DEEPAK-02

download DEEPAK-02

of 3

Transcript of DEEPAK-02

  • 8/11/2019 DEEPAK-02

    1/3

    PROJECT

    LANCO ANPARA C 2X 600 MW THERMAL POWER PROJECTANPARASONEBHDRA DISTRICTUTTAR PRADESHINDIA

    OWNER

    LANCO ANPARA POWER PRIVATE LIMITEDHARYNANA--INDIA

    Owner Consultant

    L&T S&LFARIDABAD, HARYANA, INDIA

    EPC Contractor

    LANCO INFRATECH LTD, EPC DIVISIONGURGAON--INDIA

    BTG SUPPLIER

    DONGFANG ELECTRIC CORPORATIONCHENGDU CHINA

    ORIGINATOR

    DONGFANG BOILER Group Co., Ltd

    ZIGONG CHINA

    Document No.: Rev.:

    Document Title :

    LIST OF WELDING JOINTS AT SITE

    Date Revision Prepared by Reviewed by Released by

  • 8/11/2019 DEEPAK-02

    2/3

    DONGFANG ELECTRIC CORPORATION Lanco Anpara C 2 x600 MW Thermal Power Project, Anpara, Sonebhdr a Distr ict .

    Uttar Pradesh - IndiaDocument No.: Document Title:List of welding joints at site Rev.: A

    System/Equipment Name Originator: Manufacturer Sheet No.

    LIST OF WELDING JOINTS AT SITE

    SL.NO DESCRIPTIONSIZE (ODxT)

    mmMATERIAL

    SPECIFICATION

    NUMBER OFJOINTS/BOILER

    1 Water wall66.78

    66.77SA-210C

    5684368

    2 Water Wall Suspension 82.511 15CrMoG 88

    3Connection pipe from Down comer tolow header of W.W

    14116 SA-106C 124

    4 Rising pipe 16818 SA-106C 298

    5 Economizer 516 SA-210C 2136

    6 Economizer Suspension5110

    5711.5SA-210C

    534534

    7Connection pipes from Economizer to

    drum

    12715 SA-106C 44

    8Economizer Internal Connectionpipes

    323.932

    406.440SA-106C

    208

    9 Down comer609.660

    609.665SA-106C

    348

    10 Front roof 516 15CrMoG 880

    11 secondary pass44.55.5

    44.56.5SA-210C

    1262181

    12 convection pass 63.58SA-210C

    SA-210C+15CrMoG

    1210179

    13 Headers of SH Rearwall 406.460 SA-106C 12

    14 SH internal pipes 16818 SA-106C 146

    15 LT SH 577

    15CrMoG+20G

    20G +SA-210CSA-210C +15CrMoG

    15CrMoG+12Cr1MoVG12Cr1MoVG

    356712712712712

    16 SH Vertical Panel 44.5712Cr1MoVG

    SA-213T23

    SA-213T91

    1024640384

    17 SH Vertical Platen NO

    18 SH finish 518

    12Cr1MoVG

    SA-213T91

    595

    595

    19 RH platen 63.55SA-210C

    SA-210C+15CrMoG15CrMoG+12Cr1MoVG

    890890890

    20 RH finish 574.512Cr1MoVG

    SA-213T911780890

    21 Main Steam Pipe

    45047

    77533

    76230

    SA-335P91

    12Cr1MoVG

    SA-106C

    81414

    22 Header of water wall27355

    27350SA-106C

    41

    23 Header of roof21935

    27350SA-106C

    11

    Boiler Dongfang Bolier Group Co., Ltd 2 of 3

  • 8/11/2019 DEEPAK-02

    3/3

    DONGFANG ELECTRIC CORPORATION Lanco Anpara C 2 x600 MW Thermal Power Project, Anpara, Sonebhdr a Distr ict .

    Uttar Pradesh - IndiaDocument No.: Document Title:List of welding joints at site Rev.: A

    System/Equipment Name Originator: Manufacturer Sheet No.

    24 Header of economizer

    406.460

    21930

    323.940

    SA-106C

    244

    25 Header of LT SH27345

    609.665

    12Cr1MoVG 1

    126 Header of SH finish

    609.675

    609.685

    12Cr1MoVG

    SA-335P91

    11

    27 Header of RH76245

    863.656

    SA-106C

    SA-335P91

    11

    28 SH internal pipes

    609.655

    323.930

    36835

    609.665

    12Cr1MoVG

    1481612

    Note: The number of weld joint is tentative. The final total number of weld joints shall be confirmed to the contractor after the completion ofthe detailed engineering. Apart from the above mentioned welding joints, there will be some more joints related to drain piping, vents,

    tapping etc. and interfacing piping.

    Boiler Dongfang Bolier Group Co., Ltd 3 of 3