DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject ... … · WEST PALM BEACH FL 33406 6749...

86
Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A. Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net January 28, 2019 DAVID ALAN ROUSE & DAVID ALAN ROUSE TR. 1959 MEADOW CT WEST PALM BEACH FL 33406 6749 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION - Rehabilitation of the L-8 Canal from approximately 425 LF west of FL Mango Road to Lake Clarke Project No. 18-9760P.09; Job No. 036B Site Address: 1959 MEADOW CT WEST PALM BEACH FL 33406 Dear DAVID ALAN ROUSE & DAVID ALAN ROUSE TR.: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-8 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods. The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of February 4, 2019 to identify the boundaries of the District’s L-8 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed.

Transcript of DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject ... … · WEST PALM BEACH FL 33406 6749...

Page 1: DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject ... … · WEST PALM BEACH FL 33406 6749 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION - Rehabilitation

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

January 28, 2019 DAVID ALAN ROUSE & DAVID ALAN ROUSE TR. 1959 MEADOW CT WEST PALM BEACH FL 33406 6749 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY

Subject: INITIAL NOTIFICATION - Rehabilitation of the L-8 Canal from approximately 425 LF west of FL Mango Road to Lake Clarke Project No. 18-9760P.09; Job No. 036B Site Address: 1959 MEADOW CT WEST PALM BEACH FL 33406

Dear DAVID ALAN ROUSE & DAVID ALAN ROUSE TR.:

The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-8 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.

The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of February 4, 2019 to identify the boundaries of the District’s L-8 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed.

Page 2: DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject ... … · WEST PALM BEACH FL 33406 6749 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION - Rehabilitation

Project No. 18-9760P.09 January 28, 2019 Page 2 Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. For additional information regarding this canal rehabilitation project, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.

Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 3: DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject ... … · WEST PALM BEACH FL 33406 6749 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION - Rehabilitation

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

January 28, 2019 PATRICIA B. EARL & JEROME C. EARL JR. 2552 MEADOW CT WEST PALM BEACH FL 33406 6752 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY

Subject: INITIAL NOTIFICATION - Rehabilitation of the L-8 Canal from approximately 425 LF west of FL Mango Road to Lake Clarke Project No. 18-9760P.09; Job No. 036B Site Address: 2552 MEADOW CT WEST PALM BEACH FL 33407

Dear PATRICIA B. EARL & JEROME C. EARL JR.:

The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-8 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.

The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of February 4, 2019 to identify the boundaries of the District’s L-8 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed.

Page 4: DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject ... … · WEST PALM BEACH FL 33406 6749 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION - Rehabilitation

Project No. 18-9760P.09 January 28, 2019 Page 2 Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. For additional information regarding this canal rehabilitation project, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.

Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 5: DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject ... … · WEST PALM BEACH FL 33406 6749 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION - Rehabilitation

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

January 28, 2019 TANIA M. & MARCIAL V. SOLIS 2534 MEADOW CT WEST PALM BEACH FL 33406 6752 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY

Subject: INITIAL NOTIFICATION - Rehabilitation of the L-8 Canal from approximately 425 LF west of FL Mango Road to Lake Clarke Project No. 18-9760P.09; Job No. 036B Site Address: 2534 MEADOW CT WEST PALM BEACH FL 33408

Dear TANIA M. & MARCIAL V. SOLIS:

The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-8 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.

The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of February 4, 2019 to identify the boundaries of the District’s L-8 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed.

Page 6: DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject ... … · WEST PALM BEACH FL 33406 6749 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION - Rehabilitation

Project No. 18-9760P.09 January 28, 2019 Page 2 Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. For additional information regarding this canal rehabilitation project, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.

Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 7: DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject ... … · WEST PALM BEACH FL 33406 6749 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION - Rehabilitation

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

January 28, 2019 GUY J. WHITE 2516 MEADOW CT WEST PALM BEACH FL 33406 6752 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY

Subject: INITIAL NOTIFICATION - Rehabilitation of the L-8 Canal from approximately 425 LF west of FL Mango Road to Lake Clarke Project No. 18-9760P.09; Job No. 036B Site Address: 2516 MEADOW CT WEST PALM BEACH FL 33409

Dear GUY J. WHITE :

The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-8 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.

The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of February 4, 2019 to identify the boundaries of the District’s L-8 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed.

Page 8: DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject ... … · WEST PALM BEACH FL 33406 6749 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION - Rehabilitation

Project No. 18-9760P.09 January 28, 2019 Page 2 Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. For additional information regarding this canal rehabilitation project, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.

Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 9: DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject ... … · WEST PALM BEACH FL 33406 6749 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION - Rehabilitation

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

January 28, 2019 RAYMOND W. & DANA S. PIESCIK 1921 GREGORY RD WEST PALM BEACH FL 33406 6740 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY

Subject: INITIAL NOTIFICATION - Rehabilitation of the L-8 Canal from approximately 425 LF west of FL Mango Road to Lake Clarke Project No. 18-9760P.09; Job No. 036B Site Address: 1921 GREGORY RD WEST PALM BEACH FL 33406

Dear RAYMOND W. & DANA S. PIESCIK:

The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-8 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.

The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of February 4, 2019 to identify the boundaries of the District’s L-8 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed.

Page 10: DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject ... … · WEST PALM BEACH FL 33406 6749 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION - Rehabilitation

Project No. 18-9760P.09 January 28, 2019 Page 2 Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. For additional information regarding this canal rehabilitation project, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.

Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 11: DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject ... … · WEST PALM BEACH FL 33406 6749 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION - Rehabilitation

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

January 28, 2019 SARAH G. HOGUE 1917 GREGORY RD WEST PALM BEACH FL 33406 6740 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY

Subject: INITIAL NOTIFICATION - Rehabilitation of the L-8 Canal from approximately 425 LF west of FL Mango Road to Lake Clarke Project No. 18-9760P.09; Job No. 036B Site Address: 1917 GREGORY RD WEST PALM BEACH FL 33406

Dear SARAH G. HOGUE :

The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-8 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.

The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of February 4, 2019 to identify the boundaries of the District’s L-8 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed.

Page 12: DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject ... … · WEST PALM BEACH FL 33406 6749 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION - Rehabilitation

Project No. 18-9760P.09 January 28, 2019 Page 2 Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. For additional information regarding this canal rehabilitation project, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.

Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 13: DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject ... … · WEST PALM BEACH FL 33406 6749 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION - Rehabilitation

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

January 28, 2019 PAUL & RENEE LEVINE 1909 GREGORY RD WEST PALM BEACH FL 33406 6740 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY

Subject: INITIAL NOTIFICATION - Rehabilitation of the L-8 Canal from approximately 425 LF west of FL Mango Road to Lake Clarke Project No. 18-9760P.09; Job No. 036B Site Address: 1909 GREGORY RD WEST PALM BEACH FL 33406

Dear PAUL & RENEE LEVINE:

The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-8 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.

The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of February 4, 2019 to identify the boundaries of the District’s L-8 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed.

Page 14: DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject ... … · WEST PALM BEACH FL 33406 6749 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION - Rehabilitation

Project No. 18-9760P.09 January 28, 2019 Page 2 Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. For additional information regarding this canal rehabilitation project, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.

Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 15: DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject ... … · WEST PALM BEACH FL 33406 6749 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION - Rehabilitation

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

January 28, 2019 WATERWAY MARINE ELECTRONICS INC 1404 19TH AVE N LAKE WORTH FL 33460 6066 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY

Subject: INITIAL NOTIFICATION - Rehabilitation of the L-8 Canal from approximately 425 LF west of FL Mango Road to Lake Clarke Project No. 18-9760P.09; Job No. 036B Site Address: 1901 GREGORY RD WEST PALM BEACH FL 33406

Dear WATERWAY MARINE ELECTRONICS INC :

The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-8 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.

The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of February 4, 2019 to identify the boundaries of the District’s L-8 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed.

Page 16: DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject ... … · WEST PALM BEACH FL 33406 6749 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION - Rehabilitation

Project No. 18-9760P.09 January 28, 2019 Page 2 Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. For additional information regarding this canal rehabilitation project, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.

Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 17: DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject ... … · WEST PALM BEACH FL 33406 6749 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION - Rehabilitation

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

January 28, 2019 JENNIFER & KYLE CAPPEL 1831 GREGORY RD WEST PALM BEACH FL 33406 6739 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY

Subject: INITIAL NOTIFICATION - Rehabilitation of the L-8 Canal from approximately 425 LF west of FL Mango Road to Lake Clarke Project No. 18-9760P.09; Job No. 036B Site Address: 1831 GREGORY RD WEST PALM BEACH FL 33406

Dear JENNIFER & KYLE CAPPEL:

The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-8 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.

The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of February 4, 2019 to identify the boundaries of the District’s L-8 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed.

Page 18: DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject ... … · WEST PALM BEACH FL 33406 6749 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION - Rehabilitation

Project No. 18-9760P.09 January 28, 2019 Page 2 Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. For additional information regarding this canal rehabilitation project, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.

Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 19: DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject ... … · WEST PALM BEACH FL 33406 6749 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION - Rehabilitation

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

January 28, 2019 PAMELA A. MARA 1825 GREGORY RD WEST PALM BEACH FL 33406 6739 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY

Subject: INITIAL NOTIFICATION - Rehabilitation of the L-8 Canal from approximately 425 LF west of FL Mango Road to Lake Clarke Project No. 18-9760P.09; Job No. 036B Site Address: 1825 GREGORY RD WEST PALM BEACH FL 33406

Dear PAMELA A. MARA :

The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-8 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.

The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of February 4, 2019 to identify the boundaries of the District’s L-8 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed.

Page 20: DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject ... … · WEST PALM BEACH FL 33406 6749 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION - Rehabilitation

Project No. 18-9760P.09 January 28, 2019 Page 2 Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. For additional information regarding this canal rehabilitation project, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.

Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 21: DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject ... … · WEST PALM BEACH FL 33406 6749 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION - Rehabilitation

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

January 28, 2019 MARGARET A. LEEDER 7312 CLARKE RD WEST PALM BEACH FL 33406 6710 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY

Subject: INITIAL NOTIFICATION - Rehabilitation of the L-8 Canal from approximately 425 LF west of FL Mango Road to Lake Clarke Project No. 18-9760P.09; Job No. 036B Site Address: 1821 GREGORY RD WEST PALM BEACH FL 33406

Dear MARGARET A. LEEDER :

The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-8 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.

The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of February 4, 2019 to identify the boundaries of the District’s L-8 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed.

Page 22: DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject ... … · WEST PALM BEACH FL 33406 6749 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION - Rehabilitation

Project No. 18-9760P.09 January 28, 2019 Page 2 Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. For additional information regarding this canal rehabilitation project, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.

Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 23: DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject ... … · WEST PALM BEACH FL 33406 6749 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION - Rehabilitation

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

January 28, 2019 EDELISA V. CASTRO & MIROSLAVA FERNANDEZ 1815 GREGORY RD WEST PALM BEACH FL 33406 6739 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY

Subject: INITIAL NOTIFICATION - Rehabilitation of the L-8 Canal from approximately 425 LF west of FL Mango Road to Lake Clarke Project No. 18-9760P.09; Job No. 036B Site Address: 1815 GREGORY RD WEST PALM BEACH FL 33406

Dear EDELISA V. CASTRO & MIROSLAVA FERNANDEZ:

The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-8 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.

The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of February 4, 2019 to identify the boundaries of the District’s L-8 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed.

Page 24: DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject ... … · WEST PALM BEACH FL 33406 6749 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION - Rehabilitation

Project No. 18-9760P.09 January 28, 2019 Page 2 Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. For additional information regarding this canal rehabilitation project, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.

Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 25: DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject ... … · WEST PALM BEACH FL 33406 6749 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION - Rehabilitation

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

January 28, 2019 LIISA YLIPELKONEN & LIISA YLIPELKONEN TR. 1811 GREGORY RD WEST PALM BEACH FL 33406 6739 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY

Subject: INITIAL NOTIFICATION - Rehabilitation of the L-8 Canal from approximately 425 LF west of FL Mango Road to Lake Clarke Project No. 18-9760P.09; Job No. 036B Site Address: 1811 GREGORY RD WEST PALM BEACH FL 33406

Dear LIISA YLIPELKONEN & LIISA YLIPELKONEN TR.:

The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-8 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.

The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of February 4, 2019 to identify the boundaries of the District’s L-8 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed.

Page 26: DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject ... … · WEST PALM BEACH FL 33406 6749 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION - Rehabilitation

Project No. 18-9760P.09 January 28, 2019 Page 2 Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. For additional information regarding this canal rehabilitation project, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.

Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 27: DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject ... … · WEST PALM BEACH FL 33406 6749 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION - Rehabilitation

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

January 28, 2019 HECTOR R. & CLARIBEL SARDINA 1807 GREGORY RD WEST PALM BEACH FL 33406 6739 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY

Subject: INITIAL NOTIFICATION - Rehabilitation of the L-8 Canal from approximately 425 LF west of FL Mango Road to Lake Clarke Project No. 18-9760P.09; Job No. 036B Site Address: 1807 GREGORY RD WEST PALM BEACH FL 33406

Dear HECTOR R. & CLARIBEL SARDINA:

The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-8 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.

The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of February 4, 2019 to identify the boundaries of the District’s L-8 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed.

Page 28: DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject ... … · WEST PALM BEACH FL 33406 6749 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION - Rehabilitation

Project No. 18-9760P.09 January 28, 2019 Page 2 Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. For additional information regarding this canal rehabilitation project, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.

Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 29: DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject ... … · WEST PALM BEACH FL 33406 6749 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION - Rehabilitation

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

January 28, 2019 NICAMATIRA LLC 5000 N OCEAN BLVD STE L14 BOYNTON BEACH FL 33435 7341 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY

Subject: INITIAL NOTIFICATION - Rehabilitation of the L-8 Canal from approximately 425 LF west of FL Mango Road to Lake Clarke Project No. 18-9760P.09; Job No. 036B Site Address: 1801 GREGORY RD WEST PALM BEACH FL 33408

Dear NICAMATIRA LLC :

The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-8 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.

The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of February 4, 2019 to identify the boundaries of the District’s L-8 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed.

Page 30: DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject ... … · WEST PALM BEACH FL 33406 6749 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION - Rehabilitation

Project No. 18-9760P.09 January 28, 2019 Page 2 Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. For additional information regarding this canal rehabilitation project, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.

Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 31: DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject ... … · WEST PALM BEACH FL 33406 6749 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION - Rehabilitation

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

January 28, 2019 ANTHONY SALVATORE ZEITLIN 1711 GREGORY RD WEST PALM BEACH FL 33406 6738 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY

Subject: INITIAL NOTIFICATION - Rehabilitation of the L-8 Canal from approximately 425 LF west of FL Mango Road to Lake Clarke Project No. 18-9760P.09; Job No. 036B Site Address: 1711 GREGORY RD WEST PALM BEACH FL 33406

Dear ANTHONY SALVATORE ZEITLIN :

The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-8 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.

The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of February 4, 2019 to identify the boundaries of the District’s L-8 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed.

Page 32: DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject ... … · WEST PALM BEACH FL 33406 6749 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION - Rehabilitation

Project No. 18-9760P.09 January 28, 2019 Page 2 Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. For additional information regarding this canal rehabilitation project, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.

Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 33: DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject ... … · WEST PALM BEACH FL 33406 6749 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION - Rehabilitation

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

January 28, 2019 STELLA T. DAMON DEC OF TRUST & STELLA T. DAMON TRUSTEE 7423 CLARKE RD WEST PALM BEACH FL 33406 6711 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY

Subject: INITIAL NOTIFICATION - Rehabilitation of the L-8 Canal from approximately 425 LF west of FL Mango Road to Lake Clarke Project No. 18-9760P.09; Job No. 036B Site Address: GREGORY RD WEST PALM BEACH FL 33407

Dear STELLA T. DAMON DEC OF TRUST & STELLA T. DAMON TRUSTEE:

The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-8 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.

The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of February 4, 2019 to identify the boundaries of the District’s L-8 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed.

Page 34: DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject ... … · WEST PALM BEACH FL 33406 6749 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION - Rehabilitation

Project No. 18-9760P.09 January 28, 2019 Page 2 Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. For additional information regarding this canal rehabilitation project, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.

Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 35: DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject ... … · WEST PALM BEACH FL 33406 6749 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION - Rehabilitation

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

January 28, 2019 STELLA T. DAMON & STELLA T. DAMON TR. 7423 CLARKE RD WEST PALM BEACH FL 33406 6711 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY

Subject: INITIAL NOTIFICATION - Rehabilitation of the L-8 Canal from approximately 425 LF west of FL Mango Road to Lake Clarke Project No. 18-9760P.09; Job No. 036B Site Address: 7423 CLARKE RD WEST PALM BEACH FL 33406

Dear STELLA T. DAMON & STELLA T. DAMON TR.:

The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-8 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.

The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of February 4, 2019 to identify the boundaries of the District’s L-8 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed.

Page 36: DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject ... … · WEST PALM BEACH FL 33406 6749 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION - Rehabilitation

Project No. 18-9760P.09 January 28, 2019 Page 2 Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. For additional information regarding this canal rehabilitation project, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.

Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 37: DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject ... … · WEST PALM BEACH FL 33406 6749 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION - Rehabilitation

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

January 28, 2019 JOANNA HOLLIS & JOANNA HOLLIS TR. 7424 CLARKE RD LAKE CLARKE SHORES FL 33406 6712 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY

Subject: INITIAL NOTIFICATION - Rehabilitation of the L-8 Canal from approximately 425 LF west of FL Mango Road to Lake Clarke Project No. 18-9760P.09; Job No. 036B Site Address: 7424 CLARKE RD LAKE CLARKE SHORES FL 33406

Dear JOANNA HOLLIS & JOANNA HOLLIS TR.:

The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-8 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.

The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of February 4, 2019 to identify the boundaries of the District’s L-8 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed.

Page 38: DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject ... … · WEST PALM BEACH FL 33406 6749 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION - Rehabilitation

Project No. 18-9760P.09 January 28, 2019 Page 2 Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. For additional information regarding this canal rehabilitation project, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.

Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 39: DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject ... … · WEST PALM BEACH FL 33406 6749 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION - Rehabilitation

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

January 28, 2019 JUAN GUILLERMO GOMEZ BAAS & BRIAN DORRIAN 7421 W LAKE DR LAKE CLARKE SHORES FL 33406 6723 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY

Subject: INITIAL NOTIFICATION - Rehabilitation of the L-8 Canal from approximately 425 LF west of FL Mango Road to Lake Clarke Project No. 18-9760P.09; Job No. 036B Site Address: 7421 W LAKE DR LAKE CLARKE SHORES FL 33406

Dear JUAN GUILLERMO GOMEZ BAAS & BRIAN DORRIAN:

The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-8 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.

The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of February 4, 2019 to identify the boundaries of the District’s L-8 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed.

Page 40: DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject ... … · WEST PALM BEACH FL 33406 6749 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION - Rehabilitation

Project No. 18-9760P.09 January 28, 2019 Page 2 Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. For additional information regarding this canal rehabilitation project, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.

Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 41: DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject ... … · WEST PALM BEACH FL 33406 6749 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION - Rehabilitation

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

January 28, 2019 TOBY S. WELCH & TOBY S. WELCH TRUST 7420 W LAKE DR WEST PALM BEACH FL 33406 6724 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY

Subject: INITIAL NOTIFICATION - Rehabilitation of the L-8 Canal from approximately 425 LF west of FL Mango Road to Lake Clarke Project No. 18-9760P.09; Job No. 036B Site Address: 7420 W LAKE DR WEST PALM BEACH FL 33406

Dear TOBY S. WELCH & TOBY S. WELCH TRUST:

The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-8 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.

The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of February 4, 2019 to identify the boundaries of the District’s L-8 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed.

Page 42: DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject ... … · WEST PALM BEACH FL 33406 6749 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION - Rehabilitation

Project No. 18-9760P.09 January 28, 2019 Page 2 Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. For additional information regarding this canal rehabilitation project, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.

Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 43: DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject ... … · WEST PALM BEACH FL 33406 6749 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION - Rehabilitation

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

January 28, 2019 ANGEL RIVERA 2579 EXUMA RD WEST PALM BCH FL 33406 7701 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY

Subject: INITIAL NOTIFICATION - Rehabilitation of the L-8 Canal from approximately 425 LF west of FL Mango Road to Lake Clarke Project No. 18-9760P.09; Job No. 036B Site Address: 2579 EXUMA RD WEST PALM BEACH FL 33406

Dear ANGEL RIVERA :

The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-8 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.

The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of February 4, 2019 to identify the boundaries of the District’s L-8 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed.

Page 44: DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject ... … · WEST PALM BEACH FL 33406 6749 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION - Rehabilitation

Project No. 18-9760P.09 January 28, 2019 Page 2 Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. For additional information regarding this canal rehabilitation project, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.

Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 45: DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject ... … · WEST PALM BEACH FL 33406 6749 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION - Rehabilitation

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

January 28, 2019 SERGIO L. & ONDINA NEGRIN 2563 EXUMA RD WEST PALM BEACH FL 33406 7701 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY

Subject: INITIAL NOTIFICATION - Rehabilitation of the L-8 Canal from approximately 425 LF west of FL Mango Road to Lake Clarke Project No. 18-9760P.09; Job No. 036B Site Address: 2563 EXUMA RD WEST PALM BEACH FL 33406

Dear SERGIO L. & ONDINA NEGRIN:

The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-8 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.

The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of February 4, 2019 to identify the boundaries of the District’s L-8 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed.

Page 46: DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject ... … · WEST PALM BEACH FL 33406 6749 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION - Rehabilitation

Project No. 18-9760P.09 January 28, 2019 Page 2 Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. For additional information regarding this canal rehabilitation project, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.

Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 47: DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject ... … · WEST PALM BEACH FL 33406 6749 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION - Rehabilitation

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

January 28, 2019 KEVIN M. & KAREN S. VARNEY 2545 EXUMA RD WEST PALM BEACH FL 33406 7701 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY

Subject: INITIAL NOTIFICATION - Rehabilitation of the L-8 Canal from approximately 425 LF west of FL Mango Road to Lake Clarke Project No. 18-9760P.09; Job No. 036B Site Address: 2545 EXUMA RD WEST PALM BEACH FL 33406

Dear KEVIN M. & KAREN S. VARNEY:

The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-8 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.

The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of February 4, 2019 to identify the boundaries of the District’s L-8 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed.

Page 48: DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject ... … · WEST PALM BEACH FL 33406 6749 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION - Rehabilitation

Project No. 18-9760P.09 January 28, 2019 Page 2 Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. For additional information regarding this canal rehabilitation project, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.

Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 49: DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject ... … · WEST PALM BEACH FL 33406 6749 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION - Rehabilitation

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

January 28, 2019 JAY H. HAUN & SHELLI JO HAUN BEERS 2531 EXUMA RD WEST PALM BEACH FL 33406 7701 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY

Subject: INITIAL NOTIFICATION - Rehabilitation of the L-8 Canal from approximately 425 LF west of FL Mango Road to Lake Clarke Project No. 18-9760P.09; Job No. 036B Site Address: 2531 EXUMA RD WEST PALM BEACH FL 33406

Dear JAY H. HAUN & SHELLI JO HAUN BEERS:

The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-8 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.

The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of February 4, 2019 to identify the boundaries of the District’s L-8 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed.

Page 50: DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject ... … · WEST PALM BEACH FL 33406 6749 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION - Rehabilitation

Project No. 18-9760P.09 January 28, 2019 Page 2 Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. For additional information regarding this canal rehabilitation project, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.

Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 51: DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject ... … · WEST PALM BEACH FL 33406 6749 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION - Rehabilitation

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

January 28, 2019 CONNOR L. WEISER 2515 EXUMA RD WEST PALM BEACH FL 33406 7701 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY

Subject: INITIAL NOTIFICATION - Rehabilitation of the L-8 Canal from approximately 425 LF west of FL Mango Road to Lake Clarke Project No. 18-9760P.09; Job No. 036B Site Address: 2515 EXUMA RD WEST PALM BEACH FL 33406

Dear CONNOR L. WEISER :

The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-8 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.

The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of February 4, 2019 to identify the boundaries of the District’s L-8 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed.

Page 52: DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject ... … · WEST PALM BEACH FL 33406 6749 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION - Rehabilitation

Project No. 18-9760P.09 January 28, 2019 Page 2 Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. For additional information regarding this canal rehabilitation project, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.

Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 53: DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject ... … · WEST PALM BEACH FL 33406 6749 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION - Rehabilitation

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

January 28, 2019 J. H. MCCAMPBELL JR. & CAROLYN LANDON 7561 NEMEC DR N WEST PALM BEACH FL 33406 8765 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY

Subject: INITIAL NOTIFICATION - Rehabilitation of the L-8 Canal from approximately 425 LF west of FL Mango Road to Lake Clarke Project No. 18-9760P.09; Job No. 036B Site Address: 7561 NEMEC DR N WEST PALM BEACH FL 33406

Dear J. H. MCCAMPBELL JR. & CAROLYN LANDON:

The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-8 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.

The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of February 4, 2019 to identify the boundaries of the District’s L-8 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed.

Page 54: DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject ... … · WEST PALM BEACH FL 33406 6749 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION - Rehabilitation

Project No. 18-9760P.09 January 28, 2019 Page 2 Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. For additional information regarding this canal rehabilitation project, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.

Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 55: DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject ... … · WEST PALM BEACH FL 33406 6749 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION - Rehabilitation

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

January 28, 2019 RONALD A. HAYNES & DENISHA T. CARTY 7557 NEMEC DR N WEST PALM BEACH FL 33406 8765 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY

Subject: INITIAL NOTIFICATION - Rehabilitation of the L-8 Canal from approximately 425 LF west of FL Mango Road to Lake Clarke Project No. 18-9760P.09; Job No. 036B Site Address: 7557 NEMEC DR N WEST PALM BEACH FL 33406

Dear RONALD A. HAYNES & DENISHA T. CARTY:

The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-8 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.

The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of February 4, 2019 to identify the boundaries of the District’s L-8 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed.

Page 56: DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject ... … · WEST PALM BEACH FL 33406 6749 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION - Rehabilitation

Project No. 18-9760P.09 January 28, 2019 Page 2 Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. For additional information regarding this canal rehabilitation project, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.

Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 57: DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject ... … · WEST PALM BEACH FL 33406 6749 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION - Rehabilitation

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

January 28, 2019 PABLO E. & GRACIELA R. ESTUPINAN 7553 NEMEC DR N WEST PALM BEACH FL 33406 8765 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY

Subject: INITIAL NOTIFICATION - Rehabilitation of the L-8 Canal from approximately 425 LF west of FL Mango Road to Lake Clarke Project No. 18-9760P.09; Job No. 036B Site Address: 7553 NEMEC DR N WEST PALM BEACH FL 33406

Dear PABLO E. & GRACIELA R. ESTUPINAN:

The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-8 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.

The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of February 4, 2019 to identify the boundaries of the District’s L-8 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed.

Page 58: DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject ... … · WEST PALM BEACH FL 33406 6749 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION - Rehabilitation

Project No. 18-9760P.09 January 28, 2019 Page 2 Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. For additional information regarding this canal rehabilitation project, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.

Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 59: DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject ... … · WEST PALM BEACH FL 33406 6749 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION - Rehabilitation

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

January 28, 2019 ANTONIO GERENA 7549 NEMEC DR N WEST PALM BEACH FL 33406 8765 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY

Subject: INITIAL NOTIFICATION - Rehabilitation of the L-8 Canal from approximately 425 LF west of FL Mango Road to Lake Clarke Project No. 18-9760P.09; Job No. 036B Site Address: * * CONFIDENTIAL RECORD * * WEST PALM BEACH FL 33406

Dear ANTONIO GERENA :

The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-8 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.

The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of February 4, 2019 to identify the boundaries of the District’s L-8 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed.

Page 60: DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject ... … · WEST PALM BEACH FL 33406 6749 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION - Rehabilitation

Project No. 18-9760P.09 January 28, 2019 Page 2 Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. For additional information regarding this canal rehabilitation project, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.

Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 61: DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject ... … · WEST PALM BEACH FL 33406 6749 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION - Rehabilitation

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

January 28, 2019 VINCENT DAVIS & DAWN N. DUIMSTRA & 7545 NEMEC DR N WEST PALM BEACH FL 33406 8765 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY

Subject: INITIAL NOTIFICATION - Rehabilitation of the L-8 Canal from approximately 425 LF west of FL Mango Road to Lake Clarke Project No. 18-9760P.09; Job No. 036B Site Address: 7545 NEMEC DR N WEST PALM BEACH FL 33406

Dear VINCENT DAVIS & DAWN N. DUIMSTRA &:

The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-8 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.

The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of February 4, 2019 to identify the boundaries of the District’s L-8 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed.

Page 62: DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject ... … · WEST PALM BEACH FL 33406 6749 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION - Rehabilitation

Project No. 18-9760P.09 January 28, 2019 Page 2 Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. For additional information regarding this canal rehabilitation project, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.

Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 63: DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject ... … · WEST PALM BEACH FL 33406 6749 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION - Rehabilitation

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

January 28, 2019 WILLIAM L. & SATU H. BARISH 7541 NEMEC DR N WEST PALM BEACH FL 33406 8765 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY

Subject: INITIAL NOTIFICATION - Rehabilitation of the L-8 Canal from approximately 425 LF west of FL Mango Road to Lake Clarke Project No. 18-9760P.09; Job No. 036B Site Address: 7541 NEMEC DR N WEST PALM BEACH FL 33406

Dear WILLIAM L. & SATU H. BARISH:

The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-8 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.

The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of February 4, 2019 to identify the boundaries of the District’s L-8 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed.

Page 64: DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject ... … · WEST PALM BEACH FL 33406 6749 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION - Rehabilitation

Project No. 18-9760P.09 January 28, 2019 Page 2 Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. For additional information regarding this canal rehabilitation project, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.

Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 65: DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject ... … · WEST PALM BEACH FL 33406 6749 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION - Rehabilitation

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

January 28, 2019 GARY E. & LORI E. KING 7537 NEMEC DR N WEST PALM BEACH FL 33406 8765 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY

Subject: INITIAL NOTIFICATION - Rehabilitation of the L-8 Canal from approximately 425 LF west of FL Mango Road to Lake Clarke Project No. 18-9760P.09; Job No. 036B Site Address: 7537 NEMEC DR N WEST PALM BEACH FL 33406

Dear GARY E. & LORI E. KING:

The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-8 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.

The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of February 4, 2019 to identify the boundaries of the District’s L-8 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed.

Page 66: DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject ... … · WEST PALM BEACH FL 33406 6749 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION - Rehabilitation

Project No. 18-9760P.09 January 28, 2019 Page 2 Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. For additional information regarding this canal rehabilitation project, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.

Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 67: DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject ... … · WEST PALM BEACH FL 33406 6749 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION - Rehabilitation

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

January 28, 2019 JEREMY MARTORELLA 8763 159TH CT N PALM BEACH GARDENS FL 33418 1812 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY

Subject: INITIAL NOTIFICATION - Rehabilitation of the L-8 Canal from approximately 425 LF west of FL Mango Road to Lake Clarke Project No. 18-9760P.09; Job No. 036B Site Address: 1813 ARLINGTON DR WEST PALM BEACH FL 33406

Dear JEREMY MARTORELLA :

The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-8 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.

The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of February 4, 2019 to identify the boundaries of the District’s L-8 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed.

Page 68: DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject ... … · WEST PALM BEACH FL 33406 6749 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION - Rehabilitation

Project No. 18-9760P.09 January 28, 2019 Page 2 Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. For additional information regarding this canal rehabilitation project, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.

Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 69: DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject ... … · WEST PALM BEACH FL 33406 6749 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION - Rehabilitation

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

January 28, 2019 MADELAINE MARTORELLA 1809 ARLINGTON DR LAKE CLARKE SHORES FL 33406 8705 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY

Subject: INITIAL NOTIFICATION - Rehabilitation of the L-8 Canal from approximately 425 LF west of FL Mango Road to Lake Clarke Project No. 18-9760P.09; Job No. 036B Site Address: 1809 ARLINGTON DR WEST PALM BEACH FL 33406

Dear MADELAINE MARTORELLA :

The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-8 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.

The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of February 4, 2019 to identify the boundaries of the District’s L-8 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed.

Page 70: DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject ... … · WEST PALM BEACH FL 33406 6749 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION - Rehabilitation

Project No. 18-9760P.09 January 28, 2019 Page 2 Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. For additional information regarding this canal rehabilitation project, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.

Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 71: DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject ... … · WEST PALM BEACH FL 33406 6749 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION - Rehabilitation

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

January 28, 2019 GUILLERMO & MIRIAM M. CHAVEZ 1803 ARLINGTON DR WEST PALM BEACH FL 33406 8705 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY

Subject: INITIAL NOTIFICATION - Rehabilitation of the L-8 Canal from approximately 425 LF west of FL Mango Road to Lake Clarke Project No. 18-9760P.09; Job No. 036B Site Address: 1803 ARLINGTON DR WEST PALM BEACH FL 33406

Dear GUILLERMO & MIRIAM M. CHAVEZ:

The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-8 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.

The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of February 4, 2019 to identify the boundaries of the District’s L-8 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed.

Page 72: DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject ... … · WEST PALM BEACH FL 33406 6749 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION - Rehabilitation

Project No. 18-9760P.09 January 28, 2019 Page 2 Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. For additional information regarding this canal rehabilitation project, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.

Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 73: DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject ... … · WEST PALM BEACH FL 33406 6749 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION - Rehabilitation

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

January 28, 2019 DANIEL ANDREW HANLEY JR. & JIN LEE HANLEY 1715 ARLINGTON DR LAKE CLARKE SHORES FL 33406 8703 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY

Subject: INITIAL NOTIFICATION - Rehabilitation of the L-8 Canal from approximately 425 LF west of FL Mango Road to Lake Clarke Project No. 18-9760P.09; Job No. 036B Site Address: 1715 ARLINGTON DR WEST PALM BEACH FL 33406

Dear DANIEL ANDREW HANLEY JR. & JIN LEE HANLEY:

The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-8 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.

The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of February 4, 2019 to identify the boundaries of the District’s L-8 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed.

Page 74: DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject ... … · WEST PALM BEACH FL 33406 6749 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION - Rehabilitation

Project No. 18-9760P.09 January 28, 2019 Page 2 Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. For additional information regarding this canal rehabilitation project, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.

Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 75: DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject ... … · WEST PALM BEACH FL 33406 6749 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION - Rehabilitation

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

January 28, 2019 J. R. & JOSEPHINE M. BAZINET 1709 ARLINGTON DR WEST PALM BEACH FL 33406 8703 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY

Subject: INITIAL NOTIFICATION - Rehabilitation of the L-8 Canal from approximately 425 LF west of FL Mango Road to Lake Clarke Project No. 18-9760P.09; Job No. 036B Site Address: 1709 ARLINGTON DR WEST PALM BEACH FL 33406

Dear J. R. & JOSEPHINE M. BAZINET:

The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-8 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.

The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of February 4, 2019 to identify the boundaries of the District’s L-8 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed.

Page 76: DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject ... … · WEST PALM BEACH FL 33406 6749 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION - Rehabilitation

Project No. 18-9760P.09 January 28, 2019 Page 2 Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. For additional information regarding this canal rehabilitation project, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.

Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 77: DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject ... … · WEST PALM BEACH FL 33406 6749 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION - Rehabilitation

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

January 28, 2019 ANDREW LASSISE 1703 ARLINGTON DR WEST PALM BEACH FL 33406 8703 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY

Subject: INITIAL NOTIFICATION - Rehabilitation of the L-8 Canal from approximately 425 LF west of FL Mango Road to Lake Clarke Project No. 18-9760P.09; Job No. 036B Site Address: 1703 ARLINGTON DR WEST PALM BEACH FL 33406

Dear ANDREW LASSISE :

The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-8 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.

The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of February 4, 2019 to identify the boundaries of the District’s L-8 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed.

Page 78: DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject ... … · WEST PALM BEACH FL 33406 6749 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION - Rehabilitation

Project No. 18-9760P.09 January 28, 2019 Page 2 Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. For additional information regarding this canal rehabilitation project, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.

Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 79: DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject ... … · WEST PALM BEACH FL 33406 6749 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION - Rehabilitation

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

January 28, 2019 ESTRELLA L. MEZQUITA 1615 ARLINGTON DR LAKE CLARKE SHORES FL 33406 8701 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY

Subject: INITIAL NOTIFICATION - Rehabilitation of the L-8 Canal from approximately 425 LF west of FL Mango Road to Lake Clarke Project No. 18-9760P.09; Job No. 036B Site Address: 1615 ARLINGTON DR WEST PALM BEACH FL 33406

Dear ESTRELLA L. MEZQUITA :

The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-8 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.

The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of February 4, 2019 to identify the boundaries of the District’s L-8 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed.

Page 80: DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject ... … · WEST PALM BEACH FL 33406 6749 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION - Rehabilitation

Project No. 18-9760P.09 January 28, 2019 Page 2 Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. For additional information regarding this canal rehabilitation project, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.

Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 81: DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject ... … · WEST PALM BEACH FL 33406 6749 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION - Rehabilitation

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

January 28, 2019 WAYNE & NICOLE BLACK 1601 ARLINGTON DR WEST PALM BEACH FL 33406 8701 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY

Subject: INITIAL NOTIFICATION - Rehabilitation of the L-8 Canal from approximately 425 LF west of FL Mango Road to Lake Clarke Project No. 18-9760P.09; Job No. 036B Site Address: 1601 ARLINGTON DR WEST PALM BEACH FL 33406

Dear WAYNE & NICOLE BLACK:

The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-8 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.

The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of February 4, 2019 to identify the boundaries of the District’s L-8 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed.

Page 82: DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject ... … · WEST PALM BEACH FL 33406 6749 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION - Rehabilitation

Project No. 18-9760P.09 January 28, 2019 Page 2 Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. For additional information regarding this canal rehabilitation project, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.

Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 83: DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject ... … · WEST PALM BEACH FL 33406 6749 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION - Rehabilitation

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

January 28, 2019 ENCARNACION LOPEZ 7500 W LAKE DR LAKE CLARKE SHORES FL 33406 8700 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY

Subject: INITIAL NOTIFICATION - Rehabilitation of the L-8 Canal from approximately 425 LF west of FL Mango Road to Lake Clarke Project No. 18-9760P.09; Job No. 036B Site Address: 7500 W LAKE DR WEST PALM BEACH FL 33406

Dear ENCARNACION LOPEZ :

The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-8 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.

The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of February 4, 2019 to identify the boundaries of the District’s L-8 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed.

Page 84: DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject ... … · WEST PALM BEACH FL 33406 6749 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION - Rehabilitation

Project No. 18-9760P.09 January 28, 2019 Page 2 Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. For additional information regarding this canal rehabilitation project, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.

Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District

Page 85: DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject ... … · WEST PALM BEACH FL 33406 6749 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION - Rehabilitation

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

January 28, 2019 TIMOTHY R. & LESLIE K. PEARCE 7506 EDGEWATER CIR WEST PALM BEACH FL 33406 8716 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY

Subject: INITIAL NOTIFICATION - Rehabilitation of the L-8 Canal from approximately 425 LF west of FL Mango Road to Lake Clarke Project No. 18-9760P.09; Job No. 036B Site Address: 7506 EDGEWATER CIR WEST PALM BEACH FL 33406

Dear TIMOTHY R. & LESLIE K. PEARCE:

The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the L-8 Canal adjacent to your property. This work is necessary to facilitate effective flood control for public safety and provide unobstructed access for emergency flood control response and routine canal maintenance. Rehabilitation efforts may include removal of vegetative encroachments, removal of structural and non-structural encroachments, dredging of the canal channel, and reshaping or reconstruction of the canal bank(s). Encroachments located on the District’s canal rights-of-way can create obstructions to water flow during a heavy rainfall event or hinder the District’s ability to properly maintain the canal, both of which can cause serious flooding issues for surrounding neighborhoods.

The limits of the project are scheduled to be field-staked by the District’s Florida Licensed Surveyors beginning the week of February 4, 2019 to identify the boundaries of the District’s L-8 Canal rights-of-way. Any plantings or vegetation, structures, fences or personal property located and identified within this right-of-way are encroachments and should be removed by the property owner prior to the commencement of this project. Please be advised that any encroachments remaining in the right-of-way at the commencement of the project may be removed and disposed of by the District. If you have any prior written approvals, agreements, permits, or any other written authorization from the District for any existing encroachments, or any other information relative to any existing encroachment within the canal right-of-way please contact the District as soon as you can so that this information can be reviewed.

Page 86: DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject ... … · WEST PALM BEACH FL 33406 6749 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: INITIAL NOTIFICATION - Rehabilitation

Project No. 18-9760P.09 January 28, 2019 Page 2 Also, if you have constructed or installed any fencing, plantings or vegetation, or any other items within the canal right-of-way of which you are relying on for security purposes, please be advised these are considered encroachments and they will be removed with this rehabilitation project. If any of these existing encroachments have previously been permitted by the District, you may apply for a permit to replace them; however, all current and applicable permit criteria must be met. If you wish to secure your private property, you must do so outside the limits of the canal right-of-way. Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, labor or equipment allocations, project site conditions, etc. For additional information regarding this canal rehabilitation project, please visit our website at www.lwdd.net and click on ‘In Your Neighborhood’ or email us at [email protected]. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-819-5580.

Sincerely,

Brian Tilles, P.E. Right-of-Way Compliance Manager c: Robert Brown, Executive Director, Lake Worth Drainage District