DELIVERING THAMES TIDEWAYDANNY TRUPAPM Thames Valley - 26 April 2016
![Page 2: Delivering Thames Tideway, 26th April 2016](https://reader033.fdocuments.net/reader033/viewer/2022042706/5876b3701a28abad1a8b530b/html5/thumbnails/2.jpg)
2
![Page 3: Delivering Thames Tideway, 26th April 2016](https://reader033.fdocuments.net/reader033/viewer/2022042706/5876b3701a28abad1a8b530b/html5/thumbnails/3.jpg)
3
YOU POO TOO
https://www.youtube.com/watch?v=eD_kmPIPd84
![Page 4: Delivering Thames Tideway, 26th April 2016](https://reader033.fdocuments.net/reader033/viewer/2022042706/5876b3701a28abad1a8b530b/html5/thumbnails/4.jpg)
4
LONDON
![Page 5: Delivering Thames Tideway, 26th April 2016](https://reader033.fdocuments.net/reader033/viewer/2022042706/5876b3701a28abad1a8b530b/html5/thumbnails/5.jpg)
![Page 6: Delivering Thames Tideway, 26th April 2016](https://reader033.fdocuments.net/reader033/viewer/2022042706/5876b3701a28abad1a8b530b/html5/thumbnails/6.jpg)
River Thames C16th
![Page 7: Delivering Thames Tideway, 26th April 2016](https://reader033.fdocuments.net/reader033/viewer/2022042706/5876b3701a28abad1a8b530b/html5/thumbnails/7.jpg)
7
Lost ‘rivers’ of London
![Page 8: Delivering Thames Tideway, 26th April 2016](https://reader033.fdocuments.net/reader033/viewer/2022042706/5876b3701a28abad1a8b530b/html5/thumbnails/8.jpg)
8
The Great Stink
![Page 9: Delivering Thames Tideway, 26th April 2016](https://reader033.fdocuments.net/reader033/viewer/2022042706/5876b3701a28abad1a8b530b/html5/thumbnails/9.jpg)
9
Bazalgette’s interceptor sewers
![Page 10: Delivering Thames Tideway, 26th April 2016](https://reader033.fdocuments.net/reader033/viewer/2022042706/5876b3701a28abad1a8b530b/html5/thumbnails/10.jpg)
![Page 11: Delivering Thames Tideway, 26th April 2016](https://reader033.fdocuments.net/reader033/viewer/2022042706/5876b3701a28abad1a8b530b/html5/thumbnails/11.jpg)
![Page 12: Delivering Thames Tideway, 26th April 2016](https://reader033.fdocuments.net/reader033/viewer/2022042706/5876b3701a28abad1a8b530b/html5/thumbnails/12.jpg)
![Page 13: Delivering Thames Tideway, 26th April 2016](https://reader033.fdocuments.net/reader033/viewer/2022042706/5876b3701a28abad1a8b530b/html5/thumbnails/13.jpg)
13
20138 million
18602 million
19104 million
Population of London
• In 2014, 62 million cubic metres of sewage discharged to the tidal River Thames.• 50 discharges on average in a typical year
Bazalgette design capacity
![Page 14: Delivering Thames Tideway, 26th April 2016](https://reader033.fdocuments.net/reader033/viewer/2022042706/5876b3701a28abad1a8b530b/html5/thumbnails/14.jpg)
14
CSO discharge
![Page 15: Delivering Thames Tideway, 26th April 2016](https://reader033.fdocuments.net/reader033/viewer/2022042706/5876b3701a28abad1a8b530b/html5/thumbnails/15.jpg)
15
FINDING A SOLUTION
![Page 16: Delivering Thames Tideway, 26th April 2016](https://reader033.fdocuments.net/reader033/viewer/2022042706/5876b3701a28abad1a8b530b/html5/thumbnails/16.jpg)
16
London Tideway Improvements
Riverside
Long ReachMogden
Crossness
Sewage Works UpgradesLee TunnelThames Tideway Tunnel
Beckton
![Page 17: Delivering Thames Tideway, 26th April 2016](https://reader033.fdocuments.net/reader033/viewer/2022042706/5876b3701a28abad1a8b530b/html5/thumbnails/17.jpg)
17
![Page 18: Delivering Thames Tideway, 26th April 2016](https://reader033.fdocuments.net/reader033/viewer/2022042706/5876b3701a28abad1a8b530b/html5/thumbnails/18.jpg)
18
![Page 19: Delivering Thames Tideway, 26th April 2016](https://reader033.fdocuments.net/reader033/viewer/2022042706/5876b3701a28abad1a8b530b/html5/thumbnails/19.jpg)
19
Impact of improvements
4
9
GreenwichPS
WesternPS
Existing System–CSOvolumeTypical YearCSOVolume(cubic metres)
5,000,000
4,000,000
3,000,000
2,000,000
1,000,000
0
19,418,500
AbbeyMills CSOvolume(cubic metres)
Tideway CSOHammersmith PS
AbbeyMills (see inset)
![Page 20: Delivering Thames Tideway, 26th April 2016](https://reader033.fdocuments.net/reader033/viewer/2022042706/5876b3701a28abad1a8b530b/html5/thumbnails/20.jpg)
20
Impact of improvements
4
9 No spill
GreenwichPS
WesternPSHammersmith PS
LeeTunnel and STWImprovements –CSOvolumeTypical YearCSOVolume(cubic metres)
5,000,000
4,000,000
3,000,000
2,000,000
1,000,000
0
Tideway CSO
AbbeyMills CSOvolume(cubic metres)
AbbeyMills (see inset)
![Page 21: Delivering Thames Tideway, 26th April 2016](https://reader033.fdocuments.net/reader033/viewer/2022042706/5876b3701a28abad1a8b530b/html5/thumbnails/21.jpg)
21
Impact of improvements
4
9 GreenwichPS
WesternPSHammersmith PS
ThamesTideway Tunnel –CSOvolumeTypical YearCSOVolumes(cubic metres)
5,000,000
4,000,000
3,000,000
2,000,000
1,000,000
0
AbbeyMills (see inset)
Tideway CSO
No spill
AbbeyMills CSOvolume(cubic metres)
![Page 22: Delivering Thames Tideway, 26th April 2016](https://reader033.fdocuments.net/reader033/viewer/2022042706/5876b3701a28abad1a8b530b/html5/thumbnails/22.jpg)
22
SCOPE
![Page 23: Delivering Thames Tideway, 26th April 2016](https://reader033.fdocuments.net/reader033/viewer/2022042706/5876b3701a28abad1a8b530b/html5/thumbnails/23.jpg)
23
The Thames Tideway Tunnel
![Page 24: Delivering Thames Tideway, 26th April 2016](https://reader033.fdocuments.net/reader033/viewer/2022042706/5876b3701a28abad1a8b530b/html5/thumbnails/24.jpg)
24
Tunnelling through London
![Page 25: Delivering Thames Tideway, 26th April 2016](https://reader033.fdocuments.net/reader033/viewer/2022042706/5876b3701a28abad1a8b530b/html5/thumbnails/25.jpg)
25
Interfaces with existing infrastructure
Bridges: 75
![Page 26: Delivering Thames Tideway, 26th April 2016](https://reader033.fdocuments.net/reader033/viewer/2022042706/5876b3701a28abad1a8b530b/html5/thumbnails/26.jpg)
26
Victoria Embankment
![Page 27: Delivering Thames Tideway, 26th April 2016](https://reader033.fdocuments.net/reader033/viewer/2022042706/5876b3701a28abad1a8b530b/html5/thumbnails/27.jpg)
Main Tunnel
Vortex Shaft
Existing CSO
Connection
Air Treatment
Image: CSO interception
Existing seweragenetwork
New reclaimed area
![Page 28: Delivering Thames Tideway, 26th April 2016](https://reader033.fdocuments.net/reader033/viewer/2022042706/5876b3701a28abad1a8b530b/html5/thumbnails/28.jpg)
28
Engineering challenges
• Variable ground conditions
• 120 year design life
• Dissipate energy
• minimise air entrapment
• ventilation and odour treatment
![Page 29: Delivering Thames Tideway, 26th April 2016](https://reader033.fdocuments.net/reader033/viewer/2022042706/5876b3701a28abad1a8b530b/html5/thumbnails/29.jpg)
29
PLANNING AND CONSULTATION
![Page 30: Delivering Thames Tideway, 26th April 2016](https://reader033.fdocuments.net/reader033/viewer/2022042706/5876b3701a28abad1a8b530b/html5/thumbnails/30.jpg)
30
Route to Development Consent
• Over six years of project development, planning and extensive consultation
• Planning Act 2008
• Public consultation
• DCO application
![Page 31: Delivering Thames Tideway, 26th April 2016](https://reader033.fdocuments.net/reader033/viewer/2022042706/5876b3701a28abad1a8b530b/html5/thumbnails/31.jpg)
31
Consultation and Community Engagement
30Months
development
9,400Responses
during consultation
Over 200meetings attended
114 days of public
exhibitions held
![Page 32: Delivering Thames Tideway, 26th April 2016](https://reader033.fdocuments.net/reader033/viewer/2022042706/5876b3701a28abad1a8b530b/html5/thumbnails/32.jpg)
32
PROCUREMENT AND DELIVERY
![Page 33: Delivering Thames Tideway, 26th April 2016](https://reader033.fdocuments.net/reader033/viewer/2022042706/5876b3701a28abad1a8b530b/html5/thumbnails/33.jpg)
33
Delivery model
• Thames Water, Government and Ofwat
- a range of models to ensure a value for money solution
• A new regulated Infrastructure Provider (IP),
• Bazalgette Tunnel Limited (BTL),
- formed under the Flood and Water Management Act 2010
- Regulated by Ofwat
- Tendered through a competitive process
- build, manage and maintain the tunnel.
• Thames Water will operate
- £1.1bn of investment is from Thames Water,
- £3.1bn is from BTL
![Page 34: Delivering Thames Tideway, 26th April 2016](https://reader033.fdocuments.net/reader033/viewer/2022042706/5876b3701a28abad1a8b530b/html5/thumbnails/34.jpg)
34
IP at a glance
Revenue collection/ operator of Sewer Network/TWUL Works
Debt Equity Secretary of State
Ofwat
TWUL
System Integrator Contractor
Construction Contractors Project Manager
West Central East
Insurers
100% ownership
Project Licence
Government Support Package
Tideway
![Page 35: Delivering Thames Tideway, 26th April 2016](https://reader033.fdocuments.net/reader033/viewer/2022042706/5876b3701a28abad1a8b530b/html5/thumbnails/35.jpg)
35
Bazalgette Tunnel Limited (BTL)
1.7 million UK pensioners will have an indirect investment in Tideway.
![Page 36: Delivering Thames Tideway, 26th April 2016](https://reader033.fdocuments.net/reader033/viewer/2022042706/5876b3701a28abad1a8b530b/html5/thumbnails/36.jpg)
36
Main Contractors
West Central East System Integrator
![Page 37: Delivering Thames Tideway, 26th April 2016](https://reader033.fdocuments.net/reader033/viewer/2022042706/5876b3701a28abad1a8b530b/html5/thumbnails/37.jpg)
37
OUR VISION
![Page 38: Delivering Thames Tideway, 26th April 2016](https://reader033.fdocuments.net/reader033/viewer/2022042706/5876b3701a28abad1a8b530b/html5/thumbnails/38.jpg)
38
![Page 39: Delivering Thames Tideway, 26th April 2016](https://reader033.fdocuments.net/reader033/viewer/2022042706/5876b3701a28abad1a8b530b/html5/thumbnails/39.jpg)
39
More than just a sewer
Coping with population
growth
Jobs and skills Tourism Economic
Ecological SMEs Public Health
Environmental Increased river use
Health and Safety
Recreation
![Page 40: Delivering Thames Tideway, 26th April 2016](https://reader033.fdocuments.net/reader033/viewer/2022042706/5876b3701a28abad1a8b530b/html5/thumbnails/40.jpg)
40
Leaving a legacy
Environment
Health and Safety
Economy
People
Place
• Dramatic reduction in discharges from more than 50 to only 3 or 4 in a typical year
• Three Zeros commitment• Introduce leading lorry and cycling safety initiatives
• Use river transport to remove 90 per cent of spoil from Main Drive sites
• Engage local businesses and SMEs
• 4,000 direct, sustainable jobs• 1:50 apprentice and 1:100 ex-offenders
• Three acres of new foreshore • Enhance Thames Path
![Page 41: Delivering Thames Tideway, 26th April 2016](https://reader033.fdocuments.net/reader033/viewer/2022042706/5876b3701a28abad1a8b530b/html5/thumbnails/41.jpg)
41
Timetable
2016
Main works preliminary constructionbegins
2017
Tunnelling begins
2021
Tunnelling ends
2023
Project completion
2015• BTL granted
licence by Ofwat
• Main Works contracts awarded
![Page 42: Delivering Thames Tideway, 26th April 2016](https://reader033.fdocuments.net/reader033/viewer/2022042706/5876b3701a28abad1a8b530b/html5/thumbnails/42.jpg)
42
Blackfriars: Before
![Page 43: Delivering Thames Tideway, 26th April 2016](https://reader033.fdocuments.net/reader033/viewer/2022042706/5876b3701a28abad1a8b530b/html5/thumbnails/43.jpg)
43
Blackfriars: After
![Page 44: Delivering Thames Tideway, 26th April 2016](https://reader033.fdocuments.net/reader033/viewer/2022042706/5876b3701a28abad1a8b530b/html5/thumbnails/44.jpg)
44
QUESTIONS?
![Page 45: Delivering Thames Tideway, 26th April 2016](https://reader033.fdocuments.net/reader033/viewer/2022042706/5876b3701a28abad1a8b530b/html5/thumbnails/45.jpg)
This presentation was delivered at an APM event
To find out more about upcoming events please visit our website www.apm.org.uk/events