Page 1
A Solid Foundation
www.www. delmagdelmag .de.de
Piling is both Deep Foundation Technologies for
an Art Infrastructure and Development a Science
Page 2
Performance translates to
highest Quality and maximum Efficiency
we offer
the
Commitment Capabilities Resources
required to execute any project
Fully integrated across all
- Engineering- Procurement- Construction- Installation services
- all markets- all over the world
www.www. delmagdelmag .de.de
DELMAG is a professional engineering firm and is specialized in the field of Pile Driving Equipment.
Page 3www.www. delmagdelmag .de.de
Pile driving means: Pile and Soil are known before selecting
Driving PILES Pile driving -Pile Installation -
into a bearing SOIL layer Equipment
A Solid Foundation
Page 4www.www. delmagdelmag .de.de
Piling is both an Art and a Science
TheThe ArtArtlies in lies in selecting the most suitable selecting the most suitable typetype ofof pilepile and and methodmethod ofof installationinstallationfor the ground conditions for the ground conditions and and thethe form ofform of the loadingthe loading ..
ScienceScienceenablesenables thethe engineerengineer to to predictpredict the the behaviourbehaviour of of thethe pilespiles onceonce theythey areare in in the groundthe ground and and subjectedsubjected to to loadingloading ..
This behavior is This behavior is influenced profoundly by the method influenced profoundly by the method usedused to to install the pilesinstall the piles and and it cannot be it cannot be predicted solely from the physical predicted solely from the physical properties properties of of the pile the pile and and the the undisturbed soilundisturbed soil ..
Page 5
Jetty Jetty Port ConstructionPort Construction
DELMAG‘sDELMAG‘sare used forare used for foundation building activities for foundation building activities for container terminalscontainer terminals , , bridgesbridges , , jettyjetty and and mooringmooring postsposts ..
www.www. delmagdelmag .de.de
Designed for performance
Page 6
OffshoreOffshore Wellsite & Wellsite & FabricationFabrication YardsYards
DELMAG Diesel DELMAG Diesel PilePile Hammers Hammers are used are used for installationfor installation ofof pipe piles which support pipe piles which support fixed platformsfixed platforms on on the ocean floorthe ocean floor ..
www.www. delmagdelmag .de.de
Reliable and service-friendly design
Page 7www.www. delmagdelmag .de.de
InclinationInclination Anker Anker PilingPiling forfor container terminalscontainer terminals , , jettyjetty , , mooring postsmooring posts
DELMAG DELMAG SwingingSwinging Lead Lead Up to 60 m Up to 60 m leadlead lengthlength
Safe and Efficient
Page 8www.www. delmagdelmag .de.de
Performance translates to highest Quality and maximum Efficiency
DELMAG DELMAG Up to 48 m Up to 48 m FixedFixed Lead LengthLead LengthLead Lead for for
Pile LengthPile Length42 m42 m
Page 9www.www. delmagdelmag .de.de
is depending upon the
overall efficiency of
- Site investigation and soil sampling
- Construction design work
- Setting out and pilling work
Successful completion of any piling scheme
Page 10
Natural Oil & Gas - Offshore Foundation
Jacket installation
DELMAG Diesel DELMAG Diesel PilePile Hammers Hammers are used are used for installationfor installation ofof pipe piles which support fixed platformspipe piles which support fixed platforms onon the ocean floorthe ocean floor ..
www.www. delmagdelmag .de.de
Page 11
Natural Oil & Gas
Driving Conductors
DELMAG Diesel DELMAG Diesel PilePile Hammers Hammers are used are used to to drive the conductor pipesdrive the conductor pipes toto the desired depth into the ocean floor the desired depth into the ocean floor and and ontoonto landland based oil based oil & gas & gas sourcessources
www.www. delmagdelmag .de.de
Page 12
Renewable Energy Offshore Wind Turbines Tripods/Jackets
Wind farms on land
www.www. delmagdelmag .de.de
Safe Productivity is a Priority of EfficiencyAnd Care for the Environment
Page 13www.www. delmagdelmag .de.de
Performance translates to Application highest quality and maximum efficiency oriented Piling Units
A Winning Combination
Page 14
Soil Resistance – Pile Capacity
3. Newton3. Newton ‘‘s s ThirdThird LawLawactioactio = = reactioreactio
To To every action there is alwaysevery action there is always anan equal reactionequal reaction ..
InIn other wordsother words :: IfIf a forcea force actsacts toto change the statechange the state ofof motionmotion of aof abodybody ,, the body offersthe body offers aa resistance equalresistance equal andand directly oppositedirectly opposite totothethe force.force.
InIn other wordsother words :: IfIf aa ramram ((pistonpiston ) of) of thethe Diesel HammerDiesel Hammer actsacts totochange the statechange the state ofof motionmotion of aof a pilepile ,, the pile soil interface offersthe pile soil interface offers aadriving resistancedriving resistance (PILE CAPACITY)(PILE CAPACITY) equalequal andand directly oppositedirectly opposite totothe pistonthe piston ofof the hammerthe hammer ..
TheThe soilsoil isis represented by resistancerepresented by resistance forces actingforces acting at at the pile soilthe pile soil interfaceinterface
www.www. delmagdelmag .de.de
Page 15
3. Newton‘s Third Lawactio = reactio
If a ram (piston) of the Diesel Hammer acts to change the state of motion of a pile, the pile soil interface offers a driving resistance (PILE CAPACITY) equal and directly opposite to the piston of the hammer. If a Diesel Pile Hammer is used,a statement on the Pile capacity can be madeat any given time. A driven pile is a tested pile!
No expensiveLoad tests !
The soil is represented by resistance forces acting at the p ile soil interface
A driven Pile is a tested Pile
www.www. delmagdelmag .de.de
Page 16
DELMAG GmbH + Co.KGMax- Planck- Strasse 3 73730 Esslingen GermanyTel. + 49 711 3100 200Fax.+ 49 711 3100 254Email [email protected] Stefan Mewes
Cost and Performance Ratio The profitability of a pile driving construction site is widely determined by the set- up, pile selection and maintenance times.
Hammer Performance Why is it important?
- Constructor productivity- To install pile to design depth- Quality control tool for driven piles