY 1998

2. Financial schedule: Fiscal Year Appropriation Obligations Costs

19891990199119921993

$ 22,69110,6969,9447,000

35,000

$ 27,5845,59912,2357,00035,000

$ 21,01312,50713,7087,228

33,889

3. Narrative:

(a) The Nuclear Waste Policy Amendments Act of 1987, Title V Public Law 100-203,selected the tuff site at Yucca Mountain, Nevada for detailed characterization toevaluate site suitability for the construction of the nation's first high-levelwaste repository.

Z61

Page 43: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

The Exploratory Studies Facility will consist of two 25-foot inside diameter slopingramps to the Topopah Spring Level (TSL), with side ramps 18 feet inside diametercontinuing down to the Calico Hills Level (CHL), constructed by tunnel boringmachines (TBM). When completed, the ramps will be capable of transporting personneland materials to the test and potential repository horizons. The undergroundlateral drifts will include service and core test areas and exploratory drifts whichwill allow for a wide range of in-situ geologic, geochemical, geomechanical,hydrologic, and thermal tests in the geologic horizon.

(b) The primary objective of this project is to collect and analyze data to be used indetermining the suitability of the Yucca Mountain candidate site for theconstruction of a potential high-level radioactive waste repository. Construction,as defined in the Exploratory Studies Facility Design Requirements Document, will:(1) provide access to selected underground tuff horizons and surrounding strata inan unsaturated zone and perform in-situ testing in the selected horizons at theYucca Mountain candidate site, and (2) provide the ability to safely and effectivelyacquire the necessary data for design of a potential repository, performanceassessment, and license application.

The Exploratory Studies (ES) program will contribute to the scientificinvestigations through extensive in-situ testing. This testing will assess thegeologic characteristics and characteristic variables; assess the hydrologicproperties to aid in evaluation of the isolation capability of the candidate tuffhorizon; and determine that the stability of openings can be maintained throughoutthe operational life of the potential repository without adversely affectingisolation capability or retrievability. At the conclusion of the ES program, andthrough the use of data obtained in other Yucca Mountain site investigationactivities, data will be available to assess the suitability of the tuff on the sitefor use as a nuclear waste repository.

(c) The budget authority level requested for FY 1993 will provide for equipmentprocurements; start and completion of the north area site preparation activitiesand the construction of the north area portal; installation of the primary surfaceutilities and communications for the north area; completion of the north area TitleII. design for the buildings and surface facilities and start of south area Title IIdesign for the buildings and surface facilities; and start of Title II design forthe north and south area ramp excavations.

., . ..,, .262

Q C (

Page 44: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

4 . Total Project Funding (BA):

C C

PriorYears

FY 1993Request£-- LM1 To Comletion

Construction * ...............Capital Equipment ..........Operating Expenses .........

08,221

89,953

00

9, 944

0400

6 V,600

a300

34,7-00

a133,080451,522

263

Page 45: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

DEPARTMENT OF ENERGYFY 1993 CONGRESSIONAL BUDGET REQUEST

NUCLEAR WASTE FUND(dollars in thousands)

KEY ACTIVITY SUMMARY

NUCLEAR WASTE FUND

1. Preface: Monitored Retrievable Storage

Monitored Retrievable Storage

This activity supports the siting, design, construction, licensing through the Nuclear Regulatory Commission (NRC), and operation of a facilityto perform spent nuclear fuel receipt, handling and storage, as necessary, prior to emplacement in a geologic repository. In order to ensurethat all aspects of the work are conducted effectively and efficiently and that NRC regulatory requirements for licensing are met, acomprehensive quality assurance program will be implemented and maintained. The MRS facility will provide the Federal Waste Management Systemwith the capability to start spent fuel acceptance. In accordance with the National Energy Strategy (NES), the Office of Civilian RadioactiveWaste Management (OCRWM) is seeking legislation to secure modification of the Nuclear Waste Policy Amendments Act (NWPAA) linkages between theMRS and the repository schedules. The MRS budget request is based on the assumption that the facility is de-linked from the repository schedulethrough enactment by the Congress of the legislative initiative or through a negotiated agreement with a host State or Indian Tribe that issubsequently approved by Congress.

Engineering Development

The Engineering Development portion of the MRS activity was grouped with the Transportation activity in FY 1991-92. This activity develops anddemonstrates crosscutting technologies required by OCRWM. These technologies include: 1) a process to consolidate spent nuclear fuel assemblieson a production line basis; 2) development of alternative dry storage technologies; 3) development of technologies for automated remote handlingof spent nuclear fuel; 4) development of technologies and processes to comply with international nuclear material safeguards requirements, and 5)development of processes and equipment to be used in the decontamination and decommissioning of OCRUM facilities. OCRWH believes that continuedsupport of existing engineering development activities is beneficial; however, upon completion of these activities, the engineering developmentprogram is expected to be phased out. The removal of spent fuel from West Valley, NY, to the MRS and the immediate removal of the non-fuelcomponents from the INEL TAN Hot Shop pool will significantly reduce long-term storage costs. The Engineering Development budget request is basedon the assumption that the spent fuel will be removed from West Valley, however; options for long-term storage at West Valley will be studied.The non-fuel components from the INEL TAN Hot Shop pool will be removed to dry storage at INEL. Phase IV, a hot demonstration of the prototypicalconsolidation development program (PCDP), if approved, will be delayed until 1994.

264

( ( (

Page 46: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

C C (

1t. A. Summary Tble: Monitored Retrievable Storage

Program Activity

Project Management..............................Licensing.......................................Systems Support................................Envirorwental...................................Design and Engineering Studies..................Siting..........................................Regulatory......................................Monitored Retrievable Storage

Project Management............................Licensing.....................................Systems Support..............................Environmental.................................Design and Engineering Studies................Siting........................................Regulatory....................................

Subtotal, Monitored Retrievable Storage

Engineering DevelopmentPrototypic Consolidation Development Program..Non-Fuel-Bearing Components...................Concrete Cask Testing Project.................Canister Welding..............................Dry Rod Consolidation Techtology..............Spent Fuel Traesportation and Storage.........

Subtotal, Engineering Development

FY 1991Enacted..........

S 1,8501,0001097200

3,300200300

0000000

......... ......... _

S 0

S 000000

S 0

FY 1992Enacted

...........

S 2,0007000

1,70010.5251,000300

0000000

S 0

S 000000

S 0

FY 1993Request

..........

S 0000000

3,1902,2525,0001,642

18,5796,857

610

S 38,130

S 390000

1,343

S 2,613

X Change

-100-100

0-100-100-100-100

'1999'N999'1999'999'99'1999>999

'999

'999000

)'99'999

'999

FY 1994Request

S 0000000

3,8002,4005,0002,100

21,2303,000

600

S 38,130

S 0000

1,1001,513

S 2,613

FY 1995Request

S 0000000

3,9502,5005,0002,30021,2302,500650

S 38,130

S 000

8650

1,748

S 2,613

Total, Monitored Retrievable Storage S 7,947 S 16,225 S 40,743 +151 S 40,743 S 40,7433 = = == .... ==.s z=__ UU _ _--.= = =====. = =

It. B. Major Laboratory and Facility Funding

Idaho National Engineering Laboratory - EG&G .....DOE Feld Office, Idaho ..........................Pacific Northwest Lboratory .....................

S 0 S 0 S 0S 0 S 0 S 0S 340 S 0 S 0

0 S 0 S 00 S 0 S 00 S 0 S 0

265

Page 47: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

111. Activity Descriptions: (New BA in thousands of dollars)

Program Activity FT 1991, .. . .......... .. . . .. . . .. . . .

FT 1992. .. .... . ._.... ...

FY 1993 FT 1994 FY 1995.... .... ... .... ........ ............... .......... ..................... .. ..

MonitoredRetrievable Storage

Project Management Initiated projectmanagement activitiesand coordinated theplanning of functionalareas and disciplines.Prepared Project Planand Project ManagementPlan. Ianaged qualityasswrnce program,developed MRS-specificplans and procedures.Developed Cost andSchedule Baseline forproject managementcontrol. Developedlife-cycle andlong-to planning forcost and schedule.Prepared initialinformation for EAMK-1 arovul.

Conduct projectmanagement/integrationactivities includingcritical pathnetorking, and monthlyMajor SystemAcquisition reporting.Conduct administrative,contractual, andpersonnel activities tomaintain projectdevelopment. Maintainquality assuranceprogram, plans andprocedures includingpersonnel trainng andqualification audits.Implement informationmwagement systecs tocupport lcnsingreg4latory endtechnical infwemtionneeds. Thesactivities milt utilize51,400 of prfor-yearfuds .

- S 150 S 2,000 O SO S O

( Q (

Page 48: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

( ( C'*+ ' t

III. Monitored Retrievable Storage (Cont'd):

Program Activity FY 1991 FY 1992 FY 1993 FY 1994 FY 1995.............................. .... ........ . .............. ............................ ...........

Licensing Updated QARD and QAPDappendices for amptifl-cation of A require-ments for MRS. Coordi-nated review oflicensing-relatedstatutes and regula-tions. Negotiatedprocedural greementwith NRC for pre-licensing nteractions.Conducted pre-ticensingInteractions with theNRC.

Begin preparation ofLicense Application.Continue NRC pre-Licensing interactions.Identify and initiatedevelopment of sectionsof the Safety AnalysisReport (SAR). Theseactivities will utilizeS2,200 of prior-yearfunds.

Systems Support

S 1 000

FUnds were requested toadminister grants toVtate/Tribes and Local§oWerments. No grantswere awarded during FY1991. .

S 700

Fund and administerfeasibility assessmentgrants-to the State/TrIbes and localgoverrwents. Thisactivity will utilize11,097 prior-yearfunds.

S SO S O

Environmental

S 1,097

Developed backgroundinformation for EA.Prepared annotatedoutline for MRS EAmanagement and datacollection plan. Theseactivities utilizedS350K of prior-yearfunds.

S 200

' SO

Continue dvelopment ofEA annotated outline.This activity willutilize 1,000 prior-year funds.

S 1,700

S O S S

S S S

267

Page 49: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

111. Monitored Retrievable Storage (Cont'd):

Program Activity...................... -

FY 1991.......... ................... .....

FY 1992.......................

FY 1993 FY 1994 FY 1995....... ..................... .. ........... ....................... ................................................

Design andEngineering Studies

Updated systemsengineering documents.Initiated developmentof conceptual designcriteria, and designperformance require-ments. Initiated con-ceptual designs forselected technologieswhich will be carriedinto Title I design.Updated systemsengineering documentsto support commencementof Title I design.These activitiesutilized $2,536 ofprior-year funds.

Maintain the technicalbaseline. Complete theconceptual design.Initiate design fea-tures tests and plan-ning for prototypicsystem tests. Theseactivities will utilizeS1,184 of prior-yearfunds.

$ 10,525S 3,300 S 0 $ 0 $ 0

Siting Provided support to theNegotiator throughpreparation of reportsand analysis of sitingconcerns. Asrequested, providedinformation materials.Provided support forpublic/institutionalinvolvement andexternal review.Initiated sitingcontingency planning.These activitiesutilized $450 ofprior-year funds.

S 200

Continue to providerequested support tothe Negotiator,including performanceof a technicalassessment of a singlesite. Provide publicinformation materials;oversee grants; supportpublic involvement andsupport externalreview. Theseactivities will utilize$3,400 of prior-yearfunds.

$ 1,000 S 0 S O S O

268

(

Page 50: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

( ( (

111. Monitored Retrievable Storage (Cont'd):

Program Activity FY 1991......- - - - - - - -- ---- ----.- -- --....- --- ----...............

Regulatory Prepared and reviewedregulatory planningdocuments.

S 300

FY 1992 FY 193 FY 1994 FY 1995

Update the MRS Regula-tory Compliance Plan.Prepare necessarypermit applications.These activities willutilize 5300 ofprior-year funds.

S 300 S O S SO

MonitoredRetrievable Storage

Project Management Establish ProjectOffice in vicinity ofselected site. Continueproject management/integration activitiesincluding critical pathnetworking, and MajorSystems Acquisition(MSA) reporting. Con-tinue to conduct admin-istrative, contractual,and personnel activi-ties to maintain pro-ject development.Continue to maintainquality assuranceprocedures and conductpersonnel training,audits and surveil-lance. Continue tomaintain informationmanagement systems tosupport Licensing,regulatory, andtechnical informationneeds.

Continue to maintainproject office invicinity of selectedsite. Continue to con-duct project manage-ment/integration acti-vities including criti-cal path networking,and quarterly NSAreporting. Continue toconduct administrative,contractual, and per-sonnel activities tomaintain projectdevelopment. Continueto maintain qualityassurance proceduresand conduct personneltraining, audits andsurveillances. Continueto maintain informationmanagement systems tosupport licensing,regulatory, and tech-nical informationneeds.

Continue to maintainproject office invicinity of selectedsite. Continue to con-duct project manage-rent/integration cti-vities including criti-cal path networking,and quarterly NSA re-porting. Continue toconduct administrative,contractual, and per-sonnel activities tomaintain project devel-opment. Continue tomaintain qualityassurance proceduresand conduct personneltraining, audits andsurveillances. Continueto maintain informationmanagement systems tosupport licensing,regulatory, and techni-cat information needs.

S S 0 3190 S 3800 S 3,950

Page 51: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

III. Monitored Retrievable Storage (Cont'd):

Program Activity FY 1991 FY 1992--- -- -- -- --- -- - -- -- --- -- -- -- -- .... ...... . .............

FY 1993.......................

FY 1994.. ... -- -- -- -- -

FY 1995................. .

Licensing Continue NRC pre-Licensing interactions.Continue preparation ofthe SAR. Initiate per-sonnel training programand the licensing con-ditions document.Continue pre-licensinginteractions with theNRC.

$ 2,252

Fund and administerfinancial assistance ata minimum level of S5million per year.

Continue preparation ofSAR. Complete SAR sec-tions on Decommission-ing Plan, personneltraining program, emer-gency plan, physicalprotection plan, thefacility design, andthe Licensing Condi-tions document.

S 2,400

Fund and administerfinancial assistance asspecified in negotiatedagreement.

$ 5,000

Continue preparation oflicense application.Submit LA to NRC, alongwith EIS.

$ 2,500

Fund and administerfinancial assistance asspecified in negotiatedagreement.

S 5,000

s O S

Systems Support

S O s O S 5,000

Evi ronmental Review, prepare, andissue final Environ-mental Assessment (EA)for a single proposedsite. Initiate planningfor EnvironmentalImpact Statement (EIS).

Prepare and issue EISimplementation plan.Issue notice of intentfor EIS. Conducttechnical portion ofEIS scoping hearings.Collect data for EISand prepare draft EIS.

S 2,100

Complete developmentof, and issue draftEIS. Provide technicalinput to hearings ondraft EIS. Respond tocomments on draft EIS.Complete the final EIS.

S 2,300

Continue Title 11design incorporatingappropriate NRCcomments. Identifylong-lead procurementitems. Perform designreview and technicalsupport activities.

S O So S 1,642

Design andEngineering Studies

Initiate and completeTitle I design.Initiate Title Itdesign. Perform de-sign reviews and tech-nical support studies.Continue to maintaintechnical baseline.

Complete Title 11design. Perform designreviews and technicalsupport studies. Pro-vide design input toEIS.

(270

(

Page 52: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

( ( C

111. Monitored Retrievable Storage (Cont'd):

Program Activity FY 1991 FY 1992 FY 1993 FY 1994 FY 1995... ............................. .. ...... --- --- --- --- --- -- .............................. -- - - - - - - - - - - .............................. . ..................... ...................... ................_.....

Design andEngineering Studies S 0 S 0 S 18,579 S 21,230 S 21,230(Cont'd)

Siting Acquire beneficial useof subject land.Collect, analyze, andintegrate site data inpreparation of DraftEnvironmental IpactStatement (DEIS).Perform communicationand Liaison activities,including planning, andconducting institution-al portion of EIS scop-ing hearings. Establishtwo information cen-ters, conduct plannedinteractions and con-duct semi-annual publicupdate meetings. Iple-ment socIoeconomIcprogram.

$ 6,857

Continue permittingrequirements and obtainnecessary permits.Support acquisition ofland.

S 610

Continue data collec-tion, analyses, inte-gration and assessmentin support of LicenseApplication (LA).Implement socioeconomicprogram and providesupport for LA.Continue to providecommunication andliaison support, inclu-ding planning for andconducting public hear-ings on DEIS. Maintaininformation centers andconduct semi-annualmeetings and otherinteractions.

S 3,000

obtain permits fromappropriate state andlocal governments.

S 600

Continue to providecemmnication andliaison support, main-tain nformetion cen-ters, and conduct semi-annual meetings. Con-tinue implementation ofsocioeconomic pro-gram, and provide sup-port for LA.

S 2500

Obtain permits fromappropriate state andlocal governments.

S 650

S SO

Regulatory

SO S

Subtotal, MonitoredRetrievable Storage

EngineeringDevelopment

S S O S 38,130 S 38,130 S 38,130

2C71

Page 53: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

'111. Monitored Retrievable Storage (Cont'd):

Program Activity FY 1991, . .. . . . ... ... . .. . . . . . .

FT 1992 FY 1993 FY 1994 FY 1995~.. .... ....... ...... ........... . . . . ... ...... . . . . . . . . .... . . . . . . . . .

PrototypicConsolidationDevelopment Program

This activity budgetedunder Transportationfor FY 1991.

This activity budgetedunder Transportationfor FY 1992.

S

Complete evaluation andapproval of NUS PhaseIII final technicalreport. Release all butone member of Proto-typic ConsolidationDevelopment Program(PCDP) project team,who oversees receipt ofstored rod consolida-tion equipment andcomplete all Phase IIItasks. DOE decision onwhether to proceed withPhase IV hot test.

S 390

No Activity No Activity

S S So

Non-Fuel-BearingComponents

No Activity No Activity

S

No Activity

S

No Activity No Activity

S O S SO

Concrete CaskTesting Project

This activity budgetedunder Transportationfor FY 1991.

No Activity

S O

No Activity

S

No Activity Mo Activity

S S S

Canister Welding No Activity No Activity No Activity No Activity Issue Project manage-ment and QA plans.Review requirements andissue requirementsreport. Prepare andissue Request forProposals for CanisterWelding (CU) equipmentand non-destructiveexamination equipment.Review proposals andaUsrd cntract.

c ( (

Page 54: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

(C I -

- s ~C

Ill. Monitored Retrievabte Storege (Cont'd):

Program Activity FT 199t n 1m f 1993 FY 1994 I rr 1905................Ba................................... ...................................... ...... ............... 6........ --v

Canister Welding(Cont'd) S S S S S 865

Dry RodConsolidationTechnology

No Activity No Activity Remove 48 non-fuel-bearing cwponents(spent fuel skeletons)placed in NEL TAN HotShop Pool in 187 as aresult of OCR con-solidation technologyproject. Storage costs,currently 150,000annually, will increaseto 1,675,000 annuallyin mfd-1990s wMen OCRWMwill be the onlyremining customer ofpool. Develop ProjectMnegement Plan, OAPlon, and envirormentaldocmentation. Copletestudy of ethods fordisposition and selectoption to proceed.Begin procurement ofHigh- IntegrityContainers HIC) forstoring spent fuelskeletons. Cowpletedesign panning andprocurement ofequipment and supporthardware. Prepareoperating proceduresfor Hot Shop operationsand begin on-sitefabrication.

S 880

Cowplete on-sitefabrication and HICprocurement. Performdry run and readinessreview. Completeprocessing of dry rodconsolidationtechnology skeletons.Load HIs and transferto storage area.Decontaminate enddecommission fcilityand issue final report.

S 1,100

No Activity.

S OSO S

Z73

Page 55: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

111. Monitored Retrievable Storage (Cont'd):

Program Activity FY 1991 FY 1992 FY 1993 FY 1994 FY 1995................... …. . .. -- ....................... -

Spent FuelTransportation andStorage

This activity budgetedunder Transportationfor FY 1991.

This activity budgetedunder Transportationfor FY 1992.

S O

S O

Continue fuel storage Continue monitoringand monitoring in pool. fuel in pools.Prepare revised SAR andNEPA documentation tosupport Long-termstorage at West Valley.

Continue monitoringfuel in pools. Inaddition to regularstorage costs, afterDecember 31, 1994, DOEwill also begin to paythe State of New York astorage penalty of5105,000 per quarter.

S 1,748

$ 2,613

S $ 1,343

$ 2,613

$ 1,513

S 2,613Subtotal,EngineeringDevelopment

So

-------------------------------------------------------------------------------------------------------------------------------------------------MonitoredRetrievable Storage S 7947 S 16,225 S 40,743 S 40,743 $ 40,743.................................................................................................................................................

Z74

(a c

Page 56: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

( C (

DEPARTMENT OF ENERGYFY 1993 CONGRESSIONAL BUDGET REQUEST

NUCLEAR WASTE FUND(dollars in thousands)

KEY ACTIVITY SUMMARY

NUCLEAR WASTE FUND

1. Preface: Transportation, Systems Integration, and Engineering Development

Transportation

The purpose of this activity is to develop a safe, environmentally acceptable, and cost-effective system for the transport of spent nuclear fuelin time to support the start of operation at an MRS facility, utilizing the private sector to the fullest extent possible; provide for thedesign, development, certification, and testing of necessary transportation equipment and services required for operation; identify and resolveinstitutional issues; develop analytical processes and transportation information data bases to support overall program requirements (e.g.Environmental Assessment and Environmental Impact Statement support, risk assessment, interface information, cost information, etc.); and providefor the operational aspects of the shipment of spent fuel and high-level wastes to storage nd/or final disposal facilities.

Waste Acceptance

This activity consists of: 1) primary technical interface with nuclear utilities to ensure communication with the owners and generators of spentnuclear fuel and high-level radioactive waste; 2) necessary support to manage the Standard Disposal Contract, including fees and terms ofpayment; 3) verification of on-going and one-time fees paid into the Nuclear Waste Fund (F); 4) management of the WF fee adequacy analysis 5)development and management of the contract/MOU fee structures and methodologies for West Valley and Defense Waste; 6) management of spent fueldata collection, validation and dissemination, management of the spent fuel acceptance process with owners and generators of spent fuel; and 7)preparation of the Annual Capacity Report and the Annual Acceptance Priority Ranking Report.

Systems Integration

This activity is part of the Systems and Compliance key activity summary In the FY 1993 budget. It Is shown here only for continuity with the FY1991 and FY 1992 budget structure. The objective of the Systems Integration activity is to ensure that the various components of the wastemanagement system are integrated into a single system that is safe, efficient, reliable, cost-effective, and on schedule. The approach toaccomplishing this objective is to: identify and baseline technical requirements of the total system; maintain current descriptions of thesystem, its components, and interfaces that meet requirements; enhance communication among parties responsible for individual system componentsand functions; develop and maintain a capability to fully assess alternative concepts; conduct system studies and recommend improvements; andsupport development of equipment and processes having the potential to improve the system.

Engineering Development

This activity is part of the MRS key activity summary in the FY 1993 budget. It is shown here only for continuity with the FY 1991 and FY 1992budget structure. The Engineering Development activity develops and demonstrates crosscutting technologies required by the Office of CivilianRadioactive Waste Management (OCRWM), such as a process to consolidate spent nuclear fuel assemblies on a production line basis, adequate to meetthe annual throughput requirements and facility development schedules of a MRS facility or a geologic repository and the development ofalternative dry storage technologies for spent nuclear fuel. This includes demonstration of the equipment through the consolidation of actualspent fuel assemblies. Technologies to implement automated remote handling techniques in the OCRWM Program, technologies and processes requiredto allow OCRWM to comply with international nuclear material safeguards requirements, and processes and equipment to be used in thedecontamination and decommissioning of OCRWM facilities and equipment will be developed as part of this activity.

Z75

Page 57: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

11. A. Summary Table: Transportation, Systems Integration, and Engineering Development

Program Activity

TransportationCask Systems Development......................Institutional Program ........................Systems Analysis..............................Project Management............................Program Management............................Operations....................................Support Systems Development...................

Subtotal, Transportation

FY 1991 FY 1992Enacted Enacted

- -- - - .... ..... .. .

S 9,5101,8812,171

02,276

02,125

S 17,963

S 13,0001,7501,600

04000

1,605...........S 18,355

FY 1993Request

S 14,5003,0003,0001,000

00

3,805...........S 25,305

FY 1994X Change Request

.....- -- ......... ..... ....... .

+ 12+ 71+ 88>999-1000

+137...........+ 38

S 14,5003,0003,0001,000

00

3,805....... ....S 25,305

FT 1995Request

..........

$ 14,5003,0003,0001,000

00

3,805..........S 25,305

Waste AcceptanceAcceptance Criteria...........................Fee Adequacy..................................Data Analysis.................................Technical Support.............................

Subtotal, Waste Acceptance

Systems IntegrationSystems Requirements & Description............Systems Analysis Capabilities.................Systems Engineering Studies...................Special Studies...............................Program Management............................

Subtotal, Systems Integration

Engineering DevelopmentPrototypic Consolidation Development Program..Nuclear Fuel Services (FS)...................

Subtotal, Engineering Development

5 0000

$ 0

$ 3,0471,0691,705446703

S 6,970

$ 3,4000

S 3,400

S 0000

S 0

S 2,6701,8602,4452,1603,925

$ 13,060

$ 3201,948

..........S 2,268

$ 1,100650

1,660250

...........

S 3,660

S 00000

$ 0

$ 0

0

$ 0

4999>999>999)999

...... . .

>999

-100-100-100-100-100

-100

-100

-100

-100

S 1,100650

1,660250

...... ........

S 3,660

$ 00000

$ 0

S 0

0

$ 0

S 1,100650

1,660250

.. ... ......

$ 3,660

$ 00000

S 0

S 0

0... ........

S o

Total, Transportation, Systems Integration,and Engineering Development S 28,333 S 33,683 S 28,965

==…=…=== =,======--. ==========- 14 S 28,965 S 28,965

auxxzmz=== =3=2.

(276

(

Page 58: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

( ( C

II. B. Major Laboratory and Facility Funding

FY 1991Enacted

DOE Field Office, Chicago Argonne) ..... ......... S 435DOE Field Office, Chicago (Chicago) ..... ......... S 1,487Idaho National Engineering Laboratory - EG&G ..... S 518DOE Field Office, Idaho ......... ................. 0 0Oak Ridge National Laboratory ....... ............. S 8,564Sandia National Laboratories ....... .............. S 3,000

III. Activity Descriptions: (New BA in thousands of dollars)

FY 1992Enacted

...........

S 0S 0S 1,000S 6,240S 2,428S 2,600

FY 1993Request

S 0S 0S 800S 5,800S 0S 2,900

X Change...........

0

- 20- 7-100

12

FY 1994Request

S 0S 0S 800S 5,800S 0S 2,900

FY 1995Request

...... ....... .

S 0S 0S 800S 5,8005 0S 2,900

Program Activity FY 1991 FY 1992 FY 1993 FY 1994........................... ........... ............. ....................... ............................................ ..... ........... .................................................... ...............

FY 1995.......................

Transportation,Systems Integration,and EngineeringDevelopment

Transportation

Cask SystemsDevelopment

Continued to draftfinal design reports onLegal- Weight TruckCask Design andRail/Barge Cask Design.Continued to conductengineering, drop anddesign verificationtests, as appropriate.Continued to provide QAsupport to include QAplans, document review,source inspections andcontractorsurveillance. Continuedto resolve technicalissues. Continued todevelop material andcomponent technology tosupport cask designs.Continued to developautomated handling andnew transport equipmenttechnology. Continuedtest planning support.

Issue RFP foracquisition ofcomplementary casksfrom private industryfor early shippingcapability. Issue finaldesign reports onLegal-Weight TruckCask, and Rail/BargeCask, and continue toconduct engineering,drop, and designverification tests asappropriate. SubmitSafety Analysis Reportfor Packaging (SARP) toNRC for certificationof Legal-Weight TruckCask Design andRail/Barge Cask Design.Support NRCcertification processon Legal-Weight TruckCask Design andRail/Barge Cask Design.

Award contracts) foracquisition ofcomplementary casksfrom private industryfor early shipmentcapability. SupportNRC certificationprocess on Legal-WeightTruck Cask Design andRafl/ Barge CaskDesign. Continue toprovide OA support toinclude QA plans,document review, sourceinspections andcontractorsurveillances. Continueto address technicalissues requiringresolution. Continue todevelop material andcomponent technology tosupport cask design andcertificationactivities. Continue

Continue support foracquisition ofcomplementary casksfrom private Industryfor early shippingcapability. Continuesupport for NRC certi-fication of Legal-Weight Truck Casks.Continue to support NRCcertification processof Rail/ Barge Casks.Following NRC certifi-cation, initiate caskprototype fabricationactivities for theLegal-Weight Truck Caskand the Rail/BargeCask. Continue toaddress technicalissues requiringresolution. Continue todevelop material andcomponent technology tosupport cask designs.

Continue support foracquisition ofcomplementary casksfrom private industryfor early shippingcapability. Continueto support prototypefabrication for theLegal-Weight Truck Caskand the Rail/BargeCask. Prepare detailedplans for performanceevaluation testing ofthe prototype casks.Conduct a study toupdate design specifi-cations for an Over-weight Truck Cask.Continue to addresstechnical issuesrequiring resolution.Continue monitoringverification activi-ties. Continue to pro-vide OA support to

Z77

Page 59: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

111. Transportation, Systems Integration, and Engineering Development (Cont'd):

Program Activity FY 1991 FY 1992 FY 1993 FY 1994 FY 1995..--------- ------------- ..... ................ .......................... ..... ......... ......... ................. ...... ...........................

Cask SystemsDevelopment (Cont'd)

Continued to provideinstrumentationequipment, monitortesting and review datafor cask designverification testing.Supported designreviews.

InstitutionalProgram

$ 9510

Issued draft Section180(c), NPA, strategyplan for public com-ment. Continued coop-erative agreements withvarious national andregional groups. Ident-ified Northeast Region-aL Group. Continuedinstitutional planningand issue resolutionactivities with State,Tribal and industrytransportation repre-sentatives. SupportedTransportation Coordi-nating Group (TCG)meetings and technicalworkshops. Continuedvehicle inspectionpilot study.

Continue to provide QAsupport to include Aplans, document review,source inspections andcontractorsurveillances. Continueto address technicalissues requiringresolution. Continue todevelop material andcomponent technology tosupport cask designs.Continue test planningsupport. Continuemonitoring verificationactivities. Supportdesign reviews.

S 13,000

Initiate implementationof Section 180(c),NUPA, strategy. Coor-dinate with DOT (Hazar-dous Materials Trans-portation Uniform Actof 1990, Section 117A)to develop inspectionand emergency responsetechnical assistanceprograms for States &Indian Tribes. Continuecooperative agreementswith national,regional, & technicalgroups. Add North-eastern Regional Groupto Cooperative Agree-ment Program. Continueinstitutional planningand issue resolutionactivities with State,Tribal and industry

test planning support.Continue to monitordesign verificationactivities. Supportdesign reviews.

S 14,500

Develop Section 180(c)policy options forprogram implementation.Continue cooperativeagreements with variousnational, regional andtechnical groups.Initiate procurementwith north easternregional group. Contin-ue tracking of legal &institutional policiesregarding radioactiveshipments. Initiatedetermination of railrouting criteria. Con-tinue vehicle inspect-ion pilot study. Con-tinue to support TCGmeetings and technicalworkshops. Continue toprovide public informa-tion for transportation

Continue monitoringverificationactivities. Continue toprovide QA support toinclude A plans,document review, sourceinspections andcontractorsurveillances.

S 14,500

Initiate policy devel-opment of the imple-mentation plan forassistance and fundingto States and IndianTribes as required bySection 180(c), NWIPA.Continue to trackresolution of institu-tional issues withState, Tribal, andindustry transportationrepresentatives.Continue activitiesassessing barge, rail,Legal-weight andoverweight-trucktransport institutionalissues. Continuevehicle inspectionpilot study and effortsfor State adoption ofuniform inspection

include GA plans,document review, sourceinspections and con-tractor surveillances.

S 14,500

Continue development ofthe implementation planfor the assistance andfunding to States andIndian Tribes asrequired by Section180(c), NUPA. Continuecooperative agreementswith various nationaland regional groups.Continue institutionalplanning and trackingof issue resolutionactivities with State,Tribal and industrytransportation repre-sentatives. Initiatedevelop potential bargeand overweight-trucktransport routingpolicies. Continuevehicle inspectionpilot study. Continue

278

( (

Page 60: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

( C (CB'

III. Transportation, Systems Integration, and Engineering Development (Cont'd):

Program Activity FY 1991 FY 1992 FY 1993 FY 1994 FY 1995....- - -- - -- - ..... .. ................ . . . . .. - -- - -- -- - ....................... ------------------...... .... .............................. .................................................... ......... .. .........

InstitutionalProgram (Cont'd)

transportation repre-sentatives. Continuevehicle Inspectionpilot study. SupportTCG meetings. Continueto develop publicinformation materialsand display transpor-tation exhibits atmajor public meetings.

activities. procedures. Continue toestablish routing cri-teria. Continue to sup-port TCG meetings andtechnical workshops.Continue public infor-mation activities.

Systems Analysis

S 1,881

Continued updatingcodes and supporteddata bases necessaryfor purposes of per-forming cost/riskanalyses, system trade-off study, transporta-tion logistics con-straint analyses. Con-ducted external peerreview of the RADTRANcomputer code. Main-tained reference trans-portation system toprovide baseline trade-off assumptions. Con-tinued specified trans-portat ion systems sup-port analyses to sup-port identified programdecisions, MRS andother OCRWM systemsstudies. Continued toconduct analyses andplanning applicable toprogram environmentalrequirements. CompletedNear Site Transporta-tion Infrastruture(NSTI) study. Completed

S 1,750

Continue updating codesnecessary for purposesof performing cost/riskanalyses. Maintainreference transporta-tion system to providebaseline tradeoffassumptions. Continuespecified transporta-tion system supportanalyses to supportidentified programdecisions, and MRS andother OCRWM systemsstudies. Continue toconduct analyses andplanning applicable toproject environmentalrequirements. SupportMRS EnvironmentalAssessment transporta-tion analyses. Performstudies to support thedisposal contract wasteacceptance process andthe Annual CapacityReport issue resolutionprocess with utilities.

S 3,000

Continue updating codesnecessary for purposesof performing cost/riskanalyses. Continue tomaintain referencetransportation systemto provide baselinetradeoff assumptions.Continue specifiedtransportation systemsupport analyses tosupport identifiedprogram decisions, andMRS and other OCRWMsystems studies. Con-tinue to conductanalyses and planningapplicable to projectenvi ronmental require-ments. Continue toperform studies tosupport the disposalcontract waste accept-ance process and theAnnual Capacity Reportissue resolution pro-cess with utilities.Initiate transportationsystem risk assessment.Conduct accident study

S 3,000

Continue accident studyand other transporta-tion risk analyses.Assess, review (peerreview) and enhance keytransportation models/codes. Complete trans-portation system riskassessment. Respond tocomments per the draftenvirormiental impactstatement. Participatein National Environ-mental Policy Acthearings. Continue tomaintain referencetransportation systemto provide baselinetradeoff assumpt ions.Continue specifiedtransportation systemanalyses to supportidentified programdecisions, and MRS andother OCRWf systemsstudies. Continue toconduct analyses andplanning applicable toproject environmentalrequirements. Continue

to support TCG meetingsand technicalworkshops.

$ 3,000

Continue updatingcomputer codes and sup-port data bases neces-sary for purposes ofperforming cost/riskanalyses, system trade-off studies, transpor-tation logistics con-straint analyses.Continue to maintainreference transporta-tion system to providebaseline tradeoffassumptions. Continuespecified transporta-tion system analyses tosupport identifiedprogram decisions, andMRS and other OCRWMsystems studies. Con-tinue to conductanalyses and planningapplicable to projectenvironmeental require-ments. Continue toperform logistics andwaste acceptancecriteria studies tosupport the DisposalContract waste accept-

Z79

Page 61: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

111. Transportation, Systems Integration, and Engineering Development Contid):

Program Activity FY 1991 FY 1992 FY 1993 FY 1994 FY 1995.................... ................................. . .... ..... ............................. ...... ........... ....... ................ _........ .......................

Systems Analysis(Cont'd)

Phase 11 report on theFacility InterfaceCapability Assessment(FICA) and performedwaste acceptance cri-teria studies/draftpositions to supportAnnual Capacity Reportissue resolution pro-cess.

and other transporta-tion risk analyses.Assess, review (peerreview) and enhance keytransportationmodeLs/codes.

S 3,000S 2171

Project Management This activity budgetedunder Program Manage-ment for FY 1991.

S 1,600

This activity budgetedunder Program Manage-ment for FY 1992.

SO

Continue development ofQA program documentsand planning activitiesfor existing and newactivities. Continueto update project-levelrequirements and man-agement documents. Con-tinue QA audits. Con-tinue to maintain costand schedule reportsand project-level net-work schedules.

S 1,000

Funding requirementsfor FY 93 and beyondappears in the ProjectManagement Activity.

to perform logisticsand waste acceptancecriteria studies tosupport the DisposalContract waste accept-ance process and theAnnual Capacity Reportissue resolution pro-cess with utilities.

S 3,000

Continue development ofQA program documents.Update transportationQA program descriptionand procedures. Conductaudits, surveillancesand monitoring of Aprogram requirements,Continue human factorsengineering HFE)assessments.

$ 1,000

tance process and theAnnual Capacity Reportissue resolution pro-cess with utilities.

S 3000

Continue development ofQA program documents.Update transportationOA program descriptionand procedures. Conductaudits, surveillancesand monitoring of QAprogram requirements.Continue FEassessments.

S 1,000S

Program Management Continued developmentof A program documentsand planningactivities. Updatedprogram-levelrequirements andmanagement documents.Initiated A audits.Maintained cost andschedule reports Andprogram-level- networkschedules. Thea.activities utilized

Continue development ofQA program documentsand planning activitiesfor existing and newactivities. Updateproj ct-levelrequirements andmanagement dorme nts.Continue GA audits.Maintain cost andschedule reports andproject-level networkschedules.

- .~ : ': ' V ! . '

( ( c

Page 62: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

( (o et : t I' :

I11. rnspuortstion. Systers Integratio n ad Engineering 0~ee-opimn :(Cented)..

(

Program Activity.......... ............... _, .,

Program fwanagement(Cont'd)

FT 11 FY 992 FT 1993 FY 1994 FY 1995

S316K of prior-yearfunds.

$ 2,276

No Activity

S 400

No ActivityOperationsSo

No Activity

S

No Activity

S

No Activity

Support SystemsDevelopment

So

Continuedtransportationoperational review ofStandard Contractissues and supportedissue resolutionprocess. Continuedoperationallegal-weight tractorevaluations. PublishedCask MaintenanceFacility (CMF)feasibility study.Conducted operationalassessments, includingauxiliary equipmentneeds for 20 reactorsites. Continuedoperational nput tocask final designs.Developed Tractor TestPlan to be integratedwith Trailer Test Plan.Continued monitoringand reporting ofongoing shipments.Developed drafttransportationoperations systemsdescription. Completednon-fuel associatedhardware analysis.

S

Continue site-specificanalyses. Continueoperational assessmentsfor reactor sites.Continue monitoring andreporting of ongoingshipments and foreigntechnology. Continuemonitoring of existingcasks, maintenance, andtractor issues.

s O

Maintain completedinitial utility siteevaluation assessments.Continue highway andrail service studies.Continue startup,interim maintenance andexisting cask fleetassessments. Continuerequirements analysesand establish serviceand maintenance andfield operationsrequirements. Continueto provide operationsinput to cask design.Continue to monitorongoing spent fuelshipments and relatedactivities. Initiatedevelopment of criteriato establish totalsystem software,personnel and equipmentrequirements. Continueand complete CMFpreconceptual designstudies. Formulateancillary equipmentacquisition policyDevelop interimmaintenance strategy.

So

Provide technicalbaseline management.Maintain completedinitial site evaluationassessments. Completerail configurationplanning. Assessequipment and supportrequirement to handlerail and bargeshipments. Begin site-specific transportationplans. Continue highwayand rail servicestudies. Continuestartup, interimmaintenance andexisting cask fleetassessments. Continuetotal system equipment,personnel, software andcask requirementsstudies. Continuefunctional analysis andissue resolutionprocess. Initiatecarriage subsystemrequirements andestablish planning andcontrol subsystemrequirements document.Continue to provideoperations input to

S

Provide technicalbaseline management.Maintain completedinitial site evaluationassessments. Continueto assess equipment andsupport requirement tohandle rail and bargeshipments. Continuepreparation of site-specific transportationplans. Completeidentification ofspecial equipmentrequirements. Completehighway and railservice studies.Continue startup,interim maintenance andexisting cask fleetassessments. Continuetotal system equipment,personnel, software andcask requirementsstudies. Continue toprovide operationsinput to cask design.Continue to monitorongoing spent fuelshipment and relatedactivities.

281

Page 63: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

III. Transportation, Systems Integration, and Engineering Development (Cont'd):

Program Activity FY 1991 FY 1992 FY 1993.............---- ....................... . .-- - - - - - - - - - - ......... ..................... ................ ............................

FY 1994 FY 1995.. ......... ...........- --- ----- ---- --- --- ---

Support SystemsDevelopment Cont'd)

cask design. Continueto monitor ongoingspent fuel shipmentactivities.

S 2,125

Subtotal,Transportation

S 1,605

S 18,355

S 3,805

S 25,305

S 3,805

S 25,305

$ 3,805

S 25,305S 17,963

Waste Acceptance

Acceptance Criteria This activity budgetedunder Program Manage-ment/Technical Supportfor FY 1991.

$ 0

This activity budgetedunder Program Manage-ment/TechnicaL Supportfor FY 1992.

$ 0

This activity budgetedunder Program Manage-ment/Technical Supportfor FY 1992.

So

Continue to meetcontractual deadlinesfor the Annual CapacityReport ACR) issueresolution process andAcceptance PriorityRanking (APR)publication. ContinueDelivery CommitmentSchedule Exchange(DCSE) processing.

$ 1,100

Continue quarterly feeverification. Continueannual review of feeadequacy. Continue feeestimation andelectricity generationestimates andverification.

S 650

Update ACR and APR re-ports. Continue ACRissue resolution pro-cess. Continue DCSEprocess. ReviewStandard Contract forpossible revision.

S 1,100

Continue quarterly feeverification. Continueannual review of feeadequacy. Continue feeestimation and electri-city generation esti-mates and verification.

$ 650

Update ACR and APR re-ports. Continue ACRissue resolution pro-cess. Continue DCSEprocess. ReviewStandard Contract forpossible revision.

S 1,100

Continue quarterly feeverification. Continueannual review of feeadequacy. Continue feeestimation and electri-city generation esti-mates and verification.

S 650

Fee Adequacy This activity budgetedunder Program Manage-ment/Technical Supportfor FY 1991.

S O

282

(. ( (

Page 64: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

(

111. Transportation, Systems Integration, and Engineering Development (Cont'd):

(

Program Activity FY 1991 FY 1992-- -- - -- - - - .. . . . ....... . - -- - - - -- - - - -

FY 1993 FY 194. FY 1995.... . ..... ...... - - - - - - - - - - - .... . . . . . . . . .

Data Analysis This activity budgetedunder Program Manage-ment/Technical Supportfor FY 1991.

So

This activity budgetedunder Program Manage-ment/Technical Supportfor FY 1991.

This activity budgetedunder Program Manage-ment/Technical Supportfor FY 1992.

S

This activity budgetedunder Program Manage-ment/Technical Supportfor FY 1992.

S

Review annual spentfuel data anddisseminate to users.

S 1,660

Maintain essential sup-port for fee andacceptance criteriaactivities.

S 250

Review annual spentfuel data anddisseminate to users.

S 1,660

Maintain essential sup-port fee and acceptancecriteria activities.

S 250

Review annual spentfuel data anddisseminate to users.

S 1,660

Maintain essential feeand acceptance criteriaactivities.

S 250

Technical Support

$ 0

Subtotal, WasteAcceptance

Systems Integration

S S O S 3,660 S 3,660 S 3,660

Systems Requirements& Description

Updated baselinedocuments includingsystems requirements,description andinterface. Continued tomaintain and supportthe configurationmanagement system.Refined system criteriafor waste acceptance.Continued updatingreference data base onwaste inventories,reactor capabilitiesand wastecharacteristics.Continued toparticipate in thewaste acceptance issueresolution process.Continued A effortsincluding A planimplementation review,assessments,

Maintain and updaterequirements documentsand continuedevelopment of systemdescription documents.Update program baselinedocuments according toresults of systemsstudies or specialstudies. Continue tomaintain and supportthe configurationmanagement system.Maintain and updateprogram management planand systems engineeringdocumentation. Continueto update system database to include wasteinventories, reactorcapabilities, and wastecharacteristics.Continue to participatein the waste acceptance

Funding requirementsfor FY 93 and beyondappear in the Systemsand Compliance Activitysection.

Z83

Page 65: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

111. Transportation, Systems Integration, and Engineering Development (Cont'd):

Program Activity FY 1991 FY 1992 FY 1993 FY 1994 FY 1995.,- - - -- - - - - -- - - - - - - - - - - . ...................... - - - - - - - - - - - - . . . . . . . ......... ... . . . . .. . . . .

Systems Requirements& Description(Cont'd)

surveillance and auditactivities. Providedprogram-wideconfigurationmanagement and changecontrol boardsecretariat functions.Evaluated current stateof technology andestimated technologyrisk. These activitiesutilized 3,235K ofprior-year funds.

issue resolutionprocess. Supportutility contractmodification andstrategy development.Continue QA efforts,including QA planreview, assessments,surveillance and auditactivities. Provideprogram-wideconfigurationmanagement and changecontrol boardsecretariat functions.Evaluate current stateof technology andestimate technologyrisk.

$ 2,670S 3,047 S O S O S O

Systems AnalysisCapabilities

As new information be-came available, con-tinued updating ofcapabilities for anal-ysis including wastestream, operations/logistics, cost, relia-bility/availability/maintainability (RAM)and dose. Continued tomodify capabilities, asneeded, to supportspecific applicationsto systems studies orspecial studies. Con-tinued QA efforts in-cluding QA plan impLe-mentation review,assessments, surveil-Lance and audit activi-ties. These activities

Continue updatinganalysis capabilitiesfor waste stream,operations/logistics,cost, RAN and dose.Continue to updatewaste inventoryprediction capabilitiesfor use In all systemelements. Continue tomodify capabilities, asneeded, to supportspecific applicationsto systems studies orspecial studies.Continue QA efforts,including QA planreview, assessments,surveillance and auditactivities anddocumentation and

Funding requirementsfor FY 93 and beyondappear in the Systemsand Compliance Activitysection.

284

( ( (

Page 66: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

( ( (

III. Transportation, Systems Integration, and Engineering Development (Cont'd):

Program Activity FY 1991 FY 1992 FY 1993 Fy 1994 FY 1995.. ...... . .... .... .. . .......... ............. ........ ... .... ....... ------------------------------------

Systems AnalysisCapabilities(Cont'd)

utilized $1,811 ofprior-year funds.

verification ofcomputer codes.

S 1,860S 1069 S 0 So SO

Systems EngineeringStudies

Continued detailed andrefined systemsengineering studies Insupport of systemdesign, modificationsto systems operation,and optimization ofvarious subsystemoptions that willimpact system costs,reliability tradeoffs,waste acceptanceprocedures, storageoptions, and processcosts. Conductedanalyses to assess hotfuels handling, doserates, refinements, andcost/reliabilityadjustments. ContinuedCA efforts such as Aplan implementationreview, audit andsurveillance activitiesand assessements.These activitiesutilized S3,200 ofprior year funds.

Continue detailed andrefined systemsengineering studies andsystem trade-offs insupport of systemdesign, modificationsin systems operationand optimization ofvarious subsystemoptions that willlmpact system costs,reliability tradeoffs,waste acceptanceprocedures, storageoptions, and processcosts. Conductanalyses according topriorities establishedby the systems studyplanning process inorder to supportprogram decisions aboutconfiguration andfunction allocation.Continue CA effortsincluding A planimplementation review,assessments, audit andsurveillanceactivities.

S 2445

Funding requirementsfor FY 93 and beyondappear in the Systemsand Compliance Activitysection.

So $ 1,705 S S 0

Z85

Page 67: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

III. Transportation, Systems Integration, and Engineering Development (Cont'd):

Program Activity

Special Studies

Program Management

FY 1991

Continued expansion ofsystem planning andprogram developmentactivities. Continuedinterface with otherprogram elements andutility industryregarding overallsystem planning.Conducted specialanalyses andparticipated intechnical reviews andworkshops. Continued QAefforts including GAplan implementationreview, assessments,surveillance and auditactivities.

$ 6

Continued to provideProgram management sup-port, based on respon-sibility for the over-all performance of theSystems IntegrationProgram. Continued toprovide periodic re-ports and management ofand direct participa-tion in appropriateactivities within theSystems IntegrationProgram. Maintained Aprocedures and providedcontractor GA compli-ance. This activityutilized 225K ofprior-year funds.

FY 1992......................

Perform special studiesaffecting all wastemanagement systemparticipants, includingthe utilities, theNuclear Waste TechnicalReview Board, and theStates and Tribes.Conduct special studiesthat are appropriate tothe development of thewaste managementsystem. Participate intechnical reviews andworkshops, as required.Continue GA effortsincluding A planimplementation review,assessments,surveillance and auditactivities.

S 2,160

Continue to provideProgram management sup-port, based on respon-sibility for the over-all performance of theSystems IntegrationProgram. Continue toprovide periodic re-ports and management ofand direct participa-tion in appropriateactivities within theSystems IntegrationProgram. Maintain QAprocedures and providecontractor A compli-ances.

FY 1993 FY 1994 FY 1995..........-- --- -- ................... ...... -----------------------... ...................................................

Funding requirementsfor FY 93 and beyondappear in the Systemsand Compliance Activitysection.

S S So

Funding requirementsfor FY 93 and beyondappear In the Systemsand Compliance Activitysection.

286

(

Page 68: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

( (7 C4

III. Transportation, Systems Integration, and Engineering Development (Contod):

Program Activity FY 1991 FY 1992 FY 1993 FY 1994 FY 1995........ ....... ............---_-..---....---------....---.. ---...........-------------......-----..................------...................................-.........----------------... .

Program Management(Cont'd)

Subtotal, SystemsIntegration

EngineeringDevelopment

PrototypicConsolidationDevelopment Program

$ 703

S 6970

3925

S 13,060

S

S

So

S O

So

S O

Completed delivery ofmock-up fuels and fuelcanisters to equipmentcontractor. Completedconstruction of testfacility. Beganinstallation ofconsolidation equipmentin test facility.Completed allprerequisite testacceptance criteria andbegan preparation oftest procedures. Beganperformence of SystemOperation Tests.Provided extensive CAsupport to ensurecompliance with NuclearQuality Assurance(NQA-1) requirements,including performingperiodic contractoraudits, equipmentfabricationinspections, andwitnessing of testactivities.

Initiate and completeshipments of equipmentto INEL. Issue finalreport for Phase 111.Continue QA oversight.These activities willutilize 300K ofprior-year funds.

S 320

Funding requirementsfor FY 93 and beyondappear in the MonitoredRetrievable StorageActivity section.

S S 3400 S O S

287

Page 69: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

111. Transportation, Systems Integration, and Engineering DeveLopment (Cont'd):

Program Activity FY 1991 FY 1992 FY 1993 FY 1994 FY 1995.... ........... .......................................................................... ---------------------- ----------------------- ....................... --- --- --- --- --- -- ....................... .......

Nuclear FuelServices (NFS)

Completed cask modifi-cations required tomeet NRC certificationrequirements. Purchasednew impact limiters andshipping cradles forsecond cask. Storedfuel at West Valley,N.Y., including revi-sing SAR. Completeddesign, safety, andenvironmental document-ation to upgrade fuelpool water treatmentsystem. Purchasedlong-lead-time equip-ment needed to replacewater treatment systemof spent fuel storagepool in West Valley.These activitiesutilized 2,195K ofprior-year funds.

S

S 3,400

Complete hardware pro-curements. Completestorage pool filtrationmodifications. Studyoptions for long-termstorage at West Valley.These activities willutilize S345K of prioryear funds.

S 1,948

S 2,268

Funding requirementsfor FY 93 and beyondappear in the MonitoredRetrievable StorageActivity section.

S 0

S O

So So

Subtotal,EngineeringDevelopment

So So

Transportation,Systems Integration, S 28,333 S 33,683 S 28,965 S 28,965 S 28,965and EngineeringDevelopment

28( ( c

Page 70: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

( C C

DEPARTMENT Of ENERGYFY 1993 CONGRESSIONAL BUDGET REQUEST

NUCLEAR WASTE FUND(dollars in thousands)

KEY ACTIVITY SUMMARY

NUCLEAR WASTE FUND

1. Preface: Systems and Compliance

This Key Activity Sumary encompasses the former Systems Integration activity with the addition of regulatory compliance activities. Itsobjectives are to ensure that: 1) the various components of the waste management system are integrated into a single system that is safe,efficient, reliable, cost-effective, and in compliance with all applicable regulatory guidelines; and 2) the activities leading to the finalwaste management system are conducted in accordance with the regulatory guidance provided by the governing authorities. The approach toaccomplishing these objectives is to: identify and baseline technical requirements of the total system; maintain current descriptions of thesystem, its components, and interfaces that meet requirements; enhance conmunication among parties responsible for individual system componentsand functions; develop and maintain a capability to fully assess alternative concepts; conduct systems studies and recoimend improvements;support development of equipment and processes having the potential to improve the system; conduct regulatory complance reviews; support theNuclear Waste Technical Review Board; and continue interactions with NRC concerning licensing issues. These activities are critical to thesuccess of the overall program schedule as they directly impact the NRC licensing process for both the repository and the MRS.

In FY 1993, Systems and Compliance activities will focus on the repository and MRS program elements, with emphasis on work necessary to supportYucca Mountain surface-based testing, early issue resolution, and development of the requisite performance assessment toots, as well as MRSdesign and MRS/repository integration into the overall waste management system.

It. A. Surery Table: Systems and Compliance

Program Activity................................................

Systems Engineering...........................Systems Planning and Integration................Configuration Management .....................Regulatory Policy and Requirements.............Regulatory Integration.........................

Total, Systems and Compliance

FY 191Enacted

$ 0000a

...........

S 0sW=U===__

FY 1992Enacted

$ 00000

......... ..S 0CZ======Z==

FY 1993 FY 1994Request X Change Request

........... ........... . ..... -----------.......... ... ..... ..

S 7,382 >999 S 7,3824,864 >999 4,8642,025 >999 2,0252,664 >999 2,6642,664 >999 2.664

........... -----------. ... .. ........... .................

$ 19.599 >999 5 19,599suuuusnmaz ==uusuuutu z=z==

FY 1995Request

--.........

S 7,3824,8642,0252,6642,664

...........

$ 19,599Uz3z=w==2s

289

Page 71: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

II. B. Major Laboratory and Facility Funding

FY 1991Enacted

DOE Field Office, Chicago (Argonne) ..............DOE Field Office, Chicago (Chicago) ..............Idaho National Engineering Laboratory - EG&G .....DOE Field Office, Idaho ..........................DOE Field Office, Nevada .........................Oak Ridge National Laboratory ....................Pacific Northwest Laboratory .....................DOE Field Office, Richland .......................Sandia National Laboratories .....................

SSSSSSSSS

0000

5867,5643,3001,213

0

FY 1992Enacted

S 0S 0S 0S 0S 0S 0S 0S 0

FY 1993Request

$ 0S 0S 0S 0S 0S 750S 0S 0S 0

X Change.

0

000

>999000

FY 1994Request

.. . . .

FY 1995Request

S 0 S 0S 0 S 0S 0 S 0S 0 S 0S 0 S 0$ 0 S 0S 0 $ 0S 0 S 0S 0 $ 0

III. Activity Descriptions: (New BA in thousands of dollars)

Program Activity FY 1991 FY 1992.. . . . . ..... ...

FY 1993.. . . ... . . .. . .

FY 1994.. .. . . .. . .

FY 1995. .. .. .. . . . . . .

Systems andCompli ance

Systems Engineering Initiated updating oftechnical baselinedocuments includingsystemsrequirements to reflectcurrent programpolicies and revisionsto regulations.Continued theimplementation of theManagement SystemImprovement Strategy(MSIS) effort whichinvolves the functionalanalysis on thePhysical System.Functional analysisincluded theidentification of theprimary functions,subfunctions,interfaces and theircorrespondingrequirements of theNuclear WasteManagement System.

Complete the physicalfunctional analysiseffort which ncludesfurther development ofsystems and subsystemrequirements. Continueto identify interfaces,requirements, andarchitecture for eachsubsystem of the wastemanagement system.Continue to developperformancerequirements forsubsystems andtechnical baselinedocuments. Continue tomonitor and assess theQA activitiesassociated with thefunctional analysiseffort. Update programbaseline documents as aresult of systemstudies. Maintain thedata base management,

Update technicalbaseline documents toreflect revisions toregulations andstatutes and additionalperformancerequirements resultingfrom ongoing systemsstudies. Maintain database managementrequirements/researchprocess. Update wastereference system database. Modify andevaluate systescapabilities to supportspecific applicationsto systems studies.Conduct detailedsystems engineeringstudies in support ofMRS and ExploratoryStudies Facility (ESF)design efforts,identification ofalternatives to systems

Continue to updatetechnical baselinedocuments to reflectcompleted systemstudies and revisionsof source documents.Maintain data basemanagementrequirements/researchprocess. Continue toupdate the wastereference system database. Modify andevaluate systemscapabilities to supportspecific applicationsto systems studies.Continue detailedsystems engineeringstudies in support ofMRS and ESF designefforts, identificationof alternatives tosystems operation, andoptimization of varioussubsystems options that

Continue to updatetechnical baselinedocuments to reflectrevisions of sourcedocuments. Maintaindata base managementrequirements/researchprocess. Continue toupdate the wastereference system database. Modify andevaluate systemscapabilities to supportspecific applicationsto systems studies.Continue detailedsystems engineeringstudies in support ofongoing repository andMRS design efforts,identification ofalternatives to systemsoperation, andoptimization of varioussubsystems options thatwill impact system

290

Q (

Page 72: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

(- C (

III. Systems and Compliance (Cont'd):

Program Activity.. . ........----

FY 1991.......- ---- ---... ........

FY 1992 FY 1993......... ............... ......... ..............................................

FY 1994.......................

FY 1995

Systems Engineering(Cont'd)

Initiated developmentof a data base forrequirements.Generated and revisedfunctional flowdiagrams resulting fromthe functional analysiseffort. Initiatedfunctional analysis ofthe Exploratory StudiesFacility ESF) tosupport design effort.Initiated developmentof systems engineeringstudies plan in supportof design effort, inaccordance with QualityAssurance OA) plan,including modificationsto systems operation,and optimization ofvarious subsystemsoptions. Conductanalyses on fuelshandling, andcost/reliabilityadjustments. Continuedexpansion of systemplanning and programdevelopment activities.Continued OA effortsincluding A planimplementation review,assessments,surveillance and auditactivities. Evaluated,recommended, selectedand Implemented threecomputer models forevaluation of systemand subsystemperformance measures.Initiated thedevelopment of arevised plan anddetailed methodology to

requirements researchprocess. Update thedata base to reflectcurrent statutes andregulations. Updatethe waste referencedata base. Completethe functional analysisand documentation forall major systemelements. Continue toevaluate and modifysystems capabilities,as needed, to supportspecific applicationsto systems studies.Continue GA effortsincluding A planreview, assessments,surveillance and auditactivities anddocumentation andverification ofcomputer codes.Continue detailedsystems engineeringstudies and computermodelling in support ofdesign effort,modifications tosystems operation, andoptimization of varioussubsystems options thatwill impact systemcosts, reliability,tradeoffs, wasteacceptance procedures,storage options, andprocess costs.Evaluate alternativedesign and operationalscenarios. Continuethe development of therevised plan anddetailed methodology tosequentially identify

operation, andoptimization of varioussubsystems options thatwill impact systemcosts, reliability,tradeoffs, wasteacceptance procedures,storage options, andprocess costs. Conductanalysis to assessfuels handling, andcost/reliabilityadjustments. Conductsystem planning andprogram developmentactivities. Provideinterface with otherprogram elements andutility industryregarding overallsystem planning.Evaluate theimplementation andoperation of selectedcomputer models forevaluation of systemand subsystemperformance measures.Conduct review ofongoing systems models.Evaluate alternativedesign and operationalscenarios and theeffects of changes inflow of waste materialsthrough the system.Develop the revisedplan and detailedmethodology tosequentially identifyand accomplishnecessary tradeoffstudies that willfurther clarifyrequirements andfacility design issues,

will impact systemcosts, reliability,tradeoffs, wasteacceptance procedures,storage options, andprocess costs. Continueanalysis to assessfuels handling, andcost/reliabilityadjustments. Continuesystem planning andprogram developmentactivities. Interfacewith other programelements and utilityindustry regardingoverall systemplanning. Evaluate theimplementation andoperation of selectedcomputer models forevaluation of systemand subsystemperformance measures.Continue review ofongoing systems models.Evaluate alternativedesign and operationalscenarios and theeffects of changes inflow of waste materialsthrough the system.Continue to develop therevised plan anddetailed methodology tosequentially dentifyand accomplishnecessary tradeoffstudies that willfurther clarifyrequirements andfacility design issues,approaches, and programand subsystemperformancerequirements for

costs, reliability,tradeoffs, wasteacceptance procedures,storage options, andprocess costs. Continueanalysis to assessfuels handling, andcost/reliabilityadjustments. Continuesystem planning andprogram developmentactivities. Interfacewith other programelements and utilityindustry regardingoverall systemplanning. Evaluate theimplementation andoperation of selectedcomputer models forevaluation of systemand subsystemperforvence messures.Continue review ofongoing systems models.Evaluate alternativedesign and operationalscenarios and theeffects of changes inflow of waste materialsthrough the system.Continue to develop therevised plan anddetailed methodology tosequentially identifyand accomplishnecessary tradeoffstudies that willfurther clarifyrequirements andfacility design issues,approaches, and programand subsystemperformancerequirements forbaseline requirements

291

Page 73: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

ti1. Systems and Compliance (Cont'd):

Program Activity FY 1991 FY 1992 FY 1993 FY 1994 FY 1995.... ............ ............... ................. .......... ............. ......................... ........ ................ .............. ..................... ... ......................... ....... .......................

Systems Engineering(Cont d)

sequentially identifyand accomplishnecessary trade studiesthat will furtherdecompose facilitydesign issues,approaches, and programand subsystemperformancerequirements forbaseline requirementsdocuments.

S O

Systems Planning andIntegration

Conduct programmaticfunctional analyses of8 key OCRIM technicalfunctions to supportthe Management SystemsImprovement Strategy.Identify and documenttechnical functiondefinitions,hierarchies, andinterfaces. Developinterim programmanagement systemsincluding a systemsengineering managementplan, documenthierarchy, and workbreakdown structure.Incorporate interimresults intoprogram-controlleddocuments. Provideintegration support for

DOE interactions withthe Nuclear WasteTechnical Review Board(NWTRB) in conducting

and accomplishnecessary trade studiesthat will furtherdecompose facilitydesign issues,approaches, and programand subsystemperformancerequirements forbaseline requirementsdocuments to meetprogram managementmilestones.

So

Continue conduct ofprogrammatic functionalanalyses for 8 keyOCRUM externalinteraction and programmanagement functions.Prepare final programmanagement systemmanual and systemsengineering managementplan. Providecommunications packagesdescribing programmaticprocess flowdescriptions andprogrammaticrequirements for eachkey OCRW4 technicalfunction. Begin tointegrate all OCRIMprogram functions usingcomputer analysistechniques. Describemanagement systemchanges andresponsibilities indocument hierarchy,

approaches, and programand subsystemperformancerequirements forbaseline requirementsdocuments to meetprogram milestones.Conduct GA efforts,including GA planreview, assessments,and documentation andverification ofcomputer codes.

S 7,382

Implement functionalanalysis results andassign organizationalresponsibilitiesthrough baselineddocuments. UpdateProgram ManagementSystem Manual, SystemsEngineering ManagementPlan, and full programdocument hierarchy.Integrate technical,cost and schedulebaselines withtechnical andprogrammaticrequirements. Supportdesign and systemsengineering ofrepository, MonitoredRetrievable Storage(MRS) andtransportation systems.Maintain programrequirements database.Identify and defineprogrammatic functional

baseline requirementsdocuments to meetprogram milestones.Continue GA efforts,including A planreview, assessments,and documentation andverification ofcomputer codes.

$ 7,382

Continue to implementfunctional analysisresults and assignorganizationalresponsibilitiesthrough baselineddocuments. UpdateProgram ManagementSystem Manal, SystemEngineering ManagementPlan, and full programdocument hierarchy.Integrate technical,cost and schedulebaselines withtechnical andprogrammaticrequirements. Continueto support design andsystems engineering ofrepository, MonitoredRetrievable Storage(MRS) andtransportation systems.Maintain programrequirements database.Continue to identify

documents to meetprogram milestones.Continue GA efforts,including GA planreview, assessments,and documentation andverification ofcomputer codes.

S 7,382

Continue to implementfunctional analysisresults and assignorganizationalresponsibilitiesthrough baselineddocuments. UpdateProgram ManagementSystem Manual, SystemsEngineering ManagementPlan, and full programdocument hierarchy.Integrate technical,cost and schedulebaselines withtechnical andprogrammaticrequirements. Continueto support design andsystems engineering ofrepository, MonitoredRetrievable Storage(MRS) andtransportation systems.Maintain programrequirements database.Continue to identify

(292

(

Page 74: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

( C C

111. Systems and Compliance (Cont'd):

Program Activity FY 1991 FY 1992 FY 1993 FY 1994 FY 1995.......................... ....................... ....................... ................................................................. ...................................................----................-................

Systems Planning andIntegration (Cont'd)

informetion exchanges,responding to technicalrequests, and preparingfor presentations.Initiated developmentof a computerizedsystem requirementsdatabase to maintainall technical andprogram requirements.Comply with allapplicable CAprocedures.

S O

ConfigurationManagement

Established andmaintained ProgramChange ControlProcedures (PCCP).Provided administrativesupport for the changecontrol process. Issuedstatus reports.Executed Secretariatfunction for the OCRKMChange Control Boards(CCBs). Coordinate andconduct program-levelCC8 to assure fullsupport to the DOEAcquisition Executive.Reviewed documentchange proposals.Supported controlleddocument distribution.Prepared recordpackages. Prepared foraudits and verificationof usage of up-to-date

work breakdownstructure dictionary,and program-controlledbaseline documents.Continue providingintegration support forDOE interactions withthe WTRB. Prepareinterim InterfaceControls Document.Begin operation offully qualified systemrequirements database.Continue implementationof appticable OAprocedures.

So

Continue to establishand maintain ProgramChange ControlProcedures (PCCP).Provide adhinistrativesupport for the changecontrol process. Issuestatus reports. ExecuteSecretariat functionfor the CRWM ChangeControl Boards (CCBs).Coordinate and conductprogram-tevel CCB toassure full support tothe DOE AcquisitionExecutive. Reviewdocument changeproposals. Supportcontrolled documentdistribution. Preparerecord packages.Prepare for audits andverification of usageof up-to-date

interfaces. Incorporatefunctional interfacesinto the computerizeddatabase. Support theNuclear Waste TechnicalReview Board (NWTRB),including interactionson MRS siting anddesign issues and YuccaMountain site studies.Implement applicable CAprocedures.

S 4,864

Maintain the ProgramChange ControlProcedure (PCCP).Provide administrativesupport for the changecontrol process. Issuestatus reports. ExecuteSecretariat functionfor the OCRWM ChangeControl Boards CCCBs).Coordinate and conductprogram-tevel CCB toassure full support tothe DOE AcquisitionExecutive. Reviewdocument changeproposals. Supportcontrolled documentdistribution. Preparerecord packages.Prepare for audits andverification of usageof up-to-datecontrolled documents.

and define programmaticfunctional interfaces.Incorporate functionalinterfaces into thecomputerized database.Continue support forthe Nuclear WasteTechnical Review Board(NWTRB), Includinginteractions on MRSsiting and designissues and YuccaMountain site studies.Continue to implementapplicable OAprocedures.

S 4,864

Continue to maintainthe Program ChangeControl Procedure(PCCP). Continueadministrative supportfor the change controlprocess. Issue statusreports. ExecuteSecretariat functionfor the OCRUM ChangeControl Boards CCCBs).Coordinate and conductprogram-levet CC toassure fulL support tothe DOE AcquisitionExecutive. Reviewdocument changeproposals. Supportcontrolled documentdistribution. Preparerecord packages.Prepare for audits andverification of usageof up-to-date

and define programuaticfunctionsa interfaces.Incorporate functionalinterfaces into thecomputerized database.Continue support forthe Nuclear WasteTechnical Review BoardCNWTRB), includinginteractions on MRSsiting and designissues and YuccaMountain site studies.Continue to implementapplicable PAprocedures.

S 4,864

Continue to maintainthe Program ChangeControl Procedure(PCCP). Continueadministrative supportfor the change controlprocess. Issue statusreports. ExecuteSecretariat functionfor the OCRWM ChangeControl Boards CCCBs).Coordinate and conductprogramtevel CCB toassure full support tothe DOE AcquisitionExecutive. Reviewdocument changeproposals. Supportcontrolled documentdistribution. Preparerecord packages.Prepare for audits andverification of usageof up-to-date

293

Page 75: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

III. Systems and Compliance Cont'd):

Program Activity FY 1991_ _.. . .. . .. . . . . . . . . . . . . .

FY 1992 FY 1993.. ... . .. . .. . . -- - - -- - - -- - - -

FY 1994 FY 1995....................... ….......................

ConfigurationManagement (Cont 'd)

controlled documents.Implemented allapplicable Arequirements for allconfigurationmanagement activities.Developed OCRUIconfigurationmanagement policy.Prepared OCRWNconf igurationmanagement plans andprocedures. Establishedfunctional requirementsof a requirementsdatabase.

S

Regulatory Policyand Requirements

Continue to reviewproject activities toensure regulatoryrequirements are met.Prepare documentationfor the biannual reportprepared to confirmcompliance with permitand/or regulatoryrequirements. Preparetwo EnvironmentalMonitoring andMitigation ProgressReports.

controlled documents.Implement allapplicable GArequirements for allconfigurationmanagement activities.Maintain configurationmanagement documents.Review and provideguidance to programelements to developconfigurationmanagementimplementation plansand procedures. Developand maintainrequirements database.

S O

Prepare regulatoryguidance documents forMRS, repository, andtransportation pro-jects. Develop OCRUHinput to proposed reg-ulatory initiativesfrom NRC, EPA, DOT, andDOE to ensure iple-mentation by MRS,repository, and trans-portation projects.Conduct Environment,Safety and Health(ES&H) coordination forOCRUM regulatory doc-uments and manage issueresolution activities.Coordinate NEPA compli-ance activities for allOCRWM projects. Review/approve all OperationsOffice NEPA-level de-

maintain programconfigurationmanagement plans andprocedures. Implementall applicable QArequirements forconfigurationmanagement activities.Maintain requirementsdatabase. Input allrequirements from OCRWMdocuments into thedatabase. Generateupdated master list ofinput sources.

S 2,025

Issue regulatoryguidance documents forMRS, repository, andtransportation pro-jects. Update the doc-uments to facilitatemeeting repository andMRS milestones. DevelopOCRWH input to proposedregulatory initiativesfrom NRC, EPA, DOT, andDOE to ensure implemen-tation by MRS, repos-itory, and transporta-tion projects. ConductEnvironment, Safety andHealth ES&H) coordina-tion for OCRWM regula-tory documents andmanage issue resolutionactivities. CoordinateNEPA compliance activi-ties for all OCRWM

controlled documents.maintain programconfigurationmanagement plans andprocedures. Continue toimplement allapplicable GArequirements forconfigurationmanagement activities.Maintain requirementsdatabase. Input allrequirements from OCRWEdocuments into thedatabase. Generateupdated master list ofinput sources.

S 2,025

Continue to issueregulatory guidancedocuments for MRS,repository, andtransportationprojects. Update thedocuments to facilitatemeeting repository andMRS milestones. DevelopOCRUH input to proposedregulatory initiativesfrom NRC, EPA, DOT, andDOE to ensureimplementation by MRS,repository, andtransportationprojects. ContinueEnvironment, Safety andHealth (ES&H)coordination for OCRwa4regulatory documentsand manage issueresolution activities.

controlled documents.Maintain programconfigurationmanagement plans andprocedures. Continue toimplement allapplicable GArequirements forconfigurationmanagement activities.Maintain requirementsdatabase. Input allrequirements from OCRWMdocuments into thedatabase. Generateupdated master list ofinput sources.

S 2,025

Continue to Issueregulatory guidancedocuments for RS,repository, andtransportationprojects. Update thedocuments to facilitatemeeting repository andMRS milestones. DevelopOCRIM input to proposedregulatory initiativesfrom NRC, EPA, DOT, andDOE to ensureimplementation by MRS,repository, andtransportationprojects. ContinueEnvironment, Safety andHealth (ES&H)coordination for OCRWMregulatory documentsand manage issueresolution activities.

294

( c (

Page 76: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

( C C

111. Systems and Compliance Cont'd):

Program Activity FY 1991........ ....................... -----------------------

FY 1992 FY 1993 FY 1994 FY 1995............................ .......... ............. ....................... .......................

Regulatory Policyand Requirements(Cont'd)

terminations and OCRWMEnvironmental Assess-ments (EA's) and Envi-ronmental Impact State-ments (EIS's). Provideregulatory compliancereviews of MRS andtransportation pro-jects. Track YuccaMountain regulatorycompliance. ConductOCRWM self-assessmentprogram regardingenvironmental protect-ion, radiological andnon-radiological publicsafety, and occupation-al safety and health.

projects. Review/approve all OperationsOffice NEPA-Leveldeterminations andOCRWM Envi rornentalAssessments EAs) andEnvi ronmental ImpactStatements (EIS's).Provide regulatorycompliance reviews ofMRS and transportationprojects. Track YuccaMountain regulatorycompliance. ConductOCRUM self-assessmentprogram regardingenvironmental protect-ion, radiological andnon-radiological publicsafety, and occupation-al safety and health.

S 2,664

Review NRC licensingprocess documents asthey relate to MRSvolunteer siting,Environmental ImpactStatement (EIS)/LicenseApplication (LA), andYucca Mountainsurface-based testing.Maintain interactionwith NRC for resolutionof issues concerningMRS and repositorylicensing. Develop andcoordinate DOEpetitions forlicensing-related

Coordinate NEPAcompliance activitiesfor all OCRWM projects.Review/approve allOperations Office NEPA-level determinationsand OCRWM EA's andEIS's. Continue toprovide regulatorycompliance reviews ofMRS and transportationprojects, and trackYucca Mountainregulatory compliance.Continue OCRWMself-assessment programregarding environmentalprotection,radiological andnon-radiological publicsafety, andoccupational safety andhealth.

S 2,664

Continue review of NRClicensing processdocuments as theyrelate to MRS volunteersiting, EnvironmentalImpact Statement(EIS)/LienseApplication (LA), andYucca Mountainsurface-based testing.Continue interactionwith NRC for resolutionof issues concerningMRS and repositorylicensing. Continuedevelopment andcoordination of DOE

Coordinate NEPAcompliance activitiesfor all OCRWM projects.Review/approve allOperations Office NEPA-level determinationsand OCRWM EA's andEIS's. Continue toprovide regulatorycompliance reviews ofMRS and transportationprojects, and trackYucca Mountainregulatory compliance.Continue OCRWMself-assessment programregarding environmentalprotection,radiological andnon-radiological publicsafety, andoccupational safety andhealth.

S 2,664

Continue review of NRCLicensing processdocuments as theyrelate to MRS volunteersiting, EnvirorinmentalImpact Statement(EIS)/LicenseApplication (LA), andYucca Mountainsurface-based testing.Continue interactionwith RC for resolutionof issues concerningMRS and repositorylicensing. Continuedevelopment andcoordination of DOE

S O S O

RegulatoryIntegration

Develop materials andparticipate in meetingswith the NuclearRegulatory Comission(NRC), Advisory Councilon Nuclear Waste(ACNW), and others asrequired. Refine OCRWMlicensing strategy.Review and coordinateresolution of licensingissues, including thoserelated to qualityassurance, YuccaMountain sitecharacterization,design and MRS siting.

Maintain liaison withNRC and other DOEcomponents tofacilitate resolutionof regulatory andlicensing issues.Develop materials andparticipate in meetingswith NRC, ACHW, EPA,and others. Prepareprotocols, coordinateinteractions, andassure the accuracy ofmeeting minutes.Provide technical andregulatory reviews ofdocuments affecting the

295

Page 77: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

III. Systems and Compliance Cont'd):

Program Activity--------- - ..-----

FY 1991---- ---- --- -..... -

FY 1992.......................

FY 1993........-- -- -- --

FY 1994.............. .......................

FY 1995....... ............ ......

RegulatoryIntegration (Cont'd)

licensing process.Begin developing policyguidance foralternative licensingstrategies. Develop andcoordinate petitionsfor rulemaking.Coordinate thedevelopment andnegotiation ofmemoranda ofUnderstanding NOU)concerning regulatorycompliance. Developguidance for programsafeguards/security andprovide oversight ofimplementation andactivities concerningsafeguards/security.

rulemaking, and managedevelopment andnegotiation of MW'sand ProceduralAgreements to supportrepository and MRSmilestones. Beginpreparation ofannotated outlines forlicense applicationunder 1OCFR60(repository) and1OCFR72 (MRS). Developnuclearsafeguards/securityprogram under 1OCFR75.

$ 2,664

petitions forlicensing-relatedrulemaking, and managedevelopment andnegotiation of N 'sand ProceduralAgreements to supportrepository and MRSmilestones. Continuepreparation ofannotated outlines forrepository licenseapplication under1OCFR60. Coordinatepreparation of MRSlicense applicationunder 1OCFRT2. Conductoversight of nuclearsafeguards/securityprogram.

S 2,664

petitions forlicensing-relatedrulemaking, and managedevelopment andnegotiation of MOU'sand ProceduralAgreements to supportrepository and MRSmilestones. Continuepreparation ofannotated outlines forrepository licenseapplication under10CFR60. Coordinateupdate of MRS licenseapplication under10CFR72. Conductoversight of nuclearsafeguards/securityprogram.

S 2,664S O So

...... .......... ...... ........... ....................... ................................................... .. .............................................................................................. ...................

System andCompliance S 0 S 0 $ 19,599 S 19.599 S 19,599........................................................................................ .............9 6

296

( (

Page 78: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

( C C

DEPARTMENT OF ENERGYFY 1993 CONGRESSIONAL BUDGET REQUEST

NUCLEAR WASTE FUND(dollars in thousands)

KEY ACTIVITY SUMMARY

NUCLEAR WASTE FUND

1. Preface: Program Management and Technical Support

This activity includes: 1) Program Management (Federal salaries, benefits, and travel), 2) Contractual Services (administrative support costs,including office space, printing, telecommunications, and coputer-related services), and, 3) Technical Support (Nuclear Waste Fund auditservices, external relations activites, strategic planning, international program oversight, quality assurance (A), radioactive waste managementgraduate fellowship and Historically Block College and University (HBCU) programs, and other support services).

The FY 1993 request for PMTS supports the direction of the overall program, which includes: 1) focus on the surface-based testing (SBT) programat the Yucca Mountain candidate site;' 2) waste acceptance at an MRS facility; and, 3) development of the transportation system in time to supportthe start of MRS operation.

11. A. Sumary Table: Program Maagement and Technical Support

FY 1991 FY 1992 FY 1993 FY 1994 FY 1995Program Activity Enacted Enacted Request X Change Request Request

Program Management ......... .................... S 17,236 S 17,556 S 18,276 + 4 S 18,276 S 18,276Technical Support .............. 27,490 35,259 29,311 - 17 29,311 29,311Contractual Services and Supplies . . 6,644 6,798 6,772 0 6,772 6,772

Total, Program Management and TechnicalSupport S 51,370 S 59,613 S 54,359 - 9 S 54,359 S 54,359

=zwS uzzz=== rn~zzusuu===ZR =:z-z *--===g=z=__ Zw

297

Page 79: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

111. Activity Descriptions: (New BA in thousands of dollars)

Program Activity FY 1991 FY 1992 FY 1993 FY 1994 FY 1995..--------- ------------- .... .......... .......... ....... ................ .. ------------ ------------ -------------

Program Managementand TechnicalSupport

Program Management Oversaw firstrepository sitecharacterization work,including management ofsite suitability,surface-based testing,exploratory shaftdesign, and review ofgeologic and hydrologicdata. Continuedliaison with the Stateof Nevada, and localgovernments. Continuedextensive, in-depthinteractions with NRCon licensing matters.Provided geosciencesupport to the In-situtesting program.Continued near-fieldenvironment testing andmodeling in support ofsite investigation.Continued limitedbarrier materialtesting and modeling insupport of performanceassessment. Beganrepository-relatedsupport of performanceassessment.

Oversee firstrepository siteinvestigation work,including management ofnew surface-basedtesting (SOT) tooptimize early sitesuitability evaluationand hydrologicconsiderations, ESFevaluation and design,and review of geologicand hydrologic data.Provide geosciencesupport to the in-situtesting program.Continue liaison withthe State of Nevada,and local governments.Continue extensive,in-depth interactionswith RC on licensingmatters to facilitateearly issue closure.Continue near-fieldenvironment testing andmodeling in support ofsite investigation.Continue limitedbarrier materialtesting and modeling insupport of performanceassessment (PA), focuson putting in place thenecessary PA tools.

Oversee firstrepository full-scaleSBT and ESF sitepreparation at YuccaMountain, andsupporting activitiesto ensure earlydetermination of sitesuitability. Continuerepository-relatedsupport and completeTitle 11 design forfirst access buildingsand surface structures.Manage site preparationand surface facilitiesconstruction at firstaccess. Continueliaison with the Stateof Nevada and localgovernments. Continueinteractions with theURC on licensingmatters. Overseeresource managementprogram administrativeactivities at the YuccaMountain SiteCharacterizationProject Office (YMPO).

Oversee firstrepository sitecharacterization work,including management offull-scale SBT and ESFconstruction at YuccaMountain, andgeological andhydrologicalinvestigations. Providegeoscience support tothe in-situ testingprogram. Continueliaison with the Stateof Nevada and localgovernments. Continueinteractions with theNRC on licensingmatters. Overseeresource managementprogram administrativeactivities at YPO.

Oversee firstrepository sitecharacterization work,including management offull-scale SBT and ESFconstruction at Yuccamountain, andgeological andhydrologicalinvestigations. Providegeoscience support tothe in-situ testingprogram. Continueliaison with the Stateof Nevada and localgovernments. Continueinteractions with theNRC on licensingmatters. Overseeresource managementprogram administrationactivities at YIPO.

( (

Page 80: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

( C C

III. Program Management and Technical Support (Cont'd):

Program Activity FY 1991 FY 1992 FY 1993…-- - - - - - - - - - - - - - - - - - - - - .. . . . . . . . . . . - - - - - - - - - - -

FY 1994- --.............---

FY 1995-------------------. .

Program Management(Cont'd)

Continued to oversee,manage, and report onprogress made in theimplementation of aquality assuranceprogram. This programprovides assurances toOCRWM management thatthe technicalactivities areconducted in such a wayas to appropriatelyaddress those issuesrelating to publichealth and safety andthe protection of theenvironment and meetthe licensingrequi rementsestablished by the NRC.Initiated procedures todevelop a QualityConcerns Program.Established andmonitored theimplementation of theGA administrativeprocedures andimplementing Lineprocedures throughoutOCRWM, and tookcorrective action whereneeded.

Fully implement aquality assuranceprogram. This programprovides assurances toOCRWM management thatthe technicalactivities areconducted in such a wayas to appropriatelyaddress those issuesrelating to publichealth and safety andthe protection of theenvirorment and meetthe licensingrequirementsestablished by the NRC.Implement a QualityConcerns Program.Implement GAadministrativeprocedures andimplementing lineprocedures throughoutOCRWM, including YMPO,and take correctiveaction where needed.Conduct audits andsurveillances andprepare correctiveaction reports.

Continue to implementan NRC-approved qualityassurance program toensure that technicalactivities are beingconducted to addresspublic health, safetyand enviromeentalissues. Continue theQuality ConcernsProgram,implementation of theOA administrativeprocedures, andimplementing lineprocedures. Conductaudits andsurveillances andprepare correctiveaction reports.

Continue to implementan NRC-approved qualityassurance program toensure that technicalactivities are beingconducted to addresspublic health, safetyand environmentalissues. Continue theQuality ConcernsProgram,implementation of theGA administrativeprocedures, andimplementing lineprocedures. Conductaudits andsurveillances andprepare correctiveaction reports.

Continue to implementan NRC-approved qualityassurance program toensure that technicalactivities are beingconducted to addresspublic health, safetyand environmentalissues. Continue theQuality ConcernsProgram,implementation of theOA administrativeprocedures, andImplementing lineprocedures. Conductaudits andsurveillances andprepere correctiveaction reports.

Page 81: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

III. Program Management and Technical Support (Cont'd):

Program Activity FT 1991 FY 1992 FY 1993 FY 1994 FY 1995----------- ......... ...................... ............. ........... ... .... --------------- ............. .... ...... --------------- ............ ...........

Program Management(Cont'd)

Continued MRSdevelopment activities.Provided, as requested,siting support to theNuclear UasteNegotiator. Oversawfrom-reactor caskdevelopment project,and maintained ongoingtransportation programinstitutional andgovernmental liaison.Continuedtransportationoperational planning.Managed baselinedocuments andinterfaced with eachOCRWH manager.Continued interactionswith review boards.Conducted fee adequacyanalyses, and preparedthe first AnnualAcceptance PriorityRanking Report (AAPR).Continued with ACRissue resolutionprocess. Completeddevelopmental work on aDelivery CommitmentSchedule.

Manage baselinedocuments and interfacewith OCRUH managers.Support MRS siting anddesign activities.Respond to requestsfrom the Nuclear WasteNegotiator. Obtaininformation ontechnology and initiateintegration intooperational planning.Maintain ongoingtransportation programinstitutional andgovernmental liaison.Efforts will be focusedon developing ashipping capability tosupport start of MRSoperation. Conduct feeadequacy analyses,prepare the secondAAPR, andapprove/disapproveDelivery CommitmentSchedules for spentnuclear fuel and highlevel waste acceptancefrom contract holders.

Continue NRCpre-licensinginteractions. Overseethe administration ofMRS financialassistance. Overseeestablishment of aProject Office in thevicinity of theselected MRS site.Prepare and issue finalEnvirnomentalAssessment (EA) for theMRS site. Oversee MRSTitle I and Title IIdesign activities.Oversee the annual feeadequacy analysis andthe third AAPR, andapprove/disapproveDelivery CommitmentSchedules for spentnuclear fuel andhigh-level radioactivewaste acceptance fromcontract holders.Efforts will be focusedon developing ashipping capability tosupport start of MRSoperation.

Manage baselinedocuments andinterfaces between eachelement of the CivilianRadioactive WasteManagement System.Continue preparation ofMRS License Application(LA). Administer MRSfinancial assistance.Complete MRS Title 11design. Prepare andissue MRS EnvironmentalImpact Statement EIS)implementation plan.Oversee fee Adequacyanalysis. Prepare thefourth AAPR andapprove/dissapproveDelivery CommitmentSchedules for spentnuclear fuel andhigh-level wasteacceptance fromcontract holders.

Manage baselinedocuments andinterfaces between eachelement of the CivilianRadioactive WasteManagement System.Continue to overseepreparation of RSLicense Application(LA), and submit LA toNRC. Administer RSfinancial assistance.Complete and issuedraft MRS EnvironmentalImpact Statement EIS).Continue MRS Title 11design, incorporatingappropriate NRCcomments. Oversee feeadequacy analysis.Prepare the fifth AAPRanalysis andapprove/disapproveDelivery CommitmentSchedules for spentnuclear fuel and highlevel waste acceptancefrom contract holders.

300

( ( (

Page 82: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

( C C

I11. Program Management and Technical Support (Cont'd):

Program Activity FY 1991 FY 1992 FY 1993 FY 1994 FY 1995.... _.....__ _............

Program Management(Cont'd)

Managed WF resources.Maintained program costand schedule baselines,Including preparationof budgets, financialdocuents, and NWFmanagement report.Received matrix supportfor legal,adinistrative,f inenci al,environmental, safety,health, andCongressional liaisonactivities. Oversaw PMSand change controlprocess, providedExecutive Secretariatservices to the OCRWMChange Control Board.Coapleted and publishedrevised ProjectDecision Schedule(PDS). Developed POSchanges and preparedreports to Congress asnecessary. Providedfull management supportservices. Managedinteractions with GAOand the DOE IG anddeveloped Departmentalresponses to auditreco-mendati ons.Developed andmaintained nternalcontrol procedures forresource managementactivities(procurement,personnel, recordsmanagement, etc.).Completed integrationof OCRWM and YMPOmanagement and

Manage NWF resources.Maintain program costand schedule baselines,including preparationof budgets, financialdocuments and NWFmanagement report.Receive matrix supportfor legal,adinistrative,f inancial,environmental, safety,and health. OverseeProgram ManagementSystem (PMS) and changecontrol process,provide ExecutiveSecretariat services toOCRWM Change ControlBoard. Develop PDSchanges and preparereports to Congress asnecessary. Providemanagement andadministrative supportservices. Overseeresource managementprogram. Manageinteractions with GAOand the DOE IG anddevelop Departmentalresponses to auditrecommendat ions.Develop and maintaininternal controlprocedures for resourcemanagement activities(procurement,personnel, recordsmanagement, etc.).Manage the activitiesof the M&O Contractor.

Manage NWF resourcesand investmentportfolio. Prepareannual OCRWM assuranceletter to theSecretary. Maintainprogram cost andschedule baseline,including milestoneschedule and trackingsystems, preparation ofOCRIM budgets,financial documents,and NWF managementreports. Develop PDSchanges and reports tothe Congress asrequired. Providemanagement andadministrative supportservices. Overseeresource managementprogram administrativeactivities. Manageinteractions with GAOand DOE IG, and developDepartmental responsesto auditrecommendations.Maintain internalcontrol procedures forresource managementactivities. Receivematrix support forlegal, administrative,financial,environmental, safety,and health, andCongressional liaisonactivities. Manage theactivities of the M&OContractor.

Manage NWF resources.Manage NWF investmentportfolio. Prepareannual assurance letterto the Secretary.Manage NWF resourcesand maintain programcost and schedulebaselines, includingpreparation of budgets,financial documents andNWF management reports.Receive matrix supportfor legal,administrative,financial,environmental, safety,and health, andCongressional liaisonactivities. Develop PDSchanges and reports toCongress as required.Provide management andadministrative supportservices. Manageinteractions with GAOand the DOE IG anddevelop Departmentalresponses to auditrecommendat ions.Maintain internalcontrol procedures forresource managementactivities. Manage theactivities of the M&OContractor.

Manage NWF resources.Manage NWF investmentportfolio. Prepareannual assurance letterto the Secretary.Maintain program costand schedule baselines,including preparationof budgets, financialdocuments and MwFmanagement reports.Receive matrix supportfor legal,aduinistrative,financial,environmental, safety,and health, andCongressional liaisonactivities. Develop PDSchanges and reports toCongress as required.Provide management andadcinistrative supportservices. ManageInteractions with GAOand the DOE IG anddevelop Departmentalresponses to auditrecormendat ions.Maintain Internalcontrol procedures forresource managementactivities. Manage theactivities of the M&OContractor.

301

Page 83: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

111. Program Management and Technical Support (Cont'd):

Program Activity FY 1991............ .......... ................ .......

FY 1992 FY 13 FY 194 FY 1995...... .......... .. .... .... ............. ...... ........... .... ...... .. ------------

Program Management(Cont 'd)

administrativeprocesses. Managed theactivities of the H&OContractor.

Developed and managedexternal communicationspolicies and plans.Implementedprogram-wide publiceducation, informationand outreach programs.Directed fullimplementation ofuniversity supportprogram. Responded toexternal inquiries andcomments about theOCRWH program-wide.Managed officialrecords. Prepared andsubmitted the AnnualReport to Congress.

Managed program-widestrategic andcontingency planningactivities. Conductedworkshops with affectedand interested partiesto obtain predecisionalinput for preparationof a draft Mission PlanAmendment. Developeddraft Mission PlanAmendment and issuedthe document for publiccomment. Continuedinteractions with theOffice of the NuclearWaste Negotiator andthe National Academy ofSciences. Completed

Implement program-widepublic education,information andoutreach programs.Direct fullimplementation ofuniversity supportprogram. Develop andmanage externalcommunications policiesand plans. Respond toexternal inquiries andcomments about theOCRWH program-wide.Manage high volume ofofficial records.Prepare and submit theAnnual Report toCongress.

Manage program-widestrategic andcontingency planningactivities. Prepare andissue final MissionPlan Amendment,incorporating commentsreceived on the draft.Continue interactionswith the Office of theNuclear WasteNegotiator and theNational Academy ofSciences. Implementrisk managementprogram. Managecooperative agreementswith foreign wastemanagemert programs and

Continue implementationof public education,information, andoutreach programs.Continue implementationof the universitysupport program. Manageexternalcomimunications. Respondto external inquiriesand comments aboutOCR W. Prepare andsubmit the AnnualReport to Congress.

Manage program-widestrategic andcontingency planningactivities. ReviseOCRWH Mission Plan asnecessary. Continueinteractions with theNational Academy ofSciences. Oversee therisk managementprogram. Managecooperative agreementswith foreign wastemanagement programs andconduct interactionswith multi-nationalorganizations.

Continue implementationof public education,information, andoutreach programs.Continue implementationof the universitysupport program. Manageexternalcommunications. Respondto external inquiriesand comments aboutOCRWH. Prepare andsubmit the AnnualReport to Congress.

Manage program-widestrategic andcontingency planningactivities. ReviseOCRWI Mission Plan asnecessary. Continueinteractions with theNational Academy ofSciences. Oversee therisk managementprogram. Managecooperative agreementswith foreign wastemanagement programs andconduct interactionswith multi-nationalorganizations.

Continue implementationof public education,information, andoutreach programs.Continue implementationof the universitysupport program. Manageexternalcommunications. Respondto external inquiriesand comments aboutOCRWH. Prepare andsubmit the AnnualReport to Congress.

Manage program-widestrategic andcontingency planningactivities. ReviseOCRII Mission Plan asnecessary. Continueinteractions with theNational Academy ofSciences. Oversee therisk managementprogram. Managecooperative agreementswith foreign wastemanagement programs andconduct interactionswith multi-nationalorganizations.

302

( ( (

Page 84: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

( C C II

Ill. Program Management and Technical Support (Cont'd):

Program Activity FY 1991 FY 1992 FY 1993 FY 1994 FY 1995.......................------------....................................

Program Management(Cont'd)

pLanning for riskmanagement program ndconducted training forpersonnel. Managedcooperative agreementswith foreign wastemanagement programs andconducted interactionswith multi-nationalorganizations.

Technical Support

225.0 7ThS 17,236

Continued support ofindependent financialaudit activities andfund mnagementactivities. Conductfee adequacy analysesand prepare the AnnualAcceptance PriorityRanking Report (AAPR).Approve/disapprovedelivery commitmentschedules for.spentnuclear fuel and highlevel nuclear wastefrom contract holders.

conduct interactionswith multi-nationalorganizations.

258.0 FTES 17,556

Continue support ofindependent financialaudit activities andfund managementactivities. Conductfee adequacy analysesand prepare the AnnualAcceptance PriorityRanking Report (AAPR).Approve/disapprovedelivery commitmentschedules for spentnuclear fuel and highlevel waste fromcontract holders.

258.0 FTES 18,276

Manage independentfinancial andcompliance audit of theNuclear Waste Fund.

S 300

258.0 FTES 18,276

Continue to manageindependent financialand compliance audit ofthe Nuclear Waste Fund.

S 300

258.0 FTES 18,276

Continue to manageindependent financialand compliance audit ofthe Nuclear Waste Fund.

S 300

Note: Beginning in FY1993, fee verificationactivities have beenmoved to theTransportation andWaste Acceptanedecision unit.

S2,625 S2, 739

303

Page 85: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

III. Program Management and Technical Support (Cont'd):

Program Ativity FY 1991...-- - -- - -- - .. ........ ................ .. ...... ....

FY 1992 FY 1993...- -- - - -- - - - ... ............ ...................... ........

FY 1994 FY 1995...- -- - - -- - - - .. ....... ............. ..................._

Technical Support(Cont'd)

Provided technicalsupport andcoordination of programinteractions with theNuclear Waste TechnicalReview Board and OnsiteRepresentative.Continued cooperativeactivities withnational organizations.Supported developmentand implementation ofprogram-wide publiceducation, informationand outreach programs.Continued support ofthe Fellowship and HBUprograms. Developedmaterials forpresentations to NRC,NWTRB, AmericanCommittee on Rad WasteDisposal (ACORD),technical societies andinternationalconferences. Managedprogram-wideparticipation intechnical conferencesand symposia;interfaced withtechnical and industrygroups to coordinateOCRWM participation inand planning ofsymposia. Managedprogram-wide scientificand technicalinformation inventoryand disseminationpolicies and proceduresand publicationsprocedures. Planned andparticipated innational and

Begin development of along-term educationstrategy. Initiate anactive educationprogram, includingteacher training andcurriculum developmentactivities. Continuesupport of Fellowshipand HBCU programs. Planand participate innationalteacher/educatorworkshops. Developmaterials forpresentations toCongress, NARUC, ACORD,technical societies andinternationalconferences. Continueto manage program-widescientific andtechnical informationinventory anddissemination policiesand publicationprocedures. Continue tomanage program-widenational exhibits.Participate ininternational exchangeof information onoutreach and educationprograms. Continue toprovide funds for theNational Conference ofState Legislatures(NCSL), and NationalCongress of AmericanIndians (NCAI) andprovide new funding forthe League of WomenVoters. Continueoutreach with newgroups. Continue to

Continue development oflong-term educationstrategy. Continuesupport for educationprograms, includingexpansion of Nevadaprograms, as well asteacher training andcurriculum developmentactivities. Continuesupport of Fellowshipand HBCU programs andinitiate junior facultysupport program. Planand participate innational andinternati onalteacher/educatorworkshops. Developmaterials forpresentations toCongress, NARUC, ACORD,technical societies andinternationalconferences. Continueto manage program-widescientific andtechnical informationinventory anddissemination policiesand publicationprocedures. Continue tomanage program-widenational exhibits.Participate ininternational exchangeof information onoutreach and educationprograms. Continue toprovide funds for theNational Conference ofState Legislatures(NCSL), and NationalCongress of AmericanIndians (NCAI), and the

Continue development oflong-term educationstrategy. Continuesupport for educationprograms, includingexpansion of Nevadaprograms and inclusionof education in the RSarea, as well asteacher training/education activities.Continue support of.Fellowship and HBCUprograms and juniorfaculty supportprogram. Plan andparticipate in nationaland internationalteacher/educatorworkshops. Developmaterials forpresentations toCongress, ARUC, ACORD,technical societies andinternationalconferences. Continueto manage program-widescientific andtechnical informationinventory anddissemination policiesand publicationprocedures. Continue tomanage program-widenational exhibitsprograms. Continue toparticipate ininternational exchangeof information onoutreach and educationprograms. Continue toprovide funds for theNational Conference ofState Legislatures(NCSL), and National

Continue development oflong-term educationstrategy. Continuesupport for educationprograms, includingexpansion of Nevadaprograms and inclusionof education in the MRSarea, as well asteacher training andcurriculum developmentactivities. Continuesupport of Fellowshipand HBCU programs andjunior faculty supportprogram. Continue toplan and participate Innational andinternationalteacher/educatorworkshops. Continue todevelop materials forpresentations toCongress, NARUC,ACCORD, technicalsocieties andinternationalconferences. Continueto manage program-widescientific andtechnical informationinventory anddissemination policiesand publicationprocedures. Continue tomanage program-widenational exhibitsprograms. Continue toparticipate ininternational exchangeof information onoutreach and educationprograms. Continue toprovide funds for theNational Conference of

I

304

( (

Page 86: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

C C Cr .

C

111. Program Management and Technical Support (Contod):

Program Activity FY 991 FY 1992 FY 1993 FY 1994 FY 1995

Technical Support(Contid)

internationalteacher/educatorworkshops. Managed aprogram-wide nationalexhibits program.Participated ininternational exchangeof information onoutreach and educationprograms. Theseactivities utilized$1,920K of prior-yearunobllgated funds.

$2,545

integratetechnical/institutionalprograms. Continue tocoordinatesocioeconomic research.Manage program-wideparticipation inInternationalHigh-level RadioactiveWaste Conference andother technicalconferences andsymposia. Continuepolicy coordination ofPETT and otherfinancial grantprograms. Interfacewith technical andworking groups tocoordinate OCRWMparticipation inplanning of symposia.Initiate Director'sforum. AdministersOCRWM-wide Headquarterssecurity program forclassified documentsand information.

League of Women Voters.Continue outreach withnew groups. Continue tointegratetechnical/institutionaLprograms. Continue tocoordinatesocioeconomic research.Continue to manageprogram-wideparticipation inInternationalHigh-level RadioactiveWaste Conference andother technicalconferences andsymposIa. Continuepolicy coordination ofPETT, including PETTappeals, and otherfinancial grantprograms. Interfacewith technical andindustry groups tocoordinate OCRWMparticipation inplanning of symposia.Continue Director'sforum. AdministersOCRWM-wde Headquarterssecurity program forclassified documentsand information.

Congress of AmericanIndians (NCAI), theLeague of Women Voters,and initiate fundingfor regional groups.Continue outreach withnew groups. Continue tomanage technical andinstitutional programs.Continue to coordinatesocioeconomic research.Continue to manageprogram-wideparticipation inInternationalHigh-level RadioactiveWaste Conference andother technicalconferences andsymposia. Continuepolicy coordination ofPETT and otherfinancial grantprograms. Interfacewith technical andindustry groups tocoordinate OCRWMparticipation inplanning of symposia.Continue Director'sforum. AdministersOCRWM-wide Headquarterssecurity program forclassified documentsand Information.

State Legislatures(NCSL), and NationalCongress of AmericanIndians (NCAI), theLeague of Women Voters,and regional groups.Continue outreach withnew groups. Continue tomanage and integratetechnical andinstitutional programs.Continue to coordinatesocioeconomic research.Continue to manageprogram-wideparticipation inInternationalHigh-level RadioactiveWaste Conference andother technicalconferences andsymposia. Continuepolicy coordination ofPETT and otherfinancial grantprograms. Interfacewith technical andindustry groups tocoordinate OCRWMparticipation inplanning of symposia.Continue Director'sforum. AdainistersOCRWM-wide Headquarterssecurity program forclassified documentsad information.

53,851

54,673

54,673

54,673

305

Page 87: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

1I. Program Management and Technical Support (Cont'd):

Program Activity... ... ............

FY 1991 FY 1992…......... -----------------------

FY 1993 FY 1994 FY 1995…............ ----------------------- -----------------------

Technical Support(Cont 'd)

Consistent withincreasing program pacefor MRS, continued toprovide programtechnical support andintegration efforts toassist OCRW inplanning and reviewingactivities associatedwith the wastemanagement/disposalsystem. Theseactivities utilizedS4,677K of prior-yearunobligated funds.

512,930

Continue to provideprogram technicalsupport and integrationefforts to assist OCRIMin planning andreviewing activitiesassociated with thewastemanagement/disposalsystem.

$15,123

Continue to provideprogram technicalsupport and integrationefforts to assist OCRW4in planning andreviewing activitiesassociated with thewastemanagement/disposalsystem.

S9,544

Continue to provideprogram technicalsupport and integrationefforts to assist OCRI4in planning andreviewing activitiesassociated with thewastemanagement/disposalsystem.

9, 544

Continue to provideprogram technicalsupport and Integrationefforts to assist OCRIMin planning andreviewing activitiesassociated with thewastemanagement/disposalsystem.

59,544

As a result of scheduledelay in LS,procurement funds wereprovided for closeoutof original contract.

S340

LSS activitiesdeferred.

LSS activitiesdeferred.

LSS activitiesdeferred.

SO

LSS activitiesdeferred.

SOSO tO

Continued fundingsupport fordevelopment, implemen-tation, management andoperation of theprogram-wideinformation ResourceManagement Program.These activitiesutilized 3,960K ofprior-year unobligatedfunds.

55,700

Continue fundingsupport fordevelopment,implementation,management, andoperation of theprogram-wideInformation ResourceManagement IRM)Program, includingbacklog processing andtechnical datamanagement.

59,512

Continue fundingsupport fordevelopment,implementation,management, andoperation of theprogram-wideInformation ResourceManagement (IRN)Program. Developscreening criteria forall program informationand backlog. Completeredesign of informationstreams to process allprogram information andrecords.

Continue funding sup-port for development,Implementation, andoperation of the pro-gram-wide IRM Program.Procure, install, andoperate equipment forinformation streamssystem that includesoptical stage jukeboxes and upgrade ofwide area and localarea networks. Continueprocessing backlog.Implement new localrecords as required.

59,881

Continue fundingsupport fordevelopment,implementation, andoperation of theprogram-wideInformation ResourceManagement (RN)Program. Continueenhancements andupgrades to informationstream equipment,telecommunications, andoperations toaccommodate processinginformation flowsthrough the OCRWMprogram.

,

(,306C3U

(

Page 88: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

C C (; I

I

111. Program Management and Technical Support Cont'd):

Program Activity FY 1991 FY 1992 FY 1993 FY 1994 FY 1995....... ............ ... --- -- -- --- -- -- -- ........ ............... . --- --- --- --- --- -- ....................... ....................... ........................... ............. ...............................

Technical Support S9881Conted) $9,881

Provided funding tosupport the centralizedoversight andmanagement of enhancedprogram-wide Aactivities. Thisactivity utilizedS,1OOOK of prior-yearunobligated funds.

$2,000

Continue to providecentralized oversightmanagement ofprogram-wide OAimplementation activi-ties.

S2,739

Continue support andimplementation of theCA program, which isrequired by the NRC forlicensing of arepository and MRS toensure that OCRWMactivities are executedin a manner whichprotects public health,safety, and theenvironment. SuccessfulOA implementationincludes assurance thatall personnel arequalified andadequately trained atthe locations where thework is performed.Continue developmentand maintenance of Adocumients. Continueinternal and externalverificationthe Aconcerns program, andthe corrective actionprogram.

S 2,739

Continue support andimplementation of theGA program, which Isrequired by the NRC forlicensing of arepository and MRS toensure that OCRWMactivities are executedin a manner whichprotects public health,safety, and theenvironnent. SuccessfulGA implementationincludes assurance thatall personnel arequalified andadequately trained atthe locations where thework is performed.Continue developmentand maintenance of GAdocuments. Increaseinternal and externalverification,consistent withincrease in technicalsupport activities.Continue the GAconcerns program andthe corrective actionprogram.

$ 2,739

Continue support andimplementation of theGA program, which isrequired by the NRC forlicensing of arepository and MRS toensure that CRWMactivities are executedin a manner whichprotects public health,safety, and theenvironnent. SuccessfulGA implementationincludes assurance thatall personnel arequalified andadequately trained atthe locations Where thework is performed.Continue developmentand mintenance of CAdocuments. Increaseinternal and externalverification,consistent withincrease in technicalsupport activities.Continue the GAconcerns program andthe corrective actionprogram.

$ 2,739

307

Page 89: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

Ill. Program Management and Technical Support (Cont'd):

Program Activity FY 1991 FY 1992 FY 1993 FY 1994 FY 1995…-- -- - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - --.- -

Technical Support(Cont'd)

Continued technical andmanagement support forcooperativemulti-nationaLactivities applicableto OCRUM. Continuedreview of foreign wastemanagement activities.Supported review andrefinement ofprogram-wide strategicand contingencyplanning, includingdevelopment of adraft Mission PlanAmendment. Supporteddevelopment of riskmanagement program.Supported interactionswith the Office of theNuclear WasteNegotiator. Providedfunds to supportNational Academy ofSciences (AS) reviews.

Continue technical andmanagement support forcooperativemulti-nationalactivities applicableto OCRUM. Continuereview of foreign wastemanagement activities.Support review andrefinement ofprogram-wide strategicand contingencyplanning, includingdevelopment of afinal Mission PlanAmendment. Supportimplementation of riskmanagement program.Support interactionswith Office of theNegotiator. Providefunds to support ASreviews.

S1 255

Continue strategic andcontingency planning tomeet ad-hocrequirements. MeetDepartmentalrequirements forstrategic planning.Oversee theinternational programsto maintain currentknowledge ofdevelopments in foreignhigh-level nuclearwaste managementprograms and todisseminate thisknowledge within theU.S. program. Providefunds to the NationalAcademy of Sciences forspecial studies atOCRWM's request.Continue supportinteractions withmulti-nationalorganizations.

Continue technical andmanagement support forcooperativemulti-nationalactivities applicableto OCRWM. Continuereview of foreign wastemanagement activities.Support review andrefinement ofprogram-wide strategicand contingencyplanning, Includingdevelopment of neededfurther revisions tothe Mission Plan.Support implementationof risk managementprogram. Provide fundsto support AS reviews.

$ 2174

Continue technical andmanagement support forcooperativemulti-nationalactivities applicableto OCRWM. Continuereview of foreign wastemanagement activities.Support review andrefinement ofprogram-wide strategicand contingencyplanning, includingdevelopment of neededfurther revisions tothe Mission Plan.Support implementationof risk managementprogram. Provide fundsto support AS reviews.

S 2,174

Contractual Servicesand Supplies

Si 350

S 27,490

Continuedadministrative supportservices, includingemployee development,printing, reproduction,office space, equipmentrental, postage,telecommunications,materials, supplies,and ADP/MIS technicalsupport. Continuedmainframe use, time-sharing data

5 35,259

Continue administrativesupport services,including employeedevelopment, printing,reproduction, officespace, equipmentrental, postage,telecommunications,materials, supplies,and ADP/MIS technicalsupport. Continueadditional mainframeuse, timesharing data

S 29,311

Continue administrativesupport services,including employeedevelopment, printing,reproduction, officespace, equipment rent-al, postage, telecom-munications, materials,supplies, and ADP/MIStechnical support.Continue additionalmainframe use, time-sharing data prepara-

S 29,311

Continue administrativesupport servicesincluding employeedevelopment, printing,reproduction, officespace, equipmentrental, postage,telecommunications,materials, supplies,and ADP/MIS technicalsupport. Continueadditional mainframeuse, timesharing data

5 29,311

Continue administrativesupport servicesincluding employeedevelopment, printing,reproduction, officespace, equipmentrental, postage,telecommunications,materials, supplies,and ADP/MIS technicalsupport. Continueadditional mainframeuse, timesharing data

S 2174

308 Ia

(

Page 90: Department of Energy 'U t. FEB12 › docs › ML0314 › ML031470138.pdf · injection permit. Following receipt of these two permits from the State of Nevada, OCRWM was able to resume

( ( CI

T,

Ill. Program Management and Technical Support (Cont'd):

Program Activity FY 1991 FY 1992-------------------- ----------------------- ~ . . . . . . . . . . . .

FY 1993 FY 1994 FY 1995.-- -- - - - - - - - - - - - - - - - - - -

Contractual Services preparation support,and Suppiles and continued upgrade(Cont'd) of workstation and MIS

software.

preparation support,and continue upgrade ofworkstation and MISsoftware.

tion support, andcontinued upgrade ofworkstation and MISsoftware.

preparation support, preparation support,and continue upgrade of and continue upgrade ofworkstation and MIS workstation and MISsoftware. software.

NOTE: In an effort tomanage administrativecosts more closely, theOCRWM Director's shareof FTE-dependent costsfor space, supplies,and telecommunicationsare included in thisbudget and will betransferred during theexecution year.

S 6,644 S 6,798 S 6, 7 S 6,7m S 6,772

Program Management 225.0 mz 258.0 FTE 258.0 FTE 258.0 FTE 258.0 FTEand Technical S 51,370 S 59,613 S 54,359 S 54,359 S 54,359Support

309