Rondout-West Branch Bypass Tunnel Construction &
Wawarsing Repairs - Contract BT-2
Tunnel Contractor Request for Qualifications
May 30, 2014
-
7/26/2019 Delaware-Rondout Bypass tunnel
2/36
2
Agenda
DEP Agency Chief Contracting Officer (ACCO)
Procurement Schedule
Organization of Bidders
Vendex
Financial and Contract Capability
QA/QC
References
Question procedures
Environmental Health and Safety (EHS)
Qualifications
-
7/26/2019 Delaware-Rondout Bypass tunnel
3/36
3
Agenda
Bureau of Design and Construction (BEDC)
Overview of the BT-2 Contract - Rondout-West Branch Tunnel and
Wawarsing Repair
-
7/26/2019 Delaware-Rondout Bypass tunnel
4/36
4
Delaware water is conveyed 45
miles via the RondoutWestBranch Tunnel (RWBT), 13.5 in
diameter, 3002300 in depth.
RWBT in service since 1944 with
a capacity of 900 mgd and an
average annual conveyance of
600 mgd.
RWBT supplies two upstatemunicipalitiesNewburgh and
Marlborough
Tunnel Location
4
-
7/26/2019 Delaware-Rondout Bypass tunnel
5/36
5
Leaks
Areas of Leakage
RWBT currently
leaking between
15 and 35 mgd
-
7/26/2019 Delaware-Rondout Bypass tunnel
6/36
6
Wawarsing
Roseton
EL
840
RondoutReservoir
RondoutCreek
ShawangunkMoun
tains
WalkillRiver
HudsonRiver
Shaft 6 TunnelUnwatering Shaft
Shaft
8
West BranchReservoir
El 503
El -600.0
6
6
Repair of the Leaks
Shaft1
Shaft2
Shaft3
Shaft4
Shaft2A
Shaft5
Shaft5A
Shaft7 S
haft9
Wawarsing Repairs:
Possible from within tunnel
Access via Shaft 2A
Traditional repair works
Roseton Repairs
No guarantee of repair from within
tunnel, low point in tunnel
Access shafts too distant
Best Solution is Bypass
-
7/26/2019 Delaware-Rondout Bypass tunnel
7/367
BT-1 Scope
BT-1 Scope
Two shafts:
5B and 6B
Lining only
-
7/26/2019 Delaware-Rondout Bypass tunnel
8/368
BT-1 Shafts
-
7/26/2019 Delaware-Rondout Bypass tunnel
9/369
BT-2 Scope
BT-2 Scope
Bypass tunnel from 5B
site to the Shaft 6B site
including the connection
to the RWBT
Completion of shafts
and construction of the
access chambers
Wawarsing Repairs
Tunnel Inspection
Valve replacements
-
7/26/2019 Delaware-Rondout Bypass tunnel
10/3610
Roseton Bypass
-
7/26/2019 Delaware-Rondout Bypass tunnel
11/3611
Roseton Bypass
-
7/26/2019 Delaware-Rondout Bypass tunnel
12/361212
Roseton Bypass
-
7/26/2019 Delaware-Rondout Bypass tunnel
13/3613
Roseton Bypass
-
7/26/2019 Delaware-Rondout Bypass tunnel
14/3614
Roseton Bypass
-
7/26/2019 Delaware-Rondout Bypass tunnel
15/3615
BT-2 Scope
Bypass Tunnel
Final internal tunnel diameter
= 14 feet
9,200 feet of interliner
Length 13,500 feet total
12,800 feet between shafts
Tunnel excavation may be
drill and blast or tunnelboring machine
Numerous Environmental
Impact Statement (EIS)
commitments
-
7/26/2019 Delaware-Rondout Bypass tunnel
16/3616
BT-2 Scope
Tunnel excavation may be drill and blast or tunnel
boring machine Bidders must be qualified for the tunneling
technique on the bid
Only one technique can be bid
Each excavation technique has risks, amongst them
are:
TBM: high groundwater flows and pressures, voids, high
strength rock
Drill and Blast: Initial ground support, water control, final
liner installation, must mine from west to east only
-
7/26/2019 Delaware-Rondout Bypass tunnel
17/3617
BT-2 Scope Main Tunnel Lining
-
7/26/2019 Delaware-Rondout Bypass tunnel
18/3618
BT-2 Scope Main Tunnel Lining
B W C i
-
7/26/2019 Delaware-Rondout Bypass tunnel
19/36
19
Final West Intersection and Shaft 5B
Bypass West Connection
BT 2 S C ti T l
-
7/26/2019 Delaware-Rondout Bypass tunnel
20/36
20
BT-2 Scope Connection Tunnel
BT 2 S C ti T l
-
7/26/2019 Delaware-Rondout Bypass tunnel
21/36
21
BT-2 Scope Connection Tunnel
BT 2 S C ti T l
-
7/26/2019 Delaware-Rondout Bypass tunnel
22/36
22
BT-2 Scope Connection Tunnel
BT 2 S C ti T l
-
7/26/2019 Delaware-Rondout Bypass tunnel
23/36
23
BT-2 Scope Connection Tunnel
B D i T l
-
7/26/2019 Delaware-Rondout Bypass tunnel
24/36
24
Bypass Drainage Tunnel
Shaft 6B
-
7/26/2019 Delaware-Rondout Bypass tunnel
25/36
25
Shaft 6B
Th D i T l S h ti
-
7/26/2019 Delaware-Rondout Bypass tunnel
26/36
26
The Drainage Tunnel Schematic
BT 2 Scope
-
7/26/2019 Delaware-Rondout Bypass tunnel
27/36
27
BT-2 Scope
5B Shaft
BT 2 Scope: 5B Access Chamber
-
7/26/2019 Delaware-Rondout Bypass tunnel
28/36
28
BT-2 Scope: 5B Access Chamber
BT 2 Scope
-
7/26/2019 Delaware-Rondout Bypass tunnel
29/36
29
BT-2 Scope
5B Shaftconstruction piping
BT 2 Scope
-
7/26/2019 Delaware-Rondout Bypass tunnel
30/36
30
BT-2 Scope
6B Shaft
BT 2 Scope: 6B Access Chamber
-
7/26/2019 Delaware-Rondout Bypass tunnel
31/36
31
BT-2 Scope: 6B Access Chamber
BT 2 Scope
-
7/26/2019 Delaware-Rondout Bypass tunnel
32/36
32
BT-2 Scope
Construction Sequence
Pre-connection: Complete Bypass
Tunnel/Shafts/Access Chambers
Connection:
Connect Bypass tunnel
Wawarsing Repairs
Tunnel Inspection
Operate Siphons
Valve Replacements
BT 2 Scope
-
7/26/2019 Delaware-Rondout Bypass tunnel
33/36
33
BT-2 Scope
Wawarsing Repair
Grout program
Ventilation and access
Contact grouting
Consolidation grouting
BT-2 will have a tool box of repairs
BT 2 Schedule
-
7/26/2019 Delaware-Rondout Bypass tunnel
34/36
34
BT-2 Schedule
BT-2 Schedule
Bid period: Sept 2014 to Nov 2014
NTPApril 2015
Start tunnel construction at 5BApril 2016 Tunnel and Shafts CompletionSept 2021
Connection period startOct 2021
BT 2 Construction Schedule
-
7/26/2019 Delaware-Rondout Bypass tunnel
35/36
3535
BT-2 Construction Schedule
2013 2014 2015 2016 2017 2018 2019 2020 2021
Q1
Q2
Q3
Q4
Q1
Q2
Q3
Q4
Q1
Q2
Q3
Q4
Q1
Q2
Q3
Q4
Q1
Q2
Q3
Q4
Q1
Q2
Q3
Q4
Q1
Q2
Q3
Q4
Q1
Q2
Q3
Q4
Q1
Q2
Q3
Q4
Shaft 5B
Shaft 6B
BT-1
TBM
Procure
ment
Construct Tunnel from 5B
Shaft 5B
Start Connection
BT-2
BT-2 Construction Schedule
-
7/26/2019 Delaware-Rondout Bypass tunnel
36/36
BT-2 Construction Schedule
THE END