    ESB NetworksIWEA Conference

    MARCH 2009

  • 8/13/2019 Denis O Leary IWEA Conference Final 2

    2/35

    ESB NETWORKS

    Developing 21st

    centuryElectricity networks

  • 8/13/2019 Denis O Leary IWEA Conference Final 2

    3/35

    ESBs Strategic Vision To 2020World Class Sustainable Networks

    A Renewables Business of Scale

    Best Practice Generation Portfolio

    Customer Focussed Supply BusinessSignificant International Presence

    And to be a Leader in Carbon Managementand Energy Efficiency

  • 8/13/2019 Denis O Leary IWEA Conference Final 2

    4/35

    Key Initiatives to Date

    Networks infrastructure investment

    Investment in Smart Systems

    Connection of Wind Farms

    Distributed automation switches

    Smart Metering

  • 8/13/2019 Denis O Leary IWEA Conference Final 2

    5/35

    Key Initiatives to Date

    Networks infrastructure investment

    Investment in Smart Systems

    Connection of Wind Farms

    Distributed automation switches

    Smart Metering

  • 8/13/2019 Denis O Leary IWEA Conference Final 2

    6/35

    Transmission6,300 km of Overhead Network140km of Underground Cables165 HV Stations

    1B RAB Value

    Distribution160,000 km of Lines/Cables630 HV Substations

    230,000 MV Transformers/Units2m meters

    4B RAB Value

    Transmission

    400kV 220kV 110kV 38kV MV20 kV & 10 kV

    Distribution

    LV400 & 230 V

    Network Assets

  • 8/13/2019 Denis O Leary IWEA Conference Final 2

    7/35

    Networks Infrastructure Delivery 10.5 Billion+ bns

    0

    1

    2

    3

    4

    5

    2003-2007 2008-2012 2013-2017 2018-2022

    Smart Metering

    Other

    Transmission

    Asset Replacement

    Reinforcement

    Generation Connections

    Customer Connections

  • 8/13/2019 Denis O Leary IWEA Conference Final 2

    8/35

  • 8/13/2019 Denis O Leary IWEA Conference Final 2

    9/35

  • 8/13/2019 Denis O Leary IWEA Conference Final 2

    10/35

    Smarter Networks Initiatives Already Commenced

    20kVConversion

    WindfarmCluster Design

    (Gate 2)

    IntegratedICT/SAPPlatform

    SCADA

    OMS

    NationalContactCentre

    CentralisedControl

    1000 MV

    AutomatedSwitches

    Smarter

    Networks

  • 8/13/2019 Denis O Leary IWEA Conference Final 2

    11/35

    Smart Networks Main Road Map Elements

    6,000MW of Renewables

    Energy Storage/Voltage Control

    Self-HealingNetworks

    Green Circuits/Loss Reduction

    Smart Circuits/(optimisation)

    SmartMetering

    Home AreaNetworks/Services

    DSM

    Microgeneration

    TransportElectricity

    SmarterNetworks

    Exciting Challenge

  • 8/13/2019 Denis O Leary IWEA Conference Final 2

    12/35

    Key Initiatives to Date

    Networks infrastructure investment

    Investment in Smart Systems

    Connection of Wind Farms

    Distributed automation switches

    Smart Metering

  • 8/13/2019 Denis O Leary IWEA Conference Final 2

    13/35

    Other Initiatives

  • 8/13/2019 Denis O Leary IWEA Conference Final 2

    14/35

    Distribution Automation

  • 8/13/2019 Denis O Leary IWEA Conference Final 2

    15/35

    Network Fault Performance

    100

    110

    120

    130

    140

    150

    160

    170

    180190

    2001 2002 2003 2004 2005 2006 2007 2008

    Averageminutes

    per customer

    YEAR

  • 8/13/2019 Denis O Leary IWEA Conference Final 2

    16/35

    Key Initiatives to Date

    Networks infrastructure investment

    Investment in Smart Systems

    Connection of Wind Farms

    Distributed automation switches

    Smart Metering

  • 8/13/2019 Denis O Leary IWEA Conference Final 2

    17/35

    Pre-Gate Process

    Gate 1

    Gate 2

    Gate 3

    Approved Capacity

    for Connection

    In Queue

    760MW

    370MW

    1300MW

    3940MW

    6,370MW

    4,600MW

    Gate 3 roll-out of Wind Generation

  • 8/13/2019 Denis O Leary IWEA Conference Final 2

    18/35

    Gate1: Blue

    Gate2: Red

    Gate 3: Green

  • 8/13/2019 Denis O Leary IWEA Conference Final 2

    19/35

    Wind Connections

    1005

    Connected

    1425

    InProgress

    3940

    Gate 3 ConnectedPost G3

    6370

    InQueue

    4600

    February 09

  • 8/13/2019 Denis O Leary IWEA Conference Final 2

    20/35

    Connecting Wind Generation

    MW Wind Connected To 2012

    Year

    M W

    0

    500

    1000

    1500

    2000

    2500

    3000

    2005 2006 2007 2008 2009 2010 2011 2012

  • 8/13/2019 Denis O Leary IWEA Conference Final 2

    21/35

    Key Initiatives to Date

    Networks infrastructure investment

    Investment in Smart Systems

    Connection of Wind Farms

    Distributed automation switches

    Smart Metering

  • 8/13/2019 Denis O Leary IWEA Conference Final 2

    22/35

  • 8/13/2019 Denis O Leary IWEA Conference Final 2

    23/35

    Smart Meter

  • 8/13/2019 Denis O Leary IWEA Conference Final 2

    24/35

    Advanced Metering Infrastructure

    Head End Datacollection

    Meters

    RF

    Concentrator

    GPRSCommunication

    Router

    WAN.

    GPRS

    Meter DataManagement

    System

    HAN

    HAN

    HAN

    HAN

    SAP-ISU

    Market/Suppliers

    DLCDistributionLine Carrier

  • 8/13/2019 Denis O Leary IWEA Conference Final 2

    25/35

    Electrificationof

    Road Transport(E/Vs)

  • 8/13/2019 Denis O Leary IWEA Conference Final 2

    26/35

    Government Targets for 2020

    10% of all Vehicles will be electricBattery or PHEV

    250,000 vehicles

    10% of all road transport energy will be renewable Assume 4% biofuel and 6% electric

    Implies between 2% and 10% of current GWh

    Energy Storage opportunity

  • 8/13/2019 Denis O Leary IWEA Conference Final 2

    27/35

    E-mobility Berlin

  • 8/13/2019 Denis O Leary IWEA Conference Final 2

    28/35

    Gate 3 Overview

    Transmission nodes decided first

    3940MW renewables (160 applicants)

    Offer process will start end 2009

    Grid 25 derived transmission network

    All offers issued by end Q2 2011

  • 8/13/2019 Denis O Leary IWEA Conference Final 2

    29/35

    Gate 3 Outcome

    2091

    1939

    125

    35

    Operator MWNetwork

    Connections

  • 8/13/2019 Denis O Leary IWEA Conference Final 2

    30/35

    Wind Applications in MW

    B-103MW

    A-204MW

    G-14MW

    H1159MW

    H2-118MWD-66MW

    F-44MWI-2MW

    C-13MW

    E-594MW

    Gate 2 1300 MW

  • 8/13/2019 Denis O Leary IWEA Conference Final 2

    31/35

    Wind Applications in MW

    Gate 2 1300 MWB-1071MW

    A-166MW

    G-112MW

    H1532MW

    H2-88MWD-121MW

    F-101MWI-61MW

    C-70MW

    E-689MW

    J-772 MW

    K-62 MW

    Gate 3 3940 MW

  • 8/13/2019 Denis O Leary IWEA Conference Final 2

    32/35

    Wind Applications in MW

    Gate 2 1300 MW

    Gate 3 3940 MWMay/Aug

    2009

    Oct 09 /Feb 10

    Mar/Apr 2010

    May/Jul2009 June/July

    2009

    1-19 May09

    Aug/Nov2009

    Apr/May2010

    Mar/Apr 2010

    May/Nov2009

    Customer Meeting Timelines

    Apr/May2009

    Oct/Nov2009

  • 8/13/2019 Denis O Leary IWEA Conference Final 2

    33/35

    Wind Applications in MW

    Gate 2 1300 MW

    Gate 3 3940 MW

    Customer Meeting Timelines

    13.10.10

    10.06.11

    17.06.11

    17.09.10

    29.07.1002.04.10

    23.11.1021.06.11

    15.06.11

    07.03.11

    Offers Issue

    13.04.11

    17.12.09

  • 8/13/2019 Denis O Leary IWEA Conference Final 2

    34/35

    Gate 3: Innovations

    Transparent method for 110kV node assignments

    Facilitate Developer input for group connection methods

    Holding of Connection Method Briefings pre offer

    Facilitation of cable option pre-offer

    Make available full report on LCTA method

    Facilitation of demonstration projects on emergingsolutions

    Appointment of a Customer Relations Manager

  • 8/13/2019 Denis O Leary IWEA Conference Final 2

    35/35