SHERATON HELIOPOLIS EXTENTION PROJECT Date: 11 -9- 2006 To: Mr: Zikar Masroua (Project Director) From : Khaled Metwaly (HSE Manager) Subject: Unsafe welding machine Dear, sir With reference to above subject, I would like to inform you that: there are at our site sup contractor DEPA co, zone (J) level (-9) using unsafe welding machine. This causing to taking place electrical shock. Please we need to resolve this problem as soon as possible to prevent any hazards inside the site. . Yours Sincerely, …………………………………… HSE Manager / Khaled Metwaly
-
Upload
mohamed-metwally -
Category
Documents
-
view
191 -
download
6
Transcript of DEPA 11-9-2006
SHERATON HELIOPOLIS EXTENTION PROJECT
Date: 11 -9- 2006
To: Mr: Zikar Masroua (Project Director)
From : Khaled Metwaly (HSE Manager)
Subject: Unsafe welding machine
Dear, sir With reference to above subject, I would like to inform you that: there are at our site sup contractor DEPA co, zone (J) level (-9) using unsafe welding machine. This causing to taking place electrical shock.
Please we need to resolve this problem as soon as possible to prevent any hazards inside the site. .
Yours Sincerely,
……………………………………
HSE Manager / Khaled Metwaly